gwynne shotwell january 13, 2009
DESCRIPTION
SpaceX Dragon A Flexible Platform for Space . Gwynne Shotwell January 13, 2009. Bringing Manufacturing Back to the US: 21 st Century Rocket Factory. SpaceX Falcon Family of Vehicles. Falcon 1. Falcon 9. Dragon. NASA COTS Capability A-C. SpaceX started COTS work Sept 1, 2006 - PowerPoint PPT PresentationTRANSCRIPT
Gwynne ShotwellJanuary 13, 2009
2
Space Exploration Technologi
es Corporatio
nSpacex.co
m
Bringing Manufacturing Back to the US: 21st Century Rocket Factory
Falcon 1 Falcon 9 Dragon
Space Exploration Technologies Corporation 3
NASA COTS Capability A-C
SpaceX started COTS work Sept 1, 2006 Completed COTS Space Act Agreement (SAA)
Milestones: Sep. ‘06: Project Management Plan Review
Nov. ‘06: Demo 1 System Requirements ReviewFeb. ‘07: Demo 1 Preliminary Design ReviewMar. ‘07: Financing Round 1Mar. ’07: Demo 2 System Requirements ReviewAug. ‘07: Demo 1 Critical Design Review
Oct. ’07: Demo 3 System Requirements ReviewDec. ’07: Demo 2 Preliminary Design ReviewMar. ’08: Draco Initial Hot-Fire
Mar. ’08: Financing Round 2Jun. ’08: Demo 3 Preliminary Design ReviewAug. ’08: 15 second 9-engine testJan. ’09: Critical Design Review
SpaceX DragonLabFast Track to Flight
04/22/23 5
Launch ManifestCustomer Target Date Vehicle Launch Site Falcon 1 Flight 4 Sept. 28, 2008* Falcon 1 KwajaleinFalcon 9 Maiden Flight 2009 Falcon 9 Cape Canaveral ATSB (Malaysia) 2009 Falcon 1 Kwajalein NASA COTS – Demo 1 2009 F9/Dragon Cape Canaveral Avanti Communications (UK) 2009 Falcon 9 Cape Canaveral NASA COTS – Demo 2 2010 F9/Dragon Cape Canaveral SpaceDev 2010 Falcon 1 Kwajalein NASA COTS – Demo 3 2010 F9/Dragon Cape Canaveral MDA Corp. (Canada) 2010 Falcon 1 Kwajalein Swedish Space Corp. (Sweden) 2010 Falcon 1 Kwajalein DragonLab Mission 1 2010 F9/Dragon Cape CanaveralMDA Corp. (Canada) 2010 Falcon 9 Cape Canaveral NASA Resupply to ISS – Flight 1 2010 F9/Dragon Cape Canaveral Bigelow Aerospace 2011 Falcon 9 Cape Canaveral DragonLab Mission 2 2011 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 2 2011 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 3 2012 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 4 2012 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 5 2013 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 6 2013 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 7 2013 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 8 2014 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 9 2014 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 10 2014 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 11 2015 F9/Dragon Cape CanaveralNASA Resupply to ISS – Flt 12 2015 F9/Dragon Cape Canaveral
6* Actual launch date
7 Spacex.com
Preliminary Design ReviewDemo-C3 Mission
The Dawn of a New Era in Space