GOLDEN RULE 9:
EXCAVATION WORK
GM-GR-HSE-457 - V0 - JANUARY 2020 / EN
![Page 2: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/2.jpg)
This guide contains practical information for Group employees to raise their awareness to the risks
related to excavation work and help them to organize these operations in compliance with the musts and mustn’ts
of Golden rule no.9 and the Group HSE requirements stipulated in the Group HSE rule CR-GR-HSE-419
“HSE requirements for Excavation Works”.
It does not reiterate all the requirements of the rule CR-GR-HSE-419 in detail which,
combined with Golden Rule no.9, are the reference documents specifying the Group HSE requirements
concerning excavation work.
The best practices in this guide can be applied in all Group entities and affiliates, in compliance with their respective decision-making rules and without superseding applicable local legal and regulatory provisions.
![Page 3: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/3.jpg)
3
Golden Rule no.9
Accidentology related to excavation work
Excavation work and related risks
PREPARATION
� Identification of underground structures and networks
� Risk analysis
EXCAVATION WORKS
� Protect the excavation area and underground networks
� Clearly mark the excavation area and the work site
� Safety distance
WORKS INSIDE THE EXCAVATION
ON COMPLETION OF WORK
CO
NTE
NTS
TIP SHEETS
29
0607
11
21
33
05
1217
222527
![Page 4: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/4.jpg)
4
![Page 5: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/5.jpg)
5
Perform excavation work with a permit comprising a map of all buried hazards.
Apply precautions for work in confined spaces, as necessary.
Clearly mark all excavation areas and identify underground structures.
GOLDEN RULE No.9
EXCAVATIONWORK
Place machinery or spoil piles within one meter of a trench being excavated.
YOU MUST:
YOU MUST NOT:
![Page 6: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/6.jpg)
6
ACCIDENTOLOGY RELATED TO EXCAVATION WORK
35 fatalities per year
during excavation works in the USA (source National Institute for Occupational Safety and Health– NIOSH, USA).
Worldwide, all sectors
In 14 years
in France,
117occupational accidents as a result of cave-in (source EPICEA database - France).
occur in excavations less than 3 m deep (source OPPBTP December 2013 - France).
2/3 of cave-ins
In the Group, over the period 2008-2018
Over 40 potentially serious events related to excavation works (incidents at the work station).
fatalaccident
Main causes of accidents during excavation works:ripping out or hitting underground networks.
1
![Page 7: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/7.jpg)
7
EXCAVATION WORKS AND ASSOCIATED RISKS
Excavation and trench
ExcavationA trench, cavity, cut or hole in the ground and involving the extraction of earth or rock, including geotechnical drilling and piling activities.
Trench
Long and narrow excavation made in the ground, the depth of which is equal to or greater than its width measured at the bottom of the excavation.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Excavation work is sometimes also referred to as digging work. The term ‘excavation work’ will be used in this document.
Golden rule no.9 and the group HSE rule CR-GR-HSE-419 cover the excavation execution as well as the activities carried out in the excavated area.
![Page 8: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/8.jpg)
8
Cave-in / wall collapse on personnel in the trench
Objects falling into the excavation
Personnel falling
Risk of dangerous atmosphere
Burns or electrocution owing to contact or an electric arc
with overhead electrical lines
Risks related to hitting an active underground network
or a dangerous object (e.g. shell)
Machinery/equipment falling or toppling over (risks related to driving
near the excavation area)
Risks related to the movement of excavating machines.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
MAIN RISKS
People moving around or working near an excavation or people working at the bottom of an excavation are potentially exposed to the risks related to excavation work.
![Page 9: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/9.jpg)
9
EXCAVATION EQUIPMENT OR MACHINERY/VEHICLES
Soft or “non-aggressive” excavation techniques
Excavation methods using soft techniques such as those described below:
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Hand shovel Air pick
“Aggressive” excavation techniques
Excavation method using mechanical machinery or pickaxe, e.g.
Pickaxe Jackhammer Mechanical excavator digger, mini digger, etc.)
