Building Experiences

Credentials

Organization Chart

Gruppo Inveco in Serbia

Cases of successful industrial projects in Serbia

Nova PazovaYear 2015.Ind. Area Nova PazovaSqmt 8.000 BROWNFIELD

Sremska MitrovicaYear 2013/2014Ind. Area S. MitrovicaSqmt 19.135 GREENFIELD

KostolacYear 2012.Ind. Area KostolacSqmt 8.000 BROWNFIELD

SuboticaYear 2012

Ind. Area BajmokSqmt 8.500 GREENFIELD

KragujevacYear 2011

Ind. Area Kasarna GrošnicaSqmt 13.900 GREENFIELD

NišYear 2010

Ind. Area Donje MeđurovoSqmt 10.209 GREENFIELD

As a General Contractor, INVECO I.B.C. realizedseveral projects for international clients who chose Serbia for their new production localizations.

Building Experiences - Serbia 2010.-2015.

CREDENTIALS & REFERENCES

CARRIED OUT PROJECTS 6

TOTAL SQM 50.000 sqm

AVERAGE TIMING FOR PROJECT DELIVERY < 9 months

TOTAL TURNOVER 33 MLN €

SPECIAL FOUNDATIONS works

BROWNFIELD general installation

SYSTEMS installation

MAIN CLIENTS

Credentials: Cooper Standard

Outcome• Feasibility Study and selection of the land;

• Project-time scheduling;

• Definition of the preliminary project to start bureaucratic process;

• Relationship management with Authorities and Municipalities;

• Obtaining of preliminary and generic permits;

• Draft of structural, architectural and system projects;

• Construction management, testing and start of production.

Critical aspects Slow Cadaster (Land register) process;

Local grid operator connection process (many requests of additional documents);

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Sremska Mitrovica

S• ADMINISTRATIVE EFFICIENCY OF THE

MUNICIPALITY• CONNECTIONS: Beograd airport - Nikola

Tesla, Close to Beograd Town

W • LACK OF HIGHLY - SKILLED LABOUR

O• COMMERCIAL RELATIONS WITH NEAR

VOJVODINA REGION• B2B OPPORTUNITIES

T

Optimized management of 12 subcontractors

Building Experiences - Serbia 2010.-2015.

Cooper Standard project

GANTT20.000 SQMT

Building Experiences - Serbia 2010.-2015.

Credentials

Cooper Standard Factory Building Process Images

Municipality of SremskaMitrovica, Serbia

2013./2014.

Credentials : PMC Automotive

Outcome• Feasibility Study and selection of the land with FIAT staff;

• Project time scheduling;

• Definition of the preliminary project to start bureaucratic process;

• Relationship management with Authorities and Municipalities;

• Obtaining of preliminary and generic permits;

• Draft of structural, architectural and system projects;

• Construction management, testing and start of production.

Critical aspects Harsh weather conditions (-20° and snow) caused works to be stopped for days;

The customer has changed the final design of the project several times

(extra costs & time)

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Kragujevac

S• ALREADY HIGHLY INDUSTRIALIZED AREA (F.A.S.+ INDUCED) • PRESENCE OF ENGINEERING COLLEGES (professional

training)• PLENTY OF HIGHLY-SKILLED LABOUR (AUTOMOTIVE)

W• RAW/MANUFACTURING/SERVICES HIGH COSTS • MORE EXPENSIVE THAN OTHER LOCATIONS • MUCH HIGHER SALARY• LOCAL SPECULATION EVENTS

O • VIRTUOUS CYCLE OF DEVELOPMENT IN THE AREA

T • INFLATION AND SALARY INCREASE

Optimized management of 20 subcontractors

Building Experiences - Serbia 2010.-2015.

Credentials

PMC Automotive FactoryBuilding Process Images

Municipality of Kragujevac, Serbia

2011.

Credentials : CLN Group

Outcome• Feasibility Study for ‘’special foundations’’;

• Draft of structural and executive projects;

• Construction management and testing.

Critical aspects Financial instability of local subcontractors:

we were constantly requested for pre-payments and advances on the work.

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Kostolac

S • GOOD LINKS TO THE MAIN ROADS

W• LIMITED SIZE OF THE INDUSTRIAL AREA • LIMITED NUMBER OF INDUSTRIAL PLAYERS• LACK OF HIGHLY - SKILLED LABOUR

O • PRESENCE OF A DISTRIC HEATING SYSTEM

T • LOCAL CRIME

Optimized management of 3 subcontractors

Credentials : Dytech F&F Serbia

Outcome• Feasibility Study and selection of the land;

• Project time scheduling;

• Definition of the preliminary project to start bureaucratic process;

• Relationship management with Authorities and Municipalities;

• Obtaining of preliminary and generic permits;

• Draft of structural, architectural and system projects;

• Construction management.

