Investor Presentation May 2009 GVK Power & Infrastructure Limited

Upload: others

Post on 30-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

Investor PresentationMay 2009

GVK Power & Infrastructure Limited

Page 2: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVKPIL - Verticals

GVK POWER & INFRASTRUCTURE LTD

GVK Industries Ltd(217 + 220 MW)

Gautami Power Ltd(464 MW)

Alaknanda HydroPower Ltd (330 MW)

Goriganga HydroPower Ltd (370 MW)

GVK Power GoindwalSahib Ltd (540 MW)

Seregraha Mines Ltd(68 Mil Tonnes)

Mumbai InternationalAirport Ltd

GVK JaipurExpressway Ltd

GVK Perambalur SEZPvt Ltd

ENERGYTRANSPORTATION URBAN INFRASTRUCTURE

Holding Company Subsidiary Associate2

GVK Coal (Tokisud) Ltd(52 Mil Tonnes)

GVK Oil & Gas Ltd(7 Deepwater Blocks)

Page 3: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

Current Breadth of Infrastructure Assets

3

ENERGY

• Eight Power Projects – Gas, Hydro & Thermal

Ø Operational Capacity – 901 MW

Ø Capacity under construction – 1,240 MW

Ø Capacity under development – 1,500 MW

• Two Coal Mines –Reserves of 120 million tonnes

• 7 deepwater oil & gas blocks off the west coast ofIndia

TRANSPORTATION

URBAN INFRA

POWER MINES

• Developing India’s busiest airport – Mumbai

Ø Estimated Project Cost - $ 2 Billion

Ø Handling 23.4 million passengers annually

• India’s first 6 lane BOT expressway (90 km)

Ø Handling 6.9 million vehicles annually

Ø One of the first road project SPVs in Indiato share excess toll revenue with the NHAI

• 3,184 acre multi-product SEZ in Tamil Nadu

Ø 225 km from Chennai & 75 km from Trichy

Ø 2,882 Acres of land already registered

AIRPORTS ROADS

SEZs

OIL & GAS

Page 4: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

0

1000

2000

3000

4000

5000

6000

1996 2002 2003 2004 2006 2007 2009 2010

GVKPIL - The Growth Story

GV

K In

dust

ries

Ltd

Phas

e 1

GV

K J

aipu

rE

xpre

ssw

ay L

td

Gau

tam

i Pow

er L

td Mu

mba

i In

tern

atio

nal

Air

port

Ltd

Ala

knan

da H

ydro

Pow

er L

td

GV

K G

oin

dwal

Sah

ib L

td /

/ G

VK

Coa

l (To

kisu

d)

Gor

igan

ga H

ydro

Po

wer

Ltd

/ G

VK

Per

amba

lur

(SE

Z) L

td/

Ser

egra

ha

Min

es L

td

Cumulative Asset Base of US $5.24 Billion

Cum

ulat

ive

Ass

et B

ase

(US

$ M

n)

Year of Financial Closure

4

GV

K In

dust

ries

Ltd

Phas

e 2

Page 5: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

0

100

200

300

400

500

600

Revenues EBITDA PAT

GVKPIL – Financials FY 2009 (Consolidated)

FINANCIALRESULTS

YEAR ENDED MARCH, 2009

FY 2009 FY 2008 % CHANGE

Revenues 533.97 532.15 0.3%

EBITDA 118.54 170.12 - 30.3 %

PAT 107.56 135.47 -20.6 %

5

Rs.

Cror

es

FY 2008

FY 2009534

532

170119 135108

Page 6: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

0

50

100

150

200

250

300

350

400

Power Road Others

GVKPIL Sector Wise Contribution to ConsolidatedRevenue –FY 2009

6

Power 67%Power 60%Road 26%

Other Income6%

Other Income14%

Rs.

