CIRCUIT DESCRIPTION
![Page 3: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/3.jpg)
PROJECT OBJECTIVES
Grinding Survey has been done in order to
achieve the following objectives for the
grinding circuit:
Gold distribution through each size
friction.
Transfer size, calculate the P80 for
cyclone, and all Mills
![Page 4: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/4.jpg)
INTRODUCTION
Grinding survey has been done in 20th of June 2015
for 4 hours and samples collected from different
spots:
B.M.1 and B.M.2 discharge Cyclone feed &
Cyclone O/F &Cyclone U/F to B.M.1 and Cyclone
U/F to B.M.2
![Page 5: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/5.jpg)
INTRODUCTION CONT…
CV03 (SAG Mill Scats)
CV04 (Pebble Crusher Discharge)
SAG Discharge
CV02 (SAG Mill Feed Conveyor)
By collecting these samples we can achieve the
survey objectives
![Page 6: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/6.jpg)
EXPERIMENTAL WORKS
Samples collecting Technique
CV02: 1M belt cut from conveyor
CV03: 1 Drum from the Pebble Crusher
Feed shut about 50 Kg
CV04 1 Drum from the Pebble Crusher
Discharge shut about 50 Kg
![Page 7: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/7.jpg)
EXPERIMENTAL PROCEDURE CONT…
B.M Discharge: 1L every 30 min for 4 hours,
sample were collected from normal point of BM
discharge sample SG
Cyclone O/F: 1L every 30 min for 4 hours,
samples were collected from trush Sc. Feed Box.
Cyclone U/F: 1L every 30 min for 4 hr, sample
were collected from BM feed hopper
![Page 8: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/8.jpg)
SAG Discharge: 1L every 30 min for 4 hr samples were
collected from normal point of SAG Discharge sample
SG
Cyclone Feed: 1L every 30 min for 4 hr sample were
collected by opening the cyclone Feed valve slowly so
the cyclone to give only U/F (This U/F is representative
for the cyclone Feed.
EXPERIMENTAL PROCEDURE CONT…
![Page 9: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/9.jpg)
FINDINGS
BM1&2 discharge looks similar same applies to their feed
![Page 10: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/10.jpg)
RESULTS CONT…
Poor performance of p crusher since P80=CV03,Also crusher P80=35mm which is above the target of 25mm
![Page 11: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/11.jpg)
RESULTS CONT…
Cyclone P80 =116µ
![Page 12: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/12.jpg)
CIRCUIT AVARAGE GOLD DISTRIBUTION
CV02 CV03 PEBBLE D SAG D BMI D BMII D CYCLONE F BMI F BMII F CYCLONE OVERFLOW
0
2
4
6
8
10
12
14
16
18
20
![Page 13: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/13.jpg)
CONCLUSIONS
P80 of cyclone O/F =106μ and the result coming from survey is 116μ which is very close to target and good indication about cyclone performance.
![Page 14: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/14.jpg)
RECOMMENDATION
Therefore, Water balance of grinding circuit need
some adjustment in order to decrease % Solids of O/F
to be 50% by adjust cyclone feed to 68% Solids and
U/F to 76% solids.
In order to improve our grinding efficiency we need to
adjust Cyclone recycle load to increase separation
process across cyclone.
![Page 15: grinding survey presentation report- Baya june 2015](https://reader030.vdocuments.net/reader030/viewer/2022032513/55d1c309bb61eb386e8b4740/html5/thumbnails/15.jpg)
RECOMMENDATION CONT…
Adjust required %Solids across cyclone
streams to drop recycle load to required
target.
Daily adjustment of the pebble crusher gap.