Complete this workbook to satisfy the planning and design requirements needed to get approval for a new or expanding Group B water system

DOH 331-468 December 2012

This workbook supports the Group B rule that goes into effect January 1, 2014.

Page 2: Group B Design Workbook

INTRODUCTION

Completing this Group B Design Workbook (workbook) will satisfy the design and planning requirements for a new or expanding Group B water system (WAC 246-291-120 and WAC 246-291-140, respectively). If you’re a professional engineer, and you are not comfortable using the workbook format, you may submit your design in an alternate format of your choosing. However, you must submit all the information referenced in this workbook and required by chapter 246-291 WAC. Before sending your completed workbook to the reviewing agency, make copies of all plans, design drawings, worksheets, equipment information, operations and maintenance manuals, legal documents, and forms. Keep this information with your other project documents because it will help you and others successfully manage and operate your new water system. Regulations We suggest you become familiar with chapter 246-291 WAC and the information in the Group B Water System Design Guidelines (331-467) before you start your design. Chapter 246-291 WAC is Washington’s Group B water system rule. You can view and download the Group B rule that was revised in 2012 and goes into effect January 1, 2014, at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/RegulationandCompliance/Rules.aspx Group B Water System Design Guidelines Use this workbook with the Group B Water System Design Guidelines (331-467). Even if you have a lot of experience designing small systems, we recommend you read the design guidelines before starting your design. We created the guidelines to support your goal of preparing a complete submittal that reflects sound water system design practices and established principles of public health protection. The Group B Water System Design Guidelines will answer questions such as:

• When can’t I develop my own Group B water system?

• When don’t I need to get approval before I construct my water system?

• When must a professional engineer design the new or expanding system?

• Which water quality tests must I submit?

• How long must I run the pump test on my well?

• How do Washington’s water rights laws affect my design?

• How big an easement should I have for my pipelines?

• What information must I include on the title of customers’ properties?

Group B Design Workbook (DOH 331-468) Page 1 December 2012

Page 3: Group B Design Workbook

Certain one and two-connection water systems are not regulated. Before submitting your Group B design workbook, see Section 2.1 of the Group B Water System Design Guidelines (331-467) to be sure your project design requires department approval. You can view and download the Group B Water System Design Guidelines (331-467) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm To order the design guidelines on CD, click “Add to cart.” Due to budget constraints, we don’t have paper copies of the guidelines available for distribution. Fees Charged for Workbook Design Reviews A completed workbook addresses the planning, design report, and construction documents required by WAC 246-291-120 and -140. • If the local health jurisdiction is the reviewing

authority Ask your local health department about the fees it will charge to review your workbook.

• If the state Department of Health is the reviewing authority

The department will charge applicants each of the following fees for a new Group B water system:

$138 for a Water System Plan Review (WAC 246-290-990 (1)(a))

$205 for a Design Report Review (WAC 246-290-990 (1)(d))

$281 for a Construction Document Review (WAC 246-290-990 (1)(f))

Total fee = $624

In addition to the fees above, the department will charge applicants for these services:

$205 for a Well Site Evaluation (WAC 246-290-990 (1)(i))

Fee varies for a Secondary Treatment Design Review (For amounts, see WAC 246-290-990 (1)(d) and (1)(f)).

Online Group B Resources We developed online Group B resources to help you from the pre-submittal stage of your water system design through operation and maintenance. Before your new system becomes operational, we recommend you visit the Group B website at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB.aspx

Group B Design Workbook (DOH 331-468) Page 2 December 2012

Page 4: Group B Design Workbook

The Online Group B Resources have: • All the forms you need to meet the submittal requirements for a new or expanding Group

B water system, including the Group B Project Approval Application Form, Water Facilities Inventory Form, and examples of Well sanitary control area protective covenants forms.

• Guidance to help you operate and maintain your small system. After you receive written approval of your water system design, you may begin construction of the distribution system, well house, tanks, treatment equipment, and so forth. We urge you to review this information before you begin operating your new or expanded system.

Department of Health Contacts Before beginning your Group B workbook, we strongly recommend that you contact your local health jurisdiction to find out whether the local or state health department administers the Group B program in your county. In the Group B workbook and in the Group B Water System Design Guidelines, the term "department" refers to the agency responsible for reviewing and approving a Group B water system design in your particular county. Designers or design engineers with questions or concerns should contact the department. Table 1 presents contact information for the state Department of Health. You can get contact information for your local health jurisdiction from your local phone book.

Group B Design Workbook (DOH 331-468) Page 3 December 2012

Page 5: Group B Design Workbook

Table 1

Office of Drinking Water Regional Offices

If you have questions about this workbook, the Group B Water System Design Guidelines, the Online Group B Resources, or the State Board of Health Rules on Group B Public Water Systems, call our regional office or your local health jurisdiction.

Eastern Region Serving Drinking Water Eastern Regional Office 16201 E. Indiana Ave. Suite 1500 Spokane Valley, WA 99216 Phone: 509-329-2100 Fax: 509-329-2104 TDD Relay: 1-800-833-6388

Adams, Asotin, Benton, Chelan, Columbia, Douglas, Franklin, Ferry, Garfield, Grant, Kittitas, Klickitat, Lincoln, Okanogan, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman, and Yakima counties.

Northwest Region Serving Drinking Water Northwest Regional Office 20425 - 72nd Avenue South Suite 310 Kent, WA 98032 Phone: 253-395-6750 Fax: 253-395-6760 TDD Relay: 1-800-833-6388

Island, King, Pierce, San Juan, Skagit, Snohomish, and Whatcom counties.

Southwest Region Serving Drinking Water Southwest Regional Office Physical: 243 Israel Road

Tumwater, WA 98501 Mailing: P O Box 47823

Olympia, WA 98504-7823 Phone: 360-236-3030 Fax: 360-664-8058 TDD Relay: 1-800-833-6388

Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Kitsap, Lewis, Mason, Pacific, Skamania, Thurston, and Wahkiakum counties.

Group B Design Workbook (DOH 331-468) Page 4 December 2012

Page 6: Group B Design Workbook

Group B Planning and Design Submittal Checklist

CHECKLIST FOR A NEW OR EXPANDING GROUP B WATER SYSTEM

Planning and Design Submittal Element

Group B Design

Guidelines Section

Yes, Included

No, Not Applicable

Completed submittal checklist for a new or expanding Group B system

Completed project approval application form Section 2.2

Property title notice Section 2.6

Service area map Section 2.3

Demonstrate compliance with SMA requirement Applies to new systems only.

Section 2.5

Demonstrate compliance with PWS Coordination Act Section 2.6

Completed Water Facilities Inventory (WFI) (OPTIONAL) Section 2.9

Water users’ agreement (OPTIONAL) Section 2.8

Water right permit Section 3.0

Well log Section 4.1

Well pump test report Section 4.1

Well water quality sampling results Section 4.2

Documentation of well site approval Section 4.3

Well sanitary control area protective covenants Section 2.7 and 4.3

Intertie agreement Section 4.4

Well and pump house detailed drawings and specifications Section 5.2 and 5.3

Distribution system detailed drawing and specifications Section 6.10

Storage tank sizing, detailed drawings, and specifications Section 7.6

Booster pump sizing, detailed drawings, and specifications Section 8.1

Secondary contaminant treatment design Chapter 9

Completed Group B Design Report Workbook

Group B Design Workbook (DOH 331-468) Page 5 December 2012

Page 7: Group B Design Workbook

GROUP B Design Report Workbook

1.0 Designer and Owner Failure to complete all applicable sections of this workbook will result in denial of your application or delay in its approval. Please print all information. 1.1 Water System Designer

Workbook prepared by Mailing Address Company Name Day Phone

If prepared by a Professional Engineer, apply seal here. 1.2 Water System Owner

Owner’s Name

Owner’s Mailing Address

Day Phone Owner’s Representative Signature ___________________________ Date _______

Group B Design Workbook (DOH 331-468) Page 6 December 2012

Page 8: Group B Design Workbook

2.0 Basic Water System Information

2.1 Water system name and location

System Name Water System Location

(Town or City, County) Public Water System ID# (Applies only to existing systems seeking approval to expand) 2.2 Basic information

You must submit the following with this workbook:

• Completed Group B planning and design submittal checklist

• Completed project approval application form The form is online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx

• Property title notice (the notice you intend to record on the title for each property served, see Group B Water System Design Guidelines Section 2.6)

• Service area map

• Demonstrated compliance with Satellite Management Agency requirement See Group B Water System Design Guidelines Section 2.5.

• Demonstrated compliance with Public Water System Coordination Act See Group B Water System Design Guidelines Section 2.4.

We recommend you include a completed Water Facilities Inventory form. See Group B Water System Design Guidelines Appendix E.

Group B Design Workbook (DOH 331-468) Page 7 December 2012

Page 9: Group B Design Workbook

2.3 Connections and Population See the requirements for establishing the design service population for each dwelling unit in WAC 246-291-200 (2). See Section 2.0 of the Group B Water System Design Guidelines for expectations on counting accessory dwelling units as separate connections.

Connections Service Population Dwelling units Nonresidential Residential Nonresidential

Use the space below to describe the basis for estimating your residential and nonresidential service population.

Group B Design Workbook (DOH 331-468) Page 8 December 2012

Page 10: Group B Design Workbook

3.0 Estimating Water Demands

3.1 Complete Worksheet 3-1 Summary of Peak Hourly Demand (PHD) and Maximum Daily Demand (MDD) Summary

Worksheet 3-1 Line Group B Design

Guidelines Section Description Value

A 3.1.1, and 3.3 Total residential MDD, gallons per day B 3.1.2, and 3.3 Total residential PHD, gallons per minute C 3.2.1, and 3.3 Total non-residential MDD, gallons per day D 3.2.2, and 3.3 Total non-residential PHD, gallons per minute F-1 3.4 Fire suppression flow required (if any), gpm F-2 3.4 Fire suppression flow duration, minutes

Total area intended for irrigation: square feet or acres

Total system MDD (Lines A+C): gallons per day

Total system PHD (Lines B+D+F1): gallons per minute

--------------------------------------------------------------------------------------------------------------------- Is a water right permit or other written Dept. of Ecology water resource approval required? See Section 3.0 of the Group B Water System Design Guidelines.

Yes No If “Yes,” enclose a copy of the water right permit or other written approval from the Department of Ecology. Use the space below to show your calculations of estimated MDD and PHD:

Group B Design Workbook (DOH 331-468) Page 9 December 2012

Page 11: Group B Design Workbook

4.0 Source of Supply

4.1 Well information If a well will supply water to your system, you must attach the following to your design submittal:

• Well log

• Pump test report (See Section 4.1 of the Group B Water System Design Guidelines)

• Water quality sampling results (See Section 4.2 of the Group B Water System Design Guidelines and WAC 246-291-125 (3)(g))

• Well site inspection report prepared by DOH or the local health jurisdiction

• Well sanitary control area protective covenants (Attach a copy of the actual protective covenants filed with the County Auditor for each public drinking water well. See Sections 2.7 and 4.3 of the Group B Water System Design Guidelines.)

• Low yield well water supply contingency plan, if required. (See Section 4.1 of the Group B Water System Design Guidelines.)

4.2 Wellhead Protection Inventory Please indicate whether any of the following are present within 600 feet of your well.

Potential Water Quality Threat Yes No Unknown

Likely pesticide application

Storm water injection wells

Other injection wells

Abandoned groundwater wells

Landfills, dumps, disposal areas

Known hazardous materials site

Another water system with known water quality problems

Residential development greater than one house per acre

Residential septic tanks

Underground storage tanks

Sewer lines

Group B Design Workbook (DOH 331-468) Page 10 December 2012

Page 12: Group B Design Workbook

Storm water disposal areas

Surface water – If yes, specify distance from well site: feet

Group B Design Workbook (DOH 331-468) Page 11 December 2012

Page 13: Group B Design Workbook

Use this space to provide more detail of any water quality threat located within 600 feet of your well: 4.2 Intertie information If an intertie will supply your system, you must attach a copy of your intertie agreement, and service capacity and hydraulic analyses of the wholesale system. For details about the minimum scope of an intertie agreement, see WAC 246-291-135.

Group B Design Workbook (DOH 331-468) Page 12 December 2012

Page 14: Group B Design Workbook

5.0 Well Pump, Bladder Tanks, and Pump House

5.1 Piping Schematic Draw a schematic of the piping system below. Begin with the well, continue to the pump house, and on to the distribution system. Include each branch line in the distribution system, and label each branch line junction. These junction points will be referenced in Worksheet 5-1. (See Example 5-1 in Section 5.0 of the Group B Water System Design Guidelines.)

Group B Design Workbook (DOH 331-468) December 2012

Page 15: Group B Design Workbook

5.2 Complete Worksheet 5-1 (See Example 5-1 in Section 5.0 of the Group B Water System Design Guidelines.)

Total Dynamic Head Calculation

Friction Head Calculation Static Head Calculation,

Assume top of well casing elevation is 0 ft.

Min. Pressure Head, ft

Min. Total Dynamic Head, ft

Pipe Segment From To

Pump or Flow

Rate, gpm

Pipe Size,

inches

Friction Loss per

100 ft

Pipeline Length,

ft

Pipe Segment Friction Loss, ft

Top of well casing to water while pumping,

ft

Ground Elev. at

“to”

Elevation difference,

ft

1 Well pump Top of well casing 69

2 Top of well casing 69

3 69

4 69

5 69

6 69

7 69

8 69

9 69

1. With a simple system consisting of only a well pump and bladder tanks, the well pump is the only pump in the system. Without a storage tank, the well pump must

generate enough flow and pressure to supply at least the PHD, and to provide at least 30 psi to each customer connected to the distribution system during PHD conditions.

2. For the segment that includes the well house, add 10 feet of friction loss to account for losses related to fittings and valves. If you intend to use a CSV, add additional friction loss per manufacturer’s data (See Section 5.0 of the Group B Water System Design Guidelines).

3. Total the “pipe segment friction loss” for each pipe segment + “elevation difference” + “minimum pressure head” values. The highest total dynamic head (TDH) is the minimum pressure, expressed in feet of head that the well pump must generate while pumping the peak hourly demand. You may wish to select a pump with a TDH greater than the required minimum.

Group B Design Workbook (DOH 331-468) Page 14 December 2012

Page 16: Group B Design Workbook

5.3 Summary of Well Pump Selection Cycle Stop Valve (CSV) incorporated in design: Yes No Variable frequency drive well pump(s) incorporated in design: Yes No Pump Design Parameter At well pump “on”: At well pump “off”: Comment Pressure switch settings or Reservoir level control

psi ft

psi ft

If well pumps to bladder tanks If well pumps to atmospheric reservoir

Discharge rate gpm gpm Total Dynamic Head feet feet Well pump setting (depth) below top of well casing: feet Attach well pump catalog information with your design submittal:

• Pump curve (or table showing discharge head and corresponding discharge flow) • Identify the pump “on” and pump “off” operating points on the pump curve • Pump manufacturer and pump model number • Pump horse power

5.4 Bladder Tank Selection (for well pump or booster pump) Follow the design guidance in Section 5.1 of the Group B Water System Design Guidelines for bladder tank selection. If the design includes a cycle stop valve, see the design guidelines Appendix G. Summarize the bladder tank selection:

Size of bladder tanks gallons Number of tanks tanks Pre-charged pressure psi

Group B Design Workbook (DOH 331-468) Page 15 December 2012

Page 17: Group B Design Workbook

Use the space below to show your calculations (Equation 5-2) for selecting bladder tanks: 5.5 Well and pump house detailed drawings and specifications Attach a copy of the well and pump house detailed drawings and specifications. The minimum scope of this information is in Sections 5.2 and 5.3 of the Group B Water System Design Guidelines.

Group B Design Workbook (DOH 331-468) Page 16 December 2012

Page 18: Group B Design Workbook

6.0 Piping and Distribution System

6.1 Summary of pipe design Distribution system pipe size and material specified:

(For example, 1½ to 3-inch ASTM D 1785 Schedule 40 PVC) Minimum pipeline depth of bury specified:

(For example, No less than 48 inches from finished grade) Pipeline hydrostatic pressure testing specification:

(For example, APWA/WSDOT (2012) Section 7-11 … minimum 200 psi) Pipeline disinfection specification:

(For example, APWA/WSDOT (2012) Section 7-11) Private property easements required? Required (Design drawings must identify the location and dimension of these easements) Not required 6.1 Service meters Service meters:

Provided at each connection Not provided at each connection

6.3 Cross connection control Are there any existing or proposed cross connections?

Yes (If yes, attach a description of the cross connection and how the cross connection will be controlled or eliminated)

No

Group B Design Workbook (DOH 331-468) Page 17 December 2012

Page 19: Group B Design Workbook

6.4 Distribution system detailed drawings and specifications Attach a copy of the distribution system detail drawings and specifications (See Section 6.10 of the Group B Water System Design Guidelines).

Group B Design Workbook (DOH 331-468) Page 18 December 2012

Page 20: Group B Design Workbook

7.0 Atmospheric Storage Tank

7.1 Determining need for an atmospheric storage tank If any of the following conditions apply to the design of the new or expanding Group B water system, an atmospheric storage tank must be provided (Check all that apply.): Yes The peak hourly demand is greater than the selected well pump can deliver at the

pump “on” setting. Yes The local fire authority requires the Group B water system to provide fire

suppression capacity, and the source of supply cannot match the needed fire flow.

Yes The location of the Group B water system is subject to the Public Water System

Coordination Act, it must provide a minimum fire flow, and the source of supply cannot match the needed fire flow.

Yes The designer wishes to provide standby storage or fire suppression capacity. Use the space below (or a separate sheet of paper) to show your calculations for sizing the storage tank and establishing the elevation of the tank bottom and tank overflow. See Chapter 7 and Equation 7-4 in the Group B Water System Design Guidelines. Operating storage: Equalizing storage: Standby storage:

Group B Design Workbook (DOH 331-468) Page 19 December 2012

Page 21: Group B Design Workbook

Fire suppression storage: Dead storage: 7.2 Storage tank detailed drawings and specifications Attach a copy of the storage tank detail drawings and specifications. (See Section 7.6 of the Group B Water System Design Guidelines.)

Group B Design Workbook (DOH 331-468) Page 20 December 2012

Page 22: Group B Design Workbook

8.0 Booster Pumps

8.1 Booster pump selection Summarize the following booster pump design information: Number of booster pumps: Cycle Stop Valve (CSV) incorporated in design: Yes No Variable frequency booster pump drive pump(s) incorporated in design: Yes No Booster Pump 1 Pump Design Parameter At well pump “on”: At well pump “off”: Pressure switch pressure setting psi psi Discharge rate gpm gpm Total Dynamic Head feet feet Attach booster pump catalog information with your design submittal:

• Pump curve (or table showing discharge head and corresponding discharge flow) • Identify the pump “on” and pump “off” operating points on the pump curve • Pump manufacturer and pump model number • Pump horse power

Booster Pump 2 (if applicable) Pump Design Parameter At well pump “on”: At well pump “off”: Pressure switch pressure setting psi psi Discharge rate gpm gpm Total Dynamic Head feet feet Attach booster pump catalog information with your design submittal:

• Pump curve (or table showing discharge head and corresponding discharge flow) • Identify the pump “on” and pump “off” operating points on the pump curve • Pump manufacturer and pump model number • Pump horse power

Group B Design Workbook (DOH 331-468) Page 21 December 2012

Page 23: Group B Design Workbook

8.2 Booster pump station detailed drawings and specifications Attach a copy of the booster pump station detail drawings and specifications. (See Sections 5.2, 5.3, and 8.0 of the Group B Water System Design Guidelines.)

Group B Design Workbook (DOH 331-468) Page 22 December 2012

Page 24: Group B Design Workbook

9.0 Secondary Contaminant Treatment Design

If treatment for a secondary contaminant (such as iron or manganese) is required, provide the following information. Contaminant(s) to be treated: Treatment device:

Manufacturer's name: Model:

Capacity (gpm): Capacity (gpd): Removal efficiency:

Concentration in well: mg/l Expected concentration after treatment: mg/l

Attach a copy of the following information:

• Treatment process and maximum daily treated water production capacity. • Hydraulic considerations and headloss calculations. • Manufacturer’s catalog information showing the treatment system is appropriate for

removing the contaminant, based on the untreated water sample information from the well.

• A complete set of water quality data necessary to assess and confirm the effectiveness of the proposed treatment, based on the unique water quality characteristics of the well to be treated.

• Residual disposal volume, disposal permit(s) (if required), and plan for residual disposal. • Manufacturer’s recommended operations and maintenance procedures. • A list of all chemicals needed for normal operation and maintenance (if any). • Materials safety data sheet information on all chemicals needed. • Manufacturer’s recommended field water quality testing (if any).

Group B Design Workbook (DOH 331-468) Page 23 December 2012

Page 25: Group B Design Workbook

10.0 Financial Viability

10.1 Financial Viability Worksheet The goal is to establish plans, policies, and procedures that give the system owner(s) the ability to obtain enough funds to cover the total cost of operating and maintaining a safe, reliable water system on a continuing basis. Rates and other revenue should be adequate to cover all anticipated expenses. See Chapter 10 of the Group B Water System Design Guidelines.

TOTAL EXPENSES 1st Yr. 2nd Yr. 3rd Yr. 4th Yr.

1. Wages & Benefits (Incl. SMA costs) $ $ $ $

2. Electricity & other utilities $ $ $ $

3. Chemical & Treatment $ $ $ $

4. Monitoring Costs $ $ $ $

5. Materials & Supplies $ $ $ $

6. Repairs and Parts $ $ $ $

7. Emergency Reserve Contribution $ $ $ $

8. Asset Replacement Reserve Contribution

$ $ $ $

9. Principal & Interest Payments (For outstanding loans)

$ $ $ $

10. Taxes and Assessments $ $ $ $

11. Insurance and Misc. Expenses $ $ $ $

12. Total Expenses (Add lines 1 to 11)

$ $ $ $

TOTAL REVENUE FROM SOURCES OTHER THAN WATER RATES

13. Hook Up and Other User Fees $ $ $ $

14. Interest Earned $ $ $ $

15. Other Revenue $ $ $ $

16. Total Revenue (Add lines 13 to 15)

$ $ $ $

WATER RATE CALCULATIONS

17. Remaining Revenue Required (Line 12 minus Line 16)

$ $ $ $

18. Number of Connections $ $ $ $

19. Average Water Rate (Line 17 divided by Line 18)

$ $ $ $

Group B Design Workbook (DOH 331-468) Page 24 December 2012

Page 26: Group B Design Workbook
Page 27: Group B Design Workbook

Group B Water System Design Guidelines

Design information for new or expanding

Group B water systems

DOH 331-467 December 2012

This workbook supports the Group B rule that goes into effect January 1, 2014.

Page 28: Group B Design Workbook

Table of Contents TABLE OF CONTENTS .............................................................................................................................. I

CHAPTER 1 INTRODUCTION ............................................................................................................ 1 1.0 PURPOSE AND SCOPE.............................................................................................................................. 2 1.1 “MUST” VERSUS “SHOULD” ................................................................................................................... 2 1.2 JURISDICTION AND STANDARDS ............................................................................................................. 3 1.3 BASIC DESIGN STANDARDS.................................................................................................................... 4 1.4 PROJECT SUBMITTALS ............................................................................................................................ 5 1.5 REQUIREMENTS FOR A PROFESSIONAL ENGINEER .................................................................................. 6 1.6 OTHER REFERENCED DOCUMENTS AND STANDARDS ............................................................................. 7 1.7 DEPARTMENT OF HEALTH CONTACTS .................................................................................................... 7

CHAPTER 2 BASIC WATER SYSTEM INFORMATION ................................................................ 8 2.0 PUBLIC WATER SYSTEM CLASSIFICATION ............................................................................................. 8 2.1 APPLICABILITY..................................................................................................................................... 10 2.2 PROJECT APPROVAL APPLICATION FORM ............................................................................................ 11 2.3 SERVICE AREA MAP AND LOCATION ................................................................................................... 11 2.4 PUBLIC WATER SYSTEM COORDINATION ACT ..................................................................................... 11 2.5 SATELLITE MANAGEMENT AGENCY (SMA) ........................................................................................ 12 2.6 DISCLOSURE ON PROPERTY TITLE ........................................................................................................ 12 2.7 PROTECTIVE COVENANTS .................................................................................................................... 12 2.8 WATER USERS’ AGREEMENT ............................................................................................................... 13 2.9 WATER FACILITIES INVENTORY ........................................................................................................... 13 2.10 EASEMENTS.......................................................................................................................................... 13

CHAPTER 3 ESTIMATING WATER DEMANDS ........................................................................... 14 3.0 WATER RIGHTS .................................................................................................................................... 14 3.1 RESIDENTIAL WATER DEMAND ........................................................................................................... 16 3.3 EXAMPLES ........................................................................................................................................... 19 3.4 FIRE SUPPRESSION ............................................................................................................................... 22

CHAPTER 4 SOURCES OF SUPPLY ................................................................................................ 23 4.0 WELL CONSTRUCTION ......................................................................................................................... 23 4.1 SOURCE WATER QUANTITY ................................................................................................................. 24 4.2 SOURCE WATER QUALITY ................................................................................................................... 26 4.3 SOURCE PROTECTION ........................................................................................................................... 29 4.4 INTERTIES ............................................................................................................................................ 29

CHAPTER 5 WELL PUMP, BLADDER TANKS, AND PUMP HOUSE ....................................... 31 5.0 WELL PUMP ......................................................................................................................................... 31 5.1 PRESSURE TANKS ................................................................................................................................. 41 5.2 PUMP HOUSE DESIGN AND CONSTRUCTION RECOMMENDATIONS ........................................................ 44 5.3 WELL AND PUMP HOUSE DETAILED DRAWINGS AND SPECIFICATIONS ................................................ 44

Group B Water System Design Guidelines (DOH 331-467) Page i December 2012

Page 29: Group B Design Workbook

CHAPTER 6 PIPING DESIGN AND CONSTRUCTION ................................................................. 46 6.0 PIPING MATERIAL ................................................................................................................................ 46 6.1 PIPE BURIAL, BEDDING, AND THRUST BLOCKS .................................................................................... 47 6.2 ISOLATION VALVES, FLUSHING HYDRANTS, AND AIR RELEASE VALVES ............................................ 47 6.3 DISTRIBUTION SYSTEM PIPELINE EASEMENTS ..................................................................................... 48 6.4 PRESSURE AND LEAKAGE TEST ............................................................................................................ 48 6.5 DISINFECTION ...................................................................................................................................... 48 6.6 MICROBIOLOGICAL TESTING ................................................................................................................ 48 6.7 SEPARATION FROM NONPOTABLE PIPING SYSTEMS ............................................................................. 49 6.8 SERVICE CONNECTIONS ....................................................................................................................... 49 6.9 INDIVIDUAL PRESSURE REDUCING VALVES ......................................................................................... 50 6.10 DISTRIBUTION SYSTEM DETAIL DRAWINGS AND SPECIFICATIONS ....................................................... 50

CHAPTER 7 ATMOSPHERIC STORAGE TANKS ......................................................................... 52 7.0 OPERATING STORAGE VOLUME ........................................................................................................... 52 7.1 EQUALIZING STORAGE VOLUME AND ELEVATION ............................................................................... 52 7.2 STANDBY STORAGE VOLUME .............................................................................................................. 54 7.3 FIRE SUPPRESSION ............................................................................................................................... 54 7.4 DEAD STORAGE VOLUME..................................................................................................................... 55 7.5 TOTAL STORAGE VOLUME ................................................................................................................... 55 7.6 RESERVOIR DESIGN REQUIREMENTS AND CONSIDERATIONS ............................................................... 56

CHAPTER 8 BOOSTER PUMPS ........................................................................................................ 59 8.0 BOOSTER PUMP STATION DETAILED DRAWINGS AND SPECIFICATIONS ............................................... 59

CHAPTER 9 TREATMENT FOR SECONDARY CONTAMINANTS........................................... 61 9.0 SECONDARY TREATMENT DESIGN ....................................................................................................... 61 9.1 COMMON STRATEGIES FOR IRON AND MANGANESE REMOVAL ........................................................... 61 9.2 SECONDARY TREATMENT DETAIL DRAWINGS AND SPECIFICATIONS ................................................... 61 9.3 CONSUMER NOTIFICATION REQUIRED ................................................................................................. 62 9.4 TREATMENT WASTE DISPOSAL ............................................................................................................ 62

CHAPTER 10 FINANCIAL VIABILITY ............................................................................................. 64 10.0 COMPLETING THE FINANCIAL VIABILITY WORKSHEET ........................................................................ 64 10.1 DISCLOSURE TO CUSTOMERS ................................................................................................................ 64 10.2 EXPLANATION OF TERMS ...................................................................................................................... 65

APPENDICES ............................................................................................................................................. 69

Group B Water System Design Guidelines (DOH 331-467) Page ii December 2012

Page 30: Group B Design Workbook

CHAPTER 1 Introduction The Washington State Department of Health Office of Drinking Water (DOH) developed these Group B Water System Design Guidelines. They explain how to design Group B water systems to ensure safe, adequate, and reliable drinking water for those the water system will serve. They will also help you prepare a complete Group B Design Workbook, which you must submit for approval before you start constructing your new or expanding Group B water system. We recommend you review these Guidelines before beginning your Group B water system design. We organized the chapters by subject matter (basic water system information, estimating water demand, source of supply, and so forth). The Appendices contain helpful references, such as how to perform and report the results of a well pump test, using special well pump controls, an outline for a water users’ agreement, and how to complete an inventory of your proposed water system. Group B information is available on our website at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB.aspx Group B Design Workbook These Guidelines will help you prepare a complete Group B Design Workbook (workbook) that meets each applicable requirement of chapter 246-291 WAC in an efficient manner that reflects sound water system design practices and public health principles. You will submit the workbook to the reviewing authority for approval. You can view, download, or order a CD of the workbook from DOH at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm Before you send your completed workbook to the reviewing agency, make copies of all plans, design drawings, worksheets, equipment information, operations and maintenance manuals, legal documents, and forms. Keep this information with your other project documents. It will help you and others manage and operate the new water system successfully. You also may want to keep your copy of these Guidelines there. Do not submit the Guidelines with your workbook. Online Group B Resources We developed the following Group B resources to help you from pre-approval of your water system design through operation and maintenance:

• All the forms you need to meet the submittal requirements for a new or expanding Group B water system.

• Guidance to help you operate and maintain your small system. We urge you to review this information before you begin operating your new or expanded system.

They are online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx

Group B Water System Design Guidelines (DOH 331-467) Page 1 December 2012

Page 31: Group B Design Workbook

Regulations You should become familiar with Washington’s Group B water system rule (chapter 246-291 WAC) and the information in these Guidelines before starting your design. The Group B rule is online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/RegulationandCompliance/Rules.aspx If you have questions about these Guidelines or the State Board of Health rules on Group B Water Systems (chapter 246-291 WAC), contact the state Department of Health (see Table 1.1) or your local health jurisdiction (LHJ). 1.0 Purpose and Scope These Guidelines will help developers, locally certified designers, and design engineers meet the approval requirements for a new or expanding Group B public water system by:

• Establishing uniform and simplistic concepts for very small water system designs.

• Meeting the submittal requirements described in chapter 246-291 WAC.

• Helping DOH regional engineers and LHJ reviewers to apply consistent review procedures. 1.0.1 Expanding Systems Unless otherwise noted, these Guidelines apply to new and expanding systems. For example, suppose your successfully operating existing Group B water system has approval to serve four residential connections. To expand the system to serve additional residences, your existing system must meet all current regulatory requirements, regardless of the past approval (chapter 246-291 WAC). You must prepare a complete workbook for review and approval by the reviewing authority before expanding your water system. Designers may use design approaches other than those in these Guidelines as long as the alternate approach does not conflict with chapter 246-291 WAC, and they give appropriate justification for taking an alternate approach. 1.1 “Must” versus “Should” Throughout these Guidelines we use the terms “must,” “will,” “shall” or “required” when design practice is sufficiently standardized to permit specific delineation of requirements, or where safeguarding the public health justifies definitive criteria or action (for example, when a state statute or rule mandates a requirement). The terms “should” or “recommend” indicate procedures, criteria, or methods that are not required. You can approach these with some degree of flexibility. Designers and design engineers need to explain the basis of the altered approach or, in specific circumstances, why another approach may be more applicable.

Group B Water System Design Guidelines (DOH 331-467) Page 2 December 2012

Page 32: Group B Design Workbook

1.2 Jurisdiction and Standards Many local health jurisdictions (LHJs) assist DOH with at least some Group B drinking water program administration. Others direct the Group B program within their jurisdictions, including approval of Group B water system designs. In these Guidelines, the term "department" refers to the agency that is responsible for reviewing and approving a Group B water system design in the particular county. 1.2.1 Reviewing Authority An LHJ has authority to adopt and implement its own Group B regulations, if they are at least as stringent as chapter 246-291 WAC. Before beginning your Group B workbook, we strongly recommend that you contact your LHJ to ask:

1. Is it the LHJ or DOH that is responsible for reviewing and approving the Group B workbook? If the LHJ is responsible, you must submit the completed Group B workbook to the LHJ for approval.

2. Has the LHJ adopted its own Group B regulations? If so, ask for a copy. This could affect who is permitted to prepare the design, and the design options available.

3. Does the LHJ regulate one- or two-connection Group B systems? (Ask if you intend to construct a one- or two-connection Group B water system).

