green recycling city of nedlands & … managment... · cotiesloe wa 69 너 1: (08) 9418 5577 ......

14
PERTH WASTE 0 GREEN RECYCLING CITY OF NEDLANDS & PERTHWASTEGREEN RECYCLING NOISE MANAGEMENT PLAN FOR CLASS 2 SPECIFIE ' WORKS

Upload: doandan

Post on 27-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • PERTH WASTE0

    GREEN RECYCLING

    CITY OF NEDLANDS & PERTHWASTEGREEN RECYCLING

    NOISE MANAGEMENTPLAN FOR CLASS 2SPECIFIE ' WORKS

  • CONTENTS PAGE

    I SCOPE OF PLANPage

    3

    2 APPLICATION

    3 DEFINITIONS

    4 PURPOSE OF THE NOISE MANAGEMENT PLAN

    5 EQUIPMENT PURCHASE POLICY

    6 MEASURES TO MINIMISE NOISE EMMISSIONS 4- 5

    7 PLANT MAINTENANCE

    8 PLANT OPERATOR TRAINING

    9 TOWN PLANNING

    10 JUSTIFICATION FOR CLASS 2 WORKS

    11 DESCRIPTION OF SPECIFIED WORK

    7-8

    12 COMPANY INFORMATION

    13 COMPLAINT RESPONSE

    14 RESPONSIBILITIES

    15 ANNUAL REVIEW

    0

    ^ ^ Sufficient maintenance programmes will rectify noisy defective components

    /TEM ' This will reduce the frequency of the plants' 'reversing buzzer' sounding whilst ensuring no additionalincreased noises are realised due to 'At Fault' accidents I incidents

    Perthwaste Green Recycling plant operators will ensure the following 'Noise Minimisation Measures' areembraced during collections prior to 7.00am:i. Reverse buzzers are manually inactivated (then reactivated from 7.00am onwards)ii. Cab windows are closed (to reduce the impact of any radio emissions)iii. Defensive driving techniques are embraced (smooth accelerating & braking techniques)iv. Bin lifter hydraulics are not fully activated (too slow down collection manoeuvres)v. Engine Revs do not exceed idle limitationsvi. Engine brakes are manually inactivatedvii. Hydraulics & Power Take Off (PTOs) devices are disengaged between travel to next collection

    location

    i \'so ,

    `S7 9O0;57 ISOo Pertliwaste Pty Ltd T/AS Perthwaste Green Recyc9ng

    P0 Box 6, cotiesloe WA 6911T: (08) 9418 5577 F: (08) 9418 5588 www.perthwaste.com.au

    9BN: 94 1 323 37 AcN 118828872Page 5 oF 14

  • PlTH WASTE*

    cIE, RFcL'Nc

    7. PLANT MAINTENANCEPerthwaste Green Recycling Pty Ltd places a high priority on the maintenance upkeep of its plant

    In particular, the following internal documents detail the extent of these programmes:

    'SOP's - Daily Checks (available to the 'City of Nedlands' upon request)Work Method Statement (WMS) 023 - Plant Repairs & Maintenance Programming (available to the 'Cityof Nedlands' upon request)Mechanical Vehicle Inspection Checklists (available to the 'City of Nedlands' upon request)

    Safe Operating Procedure's - Pre & Po Run Vehicle ChecAll operators are required to perform comprehensive pre & post run vehicle inspections in the manner which hasbeen systematically detailed in the applicable 'SOP's.

    Strict adherence & monitoring of pre & post run vehicle inspections ensures potential noisy defectivecomponents are realised prior to conducting collections

    WMS 023 - Plant Repairs & Maintenance ProgrammingThis procedure provides instruction for the 'Repairs & Maintenance Programming' for all 'Perthwaste GreenRecycling' plant.

    Strict adherence to the procedure ensures that all plant is scheduled for servicing within required timeframes,vehicle inspections are carried out in accordance with required timeframes & defective components are repairedwithin reasonable timeframes & according to priority.

    The procedure also clearly defines the responsibilities of each personnel to ensure all field service relatedregisters are updated accordingly & the communication pathway to ensure effective programming schedules areupheld to realize & maintain efficiencies.

    Any defective component which contributes to abnormal noise levels will be given a priority 1 rating forimmediate rectification.

    Mechanical Vehicle speon iecklistsComprehensive periodic vehicle inspections are carried out by Field service Technicians in order to identify earlystages of wear & tear. Whilst it is the operators obligation to detail any defective component immediately to theirrespective Leading Hand & through the defective reporting system, the comprehensive examinations ensuremajor wear & tear issues can be addressed accordingly & identify which operators are meeting their pre & postrun vehicle inspections adequately.

    Grea1g SchedesIn addition to the above procedures, all operators are required to grease the components of lifting & packingmechanisms as per rostered schedules to ensure moving bearings remain lubricated to prevent premature wear& tear whilst minimising potential noise related issues.

    *AIl the above measures are designed to identify potentially noisy plant components during the infancy stage forimmediate rectification, ensuring community members are not exposed to unnecessary elevated plant noise.

    () :, )r;'::)i) Pert hweste Pty d i/AS Perthwaste Green RecyclingPG Box 6, Cottesloe WA 69111: (08) 9418 5577 F: (08) 9 185588 wvw.perihwaslo.comxu9814: 94118929872 "CI1: 118 528 872Page 6 14

  • 8. PLANT OPERATOR TRAININGAll Plant Operators will be trained accordingly to embrace 'Noise Minimisation Measures'.