Cror

es

FY 2008

FY 2009

320356

146

7532

FY 2009 FY 2008

137

Road 27%

Page 7: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

TRANSPORTATION VERTICAL

Page 8: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

Mumbai International Airport Ltd

PROJECT OVERVIEW

Estimated Project Cost Rs. 9,800 Crores

Completion Date December 2012

Concession Period 30 + 30 Years

Land 1,976 Acres

Target PAX Capacity 40 Million pa

Target Cargo Capacity 1 Million Tonnes pa

Revenue Sharing 38.7% with AAI

PARTNERS

GVKPIL 37%

South AfricanConsortium 37%

AirportsAuthority ofIndia

26%

HIGHLIGHTS

• OMDA was signed in April 2006 and the airport was handed over to MIAL in May 2006

• Project includes upgrading, modernizing, managing operations, etc of the airport• City side commercial development

• Master Plan for Modernization and Development in place• Non-clearance of encroached land will have no impact on the operational areas of the airport

• Stringent norms to meet international service standards

• Mandatory projects being completed as per schedule

8

Page 9: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

Integrated PassengerTerminal Sahar

SantacruzLow Cost Carriers

+Cargo Complex

(1million tonnes)

CSIA Master Plan

9

Page 10: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL - Key Contracts Awarded

CONTRACT AWARDED TO HIGHLIGHTS

EPC Larsen & Toubro

• Covers the new Integrated Passenger Terminal

(400,000 sq metres) & various airside works

• To be executed by December 2012

• Estimated contract value of Rs. 6,000 Crores

• Strict penalties for missing deadlines

Duty Free Shopping DFS, Singapore

• Awarded on January 10, 2008 for a period of 3 years

• Located within International Terminal 2C

• Spread over 24,541 Sq Ft

Retail Contract Multiple Retailers • At Terminal 1B (domestic & international brands)

Advertisement Rights Times InnovativeMedia Pvt. Ltd.

• For all advertisement locations at CSIA

• Contract for next 3 years

Architectural Design SOM, New York Architects for the Integrated Terminal

Program Management CH2MHill Responsible for review & oversight of the entire project– airside, landside and terminals

10

Page 11: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL – Revenue from Contracts

LICENSES FY 2009 FY 2008 % CHANGE

Oil Throughput 69.91 93.59 -25 %

Food & Beverages 38.39 29.91 28 %

Advertisements 51.81 39.00 33 %

Duty Free 74.59 23.49 218 %

Ground Handling 25.61 16.64 54 %

HIGHLIGHTS

Aviation fuel handled by IOC, BPCL and HPCL

F&B outlets such as Baskin Robbins, Café CoffeeDay, Yo! China, etc

Duty Free Shopping:

• Departure level – 14,585 sq ft

• Arrival level – 8,395 sq ft

• Storage – 1,560 sq ft

11

Figures in Rs. Crores

Page 12: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL - Slum Rehabilitation

Phased Rehabilitation in Line with Airport Development Requirements

PHASE TIME FRAME TARGET

Phase 1 6 - 36 months 158 Acres

1. (i) 6 - 18 months 78 Acres

1. (ii) 18 - 24 months 20 Acres

1. (iii) 24 - 36 months 60 Acres

Phase 2 36 - 48 months 118 Acres

TOTAL Upto 48 months 276 Acres

HIGHLIGHTS

Acreage under encroachment - 276

Estimated: ~ 65,000 hutments, ~ 300,000 inhabitants

Contract signed with HDIL for slum rehabilitation in October,2007

No cash outflow for MIAL

HDIL entitled to development rights over 65 Acres of thecleared encroached land in the 2nd Phase

HDIL rights are contingent on fulfillment of all its obligationsunder the contract with MIAL

12

Page 13: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL – Commercial Real Estate Opportunities

HIGHLIGHTS

20 million Sq Ft of development planned

Master Plan including structure for development to befinalized by December 2009

Estimated timeframe for development – over 10 to 15 yearsbeginning March 2010

Development of a ‘Destination City’ to cater to every possiblerequirement of passengers and visitors

13

Page 14: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL – Operational Highlights

PARTICULARS FY 2009 FY 2008

INTERNATIONAL

Aircraft Movements per Day 180 169

Passenger Movements (Million) 8.12 7.98

DOMESTIC

Aircraft Movements per Day 443 468

Passenger Movements (Million) 15.32 17.88

TOTAL (INT+DOM)

Aircraft Movements per Day 623 637

Passenger Movements (Million) 23.44 25.86

CARGO

Cargo Handled (Metric Tonnes) 530,278 533,588

14

Page 15: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL – Financial Highlights

15

PARTICULARS FY 2009 FY 2008 % CHANGE

RevenueAeronautical 375.29 366.57 3.5 %Non Aeronautical 389.42 314.73 23.7 %Cargo 181.11 173.05 4.7 %Interest & Dividend 9.27 2.48 273.8 %