Vacuum excavator with rigid tip
Trencher
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Vacuum excavation with a soft tip
Truck-mounted drilling rigs
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
![Page 10: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/10.jpg)
10
TIP SHEETS
![Page 11: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/11.jpg)
11
PREPARATION
![Page 12: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/12.jpg)
12
PR
EPA
RA
TIO
N
IDENTIFICATION OF UNDERGROUND STRUCTURES AND NETWORKS In the Group, the most serious accidents related to excavation work are caused by ripping out or hitting pipelines carrying flammable substances (gas or liquid) or live power lines that were not detected or were not expected to be found at a given location or a given depth.
It is therefore crucial to identify underground structures and networks in the work preparation phase. This implies having accurate information about the underground and up-to-date plans. It is formalized by an excavation certificate. If an underground network is identified, another step, called spot on site is performed on site (see page 14).
Perform excavation work with a permit prepared based on subsurface maps
Clearly mark the excavation area and identify underground networks
YOU MUST:
REQUIREMENTS OF CR-GR-HSE-419
Prior identification
Any underground structures or networks in or near the excavation footprint (area that may be affected by the work) need to be identified:
� Using existing plans.
� By consulting operators of third-party structures or networks if necessary.
� By possible additional investigations. N.B. If “aggressive” excavation methods are used, additional investigations will be systematically performed.
![Page 13: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/13.jpg)
13
PR
EPA
RA
TIO
N
The excavation certificate is not an authorization to start work.A work permit is needed.
≠
Excavation certificate
The identification of underground structures or networks is formalized by an excavation certificate (apart from exceptions, cf. CR-GR-HSE-419).
It is accompanied by a plan giving details of any underground installations.
The excavation certificate, sometimes referred to as the “supplementary excavation permit” or “excavation notice” is an independent document established before the work permit.
Its aim is to:� Formally define the consultation of pertinent
in-house services.
� Inform the company performing the work of the location and type of underground structures present in the excavation area.
� Specify general safety instructions.
THE EXCAVATION CERTIFICATE
24, rue Salomon de Rothschild - 92288 Suresnes - FRANCETél. : +33 (0)1 57 32 87 00 / Fax : +33 (0)1 57 32 87 87Web : www.carrenoir.com
TOTALTOTAL_Logo2017_CMYK29/12/2016
RÉFÉRENCES COULEUR
M100% Y80%
M48% Y100%
C100% M80%
C70% M30%M100% Y80%
EXCAVATION CERTIFICATE
In-house consultations
External agencies to be consulted
General safety instructions
NO. ...
Page 9
+For more information
on aggressive excavation methods
Page 34
+For more information
on updating plans
![Page 14: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/14.jpg)
14
PR
EPA
RA
TIO
N
Spotting on site: marking on the ground and picketing
Any identified underground installations or networks identified are localized on site.The spotting on site is done using the color code corresponding to the network(s) in question.
Example of methods used for spotting on site:
Spotting on site by picketing Spotting on site by painting on the ground
TO TAKE THINGS A STEP FURTHER
Complementary investigations: detection with or without surveys
This involves searching for underground networks so that their location can be accurately pinpointed with a maximum uncertainty of +/- 50 cm.
Detection techniques No one method is suitable for all conditions and situations. Electromagnetic detectors and ground penetrating radars are the basic tools used in complementary investigations without excavation. It is advisable to use them both.
The effectiveness of the search for underground networks depends first on the pertinence of the information collected upstream (plans, preliminary studies, visits on site) and on operators’ competencies when it comes to using and interpreting the results from the different systems and tools used to detect and locate underground networks.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
![Page 15: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/15.jpg)
15
PR
EPA
RA
TIO
N
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Electromagnetic localization sensorsare used to locate electrical conductors (copper, steel, cast iron, etc.).
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Ground oriented radars are used to detect insulator networks (PVC, PE) or networks for which the type and location are not known.
Acoustic detectors are used to locate certain types of pipelines transporting water or gas.
Metal detectors are not suitable for locating underground networks. They are used for other tasks such as locating plugs, manhole covers, or metal inspection holes.
In certain countries, there are qualifications or certification for companies specialized in detection.
