h i g h s t r e e t zone mzone rfr-80
TRANSCRIPT
ZONE RFR-80
ZONE R-1
ZONE RFR-80ZONE M
90
92
82
9010
0
S 79°01'54" W
607.37'-C 608'm/l-D
S 40°
22'01
" W
159.8
0'-C 5
9.96'
[sic]-
D
S 55°54'39" W
157.93' [IR-IP
]
N 43°18'39" W
76.40'-C 159.71'-Total
607.46-D
159.9
6'-D
300
200
S 79°41'36" E63.15' N 80°25'44" E
23.96'
N 67°40'09" E
222.96'-C [DH-DH] 223.62'-P6B
N 39°07'03" W
83.31'-C 162'm/l-D
N 0
1°07
'30"
E42
1.18
'-C 4
21.0
8'-P
6D 4
17.6
9'±-
D
63.03'-P6B 23.22'-P6B
H i g h S t r e e t
Limits of Existing Pvmnt
Limits of Existing Pvmnt
RFC IR Exist@ Gr.
1" IP Exist@ 7" BG
RFC IR Exist@ Gr.
RFC IR Exist@ Gr.
5/8" IR Exist@ Gr.
DH Exist@ Gr.
DH Exist@ 14" AG5/8" IR Exist
@ Gr.
DH Set 11/29/17@ 10" AG
Reasonable SearchNo DH Recovered
NOTE: This line is alsoidentified as being the CT-RIState Line. Not verified bySurveyor of Record.
RIHB Exist
Plat No. 70Sheet 2[East Side of High Street Only]
N 39°38'35" W
178.44'
S 55°40'21" W
78.66'
S 67°05'37" W228.75'
N 65°12'31" E29.28'
N 66°02'03" E215.08'
159.00' [IR-Corner]
159' m/l -
Deed
5/8" IR w/CapSet 1" AG 05-22-2018
Reasonable SearchNo IP/DH Recovered
Existing Access D
riveThis line differentiates the LiDar data from the onsite topographic data
Existing Material PileAt Time of Observations
Existing Material PileAt Time of Observations
Existing Material PileAt Time of Observations
Existing Material PileAt Time of Observations
Existing Material PileAt Time of Observations
5/8" IR w/CapSet @ Gr. at End Wall
1" IP Exist@ 6" BG [HELD for Line]
(Width Varies)
Ground Cover: Extraction Operation
Ground Cover: Specimen Vegetation w/Moderate Understory
Ground Cover: Specimen Vegetation w/Moderate Understory
Ground Cover: Specimen Vegetation w/Moderate Understory
Ground Cover: Extraction Operation
Ground Cover: Extraction Operation
Limits of Existing Pvmnt
Approx. Moveable Outbuilding
Approx. Gate Posts (typ)
Approx. Gate
26'±
4.3'±
(32sf,m/l. Approx. 8' height)
Pole 8
Pole 9
Pole 10
Observed EncroachmentArea 3128sf, m/l
NE WILDFLOWER SEED MIX;TYPICAL
TP1
TP1
CS3
AR3
IO3
SL11
PO5
SL6
RM8
VDC5
PO3
SL3
CS3
PO3
PS3
HF18
HF18
HF36
QB1
NS3
FG3
QB1
HF18
IG12
SC12
GS1
GS1
PROPOSED DECIDUOUS TREE | SHRUB
PROPOSED EVERGREEN TREE | SHRUB
TREE TAG
SHRUB TAG
PERENNIAL TAG
LEGEND
1GS
NEW ENGLAND WILDFLOWER SEED MIX
PROPERTY LINE
LIMIT OF DISTURBANCE (LOD)
ZONING SETBACK
KEY BOTANICAL NAME COMMON NAME SIZE ROOT
DECIDUOUS TREESNOTESQTY
AR3 (N)ACER RUBRUM 'RED SUNSET' RED SUNSET RED MAPLE
SHRUBS - DECIDUOUS AND EVERGREENCS CORNUS SERICEA 'ARTIC FIRE' ARTIC FIRE RED-OSIER DOGWOOD 6' O.C. (N)18"-24" HT.6
PLANT SCHEDULE - SHEET L3.01
#3 CONT.