We based statements in these Guidelines on the requirements and limitations in chapter 246-291 WAC. Your LHJ may adopt its own regulations that offer broader design options and impose increased regulation (WAC 246-291-030 (1)(a)). Moreover, if your LHJ does adopt its own regulations, it may develop its own accompanying design guidelines and Group B design workbook. 1.2.2 Project Location The location of your project affects whether you can create a new Group B water system and the standards that apply to its design and approval. Before beginning your Group B design, we strongly recommend you ask the reviewing authority whether the location of your proposed Group B water system is in:

1. An area the Department of Ecology has closed to all future appropriation of groundwater, including small groundwater withdrawals that are normally exempt from the water right permitting process. If so, this could significantly affect the feasibility, scope, cost, and timing of your project.

2. A Critical Water Supply Service Area (as established under the Public Water System Coordination Act of 1977). If so, you must request service from the existing water utility serving the area of your proposed Group B water system.

3. An area served by one or more Satellite Management Agency (SMA). If so, an available SMA must own, or manage and operate your proposed Group B water system before the department can approve the water system.

Group B Water System Design Guidelines (DOH 331-467) Page 3 December 2012

Page 33: Group B Design Workbook

1.3 Basic Design Standards The following standards apply to the approval of a Group B water system workbook from chapter 246-291 WAC. It’s possible that your LHJ adopted regulations that offer broader design options and impose increased regulation (WAC 246-291-030 (1)(a)). Ask your LHJ whether it adopted a set of regulations that affect the standards for design approval.

1. No supply source will be approved other than a drilled well that meets the requirements of chapter 173-160 WAC, or an agency-approved intertie with an approved Group A or Group B water system (WAC 246-291-125). New or expanding Group B systems cannot use a lake, river, spring, dug well, groundwater under the direct influence of surface water (GWI), rainfall catchment, or seawater source (WAC 246-291-125).

2. No supply source for a new or expanding Group B water system that exceeds a primary drinking water standard (such as nitrate, arsenic, coliform) will be approved (WAC 246-291-125(1) and -170(5)).

3. An LHJ or DOH must inspect the location (“well site”) of any existing or proposed well. You must submit the inspector’s written well site inspection report with the water system workbook (WAC 246-291-125(3)).

4. Applicants for a new or expanding water system must receive written approval of the workbook from the reviewing authority before starting any construction (WAC 246-291-120(1)).

5. Unless the proposal meets the exemption criteria for an engineer, new and expanding Group B water systems must be designed by a professional engineer licensed in Washington State (WAC 246-291-120(3) and (4)). Throughout these Guidelines, we cite “may require a professional engineer,” in recognition of the exemption criteria. Designers should note that a professional engineer must prepare and submit the workbook whenever DOH is the reviewing authority (WAC 246-291-120(3) and (4)).

6. New or expanding water systems designed and intended to serve 10 or more dwelling units must follow the Group A public water system approval process (WAC 246-291-200(2)).

7. The design must demonstrate source capacity of at least 750 gallons per day per dwelling unit for systems located west of the Cascade Mountain crest, and 1,250 gallons per day per dwelling unit east of the Cascade Mountain crest (WAC 246-291-125(4)).

8. If a Satellite Management Agency (SMA) is available in the location of a new Group B water system, then the workbook must document that a SMA will either own or manage and operate the water system (WAC 246-291-090). This requirement does not apply to an existing Group B water system seeking to expand its number of approved connections.

9. If a proposed Group B water system is in a Critical Water Supply Service Area, then the workbook must show that you requested water service from the water utility operating in the area of the proposed system (WAC 246-291-090). This requirement does not apply to an existing Group B water system seeking to expand its number of approved connections if the new connections are in the Group B’s existing service area.

Group B Water System Design Guidelines (DOH 331-467) Page 4 December 2012

Page 34: Group B Design Workbook

10. Conducting a well site inspection and undertaking review of a new or expanding Group B water system workbook are fee-supported activities. The LHJ or DOH will charge fees. For DOH review fees, see WAC 246-290-990.

1.4 Project Submittals You must submit a complete Group B workbook to the department for written approval before construction begins whenever a new Group B water system is being developed, and whenever an existing Group B water system seeks an increase the number of approved connections (an expanding system) (WAC 246-291-120(1)). Construction projects may be subject to local permits or approvals. Compliance with DOH requirements does not guarantee full compliance with local rules. Purveyors must ensure they follow local approval processes. Typically, the county building department and environmental health program will have information describing the local approval process. The designer must verify that construction was completed according to the approved plans and specifications. The designer or inspecting engineer must complete a Construction Completion Report and submit it to the department within 60 days of project completion and before providing water to the public (WAC 246-291-120(5)). A Construction Completion Report form is online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx If the engineer considers significant changes from the approved project plans during construction, the engineer must submit a description of the changes and justification for them to the department. The department must approve the proposed changes before they are constructed (WAC 246-291-120 (6)). Significant change means:

• The size, number, elevation, depth, material, and/or capacity of water system components are different than those described in the approved workbook

• Testing procedures differ from those described in the approved workbook See Figure 1.1 for the project design, submittal, review, and construction process.

Group B Water System Design Guidelines (DOH 331-467) Page 5 December 2012

Page 35: Group B Design Workbook

Figure 1.1: Design, Submittal, Review, and Construction Process 1.5 Requirements for a Professional Engineer The design report workbook must be prepared by a professional engineer licensed in Washington State (chapter 18.43 RCW (WAC 246-290-120 (3)). Exceptions to the professional engineer requirement are only possible when the local health jurisdiction has accepted primary responsibility for review and approval of Group B design report workbooks, and the local Board of Health rules provide an exception to the professional engineer requirement, and all of the following design conditions are satisfied:

• No variable speed pumps

• No fire flow

• No special hydraulic considerations

• No atmospheric storage in which the bottom elevation of the storage reservoir is below the ground surface

• No more than nine service connections to be served

Contact DOH or LHJ and confirm applicable standards

Estimate the water supply needs for your system.

Consult with Dept. of Ecology on water rights if needed.

Conduct well site inspection with DOH or LHJ

Drill well, pump test well, collect water samples from well

Design the water system and submit workbook to the

reviewing authority for approval

Design meets all requirements

Construct the water system

Submit Construction Completion Report

The new water system may begin service to

the public

YES

NO

Group B Water System Design Guidelines (DOH 331-467) Page 6 December 2012

Page 36: Group B Design Workbook

1.6 Other Referenced Documents and Standards We cite other waterworks-related laws, guides, standards, and documents in these Guidelines to provide appropriate references. These references form a part of these Guidelines, but it is not our intent to duplicate them. All water system designs must comply with locally adopted national model codes, such as the International Building Code (IBC) and Uniform Plumbing Code (UPC), and conform to other applicable industry standards and guidance, such as that from the American Water Works Association (AWWA), American Society of Civil Engineers (ASCE), and the American Public Works Association (APWA) (WAC 246-291-200(1)). 1.7 Department of Health Contacts The designer or design engineer should contact the department with questions or design concerns. DOH contact information is in Table 1.1. You can get contact information for your LHJ from your local phone book or online at http://www.doh.wa.gov/AboutUs/PublicHealthSystem/LocalHealthJurisdictions.aspx

Table 1.1 Office of Drinking Water Regional Offices

Eastern Region Serving Drinking Water Eastern Regional Office 16201 E. Indiana Ave., Suite 1500 Spokane Valley, WA 99216 Phone: 509-329-2100 Fax: 509-329-2104 TDD Relay: 1-800-833-6388

Adams, Asotin, Benton, Chelan, Columbia, Douglas, Franklin, Ferry, Garfield, Grant, Kittitas, Klickitat, Lincoln, Okanogan, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman, and Yakima counties.

Northwest Region Serving Drinking Water Northwest Regional Office 20425 – 72nd Avenue South, Suite 310 Kent, WA 98032 Phone: 253-395-6750 Fax: 253-395-6760 TDD Relay: 1-800-833-6388

Island, King, Pierce, San Juan, Skagit, Snohomish, and Whatcom counties.

Southwest Region Serving Drinking Water Southwest Regional Office Physical: 243 Israel Road

Tumwater, WA 98501 Mailing: P O Box 47823

Olympia, WA 98504-7823 Phone: 360-236-3030 Fax: 360-664-8058 TDD Relay: 1-800-833-6388

Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Kitsap, Lewis, Mason, Pacific, Skamania, Thurston, and Wahkiakum counties.

Group B Water System Design Guidelines (DOH 331-467) Page 7 December 2012

Page 37: Group B Design Workbook

CHAPTER 2 Basic Water System Information Chapter 2 covers the basic water system information required for most submittals. This includes the location, size, system classification, and future ownership and management of the water system. 2.0 Public Water System Classification Different types of water systems are subject to different regulations. Start by establishing whether your proposed water system is a public water system. Next, determine the system classification. A public water system is any system providing water for human consumption, excluding a system serving only one single-family residence, or a system with four or fewer service connections all of which serve residences on the same farm. See the complete definition in WAC 246-291-010. We base public water system classification on population and number of connections served. There are two classifications, Group A and Group B.

• Group A water systems serve 15 or more connections, or 25 or more people at least 60 days per year.

• Group B water systems serve fewer than 15 service connections and less than 25 people per day, or fewer than 15 service connections and 25 or more people per day for fewer than 60 days per year (WAC 246-291-005).

These Guidelines cover the design standards applicable to Group B public water systems. 2.0.1 Connections Served Determine the total number of connections by counting each single-family home, each dwelling unit in a multifamily building, and each nonresidential building the water system serves. The complete definition of “service connection” is in WAC 246-291-010. An accessory dwelling unit (ADU) is not always considered a separate dwelling unit. After hearing a case about ADUs in rural areas, the Growth Management Hearings Board ruled that counties should consider ADUs that are separate structures as additional dwelling units. In the following examples, we applied the definitions of “connection” in WAC 246-291-005 and the Hearings Board decision:

• A system serving two duplexes and two single-family homes serves a total of six dwelling units. Each dwelling unit is considered a separate connection.

• A system serving four single-family homes, each with an accessory dwelling unit incorporated into the main structure of the home, serves a total of four dwelling units, and therefore four connections.

Group B Water System Design Guidelines (DOH 331-467) Page 8 December 2012

Page 38: Group B Design Workbook

• A system serving four single-family homes, each with an accessory dwelling unit built as a separate structure on the same parcel, serves a total of eight dwelling units, and therefore eight connections.

• A system serves three single-family homes. One home has a shop with piped water that serves as a place of employment for people from outside the home. The other two homes include a separate structure with piped water that serves as a retail or commercial business open to customers or clients. This system serves three dwelling units plus three nonresidential connections, for a total of six connections.

Section 2.0 of the workbook explains how to report the number of residential and nonresidential connections your Group B water system will serve. 2.0.2 Population Served The population you must count is the number of people that have access to piped water for human consumption. The population served is either residential (people living in a residence), or nonresidential (tourists, customers, employees) entering the premises and given the opportunity to access tap water. 2.0.2.1 Residential Population

For the purposes of design, and to identify the appropriate water system approval standards, 2.5 residents must be assigned to each dwelling unit (WAC 246-291-200(2)). Therefore, if your proposed system serves 10 or more dwelling units, the department will review your proposal under the approval standards for Group A public water systems (chapter 246-290 WAC). Group A system approval standards are different from Group B system approval standards. See Section 2.0.3 below.

2.0.2.2 Nonresidential Population

A water system designed to serve 25 or more persons for 60 or more days per year will be considered a Group A water system (WAC 246-290-005). Our data system uses the information you provide on your Water Facilities Inventory Form (WFI) to calculate a daily average for each calendar month. (See Section 2.9.) If your expected average daily service population for two or more calendar months exceeds 24 persons, the department will review your proposal under the approval standards for Group A public water systems. See Section 2.0.3 below.

2.0.3 Application of Group A Public Water System Approval Standards If the department concludes that the scope of your project places your proposed water system into the Group A classification, the department will return your Group B workbook to you with an explanation. Contact your DOH regional office to discuss the department’s conclusion and, as applicable to your circumstance, the Group A public water system approval process.

Group B Water System Design Guidelines (DOH 331-467) Page 9 December 2012

Page 39: Group B Design Workbook

2.1 Applicability Based on public water system definitions and classifications (see Section 2.0), the following flow chart will help you decide whether your proposed Group B public water system is subject to the Group B design approval process. Please note that the department is responsible for properly classifying public water systems. Your use of this flow chart does not replace the department’s responsibility.

Does my proposal involve serving three or

more connections?

My proposal is subject to the design approval requirements for Group B systems: Chapter

246-291 WAC. I must obtain written approval prior to start of construction

My proposal is not subject to the design approval requirements of Chapter 246-291 WAC or Chapter 246-290 WAC. Check with the LHJ for any locally adopted regulations

Does my proposal involve serving any of the following?

Food service establishment

Residential treatment facility Transient accommodations

Boarding home Childcare

Nursing home

YES

NO

YES

NO

Has DOH informed me that approval of my public water

system is necessary to protect public health and safety?

YES Does my proposal

involve serving 10 or more dwelling units?

Does my proposal involve serving 25 or

more people at least 60 days per year?

Does my proposal involve serving 15 or

more connections?

My proposal is subject to the design approval requirements for Group A systems: Chapter 246-290 WAC.

YES YES

YES

NO

NO

NO

NO

START

Is my proposal limited to serving a single-family home, or 4 or fewer residences all located

on the same farm?

YES

NO

Group B Water System Design Guidelines (DOH 331-467) Page 10 December 2012

Page 40: Group B Design Workbook

2.2 Project Approval Application Form A Group B Project Approval Application Form offers the designer the means to provide the information necessary for the proper review and processing of the application. This information includes:

• Contact information for both the water system and the person submitting the project.

• The number and type of connections that are or will be served.

• The type of project. The Group B Project Approval Application Form is online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx 2.3 Service Area Map and Location Applicants for a new or expanding water system must also provide a scaled map of the proposed service area (WAC 246-291-140(1)). You can use the same map submitted with a land use application or one that is similarly detailed. The map you use should include the boundaries of the proposed service area, roads, property lines, parcel numbers, and other features helpful in locating the project and individual features. You can use the same map to show the proposed distribution system, or use a separate map. 2.4 Public Water System Coordination Act The Public Water System Coordination Act of 1977 (RCW 70.116) requires applicants seeking development of a new public water system to determine whether the proposed system is in the future service area of an existing utility. The intent of the Coordination Act is to avoid creating new water systems whenever an existing water system is available and willing to provide service. If your project is in a Critical Water Supply Service Area, ask the reviewing authority to identify the utility providing service. You must request water service from that utility. If the utility can provide service in a timely and reasonable manner, you must obtain water service from the utility and abandon plans to develop a new water system (WAC 246-291-090). This requirement does not apply to an existing Group B water system seeking to expand its number of approved connections if the new connections are in the Group B’s existing service area. To ensure compliance with this statute, you must include a written record of the request for water service, and the water supplier’s written response to that request in your workbook (WAC 246-291-120). An example of a letter requesting water service is in the Appendix. If your project is outside a Critical Water Supply Service Area, you may develop a new water system. However, your application is subject to the Satellite Management Agency requirement (WAC 246-291-090).

Group B Water System Design Guidelines (DOH 331-467) Page 11 December 2012

Page 41: Group B Design Workbook

2.5 Satellite Management Agency (SMA) A Satellite Management Agency (SMA) is an individual, water system, or other entity approved by DOH to own or operate public water systems on a regional or countywide basis. The law requires all new water systems to be owned or operated by an approved SMA, if one is available (RCW 70.119A.060). The intent of the SMA requirement is to place ownership, or operations and management, of all new public water systems in the hands of experienced water suppliers whenever possible. This requirement does not apply to an existing Group B water system seeking to expand its number of approved connections. Some counties do not have any approved SMAs, but most do. You should choose the one that best meets your needs. The current approved SMA list is online at http://www.doh.wa.gov/Portals/1/Documents/4200/sma_list.pdf If your project is in the service area of one or more approved SMA, ask each one whether it is available to provide ownership or management services to the proposed public water system. An example of a letter requesting SMA services is in Appendix B. You must either provide a copy of an SMA agreement with your project submittal or proof that no approved SMA is available (WAC 246-291-090 and -120).

YES, an SMA is available to own the proposed water system or provide management services. You must provide a copy of the agreement with the project submittal.

NO SMA is available. You must provide a written record of each SMA rejection with your project submittal.

Your SMA may require you to submit your water system design for review and acceptance before you submit your application to the department for approval, particularly if the SMA will become the owner of the new water system. 2.6 Disclosure on Property Title You must record an informational notice on the title of each property to be served by your new water system (WAC 246-291-140(2)). A sample notice is in the Appendix. When submitting your workbook to the reviewing authority, provide a copy of the content you will record on the title of each property your water system will serve. Ask your County Auditor which form you should use to record notice to title. 2.7 Protective Covenants Protective covenants are required to secure the area around a public drinking water supply from future use and development that may threaten water quality and public health (WAC 246-291-125(5)). Section 4.3 explains how to provide legal protection for the area around a public drinking water supply well. When submitting your workbook to the reviewing authority, provide a copy of the actual protective covenants on record with the County Auditor for each public drinking water supply well.

Group B Water System Design Guidelines (DOH 331-467) Page 12 December 2012

Page 42: Group B Design Workbook

These covenants must be on each of the affected properties, and filed with the County Auditor. Check with your local government; you may be allowed to establish the covenant on the subdivision plat. Ask your County Auditor which format you should use to record the protective covenants for each public drinking water supply well. 2.8 Water Users’ Agreement You should establish a water users’ agreement for all new Group B water systems that include residences or multiple property owners. All owners of the water system should sign the users’ agreement when the system is constructed and operational. An outline for a water users’ agreement is in the Appendix. You may need to complete your water system design before you can finalize your draft water users’ agreement. 2.9 Water Facilities Inventory We recommend that you complete a Water Facilities Inventory Form (WFI) and include it with your Group B workbook. To ensure the information in our data system is correct, answer all the questions on the WFI. Instructions for Group B systems and a sample WFI form are in the Appendix. If you plan to submit a workbook for an expanding Group B system, please submit a marked-up version of your existing WFI form. 2.10 Easements Your Group B workbook must show the location and dimension of easements you intend to secure in order to adequately access and maintain all distribution system components, reservoirs, wells, and pumping stations (WAC 246-291-120).

Group B Water System Design Guidelines (DOH 331-467) Page 13 December 2012

Page 43: Group B Design Workbook

CHAPTER 3 Estimating Water Demands Chapter 3 explains how to estimate expected maximum daily demand (MDD) and peak hour demand (PHD) for your proposed water system. Engineers need water demand estimates to size pumping equipment, transmission lines, distribution mains, and water storage facilities properly. Demand estimates combined with information about your water supply source will ensure the water system can meet all the demands you expect it to meet over the year. Establishing the expected MDD also determines whether you need a water right (RCW 90.44.050). If you do need a water right, you must get the appropriate documents from the Department of Ecology and include them in your workbook (WAC 246-291-125(3)). If the department believes you need a water right, but you don’t provide a copy with your submittal, we will return your submittal to you. We will also explain our decision and recommend that you consult with the Department of Ecology before resubmitting your design. 3.0 Water Rights 3.0.1 Water Right Permit Exempt Wells The Department of Ecology administers the regulatory and permitting processes for water rights. Newly designed Group B water systems may only obtain water from a groundwater source. Most Group B water systems use the groundwater permit exemption (RCW 90.44.050) rather than obtaining a permit from Ecology prior to using any water. An owner of a permit-exempt well may withdraw up to 5,000 gallons per day for single or group domestic uses. In addition, the owner gets a separate allowance to irrigate lawns or noncommercial gardens. This separate irrigation allowance is not limited in terms of gallons per day; it is limited by the size of the area you are permitted to irrigate with water from the well. In addition to the 5,000 gallons per day limit for domestic use, an owner of a permit-exempt well may withdraw any amount of water for irrigating not to exceed a combined total of ½ acre of lawns and noncommercial gardens. For a complete description of the legal uses of a permit-exempt well, see RCW 90.44.050 and the Attorney General’s Exempt Ground Water Withdrawals: 2009 AG Opinion (No. 6) online at http://www.atg.wa.gov/AGOOpinions/Opinion.aspx?section=archive&id=23864 The Attorney General’s opinion affects the design of new and expanding Group B water systems:

• If the expected maximum daily demand for domestic use (water used inside residences) combined with any other nonresidential water use (business, commercial, industrial) exceeds 5,000 gallons per day, you must submit documents confirming a water right exists for the project (WAC 246-291-125(3)).

• If the water supply will be used to irrigate more than ½ acre (21,780 square feet) of lawn(s) and noncommercial garden(s) for all parcels combined, you must submit documents confirming a water right exists for the project (WAC 246-291-125(3)).

Group B Water System Design Guidelines (DOH 331-467) Page 14 December 2012

Page 44: Group B Design Workbook

Permit-exempt wells are exempt only from the duty to obtain a permit to use groundwater, not the other provisions of the Water Code. A right established through a permit-exempt well has the same legal effect and must abide by the same requirements of prior appropriation and state regulation of water resources as a permitted withdrawal. In other words, use of water from a permit-exempt well must be regulated or curtailed, where necessary, to protect and prevent impairment to more senior water rights. Even if your Group B water supply is a permit-exempt well, it’s subject to curtailment if Ecology finds such action necessary to protect senior rights or public waters. When assessing the need for a water right, you should assume that the domestic in-home portion of your total system maximum daily demand (MDD) will be at least 350 gallons per day (gpd) per dwelling unit. The domestic in-home demand is the portion of the total system MDD that counts toward the 5,000-gallon-per-day limit described above. 3.0.2 Basins Closed to Further Appropriation Ecology may close a basin to all further appropriation or establish reservations of water for permit-exempt wells to protect senior water right holders and minimum instream values. However, Ecology may create a pathway for an applicant of a new Group B water system to follow a basin-specific process to secure permission to withdraw groundwater to supply the system. A basin-specific process may involve developing and implementing a mitigation plan. To determine whether your project is located in a closed basin, contact the Department of Ecology. If so, you must submit Ecology’s written permission to withdraw the groundwater you need with your Group B water system workbook. While such permission, if granted, is not a “water right,” we apply the requirement of WAC 246-291-125 (3) to such circumstances. 3.0.3 Multiple Permit-Exempt Withdrawals The rule permits only one exemption for any one project, no matter how many wells and separate small systems are established to supply the project. If you intend to develop two or more separate, contiguous Group B water systems, you may not have the legal authority to do so. Contact the Department of Ecology for assistance on this legal requirement. 3.0.4 Group B Applicants with a Water Right A water right may state the number of connections that can be served. With one exception (see below), the number of connections shown on the water right is a limiting factor for a new or expanding system intended to serve fewer than 15 residential connections. In other words, if the water right specifies that it applies to serving six single family homes, then the maximum number of homes that can be served by the water system is six, even if the instantaneous and annual volume permitted under the right could supply more homes. The one exception is when an existing municipal water supplier owns the new or expanding Group B system. Applicants who want to know whether their organization is a municipal water supplier should contact their DOH regional office. Group B Water System Design Guidelines (DOH 331-467) Page 15 December 2012

Page 45: Group B Design Workbook

3.1 Residential Water Demand 3.1.1 Residential MDD The MDD is the maximum single-day demand the water supply must meet. It consists of in-home domestic demand (see Section 3.0.1), outdoor demand, nonresidential demand, and distribution system leakage. It’s important to establish the proposed water system’s MDD before you drill and test the water supply well. WAC 246-291-125 (4) specifies the minimum source capacity and minimum MDD for residential service connections (see Table 3.1).

Table 3.1 Standards for Minimum Source Capacity and

Minimum MDD for Residential Service Connections

County Gallons per day per dwelling unit

Clallam, Clark, Cowlitz, Grays Harbor, Island, Jefferson, King, Kitsap, Lewis, Mason, Pacific, Pierce, San Juan, Skamania, Skagit, Snohomish, Thurston, Wahkiakum, and Whatcom

750

Adams, Asotin, Benton, Chelan, Columbia, Douglas, Ferry, Franklin, Garfield, Grant, Kittitas, Klickitat, Lincoln, Okanogan, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman, and Yakima

1,250

Because residential MDD includes inside and outside uses, the actual demand could be considerably higher than the minimum values listed in Table 3.1. In general, the demand for water increases along with lot size, home size, and average summer temperatures. Other site-specific considerations, such as the development’s Covenant, Conditions, and Restrictions; cost of water; soil type; and irrigation system technology, may also affect water demand. The designer and design engineer should strongly consider whether the minimum values in Table 3.1 are sufficient to meet the expected demands of future customers. The effect of under-estimating the MDD includes low pressure, summertime water rationing, dissatisfied customers, and increased vulnerability to backsiphonage of nonpotable water into the distribution system. 3.1.2 Residential PHD It’s important to establish the peak hourly demand (PHD) before designing the system of wells, pumps, pipes, and pressure tanks. The relationship between PHD, sustained well yield, and well pump capacity will determine whether the proposed water system requires atmospheric storage to supplement the supply source(s) to meet the expected PHD. See Chapter 5 for details. Table 3.2 provides guidance on establishing the minimum PHD for residential demand. For the same reasons cited in 3.1.1 above, the actual PHD of the customers your proposed Group B system will serve could be considerably higher than the values in Table 3.2. The effect of under-estimating the PHD includes low pressure, dissatisfied customers, and increased vulnerability to backsiphonage of nonpotable water or other potential contaminants into the distribution system.

Group B Water System Design Guidelines (DOH 331-467) Page 16 December 2012

Page 46: Group B Design Workbook

Table 3.2 Guide for Minimum Residential Peak Hourly Demand

Number of

dwelling units Peak Hour Demand

(in gallons per minute) 2 23 3 26 4 28 5 31 6 34 7 36 8 39 9 41

Source: Adapted from DOH Water System Design Manual 3.2 Nonresidential Water Demand 3.2.1 Nonresidential MDD Table 3.3 provides guidance on nonresidential average maximum daily demand (MDD). We use the values here as guidance with the following assumptions:

• Unit nonresidential demand will vary little from day to day.

• MDD is based on a full facility (the campsite or hotel is fully occupied or the school is operating at capacity).

Table 3.3

Guide for Nonresidential Water Demand

Type of Establishment Maximum Daily Demand

(in gallons per day) Bathhouse (per bather) 10 Boardinghouse (per boarder)

Additional kitchen requirements for nonresident boarders 50 10

Camp: Construction, semi-permanent (per worker) Day, no meals served (per camper) Luxury (per camper) Resort, day and night, limited plumbing (per camper) Tourist, central bath and toilet facilities (per person)

50 15

100 - 150 50 35

Factory (gallons per person per shift) 15 - 35 Highway rest area (per person) 5 Hotel: Private baths (2 persons per room) No private baths (per person)

50 50

Institution other than hospital (per person) 75 - 125 Laundry, self-serviced (gallons per washing (per customer)) 50 Motel: Bath, toilet, and kitchen facilities (per bed space) Bed and toilet (per bed space)

50 40

Park:

Group B Water System Design Guidelines (DOH 331-467) Page 17 December 2012

Page 47: Group B Design Workbook

Type of Establishment Maximum Daily Demand

(in gallons per day) Overnight, flush toilets (per camper) Trailer, individual bath units, no sewer connection (per trailer) Trailer, individual baths, connected to sewer (per person)

25 25 50

Picnic: Bathhouses, showers, and flush toilets (per picnicker) Toilet facilities only (gallons per picnicker)

20 10

Restaurant: Toilet facilities (per patron) No toilet facilities (per patron) Bar and cocktail lounge (additional quantity per patron)

7 - 10

2 ½ - 3 2

School: Day, cafeteria, gymnasiums, and showers (per pupil) Day, cafeteria, no gymnasiums or showers (per pupil) Day, no cafeteria, gymnasiums or showers (per pupil)

25 20 15

Service station (per vehicle) 10 Store (per toilet room) 400 Worker: Construction (per person per shift) Day (school or offices, per person per shift)

50 15

Sources: Adapted from Design and Construction of Small Water Systems American Water Works Association, 1984; and Planning for an Individual Water System. American Assoc. for Vocational Instruction Materials, 1982.

3.2.2 Nonresidential PHD Tables 3.4 and 3.5 provide guidance on establishing nonresidential PHD.

Table 3.4 Demand Weight in Fixture Units

Fixture Type Weight in Fixture Units per Fixture Type

Shower 2 Kitchen sink 1.5 Urinal 3 Toilet (flushometer) 5 Toilet (tank flush) 2.5 Bathroom sink (lavatory) 1 Clothes washer 4.0 Drinking fountain 0.5 Dishwasher 1.5 Hose Bibb 2.5

Source: Adapted from the 2009 Uniform Plumbing Code, Appendix A, Table A-2 After determining the total number of fixture units (sum of fixture type times fixture weight), round the total to the next value given in Table 3.5, and determine the peak hourly demand.

Group B Water System Design Guidelines (DOH 331-467) Page 18 December 2012

Page 48: Group B Design Workbook

Table 3.5 Nonresidential Peak Hourly Demand

Based on Total Fixture Units

Total Number of Fixture Units

PHD (gpm)

10 8 15 12 20 15 25 18 30 20 35 22 40 25 50 29 60 32 70 35 80 38 90 41 100 43

Source: Adapted from the 2009 Uniform Plumbing Code, Appendix A 3.3 Examples Example 3-1 A new Group B water system proposed east of the Cascade Mountains consists of six single-family homes. The plan for development allows each lot to irrigate up to 3,500 square feet, for a total irrigated area of 21,000 square feet. The design relies on supply from a permit-exempt well. The system will not supply fire-suppression requirements (fire hydrants or residential sprinkler systems). Check water right: Maximum daily residential in-home demand is assumed to be 350 gpd per residence

6 residences x 350 gpd per residence = 2,100 gpd

This is less than the 5,000-gpd limitation on a permit-exempt well. OKAY Total irrigated area is below the maximum 21,780 square feet allowed without a water right.

OKAY Minimum required MDD and water supply capacity = 6 homes x 1,250 gpd/home (per Table 3.1) = 7,500 gpd PHD = 34 gpm (per Table 3.2) Example 3-2 A new Group B water system proposed west of the Cascade Mountains consists of four single-family homes. The plan for development allows each lot to irrigate up to 5,000 square feet, for a total irrigated area of 20,000 square feet. The design relies on supply from a permit-exempt well.

Group B Water System Design Guidelines (DOH 331-467) Page 19 December 2012

Page 49: Group B Design Workbook

The system will not supply fire-suppression requirements (fire hydrants or residential sprinkler systems). Check water right: Maximum daily residential in-home demand is assumed to be 350 gpd per residence

4 residences x 350 gpd per residence = 1,400 gpd.

This is less than the 5,000 limitation on a permit-exempt well. OKAY

Total irrigated area is below the maximum 21,780 square feet allowed without a water right. OKAY

Minimum required MDD and water supply capacity = 4 homes x 750 gpd/home (per Table 3.1) = 3,000 gpd PHD = 28 gpm (per Table 3.2) Example 3-3 A new water system proposed east of the Cascade Mountains consists of nine single-family homes. The planning documents for this development indicate that each lot is 10 acres and each lot owner will be allowed to irrigate up to 5,000 square feet. The design relies on supply from a permit-exempt well. The system will not supply fire-suppression requirements (fire hydrants or residential sprinkler systems). Check water right: Maximum daily residential in-home demand is assumed to be 350 gpd per residence

9 residences x 350 gpd per residence = 3,150 gpd This is less than the 5,000 limitation on a permit-exempt well. OKAY

× Total irrigated area is 45,000 square feet (9 x 5,000). This exceeds the area allowed without a water right. NOT OKAY.

The department will return the workbook with instruction to change the irrigation allowance, or obtain a water right. Example 3-4 An existing Group B water system located west of the Cascade Mountains consists of six single-family homes. The owner wishes to add five single-family homes to the existing system. The department approved the existing system in 2001. As described in Section 1.4, the Group B design requirements apply to new and expanding Group B systems. There is no “grandfathering” of existing system design when the owner of the system proposes an expansion. So, the owner must apply the requirements of the current Group B Rule to all 11 connections (6 existing and 5 proposed), including such standards as minimum MDD and demonstrated source capacity per dwelling unit, population per dwelling unit, notice to title, and limits on irrigation per parcel.

Group B Water System Design Guidelines (DOH 331-467) Page 20 December 2012

Page 50: Group B Design Workbook

An expanding system proposing to serve 11 single-family homes must meet the planning, engineering, and design standards for Group A public water systems because the design population exceeds 24 people (WAC 246-291-200(2)).

11 dwelling units x 2.5 people per dwelling unit = 28 people Example 3-5 A small commercial building proposed in Western Washington will provide worksites for 20 daytime employees and no visitors. The proposed building will have its own drinking water system, using a permit-exempt well. The area around the building to be irrigated is 3,000 sq feet. A fire pond filled by a nonpotable water supply will meet the building’s fire-suppression requirements. The fire pond and associated fire-suppression piping have no physical connection with the potable water system. To determine the need for a water right, follow the steps below. Step 1: Apply the fixture weight to each fixture type (Table 3.4), and determine the building’s

total fixture units. Fixture Type Number of Fixtures x Fixture Weight = Fixture Units Drinking fountain 2 0.5 1 Toilet (tank flush) 4 2.5 10 Urinal 1 3 3 Lavatory 2 1 2 Kitchen sink 1 1.5 1.5 Total 17.5 Step 2: Round the total fixture units from 17.5 up to 20 (the next increment in Table 3.5). Step 3: Use Table 3.5 to establish peak hourly demand for internal use within the building.