E.g. In France, it is mandatory to have certification in the localization of underground networks in the cases required by regulations. In other cases, the QUALIFNEDRE professional qualification is required.
Non-intrusive detection techniques are used in priority, for example: acoustic, radar, electromagnetic and seismic techniques.
In general:
![Page 16: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/16.jpg)
16
PR
EPA
RA
TIO
N
1 to 2 potential fatalities
During ground-leveling work, the bucket of the mini-digger hit and cut through a 20,000 V high-voltage line. According to the plan - that had a high level of accuracy - the line should have been 1.5 m away from the excavation area. The driver of the mini-digger was shocked by the incident, which could have had drastic consequences for his colleague who was in the work area.
The risks had not been correctly assessed. The plan was not accurate and the results of further investigations were not taken into account.
SERIOUS INCIDENT
THAT OCCURRED IN THE GROUP
For further information on detection methods:
Guide ED 6164 “Work near underground networks and complementary investigations without excavation” (INRS - France).
Guide to applying the regulations concerning work near networks - part 2 (MTES and Observatoire national DT DICT-France).
Guide HSG47 - Avoiding danger from underground services (United Kingdom).
When surveys are carried out, the number and position of survey points are chosen to accurately identify the position of the underground networks and to factor in any possible changes in direction.
Surveys When detection techniques are not sufficient or unsuitable for the accurate location of underground networks, they are combined with surveys performed with non-aggressive techniques to expose the structures concerned.
![Page 17: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/17.jpg)
17
PR
EPA
RA
TIO
N
RISK ANALYSIS
REQUIREMENTS OF CR-GR-HSE-419
Elements in the risk analysis
Among other information, the risk analysis includes the following among other information:
� Potential pre-existing site pollution.
� Traffic and other activities taking place on the site.
� Presence of underground structures throughout the excavation area.
Reminder of the main risks of excavation work
Page 8
Based on the information given in the excavation certificate and the operating procedure initially proposed, the contractor company develops the risk analysis and suitable operating procedure. A work permit is prepared, indicating the measures to be taken.
TO TAKE THINGS A STEP FURTHER
A risk analysis must be performed. It gives rise to the definition of a suitable operating procedure including the risk management measures identified.
Apply precautions for work in confined spaces, as necessary.
YOU MUST:
![Page 18: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/18.jpg)
18
PR
EPA
RA
TIO
N
What is considered as a confined space?
When the depth of the excavation is greater than 1.3 m AND that at least one of the following conditions is present:
� Trench excavation (see page 7).� Intervention on or near equipment containing
toxic or flammable substances (hydrocarbons, mercury, etc.).� Interventions on gas or hydrocarbon pipelines
where a leak is suspected.� Potential emanations of toxic or inflammable gases (H2S, CO,
CO2, CH4, etc.) from decomposing organic matter, contaminated soil or by thermic motors from nearby engines.
It often happens that on industrial oil and gas sites (refineries, petrochemical or chemical sites, etc.) excavations deeper than 1.3 m deep are systematically considered as confined spaces, owing to the possibility of a dangerous atmosphere.
If the excavation is considered as a confined space, apply and respect the applicable rules and refer to Golden rule no.8.
GOLDEN RULE No. 8
CONFINED SPACES
Irrespective of the depth of the excavation, an atmospheric test is performed before any access or work, when the presence of a dangerous atmosphere is suspected.
� Type and quality of soil, wall arrangements.
� Presence of water.
� Presence of a dangerous atmosphere.
� Presence of nearby structures or buildings.
� The time the excavation remains open (to be reduced to a minimum in the planning phase).
� Depth (height) and risk of people or objects falling into the excavation (See CR-GR-HSE-425: HSE Requirements for Excavation Works).
The risk analysis takes into account all phases of the work.
![Page 19: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/19.jpg)
19
PR
EPA
RA
TIO
N
Danger zone around the excavation vehicle
This area corresponds to: the maneuver area of the excavation vehicle + the movement area of the mobile part (swivel range of the excavation equipment).