BALL & BURLAP
TURF
EVERGREEN TREES
2"- 2.5" CAL. 30' O.C.
TP 6'-7' HT.GREEN GIANT WESTERN ARBORVITAE 15' O.C.THUJA PLICATA 'GREEN GIANT' (N)2 B&B
IO 6'-7' HT.OLD HEAVY BERRY AMERICAN HOLLY 15' O.C.ILEX OPACA 'OLD HEAVY BERRY' (N)3 B&B
ILEX GLABRA 'COMPACTA'IG COMPACT INKBERRY 5' O.C.18"-24" HT. (N)12 #3 CONT.
SC SAMBUCUS CANADENSIS ELDERBERRY 8' O.C. (N)18"-24" HT. #3 CONT.12
PO PHYSOCARPUS OPULIFOLIUS 'DIABLO' PURPLELEAF NINEBARK 6' O.C. (N)11 #5 CONT.24"-30" HT.
O.C. = ON-CENTER SPACING(N) = NATIVE SPECIESNOTE: AMENDMENT TO PLANS GRANTED DEVELOPMENT
PLAN REVIEW APPROVAL ON FEBRUARY 7, 2018 AND BUILDING PERMIT APPROVAL ON JULY 2, 2019.
PERENNIALSHF HEMEROCALLIS FLUVA ORANGE DAYLILIES 18" O.C.#1 CONT.90 NA
PS 7'-8' HT.WHITE PINE 15' O.C.PINUS STROBUS (N)3 B&B
(N)NE WETLAND PLANTS, INC., MA; 413.548.8000NEW ENGLAND SHOWY WILDFLOWER MIX
MIX INCLUDES; LITTLE BLUESTEM; PARTRIDGE PEA; INDIAN GRASS;RED FESCUE; CANADA WILD RYE; RIVERBANK WILD RYE; OX EYESUNFLOWER; LANCE LEAVED COREOPSIS; BLACK EYED SUSAN;SPIKED GAYFEATHER/MARSH BLAZING STAR; COMMON MILKWEED;NEW YORK IRONWEED; NEW ENGLAND ASTER; PURPLE JOE PYEWEED; BUTTERFLY MILKWEED; EARLY GOLDENROD; BONESET (2020MIX)
APPLICATION RATE 23 LBS/ ACRESF5,540
FG3 (N)FAGUS GRANDIFOLIA AMERICAN BEECH WHIP7'-10' HT.NS3 (N)NYSSA SYLVATICA BLACK TUPELO 7'-10' HT.QB2 (N)QUERCUS BICOLOR SWAMP WHITE OAK 7'-10' HT.
WHIP
WHIP
VDC VIBURNUM DENTATUM 'CHRISTOM' BLUE MUFFIN ARROWWOOD VIBURNUM 6' O.C. (N)30"-36" HT. #7 CONT.5SL SPIRAEA LATIFOLIA MEADOWSWEET 5' O.C. (N)18"-24" HT.20 #3 CONT.
RHODODENDRON MAXIMUMRM ROSEBAY RHODODENDRON 8' O.C.2'-3' HT. (N)8 B&B
1. All planting soils shall be (1) part topsoil,(1) part composted organic matter, (1) partnative soil mixed prior to planting installation.2. The Contractor shall confirm the actualdepth of all planting areas prior to any plantmaterial being secured. Report any ledge orsubstandard soil/subsurface conditions tothe Owner's Representative.3. The Contractor shall consider thedisplacement of planting soil from the plantmaterial root balls in the overall planting bedfinished grade. Allow enough room in theplanting bed elevation to spread displacedsoil and still meet the indicated finishedgrade including the 2" of hardwood mulch.4. Any materials accumulated over the rootflare of a tree or shrub must be removedcompletely until the root flare is exposed andall girdling roots removed prior to planting.5. The Contractor shall locate and verify withthe Owner's Representative all trees,shrubs, perennials, and/or groundcover toremain, to be removed, or to betransplanted. Protect in place all existingtrees, shrubs, and groundcover to remain.6. All new planting material shall conform tominimum guidelines established by theAmerican Standard for Nursery Stockpublished by the American Association ofNurserymen, Inc. (AAN). In addition, all newplant material for the project shall be ofspecimen quality and the plant height shallbe measured from the root flare, not thebottom of pot or burlap ball.7. In the event that quantity discrepancies ormaterial omissions occur between the plantmaterials list and the drawings, the highernumber of plants shall govern. TheContractor shall report discrepancies to theOwner's Representative.8. Any proposed substitutions of plantspecies shall be made with plants ofequivalent overall form, height, branchinghabit, flower leaf, fruit, color, and culture andmust be approved by the Owner'sRepresentative.9. All lawn areas disturbed by constructionoperations inside and outside the Limit ofWork shall be loamed and seeded.
