Global Experience with CCS Pilot Projects

CCS developments in cement: ECRA, Norcem

Rob van der Meer

December 5th, 2013

Page 2: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Index

ECRA

– European Cement Research Academy

ECRA CCS Study

– Post combustion

– Oxyfuel

NORCEM CCS project

Slide 2 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 3: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

ECRA: The European Cement Research Academy

ECRA was founded in 2003:

as a platform to stimulate and undertake research activities in the context of

the production of cement and its application in concrete

to facilitate and accelerate innovation to guide the cement industry by creating

and disseminating knowledge from research.

– ECRA initiates and provides seminars and workshops teaching state-of-the-

art knowledge on cement and concrete technology and communicating the

latest research findings

– ECRA undertakes dedicated research projects

– ECRA focuses on issues which individual companies may not be able to

tackle

alone and are of major importance to the cement industry as a whole

ECRA is an internationally recognized European research body in the

field of cement and concrete technology.

Slide 3 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 4: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

ECRA: Successful seminars and workshops

Examples of seminar/workshop topics

– Alternative fuels and raw materials

– Grinding efficiency

– Clinker reactivity and cement performance

– CO2 monitoring & reporting

– Process technology

Seminars 2014

– Alternative Fuels: Quality and

environmental control

– Quality control of cement

– CO2 monitoring and reporting:

Methods, experiences and new

developments

– Refractory materials and high temperature

corrosion in the cement industry

– Hydration of blended cements

Training Course 2014

– Clinker and cement production

Slide 4 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 5: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

WBCSD/IEA cement technology roadmap 2009

4 Levers for CO2 emissions reductions

– Energy efficiency 27%

– Alternative fuels (biomass) 19%

– Clinker substitution 9%

– Carbon Capture and Storage 46%

Slide 5 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 6: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

ECRA CCS project: Objectives

• Technical and economical feasibility of CCS

technologies

• No focus on CO2 transport and storage

• Integration of cement organisations: CSI,

CEMBUREAU, PCA, etc.

• Joint research activities

• Cooperation with universities

Cooperation agreement between ECRA and Mons

University

ECRA visit to the CASTOR CCS pilot plant, 2009

Slide 6 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 7: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

ECRA CCS Project: Research Agenda

Study about technical and financial aspects of CCS projects,

concentrating on oxyfuel and post-combustion technology

(summer 2007 – summer 2009)

Phase I Literature study (January - June 2007)

Laboratory-scale / small-scale research

activities (autumn 2009 – autumn 2011)

Prepare pilot plant (time-frame: 2 - 3 years)

Build and operate pilot plant (time-frame: 3-5 years)

Phase II

Phase III

Phase IV

Phase V

Phase VI Demonstration plant (time-frame: 3-5 years)

Slide 7 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 8: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Oxy-fuel technology

Combustion with pure oxygen instead of ambient air

Flue gas recirculation to regulate temperature level

Integrated system

Doubling of the

electrical energy

demand per tonne

of produced cement

Thermal energy

demand constant

Slide 8 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 9: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Limiting factors by quality and durability requirements

• No serious influence on clinker

composition

• Slight differences in cement properties

(caused by Fe2+) are in range of assured

quality

• No negative influence on basic refractory

material detected

• Using non-basic materials an increasing

thermo-chemical reaction expected

• Adaption of refractory brickwork

necessary

• Long-term test for evaluation advisable

STOE Powder Diffraction System 02-Aug-11Verein Deutscher Zementwerke e. V. Düsseldorf

2Theta10.0 20.0 30.0 40.0 50.0 60.00

2000

4000

6000

8000

10000

12000

14000

Ab

so

lute

In

ten

sity

[49-442] Ca3SiO5

[33-302] Ca2SiO4 / Larnite

[30-226] Ca2(Al,Fe)2O5 / Brownmillerite

[38-1429] Ca3Al2O6 (cubic)

[32-150] Ca3Al2O6 (ortho)

[45-946] MgO / Periclase

[37-1497] CaO / Lime

[37-1496] CaSO4 / Anhydrite

[46-1045] SiO2 / Quartz, syn

[49-1807] Ca5(SiO4)2SO4 / Ternesite

P-2011/0372, A11/057 (Range 1)

von unten nach oben:V1K1, 2011-i_MVT-03280V6K1, 2011-i_MVT-03285V11K1, 2011-i_MVT-03290V16K1, 2011-i_MVT-03295V21K1, 2011-i_MVT-03305V26K1, 2011-i_MVT-03310

No barriers expected from

clinker quality and refractory

durability

Slide 9 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 10: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Flue gas conditioning decisive issues

Main influencing parameter: degree of false air intrusion

Cost of CO2 compression and purification ranges

– from about € 24 to about € 27/ton* depending on false air intrusion and CO2 purity

Capture rate of 90% possible.

At higher cost level capture rates of 99% are achievable.

Major intrusion from sealing locations like doors and poke holes

Improved maintenance of these locations

(gap reduction of 25%) would

reduce intrusion to 6%.

Singular sealing locations at kiln

can be equipped with seal gas technology

* at power costs of 0.071 €/kWh

False AIr Intrusion - Percentage of Sealing Locations - Conventional Design

2%11%

10%

7%

35%

9%

7%

19%

kiln outlet

kiln inlet

TA slide damper

inspection doors, -20 mbar

inspection doors, -40 mbar

poke holes

feed sluice

pendulum flap boxes

Slight cost increase of CPU by impurities.

Decrease of false air by improved

maintenance sufficient

Not only CO2 captured !