Nonresidential internal PHD is 15 gallons per minute. If the irrigation system is not operated while the building is occupied, then the estimated design PHD should be 15 gpm. If the irrigation system can be operated while the building is occupied, then the design estimate for PHD should include both the internal PHD (15 gpm in this example) plus the peak flow rate of the irrigation system.

Check water right: To estimate nonresidential MDD, multiply 20 workers x 15 gallons per day (per Table 3.4).

Therefore, the nonresidential MDD is 300 gpd.

This is less than the 5,000 limitation on a permit-exempt well. OKAY

Total irrigated area is below the maximum 21,780 square feet allowed without a water right. OKAY

Group B Water System Design Guidelines (DOH 331-467) Page 21 December 2012

Page 51: Group B Design Workbook

3.4 Fire Suppression If the project is in a Critical Water Supply Service Area, the water system design must provide the minimum stipulated fire suppression capacity (WAC 246-291-090 (1)). The local fire authority may require greater fire suppression capacity for the proposed water system. Minimum fire-flow requirements for public water systems in a Critical Water Supply Service Area are in WAC 246-293-640. If the project is not in a Critical Water Supply Service Area, we recommend you consult with the local fire authority to determine what, if any, fire suppression capacity it expects from the proposed water system. 3.4.1 Design for Individual Structure Sprinkler Systems If the water system will provide the direct supply of water to individual sprinkler systems in homes or other nonresidential structures, you must include the added supply and pressure requirements these sprinkler systems demand (WAC 246-291-200 and -210). If you intend to design a water system capable of providing fire flow, either through hydrants or individual structure sprinklers, a professional engineer licensed in Washington State must prepare and submit the water system design (WAC 246-291-120(4)). For further guidance, please see our Water System Design Manual (331-123) online at http://www.doh.wa.gov/portals/1/Documents/pubs/331-123.pdf References WSDOH, 2009. Water System Design Manual, DOH 331-123, Washington State Department of Health, Olympia, WA. American Association for Vocational Instructional Materials. 1982. Planning for an Individual Water System, 4th Edition, American Association for Vocational Instructional Materials, Athens, GA. AWWA. 1984. Design and Construction of Small Water Systems, American Water Works Association, Denver, CO.

Group B Water System Design Guidelines (DOH 331-467) Page 22 December 2012

Page 52: Group B Design Workbook

Chapter 4 Sources of Supply Chapter 4 covers design considerations for your water source(s). The first consideration and a potential limiting factor in small water system design is the capacity of the source(s). The goal of your water system design is to provide the quantity of water needed to reliably meet the expected maximum day and peak hourly demands of your future customers. The rule permits two types of sources for new or expanding Group B water systems: a well or an intertie with an existing, approved public water system (chapter 246-291 WAC). If you intend to supply your proposed water system with an intertie, please refer to Section 4.4. The rest of this chapter is devoted exclusively to using a well as your Group B water supply. 4.0 Well Construction In your workbook, you must demonstrate that your Group B groundwater supply:

• Is a drilled well, constructed according to chapter 173-160 WAC (WAC 246-291-125(1)). The department will not approve springs, surface water, dug wells, and wells found to be in direct hydraulic connection with surface water as a Group B water supply.

• Is capable of reliably delivering the minimum supply described in WAC 246-291-125 (4).

• May be used in compliance with Washington’s Water Code and other applicable regulations (WAC 246-291-125(3)) and the water right discussion in Chapter 3.

• Is physically connected to the distribution system. Trucked or hauled water is not an acceptable Group B public water supply, regardless of the trucked water source (WAC 246-291-125(1)).

• Meets all primary water quality standards without needing treatment (WAC 246-291-125(1) and -170(5)).

• Is protected adequately from potential contamination sources. Protective covenants establishing the minimum sanitary control area must be filed for each source (WAC 246-291-125(5)).

A totalizing source meter and sample tap are required on each new supply source (WAC 246-291-200). In addition, we recommend individual service meters on each service connection. The well casing must extend at least 6-inches above the finished ground surface, or at least 6-inches above the pump house finished floor. Further, the top of the well casing must be at least 24 inches above the 100-year flood elevation (WAC 246-291-125(1) and chapter 173-160 WAC). Your submitted workbook must document the height of the well casing above the finished ground surface or floor. You may find flood-mapping information at your local planning office. If your well is in the 100-year flood plain, you must note this on your drawings. (See Section 5.3.) The pitless adaptor or pitless unit, and the well cap must be manufactured according to Standard PAS-97 (04) (WAC 246-291-200 (13)). Group B Water System Design Guidelines (DOH 331-467) Page 23 December 2012

Page 53: Group B Design Workbook

4.1 Source Water Quantity Groundwater is the most common form of public drinking water supply in Washington State. Your groundwater source(s) must provide sufficient water to meet the maximum daily demand (MDD) for your water system (WAC 246-291-125(4)). If your well can produce the maximum daily demand, but not the peak hour demand (PHD), you must provide equalizing water storage (WAC 246-291-200 (5)). If storage is required, a professional engineer may need to design the water system (WAC 246-291-120(4)). 4.1.1 Well Log The well log, otherwise known as a “water well report,” provides important information about the construction of your well and its vulnerability to contamination. It also contains information about your aquifer and sometimes your well capacity and pump setting. You must include a copy of the well log in the workbook, even when the design intends to use an existing well (WAC 246-291-125(3)). If a well log is not available, the department may not approve the source, or it may require additional information before considering the source for approval. 4.1.2 Pump Tests All wells submitted for approval must be pump tested (WAC 246-291-125(3)). The goal of the pump test is to demonstrate the source’s capacity to meet or exceed proposed water system demand during a range of conditions likely to occur over the course of a year and the life of the well. See Appendix F for detailed pump test guidance. The pump test must provide the:

• Static water level • Sustainable yield • Drawdown • Recovery rate • Duration of pumping

To demonstrate sustainable yield, a successful pump test must show the proposed well (or combination of wells) can provide a sustainable and reliable yield equal to or exceeding the minimum supply requirements in WAC 246-291-125 (4)(d). In addition, the water level in the proposed well must recover to 95 percent or more of the pre-test water level within a normal 24-hour operational period.

Group B Water System Design Guidelines (DOH 331-467) Page 24 December 2012

Page 54: Group B Design Workbook

A successful pump test will provide data needed for source approval, well design, and water system planning decisions. By analyzing the pump test data, you can:

• Identify the capacity and reliability of your well.

• Establish well pump settings (depth and discharge rate).

• Define the area of influence of your well.

• Identify whether the system requires a water supply contingency plan because of a low-yield well (defined as 5.0 gpm or less) (WAC 246-291-140 (1)).

4.1.2.1 Elements of a Pump Test

A pump test is an aquifer and well stress test. The test subjects the well to a series of controlled pump and recovery (rest) challenges. Pumping rates and the water level in the well are monitored and recorded. The designer can use an analysis of the data to identify aquifer characteristics, such as transmissivity, hydraulic capacity, and specific yield. A design engineer can use the capacity of the well (in gallons per minute), established from the pump test, and the required pump head (in feet) to select the proper pump size, pump placement and determine overall well efficiency. Because aquifer conditions vary, the Appendix describes three different pump test procedures, each suited for different hydrologic conditions.

Test Procedure Application

1 Standard Step Drawdown/ Constant Rate Complex or unknown hydrologic settings

2 Extended Step Drawdown Small systems with low demand located in high yield aquifers

3 Alternating Pump and Recovery Very small systems in very low yield aquifers

Every pump test must include regularly recorded pumping and water level measurements taken before the test begins (pre-pumping conditions), during the pumping phase (drawdown), after the pump is shut off, and as water levels return to pre-pumping or near normal conditions (recovery). Pre-pumping and recovery water level measurements are as important as measurements taken during the pumping phase of a test. A pump test must be long enough to demonstrate that the well can produce the minimum supply requirements defined in WAC 246-291-125 (4)(d) and recover to at least 95 percent of pre-pumping levels within a normal 24-hour operational period. The length of an individual pump test will vary based on the structure of the test and the aquifer conditions. Pump tests may take longer than 24 hours to complete and still be considered successful. It is the analysis of the data collected during the pump and recovery tests that demonstrates sustainable operating conditions. The designer is responsible for ensuring that a pump test provides sufficient data to achieve its objectives.

Group B Water System Design Guidelines (DOH 331-467) Page 25 December 2012

Page 55: Group B Design Workbook

To conduct a pump test on an existing drinking water supply (to an individual home or an existing Group B water system), you must disconnect the pump discharge from the distribution system and any pressure tanks. This will allow you to measure the unrestricted pump discharge. Be sure to disinfect the well and pump discharge piping after completing the pump test and before placing the well pump back into service. Follow the disinfection standards in WAC 246-291-220.

If not already present, the designer must install an access port permitting “depth to water” measurement prior to the pump test (WAC 173-160). We recommend that you measure water levels to the nearest 0.01 ft. However, not all measuring devices have the same level of accuracy. Many electric tapes and loggers can provide accuracy of 0.01 ft. Sonic loggers may not show the same level of accuracy (typically 0.1 ft) but can provide more frequent and consistent measurements. To ensure recovery data is accurate, the designer should install check valve(s) to prevent water in the riser pipe from flowing back into the well when the well shuts off. If aquifer conditions are unknown or hydrologically complex, you should consider getting help from a hydrogeologist or licensed water resource professional. Before conducting a pump test in areas subject to seawater intrusion, contact the local health jurisdiction. The LHJ may have pump test requirements or standards in addition to those in these Guidelines.

4.1.2.2 Low Well-Yield Water Supply Contingency Plan If the pump test indicates the well yield is 5.0 gpm or less, the design must include a contingency plan describing short-term and long-term measures to restore water to consumers if the supply is ever inadequate to meet demand (WAC 246-291-140). When the supply begins with such a low yielding well, any decline in well yield of even a few gallons per minute will significantly affect the water system’s ability to satisfy demand. Such a contingency plan should address both the supply constraint and consumer demand, and consider how the costs associated with a remedy will be met. The plan should identify how the system will continue to provide at least 350 gallons per day per residence of safe drinking water. Maintaining this minimum level of supply presumes the community is capable of prohibiting all outdoor water use, and that distribution system leakage is virtually nonexistent. There will likely be costs associated with pursuing a remedy to a low-yield source that suffers from declining yield, such as well rehabilitation or constructing a new source. The plan should contemplate how and when the system would establish a fund for such work.

4.2 Source Water Quality The statements in this section, and throughout these Guidelines, assume the requirements and limitations in chapter 246-291 WAC are in effect in your project’s jurisdiction. It is possible that your local health jurisdiction adopted its own regulations that offer broader design options and impose increased regulation to protect against public health risks associated with those options (WAC 246-291-030 (1)(a)). Ask your local health jurisdiction if it has adopted regulations that differ from chapter 246-291 WAC.

Group B Water System Design Guidelines (DOH 331-467) Page 26 December 2012

Page 56: Group B Design Workbook

All supply sources used for public water system service must meet minimum public health water quality standards. These standards, known as maximum contaminant levels, are in WAC 246-291-170. A state accredited lab must analyze all source samples to ensure they meet these standards (WAC 246-291-170(l)). Source water sample taps must be provided (WAC 246-291-200(9)). We recommend you install the sample tap as close to the source as practical. If your design requires treatment for a secondary contaminant (WAC 246-291-170(6)), install a second sample tap after treatment and prior to entry to the distribution system. 4.2.1 Coliform Bacteria All groundwater sources must be disinfected, flushed, and subsequently tested for coliform bacteria, and you must include the coliform bacteria test results with the workbook (WAC 246-291-170(2)). If coliform is present in the initial well sample, at least two follow-up coliform samples must be collected after re-disinfecting and re-flushing the well. If coliform is present in any of these follow-up coliform samples, the department will not approve the well as a Group B public water supply (WAC 246-291-170(5)). 4.2.2 Inorganic Contaminants All groundwater sources submitted for approval must be tested for complete inorganic chemicals (IOC), and must meet the listed primary water quality standards without treatment (WAC 246-291-170(2)). If your proposed groundwater source exceeds an IOC primary water quality standard, you must collect a second (confirmation) sample. If the average of the two samples exceeds the drinking water standard, the department will not approve the well as a Group B public water supply WAC 246-291-170(5)). If your proposed groundwater source exceeds an IOC secondary water quality standard (iron, manganese), your workbook must include treatment for its effective removal (WAC 246-291-170(6)). See Chapter 9 for guidance on treatment for secondary contaminants. 4.2.2.1 Groundwater with High Initial Turbidity While not a regulated contaminant, turbidity is commonly included in a complete inorganic chemical analysis. A new well may show high turbidity in the post-pump test IOC sample. If so, you should thoroughly purge and pump the well to remove any construction residuals. High turbidity can be an indication of a poorly developed well. Iron or manganese may also cause high turbidity. Finally, turbidity may be an indication that the well is under the influence of nearby surface water (a serious problem). Turbidity can cause distribution-related problems and customer complaints. Turbidity in groundwater, and particularly turbidity without any reasonable or logical explanation, is a significant concern. The design engineer should contact the reviewing authority for additional guidance.

Group B Water System Design Guidelines (DOH 331-467) Page 27 December 2012

Page 57: Group B Design Workbook

4.2.3 Other Site-Specific Contaminants The department may require you to sample the well for volatile or synthetic organic chemicals, or radionuclides if your proposed Group B groundwater source is in an area of known or suspected contamination (WAC 246-291-170(2)). If the initial sample shows the well exceeding a public health water quality standard, you must take a confirmation sample. If the average of the initial and confirmation samples exceeds the drinking water standard, the department will not approve the well as a Group B water supply (WAC 246-291-170(5)). 4.2.4 Potential Groundwater under the Direct Influence of Surface Water You must evaluate all sources that meet the definition of potential groundwater under the direct influence of surface water (GWI) before submitting your completed Group B design for approval (WAC 246-291-125(1)). If your proposed groundwater supply is within 200 feet of surface water and the first open interval (top of well screen, first perforations in the well casing, and so on) is less than 50 feet below the ground surface, then your proposed groundwater supply is considered a potential GWI. The department will not approve a potential GWI source until a licensed hydrogeologist or engineer completes a hydrogeologic evaluation that determines the source is not GWI and is not in hydraulic connection with surface water (WAC 246-291-125(1)). The department will charge a separate fee to review your GWI evaluation. 4.2.5 Seawater Intrusion Wells developed close to seawater are potentially vulnerable to seawater intrusion. You should avoid supply sources at risk of seawater intrusion. Wells are at risk for seawater intrusion if they are:

• Within ½ mile of the shoreline and pump water from a depth below sea level.

• Within ½ mile of a groundwater source with chloride concentrations over 100 mg/L. The Department of Ecology may condition water right permits to provide for reduced pumping rates, or even to require sources be abandoned if seawater intrusion threatens senior water right permits. In addition, several counties have policies or ordinances that affect water systems in areas vulnerable to seawater intrusion. You should contact Ecology and the local health jurisdiction for current policies and rules on well development where seawater intrusion may be a concern. If you intend to develop a brackish well, and intend to apply reverse osmosis to desalinate the groundwater supply, be aware that you may only apply desalination for the removal of secondary contaminants. If the untreated groundwater supply from a brackish well exceeds a primary drinking water standard, such as those in Sections 4.2.1, 4.2.2, and 4.2.3 of these Guidelines, the department will not approve the source (WAC 246-291-170(5)).

Group B Water System Design Guidelines (DOH 331-467) Page 28 December 2012

Page 58: Group B Design Workbook

4.3 Source Protection You must have your well site inspected and approved before submitting your design for approval (WAC 246-291-125(3)). We strongly recommend that you have the well site inspected before drilling a new well. Ask your local health jurisdiction if it offers this service. If not, DOH will conduct the well site inspection. The department charges a separate fee for well site inspections. You must maintain a sanitary control area of at least 100 feet around each well, unless adequate engineering justification is provided, to protect against existing or potential sources of contamination (WAC 246-291-125(5)). You must prepare and file legal documents with the County Auditor to protect the sanitary control area from sources of contamination (WAC 246-291-125(5)). Information explaining how to file these legal documents, known as covenants, is in Covenants for Group B Public Water Supply Protection. General guidance on sanitary control area protection is in Sanitary Control Area Protection (331-453). Both publications are online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx 4.4 Interties An intertie is a connection between a wholesale (supplying) public water system and a consecutive (receiving) public water system, permitting the exchange or delivery of water between those systems. There are two types of interties:

1. Non-emergency intertie: The piped connection supplies water from the wholesaler to meet the routine day-to-day needs of the consecutive system. If you plan to supply your proposed system through a non-emergency intertie, contact your DOH regional office and discuss it before moving too far into the design of your water system.

2. Emergency intertie: The piped connection provides a standby water supply from the wholesaler to the consecutive system necessary to meet the emergency water supply needs of the consecutive system. This may include help providing fire flow or serving as back up if one or more of the consecutive system’s own sources fail. There are no regulatory requirements in chapter 246-291 WAC concerning emergency interties with another approved public water system.

This section describes the considerations you should make when designing your Group B water system as a consecutive system supplied by a non-emergency intertie. 4.4.1 Effect on Wholesale Purveyor The wholesale system must demonstrate that it has enough department-approved connections to serve the total number of connections contemplated by your proposal. If the wholesale system does not have enough approved connections to accommodate its own customers plus your proposed customers, the wholesale purveyor must submit the appropriate planning and design documents to the department for written approval. The wholesale system will have to construct any needed improvements before the department will begin reviewing your workbook (WAC 246-291-120 (1)). Group B Water System Design Guidelines (DOH 331-467) Page 29 December 2012

Page 59: Group B Design Workbook

Even when your design reflects that the wholesale purveyor has the approved service capacity to serve your proposed water system, your workbook must include an analysis of the wholesaler’s capacity. The analysis must show the wholesale system can deliver the water supply your proposed system demands while maintaining minimum acceptable service in the wholesale system (WAC 246-291-200 (4) and WAC 246-291-135 (1)). If your proposed consecutive system’s service connections and service population, when combined with the wholesale system’s connections and service population add up to 15 or more service connections, or 25 or more people served at least 60 days per year, then the wholesale system will be considered a Group A water system. If so, the wholesale system must meet all the applicable planning, engineering, and design requirements in chapter 246-290 (WAC 246-291-005). It may take the wholesale system considerable time to meet these requirements, if it isn’t already a Group A water system. 4.4.2 Intertie Agreement The intertie agreement has particular significance. If the intertie agreement between you and the wholesale purveyor cannot satisfy all the water supply requirements you identify in Chapter 3, you must show how your proposed system will meet the MDD and PHD reliably and consistently (WAC 246-291-200 (3) and (4)). If the intertie agreement is not valid in perpetuity, your completed workbook must identify the alternative source(s) your system will use when the intertie agreement expires (WAC 246-291-135 (1)). In other words, planning your supply around an intertie agreement that is not valid in perpetuity requires you to spend the resources necessary to secure your own source that complies with the requirements of chapter 246-291 WAC before getting approval to be supplied by the intertie. References AWWA, 1999. Design and Construction of Small Water Systems, 2nd Edition, American Water

Works Association, Denver, CO. USEPA, 1991. Manual of Small Public Water Supply Systems, EPA 570/9-91-003. WSDOH, 2007. Covenants for public water supply protection, DOH 331-048, Washington State Department of Health, Olympia, WA.

Group B Water System Design Guidelines (DOH 331-467) Page 30 December 2012

Page 60: Group B Design Workbook

CHAPTER 5 Well Pump, Bladder Tanks, and Pump House

Chapter 5 explains how to make well pumps and pressure tanks work together as a single system capable of reliably providing safe drinking water to customers of new Group B water systems. 5.0 Well Pump Your job is to select a well pump suited to the specific needs of your proposed water system. It’s not enough to consider the horsepower rating of the pump motor (such as “I need a 5-hp pump”). In fact, before you select the pump motor size you must properly identify the right pump for your well.

5.0.1 Calculate Minimum Well Pump Discharge Rate Begin your well pump selection process by referencing how much water your well can produce, as determined by your pump test (Section 4.1.2). If your well can produce up to the PHD determined for your proposed system (Sections 3.1 and 3.2), we recommend you select your well pump based on the PHD. A well pump capable of meeting the PHD of the proposed water system eliminates the need for equalizing storage (Section 5.3.1). If there is no requirement to provide fire suppression, then a well and well pump capable of supplying the PHD enables you to design your Group B water system using only one pump (the well pump) and pressurized storage (Section 5.1). This is the simplest, least expensive design option. If your well cannot produce at least the PHD, then your design will have to include additional equipment, including an atmospheric storage tank and likely a booster pump. This equipment will add considerably to the cost of constructing your water system. In this instance, selecting a well pump that takes maximum advantage of the well capacity will minimize the size of your atmospheric storage tank. 5.0.2 Calculate Minimum Required Well-Pump Discharge Pressure After you determine the well-pump discharge rate, you have to determine the pressure that the well pump must generate at the selected discharge flow rate. When you know the pump discharge rate and the pressure the pump must generate, you can begin the process of selecting the appropriate well pump. There are two well-pump design scenarios:

1. A simple system consists of only a well pump and bladder tanks; the well pump is the only pump in the system. The well pump must generate enough flow and pressure to supply at least the PHD, and to provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system (WAC 246-291-200 (4)).

Group B Water System Design Guidelines (DOH 331-467) Page 31 December 2012

Page 61: Group B Design Workbook

2. A complex system consists of a well pump and an atmospheric storage tank. The well pump must generate enough pressure to lift the water to fill the atmospheric tank. In some designs, the storage tank is next to or near the well, and the system will include a booster pump to move the water from the storage tank to the distribution system. In others, the storage tank will be on top of a hill or elevated sufficiently high above the service area so that the reservoir provides adequate pressure to serve customers without a booster pump.

The pressure the well pump must generate sometimes is measured in “feet,” as in “feet of head.” Water at a depth of 2.31 feet creates exactly 1 psi of pressure. In other words, if you had a pressure gauge connected to the bottom of a water tank, and the gauge read 30 psi, you’d know that there is 69 feet of water standing inside the water tank (30 x 2.31 = 69). Some well pump manufacturers refer to a pump’s discharge capacity in gpm and “feet,” rather than gpm and psi. Just remember that “feet” and “psi” are interchangeable terms. The following describes the design considerations for a simple system consisting of a well pump capable of delivering the peak hourly demand and one or more pressure tanks. This is the most common design scenario. Total Dynamic Head The total dynamic head of a pump is the sum of the total static head, the pressure head, and the friction head. We explain these terms below.

Static Head The total static head is the difference in elevation between the water surface in the well while the well pump is running (not the elevation of the pump itself) and your customers. This is a major factor in determining the pressure your well pump must generate, so be sure to base it on accurate measurements. To calculate the difference in elevation, you must know:

• The elevation of the top of your well casing and the elevation of the water surface in the well at the selected well pump discharge rate (this distance is measured during the pump test); and

• The elevation of the top of your well casing and the ground surface elevation along the planned distribution system piping to your customers.

Pressure Head Public water systems must provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system (WAC 246-291-200 (4)). You can convert the pressure head at any point

Equation 5-1: TDH = SH + FH + PH

Where:

TDH = Total dynamic head, measured in feet SH = Static head, measured in feet FH = Friction head, measured in feet PH = Pressure head, measured in feet

Group B Water System Design Guidelines (DOH 331-467) Page 32 December 2012

Page 62: Group B Design Workbook

along the distribution pipeline from pressure (psi) to pressure head (feet) by multiplying the pressure by 2.31. For example, 30 psi is equal to 30 x 2.31 = 69 feet of head. This means that the minimum allowable value for the pressure head is 69 feet. Friction Head Your well pump moves water up the discharge pipe in the well, through all the pipes and valves in your pump house, and then out into the distribution system to your customers. While on this journey, the water is constantly losing energy due to friction of the water flowing inside the pipes, fittings, and valves. This energy loss may be described as the loss of “feet,” as in “At 50 gpm, water flowing through a 2-inch Schedule 40 PVC pipe results in 4.2 feet of head loss per 100 feet of pipe.” The 4.2 feet of head loss is equal to about 2 psi. The friction head for a piping system is the sum of all the friction losses from the well to the end-user. Friction loss occurs through valves, meters, and fittings in greater proportion than through an equal length of pipe. To accommodate these added sources of friction loss, Worksheet 5-1 provides an allowance of 10 ft of friction loss (4 psi) for these common well house features. Use the information from Table 5.1 and 5.2 to complete Worksheet 5-1. Estimating friction head loss in the piping system requires estimating the flow through each pipe segment. We recommend using the values in Table 3.2 and 3.3, and assigning water demand at the end of each pipe segment equal to the number of houses or nonresidential uses within and downstream of the end of the pipe segment. For example:

Pipe Segment Homes downstream Flow (gpm) Well to Pump House 9 50 Pump House to J-1 9 50

J-1 to J-2 3 29 J-2 to J-3 2 24 J-1 to J-4 5 37 J-4 to J-5 3 29

Alternatively, you can use a computer-based hydraulic model to identify the total dynamic head required to maintain the minimum pressures throughout the distribution system. EPANET, distribution system hydraulic modeling software, is available free at http://www.epa.gov/nrmrl/wswrd/dw/epanet.html There are also other, more sophisticated hydraulic modeling software tools available for purchase.

= House

Pump House

J-1 J-4

J-5

J-2 J-3

Well

Group B Water System Design Guidelines (DOH 331-467) Page 33 December 2012

Page 63: Group B Design Workbook

Table 5.1 Head loss, ft/100 ft of pipe For PVC Pipe Schedule 40

Pipe Size (inches)

Flow rate, gpm 1 1 ¼ 1 ½ 2 2 ½ 3 4 5 1.7 0.4 0.2

10 6.0 1.6 0.7 0.2 15 12.8 3.3 1.5 0.5 20 21.8 5.6 2.6 0.8 0.3 25 8.5 4.0 1.2 0.5 30 11.9 5.5 1.6 0.7 0.2 35 15.8 7.4 2.2 0.9 0.3 40 20.2 9.4 2.8 1.2 0.4 45 11.7 3.4 1.4 0.5 50 14.3 4.2 1.8 0.6 0.2 60 20.0 5.8 2.5 0.9 0.2 70 7.8 3.3 1.1 0.3

Table 5.2 Head loss, ft/100 ft of pipe For PVC Pipe Schedule 80

Pipe Size (inches)

Flow rate, gpm 1 1 ¼ 1 ½ 2 2 ½ 3 4 5 2.6 0.7 0.3

10 9.6 2.3 1.0 0.3 15 20.4 4.9 2.2 0.6 20 8.3 3.8 1.1 0.4 25 12.6 5.7 1.6 0.7 30 17.6 8.0 2.3 0.9 0.3 35 23.4 10.6 3.0 1.3 0.4 40 13.6 3.8 1.6 0.5 45 16.9 4.8 2.0 0.7 50 20.5 5.8 2.4 0.8 0.2 60 28.7 8.1 3.4 1.1 0.3 70 10.8 4.5 1.5 0.4

Not meaningful

Not recommended

Not meaningful

Not recommended

Group B Water System Design Guidelines (DOH 331-467) Page 34 December 2012

Page 64: Group B Design Workbook

Worksheet 5-1 (included with Group B Workbook) Total Dynamic Head Calculation

Friction Head Calculation Static Head Calculation,

Assume top of well casing elevation is 0 ft. Min.

Pressure Head, ft

Min. Total Dynamic Head, ft Pipe

Segment From To Pump or

Flow Rate, gpm

Pipe Size,

inches

Friction Loss per

100 ft

Pipeline Length,

ft

Pipe Segment Friction Loss, ft

Top of well casing to water while pumping,

ft

Ground Elev. at

“to”

Elevation difference,

ft

1 Well pump Top of well casing 69

2 Top of well casing 69

3 69

4 69

5 69

6 69

7 69

8 69

9 69

With a simple system consisting of only a well pump and bladder tanks, the well pump is the only pump in the system. Without a storage tank, the well pump must generate enough flow and pressure to supply at least the PHD, and to provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system.

For the segment that includes the well house, add 10 feet of friction loss to account for losses related to fittings and valves. If you intend to use a cycle stop valve, add additional friction loss per manufacturer’s data (Section 5.0.6)

Total up the “pipe segment friction loss” for each pipe segment + “elevation difference” + “minimum pressure head” values. The highest total dynamic head (TDH) is the minimum pressure, expressed in “feet of head” that the well pump must generate while pumping the peak hourly demand. You may wish to select a pump with a TDH greater than the required minimum.

Group B Water System Design Guidelines (DOH 331-467) Page 35 December 2012

Page 65: Group B Design Workbook

Example 5-1 Total Dynamic Head

Friction Head Calculation Static Head Calculation,

Assume top of well casing elevation is 0 ft. Min.

Pressure Head, ft

Min. Total Dynamic Head, ft Pipe

Segment From To Pump or

Flow Rate, gpm

Pipe Size,

inches

Friction Loss per

100 ft

Pipeline Length,

ft

Pipe Segment Friction Loss, ft

Top of well casing to water while pumping,

ft

Ground Elev. at

“to”

Elevation difference,

ft

1 Well pump Top of well casing 50 2 5.8 160 9.3 119.3 0 119.3 69 197.6

2 Top of well casing

Exit pump house 50 2 5.8 75 4.3 +10 =

14.3 119.3 0 119.3 69 211.9

3 Exit pump house Junction #1 50 3 0.8 400 3.2 119.3 20 139.3 69 235.1

4 Junction #1 Junction #2 29 2 2.3 300 6.9 119.3 30 149.3 69 252.0

5 Junction #2 Junction #3 24 2 1.6 250 4.1 119.3 50 169.3 69

6 Junction #1 Junction #4 37 2 3.0 500 15 119.3 30 149.3 69 260.1

7 Junction #4 Junction #5 29 2 2.3 500 11.5 119.3 10 129.3 69 251.6

Objective: Determine minimum total dynamic head required at the end of each pipe segment. Choose the highest total dynamic head value. Conclusion: The well pump must be capable of producing at least 276 feet of total dynamic head at 50 gpm. See below.

Pump lift from water level in the well to the top of the well casing = 119.3 ft Elevation change (increase) from top of well casing to Junction #3 = 50 ft Total static head (SH) from well pump to Junction #3 = 169.3 ft Total friction head (FH) between well pump and Junction #3 = 9.3 + 14.3 + 3.2 + 6.9 + 4.1 = 37.8 ft Total (minimum) pressure head (PH) required at Junction #3 = 69 ft (provides 30 psi at the customer)

Eq. 5-1: Total dynamic head = SH + FH + PH

TDH = 169.3 + 37.8 + 69 = 276.1 ft (equal to 119 psi at the pump itself) at 50 gpm

276.

J-1

J-2 J-3

J-4

J-5

Well

Pump House

Group B Water System Design Guidelines (DOH 331-467) Page 36 December 2012

Page 66: Group B Design Workbook

5.0.3 Well Pump Selection and Controls with Pressure Tanks With bladder tanks and no storage tank, a pressure switch located in the pump house, near the bladder tank(s), will control the well pump. The “pump-on” pressure must be set so that the pressure is at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system, just before the well pump comes on to recharge the pressure tanks (WAC 246-291-200 (4)). Continuing with our Example 5-1, to maintain 30 psi at Junction #3 with the well pump off, the pressure in the well house must be 276.1 ft – 119.3 ft – 9.3 ft – 14.3 ft = 133.2 ft = 57 psi. In our example, this is the pressure at which the well pump must come on (“pump-on” setting) to maintain a minimum of 30 psi everywhere in the distribution system. The pump-off setting should be about 20 psi greater than the pump-on setting. In this example, 80 psi as the pump-off setting would work fine. In our example, this corresponds to a “pump head” of:

80 psi x 2.31 = 185 ft (pressure head inside the pump house) + 119.3 (vertical distance from the water level in the well to the pump house) + 9.3 + 14.3 = 327.9 TDH (use 330 ft).

In this example, the pressure in the distribution system will not exceed 80 psi or fall below 30 psi between the “pump on” and “pump off.” 5.0.4 Well Pump Selection and Control with a Storage Tank The principles above also apply to determining the TDH of the well pump when pumping to a storage tank. Here are the major differences: When applying equation 5-1, the pressure head (PH) is zero because the storage tank is open to the atmosphere (unpressurized storage); and the static head (SH) must include the difference in elevation between the water level in the well and the water level in the reservoir. You may need to include a reservoir in your Group B water system design for many reasons. For example:

• The well and well pump cannot produce enough water to satisfy the peak hour demand. Water stored in a reservoir can provide the supplemental supply needed to serve the distribution system.

• The owner of the water system seeks the higher level of service reliability that a reservoir offers.

• The water system must be capable of providing fire protection. A reservoir design may supply water to the distribution system directly or by gravity. Gravity uses the elevation difference between the water in the reservoir and customers. This difference in elevation must provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system (WAC 246-291-200 (4)). Alternately, you may design a reservoir without sufficient difference in elevation between water in the reservoir and customers if the water is re-pumped from the reservoir into the distribution system so that the 30-psi standard is met.