L3.01
SCREENINGPLANTING
1" = 40'-0"
0 20' 40' 80'
GRAPHIC SCALEIN FEET
ãte
rrain
k In
corp
orat
ed
21010
No. Date Comment
NORTH
Notes:
Sheet Number:
Sheet Title:
Project Title:
Date:
Scale:
Project #:
23 JULY 2021
Drawn By:
Checked By: JC | KACKA
Bar Scale:
landscape architecture +planning7 Central St . Arlington . MA 02476telephone: 781.316.1595
ink
7/21
/202
1 5:
17:0
7 PM
- P:
\210
10_E
SS_H
IGH
STR
EET
SOLA
R\C
AD\0
3_PL
_TI2
1010
.DW
G -
KELL
Y HIGH STREET SOLAR95 HIGH STREETHOPKINTON, RI
AMENDMENT TO AN APPROVED PLAN
12" M
IN.
GROUNDCOVER2" BARK MULCH
PLANTING SOIL MIX
FREE DRAININGUNDISTURBED ORCOMPACTED SUBGRADE
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I.DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
NOTES:1. ALL DISTURBED AREAS SHALL BE LOAMED AND SEEDED UNLESS
NOTED OTHERWISE.2. SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I.
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
4"
SEEDED LAWNPLANTING SOIL MIX;ROLLED THICKNESS
FREE DRAININGUNDISTURBED SUBGRADEOR COMPACTED LOAM FILL
EQ.EQ.
D
3XD
2"1'
-0"
BULBS TO BE SPACED INCLUSTERS OF 3, 5, 7 ASDIRECTED BY LANDSCAPEARCHITECT.BOTTOM OF BULBS TO BEPLANTED 3X THE DIAMETER(D) OF THE BULB BELOWTOP OF MULCH UNLESSOTHERWISE NOTED.
2" BARK MULCH
PLANTING SOIL MIX
FREE DRAININGUNDISTURBED ORCOMPACTED SUBGRADE
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I.DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
EQ.EQ.
EQ.
EQ.
PERENNIAL ANDGROUNDCOVERMATERIALS
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I.DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
12" D
EEP
PLACE SHRUBSPERPENDICULAR TO GRADE
PULL BARK MULCH AWAYFROM BASE OF SHRUB2" BARK MULCH
PLANTING SOIL MIXTHROUGHOUT WHOLEPLANTING AREA
PLACE ROOT BALL ONCOMPACTED SUBGRADE
FREE DRAINING UNDISTURBEDSUBGRADE OR COMPACTEDLOAM FILL
REMOVE BURLAP OR ROPE FROMTOP 1/3 OF BALL. CUT REMAININGPORTIONS OF ROPE AND REMOVEWIRE BASKET OR GROWINGCONTAINER COMPLETE, TYPICAL
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I. DEPARTMENT OFTRANSPORTATION STANDARD SPECIFICATIONS
HEDGE SHRUBS TO BE SPACED TOFORM CONTINUOUS HEDGE AT TIMEOF PLANTING. PRUNE CROSSED ANDRUBBING BRANCHES ONLY ASDIRECTED BY OWNER OR LANDSCAPEARCHITECT. SHRUBS TO BE SPACEDAS SPECIFIED ON PLANTING PLAN ANDREVIEWED BY OWNER OR LANDSCAPEARCHITECT PRIOR TO PLANTING.CROWN OF ROOT BALL TO BE SETFLUSH WITH FINISHED GRADE
SEE PLAN FORSPACING,TYP.
