gridlock? – transport in 2030 solving congestion in south east england

23
Gridlock? – Transport in Gridlock? – Transport in 2030 2030 Solving Congestion in South East Solving Congestion in South East England England 14 th November, 2007 Adrian Shooter Chairman, ATOC

Upload: regis

Post on 19-Jan-2016

42 views

Category:

Documents


0 download

DESCRIPTION

Gridlock? – Transport in 2030 Solving Congestion in South East England. 14 th November, 2007 Adrian Shooter Chairman, ATOC. London’s economy depends on its railways. “You can’t build your way out of congestion”. London Commuting. Where are we Going?. European Comparisons. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Gridlock? – Transport in 2030 Solving Congestion in South East England

Gridlock? – Transport in Gridlock? – Transport in 20302030

Solving Congestion in South Solving Congestion in South East EnglandEast England

14th November, 2007

Adrian ShooterChairman, ATOC

Page 2: Gridlock? – Transport in 2030 Solving Congestion in South East England

London’s economy depends on its railways

Page 3: Gridlock? – Transport in 2030 Solving Congestion in South East England

“You can’t build your way out of congestion”

Page 4: Gridlock? – Transport in 2030 Solving Congestion in South East England

London Commuting

People entering central London during morning peak (thousands)2006

1.3%

1.6%

0.6%

0.7%

7%

10%

34%

44%

Surface RailLU & DLRBusCoach/MinibusCarMotor CyclePedal CycleTaxi

Source: DfT Transport Statistics Great Britain 2007 Edition; Table 1.6

Page 5: Gridlock? – Transport in 2030 Solving Congestion in South East England

Where are we Going?

Passenger Kilometres since 1995/96

0

10

20

30

40

50

60

70

1995

/96

1996

/97

1997

/98

1998

/99

1999

/00

2000

/01

2001

/02

2002

/03

2003

/04

2004

/05

2005

/06

2006

/07

2007

/08

2008

/09

2009

/10

2010

/11

2011

/12

2012

/13

2013

/14

2014

/15

2015

/16

2016

/17

2017

/18

2018

/19

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

2030

/31

2031

/32

2032

/33

2033

/34

2034

/35

2035

/36

2036

/37

Pa

ss

en

ge

r K

M (

Bill

ion

)

TfL Forecast25% by 2025

White Paper Forecast

22% by 2014

Ruth Kelly50% by 2037

London Commuting Passenger KM99/00 to 06/07

Total Passenger KM95/06 to 06/07

Note: Percentage Increase on 2005/06 Pass KM is assumed in all forecasts

Source of historical Pass KM : pre 99/00 = Lennon data (ATOC); 99/00 - 06/07 = ORR's National Rail Trends ver. Q1 07-08, Table 1.1b

Page 6: Gridlock? – Transport in 2030 Solving Congestion in South East England

European Comparisons

42.240.9 40.4

33.928.3

22.1 22.119.6

11.5 10.17.4

5.3 3.2 1.2

-13.3

-17.6-24.1

-30

-20

-10

0

10

20

30

40

50

% i

ncr

ease

Great

Brit

ain

Irelan

d

Belgium

Franc

e

Spain

Germ

any

Denmar

k

Switzer

land

(SBB)

Holland

(NS)

Finlan

d

Hungar

yIta

ly

Austri

a

Norway

Czech

Rep

ublic

Poland

Portu

gal

Country

Passenger Kilometres - 2006 against the Base Year (1995/6/7)

Page 7: Gridlock? – Transport in 2030 Solving Congestion in South East England

New Line Capacity: HSL1

Page 8: Gridlock? – Transport in 2030 Solving Congestion in South East England

London/SE Capacity Schemes

Page 9: Gridlock? – Transport in 2030 Solving Congestion in South East England

What do Passengers want?

• Reliable, clean trains

• Good information

• Seat or standing?

• Value for money

• Easy ticketing

Page 10: Gridlock? – Transport in 2030 Solving Congestion in South East England

What the White Paper Offers

• Improved performance to 92.3%

• 1300 new coaches (2/3 in S.E.)

• Platform and depot works

• Thameslink project

• Reading rebuilding

• £150m on stations

• £200m on freight schemes

Page 11: Gridlock? – Transport in 2030 Solving Congestion in South East England

Clean, reliable trains; new depots

Page 12: Gridlock? – Transport in 2030 Solving Congestion in South East England

Double deck trains?

Page 13: Gridlock? – Transport in 2030 Solving Congestion in South East England

Longer trains

Page 14: Gridlock? – Transport in 2030 Solving Congestion in South East England

Track capacity

Page 15: Gridlock? – Transport in 2030 Solving Congestion in South East England

Station capacity

Page 16: Gridlock? – Transport in 2030 Solving Congestion in South East England

Schemes to unblock capacity

Page 17: Gridlock? – Transport in 2030 Solving Congestion in South East England

Access: bus

Page 18: Gridlock? – Transport in 2030 Solving Congestion in South East England

Access: cycling/walking

Page 19: Gridlock? – Transport in 2030 Solving Congestion in South East England

Access: car

Page 20: Gridlock? – Transport in 2030 Solving Congestion in South East England

London Overground

Page 21: Gridlock? – Transport in 2030 Solving Congestion in South East England

Electrification Benefits

• Acceleration rate improves capacity

• Alternative energy sources

• Regenerative braking

• Lighter vehicles

• Cheaper rolling stock cost

• Lower maintenance costs

Page 22: Gridlock? – Transport in 2030 Solving Congestion in South East England

Regenerative braking saves 16% energy consumption

Page 23: Gridlock? – Transport in 2030 Solving Congestion in South East England

Conclusions

Rail solutions:

• Longer trains, platforms

• Access to stations

• Schemes to unblock capacity

• Electrification

• New lines