Group B Water System Design Guidelines (DOH 331-467) Page 37 December 2012

Page 67: Group B Design Workbook

The well may pump to a reservoir directly through a dedicated water main from well to reservoir or indirectly through the distribution system (where the pipe between the well pump and reservoir also serves customers). In either case, the level of the reservoir must control the well-pump function. The operating range between the “well pump off” and “well pump on” defines the “operating storage” volume in your reservoir (Section 7.0). Float switches in the reservoir usually control these two levels by sending a signal to the well-pump controller through direct wire or wireless (radio frequency) communication. The basis of the well pump control system design is the reservoir volume between pump “on” and pump “off,” and the well pump discharge. The reservoir design should provide the volume required to prevent excessive cycling (starting and stopping) of the pump motor. Unless the well-pump motor manufacturer specifically allows starts more frequently, the pump should not be called to fill the reservoir more than six times in an hour. To simplify the well pump control system design, set the well pump “on” and pump “off” levels in the reservoir so that the volumetric difference between these two levels is equal to 10 times the discharge rate of the well pump. For example: Suppose the water system design presented in Example 5-1 has a 3,500-gallon polyethylene tank that’s 8 feet in diameter and 10 feet tall. The well pump produces 50 gpm, and pumps directly to the reservoir. No pressure tanks are connected to the well pump discharge. The reservoir is right outside the well house, and the base of the tank is at the same elevation as the wellhead. Because the difference between the pump-on and pump-off level switches should provide a volume about 10 times more than the discharge rate of the well pump, the pump-on level should be set about 15 inches below the pump-off level (15 inches of depth in this particular tank is equal to about 500 gallons). The total dynamic head (TDH) the well pump must pump against is equal to (see Example 5-1):

• The pipe segment friction loss for pipe segments 1 and 2 (9.3 ft + 14.3 ft = 23.6 ft)

• Top of well casing down to the stabilized water level in the well while the pump is on (119.3 ft)

• Top of the well casing to top of the 3,500-gallon tank (10 ft)

• TDH the well pump must overcome to produce 50 gpm is 23.6 + 119.3 + 10 = 152.9 ft. The water in the reservoir will have to be re-pumped into the distribution system to provide at least 30 psi throughout the distribution system during peak hour demand (see Chapter 8 for booster pump design).

Group B Water System Design Guidelines (DOH 331-467) Page 38 December 2012

Page 68: Group B Design Workbook

5.0.5 Well Pump Selection In this section, we will use the example water system introduced in Example 5-1 above.

In our example, we are looking for a pump that can produce 50 gpm while generating at least 276 ft TDH. In the set of pump curves below, the 5-hp pump can produce 50 gpm at about 275-280 ft TDH (see C below). This same pump will produce about 35 gpm at 330 ft TDH (see A below). The operating pumping range for the 5-hp pump will be between 35 gpm (the “pump off” setting) and 50 gpm (the “pump on” setting - see B and D).

The figure at left is a family of pump curves, beginning with a 7½-hp pump (top) down to a 1½-hp pump (bottom). A pump curve expresses the relationship between discharge pressure (“total head” or TDH) shown on the vertical axis, and discharge pumping capacity (gpm) shown on the horizontal axis. For example, look at the 1½-hp pump curve. It shows this particular pump is capable of producing 50 gpm at 100 ft TDH. The rising and falling curve in the middle of graph is the pump efficiency curve. As you can see, this family of pumps is most efficient between 35-60 gpm.

Group B Water System Design Guidelines (DOH 331-467) Page 39 December 2012

Page 69: Group B Design Workbook

5.0.6 Using a Cycle Stop Valve If you choose to use a cycle stop valve (CSV), be sure to include the head loss through the valve when determining the friction loss within the pump house. The 10-foot head loss allowance suggested in Worksheet 5-1 is for normal valves and fittings, and does not make any allowance for a CSV. As described more fully in Appendix G, the CSV is designed to keep the pump operating nearly all the time. Much of this time, especially at night, water demand will be very low, resulting in prolonged pump operation at the upper end of its pump curve (near where the pump curve intersects the vertical axis of the graph). That is the point of extremely low pump efficiency, and may cause early failure of the pump if the manufacturer did not design the pump-motor for prolonged operation at a very low flow rate and very high pressure. If your design includes a CSV, consult directly with the pump vendor or manufacturer to make sure the pump is compatible with the type of service you intend for it.

C. This 5-hp pump will generate 50 gpm at 276 ft TDH. This is the minimum TDH required in the example above, and represents the “pump-on” set point for the pressure switch in the pump house.

A. This 5-hp pump will generate about 35 gpm at 330 ft TDH. This is the “pump off” set point for the pressure switch in the pump house in the example above.

B. In our example, the pressure switch will be set so that the operating range of the 5-hp well pump will be between 276 ft TDH and 330 ft TDH. This operating range for the well pump should provide a minimum of 30 psi at Junction #3. (see Section 5.1.3)

D. In our example, the well pump will operate between 35 gpm (when the pump shuts off) and 50 gpm (the moment the pump is turned on)

Group B Water System Design Guidelines (DOH 331-467) Page 40 December 2012

Page 70: Group B Design Workbook

5.0.7 Using Variable Frequency Drive Identifying the right well pump based on the design flow at the “pump on” pressure setting does not change if you are considering a variable frequency drive (VFD) system for your well pump. Designers may consider using VFDs because of the potential for reducing power bills and lowering overall water system construction costs (fewer bladder tanks). For further information, see Appendix H. If you intend to design a water system using a variable frequency pumping system, a professional engineer licensed in Washington State must prepare and submit the water system design (WAC 246-291-120 (4)). 5.1 Pressure Tanks Water systems use pressure tanks with well pumps and when re-pumping water, such as from a reservoir into a distribution system. Pressure tanks make it possible to deliver water within a selected pressure range without continuously operating pumps or having the pumps start every time there is a minor demand for water. Two types of pressure tanks are used to protect water system pumps. Each has its own basic design procedures. Conventional tanks, also called hydropneumatic tanks, allow air-water contact. Bladder tanks have a membrane separating the air from the water. 5.1.1 Conventional (Hydropneumatic) Tanks Designers use conventional tanks in well pump installations that are usually larger than necessary for Group B water systems. If you intend to design a conventional tank system, please see our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm 5.1.2 Bladder Tanks Bladder tank sizing depends on the number of “selected-size” tanks needed to provide pump protection. Bladder tanks have pre-charged air bladders with a pressure of 2 psi below the low operating (pump-on) pressure for the system. Engineers should call out this stipulation in the design specifications. For more information, see Troubleshooting Bladder Pressure Tanks (331-342) online at http://www.doh.wa.gov/portals/1/Documents/pubs/331-342.pdf

Group B Water System Design Guidelines (DOH 331-467) Page 41 December 2012

Page 71: Group B Design Workbook

5.1.2.1 Bladder Tank Sizing Equation Equation 5-2: Ts > (R)(Qp)

(Nc )(VB) Where:

R = 15(P1 + 14.7)(P2 + 14.7) (or refer to Table 5.3)

(P1 - P2)(P2 + 9.7)

VB = The gross volume of an individual bladder tank in gallons, or bladder tank size (“86-gallon tank,” for example).

Ts = The number of bladder tanks of gross volume VB

P1,P2 = Pressures selected for water system operation in psig (gauge pressures). P1 corresponds to the pump-off pressure and P2 to the pump-on pressure

Nc = Number of pump operating cycles per hour. This should be the maximum number of pump motor starts per hour as justified and documented by the pump or motor manufacturers' warranty. Without such information, this should be no more than six cycles per hour.

Qp = Pump delivery capacity in gallons per minute at a midpoint of the selected pressure range. Determine this by examining pump curves or tables. If this value is not used, the designer must use the Qp that occurs at P2 (pump-on).

5.1.2.2 Bladder Tank Design Procedure

1. Based on water system hydraulic requirements, select the operating range of pressure, P1 (pump-off) and P2 (pump-on).

2. Select the operating cycles per hour, Nc. The value for Nc should not exceed six cycles per hour unless documented manufacturers’ warranties justify larger values. For multiple pump installations, Nc may be increased if an automatic pump switchover system is installed to automatically alternate pumps. The actual increase in Nc should be justified by documented manufacturers’ warranties.

3. Determine the delivery capacity, Qp, for the midpoint of the operating pressure range [(P1 + P2)/2]. The pump capacity must meet system requirements at P2 pressure (see WAC 246-291-200 (4)).

4. Select an appropriate gross volume, VB , for each bladder tank (bladder tank size). This volume should be available from bladder tank manufacturers. Do not select bladder tank sizes larger than 120 gallons gross volume.

5. Calculate the value of R. For convenience, Table 5.3 gives R-values for several commonly used pressure ranges.

6. Use Equation 5-2 (see above). 7. Round up the value determined in Step 6 to the nearest whole number. This is the number

of tanks, each with the selected volume, VB , to be used for pump protection.

Group B Water System Design Guidelines (DOH 331-467) Page 42 December 2012

Page 72: Group B Design Workbook

Table 5.3 R Values for Various Pressure Tank Ranges

P1 pump-off pressure (gauge)

P2 pump-on pressure (gauge)

55 psi 60 psi 65 psi 70 psi

80 psi

35 psi 58.1 49.8 44.3

40 psi 76.7 61.7 52.6 46.6

45 psi 81.5 65.2 55.5

50 psi 86.4 68.8 51.3

60 psi 76.1

Example 5-2 For a mid-pressure range pumping rate, Qp, of 40 gpm, a selected cycling of six cycles per hour, a bladder tank gross volume of 86 gallons, and a selected pressure range of 60/80, the number of 86-gallon tanks required is determined as follows:

Qp = 40; N = 6; VB = 86

Using Table 5.3 for P2/P1 = 60/80, R = 76.1

Using Equation 5-2:

Ts > (R)(Qp) (Nc )(VB)

Ts > (76.1)(40) = 5.9

(6)(86)

Select six 86-gallon bladder tanks for pump protection, pre-charged to 58 psi (2 psi below pump-on pressure).

5.1.3 Labor and Industries Standards for Pressure Tanks Many pressure tanks used in water systems are “unfired pressure vessels” that must comply with chapter 70.79 RCW and the Department of Labor and Industries’ (L&I) regulation (chapter 296-104 WAC). These regulations require all pressure tanks more than 5 cubic feet (37.5 gallons) in volume to be constructed according to the latest edition of ASME specifications (RCW 70.79.080). While all pressure tanks used by water systems must meet the construction and installation requirements of chapter 296-104 WAC, they are exempt from routine L&I inspections and fees (RCW 70.79.090(6)).

Group B Water System Design Guidelines (DOH 331-467) Page 43 December 2012

Page 73: Group B Design Workbook

All pressure tanks must have a safety valve to protect against over-pressurization, such as a properly sized and installed ASME-approved pressure relief valve (PRV) (WAC 296-104-316). You must install the PRV on top of the tank or on outlet piping as close as possible to the vessel. There must be no valves between the PRV and the pressure tank (WAC 296-104-235). The “set” pressure of the PRV must not exceed the design pressure of the vessel. For design requirements and other guidance, see Pressure Relief Valves on Pressure Tanks (DOH 331-429) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm The maximum allowable working pressure for a tank is on the nameplate attached to the tank. For nonstandard pressure vessels, engineers can determine the maximum allowable working pressure with the L&I formula in WAC 296-104-405. A properly sized ASME PRV should have a relieving capacity that will prevent pressure in the vessel from rising more than 10 percent or 3 psi above the maximum design set pressure of the PRV, whichever is greater. 5.2 Pump House Design and Construction Recommendations The pump house design and construction should allow convenient, safe access for removal and service of equipment. When you construct your Group B well house, be sure to:

• Install a wall-mounted thermostat-controlled wall heater.

• Use PVC Schedule 80, galvanized iron, or copper piping for all internal piping.

• Support all internal piping properly.

• Install unions and isolation valves at pressure tanks, booster pumps, and other equipment to allow for equipment removal.

• Secure any booster pump to the floor.

• Install ASME pressure relief valve(s) properly sized based on flow.

• Install a totalizing source meter inside the pump house.

• Install all pressure tanks on the floor.

• Install the raw water tap at least 6-inches above the floor.

• Position pressure gauges so they are easily readable.

• Be sure to install a keyed lock on door.

5.3 Well and Pump House Detailed Drawings and Specifications The design submittal must include drawings of each project component, including location, orientation, and size (WAC 246-291-120 (2)). The drawing(s) and specifications of the well pump, pressure tank(s), and pump house appurtenances should include:

Group B Water System Design Guidelines (DOH 331-467) Page 44 December 2012

Page 74: Group B Design Workbook

a. Pump-house building specifications.

b. A plan view with a scale of not more than 10 feet to the inch. It must show the location of the well and proposed pump house, water mains, fittings, valves, construction and maintenance easements, sanitary control area, existing above ground and underground utilities (gas, electric, power, sewer, irrigation, and so forth), and other natural or man-made features important to the proper construction of the pump house.

c. Location, size, capacity, and construction materials of all pipes, pumps, valves, sample tap, water meter, pressure gauges, pressure switch, pressure tanks, pressure relief valves, and other key components inside the pump house.

d. Manufacturer’s catalog information on the specific well pump showing operating pump-on and pump-off limits.

e. Manufacturer’s catalog information on the specific bladder tanks and pressure switch.

f. Settings for the pressure switch, pressure relief valves, CSV (if any).

g. Elevation of the top of the well casing above the ground or pump house floor, and whether the wellhead is located in the 100-year flood plain.

h. Disinfection procedures for well-after-pump installation.

i. Disinfection and pressure testing procedures for all well and pump house piping and tanks.

j. Physical protection of the wellhead (if located outside the pump house).

k. Location of required generator disconnect switch (WAC 246-291-200(11)).

l. Specification for well casing cap, well pitless adaptor, or pitless unit.

m. Typical details of thrust blocking or restraints for internal and below-building piping.

n. All other buried utilities, including storm and sanitary sewers, dry wells, telephone, natural gas, power and TV cable lines in the project area (existing or proposed concurrent with pipeline construction) to the extent possible, given existing available records. Construction details should note that all buried utilities are to be field located prior to construction.

You must show the following accessories on the drawings:

• Generator disconnect switch (WAC 246-291-200 (11))

• Source water meter (WAC 246-291-200 (9))

• Source sample tap (WAC 246-291-200 (9))

• Each pressure tank equipped with an isolation valve and an ASME pressure relief valve (WAC 296-104-316)

• A lock on the pump house door (WAC 246-291-140 (1)) References WSDOH, 2009. Water System Design Manual (331-123), Washington State Department of Health, Olympia, WA.

Group B Water System Design Guidelines (DOH 331-467) Page 45 December 2012

Page 75: Group B Design Workbook

CHAPTER 6 Piping Design and Construction Chapter 6 explains how to design and construct the distribution system so that it can deliver a safe and reliable water supply from the well to the system’s customers. This guidance, combined with the information on friction loss and distribution system design from Chapter 5, assumes your proposed water system will not provide fire suppression (fire flow). If you intend to design a water system capable of providing fire flow, a professional engineer licensed in Washington State must prepare and submit the water system design (WAC 246-291-120(4)). For further guidance, see our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm 6.0 Piping Material When designing a water main, it is important to consider the type of pipe and the pressure needs of the system. Excessive system pressure can increase the risk of pipe failure and cause customers to waste water. Distribution system pressure should not exceed 100 psi. All distribution piping should be rated to withstand the maximum pressure they may experience during operations and pressure testing. PVC pipe is the most common pipe material used in small water systems. Other pipe material includes ductile iron, steel, high-density polyethylene (HDPE), and cross-linked polyethylene, commonly abbreviated PEX or XLPE. The use of asbestos-cement, cast iron, or galvanized iron pipe in distribution system design is not recommended. In addition, the use of irrigation pipe, drainpipe, or other thin-walled pipe material is strictly prohibited for potable water systems. The designer or design engineer must use established standards, such as AWWA or ASTM, when justifying the material and class of pipe and pipe fittings selected (WAC 246-291-200(1)). PVC pipe “schedule” refers to a specific ratio of the outside diameter of the pipe and the pipe wall thickness, known as the dimensional ratio (DR). PVC pipe “class” reflects the working pressure rating of the pipe. For example, PVC Schedule 80 pipe (DR 11) has a greater pressure rating than PVC Schedule 40 pipe (DR 16) because of a thicker pipe wall. Because both pipe schedules have the same outside diameter (“OD”), the Schedule 80 pipe (with the thicker pipe wall) has a smaller inside diameter (“ID”). The head loss difference between Tables 5.1 and 5.2 reflect the difference in the pipes’ inside diameter. You should use flow rate, pressure, and allowable head loss as the basis for selecting a pipeline size and schedule. We recommend using a minimum 1½-inch diameter and maximum DR 21 pipe in all distribution main designs. The recommended minimum size provides for conveyance without undue friction loss. Larger pipe sizes may be needed. The recommended maximum DR (measure of wall thickness) provides an allowance for hydrostatic testing pressure (Section 6.4), less than perfect installation (depth of bury, bedding, joints, expansion and contraction), unusual pressure conditions (surge pressures, poorly controlled leak testing), and a general design factor of safety. Applying a maximum DR 21 excludes ASTM D2241 PVC Class 160 and AWWA C900 Class 100 pipe. Any specified and installed pipe and pipe fittings must conform to material standards for contact with potable water, ANSI/NSF Standard 61 (WAC 246-291-205). Group B Water System Design Guidelines (DOH 331-467) Page 46 December 2012

Page 76: Group B Design Workbook

6.1 Pipe Burial, Bedding, and Thrust Blocks Pipelines must be installed below the frost line, and “bedded” with uniform material that doesn’t present a risk to the pipe. PVC pipe is brittle, and has little resistance to the forces of a sharp or heavy rock pressing on it or its fittings. Poor bedding material, and failure to compact the bedding material around the pipe, may result in pipeline failure. You should place, spread, and compact bedding at a minimum of 6-inches beneath, beside, and over the pipe. Pipes should be buried below the frost line as determined by the most severe cold weather on record; otherwise, pipelines should be protected against freezing by some other means (insulation, heat tracing). When determining proper depth, designers should evaluate temperature variations in the area, especially at high altitudes, in Eastern Washington, and beneath regularly plowed paved surfaces. The minimum fill depth over the top of the pipe should be at least 36 inches, even in temperate areas. The designer may justify another depth (for example, to avoid underground obstructions or rocky conditions). If providing less than 36 inches of cover, you should consider the pipe load rating and the location of the installation (to avoid crushing the pipeline due to traffic loads). Depending on the pressure and the size of the pipe, a change in pipe direction can cause substantial forces at pipe fittings such as bends, tees, crosses, and dead-end caps. You should consider installing thrust blocks to protect the new pipeline from these forces. Thrust blocks are typically made of concrete poured in place between the fitting and the solid, undisturbed earth wall of the pipe trench. Restrained joint pipe may be used instead of thrust blocks to prevent pipe separation due to unequal hydraulic forces at pipe fittings. 6.2 Isolation Valves, Flushing Hydrants, and Air Release Valves Isolation valves provide a way to isolate sections of the distribution system. Your Group B water system should have enough valves on water mains to minimize the number of customers without water service and minimize hazards during repairs. We recommend valves on each branch of pipeline “tees” and “crosses.” Pipelines should be flushed from time to time, especially dead-end lines. To flush a pipeline, you must generate sufficient flow velocity and have an appropriate egress point for the flushed water. The minimum effective flush velocity is 2.5 feet per second. For example, it takes about 14 gpm to generate 2.5 fps flow velocity in a 1½-inch pipeline, and it takes about 25 gpm to generate the same flushing velocity in a 2-inch diameter pipe. A small flushing device installed at the end of dead-end lines will facilitate pipeline flushing. To view options for flushing, conduct an Internet search under “yard hydrants” or “flushing hydrants.” You may not use yard hydrants that drain the riser into the ground. The weep hole presents a risk of contamination to the distribution system through a cross connection with contaminated groundwater. If you choose to use a yard hydrant, the Uniform Plumbing Code requires you to use a model that does not drain into the ground. Yard hydrants that conform to American Society of Sanitary Engineers Standard 1057 are acceptable because they do not drain into the ground.

Group B Water System Design Guidelines (DOH 331-467) Page 47 December 2012

Page 77: Group B Design Workbook

You should provide air release valves at high points on distribution lines to release accumulated air. These valves can be automatic (they release air when it accumulates at the valve) or manual (they release accumulated air only when a person manually opens them). If accumulated air is not released it can restrict or even completely block the flow of water through the pipe. 6.3 Distribution System Pipeline Easements Distribution system pipelines must be installed in the public right-of-way or within private property easements. The water system owner must have access to maintain pipelines and all related components, such as valves, meters, flushing hydrants, and so on. Your design submittal must show all distribution system components either within the public right-of-way or within a private property easement. The easement must be wide enough to accommodate all work (excavation, equipment access, and turning radius). We recommend a width of at least 15-feet (7.5 feet on each side of the pipeline). 6.4 Pressure and Leakage Test To check the quality of pipe joints and fittings, it’s necessary to conduct a pressure and leakage test. The test must follow the testing procedures the designer or design engineer specified in the approved design submittal (WAC 246-291-200(1)). The project engineer or the owner’s representative should be present during this critical test to verify that it meets the specifications. Pressure testing standards are in the Standard Specifications for Road, Bridge and Municipal Construction (WSDOT/APWA 2012), available free on the WSDOT website. These standards state:

All water mains and appurtenances shall be tested in sections of convenient length under a hydrostatic pressure equal to 150 psi in excess of that under which they will operate, or in no case shall the test pressure be less than 200 psi.

6.5 Disinfection Purveyors must properly disinfect all components of a new or expanding Group B water system before putting the new or expanded system into service. The disinfection process must meet the specifications approved for the water system, such as AWWA C651or WSDOT/APWA (2012) for all sizes of water mains; AWWA C652 for water storage facilities; and AWWA C654 for well disinfection (WAC 246-291-220(1) and (2)). 6.6 Microbiological Testing Each of the disinfection standards listed in Section 6.5 includes a requirement for coliform bacteria testing. Water systems must complete and report satisfactory coliform testing done as part of disinfecting all the components of a new or expanding Group B system. The engineer must note the satisfactory test results on the Construction Completion Report form (WAC 246-291-120(5)). To ensure the samples properly represent water quality in the water system, purveyors should not take water samples before sufficiently flushing the new lines or equipment.

Group B Water System Design Guidelines (DOH 331-467) Page 48 December 2012

Page 78: Group B Design Workbook

6.7 Separation from Nonpotable Piping Systems The water system design should provide at least a 10-foot horizontal and 18-inch vertical separation above nonpotable pipelines (sanitary sewers, reclaimed water piping, irrigation lines, and so on). The 18-inch vertical separation should be the measured distance between the closest sides of the two pipes. If the nonpotable line is a sewer line, the designer should refer to Section C1-9 of Criteria for Sewage Works Design (WSDOE 2006) for appropriate sewer design requirements. For additional guidance on potable and nonpotable pipe separation, consult Pipeline Separation Design and Installation Reference Guide (WSDOE and DOH 2006). 6.8 Service Connections 6.8.1 Service meters and service lines We recommend that you install the water service line at the same depth and with the same bedding as the water main. The water service line should be least 1-inch in diameter and be made of PVC, copper, HDPE, or PEX. Using a 1-inch service line instead of a ¾-inch service line decreases friction loss due to flow from the water main to the building by a factor of three. For many homeowners and businesses, installing a 1-inch service line is worthwhile because it noticeably improves the level of service. Residential fire sprinkler systems demand higher flow and pressure. Therefore, a residence with fire sprinklers may require a larger diameter water service line. Consult your local building code for guidance. You should install a separate curb or meter “stop” (valve) for each service connection. These valves allow system managers or the property owner to shut off an individual connection without interrupting service to other customers. A curb stop is a valve installed at the property line if there is no meter at the property line. You can operate a curb stop from the surface. A meter stop is a valve installed just upstream or downstream of the meter. Service meters are not required, but we recommend every designer include them because they enable the system manager to proportion the cost of service fairly, and reduce the incidence of over-use at the expense of the other consumers. 6.8.2 Cross-connection control A cross connection is any actual or potential physical connection between a public water system or a consumer's water system and any source of nonpotable liquid, solid, or gas that could contaminate the potable water supply by backflow. Because all Group B water system users share a common distribution system, contamination from one connection has the potential to move about the distribution system and contaminate the water supply to other connections. On certain premises, the contamination hazard associated with the plumbing and water use may require a cross-connection control assembly. This special valve assembly prevents water from flowing back into the distribution system. For guidance, see Cross Connection Control for Small Water Systems (331-234) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm

Group B Water System Design Guidelines (DOH 331-467) Page 49 December 2012

Page 79: Group B Design Workbook

Many commercial properties involve water uses that pose a threat of a cross connection. You should consult the local building official to determine what, if any, cross-connection control assembly is needed on a commercial customer’s service line. Most single-family homes do not pose a high health hazard to the Group B water system users. There is a potential for problems if single-family homes have access to a separate water supply. Your development’s covenants, conditions, and restrictions (CC & Rs) should require proper cross-connection control assemblies on service connections if your service area is supplied by a separate irrigation system, or individual homeowners are entitled to drill their own wells. You must test all cross-connection control assemblies installed on service lines annually to ensure they continue to function properly. You should include the authority to require such testing in the development’s CC & Rs. 6.9 Individual Pressure Reducing Valves If you anticipate that pressure at any service connection will exceed 80 psi, you are responsible for recommending that those customers install and maintain individual pressure reducing valves (PRVs) as delineated in the Uniform Plumbing Code (UPC). Water systems should install individual customer PRVs only if they have a written agreement with the customer showing who is responsible for required PRV maintenance, repair, or replacement. The water system should check for local ordinances or service agreements on PRV use. 6.10 Distribution System Detail Drawings and Specifications The workbook must include drawings of each project component, including location, orientation, and size (WAC 246-291-120 (2)). The drawing(s) and specifications of the distribution system should include:

a. A plan view with a scale of not more than 100 feet to the inch showing the location of the proposed water mains, fitting, valves, service meters, flushing hydrants, construction or maintenance easements, existing above-ground and underground utilities (gas, electric, power, sewer, irrigation), and other natural or man-made features important to the proper construction of the water main.

b. Location, size, capacity, and construction materials of all proposed pipelines in the project area. Show all flushing hydrants, valves, meters, air release valves, blow-off valves, and so on.

c. Identification of lots served under the project scope of work by new distribution mains serving plats or subdivisions.

d. Typical construction details of all new pipeline tie-ins to existing pipelines.

e. Typical details of pipeline trench cross-section indicating bedding, backfill, and compaction requirements.

f. Typical details of thrust blocking or other type of pipe restraint.

g. Disinfection and pressure-testing procedures for all new pipelines.

h. Service connection details, where appropriate.

Group B Water System Design Guidelines (DOH 331-467) Page 50 December 2012

Page 80: Group B Design Workbook

i. All other buried utilities, including storm and sanitary sewers, dry wells, telephone, natural gas, power and TV cable lines in the project area (existing or proposed concurrent with pipeline construction) to the extent possible, given existing available records. Construction documents must clearly state that all buried utilities are to be field located prior to construction (RCW 19.122).

References WSDOH, 2009. Water System Design Manual (331-123), Washington State Department of Health, Olympia, WA. WSDOE, 2008. Criteria for Sewage Work Design. WSDOE Pub. 98-37. Washington State Department of Ecology, Olympia, WA. WSDOE and DOH, 2006. Pipeline Separation Design and Installation Reference Guide. WSDOE Pub. 06-10-029. Washington State Department of Ecology, Olympia, WA.

Group B Water System Design Guidelines (DOH 331-467) Page 51 December 2012

Page 81: Group B Design Workbook

CHAPTER 7 Atmospheric Storage Tanks Chapter 7 covers the design and construction of an atmospheric storage tank (unpressurized storage). Group B water systems use atmospheric storage tanks to:

• Directly supply the distribution system by providing the minimum pressure requirement of 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system (WAC 246-291-200 (4)). An example of this is a tank constructed on top of a hill, high above all the customers.

• Indirectly supply the distribution system by collecting water pumped from the well and supplying it to the distribution system via water pumped through a booster pump. An example is a small tank constructed right outside the well and booster pump house.

Most Group B water systems construct atmospheric storage when the well and well pump are not able to supply the PHD, or must provide fire flow. If the design calls for construction of the storage tank with the tank bottom below the finished ground surface, a professional engineer must prepare and submit the entire Group B water system design (WAC 246-291-120 (4)). 7.0 Operating Storage Volume Operating storage (OS) is the volume of the reservoir devoted to supplying the water system while, under normal operating conditions, the source of supply (such as a well pump) is in “off” status. Every atmospheric reservoir needs OS. This volume will vary according to two main factors:

1. The sensitivity of the water level sensors controlling the well pump(s).

2. The configuration of the tank designed to provide the volume required to prevent excessive cycling (starting and stopping) of the source pump motor.

The OS volume should be sufficient to avoid pump cycling in excess of the well pump motor manufacturer's recommendation. Without the specific pump motor manufacturer’s standards, you should design OS to limit the well pump motor to no more than six starts per hour. 7.1 Equalizing Storage Volume and Elevation 7.1.1 Equalizing storage volume When source pumping capacity cannot meet the peak hourly demand, the water system must provide equalizing storage (ES) (WAC 246-291-200 (5)). Generally, the most practical way to provide needed ES is to design atmospheric storage. Designers are cautioned against attempting to provide ES with bladder tanks. Pressurized bladder tanks provide only a small volume of usable “drawdown” volume within a given pressure range. For example, an 86-gallon bladder tank will release about 18 gallons when the tank is drawn down from 80 psi to 60 psi. The design must provide for at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system when equalizing storage volume is exhausted (WAC 246-291-200 (4)). It is considered impractical to provide ES with an array of bladder tanks. Group B Water System Design Guidelines (DOH 331-467) Page 52 December 2012

Page 82: Group B Design Workbook

Designers should use Equation 7-1 to estimate the ES requirement for residential water systems. They must add the OS volume to calculated ES volume. Equation 7-1:

ES = (PHD - QS ) x T, but in no case less than zero

Where:

ES = Equalizing storage, in gallons

PHD = Peak hourly demand, in gpm, as defined in Chapter 3 of these Guidelines

QS = The installed well pumping capacity at the “pump-on” pressure setting

T = See Table 7.1 below

For extremely small water systems, design standards suggest 30 percent of the MDD should be provided as ES when the source pumping rate (Qs) matches the MDD pumping rate (assume 24-hour pumping at a constant rate). Any fraction of Qs that is in excess of the MDD pumping rate will reduce ES from this baseline volume. The minimum “T” values shown in Table 7.1 convert the deficit between PHD and Qs into ES volume. “T” increases with the number of connections, reflecting the higher probability of a longer period of overlapping demand among an increasing number of residential users.

Table 7.1

Number of Residential Connections

Minimum “T”

2 35 3 47 4 60 5 68 6 76 7 85 8 91 9 98

ES needs will vary greatly for nonresidential water systems, depending on the daily water demand pattern during the highest demand days. If the daily demand pattern can be predicted, use this information to determine an appropriate volume of ES. If not, use Equation 7-2 to estimate ES for a nonresidential water system:

Group B Water System Design Guidelines (DOH 331-467) Page 53 December 2012

Page 83: Group B Design Workbook

Equation 7-2: ES = [0.30 x MDD] x [1 – Qs/PHD] x [1 + (MDD/1440)/PHD] Where:

ES = Equalizing storage, in gallons

QS = The installed well pumping capacity at the “pump on” pressure setting

PHD = Peak hourly demand, in gpm, as defined in Chapter 3 of these Guidelines

MDD = System-wide maximum daily demand, in gallons per day

7.1.2 Equalizing storage elevation An atmospheric storage tank supplying a system by gravity must provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system (WAC 246-291-200(4)). To do so, there must be sufficient difference in the elevation between the bottom of equalizing storage volume in the tank and the highest point in the distribution system, taking head loss into account. 7.2 Standby Storage Volume Standby storage (SB) is not required, and not usually provided in Group B system design. SB volume provides a measure of reliability in case sources fail or unusual conditions impose higher demands than anticipated. If you contemplate providing SB volume, we recommend you provide the volume equivalent to the MDD for your entire system. 7.3 Fire Suppression The local fire protection authority or county fire marshal determines a fire flow requirement for water systems. This fire suppression storage (FSS) level depends on the maximum flow rate and duration. If your Group B water system must provide fire suppression capacity, the design must enable the water system to meet fire flow requirements while maintaining 20 psi pressure throughout the distribution system under MDD conditions (WAC 246-291-200(8)). Water systems in areas governed under the Public Water System Coordination Act of 1977 (chapter 70.116 RCW) must meet the act’s specified minimum flow rates and durations for residential, commercial, and industrial developments (WAC 246-293-640). The local fire protection authority, county fire marshal, or a locally adopted coordinated water system plan may specify greater FSS requirements. If you intend to design a water system capable of providing fire flow, a professional engineer licensed in Washington State must prepare and submit the water system design (WAC 246-291-120(4)). For further guidance, please see our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm

Group B Water System Design Guidelines (DOH 331-467) Page 54 December 2012

Page 84: Group B Design Workbook

7.3.1 Minimum FSS Volume The minimum FSS volume for water systems served by single or multiple supply sources is the product of the required flow rate (expressed in gpm) multiplied by the flow duration (expressed in minutes). See Equation 7-3.