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Multiple potential injuries
During excavation works by a site vehicle, a gas pocket caught light at the bottom of the trench. The soil was contaminated by hydrocarbons that were releasing vapors. The vapors caught fire when the digger bucket struck stones, causing sparks.SERIOUS
INCIDENTS THAT OCCURRED
IN THE GROUP
The corresponding safety distance is defined in the risk analysis depending on the work environment and the equipment used, and considering the information given on the user instructions of the excavation vehicle/equipment.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
DANGER
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
2 m
1 injury: fractures
Person fell into an excavation 3.5 meters deep during work to build foundations. When the accident occurred, the victim was at the edge of the pit that had not been fenced off in the digger rotation zone. When the digger rotated, it pushed the victim into the excavation.
Movement area of the mobile part
Maneuver area
![Page 20: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/20.jpg)
20
PR
EPA
RA
TIO
N
TIP SHEETS
![Page 21: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/21.jpg)
21
PR
EPA
RA
TIO
N
EXCAVATION WORK
21
![Page 22: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/22.jpg)
22
EX
CA
VAT
ION
WO
RK
PROTECT THE EXCAVATION AREA AND UNDERGROUND NETWORKS
The excavation works covered in this sheet are the works done to dig an excavation, and not the works carried out in the excavations.
VIGILANCE during excavation work:There are no warning devices on certain old networks.The conventional color codes are not always respected.
REQUIREMENTS OF CR-GR-HSE-419
Restrictions related to aggressive excavation methods
Excavation work using aggressive methods is prohibited: � At a distance of < 1 m from networks presenting a high level of risk
for safety (gas, hydrocarbon, water vapor pipelines or electrical wires, etc.).� If a warning device is discovered.
If this distance cannot be respected, the networks are fully de-energized.
Page 9
+For further information
on “aggressive” excavation techniques
![Page 23: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/23.jpg)
23
EX
CA
VAT
ION
WO
RK
BEST PRACTICES
Systematically isolate all underground networks identified on the work site before work starts.
The walls of the excavation must be reinforced to prevent cave-in, in the following cases AND if personnel are expected to access the excavation:
� Trench excavation (see page 7) more than 1.3 m deep.
� Or an excavation where a cave-in risk was identified in the risk analysis.
Arrangement of the walls
TO TAKE THINGS A STEP FURTHER
The warning devices indicate the presence of an underground network, to identify the type of network and indicate the routing.
A minimum distance is maintained between the warning device and the network. This distance is defined in compliance with regulations / local standards.
If slabs are laid, then the warning mesh is laid directly on top of the slabs.
Identification of underground networks using a warning device
Isolate networks Adapt the type of shovel when using a mechanical digger
When a mechanical digger is being used close to underground networks, a bucket without teeth should be used in priority whenever possible.
![Page 24: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/24.jpg)
24
EX
CA
VAT
ION
WO
RK
Types of arrangements for excavation walls
Shoring Sloping
Benched slope
Multiple potential injuries
During excavation work at a depth of 4-5 m in an excavation that was protected up to 3/4 of the height, the upper edges caved in, moving the supporting walls and struts.
As solid protection barriers were installed and respected, no personnel were present in the zone during this phase when the shoring of the walls had not been completed. Nobody was injured.
SERIOUS INCIDENT
THAT OCCURRED IN THE GROUP
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Wall arrangements are designed to avoid the risk of cave-in and protect people working in the excavation.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Net or plastic strip
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Location of warning device
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
A minimum distance is maintained between the warning device and the network.
![Page 25: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/25.jpg)
25
EX
CA
VAT
ION
WO
RK
CLEARLY MARK THE EXCAVATION AREA AND THE WORK SITE
REQUIREMENTS OF CR-GR-HSE-419
The excavation footprint is marked out using appropriate signage/markings.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
If there is a risk of people or vehicles falling: adapted rigid and visible day and night barrier is put in place.
BEST PRACTICES
Signage and protective barriers must be installed: at least 1 meter from the edge of the excavation.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
> 1 m
The excavation footprint is the maximum area where the excavation is planned.
Clearly mark all excavation areas and identify underground structures.