    All new employees will undertake Driver Assessments to ensure they display defensive driving techniques innoise-minimising braking, accelerating & bin emptying techniques.

    The training will cover the following aspects:

    Pre & post run vehicle inspections (to identify defective components contributing to potential excessivenoise)Defensive driving techniques (smooth braking & accelerating techniques)Bin servicing techniques (as per 'Safe Operating Procedures')Waste collection routes

    > 'Noise Minimisation Measures' will be communicated at Toolbox Meetings & documented on NoticeBoards to constantly remind operators of their obligations whilst conducting collections duringprescribed times

    9. TOWN PLANNINGTo minimise waste collection noise from future developments, the City's applicable personnel can seek advice & recommendations from 'Perthwaste Green Recycling' Operations Department as to the appropriate location & configuration of the waste collection points for the development.

    10. JUSTIFICATION FOR CLASS 2 WORKSThe class 2 works covered by this NMPexperienced within the designated precincts.

    are primarily required due to traffic congestion & access issues

    These high traffic count precincts, predominantly from 7.00am onwards, increases waste collection 'OccupationalHealth & Safety' risk for all road users, as well as hampering the flow of traffic causing significant delays,inconvenience & frustration for all road users.

    Frustrated road users have the potential to undertake unsafe driving practices, particularly in relation toovertaking manoeuvres in single lane road networks, & engage in unwarranted road rage scenarios.

    Many businesses within the precincts commence trading at 7.00am, which results in increased vehicular streetparking & pedestrian movements within the immediate vicinities.

    Parked vehicles are often found to block access to bins which impedes & extends collection service times.

    Bins serviced prior to 7.00am also allow businesses to return empty bins to storage locations in timely mannerswhich help maintain clean & tidy landscapes.

    Collection vehicles can conduct services in a far more effective, efficient & safe manner within the designatedprecincts between 6.00am - 7.00am as opposed to conducting the same collection routes after 700am to thebenefit of all road users.

    bsi.) so() ;;,) 4eoz5) , xwxste Ply Ltd TIAS Perthwaste Green RecyclingPG Box 6 Cottesloe WA 6911 (08) 9418 5577 (08) 9418 5588 v[/mv7.perthWaste.com.auNBN: 94 8 928 872 HON: 118825372

    Page7 of14

  • PERTH WASTE.

    c

  • 14. RESPONSIBILITIESThe Perthwaste Green Recycling General Manager will be responsible for the implementation of this NMP, ifapproved by the ' City of Nedlands' CEO.

    15. ANNUAL REVIEW'Ferthwaste Green Recycling' collection operations under this plan will be reviewed annually.'Perthwaste Green Recycling' will maintain a register detailing any noise related items, issues &/or complaintsrelated throughout the term of this NMP.

    The review will include:A review of all noise complaints received in the last 12 months. Where a location-specific noise issue isidentified, an onsite assessment of the operation will be conducted with a view to making improvementsto the noise impact where it is practicable & reasonable to do so.

    The ' City of Nedlands' in conjunction with ' Perthwaste Green Recycling' will review the operation & effectivenessof this NMP on an annual basis.

    The results of the review & any recommendations for amendment to the NMP will be discussed at ContractualMeetings between key personnel from both parties.

    All items raised during the annual reviews between Perthwaste Green Recycling & the ' City of Nedlands' will beconsidered for potential continuous improvement items & measures to be implemented with future NMP's.

    If approved, the NMP will be valid for three (3) years after day of commencement & will not be reviewed until thecompletion term.

    Tbsi\ ISO ,) SO( 9OOi 14OO1 OS

    Perthwaste Pty Ltd T[AS Perthwaste Green RecyclingP0 Box 6. Cottesloe WA 6911

    (08) 9418 5577 F: (08) 945583 wWw.perthweste.com.au785: 94 1 928 872 ACN: 115 528 872

    Page 9 of 14

  • PERTH WASTE*

    cR[;:N REcYCIJN(1

    ATTACHMENT IStirling Highway Precinct Map

    57

    8

    J

    ^Ifed

    FirsL

    K

    $end >

    , C Nedlands

    ne

    ant:ha

    m'n

    Ka'1a

    Per

    un 5 BaY

    oJ

    'S

    /,1 . q7,,

    LWICFTIOflS J

    "" S

    G vfrnn

    cannqtonG rd1 f'

    o

    nm

    z

    g

    oc'

    lEd ,ar

    Subiaco

    n

    d

    7m

    Smith

    a- 2

    J

    7

    `

    r

    7

    nn

    g

    m

    7

    d

    r

    n

    H

    J

    J

    m

    ; 3

    Borcoo.

    5 Myers

    0.kBer.ard Elizobeth

    hmson-4 o

    PmCes$

    Caper,, 2

    Everettnn

    Kenoedia

    ,,,d

    M

    ".' Nedlands

    Alfred

    FrMeneler

    9

    LakewOy

    $eaWad

    / f oley

    SwanSea8aver

    Nada

    Fimsstofl

    c `mw

    tford

    Brassey

    m

    Ipey

    Lynt

    Wood 5

    8 Shentoo5-)

    Femn

    Garden

    Bevue " n8 Saanders

    aremontWood

    Watt

    Reeve

    Cross

    . St a m

    E h

    t

    m

    <

    ra

    r ,

    a

    m

    Sn .*

    Knes 2

    11

    8 4 l

    mO

    5-bSW' . Mourit

    .

    5`j

    m

    Grant Grant

    :c

    Grant

    MelvilleWilliam

    Hills,de J

    Grant ,G

    LEGEND

    Bernard