7.4 Dead Storage Volume Dead storage (DS) is the volume of stored water not available to all consumers at the minimum design pressures required under WAC 246-291-200 (30 psi during PHD conditions and 20 psi during MDD plus needed fire flow throughout the distribution system). Every atmospheric reservoir has some amount of dead storage due to the geometry of the outlet pipe and the tank bottom. For example, if the top of a reservoir outlet pipe is 12 inches above the reservoir floor, and an allowance of 6 inches is made to ensure the outlet pipe is always submerged, then the bottom 18 inches of the reservoir is “dead storage.” The depth of DS is convertible to water volume based on the geometry of the tank (volume in gallons = area (sf) x depth (ft) x 7.48 gallons per cubic foot). The DS volume must be added to the OS and ES volumes determined above. 7.5 Total Storage Volume The total atmospheric storage tank volume is the sum of OS, ES, SB, FSS and DS. See Equation 7-4.

Equation 7-4: TS = OS + ES + SS + FSS + DS Where TS = total storage volume, in gallons.

7.5.1 Water Quality Concerns With Excessive Storage Water stored in a reservoir for an extended time will undergo physical, chemical, and biological changes, causing deterioration in water quality. Excessive water age can be caused by under- utilization (water is not cycled through the tank), and poor mixing within the reservoir. Such changes include temperature increases, microbial growth, and changes in color, taste, and odor. Numerous factors contribute to these changes. For example, temperature, system hydraulics, mixing, and nutrient availability all affect the microbial growth rate. Aged, stale water provides an environment conducive to the growth and formation of taste and odor-causing microorganisms and substances. (USEPA, Finished Water Storage Facilities, 2002) Standards for the states of Georgia, Virginia, and Ohio call for a minimal daily “turnover” rate of 20 to 33 percent. Turnover refers to the portion of stored water exchanged with new water.

Equation 7-3:

FSS = (FF)( tm )

Where:

FF = Required fire flow rate, expressed in gpm, as specified by fire protection authority or under WAC 246-293-640, whichever is greater

tm = Duration of FF rate, expressed in minutes, as specified by fire protection authority or under WAC 246-293-640, whichever is greater

Group B Water System Design Guidelines (DOH 331-467) Page 55 December 2012

Page 85: Group B Design Workbook

To avoid deterioration of water quality in the reservoir, we recommend operating the tank so that one-fifth to one-third of the tank volume is exchanged with new water each day. To prevent poor mixing, we recommend designing the inlet and outlet tank piping to maximize mixing of the water stored in the reservoir. 7.6 Reservoir Design Requirements and Considerations The design submittal must include drawings of each project component, including location, orientation, and size (WAC 246-291-120 (2)). A number of companies manufacture prefabricated concrete, plastic (polyethylene, polypropylene), and fiberglass potable water storage tanks that meet National Sanitation Foundation Standard 61. If you choose to use a prefabricated tank, make sure the manufacturer’s drawing(s) and specifications demonstrate compliance with the requirements below. 7.6.1 Reservoir Design Requirements The following are mandatory elements of reservoir design:

a. If any of the following is true, then a professional engineer licensed in Washington State must prepare and submit the design report workbook (WAC 246-291-120(3) and (4)).

• The bottom of the storage tank is below the finished ground surface.

• The design of the Group B water system depends on gravity to deliver sufficient flow and pressure from the atmospheric tank to meet the minimum performance standards in WAC 246-291-200 (4).

For further guidance on atmospheric reservoir design, see our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm

b. Designed and installed overflow pipe with atmospheric discharge or other suitable means to prevent cross connection contamination. Overflows must be covered with a 24-mesh non-corrodible screen or mechanical device, such as a flap valve or duckbill valve, to keep animals, insects or other contamination sources out of the reservoir (WAC 246-291-210 (1)).

c. Tank materials in contact with potable water must meet ANSI/NSF Standard 61 (WAC 246-291-205 (1)).

d. Locate and show other buried utilities, including storm and sanitary sewers, dry wells, telephone, natural gas, and power and TV cable lines in the project area (existing or proposed concurrent with pipeline construction) to the extent possible, given existing available records. Construction documents must clearly state that all buried utilities are to be field located prior to construction (RCW 19.122).

e. Designed and installed drain facilities that drain to daylight (WAC 246-291-210 (1)).

f. Tank roof atmospheric vent, with a noncorroding 24-mesh insect screen (WAC 246-291-210 (1)).

g. Locking mechanism on all openings into the reservoir (WAC 246-291-140 (1)(g).

h. Water tight, insect proof access hatch and vent (WAC 246-291-210 (1)).

i. Leakage testing and disinfection per accepted standards, such as AWWA (WAC 246-291-220 (1)).

Group B Water System Design Guidelines (DOH 331-467) Page 56 December 2012

Page 86: Group B Design Workbook

j. Reservoir isolation valve(s), which permit isolating the tank from the water system (WAC 246-291-210 (1)).

k. Smooth-nosed sample tap on the tank side of the isolation valve (WAC 246-291-210 (1)).

l. Design calculations identifying the elevation at the bottom of the equalizing storage volume necessary to provide at least 30 psi during PHD conditions along property lines adjacent to distribution mains and at the point of service to each customer connected to the distribution system, if gravity storage provides equalizing storage.

m. Design calculations identifying the elevation at the bottom of the fire-suppression storage volume necessary to provide 20 psi throughout the distribution system under needed fire flow plus MDD conditions, if gravity storage provides fire suppression storage.

7.6.2 Reservoir Design Considerations We recommend the storage tank design include:

a. High- and low-level alarm system that directly notifies operations personnel.

b. Access ways and ladders necessary to provide access for safe maintenance.

c. A silt-stop on the outlet pipe to keep sediment from entering the distribution system.

d. The slope of the reservoir roof should be at least 2 percent (¼ inch per foot). 7.6.3 Reservoir Plan Submittal The drawings and specifications for a reservoir should be prepared as follows:

a. A plan view and a profile (elevation) view with a scale of not more than 10 feet to the inch showing the location and dimensions of the proposed tank, water mains, drain, overflow, and valves.

b. Indicate the elevation of the tank bottom and tank overflow level.

c. Identify easements and property lines.

d. Describe the tank level control system.

e. Provide manufacturer’s information, construction details, and specifications for the reservoir roof hatch and vent.

f. Provide details on the foundation design and requirements to prepare the site for installation of the foundation.

g. Locate existing above ground and underground utilities (gas, electric, power, sewer, irrigation, and so forth), and other natural or man-made features important to the proper construction and operation of the tank.

Group B Water System Design Guidelines (DOH 331-467) Page 57 December 2012

Page 87: Group B Design Workbook

References WSDOH. 2009. Water System Design Manual (331-123), Washington State Department of Health, Olympia, WA. USEPA. 2002. Finished Water Storage Facilities, prepared by AWWA and Economic and Engineering Services, Inc., for U.S. Environmental Protection Agency Office of Ground Water and Drinking Water Standards and Risk Management Division

Group B Water System Design Guidelines (DOH 331-467) Page 58 December 2012

Page 88: Group B Design Workbook

CHAPTER 8 Booster Pumps For most Group B water systems, booster pumps are designed to pressurize water taken from a storage tank to maintain a consistent pressure range in the distribution system. In that regard, the booster pump acts just like the well pump, working to pressurize water taken from a well to maintain a consistent pressure range in the distribution system. The design of a booster pumping system should follow the same, general principles described for well pumps in Chapter 5. If you intend to design a booster pump station, please see our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm 8.0 Booster Pump Station Detailed Drawings and Specifications The design submittal must include drawings of each project component, including location, orientation, and size (WAC 246-291-120 (2)). The drawing(s) and specifications of the booster pumps and appurtenances should include:

a. Booster pump station building specifications (only if the building is separate from the pump house addressed in Sections 5.2 and 5.3).

b. A plan view with a scale of not more than 10 feet to the inch showing the location of the booster pump station, water mains, fittings, valves, construction and maintenance easements, existing above ground and underground utilities (gas, electric, power, sewer, irrigation, and so on), and other natural or man-made features important to the proper construction of the pump house.

c. Location, size, capacity, and construction materials of all pipes, pumps, valves, sample tap, water meter, pressure gauges, pressure switch, pressure tanks, pressure relief valves, and other key components inside the booster pump station.

d. Manufacturer’s catalog information on the specific booster pumps, with the operating limits (pump on, pump off) identified.

e. Manufacturer’s catalog information on the specific bladder tanks and pressure switch to be installed.

f. Settings for the pressure switch, pressure relief valves, CSV (if any).

g. Alarm conditions (if any), and alarming system.

h. Disinfection and pressure testing procedures for all piping and tanks.

i. Typical details of thrust blocking or restraints for internal and below-building piping.

j. All other buried utilities, including storm and sanitary sewers, dry wells, telephone, natural gas, and power and TV cable lines in the project area (existing or proposed concurrent with pipeline construction) to the extent possible, given existing available records. Construction documents must clearly state that all buried utilities are to be field located prior to construction (RCW 19.122).

Group B Water System Design Guidelines (DOH 331-467) Page 59 December 2012

Page 89: Group B Design Workbook

References WSDOH. 2009. Water System Design Manual, 331-123, Washington State Department of Health, Olympia, WA.

Group B Water System Design Guidelines (DOH 331-467) Page 60 December 2012

Page 90: Group B Design Workbook

CHAPTER 9 Treatment for Secondary Contaminants This chapter discusses design and construction of treatment systems for secondary contaminants in drinking water. Secondary contaminants include iron, manganese, total dissolved solids, chloride, and sulfate. The department will not approve your proposed Group B water supply well if it exceeds the standard for a primary contaminant, such as coliform, arsenic, or nitrate (WAC 246-291-170 (5)). 9.0 Secondary Treatment Design If the untreated well water contains a secondary contaminant above the drinking water standard (WAC 246-291-170, Table 2 and Table 3), the workbook must include design and construction information on the selected treatment process (WAC 246-291-170 (6)). 9.1 Common Strategies for Iron and Manganese Removal 9.1.1 Oxidation and filtration When removal of iron or manganese is required, the most common removal methods are oxidation, followed by sedimentation and filtration. Oxidation may be affected by aeration, chlorination, or potassium permanganate. Treatment is most effective at higher pH levels, usually in excess of pH 7.5. The best oxidant for manganese removal is potassium permanganate, which has been shown effective over wide ranges of pH. Chemical additives and filter media must be approved for use in potable water service (National Sanitation Foundation listing 60 and 61, respectively) (WAC 246-291-205). 9.1.2 Ion exchange Ion exchange technologies can also be used to remove iron (Fe) or manganese (Mn). These methods require special care to prevent oxidation before the iron and manganese enter the exchange media. Fouling of the exchange bed can occur if the iron or manganese is not maintained in a chemically reduced state. Lime-softening processes can be used for iron or manganese removal, but this practice is normally used adjunct to water softening, which is not common in Washington State. Ion exchange resins must be approved for contact with potable water (National Sanitation Foundation listing 61) (WAC 246-291- 205). 9.1.3 Iron and Manganese Sequestering We do not recommend sequestering (also called stabilization, chelation, or dispersion) as a strategy to address excess levels of iron and/or manganese. 9.2 Secondary Treatment Detail Drawings and Specifications The design report must include drawings of each project component, including location, orientation, and size (WAC 246-291-120 (2)). The drawing(s) and specifications of the secondary treatment process should include:

Group B Water System Design Guidelines (DOH 331-467) Page 61 December 2012

Page 91: Group B Design Workbook

a. Treatment process and maximum daily treated water production capacity.

b. Hydraulic considerations and headloss calculations.

c. Actual water quality data from the proposed drinking water well supporting the selection of the treatment process, including analytes targeted for removal and analytes that may interfere with treatment efficacy

d. Treatment flow rate.

e. Backwash or regeneration flow rate.

f. Treatment waste volume.

g. Waste disposal.

h. Chemicals, media, and or resins used.

i. Control system.

j. Monitoring employed to ensure proper operation.

k. Location, size, capacity, and construction materials of all pipes, pumps, valves, sample tap, gauges, switches, tanks, and other vendor-supplied secondary treatment components. Explain how this system works with the well pump, reservoir or bladder tanks, and booster pump (if any). Include the operations and maintenance manual for the treatment system.

If design and construction of a secondary contaminant treatment process is necessary, see additional secondary treatment design guidance in our Water System Design Manual (331-123) online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm 9.3 Consumer Notification Required Whenever treatment is used to remove or control a secondary contaminant, you must include in the Notice to Title a description of the form of treatment or control being applied and the secondary contaminant(s) of concern (WAC 246-291-140). If sequestration is used, your Notice to Title should inform property owners that they might experience problems with the hot water portion of their home plumbing. You should also let them know that you must periodically flush remote portions of the water distribution system to remove precipitated iron or manganese. 9.4 Treatment Waste Disposal Wastes associated with secondary treatment applications (such as brine discharges or filter backwash wastewater) must be disposed of properly. The Department of Ecology should be contacted to determine the disposal requirements.

Group B Water System Design Guidelines (DOH 331-467) Page 62 December 2012

Page 92: Group B Design Workbook

References WSDOH. 2009. Water System Design Manual, 331-123, Washington State Department of Health, Olympia, WA. AWWA and American Society of Civil Engineers (ASCE). 1990. Water Treatment Plant Design, 2nd Edition, Chapter 11: “Iron and Manganese Removal,” McGraw-Hill. New York, NY. HDR Engineering, Inc. 2001. Handbook of Public Water Supplies, 2nd Edition, Chapter 14: “Iron and Manganese Removal,” John Wiley & Sons, New York, NY. Sommerfeld, E.O. 1999. Iron and Manganese Removal Handbook, AWWA, Denver, CO.

Group B Water System Design Guidelines (DOH 331-467) Page 63 December 2012

Page 93: Group B Design Workbook

CHAPTER 10 Financial Viability Chapter 10 covers the preparation of a realistic, balanced budget necessary to cover the total cost of operating and maintaining a safe and reliable water system. If you are creating a new or expanding Group B water system, you must show how much revenue is needed to operate and maintain the system, and present a plan to meet these revenue needs (WAC 246-291-140 (1)). Financial viability is the ability to obtain sufficient funds to develop, construct, operate, maintain, and manage a public water system, on a continuing basis. A viable water system generates enough revenue to meet or exceed its expenses and the owner(s) manage the financial resources in a manner that accounts for future capital needs. The owner of a water system is responsible for proper budgeting and ensuring sufficient funds are available to support the operation, maintenance, and infrastructure replacement needs of the system. At some point, a water system will require funds for extraordinary events, such as the unexpected failure of a well pump. Every small water system should consider replacement of every element of the system, even those not expected to fail or wear out for many decades. We recommend creating an emergency reserve fund and an asset-replacement reserve account because loans, when needed, may be hard to obtain quickly. 10.0 Completing the Financial Viability Worksheet For additional information about the items in the Worksheet, see the following publications online at https://fortress.wa.gov/doh/eh/dw/publications/publications.cfm

• Financial Viability Manual for New and Expanding Small Water Systems (331-104) • Financial Viability for Small Water Systems (331-405)

Note: Owners of a new or expanding Group B water system serving commercial facilities that will not charge customers for water should complete lines 1 through 12 on Worksheet 10-1. (The worksheet is on Page 69 of these Guidelines.) 10.1 Disclosure to Customers Section 2.6 of these Guidelines describes the requirement to disclose certain information to water system customers. A template for an informational notice to customers on property your Group B water system serves is included in the Appendix. The notice should let customers know:

• Whether customers are metered

• Whether water will be billed on the basis of metered use

• How often water bills will be issued

• The initial water rate and how often a bill will be sent

• How you will develop an annual water system budget

• How you will fund and administer a reserve account Group B Water System Design Guidelines (DOH 331-467) Page 64 December 2012

Page 94: Group B Design Workbook

10.2 Explanation of Terms Below is an explanation of the line items on Worksheet 10-1:

Wages and Benefits (Operator) (Line 1) Include all compensation to employees of your utility when the work is related to the utility's O&M. Electricity and Other Utilities (Line 2) Include the cost of all electric power, water, telephone, and any other utility-related expenses incurred in producing and delivering water. Chemicals and Treatment (Line 3) Include the cost of all chemicals used or manufactured by the utility in the treatment of water. Monitoring (Line 4) Include all water monitoring costs for samples you intend to take each year. We suggest you budget for the collection and analysis of at least one coliform sample each year, and one nitrate sample every three years. Materials and Supplies (Line 5) Include all materials and supplies used in the O&M of the water system and in producing and delivering water to the customer. Include all materials and supplies used in the administration of the water system, including office supplies, computers, postage, copier charges, and paper. Repairs and Parts (Line 6) Include any repairs or parts incurred in producing and delivering water, including grease, oil, and minor repairs to equipment. Emergency Reserve (Line 7) There are two parts of an emergency reserve to consider:

• Minimum required balance: This cost to replace the most vulnerable and critical facilities or equipment that may affect the reliability of the system.

• Annual Installment: Include the amount you plan to add to the emergency reserve each year. We suggest fully funding the emergency reserve account within 6 years.

Asset Replacement Reserve (Line 8)

• Include the amount you plan to add to the asset replacement reserve each year. You can assign infrastructure components by their expected lifespan. You can expect to replace shorter-lived assets, such as the well pump, electrical components, pressure tanks, booster pumps, and meters, within 20 years. Longer-lived assets, expected to last beyond 20 years, include the structures (well house), well, reservoir, and distribution system.

Principal and Interest Payments (Line 9) Include payments associated with short-term and long-term borrowing.

Group B Water System Design Guidelines (DOH 331-467) Page 65 December 2012

Page 95: Group B Design Workbook

Taxes and Assessments (Line 10) Include taxes on the utility, such as state utility tax, property tax, or business and occupation (B&O) tax. You can account for each of these taxes separately in the operating budget. Insurance and Miscellaneous Expenses (Line 11) Include all insurance costs associated with coverage for the property, general liability, workers' compensation, and other insurance costs related to the operation and administration of the water system. Include any other expenses incurred producing and delivering water. If the LHJ has an annual fee for Group B water systems, include the cost of the fee. If your system intends to retain the services of an accountant or engineer, include those costs. Hook-up and Other Fees (Line 13) Include fees and charges for service provided, including connection fees. Examples are bad check fees, reconnect fees, late payment fees, meter-testing fees, and initial first-time hookup charges. Interest Earned (Line 14) Include interest earned on savings deposits. Other Revenues (Line 15) Include all other expected sources of revenue. Average Water Rate (Line 19) The last step in the worksheet is to project the average monthly water bill. This figure is based on the estimated revenue from water rates needed to cover all expenses, divided by the number of connections expected to be in service each year. It represents a simple average. If you intend to charge each customer based on metered consumption (we recommend this approach to recovering the cost of water service), you must estimate annual demand to assess the cost per unit volume of water. For example, if you intend to install service meters on each customer and base the cost of service on metered consumption, begin by estimating that the average residential customer will consume 50 percent of the MDD value given in Table 3.1 each day of the year. Using 50 percent of the MDD as the average daily demand, an average dwelling unit would consume 19,000 gallons per month in Eastern Washington and 11,500 gallons per month in Western Washington. Multiply the number of dwelling units you expect to be in service by the average monthly water demand per dwelling unit, to arrive at a total average monthly demand. Then divide the value in line 17 by the total demand to arrive at a water rate. Water rates are usually expressed in dollars per 1,000 gallons of water.

Group B Water System Design Guidelines (DOH 331-467) Page 66 December 2012

Page 96: Group B Design Workbook

References WSDOH, 1995. Financial Viability Manual for New and Expanding Small Water Systems, Washington State Department of Health, Olympia, WA. WSDOH, 2011. Small Water System Management Program: A Guide for Small Non-Expanding Community Group A Water Systems (331-134), Washington State Department of Health, Olympia, WA. WSDOH, 2008. Financial Viability for Small Water Systems (331-405), Washington State Department of Health, Olympia, WA.

Group B Water System Design Guidelines (DOH 331-467) Page 67 December 2012

Page 97: Group B Design Workbook

Financial Viability Worksheet 10-1 TOTAL EXPENSES 1st Yr. 2nd Yr. 3rd Yr. 4th Yr. 1. Wages & Benefits (incl. SMA costs) $_____ $_____ $_____ $_____ 2. Electricity & Other Utilities $_____ $_____ $_____ $_____ 3. Chemical & Treatment $_____ $_____ $_____ $_____ 4. Monitoring Costs $_____ $_____ $_____ $_____ 5. Materials & Supplies $_____ $_____ $_____ $_____ 6. Repairs/Parts $_____ $_____ $_____ $_____ 7. Emergency Reserve Contribution $_____ $_____ $_____ $_____ 8. Asset Replacement Reserve $_____ $_____ $_____ $_____

Contribution 9. Principal & Interest Payments $_____ $_____ $_____ $_____ (if there are any loans outstanding) 10. Taxes/Assessments $_____ $_____ $_____ $_____ 11. Insurance/Misc. Expenses $_____ $_____ $_____ $_____ 12. Total Expenses $_____ $_____ $_____ $_____

(Sum lines 1-11) TOTAL REVENUE FROM SOURCES OTHER THAN WATER RATES 13. Hook Up/Other User Fees $_____ $_____ $_____ $_____ 14. Interest Earned $_____ $_____ $_____ $_____ 15. Other Revenue $_____ $_____ $_____ $_____ 16. Total Revenue $_____ $_____ $_____ $_____

(Sum lines 13-15) WATER RATE CALCULATIONS 17. Remaining Revenue Required $_____ $_____ $_____ $_____

(Line 12 minus Line 16) 18. Number of Connections _____ _____ _____ _____ 19. Average Water Rate $_____ $_____ $_____ $_____

(Line 17 divided by Line 18)

Group B Water System Design Guidelines (DOH 331-467) Page 68 December 2012

Page 98: Group B Design Workbook

APPENDICES A Public Water System Coordination Act

A.1 Sample letter to request water service for a Group B project located inside a Critical Water Supply Service Area and a water utility’s future service area (Section 2.4)

A.2 Sample letter to request water service for a Group B project located inside a

Critical Water Supply Service Area and outside any water utility’s future service area (Section 2.4)

B Sample letter requesting the services of a Satellite Management Agency (Section 2.5) C Template for informational notice to titles on property served by the Group B water

system (Section 2.6) D Outline for Water Users’ Agreement (Section 2.8) E Water Facilities Inventory form (Section 2.9)

E.1 Water Facilities Inventory form (Section 2.9) E.2 Water Facilities Inventory instructions (Section 2.9)

F Pump Test Procedure (Section 4.1)

F.1 Group B Pump Test Guidance F.2 Step Draw Down/Constant Rate Pump Test Procedure F.3 Extended Step Draw Down Pump Test Procedure F.4 Alternating Pump and Recovery Test

G Cycle Stop Valves (Section 5.0.6) H Variable Frequency Drive

Group B Water System Design Guidelines (DOH 331-467) Page 69 December 2012

Page 99: Group B Design Workbook

Appendix A.1

Sample Letter to Request Water Service Group B Project Located in a Critical Water Supply Service Area and

Inside a Water Utility’s Future Service Area (See Section 2.4)

Date Dear Local Purveyor, I am pursuing approval of a project that requires approval of a new public water system, or approval of an existing public water system not yet approved by either the local health jurisdiction or the state Department of Health. Under the Public Water System Coordination Act, I am required to request water service from you because my project lies within your utility’s future service area. Details concerning my project, including its exact location and its water supply and fire suppression requirements, are attached for your reference. Please provide me with a written response to my request for water service within 30 days of the date of this letter. In your response, please let me know if your utility can provide water service. If not, I will proceed with the design and/or approval of a Group B public water system. If there are requirements that my project connect with your utility in the future, when such a connection is feasible, please provide me with whatever legal agreement you require me to sign before I may operate a new public water system within your future service area. If you have any questions, please contact me at _________________________ or __________________________ . Thank you in advance for your response to this inquiry. Sincerely,

Group B Water System Design Guidelines (DOH 331-467) Page 70 December 2012

Page 100: Group B Design Workbook

Appendix A.2

Sample Letter to Request Water Service Group B Project Located in a Critical Water Supply Service Area and

Outside any Water Utility’s Future Service Area (See Section 2.4)

Date Dear Local Purveyor, I am pursuing approval of a project that requires approval of a new public water system, or approval of an existing public water system not yet approved by either the local health jurisdiction or the state Department of Health. Under the Public Water System Coordination Act, I am required to request water service from the nearest water supplier when my project is located outside of any purveyor’s future service area. Details concerning my project, including its exact location and its water supply and fire suppression requirements, are attached for your reference. Please provide me with a written response to my request for water service within 30 days of the date of this letter. In your response, please let me know if your utility can provide water service. If not, I will proceed with the design and approval of a Group B public water system. If you have any questions, please contact me at _________________________ or __________________________ . Thank you in advance for your response to this inquiry. Sincerely,

Group B Water System Design Guidelines (DOH 331-467) Page 71 December 2012

Page 101: Group B Design Workbook

Appendix B

Request for Satellite Management Services (See Section 2.5)

Date Dear Satellite Manager, I am pursuing approval of a project that requires approval of a new public water system, or approval of an existing public water system not yet approved by either the local health jurisdiction or the state Department of Health. Under the Satellite System Management Agency regulations, I am required to obtain the services of an approved satellite management agency (SMA) to own or operate my water system, if one is available. In order to gain approval of my water system without the services of an SMA, I must demonstrate that I have requested SMA services from all approved SMAs in my project area, and each SMA has declined my request for service. Please provide me with a written response to my request for SMA services within 30 days of the date of this letter. In your response, please let me know if you can provide ownership or management services. If you are available to provide SMA services to my water system, please provide me with information about the scope and cost of your services. I will consider your information as I explore all my options for compliance with the SMA requirement. If you are not available to provide SMA services to my water system, please send me a note with your SMA name, signature, and date, and reference to this letter. If you have any questions, please contact me at _________________________ or __________________________ . Thank you in advance for your response to this inquiry. Sincerely,

Group B Water System Design Guidelines (DOH 331-467) Page 72 December 2012

Page 102: Group B Design Workbook

Appendix C

Informational Notice to Titles on Property Served (See Section 2.6)

The Washington State Department of Health and local health jurisdictions share administration of drinking water regulations. Contact your local health jurisdiction to determine which agency has administrative responsibility. This property is served by a Group B public water system that received (check box that applies):

Design approval under chapter 246-291 Washington Administrative Code from the Washington Department of Health

Design approval under chapter 246-291 Washington Administrative Code or a local code from the _________________________________________ (local health jurisdiction)

When this water system was approved: Water System Name Water System Identification Number Water System Owner

Record the parcel numbers of all parcels approved to be served by this water system: 1. 6. 2. 7. 3. 8. 4. 9. 5. 10. No other parcels, and no additional dwellings or buildings on one of the parcels listed above, can be served by this water system unless approved by the water system owner, and the department. There are legal limits on the volume of water that can be withdrawn from the ground, and there may be limits on the total area that can be irrigated from this water system. Based on the design of this water system, each of the above parcels is permitted to irrigate no more than _______________ square feet of lawn and garden. This limitation runs with the land and is not transferable to another property. This water system has been granted one or more exceptions from specific provisions of the regulations, or a waiver (check all boxes that apply):

No exceptions or waivers were granted A reduction in sanitary control area from 100 feet to _____ feet was approved An exception or waiver was granted (describe) __________________________

__________________________________________________________________ Group B Water System Design Guidelines (DOH 331-467) Page 73 December 2012

Page 103: Group B Design Workbook

The capacity of the water supply for this water system was tested and (check the box that applies): Determined to yield more than 5 gallons per minute Determined to yield 5 gallons per minute or less, and a low water supply contingency plan is

available for review. Some small water systems are required by the local fire authority to provide fire suppression capacity. This water system (check box that applies):

Is designed and constructed to provide fire suppression Is not designed and constructed to provide fire suppression

Ownership and/or operation and management by a Satellite Management Agency (SMA) were required at the time this water system was approved, provided an SMA was available at the time of approval (check box that applies).

The name of the SMA is: __________________________________________. No SMA was available when this water system was approved. This requirement may be

applied at any time in the future. When this water system was approved, the financial plan indicated the following water rate structure would be implemented (check all boxes that apply):

All customers are metered Water will be billed based on metered use Water bills will be issued every ______ months. The water rate will be $_____________ every billing cycle,

plus $_____________ per ____________ 1,000 gallons/100 cubic feet (circle one) The method for establishing the annual water system budget is attached. The process for funding a water system reserve account is attached. Other _______________________________________________

Routine water quality sampling is encouraged, but not required. At the time of approval, the owner of the water system (check box that applies):

Intends to conduct the following routine water quality sampling:

Analyte and Location Frequency Reporting Results e.g., coliform bacteria in the distribution system

e.g., every three months e.g., by phone within 24 hours

Does not intend to conduct any routine sampling

Group B Water System Design Guidelines (DOH 331-467) Page 74 December 2012

Page 104: Group B Design Workbook

When this water system was approval (check box that applies): The source is not treated for a secondary contaminant (i.e., a contaminant that impacts the

aesthetic quality of the water, but is not known to affect human health, such as iron or manganese).

The source is treated for a secondary contaminant. The secondary contaminant being removed is from the well is _______________________________________________________

When this water system was approval, a water users’ agreement (check box that applies):

Exists and a copy can be obtained from ______________________________________ Was not prepared

Describe the public notification procedure(s) that will be used to communicate with customers:

By phone or email (assumes the maintenance of an accurate phone or email list) By posting to each customer’s property (door hanger) Other: ___________________________________________________________

Group B Water System Design Guidelines (DOH 331-467) Page 75 December 2012

Page 105: Group B Design Workbook

Appendix D

Outline for Water Users’ Agreement (See Section 2.8)

I. Ownership

A. Governing Board B. Election of Officers C. Responsibilities D. Authorities E. Communication with customers F. Transferring ownership

II. Decision-Making A. Quorum B. Annual meeting C. Special meeting D. Meeting announcement

III. Annual Operating Budget A. Basis for collecting revenue to cover the full cost of service B. Rate-setting basis C. Frequency of budgeting process D. Responsible parties E. Process for setting and approving an annual budget F. Financial and accounting controls

IV. Long-Term Capital Budget A. Provision for special assessment B. Provision for annual assessment

V. Fees A. Connection fees B. Other fees and charges

VI. Recordkeeping A. Original (approved) design documents B. Equipment catalog information C. Water production and water consumption records D. “As-built” construction documents, including all easements and covenants E. Water quality sampling results F. Complaints

VII. Standard design and construction details A. Service connection, service meter, service valves, location, and so on. B. Pipes C. Valves D. Easements

Group B Water System Design Guidelines (DOH 331-467) Page 76 December 2012

Page 106: Group B Design Workbook

VIII. Reporting to customers IX. Authorized parties to perform maintenance and repair X. Prohibited practices

XI. Heirs, successors, and assigns XII. Enforcement of agreement on nonconforming parties and properties

XIII. Changing the water users’ agreement

Group B Water System Design Guidelines (DOH 331-467) Page 77 December 2012

Page 107: Group B Design Workbook

Appendix E

Group B Water Facilities Inventory (WFI) Form INSTRUCTIONS (See WFI Form on Page 82)

Cross out outdated information on the WFI, and then write corrections in any adjacent space available Field Number and Field Name Instruction

AD

DR

ESSES & P

HO

NE N

UM

BER

S

6. PRIMARY CONTACT NAME & MAILING ADDRESS

Enter the name of the person we should contact about the water system’s day-to-day operations. Most DOH mailings will be sent to this person.

Enter only the mailing address in this part of the box Do not combine a PO Box with a street address).

Enter the Physical Delivery Address for the contact person if it is different than the normal mailing address. (This address will be used to ship sampling containers or other materials that cannot be delivered to a P.O. Box). Example:

Name & Mailing Address ANN SMITH ATTN (optional) P O BOX 3030 ANYTOWN WA 98000

Physical Delivery Address, if different from Above ATTN (Optional) 1231 MAIN ST ANYTOWN WA 98000

7. OWNER NAME & MAILING ADDRESS

Enter the name of the person or organization that is the legal owner of the water system. Follow the directions and example in field 6 (above). If the owner is an organization, you must list an individual as the contact for the organization.

9. 24 HOUR PRIMARY CONTACT INFORMATION

Enter phone and fax numbers including area code (and extension, if applicable) for the primary contact for the water system. The email address may be for the system or the primary contact.

10. OWNER CONTACT INFORMATION Enter the phone and fax numbers including area code (and extension, if applicable) for the owner of the water system.

CH

ECK

BO

XES

11. SATELLITE MANAGEMENT AGENCY (SMA)

If the system is NOT owned or managed by a Satellite Management Agency (SMA), check “Not Applicable” and go to12. If the system IS owned or managed by a SMA, check the applicable box and enter the name of the SMA. The SMA number is assigned by DOH.