YOU MUST:
![Page 26: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/26.jpg)
26
EX
CA
VAT
ION
WO
RK
High-visibility clothing: When moving around the excavation area, personnel must wear high-visibility clothing.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
TO TAKE THINGS A STEP FURTHER
Examples of protection against falls
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
Concrete Jersey barrier
Solid physical barrier
Physical protections for vehicles: concrete safety barriers, systems to block wheels, etc.
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
1 potential injury
A Mobile Elevating Work Platform (MEWP) got stuck in the ground near an excavation. A forklift truck was positioned to pull the MEWP out using a sling. The basket operator was in the MEWP and attempted to maneuver the wheels during the operation.
When the truck began to pull, the MEWP gradually slid into the excavation, which was not protected by solid physical barriers.
SERIOUS INCIDENT
THAT OCCURRED IN THE GROUP
� For personnel � For vehicles/machinery
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
The type and position of barriers must be adapted according to the risks to be prevented, while ensuring that they remain compatible with the work phases to be performed (see page 17 - risk analysis).
Remember the risk of falling into the excavation when handling or removing the protective barriers.
![Page 27: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/27.jpg)
27
EX
CA
VAT
ION
WO
RK
SAFETY DISTANCEThe safety distance from the edge of the excavation helps limit the risks of objects falling into it, overloading the edges of the excavation, or rupture of the embankment.
Place machinery or spoil piles within one meter of an excavation.
YOU MUST NOT:
TO TAKE THINGS A STEP FURTHER
� For material extracted from the excavation (not applicable to vehicles), the minimum distance of 1 m can be reduced if:
� Access to the excavation by personnel is forbidden:� AND if necessary and sufficient measures are implemented to guarantee
that this instruction is respected for the entire period the excavation is open.
� A greater safety distance can be defined during the risk analysis depending on the nature of the soil, the dimensions of the excavation, the wall arrangements and the characteristics of vehicles or equipment. E.g. heavy vehicle such as a crane.
1 person injured.
Part of the trench that was shored by wooden boards, collapsed as an operator was installing extra struts to secure them.
The excavated material, stored too close to the trench, caused the walls to cave-in. The person could have been buried.
SERIOUS INCIDENT
THAT OCCURRED IN THE GROUP
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
> 1 m > 1 m
![Page 28: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/28.jpg)
28
EX
CA
VAT
ION
WO
RK
TIP SHEETS
![Page 29: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/29.jpg)
29
EX
CA
VAT
ION
WO
RK
WORKS INSIDE THE EXCAVATION
29
![Page 30: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/30.jpg)
30
WO
RK
S IN
TH
E E
XC
AVA
TIO
N
WORKS INSIDE THE EXCAVATION
Apply precautions for work in confined spaces, as necessary.
YOU MUST:
REQUIREMENTS OF CR-GR-HSE-419
Install safe means of access and egress in the excavation (depth > 1.3m) to make access and evacuation easier, including in an emergency (see best practices).
A monitoring assistant is required in the following cases:
� when the excavation machine operator does not have, from his driving position, adequate visibility of the excavation tool and its path in the area of intervention or the excavation is approaching an existing network.
� when personnel are present in an excavation at a depth of > 1.3 m
Page 18+ For further details on confined spaces
Access to the excavation
Inspecting the excavation before access
Monitoring assistant
Inspect the excavation on completion of the excavation operation and every day before personnel enter it.
Inspection points:
� general condition of the excavation: presence of water, gas or contamination.� the area around it: guardrails, etc. � access to it: ladders, steps, etc. � the condition of the protection systems (shoring, grading, etc.).
![Page 31: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/31.jpg)
31
WO
RK
S IN
TH
E E
XC
AVA
TIO
N
BEST PRACTICES
� Use of stairs, graded slopes or ladders.
Safe means of access
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 9-PRINCIPAUX RISQUES DES TRAVAUX DE FOUILLE :
p. 10-EQUIPEMENTS OU ENGINS D’EXCAVATION
p. 13-LES INVESTIGATIONS COMPLEMENTAIRES : DETECTION ET / OU SONDAGES
Non lisible
Non lisibleREPRÉSENTER PELLE
Non lisible
Non lisible
outil non lisible
p. 15-SIGNALISATION DES OUVRAGES : MARQUAGE AU SOL ET PIQUETAGE
-BALISAGE
p. 16-BALISAGE
p. 17-Implantation du balisage : à plus d’1 mètre du bord.
