ADVANCEULTRASONICINSPECTION

GUDRUN HELIDECKPROJECT2015

Dacon Services AS/ Org. Nr. 962 969 372Vertikal Service AS/ Org. nr. 991 193 979

DACON SERVICES AS I VERTIKAL SERVICE

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Agenda

1. Dacon Services AS

2. Vertikal Service AS

3. Dacon & Vertikal

4. Case 1. Gudrun Helideck project, Dacon Services AS

5. Case 2. RS SFA 2014, Vertikal Service AS

6. Form of co-operation and further progress

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

1. Dacon Service AS

Dacon Services AS has a main office in Lillestrøm and departments in Kristiansund and Bergen, Norway.

Dacon supplies a large number of different inspection and rope access services world wide. We provide all standard NDT methods as well as a various amount of specialized methods (RVI, CuS, Pigging, etc.) and we create tailored solutionsfor all your inspections needs.

We deliver our services world wide with bases in Norway, Singapore and Thailand. Dacon is by our customers considered an innovative and creative troubleshooter who never gives up.

We primarily serve these industries:

Oil and Gas Production (offshore/onshore) Refineries Shipping and Ship Machinery Chemical production Power Plants

Food Production Cranes and lifting equipment Concrete Construction Buildings and Bridges Medicine Production

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

1.1 Product Area

Main office in Lillestrøm and departments in Kristiansund and Bergen, Norway. 30 employees, 1 trainee, 8 hired by project. Departments:

• NDT- all methods• Rope Access• Special Inspection• Lifting• Video / RVI (Remote Visual Inspection)

Powered by Dacon Inspection, Thailand, with 310 employees. See more infoabout our services at: http://www.dacon-inspection.com/resources/downloads/

Dacon Inspection, Singapore, has 18 employees.

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

1.2 Capacity

Methods Level 2 Certificate

Level 3 Certificate

NDT Visual Testing 16 3

NDT Penetrant Testing 13 2

NDT Magnetic Testing 13 2

NDT Ultrasonic Testing 7 2

NDT Eddy Current Testing 6 1

NDT Radiographic Testing 4 2

Methods Certificate

Rope Access Safety Leader 6

Rope Access Level 2 5

Rope Access Level 1 8

Lifting equipment inspector 2

Paint inspector 2

Welding Engineer IWE 1

Welding inspector NS-477, IWIs 4

Welder (111, 131, 135, 136, 138) 1

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

1.3 HSE/QA

Dacon Services AS has the following certifications:

NTO, ID: N-265 Achilles supplier registry, ID: 25921 Sellihca, ID: 111580 EN ISO 9001: 2008, ID: 957 EN ISO 14001, ID: 959 EN ISO 18001 ISO/IEC 17024 Own level 3 staff DNV 402A Norsk Akkreditering, ID: PERS019 No serious incidents 2008 – 2015 KPI-demands to our employees:

• Minimum 5 deviation reports pr. Month• Less than 2% absence• 0 injuries and dropped objects

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

2. Vertikal Service

Localized in Volda

32 employees

3 departments

Achilles-approved

Certified NS 9600

Certified ISO 9001:2008 by DNV

NORSOK S-006 Kat 2

Established

2003 2007 2008 2009 2010 2011 2012 2013 2014

First offshore task Offshore 100% of turnover Expansion offshore ISO 9001:2008 NDT departement

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

2.1 Product Area / Capacity

Vertikal Service:

Project management

Rope Access projects

Equipment

NDT/Welding inspections

Rigging / decommission

FG-inspection

VIS – Data catch at inspections

Service agreements

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

2.2 HSE / QA

Certified Quality Assurance System by DNV, (ISO 9001:2008)

Vertikal Service is NS 9600 approved

Certified NORSOK S-006 kat. 2 by Statoil ASA

Achilles id. 26810

No serious incidents 2008 – 2015

KPI-demands to our employees:

• Minimum 2 deviation reports pr. Month

• Less than 2% absence

• 0 injuries and dropped objects

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

3. InspectionsRope Access and Inspection

Inspection and document control:

Loose lifting equipment Drops inspection Bolt check / Structure insp. Rigging and lifting operations

Inspection and document control:

Loose lifting equipment Rigging and lifting operations NDT inspection

Inspection and document control:

Visual hull inspection NDT hull inspection

A com

plete system for docum

ent control: C

ertificates & inspection reportsVIS system

.

Derrick D

rill floor and cranes Hull

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

NDT – All methods

• VT – Visual Inspection

• MT/MPI – Magnetic Particle Inspection

• PT – Dye Penetrant Inspection

• RT – X-ray

• UT – Ultrasonic testing

• ET – Eddy Current

Weld inspection

• 477

• IWT/IWE

3.1 NDT / Weld Inspection

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

All technicians are skilled riggers and the competence has been a focus area sins 2003

• Slinger Banksman course• Rigging course, module 0-3.2

Rigging in combination with rope access is highly efficient method for execution of demanding rigging and lifting operations.

• Se case studies:

• Case 1. Gudrun helicopter deck • Case 2. RS SFA 2014

3.2 Rigging and Lifting

Heater module installation on tie-in Gudrun project - 2013

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Case Study 1

4. Gudrun Helicopter Deck

Gudrun Helideck Project March – June 2015:

• Rope Access / NDT-all methods (RT, MT, UT, ET, VT) of Helideck at Gudrun.

• Onsite Reporting

• Bolt inspection

• Bolt torque

• Minor lifting operations

• Supervision with DNV and Statoil

• Project leadership with peek of 16 Rope Access/NDT workers

• Supervision of 3rd party NDT/Rope Access company

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Case Study 1

4.1 Gudrun Helicopter Deck

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Case Study 2

5. RS SFA 2014

Inspection of:

• Seawater return• Flare structure• Flare tip replacement and preparation RS SFA - June 2014

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Case Study 2

5.1 Project Development

Statoil-revision and approval according to NORSOK S-006

3300 workhours inclusive detailed planning

Multidisciplinary team with back-up for competence/ capacity

Delivery on time and according to plan

Multidisciplinaries within the team solved other assignment for the customer

No injuries or reported incidents

Flare tipLanding deck for equipment by helicopterwas calculated and installed

Flare structureInspection of bolts, surfacesand cracks. Findings wassandblast and surfacetreated by Rope Access team

Seawater CaissonRope Access was a efficient tool of internalinspection and repair of42’’ seawater return pipe

DACON INSPECTION SERVICES I VERTIKAL SERVICE F O R A L L Y O U R I N S P E C T I O N N E E D S

Further Schedule?

Meeting:

Approval process? Conditions? Cooperation form?