955.10 856.83 11.5 %

ExpenditureAnnual Fee to AAI 369.62 331.59 11 .5%Operating & Admin Expenses 384.09 307.21 25.0%

753.71 638.80 17.9 %

EBITDA 201.39 218.03 -7.4 %Interest 27.32 19.69 38.8 %Depreciation & Amortization 39.95 25.39 57.3 %

Profit Before Tax 134.12 172.95 -22.5 %Taxes 48.85 62.92 -22.4 %Profit After Tax 85.27 110.03 -22.5 %

Figures in Rs. Crores

Page 16: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL - Integrated Passenger Terminal

* Artist’s Impression

16

Page 17: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

MIAL - Integrated Passenger Terminal

* Artist’s Impression

17

Page 18: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVK Jaipur Expressway Ltd

18

PROJECT OVERVIEW

Location of Project Jaipur-Kishangarh stretchof National Highway – 8

Project Cost Rs. 623 Crores

Grant from NHAI Rs. 211 Crores

D/E Ratio 70:30

Completion Date April 2005

Concession Period 20 Years (from 2003)

Length of Highway 90.385 km

Revenue Sharing40 % with NHAI onadditional revenueearned beyond projection

RESULTS’ HIGHLIGHTS

• Increase in Total Income attributable to:Ø 6.6% growth in Toll RealizationØ 24% increase in Other Income

• 22.5% increase in PAT attributable to:Ø Increase in realization per vehicleØ Increase in Other IncomeØ Reduced Tax Liability due to 80IAbenefits

FINANCIALRESULTS FY 2009 FY 2008 % CHANGE

Gross TollRevenue 145.87 136.86 6.6 %

NHAI Share ofToll 7.65 7.83 -2.3 %

EBIDTA 110.45 110.64 -0.17 %

PAT 53.46 43.64 22.5 %

Figures in Rs. Crores

Page 19: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

ENERGY VERTICAL

Page 20: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVK Industries Ltd – Jegurupadu Phase I

2020

PROJECT OVERVIEW

Capacity 217 MW Mixed Fuel Plant

Commissioning Date 1997

Project Cost Rs.1,025 Crores

D/E Ratio 70:30

PPA Agreement 18 Years with APDISCOM

Debt Fully repaid in July 2007

Tariff Structure Two part tariff with posttax ROE of 16% pa

RESULTS’ HIGHLIGHTS

• 9.6% increase in Total Income attributable tousage of naphtha

• Reduction in profit attributable to:Ø Lower Other Income – GuaranteeCommissionØ Lower depreciation recoveryØ Higher station hear rate

FINANCIALRESULTS FY 2009 FY 2008 % CHANGE

Income 357.90 326.42 9.6 %

EBIDTA 65.35 89.88 -27.29 %

PAT 7.28 29.63 -75.4 %

Figures in Rs. Crores

Page 21: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

21

GVK Industries Ltd – Jegurupadu Phase II

PROJECT OVERVIEW

Capacity 220 MW Dual Fuel Plant

COD 14th April 2009Project Cost Rs. 964 Crores

D/E Ratio

Original project cost ofRs. 723 Crores was 100%debt financed; balancewas funded by internalaccruals from JP1

PPA Agreement 15 Years with APDISCOM

Merchant Sale 20% power to be sold onmerchant basis

GAS SUPPLY HIGHLIGHTS

• Gas Supply Agreement with GAIL for gas and for RLNG (till May 2009)

• GSA with RIL for gas till March 2014

• RLNG received from 14th April 2009• RIL gas received from 24th April 2009

• RIL gas price approx $ 5.2 / million BTU (Rs 1.90 per unit - a pass through)

Page 22: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

22

Gautami Power Ltd

PROJECT OVERVIEW

Capacity 464 MW Dual Fuel Plant

Commissioning Date End of May 2009

Project Cost Rs. 1,935 Crores

D/E Ratio 70 : 30

PPA Agreement15 Years with APDISCOMfor 80% of installedcapacity

Merchant Sale 20% power to be sold onmerchant basis

GAS SUPPLY HIGHLIGHTS

• Gas Supply Agreement with GAIL for gas and for RLNG (till May2009)

• GSA with RIL for gas till March 2014

• RIL gas price approx $ 5.2 / million BTU (Rs 1.90 per unit - a passthrough)