12" D
EEP
2" BARK MULCH
FINISHED GRADE
CONTINUOUS SHRUB PLANTING BED;SCARIFY BOTTOM OF BEDLEAVE UNDISTURBED SUBGRADEBENEATH ROOT BALL
FREE DRAINING UNDISTURBED ORCOMPACTED SUBGRADE
REMOVE BURLAP OR ROPE FROMTOP 1/3 OF BALL. CUT REMAININGPORTIONS OF ROPE AND REMOVEWIRE BASKET OR GROWINGCONTAINER COMPLETE, TYPICAL
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I.DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
2X ROOT BALL DIAMETER
1'-0" MIN.TYP.
1'-0
"
6'-0
" MIN
.
FINISH GRADE
DEP
THO
F BA
LL
4'-0
"
INSTALL TREE PLUMB
DO NOT PRUNE LEADER
ORIENT TREE TO HAVE SIMILARSOLAR ASPECT AS NURSERY ORAS DIRECTED BY LANDSCAPEARCHITECT. TAGS ARE TO BEPLACED ON THE NORTH SIDE ATNURSERYROOT FLARE SHALL BE EXPOSED;CONTRACTOR SHALL REMOVEEXCESS FILL FROM TOP OFTRUNK; ROOT BALL SHALL BEARSAME RELATIONSHIP TO FINISHEDGRADE AS PREVIOUS EXISTINGGRADE
PLACE BALL ON SUBGRADE;REMOVE BURLAP, ROPE, OR WIREBASKET FROM TOP 1/3 OF BALL.CUT REMAINING PORTIONS OFROPE OR WIRE BASKET ANDREMOVE COMPLETE AS MUCH ASPOSSIBLE2" BARK MULCHCONTINUOUS PLANT SAUCER ATDRIP LINE OF TREE WITH 3" HIGHSIDES
EXCAVATE HOLE TO DIAMETER 2XWIDER THAN ROOT BALL. PLACEPLANTING SOIL IN 6-8" LIFTS.HAND TAMP AND WATERBETWEEN LIFTS
LEAVE UNDISTURBED SUBGRADEBENEATH ROOT BALL
FREE DRAINING UNDISTURBEDSUBGRADE OR COMPACTED LOAMFILL
2"X2"X10' FIR STAKES; 3 PERTREE EQUALLY SPACEDAROUND ROOT BALL. ALLPOSTS SHALL BE PLUMB ANDHAVE SAME HEIGHT ABOVE GUYWIRE
INSTALL 3 GUYS PER TREE.ATTACH GUYS ABOVE LOWESTBRANCH OF TREE WITHDOUBLE STRAND 12-GAUGEGALVANIZED SOFT STEEL WIRESECURED AT BOTH ENDS W/NON-CORROSIVE CABLECLAMPS
ENCASE GUY WIRE AROUNDTREE IN NEW TWO-PLY, BLACK,REINFORCED RUBBER HOSEPLACED ABOVE LOWESTBRANCHES
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
EQ EQ EQ
1'-0
"
6'-0
" MIN
.