12. WATER SYSTEM

CHARACTERISTICS

Mark ALL boxes that apply to your system. You may check more than one box for each service. For example, a restaurant may be “Food Service” and “Commercial.” * Agricultural: Commercial crop irrigation/Farming * Commercial / Business: Office & retail complexes, nurseries, golf courses. * Day Care: Child or adult care facilities (in home or stand alone where the clients do not live 24

hrs. per day). * Food Service/Food Permit: Restaurant, coffee shop, bakery, tavern, catering facility, deli,

grocer, mini-mart. * 1,000 or more person event for 2 or more days per year: Major event that significantly

effects your system, such as a fair, town festival, or major concert. * Hospital/Clinic: Medical / Dental office or clinic, Surgery Center, Emergency Care Facility. * Industrial: Manufacturing, assembly facility, food processing facility. * Licensed Residential Facility: Nursing home, adult boarding home, foster home. * Lodging: Hotel, motel, inn, bed and breakfast, resort. * Recreational / RV Park: Connections serving parks, beaches, ball fields, playground,

campgrounds, picnic areas, ski areas, transient recreational vehicle facilities. * Residential: Units designed to house one or more family (such as single family houses,

apartments, duplexes, condominiums, mobile home parks, etc.) no matter how many days per year they are occupied.

* School: K-12 grades, community college, technical training facility, colleges. * Temporary Farm Worker Housing / Labor Camp: Facility that provides temporary facilities

for workers and their families. May or may not meet the criteria for DOH Temporary Worker Housing licensing.

* Other: If choosing “other,” please write a brief description in the blank provided (fire station, fraternal organization, grange).

Group B Water System Design Guidelines (331-467) Page 78 December 2012

Page 108: Group B Design Workbook

13. WATER SYSTEM OWNERSHIP Mark only one type of organization that best describes the owner of the water system. Association: A non-government water system owned by its consumers (sometimes called “members”). It includes “mutual” water companies. City / Town: A city or town that has been incorporated according to the applicable RCW. County: A water system owned by county government, such as a county park, or public works maintenance facility. Federal: A water system owned by the federal government, such as a veterans’ hospital, national park, forest service facility. Investor: A privately owned water system operated with the intent of making profit. The owner may be regulated (or potentially regulated) by the Washington Utilities and Transportation Commission (WUTC). Private: A privately owned water system, not including Associations, that is not operated with the intent of making a profit. Examples are water systems serving mobile home parks, stores, industries, and so on. Special District: A special purpose district created according to applicable RCW, such as a Water or Sewer District, Public Utility District, School District, Fire District or Port District. State: A water system owned by the state, such as a state park, correctional facility, or a Department of Transportation rest area or maintenance facility.

14. STORAGE CAPACITY

Enter the total storage capacity (in gallons) available for distribution to users (if 1,000 gallons or greater). Do not include pressure tank(s) in the total.

SOU

RC

ES

16. SOURCE NAME Enter your name for the source (such as, Park Well). If the source is purchased or an intertie, list the name of the system providing the water. Each well in a well field or spring in a spring field must be identified. Please provide Well Tag number if available.

17. INTERTIE Enter the ID number of the system providing purchased water or intertie. If you do not know the ID number, contact your DOH regional office.

18. SOURCE CATEGORY Mark the box that best describes this source. Each source can have only one code. Each well in a well field, and spring in a spring field must be identified individually.

19. USE Mark the box that best describes how this source is used.

Permanent: A source that is used regularly each year for more than 3 consecutive months within a 12-month period. For systems that are in operation for 3 or less months, their sources shall also be considered permanent. Seasonal: A source that is used on a regular basis and does not meet the definition of either permanent or emergency source. Seasonal source could be used to supply peak demand. Emergency: A source that has been approved by DOH for emergency use and is not used for routine or seasonal peak water demands.

20. SOURCE METERED Mark this box if this source has a water meter installed.

21. TREATMENT

If this source is not treated, mark “none,” otherwise mark the box(es) for each type of treatment provided for this source. If a well in a well field or a spring in a spring field has its own individual treatment, mark the appropriate box. If all the wells in a well field or springs in a spring field are treated together at one location, mark the appropriate box on the well or spring field line. Treatment for an intertie refers only to additional treatment by the receiving system.

22. DEPTH TO FIRST OPEN INTERVAL

For cased wells, enter depth to top of uppermost well screen or perforated casing; for wells completed in rock, enter depth to bottom of sealed casing; for dug wells, enter depth to first unsealed casing joint below the well seal; and for well fields, enter depth of shallowest well. Round off to the nearest whole number.

23. CAPACITY Enter the actual current capacity of the source, in gallons per minute (gpm) that is available to enter the distribution system under operating conditions. For example, if the source is a well with a pump test of 100 gpm, but only has a 20-gpm pump installed, enter 20 gpm.

24. SOURCE LOCATION Enter the quarter / quarter designation, section number, township and range location for each source. For Example, SE/SW, Sec.1, T18N, R3E. Source locations can be found on well logs, water right documents, or property descriptions.

Group B Water System Design Guidelines (331-467) Page 79 December 2012

Page 109: Group B Design Workbook

CO

NN

ECTIO

NS

25-A. FULL TIME SINGLE-FAMILY RESIDENCES

Enter the number of single-family residences (including mobile homes) occupied any 180 days or more a year that are served by the water system. If you enter a number in this field, you also need to enter a number for the corresponding population residing in these connections in field 29. A connection is considered active until it is physically disconnected from the water system.

25-B. PART TIME SINGLE-FAMILY RESIDENCES

Enter the number of single-family residences (including mobile homes) occupied less than 180 days a year that are served by the water system. (These part-timers most likely inhabit vacation homes that are not used as a primary residence) If you enter a number in this field, you also need to enter data for the corresponding population residing in these connections in rows 30A and 30B. A connection is considered active until it is physically disconnected from the water system.

26-A. APARTMENT BUILDINGS, CONDOS, OTHER MULTIFAMILY BUILDINGS, BARRACKS, DORMS

Enter the number of apartment buildings, condominium buildings, duplex buildings, barracks, and dormitory buildings, and so on served by your water system.

26-B. FULL TIME RESIDENTIAL UNITS

If the water system serves multifamily residential buildings, enter the total number of residential units that are occupied any 180 days or more a year. If you enter a number in this field, you also need to enter a number for the corresponding population residing in these connections in field 29.

26-C. PART TIME RESIDENTIAL UNITS

If the water system serves multifamily residential buildings, enter the number of individual dwelling units that are occupied less than 180 days a year. If you enter a number in this field, you also need to enter data for the corresponding population residing in these connections in rows 30A and 30B.

27-A. RECREATIONAL SERVICES OR TRANSIENT ACCOMMODATIONS

CALL YOUR REGIONAL OFFICE IF YOU ARE UNSURE WHETHER YOURS IS A COMMUNITY, NONCOMMUNITY, OR GROUP B SYSTEM

COMMUNITY SYSTEMS: Leave this field empty. Include in field 27B the actual number of RV parks, campgrounds, hotels, motels, and so on served.

NONCOMMUNITY and GROUP B SYSTEMS: Enter the actual number of RV sites, campsites, spigots, etc., and hotel/motel/overnight units that are served by the water system. Enter the corresponding nonresidential population and use-days in rows 31A and 31B.

27-B. INSTITUTIONAL, COMMERCIAL, OR INDUSTRIAL SERVICES

COMMUNITY SYSTEMS: Enter the number of all service connections not used for residential purposes. Include RV parks, campgrounds, hotels, motels, etc. in your count of commercial connections. If you enter a number in this field, enter the corresponding non-resident population and use-days in rows 31A, 31B, 32A, and 32B.

NONCOMMUNITY and GROUP B SYSTEMS: Enter the number of all service connections not used for residential purposes and not otherwise accounted for in field 27A. If you enter a number in this field, enter the corresponding non-resident population and use-days in rows 31A, 31B, 32A, and 32B.

PO

PU

LATIO

NS

29. FULL TIME RESIDENTIAL POPULATION

Enter the total number of residents that are served by the water system for any 180 days or more per year.

30-A. PART TIME RESIDENTS PER MONTH

Enter the TOTAL number of seasonal or weekend residents that are present each month. (These part-timers most likely inhabit vacation homes that are not used as a primary residence).

30-B. PART TIME RESIDENT USE DAYS PER MONTH

Enter how many days part-time residents are present each month.

31-A. TEMPORARY & TRANSIENT USERS PER MONTH

Enter the TOTAL number of temporary or transient users served by the water system each month. This includes all visitors, attendees, travelers, campers, patients, or customers with access to establishments connected to the water system. Visitors must be counted for every day that they have access to the water system. For example, an individual attending a weeklong camping session (seven days) must be counted seven times.

31-B. TEMPORARY & TRANSIENT USE DAYS PER MONTH

Enter the TOTAL number of days per month this system is accessible or available to the public.

32-A. REGULAR NONRESIDENTIAL USERS PER MONTH

Enter the number of students, daycare children, and all employees that are served by the water system during each month.

32-B. REGULAR NONRESIDENTIAL USE DAYS PER MONTH

Enter the number of days per month that students, daycare children, and employees have access to the water.

SIGN

ATU

RE

35. REASON FOR SUBMITTING THE WFI

Check the appropriate box. If you are submitting this WFI as requested by DOH, please refer to the instructions in the letter.

36. CERTIFICATION Please sign and print your name and the date you are signing the WFI. Please include your title or relationship with this water system.

Group B Water System Design Guidelines (331-467) Page 80 December 2012

Page 110: Group B Design Workbook

ONE FORM PER SYSTEM 1. SYSTEM ID NO. 2. SYSTEM NAME 3. COUNTY 4. GROUP 5. TYPE 6. PRIMARY CONTACT NAME & MAILING ADDRESS 7. OWNER NAME & MAILING ADDRESS 8. Owner Number: ORGANIZATION NAME ORGANIZATION NAME

PRIMARY CONTACT NAME TITLE: NAME TITLE: ADDRESS ADDRESS

CITY STATE ZIP CITY STATE ZIP

STREET ADDRESS IF DIFFERENT FROM ABOVE STREET ADDRESS IF DIFFERENT FROM ABOVE ADDRESS ADDRESS

CITY STATE ZIP CITY STATE ZIP

9. 24-HOUR PRIMARY CONTACT INFORMATION 10. OWNER CONTACT INFORMATION Primary Contact Daytime Phone: Owner Daytime Phone:

Primary Contact Evening Phone: Owner Evening Phone:

Primary Contact Mobile/Cell Phone: Owner Mobile/Cell Phone:

Fax: Email: Fax: Email:

WAC 246-290-420()) requires water systems to provide 24-hour contact information for emergencies.

11. SATELLITE MANAGEMENT AGENCY – SMA (check only one) � Not applicable (Skip to #12) � Owned and Managed SMA NAME:__________________________________________ SMA Number: _______ ____ � Managed Only

12. WATER SYSTEM CHARACTERISTICS (mark ALL that apply) � Agricultural � Hospital/Clinic � Residential � Commercial / Business � Industrial � School � Day Care � Licensed Residential Facility � Temporary Farm Worker � Food Service/Food Permit � Lodging � Other (church, fire station, etc.): � 1,000 or more person event for 2 or more days per year � Recreational / RV Park _________________________________

13. WATER SYSTEM OWNERSHIP (mark only one) 14. STORAGE CAPACITY (gallons) � Association � County � Investor � Special District � City / Town � Federal � Private � State

15. 16. SOURCE NAME

17. INTERTIE

18. SOURCE CAPACITY

19. USE 20. 21.

TREATMENT 22.

DEPTH 23. 24. SOURCE LOCATION

LIST UTILITY’S NAME FOR SOURCE AND WELL TAG ID NUMBER.

Example: WELL #1 XYZ456

IF SOURCE IS PURCHASED OR INTERTIED,

LIST SELLER’S NAME

Example: SEATTLE

INTERTIE SYSTEM ID NUMBER

WEL

L W

ELL F

IELD

W

ELL I

N A

WEL

LFIE

LD

SPRI

NG

SPRI

NG F

IELD

SP

RING

IN A

SPR

INGF

IELD

SE

AWAT

ER

SURF

ACE

WAT

ER

RANN

EY IN

F. G

ALLE

RY

OTHE

R

PERM

ANEN

T

SEAS

ONAL

EMER

GENC

Y

SOU

RCE

METE

RED

NONE

CHLO

RINA

TION

FILT

RATI

ON

FLUO

RIDA

TION

IRRA

DIAT

ION

(UV)

OTHE

R

(DEP

TH T

O FI

RST

OP

EN IN

TERV

AL)

CAPA

CITY

GA

LLON

S PE

R MI

NUTE

¼, ¼

SEC

TION

SEC

TION

NUM

BER

TOW

NSHI

P

RANG

E

S01

S02

S03

S04

S05

S06

S07

D

Group B Water Facilities Inventory (WFI) Form For new or expanding Group B water systems only

Group B Water System Design Guidelines (331-467) Page 81 December 2012

Page 111: Group B Design Workbook

Comments:

35. REASON FOR SUBMITTING WFI:

� New System � Other______________

ACTIVE

SERVICE CONNECTIONS

DOH USE ONLY! CALCULATED

ACTIVE CONNECTIONS

DOH USE ONLY! APPROVED

CONNECTIONS

25. SINGLE FAMILY RESIDENCES (How many of the following do you have?) A. Full Time Single Family Residences (Occupied 180 days or more per year) B. Part Time Single Family Residences (Occupied less than 180 days per year) 26. MULTIFAMILY RESIDENTIAL BUILDINGS (How many of the following do you have?) A. Apartment Buildings, condos, duplexes, barracks, dorms B. Full Time Residential Units in Apartments, Condos, Duplexes, Dorms that are occupied more than 180

days/year

C. Part Time Residential Units in the Apartments, Condos, Duplexes, Dorms, that are occupied less than 180 days/year

27. NONRESIDENTIAL CONNECTIONS (How many of the following do you have?) A. Recreational Services (Campsites, RV Sites, Spigots, etc.) B. Institutional, Commercial/Business or Industrial Services

28. TOTAL SERVICE CONNECTIONS 29. FULL-TIME RESIDENTIAL POPULATION How many residents are served by this system 180 or more days per year? _______________________

30. PART-TIME RESIDENTIAL POPULATION JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A. How many part-time residents are present each

month? B. How many days per month are they present? 31. TEMPORARY & TRANSIENT USERS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A. How many total visitors, attendees, travelers, campers,

patients, or customers have access to the water system each month?

B. How many days per month is water accessible to the public?

32. REGULAR NONRESIDENTIAL USERS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A. If you have schools, daycares, or businesses connected

to your water system, how many students, daycare children, or employees are present each month?

B. How many days per month are they present?

33. ROUTINE COLIFORM SCHEDULE

JAN

N/A

FEB

N/A

MAR

N/A

APR

N/A

MAY

N/A

JUN

N/A

JUL

N/A

AUG

N/A

SEP

N/A

OCT

N/A

NOV

N/A

DEC

N/A

34. GROUP B NITRATE SCHEDULE

QUARTERLY

ANNUALLY

ONCE EVERY 3 YEARS

N/A N/A N/A

36. I CERTIFY THAT THE INFORMATION STATED ON THIS WFI FORM IS CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE: DATE: PRINT NAME: __________________ TITLE:

Group B Water System Design Guidelines (331-467) Page 82 December 2012

Page 112: Group B Design Workbook

Appendix F Group B Pump Test Guidance

Objective: To demonstrate that a proposed well (or wells) can provide sustainable and reliable water production equal to or exceeding the minimum supply requirements needed to supply the proposed number of water systems connections (WAC 246-291-125 (4)(d)). A pump test is the best way to demonstrate this. A pump test is a well and localized aquifer stress test. It involves recording and evaluating periodic measurement of pumping rate and water level changes during a series of controlled pump and recovery (“rest”) test cycles. The results show how both the well and the localized aquifer react to periods of intense pumping. Evaluating the degree of water level drawdown and the rate of water level recovery helps to characterize the aquifer’s yield and establish optimal well pump placement and operating conditions. When executed correctly, a pump test provides sufficient information to demonstrate the capacity of a well or collection of wells to produce enough water in a 24-hour period to service the water system as designed.

• A successful pump test must show the proposed well (or combination of wells) can provide a sustainable and reliable production of water (yield) equal to or exceeding the minimum supply requirements in WAC 246-291-125 (4)(d) and recover to pre-pumping level within a normal 24-hour operational period.

• A failed pump test is one that cannot demonstrate the required level of production and recovery within a normal 24-hour operational period.

Part 1: Select and Run a Recommended Group B Pump Test

Pump Test Procedure Recommended Conditions for Use

Standard Step Drawdown/Constant Rate Test

See Appendix F-1

For sources located in: • Fractured rock, shale, bedrock, or hard rock (consolidated) aquifers. • Areas of known or suspected seawater intrusion. • Aquifers with highly variable seasonal water tables. • Aquifers with limited recharge. • An area with nearby large capacity wells that could affect local water levels

and well yields. Extended Step Drawdown Test

See Appendix F-2

• Low projected water demand wells in a high-flow aquifer setting. • Most common for small Group B systems with proposed wells in sand and

gravel aquifers.

Alternating Pump and Recovery Test

See Appendix F-3

• Very small systems (2-6 connections) and • Very low flow aquifer conditions or • Failure on other tests

Part 2: Pump Test Report and Analysis: The Pump Test Report (See Appendix F-4) documents the results of the pump tests, provides an analysis of the well, and localized aquifer responses to the challenge of sustained pumping. The designer can use that data to estimate aquifer characteristics, and determine pump and well operational factors and well efficiency.

Group B Water System Design Guidelines (DOH 331-467) Page 83 December 2012

Page 113: Group B Design Workbook

Elements of a complete report should discuss: Well yield Expected operational drawdown Pumping rates and recommended pump operational cycles Recommended pump placement Estimate of well efficiency An estimate of the aquifer’s specific yield, hydraulic conductivity, or transmissivity (to

support evidence of sustainability and aquifer capacity consistent with proposed use of the well)

If a pump test is unable to demonstrate a clear sustained yield as defined above, then the designer should re-run the test with different operational assumptions and conditions (lower pumping rate, add additional sources, or reduced total volume and associated connections). The designer might need to consider using an alternative test. Part 3: Additional considerations

• Low well yield contingency plan. • Water quality test results. • Risks of seawater intrusion (if appropriate). • Reasons why stabilization was not achieved during testing. • Well interference and well field considerations.

In challenging aquifer settings, a pump test can provide a starting point in the analysis and potential mitigation of any localized aquifer conditions that could adversely affect long-term use of the well (including concerns about saltwater intrusion, declining aquifer levels, consolidated and fracture rock aquifers, aquifers with limited recharge, and high seasonal water level variability). The pump test report is an appropriate place to highlight those issues and discuss supply-related options. Part 4: Recommended Pump Test Procedures: The following sections lay out step-by-step procedures for the three recommended pump tests. Site conditions and equipment must be factored into any pump test design and implementation. While we recommend these procedures, they are still guidelines so the designer may modify them based on professional expertise, experience, and on-site conditions. The result should be a test, analysis and report that documents the sustainable use of the well as dictated by the water system design criteria and the Group B rule. In addition to the recommended pump test procedures, this Appendix includes data collection templates for both the drawdown and recovery phases of a pump test. A successful test will likely require multiple pages of each. Examples of pump and recovery test data collected under the different test procedures are online at http://www.doh.wa.gov/CommunityandEnvironment/DrinkingWater/WaterSystemAssistance/GroupB/GroupBResources.aspx

Group B Water System Design Guidelines (DOH 331-467) Page 84 December 2012

Page 114: Group B Design Workbook

Appendix F-1

Step Drawdown/Constant Rate Pump Test Procedure

Phase 1: Step Drawdown Pump Test

Objective: To evaluate well performance, and identify successful pumping conditions for phase 2 of the pump test (constant rate). This information will allow a determination of the optimal pump settings (depth and pumping rate) and well efficiency for the well.

Elements:

1. We recommend that a qualified water professional (hydrogeologist or engineer) oversee testing of the well and review data analysis and interpretations.

2. An access port to allow depth-to-water measurements must be installed, if not already present, and maintained (WAC 173-160-355).

3. The step drawdown test should include at least four consecutive constant rate discharge steps as described below, with a higher pumping rate used for each step. Each step should be at least 60 minutes long.

4. The third step of the drawdown test should use a flow rate no less than the minimum supply requirement in WAC 246-291-125 (4)(d). The remaining pumping rates should be determined by multiplying this flow rate (in gallons per minute) by 0.50, 0.75, and 1.25.

5. Drawdown should be measured in the pumped well at least as frequently as:

Time after pumping started Time Intervals 0 to 10 minutes 1 minute 10 to 60 minutes 5 minutes

60 to 240 minutes 15 minutes 240 to 600 minutes 60 minutes

600 to 1,440 minutes 120 minutes

6. Recovery should be measured beginning at the end of the last step (immediately after the pump is turned off) and ending when the water level returns to at least 95 percent of the initial, pre-pumping static water level. Measurement frequency should follow the specifications in the table above measured from the moment when pumping stopped. Initial measurement intervals will be short and expand as recovery progresses. The pump should not be removed until the water level returns to 95 percent of the pre-pumping static water level.

7. Determine the maximum pumping rate and pumping depth as established from the step drawdown test. Use these values for conducting the constant rate discharge test, if the test is applicable.

Group B Water System Design Guidelines (DOH 331-467) Page 85 December 2012

Page 115: Group B Design Workbook

Phase 2: Constant Rate Pump Test

Objective: To determine the capacity of the well and aquifer to provide a reliable yield of water at the desired rate. The pumping and recovery data from the test can be used to estimate aquifer transmissivity and a sustainable yield for the well. This test procedure is recommended for sources in complex hydrologic settings where the nature of the aquifer could adversely affect long-term continuous use of the source. Sources with the potential for seawater intrusion should also conduct the additional elements provided at the end of this document.

Elements: 1. We recommend that a qualified water professional (hydrogeologist or engineer) oversee

testing of the well.

2. An access port to allow depth to water measurements must be installed, if not already present, and maintained (WAC 173-160-355).

3. The source should be pump tested at no less than the maximum rate determined from the step drawdown test. The constant rate discharge test should not be conducted until after the water levels in the aquifer have achieved at least 95 percent recovery from the step drawdown test pre-pumping static water level conditions.

4. The constant rate discharge test should be at least 24 hours long. If, at 24 hours, four hours of stabilized drawdown have been observed, the pump may be shut off and measurements of recovery begun. If stabilized drawdown has not been observed within a total of 36 hours, the pump may be shut off and recovery measurements begun. Stabilization is defined as a drop in water level of less than or equal to 0.1 feet per hour.

5. Drawdown should be measured in the pumped well at least as frequently as:

Time after pumping started Time intervals 0 to 10 minutes 1 minute 10 to 60 minutes 5 minutes 60 to 240 minutes 30 minutes 240 to 600 minutes 60 minutes 600 to 1440 minutes 120 minutes

6. Water samples must be collected from the source using proper sampling procedures and

analyzed by a DOH-certified laboratory. Water samples must be taken within the last 15 minutes of pumping and analyzed for the following water quality parameters:

- Coliform (bacteria)

- Inorganic Chemicals (IOCs)

- Additional Volatile and/or Synthetic Organic Chemicals (VOCs /SOCs)*

*If required by DOH because the well is in areas of known or expected contamination

Group B Water System Design Guidelines (DOH 331-467) Page 86 December 2012

Page 116: Group B Design Workbook

7. After pumping, recovery data should collected until 95 percent recovery of the pre-pumping static water level is achieved. Recovery should be measured in the same manner and at the same frequency as the table above. To facilitate accurate recovery data collection, the pump test piping should incorporate backflow check-valve(s) that prevent water within the riser pipe from flowing back into the well when the pump is shut off.

8. When the pumping test is completed, the data should be compiled into a report and submitted to DOH. The report should include:

a. All data on pumping rates and water levels (including static water levels) from the pumping test and recovery period, and appropriate graphical presentations of the data.

b. An estimate of the aquifer’s specific yield, hydraulic conductivity, and transmissivity (to support evidence of sustainability and aquifer capacity consistent with proposed use of the well).

c. A map and description (¼, ¼, Section Township Range) accurately indicating the well location, and the land surface elevation to the nearest foot above sea level. Address and parcel number should be provided.

d. Summary, conclusions, and recommendations on pump settings, operational regimes, and source reliability.

e. A well construction report (well log) for the pumping well and all observation wells (if any).

f. Distance, to the nearest foot, from pumping well to all observation wells and a map indicating all well locations.

g. A copy of all laboratory test results.

Additional Steps for Potential Seawater Intrusion Areas For the source well (the well pumped during the aquifer test), chloride and

conductivity samples should be collected at the following intervals:

o One sample during the initial 30 to 60 minutes.

o One sample during the 6th hour (360 to 420 minutes).

o One sample during the 12th hour (720 to 780 minutes).

o One sample within the last 15 minutes of the aquifer test pumping phase. For at least one observation well, two chloride and conductivity samples should be

collected: one base sample before initiating the aquifer test and the other after recovery data collection is complete. An observation well should first be pumped by an amount equal to three times the volume of water inside its well casing before actually collecting the base sample. Following collection of the base sample, observation wells should be given adequate time to recover to static water level before initiating the aquifer test. Note: We recommend that a field test kit be used to monitor chloride levels within the pumping well during the pumping phase.

Group B Water System Design Guidelines (DOH 331-467) Page 87 December 2012

Page 117: Group B Design Workbook

The report should include:

1. Tidal influence on the pumping well. Data on pumping water levels, chlorides, and tidal fluctuations (corrected to point) should be plotted on a single graph with respect to time.

2. Potential for seawater intrusion into this or other seaward wells.

Group B Water System Design Guidelines (DOH 331-467) Page 88 December 2012

Page 118: Group B Design Workbook

Appendix F-2 Extended Step Drawdown Pump Test Procedure Objective: To evaluate well performance and determine whether a source over an aquifer

with an expected high yield can produce a sustainable yield. The test results can be used to determine optimal pump settings and well efficiency. The extended pumping and recovery data is used to estimate aquifer transmissivity and confirm that there are no underlying aquifer conditions likely to adversely affect long term use of the source. This test is most appropriate for sources with a small demand within a high yield aquifer.

Elements:

1. We recommend that a qualified water professional (hydrogeologist or engineer) oversee testing of the well and review data analysis and interpretations.

2. An access port to allow depth to water measurements must be installed, if not already present, and maintained (WAC 173-160-355).

3. The step drawdown test should include at least four consecutive constant rate discharge steps, with a higher pumping rate used at each step. The first three steps should be at least 60 minutes long. The fourth step is extended until 4 hours of stabilization occurs or until 12 hours total pumping time has elapsed. Stabilization means less than 0.1 foot of drawdown fluctuation per hour in 4 hours of drawdown measurement.

4. The third step of the drawdown test should use a flow rate no less than the minimum supply requirement in WAC 246-291-125 (4)(d). The remaining pumping rates should be determined by multiplying this flow rate (in gallons per minute) by 0.50, 0.75, and 1.25.

5. Drawdown should be measured in the pumped well at least as frequently as:

Time After Pumping Started

Time Intervals

0 to 10 minutes 1 minute 10 to 60 minutes 5 minutes 60 to 240 minutes 15 minutes 240 to 600 minutes 60 minutes 600 to 1440 minutes 120 minutes

6. Water samples must be collected from the source using proper sampling procedures and

analyzed by a DOH-certified laboratory. Water samples should be taken within the last 15 minutes of pumping and must be analyzed for the following water quality parameters: - Coliform (bacteria) - Inorganic Chemicals (IOCs) - Additional Volatile and/or Synthetic Organic Chemicals (VOCs /SOCs)*

*If required by DOH because the well is in an area of known or expected contamination

Group B Water System Design Guidelines (DOH 331-467) Page 89 December 2012

Page 119: Group B Design Workbook

7. Recovery should be measured beginning at the end of the last step (immediately after the pump is turned off) and ending when the water level returns to within 95 percent of the initial, pre-pumping static water level. Measurement frequency should follow the specifications in the table above measured from the moment pumping stopped. Initial measurement intervals will be short and expand as recovery progresses. The pump should not be removed until the water level returns to 95 percent of the pre-pumping static water level.

8. Determine the maximum pumping rate and pumping depth as established from the step drawdown test. Use the data from this final step to plot the time (drawdown graph) and determine transmissivity, storage coefficient, and hydraulic conductivity.

9. When the pump test is complete, the data should be compiled into a report and submitted to DOH. The report should include:

a. All data on pumping rates and water levels (including static water levels) from the pumping test and recovery period, and appropriate graphical presentations of the data.

b. An estimate of the aquifer’s specific yield, hydraulic conductivity, and transmissivity (to support evidence of sustainability and aquifer capacity consistent with proposed use of the well).

c. A map and description (¼, ¼, Section Township Range) accurately indicating the well location and the land surface elevation to the nearest foot above sea level. Address and parcel number should be provided.

d. Summary, conclusions, and recommendations on pump settings, operational regimes, and source reliability.

e. A well construction report (well log) for the pumping well and all observation wells (if any).

f. Distance, to the nearest foot, from pumping well to all observation wells and a map indicating all well locations.

g. A copy of all laboratory test results.

Group B Water System Design Guidelines (DOH 331-467) Page 90 December 2012

Page 120: Group B Design Workbook

Appendix F-3 Alternating Pump and Recovery Test Objective: To evaluate whether a proposed source in a low-flow environment can produce the

estimated daily demand and recover within a 24-hour operational period. You should use this test only when aquifer yield is low and cannot maintain the sustained periods of pumping needed for either a step-drawdown or a constant-rate test. The pumping and recovery data obtained during the test will help identify a sustainable operating regime that supports approval of a water source for a Group B water system.

Elements:

1. Because of the complex and nonstandard nature of this test, we recommend that a licensed water resource professional direct the work needed to complete it.

2. An access port to allow depth-to-water measurements must be installed, if not already present, and maintained (WAC 173-160-355).

3. The test consists of a series of alternating pump and recovery cycles. Each pumping cycle should last for a standard period of time at an intermediate flow

rate (usually 2-6 hours). At the end of that time, the pump is turned off and water levels are allowed to recover to pre-pumping or near normal condition. During both pumping and recovery parts of the cycle, water levels are recorded at the time intervals described below.

The pump and recovery cycle is continued for at least 24 hours or until the combined pumped volume equals or exceeds the maximum daily demand. Pumping rate and periods can be changed between cycles, but pumping rate must be constant within each cycle. Pumping time, volume pumped and water level changes must be recorded for each cycle. Pumping periods should be no shorter than 2 hours.

Because of the iterative nature of the test, it may be necessary to run the test longer than 24 hours to identify the appropriate combination of operational conditions that will produce maximum daily demand and still allow for recovery within a 24-hour operational regime.

The pump test cycle must be repeated until a combined pumping volume from all pump cycles has produced a total volume in excess of the minimum maximum daily demand for the proposed system. The test is not complete until recovery occurs after the last pump cycle is completed.

4. Drawdown and recovery should be measured in the pumped well for each pump and recovery cycle at least as frequently as:

Time after pumping started Time intervals 0 to 10 minutes 1 minute 10 to 60 minutes 5 minutes 60 to 240 minutes 15 minutes 240 to 600 minutes 60 minutes 600 to 1440 minutes 120 minutes

Group B Water System Design Guidelines (DOH 331-467) Page 91 December 2012

Page 121: Group B Design Workbook

5. Water samples must be collected from the source using proper sampling procedures and analyzed by a DOH-certified laboratory. Water samples should be taken within the last 15 minutes of pumping and must be analyzed for the following water quality parameters: - Coliform (bacteria) - Inorganic Chemicals (IOCs) - Additional Volatile and/or Synthetic Organic Chemicals (VOCs /SOCs)*

*If required by DOH because the well is in an area of known or expected contamination

6. Recovery should be measured beginning at the end of each pump cycle (immediately after the pump is turned off) and ending when the water level returns to within 95 percent of the initial, pre-pumping static water level. Measurement frequency should follow the specifications in the table above.

7. Determine the maximum pumping rate and pumping depth and plot the time (drawdown graph) and recovery data to determine transmissivity, storage coefficient, and hydraulic conductivity.

8. When the pump test is complete, the data should be compiled into a report and submitted to DOH. The report should include:

a. All data on pumping rates and water levels (including static water levels) from the pumping and recovery periods, and appropriate graphical presentations of the data.

b. An estimate of the aquifer’s specific yield, hydraulic conductivity, and transmissivity (to support evidence of sustainability and aquifer capacity consistent with proposed use of the well).

c. A map and description (¼, ¼, Section Township Range) accurately indicating the well location and the land surface elevation to the nearest foot above sea level. Address and parcel number should be provided.

d. Summary, conclusions, and recommendations on pump settings, operational regimes, and source reliability.

e. A well construction report (well log) for the pumping well and all observation wells (if any).

f. Distance, to the nearest foot, from pumping well to all observation wells and a map indicating all well locations.

g. A copy of all laboratory test results.