HIGHLIGHTS

• Plant under commissioning by ALSTOM (EPCcontractor)

• GT1, GT2, steam turbine, generatorssynchronized with AP grid

• Performance Acceptance Test & Reliability Runexpected by May 2009

Page 23: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

23

Alaknanda Hydro Power Ltd

PROJECT OVERVIEW

Capacity 330 MW

Commissioning Date July 2011

Approved ProjectCost Rs. 2,698 Crores

D/E Ratio 80 : 20

PPA Agreement 30 + 20 Years with UPPCL

Tariff Structure2 part tariff with assuredpost tax ROE of 14% +incentives

CONTRACTS AWARDED

• VERTEX – Civil works contract

• BHEL – Electro-Mechanical works

• Precision Engineers – Hydro-Mechanical works

• SMEC – Detailed Engineering Consultants

• L&T – Formwork & Reinforcement

HIGHLIGHTS

• Financial closure achieved in Aug 2007

• 12% of output to be given free to Uttarakhandstate

• Project being evaluated for carbon credits

• 30.38 Ha of free hold land & 90.92 Ha of Govtland acquired

• Substantial progress made in power house,fore bay, dam, de-silting basin & power channel

Page 24: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

24

GVK Power Goindwal Sahib Ltd

PROJECT OVERVIEW

Capacity 540 MW

Commissioning Date April 2012

Approved ProjectCost Rs. 2,988 Crores

D/E Ratio 80 : 20 (Expected)

PPA Agreement 25 Years with PSEB

Tariff Structure2 part tariff with assuredpost tax ROE of 14% +incentives

HIGHLIGHTS

• 1,067 acres of land acquired & ground breaking ceremony performed by Hon’ble Chief Minister of Punjab

• Environmental Clearance obtained from Ministry of Environment & Forests & Punjab Pollution Board

• BTG contract awarded to BHEL and BOP contract awarded to Punj Lloyd

• Mandate for syndication of debt given to IDBI Bank Ltd

• Coal to be sourced from captive mines (Tokisud & Seregraha) in Jharkhand

• Financial closure expected by Q2 of FY 2010

Page 25: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

25

Goriganga Hydro Power Ltd

PROJECT OVERVIEW

Capacity

200 MW – Mapang-Bogudiyar170 MW – Bogudiyar-Sirkaribhyol

Commissioning Date 2014Estimated ProjectCost Rs. 2,275 Crores

D/E Ratio 80 : 20 (Expected)

Type of Project Run of the River HydroPower Project

Power Off-take Merchant Power

HIGHLIGHTS

• Letter of Award issued to WAPCOS for preparation of DPR, submission expected in June 2009

• Letter of Award issued to EQMS for preparation of EIA, expected in July 2009

• Project to be constructed at approximately 7,500 to 9,500 feet above Mean Sea Level

• Approach road being built with Border Roads Organization

• 12% of output to be given free to Uttarakhand state

Page 26: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

26

GVK Coal (Tokisud) Ltd

PROJECT OVERVIEW

Mineable Reserves 52 million tonnes

Commissioning Date April 2010 (Expected)

Location Hazaribagh, Jharkhand

Estimated ProjectCost Rs. 280 Crores

D/E Ratio 80 : 20

Coal SupplyAgreement

Supply 2 million tonnesper annum to GoindwalSahib plant

HIGHLIGHTS

• Mine Plan approved by Ministry of Coal

• Environmental Clearance granted by Ministry of Environment & Forests in Sept 2008

• Grant of Mine Lease approved by Govt. of Jharkhand in Jan 2009

• Entire 926 acres acquired for compensatory afforestation and 20 acres of non forest land acquired for proposed railwaysiding

• LOI for construction of bridge on Damodar river issued

Page 27: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

27

Seregraha Mines Ltd

PROJECT OVERVIEW

Mineable Reserves 68 million tonnes(GVKPIL’s share)

Commissioning Date April 2013 (Expected)

Location Latehar, Jharkhand

Estimated ProjectCost

Rs. 232 Crores(GVKPIL’s share)

D/E Ratio 80 : 20

Coal SupplyAgreement

Supply 1 mil tonnes perannum to Goindwal SahibThermal Power Plant

HIGHLIGHTS

• Jointly allocated with Arcelor-Mittal

• GVKPIL’s share of the mineable reserves is 45%

• Prospecting License has been applied for

Page 28: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

URBAN INFRASTRUCTURE VERTICAL

Page 29: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

29

GVK Perambalur (SEZ) Private Ltd

PROJECT OVERVIEW

Size of SEZ 3,184 acres

Commissioning Date July 2012 (Expected)

Location Perambalur district inTamil Nadu

Project Cost Rs. 850 Crores(Estimated)

Targeted Industries Auto ancillaries, leather,textiles, etc

Technical Consultants Mahindra ConsultingEngineers Ltd.