Critical aspects Dytech still did not start production;

Obtaining Incentives VS Strategic market approach

(short-term choice) (long-term choice)

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Niš

S• FREE ZONE OPPORTUNITIES; • LOW LABOUR COST • CONNECTIONS: Konstantin Veliki Airport,

HIGHWAY E-75 NIS-BEOGRAD

W • AVAILABILITY OF PUBLIC INDUSTRIAL URBANIZED AREAS

O• PRESENCE OF MAJOR INDUSTRIAL PLAYERS • B2B OPPORTUNITIES • PLENTY OF HIGHLY - SKILLED LABOUR

T • BUREAUCRACY PROCESS

Optimized management of 10 subcontractors

Building Experiences - Serbia 2010.-2015.

Credentials

Dythech F&F SerbiaFactory Building Process Images

Municipality of Niš, Serbia

2010.

Credentials : ContiTech Fluid Serbia

Outcome• Project time scheduling;

• Draft of executive systems installation projects;

• Construction management, testing and start of production

Critical aspects Designers nominated by the customer uncooperative: we were requested to

deliver technical files and maintenance manuals in Serbian language (even if original documentation issued by the manufacturer did not include that language).

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Subotica

S• LARGE INDUSTRIALIZED AREAS • CLOSE WITH HUNGARY BORDERS (Market opportunities)• FREE ZONE OPPORTUNITIES

W• LIMITED SIZE OF THE INDUSTRIAL AREAS • LIMITED NUMBER OF INDUSTRIAL PLAYERS• UNPROFESSIONAL LOCAL ENGINEERING COMPANY

O • ADMINISTRATIVE EFFICIENCY OF THE MUNICIPALITY • NEW INDUSTRIAL INVESTORS ARE WELCOME

T

Optimized management of 8 subcontractors

Building Experiences - Serbia 2010.-2015.

Credentials

ContiTech Fluid SerbiaFactory Building Process Images

Municipality of Subotica, Serbia

2012.

Credentials : Plados Telma

Outcome• Renovation of the “Brownfield”

• Project time scheduling;

• Relationship management with Authorities and Municipalities;

• Mechanical systems projects with validation under Serbian standards;

• Obtaining permits from municipality;

• Fire protection project and permit

Critical aspects Difficulties in respecting all current fire protection prescriptions when dealing

with a “brownfield” built under outdated standards

Building Experiences - Serbia 2010.-2015.

SWOT ANALYSIS in the municipality of Nova Pazova

S• ASSISTENCE FROM VOJVODINA INVESTMENT

PROMOTION - VIP • FREE ZONE OPPORTUNITIES

W • LIMITED SIZE OF THE INDUSTRIAL AREAS • LIMITED NUMBER OF IAVAILABLE “BROWNFIELDS”

O• FAST BUILDING PERMIT PROCEDURE FROM THE

MUNICIPALITY • NEW INDUSTRIAL INVESTORS ARE WELCOME

T

Optimized management of 5 subcontractors

Building Experiences - Serbia 2010.-2015.

Banking ExperienceCooper Standard project

Financial provision

Total real estate investment 13.3 MLN€

Equity ratio 30%

Debt ratio 70%

Financial partner UniCredit Bank

Type of loan 7-year mortgage loan

Cooper Standard d.o.o. in Sremska Mitrovica

Inveco I.B.C.

Cooper Standard Automotive D.o.o

2. Build and deliver1. Build to-lease

INVECO I.B.C.

INVECO I.B.C.

Cooper Standard Automotive D.o.o

mortgage loan

build to deliver

mortgage loan

lease

Client’s final

choice

INVECO I.B.C. Organization Chart

CFODott. Gabriele Salciarini

PRESIDENTFernando Barbetti

DIRECTORFilippo Barbetti

PROJECT MANAGERIng. Raffaele Urbani

ACCOUNT MANAGERIng. Andrea Girelli

FISCAL CONSULTANTFERTIST D.o.o. Vladimir

ACCOUNTANTMarija Savić

CIVIL ENGINEERIng. Željko Murić

OFFICE CHIEFArh. Milica Čakić

MECHANICAL ENGINEERIng. Danilo Babić

MARKETING DEPT.Aleksandar Bakšunović

ELECTRICAL ENGINEERIng. Stevan Simeunović

SUPPLIERSSUB CONTRACTORS