Group B Water System Design Guidelines (DOH 331-467) Page 92 December 2012

Page 122: Group B Design Workbook

Appendix F-4

Pump Test Data Collection Form

System ID: Owner: Well Tag No.: DOH Source ID: System Name: Well Name: Type of Test: Conducted By: Date: Static Water Level (as measured from reference point): County: Observation Wells? Well Elevation (MSL): Distance of observation well (r) from pumped well (ft): Time

Time (t) since pumping

began (min)

Depth to Water

Level (ft)

Drawdown (ft)

t/r2

Pumping Rate (Q)

[gpm]

Comments

Group B Water System Design Guidelines (DOH 331-467) Page 93 December 2012

Page 123: Group B Design Workbook

Recovery Data Collection Form

System ID: Owner: Well Tag No.: DOH Source ID: System Name: Well Name: Type of Test: Conducted By: Date: Static Water Level (as measured from reference point): County: Observation Wells? Well Elevation (MSL): Distance of observation well (r) from pumped well (ft): Time

Time (t) since

pumping began (min)

Time (t’) since

pumping stopped (min))

t/t’

Depth to

Water Level (ft)

Residual

Drawdown (ft)

Comments

Group B Water System Design Guidelines (DOH 331-467) Page 94 December 2012

Page 124: Group B Design Workbook

Appendix G

Cycle Stop Valves A device called a “cycle stop valve (CSV)” was developed to maintain and control the pressure in a distribution system. Essentially a modified pressure-reducing valve, it maintains a constant downstream pressure over a wide range of flows. Depending on the model, the CSV will stop pump operation at a pre-set threshold flow of 1 to 2 gpm for wells sized to supply Group B water systems. At flows higher than that, the valve will open or close in response to system demands for water while the pump is in continuous operation. The CSV will maintain pressure until the flow goes to some prescribed low level, at which point the CSV will signal shut-off of the pump. One or more pressure tanks are needed with the CSV to accommodate the need for pump motor cycling control at the low flow settings. The number and size of pressure tanks will depend on the design setting pre-established for the CSV, but the number and size always will be less than that required if a CSV had not been installed. The advantages of using a CSV with a well pump include:

1. Limiting well pump on-off cycling. 2. Reducing the size or number of pressure tanks required for any given installation. 3. Reducing the potential for damaging transient pressure waves (“water hammer”) resulting

from pump-start and pump-stop conditions. The CSV is installed between the pump(s) and pressure switch (the pressure switch determines whether the well pump is “on” or “off”). The CSV downstream pressure setting should be a little bit below the “pump-off” pressure setting of the pressure switch. As the demand in the water system varies, the CSV adjusts the flow coming from the well pump while maintaining a constant downstream pressure. In essence, with the CSV the pump acts as a variable capacity pump whose output matches the water system demand on an instantaneous basis. The pump-on phase of the pump cycle will be extended until the water system demand drops below 2 gpm. For some water systems where the demand (including leaks) seldom if ever drops below the set-point of 2 gpm, the pump may be “on” indefinitely. Only when water system demand drops below the minimum flow setting of the CSV (recommended at no less than 2 gpm) would the well pump shut off. At that point, all water demand would be satisfied by water released from a pressure tank. The length of the “pump-off” period depends on water system demand and the available withdrawal volume of the pressure tank(s). The sizing of the tank(s), therefore, consists of determining both the:

• Probable water system demand during the pump-off period. • Recommended length of time before the pump re-starts, for example, the pump-off

period.

DOH recommends a minimum drawdown volume of 10 times the minimum flow designed for the CSV, giving an estimated 10 minutes of pump-off time when the demand is low before restarting.

Group B Water System Design Guidelines (DOH 331-467) Page 95 December 2012

Page 125: Group B Design Workbook

Considering the DOH recommendation, a CSV manufacturer’s suggestions, and the drawdown volume of bladder tanks, the following number and size of pressure tanks should be used:

Size/Number of Pressure Tanks with Cycle Stop Valve

Operating Pressure Range (P1/P2)

Bladder Tank Nominal Size, gal

Number of Bladder Tanks Needed with CSV

60-40 42 2 86 1 119 1

80-60 42 3 86 2 119 1

CSV Design Considerations

• The CSV itself can impose significant energy loss (“head loss”) at the high end of its flow range (a 1¼-inch CSV valve causes the loss of about 10 psi at 50 gpm). The well pump design must account for the head loss imposed by the CSV.

• It is difficult to predict whether the savings through limiting the number of “pump-start” events and reduced initial capital cost associated with fewer bladder tanks will offset the cost of the additional energy used in prolonging the pump-on portion of the cycle.

• Water quality may affect CSV performance. Particulate matter (sand) may adversely affect the performance of the CSV.

• At low flow conditions, the pressure on the upstream side of the CSV could approach the shut-off head of the pump, which could be very high. You should pay attention to the design, material specifications, and construction of the well pump to ensure it can operate at or near its shut-off head for extended periods, and for the pressure rating of the piping on the upstream side of the CSV.

Group B Water System Design Guidelines (DOH 331-467) Page 96 December 2012

Page 126: Group B Design Workbook

Appendix H Variable-Frequency Drive1 A variable-frequency drive is an electronic controller that adjusts the speed of an electric motor by modulating the delivered power. Variable-frequency drives provide continuous control by matching motor speed to the specific demands of the work being performed. Variable-frequency drives are an excellent choice for adjustable-speed drive users because they allow operators to fine-tune processes while reducing costs for energy and equipment maintenance. Use in the water or wastewater treatment process Variable-frequency drives are becoming more popular at water and wastewater facilities, where the greatest energy draw comes from pumping and aeration—two applications particularly suited to variable-frequency drives. Using mechanical devices, such as flow-restricting valves, to control flow for applications where flow requirements vary is akin to driving a car at full throttle while using the brake to control speed. It uses excessive energy and may create punishing conditions for the mechanical equipment involved. Variable-frequency drives enable pumps to accommodate fluctuating demand, running pumps at lower speeds and drawing less energy while still meeting pumping needs. Figure 1 illustrates the reduced energy consumption of variable-frequency drives over throttled valve control systems (such as cycle stop valves).

Group B Water System Design Guidelines (DOH 331-467) Page 97 December 2012

Page 127: Group B Design Workbook

Variable-frequency drives work with most three-phase electric motors. Therefore, you can specify variable-frequency drives for new equipment or retrofit existing pumps that use throttling devices. Benefits Single-speed drives start motors abruptly, subjecting the motor to high torque and current surges up to 10 times the full-load current. In contrast, variable-frequency drives offer a "soft start" capability, gradually ramping up a motor to operating speed. This lessens mechanical and electrical stress on the motor system, can reduce maintenance and repair costs, and extend motor life. Variable-frequency drives allow precise control of processes, such as water production and distribution. They can also maintain pressure in water distribution systems to closer tolerances. Energy savings from variable-frequency drives can be significant. Affinity laws for centrifugal pumps suggest that even a small reduction in motor speed will highly leverage your energy savings. Variable-frequency drives can reduce a pump’s energy use by as much as 50 percent. A variable frequency drive controlling a pump motor that usually runs less than full speed can substantially reduce energy consumption over a motor running at constant speed for the same period. For example: Consider a 25 horsepower motor running 23 hours per day (2 hours at 100 percent speed; 8 hours at 75 percent; 8 hours at 67 percent; and 5 hours at 50 percent). A variable-frequency drive can reduce energy use by 45 percent. At $0.10 per kilowatt-hour, this saves $5,374 annually. Because benefits vary from application to application, it is important to calculate benefits for each application before specifying a variable-frequency drive.

1. Adapted from the State of California’s Energy Office publication on VFDs

Group B Water System Design Guidelines (DOH 331-467) Page 98 December 2012

Page 128: Group B Design Workbook
Page 129: Group B Design Workbook

Group B Public Water Systems Chapter 246-291 WAC Effective November 4, 1995

March 2004

DOH PUB. #331-071 (REV. 03-10-04) The Department of Health prepared this extract from the Code Reviser's official copy.

Washington Administrative Code

Page 130: Group B Design Workbook

Group B Public Water Systems Chapter 246-291 WAC Effective November 4, 1995 March 2004

For more information or additional copies of this publication contact:

Training and Outreach Section Office of Drinking Water Department of Health PO Box 47828 Olympia, WA 98504-7828 (360) 236-3164

Mary Selecky Secretary of Health

Rich Hoey Acting Director, Office of Drinking Water

The Department of Health is an equal opportunity agency. For persons with disabilities, this document is available on request in other formats. To submit a request, please call 1-800-525-0127 (TTY 1-800-833-6388). For additional copies of this publication, call 800-521-0323. This and other publications are available at http://www.doh.wa.gov/ehp/dw.

Page 131: Group B Design Workbook

Contents Chapter 246-291 WAC – Group B Public Water Systems

Part 1. General Provisions............................................................................................................................1 WAC 246-291-001 Purpose and scope........................................................................................................1 WAC 246-291-010 Definitions....................................................................................................................1 WAC 246-291-020 Applicability.................................................................................................................5 WAC 246-291-025 Bottled water. ...............................................................................................................5 WAC 246-291-030 General administration.................................................................................................5 WAC 246-291-040 Requirements for engineers. ........................................................................................7 WAC 246-291-050 Enforcement. ................................................................................................................8 WAC 246-291-060 Waivers. .......................................................................................................................8

Part 2. Planning and Engineering.................................................................................................................9 WAC 246-291-100 Ground water source approval and protection. ............................................................9 WAC 246-291-110 Surface water and GWI source approval and protection. ..........................................10 WAC 246-291-120 Design report approval...............................................................................................13 WAC 246-291-130 Existing system approval. ..........................................................................................14 WAC 246-291-140 Water system planning requirements. ........................................................................14

Part 3. Design and Operation.....................................................................................................................17 WAC 246-291-200 Design standards. .......................................................................................................17 WAC 246-291-210 Distribution systems...................................................................................................17 WAC 246-291-220 Disinfection of facilities.............................................................................................18 WAC 246-291-230 Treatment design and operations. ..............................................................................18 WAC 246-291-240 Reliability...................................................................................................................19 WAC 246-291-250 Continuity of service..................................................................................................19 WAC 246-291-260 Recordkeeping and reporting. ....................................................................................20 WAC 246-291-270 Cross-connection control. ..........................................................................................21

Part 4. Water Quality .................................................................................................................................22 WAC 246-291-300 General monitoring requirements. .............................................................................22 WAC 246-291-310 General follow-up. .....................................................................................................22 WAC 246-291-320 Bacteriological. ..........................................................................................................23 WAC 246-291-330 Inorganic chemical and physical................................................................................23 WAC 246-291-340 Turbidity.....................................................................................................................25 WAC 246-291-350 Other substances. .......................................................................................................26 WAC 246-291-360 Public notification. .....................................................................................................26 WAC 246-291-370 Severability. ...............................................................................................................27

Page 132: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 1

Part 1. General Provisions WAC 246-291-001 Purpose and scope. (1) The purpose of these rules is to define basic regulatory requirements to protect the health of

consumers using Group B public drinking water supplies. These rules are specifically designed to ensure the provision of high quality drinking water in a reliable manner and in a quantity suitable for intended use.

(2) The rules set forth are adopted under chapter 43.20 RCW and owners of Group B public water systems shall be responsible for ensuring compliance with these rules. Other statutes relating to this chapter are: (a) RCW 43.20B.020, Fees for services -- Department of Health and Department of Social and

Health Services;

(b) Chapter 43.70 RCW, Department of Health;

(c) Chapter 70.05 RCW, Local health departments, boards, officers -- Regulations;

(d) Chapter 70.116 RCW, Public Water System Coordination Act of 1977; and

(e) Chapter 70.119A RCW, Public water systems -- Penalties and compliance.

(3) Prior to expanding a Group B public water system to a Group A public water system, the entire system shall be brought into compliance with chapter 246-290 WAC.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-001, filed 6/22/94, effective 7/23/94.] WAC 246-291-010 Definitions. Abbreviations:

CSE - comprehensive system evaluation; GWI - ground water under the direct influence of surface water; m - meter; MCL - maximum contaminant level; mg/L - milligrams per liter; ml - milliliter; mm - millimeter; NTU - nephelometric turbidity unit; psi - pounds per square inch; umhos/cm - micromhos per centimeter; VOC - volatile organic chemical; WFI - water facilities inventory form; and WHPA - wellhead protection area.

Page 133: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 2

"Authorized agent" means any person who:

• Makes decisions regarding the operation and management of a public water system whether or not he or she is engaged in the physical operation of the system;

• Makes decisions whether to improve, expand, purchase, or sell the system; or

• Has discretion over the finances of the system. "Coliform sample" means a sample of water collected from the distribution system at or after the first service and analyzed for coliform presence in compliance with this chapter. "Comprehensive system evaluation (CSE)" means a review, inspection and assessment of a public water system, including, but not limited to: Source; facilities; equipment; operation and administration; maintenance; records; planning documents and schedules; and monitoring, for the purpose of ensuring that safe and adequate drinking water is provided. "Confirmation" means to demonstrate the results of a sample to be precise by analyzing a repeat sample. Confirmation occurs when analysis results fall within plus or minus thirty percent of the original sample. "Contaminant" means a substance present in drinking water which may adversely affect the health of the consumer or the aesthetic qualities of the water. "Cross-connection" means a physical arrangement connecting a public water system, directly or indirectly, with anything other than another potable water system, and capable of contaminating the public water system. "Department" means the Washington state department of health or health officer as identified in a joint plan of operation in accordance with WAC 246-291-030(1). "Disinfection" means the use of chlorine or other agent or process the department approves for killing or inactivating microbiological organisms, including pathogenic and indicator organisms. "Distribution system" means that portion of a public water supply system which stores, transmits, pumps, and distributes water to consumers. "Expanding public water system" means a public water system installing additions, extensions, changes, or alterations to their existing source, transmission, storage, or distribution facilities which will enable the system to increase in size its existing service area and/or its number of approved service connections. "Fire flow" means the rate of water flow needed to fight fires under WAC 246-293-640 or adopted city, town, or county standards. "Generator disconnect" means an electrical circuit arranged to allow connection of a generator to the power supply for the pumping equipment while prohibiting electrical current from flowing back into the main service line.

Page 134: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 3

"Ground water under the direct influence of surface water (GWI)" means any water beneath the surface of the ground, which the department determines has the following characteristics:

• Significant occurrence of insects or other macroorganisms, algae, or large-diameter pathogens such as Giardia lamblia; or

• Significant and relatively rapid shifts in water characteristics such as turbidity, temperature, conductivity, or pH closely correlating to climatological or surface water conditions.

"Group B water system" means a public water system:

• Constructed to serve less than fifteen residential services regardless of the number of people; or

• Constructed to serve an average nonresidential population of less than twenty-five per day for sixty or more days within a calendar year; or

• Any number of people for less than sixty days within a calendar year. "Guideline" means a department document assisting the owner in meeting a rule requirement. "Health officer" means the health officer of the city, county, city-county health department or district, or an authorized representative. "Hydraulic analysis" means the study of the water system network evaluating water flows within the distribution system under worst case conditions such as, peak hourly design flow plus fire flow, when required. Hydraulic analysis includes consideration of all factors affecting system energy losses. "Maximum contaminant level (MCL)" means the maximum permissible level of a contaminant in water delivered to any public water system user. "Maximum contaminant level violation" means a confirmed measurement above the MCL and for a duration of time, where applicable. "Owner" means any agency, subdivision of the state, municipal corporation, firm, company, mutual or cooperative association, institution, partnership, or person or any other entity that holds as property, a public water system. "Peak hourly design flow" means the maximum rate of water use, excluding fire flow, which can be expected to ever occur within a defined service area over a sixty minute time period. "Potable" means water suitable for drinking by the public. "Pressure zone" means a distribution system whereby an established minimum and maximum pressure range can be maintained without the use of ancillary control equipment (e.g., booster pumps, pressure reducing valves, etc.). "Primary standards" means standards based on chronic, nonacute, or acute human health effects.

Page 135: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 4

"Public water system" means any system, excluding a system serving only one single-family residence and a system with four or fewer connections all of which serve residences on the same farm, providing piped water for human consumption, including collection, treatment, storage, or distribution facilities used primarily in connection with such system. "Repeat sample" means a sample collected to confirm the results of a previous analysis. "Same farm" means a parcel of land or series of parcels which are connected by covenants and devoted to the production of livestock or agricultural commodities for commercial purposes and does not qualify as a Group A water system. "Secondary standards" means standards based on factors other than health effects such as taste and odor. "Sell" means to bill separately for drinking water or to include drinking water as part of an itemized listing in a bill delivered to customers, where the amount billed is an increase over what the purveyor pays for water. The presence of centralized source or individual service meters does not affect whether the water is being sold. "Service" means a connection to a public water system designed to provide potable water. "Special purpose sample" means a sample collected for reasons other than the monitoring compliance specified in this chapter. "Standard methods" means the 18th edition of the book, titled Standard Methods for the Examination of Water and Waste Water, jointly published by the American Public Health Association, American Water Works Association (AWWA), and Water Pollution Control Federation. This book is available through public libraries or may be ordered from AWWA, 6666 West Quincy Avenue, Denver, Colorado 80235. "State board of health" and "board" means the board created by RCW 43.20.030. "Surface water" means a body of water open to the atmosphere and subject to surface runoff. "Volatile organic chemical (VOC)" means a manufactured carbon-based chemical that vaporizes quickly at standard pressure and temperature. "Water facilities inventory form (WFI)" means the department form summarizing each public water system's characteristics. "Well field" means a group of wells one system owns or controls which:

• Draw from the same aquifer or aquifers as determined by comparable inorganic chemical analysis; and

• Discharge water through a common pipe and the common pipe shall allow for collection of a

single sample before the first distribution system connection. [Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-010, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-010, filed 6/22/94, effective 7/23/94.]

Page 136: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 5

WAC 246-291-020 Applicability. (1) The rules of this chapter shall apply to all Group B public water systems except those systems

meeting all of the following conditions:

(a) Consists only of distribution and/or storage facilities and does not have any source or treatment facilities;

(b) Obtains all water from, but is not owned by, a public water system where the rules of this

chapter or chapter 246-290 WAC apply;

(c) Does not sell water directly to any person;

(d) Is not a passenger-conveying carrier in interstate commerce; and

(e) The distribution system is regulated under the Uniform Plumbing Code, chapter 51-26 WAC.

Examples of systems which shall not be exempt include, but are not limited to, water districts, public utility districts, cooperatives, mutuals and associations which serve residential short plats and subdivisions. (2) Group B public water systems meeting all of the conditions under subsection (1) of this section

may be required by the department to comply with such provisions of this chapter as are necessary to resolve a public health concern if the department determines a public health threat exists or is suspected.

[Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-020, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-020, filed 6/22/94, effective 7/23/94.] WAC 246-291-025 Bottled water. (1) Any water source used for bottling, regardless of size, shall meet the minimum requirements in

accordance with chapter 246-290 WAC. (2) In addition to the requirements imposed by the department, the processing of bottled water is

regulated by the state department of agriculture and the United States Food and Drug Administration.

[Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-025, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-025, filed 6/22/94, effective 7/23/94.] WAC 246-291-030 General administration. (1) The department and the health officer for each local health jurisdiction may develop a joint plan of

operation. Responsibility for administering these rules shall remain with the department of health unless there is a joint plan of operation in place. This plan shall:

(a) List the roles and responsibilities and specifically designate those systems for which the

department and local health officer have primary responsibility;

Page 137: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 6

(b) Provide a list of water system requirements and procedures which the local board of health may waive for systems within its jurisdiction;

(c) Provide for a level of water system supervision necessary to effectively achieve listed

responsibilities;

(d) Be signed by the department and the local health department or district; and

(e) Be reviewed at least once every five years and updated as needed. Wherever in these rules the term "department" is used, the term "health officer" may be substituted based on the terms of this joint plan of operation. (2) The local board of health may adopt rules pursuant to RCW 70.05.060 governing public water

systems for which the health officer has assumed primary responsibility. Adopted local board of health rules shall be:

(a) No less stringent and may be more stringent than this chapter; and

(b) Revised, if necessary, within twelve months after the effective date of revised state board of

health rules. During this time period, existing local rules shall remain in effect, except provisions of the revised state board of health rules which are more stringent than the local board of health rules shall apply.

(3) For residential systems with only two services, the department may eliminate any or all

requirements of these rules.

(4) For any residential system, the department may eliminate all ongoing requirements of these rules, except for recordkeeping and reporting requirements under WAC 246-291-260, provided the system has been granted an initial approval or an existing system has been categorized as fully approved/adequate or provisionally approved.

(5) The health officer may approve design reports and water system plans which reflect good engineering practice such as those found in the department guideline titled Group B Water System Approval, for those public water systems where the health officer has assumed primary responsibility.

(6) The health officer may allow system owners to substitute results of a calculated fixed radius method and a ten year time of travel criteria instead of using the six hundred foot radius prescribed in WAC 246-291-100 (2)(f) and 246-291-110 (3)(f).

(7) The department may develop and distribute guidelines to clarify sections of the rules as needed.

(8) Fees may be charged by the department of health as authorized in RCW 43.20B.020 and by local health agencies as authorized in RCW 70.05.060 to recover all or a portion of the costs incurred in administering these rules.

[Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-030, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-030, filed 6/22/94, effective 7/23/94.]

Page 138: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 7

WAC 246-291-040 Requirements for engineers. (1) Owners shall ensure that all design reports are prepared by a professional engineer:

(a) Licensed in the state of Washington under chapter 18.43 RCW; and

(b) Having specific expertise regarding design, operation and maintenance of public water systems. All documents shall bear the engineer's seal and signature. (2) Until such date as regulations addressing professional engineering requirements for public water

systems take effect after adoption by the state board of registration for professional engineers and land surveyors under authority of chapter 18.43 RCW, exceptions to the professional engineer requirement are:

(a) Minor improvements exempted from design report requirements under WAC 246-291-120(1);

and

(b) Public water systems serving less than ten service connections consisting of a simple well and pressure tank with one pressure zone and not providing treatment other than simple chlorine disinfection or having special hydraulic considerations, where the local health officer has been delegated authority to:

(i) Approve plans and design reports; or

(ii) Review plans and design reports for completeness prior to forwarding to the department

of health for approval. (3) A "Construction Report For Public Water System Projects" shall be submitted to the department on

a department approved form within sixty days of completion and before use of any approved project. The form shall:

(a) Be signed by a professional engineer, or in the case of projects not requiring a professional

engineer as outlined in this section, the water system owner;

(b) State that the project is constructed and is completed in accordance with approved design reports; and

(c) State that, in the opinion of the engineer or the water system owner, based on information

available, the installation, testing, and disinfection of the system was carried out in accordance with applicable sections of chapters 246-291 and 246-290 WAC.

(4) It shall be the responsibility of the owner to ensure the requirements of this section are fulfilled

before the use of any completed project. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-040, filed 6/22/94, effective 7/23/94.]

Page 139: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 8

WAC 246-291-050 Enforcement. (1) When a system is out of compliance with these rules, the department may initiate appropriate

enforcement actions, regardless of any prior approvals issued by the department, including, but not limited to:

(a) Issuance of a compliance schedule;

(b) Issuance of departmental orders requiring submission of water system plans, design reports,

and construction report forms;

(c) Issuance of departmental orders requiring specific actions or ceasing unacceptable activities within a designated time period;

(d) Issuance of departmental orders to stop work and/or refrain from using any public water system

or improvements thereto until all written approvals required by statute or rule are obtained;

(e) Imposition of civil penalties as authorized under chapter 70.119A RCW or local authority where applicable; and

(f) Legal action by the attorney general or local prosecutor.

(2) When enforcing the MCLs under this chapter, the department shall enforce compliance with the

primary MCLs as its first priority. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-050, filed 6/22/94, effective 7/23/94.] WAC 246-291-060 Waivers. (1) The state board of health or the local health officer in those counties having a joint plan of

operation, may grant waivers of the requirements of this chapter, provided that procedures used are consistent with WAC 246-290-060 (5)(b) and in the case where a local health officer is authorized to grant the waiver, procedures used shall be approved by the department of health as part of the joint plan of operation.

(2) Consideration by the board or local health officer of requests for waivers shall not be considered adjudicative proceedings as that term is defined in chapter 34.05 RCW.

(3) Statements and written material regarding the request may be presented to the board or local health officer wherein the application will be considered.

(4) The board or local health officer may grant a waiver if it determines the water system is unable to comply with the requirements and granting of the waiver will not result in an unreasonable risk to the health of consumers. No waivers may be granted for exceedance of a primary MCL.

(5) A waiver granted under this section shall lapse two years from the date of issuance unless the water system project has been completed or an extension is granted.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-060, filed 6/22/94, effective 7/23/94.]

Page 140: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 9

Part 2. Planning and Engineering WAC 246-291-100 Ground water source approval and protection. (1) The owner shall ensure that drinking water is obtained from the highest quality source feasible.

Existing sources shall conform to the primary water quality standards established in this chapter. Proposed sources shall conform to the primary and secondary water quality standards established in this chapter and the well construction standards established under chapter 173-160 WAC. The owner shall be responsible for submitting evidence required by the department to determine whether a proposed ground water source is a GWI.

(2) No new source, previously unapproved source, or modification of an existing source shall be used

as a drinking water supply without department approval. A party seeking approval shall ensure compliance with WAC 246-291-140 as applicable and provide:

(a) A copy of the water right permit, if required, obtained from the department of ecology for the

source, quantity, type, and place of use;

(b) A copy of the source site inspection approval made by the department or local health jurisdiction representative;

(c) Well source development data establishing source capacity. Data shall include static water level, yield, amount of drawdown, recovery rate and duration of pumping. The source shall be pump tested to determine whether the well and aquifer are capable of supplying water at the rate desired and to provide information necessary to determine proper pump settings. A department guideline titled Group B Water System Approval is available to assist owners;

(d) ) Upgradient water uses affecting either water quality or quantity;

(e) A map showing the project location and vicinity including a six hundred foot radius around the well site designating the preliminary short term ground water contribution area;

(f) A map depicting topography, distances to well or spring from existing property lines, buildings, potential sources of contamination within the six hundred foot radius around the well, and any other natural or man-made features affecting the quality or quantity of water;

(g) The dimensions and location of sanitary control area;

(h) Copies of the recorded legal documents for the sanitary control area;

(i) A copy of the water well report;

(j) A general description of the spring and/or aquifer recharge area affecting the quantity or quality of flow. Seasonal variation shall also be included;

(k) Documentation of totalizing source meter installation;

Page 141: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 10

(l) An initial analysis result of raw water quality from a certified lab, including as a minimum, a bacteriological, complete inorganic chemical and physical analysis of the source water quality;

(m) In areas where the department determines that other contamination may be present, or at the discretion of the department, sample results for these contaminants may be required;

(n) If water quality information from (l) and (m) of this subsection shows a contaminant level of concern, the department may require further action by the owner; and

(o) If water quality results taken from the proposed source confirm a primary MCL violation, the owner shall ensure that appropriate treatment is provided.

(3) The owner shall contact the department before developing or modifying a source, to identify any

additional requirements the department deems necessary.

(4) Sanitary control area.

(a) The owner shall ensure that a sanitary control area is maintained around all sources for the purpose of protecting them from existing and potential sources of contamination. A department guideline titled Group B Water System Approval describes activities which should be precluded within the sanitary control area and is available from the department on request.

(b) The minimum sanitary control area shall have a radius of one hundred feet (thirty meters) for wells, and two hundred feet (sixty meters) for springs, unless engineering justification supports a smaller area. The justification must address geological and hydrological data, well construction details and other relevant factors necessary to assure adequate sanitary control.

(c) The department may require a larger sanitary control area if geological and hydrological data support such a decision. It shall be the owner's responsibility to obtain the protection needed.

(d) No source of contamination may be constructed, stored, disposed of, or applied within the sanitary control area without the permission of the department and the system owner.

(e) The sanitary control area shall be owned in fee simple, or the owner shall have the right to exercise complete sanitary control of the land through other legal provisions.

(f) The owner shall obtain a duly recorded restrictive covenant which shall run with the land, restricting the use of said land in accordance with these rules.

[Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-100, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-100, filed 6/22/94, effective 7/23/94.] WAC 246-291-110 Surface water and GWI source approval and protection. (1) The owner shall ensure that drinking water is obtained from the highest quality source feasible.

Existing sources shall conform to the primary water quality standards established in this chapter. Proposed sources shall conform to the primary and secondary water quality standards established in this chapter. The owner shall be responsible for submitting evidence required by the department to determine whether a proposed ground water source is a GWI.

Page 142: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 11

(2) No new source, previously unapproved source, or modification of an existing source shall be used as a drinking water supply without department approval. As of the effective date of these rules, the department shall no longer approve new or expanding surface water or GWI sources unless the department determines they meet the following conditions:

(a) The system is under the ownership and operation of a department of health approved satellite

management agency; and

(b) Continuous effective treatment, including filtration, disinfection and any other measures required under chapter 246-290 WAC are provided.

(3) An owner seeking source approval shall provide the department:

(a) A copy of the water right permit, if required, obtained from the department of ecology for the source, quantity, type, and place of use;

(b) A copy of the source site inspection approval made by the department or local health jurisdiction representative;

(c) Upgradient water uses affecting either water quality or quantity;

(d) A map showing the project location and vicinity;

(e) A map depicting topography, distances to the surface water intake or GWI source from existing property lines, buildings, potential sources of contamination, ditches, drainage patterns, and any other natural or man-made features affecting the quality or quantity of water;

(f) For GWI sources:

(i) A map depicting topography, distances to well or spring from existing property lines, buildings, potential sources of contamination within the six hundred foot radius around the well, and any other natural or man-made features affecting the quality or quantity of water;

(ii) Copies of the recorded legal documents for the sanitary control area;

(iii) A copy of the water well report if applicable;

(iv) A general description of the recharge area affecting the quantity or quality of flow. Seasonal variation shall also be included;

(v) Well development data establishing source capacity. Data shall include static water level, yield, amount of drawdown, recovery rate and duration of pumping. The source shall be pump tested to determine whether the well and aquifer are capable of supplying water at the rate desired and to provide information necessary to determine proper pump settings. A department guideline titled Group B Water System Approval is available to assist owners.

Page 143: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 12

Existing and proposed sources shall conform to the well construction standards established under chapter 173-160 WAC if applicable.

(g) Documentation of totalizing source meter installation;

(h) An initial analysis result of raw water quality from a certified lab, including as a minimum, a bacteriological, and complete inorganic chemical and physical analysis of the source water quality;

(i) In areas where the department determines that other contamination may be present, or at the

discretion of the department, sample results for these contaminants may also be required;

(j) If water quality information from (h) and (i) of this subsection shows a contaminant level of concern, the department may require further action by the owner; and

(k) If water quality results taken from the proposed source confirm a primary MCL violation, the

owner shall ensure that appropriate treatment is provided which shall eliminate the public health risk to consumers served by the system.

(4) Watershed control program.

(a) Owners of new or expanding surface water or GWI sources shall ensure the development and submittal of a watershed control program to the department for review and approval. Once approved, the owner shall implement the program.

(b) This program shall be part of the water system plan required in WAC 246-291-140. (c) The owner's watershed control program shall contain, at a minimum, the following elements:

(i) Watershed description and inventory, including location, hydrology, land ownership

and activities which may adversely affect water quality;

(ii) Watershed control measures, including documentation of ownership and relevant written agreements, monitoring procedures and water quality;

(iii) System operation, including emergency provisions; and

(iv) Documentation of water quality trends.

Sections in the department guideline titled Planning Handbook and in the DOH SWTR Guidance Manual address watershed control and are available to owners.

(d) The owner shall ensure submittal of the watershed control program to the department for review and approval. Following department approval, the owner shall ensure implementation as approved.

(e) The owner shall update the watershed control program at least every six years, or more

frequently if required by the department. [Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-110, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-110, filed 6/22/94, effective 7/23/94.]

Page 144: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 13

WAC 246-291-120 Design report approval. (1) Design reports shall be submitted to the department for written approval prior to installation of any

new water system, or water system extension or improvement with the following exceptions:

(a) Installation of valves, fittings, and meters;

(b) Repair of a system component or replacement with a similar component of the same capacity; and

(c) Maintenance or painting of surfaces not contacting potable water.

(2) Design reports submitted for approval by owners of systems required to have a water system plan,

will not be considered for approval unless there is a current approved water system plan and the plan adequately addresses the project.

(3) Design reports shall include, at a minimum, the following:

(a) Alternatives. Verify contacts with other water system owners as applicable in accordance with WAC 246-291-140(2);

(b) Legal considerations. Identify legal aspects such as ownership, right of way, sanitary control

area, and restrictive covenants;

(c) Engineering calculations. Describe how the project complies with the design considerations;

(d) Drawings. Include detailed drawings of each project component;

(e) Material specifications. List detailed material specifications for each project component;

(f) Construction specifications. List detailed construction specifications and assembly techniques for carrying out the project;

(g) Testing. Identify testing criteria and procedures for each applicable portion of the project;

(h) Disinfection. Identify specific disinfection procedures which must conform with American

Water Works Association standards or other standards acceptable by the department;

(i) Inspection. Identify provisions for inspection of the installation of each project component. See WAC 246-291-040 for construction reporting requirements; and

(j) Change orders. All changes except for minor field revisions must be submitted to and approved

by the department in writing. (4) Approval of design reports shall be in effect for two years unless the department determines a need

to withdraw the approval. An extension of the approval may be obtained by submitting a status report and a written schedule for completion. Extensions may be subject to additional terms and conditions imposed by the department.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-120, filed 6/22/94, effective 7/23/94.]

Page 145: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 14

WAC 246-291-130 Existing system approval. (1) At the discretion of the department, owners of existing systems without approved design reports

shall, as determined by the department, provide information necessary to establish the extent of the water systems compliance with this chapter.

(2) After receipt of the required data, the department shall review the information and place the system into one of the following categories:

(a) Fully approved/adequate. A fully approved system has been found to be in full compliance with

these regulations and may add services if designed accordingly; or

(b) Provisionally adequate. A provisionally adequate system complies with applicable MCL and treatment standards, fire flow requirements where applicable, and meets a twenty psi minimum pressure requirement under peak hourly design flow conditions but may not be in compliance with other regulatory requirements. A provisionally adequate system is considered satisfactory for its existing services, but may not expand to supply additional services; or

(c) Inadequate. Any system not identified in (a) or (b) of this subsection. The system is considered unsatisfactory and no additional service connections can be made to an inadequate system.