SO2, Nox, heavy metals, etc Slide 10 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 11: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Retrofitting boundaries

Important aspect for the application of oxy-fuel in

Europe

Retrofitting an existing burner for oxy-fuel

application is unlikely, but replacement by a

suitable design is possible

Designing a gas-tight two-stage cooler is feasible

False air intrusion could be reduced to the greatest

possible extent by overhauling/ replacing

inspection doors and similar devices (< 6%)

New safety and controlling devices necessary

Space requirements of ASU/CPU

Conventional behavior in trouble shooting

restricted (no opening of doors/flaps in the plant

etc.)

Less limiting factors for retrofitting

than expected

Slide 11 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 12: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Phase IV - Deliverables

Phase IV. A:

• Provide answers to the remaining challenges and further optimise the

findings for a hypothetical medium sized plant (Work package A)

• Prepare the next steps towards a pilot kiln: work out detailed

technical and economic concepts for a pilot-scale plant (Work

package B)

Phase IV. B:

• Work out detailed technical and economic concepts concerning the

retrofitting of a full-scale existing plant (Work package C)

Slide 12 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 13: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Phase IV.A - Work packages

No. Sub-package (short title) Who?

A 1 Simulation study Research Institute

A 3 Advanced cooler design IKN

A 4 Future oxygen supply Danish Technical University

A 5 Experimental verification of sealing potential Irish Cement + Research Institute

B Concept for a pilot plant:

B 1 Plant capacity Aixergee

B 2 Design principle Aixergee

B 3 Dimensioning CINAR + Fives FCB (supported by

Research Institute)

B 4 Control and safety devices n.n. (retendering)

B 5 Cost estimation n.n. (retendering)

B 6 Concept for reuse Subgroup

D1 CO2 overall balance Student work

E Coordination Research Institute

Slide 13 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 14: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Work package A1

Simulation study:

Task assigned to: Research Institute

Objectives:

Integration of all findings from phase III

Simulation of different capacities and plant layouts,

process fluctuation and application of alternative fuels/

bypass

Concept for switching mode

Progress:

Evaluation of impact of plant capacity/ alt. fuels, false

air ingress, ASU and condenser performance and

recirculation rate on energy demand

Concept for bypass system and switching mode

Status: Programming work and further

simulations progressing

Kiln

Cooler

Calciner

Preheater

oxidizer (O2)

recirculation

separated flue gas to

CPU

recycled flue gas

cooler exhaust air

dust

tertiary gas

cooled O2 enriched

bypass gas

gas bypass

Condenserflue gas

Oxidizer (O2)

0

5

10

15

20

25

0 20 40 60 80 100Diffe

rence o

f energ

y d

em

and in %

Variation of reference in %

False air ingress

Humidity

Oxygen purity

Recirculation rate

Slide 14 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 15: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Work package A3

Advanced cooler design:

Task assigned to: IKN

Objectives:

Further development of advanced cooler concepts

Minimizing the risks of the concepts of phase III

Evaluation of acceptable gas-tightness

Progress:

Two potential concepts developed and balanced

(Intermediate Chute, Gas Recirculating Cooler)

Evaluation of pro/cons, recommendations

Status: Final report in progress

Slide 15 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 16: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Work package A5

Experimental verification of sealing

potential:

Task assigned to: Irish Cement, Research Institute

Objectives:

Experimental evaluation of best practice

maintenance for false air reduction

Measurements (2 trials), long term inspection

Progress:

Trials conducted and evaluated

Identification of reference (15 %) and improved

maintenance (8 %) false air intrusion level

Status: Student’s report available,

long term inspection on-going

Slide 16 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 17: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Work package B: Concept of a pilot plant

B1: Suitable plant size B2: Design B3:Dimension

B4: Control of and B5: Costs B6: Concept for reuse

safety concept estimation of the plant

500 t/d

Input

Output

Concept

Slide 17 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 18: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

CCR: Utilization of captured CO2 for MeOH or CH4

CO2 sources like

power plants,

cement plants, etc.

CO2 capture

technologies

Methanol or

methane

production

H2 production

with regenerative

energies

H2

CO2

Slide 18 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 19: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Carbon capture project in Brevik

The first capture project in the

cement sector

We are in need of more accurate

knowledge

Cement plants suitable for CO2

capture

– High concentration of CO2

– The flue gas is more “polluted”

– Available heat energy from kilns

Energy efficiency

Costs (CAPEX and OPEX)

Slide 19 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 20: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Project information

International project on behalf of the cement sector in Europe

Partners:

Norcem, HeidelbergCement og ECRA (European Cement Research Academy)

Funding: • State funding through Gassnova (Climit program): 75 %

• Total budged: 93 MNOK (11,7 M€)

Project period:

3, 5 years from May 2013

Slide 20 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 21: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Four capture technologies for testing

Technology Supplier

Amine technology Aker Clean Carbon

Membrane technology DNV KEMA, NTNU &

Yodfat Engineers

Solid sorbent technology RTI

Calcium Cycle

(Carbonate Looping, RCC) Alstom Power

Slide 21 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013

Page 22: Global Experience with CCS Pilot Projects · PDF filecorrosion in the cement industry ... Slide 10 Global experience with CCS Pilot Projects SO2, Nox, heavy metals, ... Preheater oxidizer

Cooperation with technology providers: ACC

• Amine scrubbing technology

• Mobil Test Unit (MTU)

- 40 foot container

- Absorption tower: 25 m

- Stripper: 13.4 m

• Capacity: 2,000 t CO2/ year

Slide 22 Global experience with CCS Pilot Projects

Rob van der Meer – 27/11/2013