DEP
THO
F BA
LL
4'-0
"
FINISH GRADE
INSTALL TREE PLUMB
ORIENT TREE TO HAVE SIMILAR SOLAR ASPECTAS NURSERY OR AS DIRECTED BY LANDSCAPEARCHITECT. TAGS ARE TO BE PLACED ON THENORTH SIDE AT NURSERY
ROOT FLARE SHALL BE EXPOSED;CONTRACTOR SHALL REMOVE EXCESS FILLFROM TOP OF TRUNK; ROOT BALL SHALL BEARSAME RELATIONSHIP TO FINISHED GRADE ASPREVIOUS EXISTING GRADE; MULCH SHOULDNOT BE WITHIN 4" OF TREE TRUNK; TYPICAL
PLACE BALL ON SUBGRADE; REMOVE BURLAP,ROPE, OR WIRE BASKET FROM TOP 1/3 OF BALL.CUT REMAINING PORTIONS OF ROPE OR WIREBASKET AND REMOVE COMPLETE AS MUCH ASPOSSIBLE
2" BARK MULCHCONTINUOUS PLANT SAUCER ATDRIP LINE OF TREE WITH 3" HIGHSIDES
EXCAVATE HOLE TO DIAMETER 3XWIDER THAN ROOT BALL. PLACEPLANTING SOIL IN 6-8" LIFTS. HANDTAMP AND WATER BETWEEN LIFTS
LEAVE UNDISTURBEDSUBGRADE BENEATH ROOTBALL; FREE DRAININGUNDISTURBED SUBGRADEOR COMPACTED LOAM FILL
2"X2"X10' CEDAR STAKES; 3 PERTREE EQUALLY SPACED
AROUND ROOT BALL. ALLPOSTS SHALL BE PLUMB AND
HAVE SAME HEIGHT ABOVEARBORTIE
INSTALL TREE TRUNKPROTECTION GUARD AND SLOW
RELEASE WATERING BAGAROUND TREE TRUNK UPON
PLANTING
INSTALL ARBORTIE AROUNDCENTRAL LEADER OF TREE;
FOLD ENDS BACK AND SECURETO STAKE WITH 1" GALVANIZED
ROOFING NAIL
NOTE:SHALL BE IN ACCORDANCE WITH SECTION L.06 OF THE R.I. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
Please refer to full Rhode Island; DOT;Standard Specifications for Road and BridgeConstruction; 2004 Edition; Amended March2018 as supplemented; "BLUE BOOK" forinformation on PART L; LANDSCAPINGSections:L.01 LOAM, PLANTABLE SOIL OR HIGHORGANIC SOILL.02 SEEDING.
Excerpts from RI DOT "BLUE BOOK":L.02.03 SEEDING DATES. Full advantageshall be taken of time and weatherconditions best suited for seeding. Thenormal dates shall be as follows:Type 6. Plantable Soil area, either flats orslopes seeded with a Wildflower Seed Mix.Type 6 seeding dates shall be as follows:Spring Seeding: April 1 to May 1Fall Seeding: September 1 to September 30
L.07.03.2 WATERING. Watering of all plantmaterial shall be performed once every twoweeks for a total of thirteen (13) times duringeach contract year from June 1 throughOctober 31. Wildflower areas shall bewatered once a month during each contractyear from June 1 through October 31 for atotal of five (5) waterings. At each watering,the soil around each plant shall bethoroughly saturated.
The following is a general guide for minimumwatering requirements:1. Trees: 2 1/2" caliper and less - Fifteen(15) gallons each.3" to 5" caliper - Twenty (20) gallons each.
2. Shrubs: 24" and less - Six (6) gallonseach.More than 24" - Ten (10) gallons each.
3. Vines, Perennials, Ornamental Grasses -Three (3) gallons each.
4. Bulbs and Ground Covers - Two (2)gallons per square foot.
5. Wildflower Areas - One (1) gallon persquare foot.
L4.01AS SHOWN
DETAILS -PLANTING
HERBACEOUS MATERIALS SPACING CHARTSCALE: N.T.S.1 WILDFLOWER SEED MIX
SCALE: N.T.S.
BULB PLANTING
SCALE: N.T.S. PLAN | SECTION
SHRUB PLANTINGSCALE: N.T.S.
HEDGE PLANTINGSCALE: N.T.S.
DECIDUOUS TREE PLANTINGSCALE: N.T.S.
EVERGREEN TREE PLANTINGSCALE: N.T.S.
PERENNIAL PLANTING
SCALE: N.T.S. SECTION
2
36
5
4
7
8
SECTION
SECTION
SECTION
SECTIONSECTION
SECTION
ãte
rrain
k In
corp
orat
ed
21010
No. Date Comment
Notes:
Sheet Number:
Sheet Title:
Project Title:
Date:
Scale:
Project #:
23 JULY 2021
Drawn By:
Checked By: JC | KACKA
Bar Scale:
landscape architecture +planning7 Central St . Arlington . MA 02476telephone: 781.316.1595
ink
7/21
/202
1 4:
59:1
2 PM
- P:
\210
10_E
SS_H
IGH
STR
EET
SOLA
R\C
AD\0
4_D
ETAI
LS_P
LT_T
I210
10.D
WG
- KE
LLY
HIGH STREET SOLAR95 HIGH STREETHOPKINTON, RI
AMENDMENT TO AN APPROVED PLAN