(3) After categorizing the system, the department shall notify the owner in writing of the following:

(a) The system's category;

(b) The relationship of the system's category with respect to adding service connections and potential comments on status request letters; and

(c) If the system is not fully approved, what additional actions the owner needs to complete before a full or provisional approval is granted.

(4) The department is authorized to take enforcement actions in accordance with WAC 246-291-050. [Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-130, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-130, filed 6/22/94, effective 7/23/94.] WAC 246-291-140 Water system planning requirements. (1) Water system plan.

(a) The water system plan shall:

(i) Identify present and future needs;

(ii) Set forth means for meeting those needs; and

(iii) Do so in a manner consistent with other relevant plans and local, state, and federal laws.

Page 146: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 15

(b) Owners of the following categories of systems shall ensure the development and submittal of a water system plan for review and approval by the department:

(i) All systems as required by chapter 70.116 RCW the Public Water System Coordination

Act of 1977 and chapter 246-293 WAC;

(ii) Any system experiencing problems related to planning, operation, and/or management as determined by the department and outlined in a departmental order;

(iii) Any proposed or expanding system as determined by the department; and

(iv) Any system which installs treatment, other than simple chlorination disinfection equipment, after the effective date of these regulations.

(c) A department guideline titled Group B Water System Approval is available from the department

to assist owners in developing this plan. Design reports may be combined with a water system plan. To the extent to which they are applicable, the water system plan shall address the following elements:

(i) Description of system management and ownership;

(ii) Description of appropriate water quality monitoring and reporting requirements;

(iii) Service area and identification of existing and proposed major facilities;

(iv) Maximum number of connections the system can safely and reliably support;

(v) Water conservation program. Systems which are developed or expanded after the

effective date of this rule shall develop a conservation program;

(vi) Relationship and compatibility with other plans;

(vii) Description of water source(s) including compliance with applicable source approval and protection under WAC 246-291-100 and 246-291-110;

(viii) Source protection (including required protective covenants, wellhead protection and watershed control where applicable); and

(ix) Financial viability. (2) Prior to developing a new water system, the developer of the proposed system shall follow the

steps listed below as applicable:

(a) The developer shall ensure that the new system is owned or operated by a department-approved satellite management agency (SMA), or if a department-approved SMA is not available, that the proposed new system has a department-approved water system plan in accordance with WAC 246-291-140;

Page 147: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 16

(b) Department approval of any system created after July 22, 1995, that is not owned or operated by a SMA shall be conditioned upon future management or ownership by a SMA, if such management or ownership can be made with reasonable economy and efficiency, or upon periodic review of the system's operational history to determine its ability to meet the department's financial viability and other operating requirements.

(c) If the proposed system is located within the boundaries of a critical water supply service area, the ability to develop an independent system shall be governed by the provisions of the Public Water System Coordination Act, chapter 70.116 RCW and chapter 246-293 WAC, and will be subject to the jurisdictional coordinated water system plan; or

(d) If the proposed system consists of a surface water or GWI source, ensure that the proposed system will be owned and operated by a department-approved satellite system management agency.

(3) For systems approved after the effective date of these rules, a summary of the following shall be

recorded, by the system owner, on all affected property titles as a means of providing information about the system to property owners, lending institutions, and other potentially affected parties:

(a) Notice that the property is served by a public water system;

(b) The initial water system plan, planning section of the Group B Water System Guideline, or

equivalent information from other documents as determined by the department;

(c) Notice that the system is subject to state and local rules;

(d) Recommendation to check with the jurisdictional regulatory authority on the current system status;

(e) Notice that fees may be assessed by the department for providing information on a public water system;

(f) Requirement for satellite management, if applicable;

(g) Notice of any waivers granted to the system; and

(h) Other information required by the department. [Statutory Authority: RCW 43.20.050. 95-20-078, § 246-291-140, filed 10/4/95, effective 11/4/95; 94-14-002, § 246-291-140, filed 6/22/94, effective 7/23/94.]

Page 148: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 17

Part 3. Design and Operation WAC 246-291-200 Design standards. (1) Water system owners shall ensure that good engineering practices are used in the design of all

public water systems. Information on what is good engineering practice is available from the department in the guideline titled Group B Water System Approval.

(2) In addition, owners of new or expanding public water systems shall ensure the following factors are addressed:

(a) Local conditions, plans and/or regulations;

(b) Public Water System Coordination Act considerations where appropriate; and

(c) Other requirements as determined by the department.

(3) Any pipe, pipe fittings, solder, or flux used in the installation or repair of a public water system

shall be lead-free. Within the context of this section, lead-free shall mean having no more than eight percent lead in pipes and pipe fittings, and no more than two-tenths of one percent lead in solder and flux. This prohibition shall not apply to leaded joints necessary for the repair of cast iron pipes.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-200, filed 6/22/94, effective 7/23/94.] WAC 246-291-210 Distribution systems. (1) All distribution reservoirs shall have suitable watertight roofs or covers preventing entry by birds,

animals, insects, and dust and shall include appropriate provisions to safeguard against trespass, vandalism, and sabotage. All new distribution reservoirs shall be able to be drained by gravity to daylight.

(2) The owner shall ensure that the distribution system is sized and evaluated using a hydraulic

analysis acceptable to the department. (3) Systems designed to provide fire hydrants shall have a minimum distribution main size of six

inches (150 mm). (4) New water systems or additions to existing systems shall provide a design quantity of water at a

positive pressure of at least thirty psi throughout the system under peak hourly design flow conditions measured at any customer's water meter or at the property line if no meter exists.

(5) If fire flow is to be provided, the distribution system shall be designed to provide the required fire flow at a pressure of at least twenty psi throughout the system during peak hourly design flow conditions.

Page 149: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 18

(6) Booster pumps needed for individual services shall be subject to review and approval by the department. Installation shall be made under the supervision of the owner to ensure cross-connection control requirements are met. Installation of booster pumps which are an integral part of the system design shall be inspected and certified by the engineer.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-210, filed 6/22/94, effective 7/23/94.] WAC 246-291-220 Disinfection of facilities. No portion of a public water system containing potable water shall be put into service, nor, if service has been terminated, shall service resume, until the facility has been effectively disinfected. The procedure used for disinfection shall conform to the American Water Works Association standards or other standards acceptable to the department. In cases of new construction, drinking water shall not be furnished to the consumer until satisfactory bacteriological samples have been analyzed by a laboratory certified by the state. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-220, filed 6/22/94, effective 7/23/94.] WAC 246-291-230 Treatment design and operations. (1) Finished water quality from existing and proposed sources of supply shall conform to the minimum

water quality standards established in this chapter.

(2) Predesign studies shall be required for proposed surface water and GWI treatment and may be required for ground water treatment. The goal of the predesign study shall be to establish the most acceptable method to produce satisfactory finished water quality.

(3) Treatment of ground water sources shall be as determined by the department.

(4) The minimum level of treatment for new or expanding surface water and GWI sources approved after the effective date of these regulations shall be coagulation, flocculation, filtration, and disinfection unless otherwise approved by the department.

(5) The minimum level of treatment for existing nonexpanding surface water and GWI sources approved prior to the effective date of these regulations shall be filtration and disinfection.

(6) Disinfection methods, other than chlorination, i.e., ozonation or ultraviolet radiation, may be approved by the department with appropriate engineering justification.

(7) The owner shall ensure that the system is operated in accordance with good operations procedures such as those listed in the department guideline titled Group B Water System Approval.

(8) The owner shall ensure that no bypass is established or maintained to divert water around any feature of a treatment process, except by written approval from the department.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-230, filed 6/22/94, effective 7/23/94.]

Page 150: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 19

WAC 246-291-240 Reliability. (1) All public water systems shall provide an adequate quantity and quality of water in a reliable

manner.

(a) In determining whether a proposed public water system or an expansion or modification of an existing system is capable of providing an adequate quantity of water, the department shall consider the immediate as well as the reasonably anticipated future needs of the system's consumers.

(b) In determining whether an existing public water system is providing an adequate quantity of water, the department shall consider the needs of the system's existing consumers exclusively, unless, in the department's discretion, consideration of the needs of potential consumers is in the public interest.

(2) The owner shall ensure the system is constructed, operated, and maintained to protect against

failures. New and expanding systems shall be equipped with a generator disconnect. Security measures shall be employed to assure the water source, water treatment processes, water storage facilities, and the distribution system are under the strict control of the owner.

(3) Where fire flow is required, a positive pressure shall be maintained throughout the system under fire flow conditions.

(4) Water pressure at the customer's service meter or property line if a meter is not used, shall be maintained at the approved design pressure under peak hourly design flow conditions.

(5) No intake or other connection shall be maintained between a public water system and a source of water not approved by the department.

(6) Owners shall provide the department with the current names, addresses, and telephone numbers of the owners, operators, and emergency contact persons for the system, including any changes to this information. The owner shall ensure that customer concerns and service complaints are responded to in a timely manner.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-240, filed 6/22/94, effective 7/23/94.] WAC 246-291-250 Continuity of service. (1) No owner shall transfer system ownership without providing written notice to the department and

all customers. Notification shall include a time schedule for transferring responsibilities, identification of the new owner, and under what authority the new ownership will operate. If the system is a corporation, identification of the registered agent shall also be provided.

(2) The system transferring ownership shall ensure all health-related standards are met during transfer and shall inform and train the new owner regarding operation of the system.

(3) No owner shall end utility operations without providing written notice to all customers and the department at least one year prior to termination of service.

Page 151: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 20

(4) Nothing in these rules shall prohibit an owner from terminating service to a specific customer if the customer fails to pay normal fees for service in a timely manner or if the customer allows or installs an unauthorized service connection to the system.

(5) Where this section may be in conflict with existing state statutes, the more stringent statute shall prevail.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-250, filed 6/22/94, effective 7/23/94.] WAC 246-291-260 Recordkeeping and reporting. (1) The owner shall ensure that the following records of operation and water quality analyses are kept

on file:

(a) Records of bacteriological and turbidity analyses shall be kept for five years. Records of chemical analyses shall be kept for as long as the system is in operation. Other records of operation and analyses required by the department shall be kept for three years. All records shall bear the signature of the owner of the water system or his or her representative.

(b) Records of action taken by the system to correct violations of primary drinking water regulations and copies of public notifications shall be kept for three years after the last action taken with respect to the particular violation involved.

(c) Copies of any written reports, summaries, or communications, relating to comprehensive system evaluations (CSEs) conducted by system personnel, by a consultant or by any local, state, or federal agency, shall be kept for ten years after completion of the CSE involved.

(d) Where applicable, records of operation and analyses shall include the following:

(i) Daily chlorine residual;

(ii) Water treatment plant performance including, but not limited to:

(A) Type of chemicals used and quantity;

(B) Amount of water treated; and

(C) Results of analyses.

(iii) Daily turbidity;

(iv) Monthly water use readings from totalizing source meters; and

(v) Other information as specified by the department.

Page 152: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 21

(2) Reporting.

(a) The owner shall ensure that reports required by this chapter, are submitted to the department when requested by the department or as otherwise required by this section, including tests, measurements, and analytic reports.

(b) Water facilities inventory and report form (WFI).

(i) Owners shall ensure the submittal of an updated WFI to the department every three

years or as requested; and

(ii) The owner shall also ensure the submittal of an updated WFI to the department within thirty days of any change in name, number of connections, ownership, or responsibility for management of the water system.

(c) Bacteriological.

(i) The owner shall ensure that the department is notified of the presence of:

(A) Coliform in a sample, within ten days of notification by the laboratory; and

(B) Fecal coliform or E. coli in a sample, by the end of the business day in which the

owner is notified by the laboratory or as soon as possible.

(ii) When a coliform MCL violation occurs, the owner shall ensure that the following notifications are made:

(A) Notification of the department before the end of the next business day when a

coliform MCL is determined; and

(B) Notification of the water system users in accordance with WAC 246-291-360.

(d) Water use data shall be reported upon request of the department. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-260, filed 6/22/94, effective 7/23/94.] WAC 246-291-270 Cross-connection control. (1) Owners have the responsibility to protect public water systems from contamination due to cross-

connections. (2) Cross-connections which can be eliminated shall be eliminated. The owner shall work

cooperatively with local authorities to eliminate or control potential cross-connections in a manner acceptable to the department.

(3) When an existing cross-connection poses a potential health or system hazard, the owner shall shut

off water service to the premises until the cross-connection has been eliminated or controlled by the installation of a proper backflow prevention assembly.

(4) Backflow prevention devices shall be approved by the department and tested in a manner

prescribed by the department in WAC 246-290-490. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-270, filed 6/22/94, effective 7/23/94.]

Page 153: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 22

Part 4. Water Quality WAC 246-291-300 General monitoring requirements. (1) The department may require additional monitoring when it determines contamination is present or

suspected in the water system or when it determines the source may be vulnerable to contamination.

(2) Special purpose samples shall not count toward fulfillment of the monitoring requirements of this chapter.

(3) The owner shall ensure samples required by this chapter are collected, transported, and submitted for analysis according to department-approved methods. The analyses shall be performed by the state public health laboratory or another laboratory certified by the department. Qualified water utility, certified laboratory, or department personnel may conduct measurements for pH, temperature, residual disinfectant concentration and turbidity as required by this chapter, provided, these measurements are made in accordance with Standard Methods.

(4) When one Group B water system sells water to another public water system and the cumulative number of services or population served meet the definition of a Group A system, the owner of the selling system shall ensure that source monitoring is conducted in accordance with the minimum requirements for Group A community systems found in chapter 246-290 WAC.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-300, filed 6/22/94, effective 7/23/94.] WAC 246-291-310 General follow-up. (1) If a water quality sample exceeds any MCLs listed in this chapter, the owner shall ensure

notification of the department and take follow-up action as described in this chapter.

(2) When a primary MCL violation occurs, the owner shall ensure that the following actions are taken:

(a) Notification of the department in accordance with WAC 246-291-260;

(b) Notification of the consumers served by the system in accordance with WAC 246-291-360;

(c) Determination of the cause of the contamination; and

(d) Other action as directed by the department. (3) When a secondary MCL violation occurs, the owner shall ensure that the department is notified and

that action is taken as directed by the department.

(4) The department shall determine the follow-up action when a substance not included in this chapter is detected.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-310, filed 6/22/94, effective 7/23/94.]

Page 154: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 23

WAC 246-291-320 Bacteriological. (1) Owners shall ensure the collection and submittal of a sample for coliform analysis at least once

every twelve months from the furthest end of the distribution system or as directed by the department.

(2) When coliform bacteria are present in any sample the owner shall ensure that:

(a) The sample is analyzed for fecal coliform or E. coli;

(b) The department is notified in accordance with WAC 246-291-260; and

(c) Further action is taken as directed by the department. (3) MCLs.

(a) MCLs under this subsection shall be considered primary standards.

(b) An MCL violation for coliform bacteria occurs when a routine and repeat sample have coliform presence.

(c) In determining MCL compliance, the owner shall:

(i) Include:

(A) Routine samples; and

(B) Repeat samples.

(ii) Not include:

(A) Invalidated samples; and

(B) Special purpose samples. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-320, filed 6/22/94, effective 7/23/94.] WAC 246-291-330 Inorganic chemical and physical. (1) Monitoring.

(a) A complete inorganic chemical and physical analysis shall consist of the primary and secondary chemical and physical standards.

(i) Primary chemical and physical standards are antimony, arsenic, barium, beryllium,

cadmium, chromium, cyanide, fluoride, mercury, nickel, nitrate (as N), nitrite (as N), selenium, sodium, thallium, and turbidity.

Page 155: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 24

(ii) Secondary chemical and physical standards are chloride, color, hardness, iron, manganese, silver, specific conductivity, sulfate*, total dissolved solids*, and zinc.

*Required only when specific conductivity exceeds seven hundred micromhos/centimeter.

(b) Samples taken for inorganic chemical analyses shall be collected at the source before treatment.

(c) Owners shall ensure submittal of at least one initial complete analysis from each source or well field;

(d) After the initial complete analysis, owners shall ensure submittal to the department of results of at least one nitrate sample analyzed from each source or well field every thirty-six months; and

(e) When treatment is provided for one or more inorganic chemical or physical contaminants, samples shall be taken for the specific contaminant or contaminants before and after treatment. The department shall determine the frequency of sampling.

(2) Follow-up. When an initial analysis of a substance exceeds the MCL, the owner shall ensure that at

least one additional sample is immediately taken from the same sampling point and analyzed for any substance which exceeded the MCL. If the average of the samples exceeds the MCL, a violation is confirmed.

(3) MCLs. The primary and secondary MCLs are listed in Tables 1 and 2

Table 1 Inorganic Chemical Characteristics

Substance Primary MCLs (mg/L) Antimony 0.006 Arsenic 0.05 Barium 2.0 Beryllium 0.004 Cadmium 0.005 Chromium 0.1 Cyanide 0.2 Fluoride 4.0 Mercury 0.002 Nickel 0.1 Nitrate (as N) 10.0 Nitrite (as N) 1.0 Selenium (Se) 0.05 Sodium (Na) * Thallium 0.002

Page 156: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 25

Substance Secondary MCLs (mg/L) Chloride (Cl) 250.0 Fluoride (F) 2.0 Iron (Fe) 0.3 Manganese (Mn) 0.05 Silver (Ag) 0.1 Sulfate (SO4) 250.0 Zinc (Zn) 5.0

Note: Although the state board of health has not established an MCL for sodium, there is enough public health significance connected with sodium levels to require inclusion in inorganic chemical and physical monitoring.

Table 2 Physical Characteristics

Substance Primary MCL Turbidity 1-0 NTU

Substance Secondary MCLs Color 15 Color Units Hardness None established Specific Conductivity 700 umhos/cm Total Dissolved Solids (TDS) 500 mg/L

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-330, filed 6/22/94, effective 7/23/94.] WAC 246-291-340 Turbidity. (1) The department shall determine monitoring requirements on a case-by-case basis. New surface

water and GWI sources shall comply with applicable turbidity monitoring requirements in accordance with Part 6 of chapter 246-290 WAC.

(2) MCLs.

(a) The department shall consider standards under this subsection primary standards.

(b) The MCLs for turbidity are:

(i) 1.0 NTU, based on a monthly average of the maximum daily turbidity, where the maximum daily turbidity is defined as the average of the:

(A) Highest two hourly readings over a twenty-four-hour period when continuous

monitoring is used; or

(B) Daily grab samples taken within one hour when daily monitoring is used. The department may increase the MCL to 5.0 NTUs if the owner can show the source is within a controlled watershed and the source meets the requirements under WAC 246-291-110.

(ii) 5.0 NTUs based on an average of the maximum daily turbidity for two consecutive days. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-340, filed 6/22/94, effective 7/23/94.]

Page 157: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 26

WAC 246-291-350 Other substances. (1) In areas known or suspected of being contaminated with other substances of public health concern,

the department may require that an owner submit water samples to test for the suspected contamination at a frequency determined by the department.

(2) The department may require repeat samples for confirmation of results.

(3) Any substance confirmed in a water system that does not have an MCL listed in this chapter shall be subject to the MCLs, state advisory levels (SALs) and other provisions found in chapter 246-290 WAC.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-350, filed 6/22/94, effective 7/23/94.] WAC 246-291-360 Public notification. (1) Responsibility. Within fourteen days of the violation, the owner shall ensure that water system

users are notified when the system has a violation of a primary MCL.

(2) Content. Notices shall provide:

(a) A clear, concise, and simple explanation of the violation;

(b) Discussion of potential adverse health effects and any segments of the population that may be at higher risk;

(c) A list of steps the owner has taken or is planning to take to remedy the situation;

(d) A list of steps the consumer should take, including advice on seeking an alternative water supply if necessary;

(e) The owner's and manager's names and phone numbers; and

(f) When appropriate, notices shall be multilingual. The owner may provide additional information to further explain the situation. (3) Distribution. Owners shall ensure that a written notice is distributed to all water system users

within fourteen days of a violation unless otherwise directed by the department.

(4) When circumstances dictate the owner give a broader or more immediate notice to protect public health, the department may require notification by whatever means necessary.

(5) When a system is granted a waiver for reduction of water quality standards, the owner shall ensure that customers are notified. The owner shall provide a notice annually and send a copy to the department.

[Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-360, filed 6/22/94, effective 7/23/94.]

Page 158: Group B Design Workbook

Chapter 246-291 WAC – Group B Public Water Systems Page 27

WAC 246-291-370 Severability. If any provision of this chapter or its application to any person or circumstances is held invalid, the remainder of this chapter, or the application of the provision to other persons or circumstances, shall not be affected. [Statutory Authority: RCW 43.20.050. 94-14-002, § 246-291-370, filed 6/22/94, effective 7/23/94.]

Page 159: Group B Design Workbook

YAKIMA HEALTH DISTRICT PUBLIC WATER SUPPLY SYSTEM ASSISTANCE APPLICATION

1210 Ahtanum Ridge Drive, Union Gap, Washington 98903

If you need help or have questions, contact

Environmental Health at: (509) 249-6508

(800) 535-5016 ext. 508 FAX (509) 575-7894

PLEASE PRINT CLEARLY

APPLICANT INFORMATION _____________________________________________

(Name) _____________________________________________

(Address) _____________________________________________

(City, State, Zip) ______________________|______________________ Phone: Home Work

LAND OWNER INFORMATION

_____________________________________________

(Name) _____________________________________________

(Address) _____________________________________________

(City, State, Zip) ______________________|______________________ Phone: Home Work

1. Well Site Location: ________________________________________________________________________ (Street/Road) (City) 2. Well Site Tax Parcel #: _______________________ Short Plat #: ______________ Lot #: _______ 3. Service Requested: 2-Party Well Approval: ______ Well Site Approval: ______ Group B Assistance: ______ Same Farm Exemption Review: ______ Other (specify): __________________________ 4. Water System Name: ________________________________________________________________________ 5. Current # of Connections: ____________ Total Proposed Number of Connections: ______________ 6. List all tax parcel numbers of current and future lots served by the system: ______________________________ __________________________________________________________________________________________________ 7. Well(s): Existing: Proposed: Service Type: Residential: Commercial: My signature certifies that this information is accurate to the best of my knowledge. I grant permission for the Yakima Health District to make studies and/or inspections required by the review process. I understand that any decision made by the Yakima Health district may be appealed provided that the appeal is made in writing and delivered to the Health District within 30 days of the decision. I also understand that supplying incorrect and/or incomplete information may result in a delay or prohibit approval. Additional costs may also be incurred as a result of misinformation. Applicant’s Signature: _________________________________________________________ Date : ______________

FOR OFFICE USE ONLY Date Received ___________________ Amount Paid ___________________ Staff Initials ___________________ Check # ___________________ Receipt # ___________________ Comments ___________________

Updated 1/6/11

Page 160: Group B Design Workbook
Page 161: Group B Design Workbook

RETURN TO: Eastern Regional Office, 1500 W 4th Ave, Ste 305, Spokane, WA 99204

1. SYSTEM ID NO.

2. SYSTEM NAME 3. COUNTY 4. GROUP

5. TYPE

6. PRIMARY CONTACT NAME & MAILING ADDRESS 7. OWNER NAME & MAILING ADDRESS 8. Owner Number: M TITLE:

TITLE:

STREET ADDRESS IF DIFFERENT FROM ABOVE STREET ADDRESS IF DIFFERENT FROM ABOVE ATTN ATTN ADDRESS ADDRESS

CITY STATE ZIP CITY STATE ZIP

9. 24 HOUR PRIMARY CONTACT INFORMATION 10. OWNER CONTACT INFORMATION

Primary Contact Daytime Phone: Owner Daytime Phone: Primary Contact Evening Phone: Owner Evening Phone: Primary Contact Mobile/Cell Phone: Owner Mobile/Cell Phone: Fax: E-mail Fax E-Mail:

WAC 246-290-420()) requires that water systems provide 24-hour contact information for emergencies.

11. SATELLITE MANAGEMENT AGENCY – SMA (check only one) � Not applicable (Skip to #12) � Owned and Managed SMA NAME:_______________________________________________________ SMA Number:___________ � Managed Only � Owned Only

12. WATER SYSTEM CHARACTERISTICS (mark ALL that apply) � Agricultural � Hospital/Clinic � Residential � Commercial / Business � Industrial � School � Day Care � Licensed Residential Facility � Temporary Farm Worker � Food Service/Food Permit � Lodging � Other (church, fire station, etc.): � 1,000 or more person event for 2 or more days per year Recreational / RV Park _________________________________

13. WATER SYSTEM OWNERSHIP (mark only one) 14. STORAGE CAPACITY (gallons) � Association � County � Investor � Special District

� City / Town � Federal � Private � State

D

15. 16 SOURCE NAME

17. INTERTIE

18. SOURCE CATEGORY

19. USE

20

21. TREATMENT

22. DEPTH

23.

24. SOURCE LOCATION

SOUR

CE N

UMBE

R

LIST UTILITY’S NAME FOR SOURCE

AND WELL TAG ID NUMBER.

Example: WELL #1 XYZ456

IF SOURCE IS PURCHASED OR INTERTIED, LIST SELLER’S NAME Example: SEATTLE

INTERTIE SYSTEM

ID NUMBER

WEL

L W

ELL

FIEL

D W

ELL

IN A

WEL

LFIE

LD

SPR

ING

SPR

ING

FIEL

D S

PRIN

G IN

SPR

ING

FIEL

D S

EA W

ATER

S

URFA

CE W

ATER

R

ANNE

Y / IN

F. G

ALLE

RY

OTH

ER

PERM

ANEN

T SE

ASON

AL

EMER

GENC

Y

SOUR

CE M

ETER

ED

NONE

CH

LORI

NATI

ON

FILT

RATI

ON

FLUO

RIDA

TION

IRRA

DIAT

ION

(UV)

OTHE

R

DEPT

H TO

FIR

ST O

PEN

INTE

RVAL

IN F

EET

CAPA

CITY

( G

ALLO

NS P

ER M

INUT

E)

¼,

¼ S

ECTI

ON

SECT

ION

NUMB

ER

TOW

NSHI

P RA

NGE

S01

WATER FACILITIES INVENTORY (WFI) FORM

DOH 331-011 (Rev. 06/02)

Page 162: Group B Design Workbook

35. Reason for Submitting WFI: _____________Other ٱ New System ٱ Name change ٱ Re-Activate ٱ Inactivate ٱ Update-No Change ٱ Update-Change ٱ

ACTIVE SERVICE CONNECTIONS

DOH USE ONLY! CALCULATED

ACTIVE CONNECTIONS

DOH USE ONLY! APPROVED

CONNECTIONS

25. SINGLE FAMILY RESIDENCES (How many of the following do you have?) A. Full Time Single Family Residences (Occupied 180 days or more per year) B. Part Time Single Family Residences (Occupied less than 180 days per year) 26. MULTI-FAMILY RESIDENTIAL BUILDINGS (How many of the following do you have?) A. Apartment Buildings, condos, duplexes, barracks, dorms B. Full Time Residential Units in the Apartments, Condos, Duplexes, Dorms that are occupied more than 180

days/year

C. Part Time Residential Units in the Apartments, Condos, Duplexes, Dorms that are occupied less than 180 days/year

27. NON-RESIDENTIAL CONNECTIONS (How many of the following do you have?) A. Recreational Services (Campsites, RV Sites, Spigots, etc.) B. Institutional, Commercial/Business, School, Day Care, Industrial Services, etc.

28. TOTAL SERVICE CONNECTIONS

29. FULL-TIME RESIDENTIAL POPULATION A. How many residents are served by this system 180 or more days per year? ___

30. PART-TIME RESIDENTIAL POPULATION JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

A. How many part-time residents are present each month? B. How many days per month are they present?

31. TEMPORARY & TRANSIENT USERS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

A. How many total visitors, attendees, travelers, campers, patients or customers have access to the water system each month?

B. How many days per month is water accessible by the public ?

32. REGULAR NON-RESIDENTIAL USERS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

A. If you have schools, daycares, or businesses connected to your water system, how many students, daycare children and/or employees are present each month?

B. How many days per month are they present?

33. ROUTINE COLIFORM SCHEDULE

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

34. GROUP B NITRATE SCHEDULE

QUARTERLY

ANNUALLY

ONCE EVERY 3 YEARS

36. I certify that the information stated on this WFI form is correct to the best of my knowledge. SIGNATURE: __________________ DATE: PRINT NAME: ___________________ TITLE:

DOH 331-011 (Rev. 06/02)

Page 163: Group B Design Workbook

RETURN ADDRESS: ______________________________________________ ______________________________________________ ______________________________________________ DOCUMENT TITLE: DECLARATION OF COVENANT GRANTOR: ______________________________________________ GRANTEE: ______________________________________________ LEGAL DESCRIPTION: ______________________________________________ ______________________________________________ ______________________________________________ PARCEL NUMBER: ______________________________________________

Page 164: Group B Design Workbook
Page 165: Group B Design Workbook

DECLARATION OF COVENANT Know all men by these presents that I (we) the undersigned, owner(s) in fee simple of the land described herein, hereby declare this covenant and place same on record. I (we), the grantor(s) herein, am (are) the owners in fee simple of (an interest in) the following described real estate situated in Yakima County, State of Washington, to wit: ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ on which the grantor(s) owns and operates a well and waterworks supplying water for public use located on said real estate, to wit: ____________________________________________________________________________________ ____________________________________________________________________________________ It is the purpose of these grants and covenants to prevent certain practices hereinafter enumerated in the use of said grantor(s) land which might contaminate the water supply. NOW, THEREFORE, the grantor(s) agree(s) and covenant(s) that said grantor(s), his (her) (their) heirs, successors and assigns will not construct, maintain, or suffer to be constructed or maintained upon the said land of the grantor(s) and within _______ feet of the well(s) herein described (see attached), so long as the same is operated to furnish water for public consumption, any potential source of contamination, such as cesspools, sewers, privies, septic tanks, drain fields, manure piles, garbage of any kind or description, barns, chicken houses, rabbit hutches, pigpens, or other enclosures or structures for the keeping or maintenance of fowls or animals, or storage of liquid or dry chemicals, herbicides, or insecticides. These covenants shall run with the land and shall be binding on all parties having or acquiring any right, title, or interest in the land described herein or any part thereof, and shall inure to the benefit of each owner thereof. WITNESS _________________ hand ________ this ____________ day of ___________, 19_______. State of Washington) __________________________ (Seal) County of Yakima ) Grantor (s) I, the undersigned, a Notary Public in and for the above named County and State, do hereby certify that on this __________ day of _______________, 19_______, personally appeared before me ___________________________________ to me known to be the individual ______________ described in and who executed the within instrument, and acknowledge that he (they) signed and sealed the same as free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal the day and year last above written. ________________________________________________ Notary Public in and for the State of Washington residing at _______________________________

Page 166: Group B Design Workbook
Page 167: Group B Design Workbook

RETURN ADDRESS: ______________________________________________ ______________________________________________ ______________________________________________ DOCUMENT TITLE: RESTRICTIVE COVENANT GRANTOR: ______________________________________________ GRANTEE: ______________________________________________ LEGAL DESCRIPTION: ______________________________________________ ______________________________________________ ______________________________________________ PARCEL NUMBER: ______________________________________________

Page 168: Group B Design Workbook
Page 169: Group B Design Workbook

RESTRICTIVE COVENANT The grantor(s) herein is (are) the owner(s) of (an interest in) the following described real estate situated in Yakima County, State of Washington, to wit: ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ the grantee(s) herein, ________________________________________ own(s) and operate(s) a well and waterworks supplying water for public use, located upon the following described real estate situated in Yakima County, State of Washington, to wit: ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ which well(s) is in close proximity to the land of the grantor(s), and said grantee(s) is (are) required to keep the water supplied from said well free from impurities which might be injurious to the public health. It is the purpose of these grants and covenants to prevent certain practices hereinafter enumerated in the use of the said grantor(s) land which might contaminate said water supply. NOW, THEREFORE, in consideration of ________ Dollar(s) in hand paid and other good and valuable consideration received by said grantor(s), the grantor(s) agree(s) and covenant(s) with the grantee(s),its successors and assigns, said covenants to run with the land for the benefit of the land of the grantee(s), that said grantor(s), its (their) heirs, successors and assigns will not construct, maintain or suffer to be constructed or maintained upon the said land of the grantor(s) and within _______ feet of the well(s) of the grantee(s), so long as the same is operated to furnish water for public consumption, any potential source of contamination, such as cesspools, sewers, privies, septic tanks, drain fields, manure piles, garbage of any kind or description, barns, chicken houses, rabbit hutches, pigpens, or other enclosures or structures for the keeping of maintenance of fowls or animals, or storage of liquid or dry chemicals, herbicides, or insecticides. WITNESS ________________ hand ________ this ____________ day of ___________, 19________. State of Washington) __________________________ (Seal) County of Yakima ) Grantor (s) I, the undersigned, a Notary Public in and for the above named County and State, do hereby certify that on this __________ day of _______________, 19_______, personally appeared before me ___________________________________ to me known to be the individual ______________ described in and who executed the within instrument, and acknowledge that he (they) signed and sealed the same as free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal the day and year last above written. ________________________________________________ Notary Public in and for the State of Washington residing at ________________________________