HIGHLIGHTS• BOA has granted the formal approval in December, 2008

• Government land alienation in the name of TIDCO is in progress

• SENSES Consultants retained for environmental studies & obtaining clearance from Ministry of Environment & Forests

• 2,882 acres of land acquired

• Contour & topography studies completed by Apex Topomappers Pvt. Ltd.

• 40 MLD water supply from Kollidam river sanctioned by TWAD Board

Page 30: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

THE ROAD AHEAD

Page 31: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVK – The Road Ahead

3131

• MIDC Bhadrawati 1,200 MW Power Project – Prequalified with YTL

• DB Power 1,200 MW Thermal Plant – Due Diligence going on

• 690 MW Hydro Project in J&K – RFQ submitted

• Submitted EOI to Coal India Ltd in JV with Singareni Coallieries Co. Ltd. for 200 milliontonnes Hindegir coal block in Jharkand

• Venturing into large coal mine development & operations including coal logistics, coalwashing and generation of power from washery rejects

• Exploring opportunities in Oil & Gas Sector

• Developing 7 deepwater blocks awarded in NELP - Round VII

• Partnered with BHP-Billiton, the world’s largest diversified resources company

POWER

MINING

OIL & GAS

Page 32: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVK – The Road Ahead (contd.)

3232

• Right of First Refusal for the greenfield airport in Navi Mumbai, India

• Preparing for upcoming bids – India, Europe, Latin America, UK

• Scouting for investment opportunities in existing international airports with attractivetraffic profile & strong economic prospects

• Submitted RFQs for 8 road projects

• Preparing to bid for MSRDC project – Tolling projects for Mumbai entry roads

• New Delhi Railway Station – Submitted RFQ

• Bangalore Airport High Speed Rail Link – Preparing to submit RFQ

AIRPORTS

ROADS

METRO RAIL

Page 33: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVK – The Road Ahead (contd.)

3333

• Tie-up with GE to explore possibilities in water management across India

• Shortlisted for ONGC-Dahej water treatment & supply

• Preparing to bid for desalination project in Kutch

WATER TREATMENT

• EOI submitted to CIDCO for Kharghar Theme Development

• Developing a ‘Destination City’ around the Mumbai Airport with amenities to cater topassengers and visitors. For instance:

Ø Hotels including convention & business centres

Ø Banking and ATMs

REAL ESTATE

• MoU signed with Gujarat government for developing one greenfield port

• MoU signed with Gujarat government for mechanization of Okha port

• Preparing to bid for container development terminal at JNPT port

• Submitted RFQ for container terminal development Chennai port

PORTS

Page 34: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

GVKPIL - A Compelling Investment

34

KEY STRENGTHS

PROVEN TRACK RECORD• Consistent dividend paying track records

• Diversified asset base

• Recipient of numerous international awards forperformance, pollution control & efficient businesspractices

FINANCIAL PERFORMANCE• Zero debt in GVKPIL

• Superior returns on capital employed

• Diversified revenue base

• Resource mobilization capability

MANAGEMENT• Abundant experience at developing, building &operating diverse infrastructure projects

• Ability to take on & successfully execute complexprojects

• In-House talent nurtured to take on leadership rolesin new projects

• Scalability in challenging timelines

CURRENT INITIATIVES• Foraying into Non-Conventional Energy

• Pursuing inorganic growth avenues

• Exploring sound business opportunitiesinternationally

Page 35: GVK Power & Infrastructure Limited Meet/132708_20090501.pdf · PROJECT OVERVIEW Estimated Project Cost Rs. 9,800 Crores Completion Date December 2012 Concession Period 30 + 30 Years

THANK YOU

For further information, please contactIssac A George – Director & Chief Financial Officer