green and efficient energy supply solutions for ships at ports 06.10.2015 max kommorowski
TRANSCRIPT
Green and efficient energy supply solutions for ships at ports
06.10.2015
Max Kommorowski
Becker Marine Systems
• 220 Employees • 130 in Hamburg• 6 Locations worldwide• 20 Products
Innovative engineering for environmentally-friendly products!
Maneuvering Equipment Energy-Saving Devices
Reduction of CO2
1.770.500 t (619 Schiffe)
Becker Marine Systems - weltweit
Today´s Challenges
• Air and noise pollution in port from ships• Stronger public awareness• Cruise operators are in danger to loose image • SECA - Sulphur Emission Control Areas
Our IdeaSupply of emission neutral energy for the shipping industry in ports
LNG HYBRID Barge
Arrival/Departure Berthing /Unberthing
Hotel load
One average cruise ship (2.000 Pax) caused about 93 % of the emissions during a typical stay in the port while it´s lying at the berth.
LNG – a clean energy!
( 6MW average load; 10 hours /data based on the electrical power)
Ca. 22%
100%
100%Ca. 88%
MGO 0.1% S
LNG Kraftwerk*
0
200
400
600
800
NOx Emissions
* Federal Environment Agency– Energymix Germany
kg
MGO 0.1% S
LNG Kraftwerk*
05,000
10,00015,00020,00025,00030,00035,00040,000
CO2 Emissions
*Federal Environment Agency- Energymix Germany
kg
MGO 0.1% S
LNG Kraftwerk*0
5
10
15
20
25
SOx Emissions
* EON - Daten 2011
kg
MGO 0.1% S
LNG Kraftwerk*
02468
10121416
PM Emissions
* Federal Environment Agency – Energymix Germany
kg
Powerplant*
Powerplant*
Powerplant*
Powerplant*
LNG HYBRID BargeWINNER 2013
Barge Dimensions: 76 x 11,4 x 2,5 mLNG Capacity: 2 x 15 t LNG Container
for 2 Days/OperationPower: 5x 1,5MW LNG GenSets
Silent operation(60 dBA / 10m)Classified as seagoing ship
LNG HYBRID Barge• Push barge (Classified as seagoing ship)• Operation in harbor (restricted areas)• Modular LNG-Engine design• Silent operation (60 dBA / 10m)• Heat recovery for Gas processing
Standard
5 x 1.500 kW 7.500 kW11 kV Barge/Ship60 Hz
5x ~1.400 kW ~7.000 kW10 kV Barge/Shore50 Hz
Thermal Capacity: ~8.800 kW
Option
7 x 1.500 kW 10.500 kW11 kV Barge/Ship60 Hz
7x ~1.400 kW ~9.800 kW10 kV Barge/Shore50 Hz
Thermal Capacity: ~10.500 kW
LNG HYBRID Barge
Handling LNG
2 x 40 ft. LNG Container Typ C, Capacity < 30 t
LNG HYBRID Barge
Cruise Ship
Pit-Box
HPE Mobil
Engines: OFF
Our Solution for a clean future in ports!
LNG HYBRID Barge
Shore Junction Box & Cable Channel
Infrastructure Hamburg
project partners:
Impressions
Concept Summer & Winter
…earn money
Cruise ShipsSupply 60Hz / 11kV20 – 90 Operations 10 – 12 Hours
Main Operation:
Industrial ClientsSupply 50Hz / 10kV24 Hours / 7 Days
Alternativ Operation:
Moving the Barge…Magdeburger HafenSummer mode
HansahafenStand By (Summer)
O´SwaldkaiContainerhandling
Rugenberger HafenWinter mode
AIDAluna April – August 22 Anläufe 10-13 Stunden
AIDAsol März – Dezember 34 Anläufe 10-13 Stunden
AIDAstella Mai – August 9 Anläufe 10-14,5 Stunden
Beispiel: Einsparungspotenzial AIDAsol, Saison 2014, Hamburg
Einsparungen CO2 320,2 Tonnen ca. 22 Prozent
NOx 22,6 Tonnen ca. 88 Prozent
SOx 0,8 Tonnen 100 Prozent
PM 0,5 Tonnen 100 Prozent
6MWel. Durchschnittliche LastLiegezeit 10Stunden
Einsparpotenzial
Approvals from Authorities
CHP LawCombined Heat & Power Law
BImSchGFederal Immission Control Act
BSU Department of Civil Engineering and the Environment
Flag State BG Verkehr
Port Authority
Port Captain
Fire Brigade
Class SocietyBureau Veritas
Hazard Workshop
Water Police
Departments
Approvals for safe operation
Risk AnalysisCollision Analysis
Video LNG HYBRID Barge
LNG HYBRID Portofolio
LNG HYBRID Barge LNG PowerPac LNG HYBRID
FährenLNG Fuel Gas Marine Pack
LNG Consulting
KontaktAbteilung LNG HYBRIDBecker Marine Systems
Henning KuhlmannGeschäftsfü[email protected]
040 – 24199 -0
Dirk LehmannGeschäftsfü[email protected]
040 – 24199 -0
Ralf-Thomas RappDirektor LNG [email protected]
040 – 24199 -1620
Max KommorowskiDirektor LNG [email protected]
040 – 24199 -1610
Thanks for your attention!
For more information please visit www.becker-marine-systems.com
Your greener future starts now!
Becker Marine SystemsMax KommorowskiDirector LNG HYBRIDMob. +49 171 728 01 99Tel. +49 40 24199-1610Mail [email protected]