-Vêtements de signalisation :
-PROTECTION CONTRE LA CHUTE DES PERSONNES ? DES ENGINS ?
p. 21-QUAND EST-T-ON EN ESPACE CONFINE ?
p. 23-DETERMINATION DE LA DISTANCE DE SECURITE
p. 24-MOYENS D’ACCES SECURISES
1m 1m
1m
SCHEMA D’ORIGINE PEU CLAIR
Terrain instable : a = 2xh
Terrain compact : a = 2xh
NOTA : b doit être au minimum de 2m
Extrait Guide Technique
b
a
h
PIOCHE À AIR
PHOTOS + CLAIRES DANS NV DOC
� Manage water flow to keep the access points in good condition and enable personnel to climb down into the excavation in all weathers.
� Create a safe point of access on either side of the excavation and make sure that stairs or ramps have guardrails.
� In trenches, personnel must not have to cover a distance of more than 8 m to find a safe means of exiting the excavation.
� If ladders are used, they must be installed at an angle between 65° and 75°, stable (fixed at the top or bottom) and sticking out of the excavation by at least 1 m.
� To access a deep excavation using a long ladder, it is advisable to equip the operator with a fall arrest system attached to an anchor point on the shoring system.
![Page 32: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/32.jpg)
32
WO
RK
S IN
TH
E E
XC
AVA
TIO
N
TIP SHEETS
![Page 33: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/33.jpg)
33
WO
RK
S IN
TH
E E
XC
AVA
TIO
N
ON COMPLETION OF WORK
33
![Page 34: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/34.jpg)
34
ON
CO
MP
LET
ION
OF
WO
RK
BEST PRACTICE
ON COMPLETION OF WORK
REQUIREMENTS OF CR-GR-HSE-419
Before closing the excavation, a warning device is systematically installed just above the underground network (characteristics and installation in compliance with applicable / local regulations/standards).
Identification of installations
Page 23+ For further information on warning devices
Update the underground plan (or create them if there are none) when:
� a new underground structure has been laid;
� an unexpected underground structure is discovered;
� an incorrect location of an existing underground structure is identified.
Updating plans
The new structure or network is georeferenced.
![Page 35: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/35.jpg)
TOOLS THE GOLDEN RULESIn 11 languages
The Golden Rules app
Available from Apple Store and Google Play.
AVAILABLE TOOLS
Videos
E-learningOn Lizzy
Android Iphone
www.toolbox-hse.total.com
Posters
Awareness kits
Practical guides
Support material to accompany the Golden Rules.
The HSE Toolbox
TOTAL’SGOLDEN
RULES Have another look at the musts and mustn’ts for the Golden rules, quizzes to test your knowledge and much much more!
![Page 36: GOLDEN RULE 9: EXCAVATION WORKtoolbox-hse-ftp.total.com/RO/Travaux_fouille/R09...in compliance with their respective decision-making rules and without superseding applicable local](https://reader033.vdocuments.net/reader033/viewer/2022060904/60a0036535193b63873aa49c/html5/thumbnails/36.jpg)
total.com
HSE DivisionTOTAL S.A.2, place Jean Millier - La Défense 692078 Paris-La Défense Cedex - FranceTel. +33 (0)1 47 44 45 46Share capital: € 6,340,193,800Registered in Nanterre RVS 542 051 180
Total is a major energy player, which produces and markets fuels, natural gas and low-carbon electricity. Our 100,000 employees are committed to better energy that is safer, more affordable, cleaner and accessible to as many people as possible. Active in more than 130 countries, our ambition is to become the responsible energy major.
24, rue Salomon de Rothschild - 92288 Suresnes - FRANCETél. : +33 (0)1 57 32 87 00 / Fax : +33 (0)1 57 32 87 87Web : www.carrenoir.com
TOTALTOTAL_Logo2017_CMYK29/12/2016
RÉFÉRENCES COULEUR
M100% Y80%
M48% Y100%
C100% M80%
C70% M30%M100% Y80%