hāna harbor pier improvement environmental assessment
TRANSCRIPT
![Page 1: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/1.jpg)
1
Hāna Harbor Pier Improvement Environmental Assessment
Public Meeting October 28, 2014 | Helene Hall | Hāna, Maui
![Page 2: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/2.jpg)
2
1. Meeting purpose
2. Project update
3. Clarify commercial use of the pier
4. Alternatives (rebuild, demolish)
5. Pier access, Wave attenuation project (DLNR DOBOR)
6. Q&A
Agenda
10/28/14
![Page 3: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/3.jpg)
3
Meeting Purpose
Update the community on the status of the project
Provide clarification on commercial use of the pier
Identify potential impacts that should be studied in the EA
10/28/14
![Page 4: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/4.jpg)
4
Project Update
Funding
Contract amendment
Internal consensus on purpose and need, & commercial use of the pier
10/28/2014
![Page 5: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/5.jpg)
5
As identified in the development plan: To provide an operational pier in times of emergency. To provide an improved pier for local & commercial fishermen. To provide an operational pier for the present and future community of Hāna.
Purpose and Need
10/28/2014
![Page 6: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/6.jpg)
6
DOT-Harbors Mission
10/28/2014
The mission of the Harbors Division is to effectively manage and operate a statewide commercial harbors system that facilitates the efficient movement of commercial cargo, passenger and fishing vessels entering, leaving, or travelling within the State, and facilities and supporting services for loading, off-loading, and handling of cargo, passengers, and vessels. – HRS 266-1
![Page 7: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/7.jpg)
7
Allowed uses Emergency calls – Emergency supplies, building
materials
Cargo – exporting produce, importing building materials, fuel
Passenger - ferry service
Cruise - smaller scale cruise operations
Commercial Fishing
![Page 8: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/8.jpg)
8
Limitations
10/28/2014
Remote location
Rough conditions
Lack of landside infrastructure
Design – Height of the pier deck would prohibit smaller vessels from berthing
Labor, security, staff (i.e. stevedores)
![Page 9: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/9.jpg)
9
Alternatives
10/28/2014
Under current administrative rules & under DOT-Harbors’ mission, commercial activity cannot be excluded, but can be limited by rules.
Moving forward:
Improve the pier under commercial jurisdiction, allowing for commercial use as appropriate
Demolish
![Page 10: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/10.jpg)
10
Boat Ramp and Wharf Improvements
10/28/2014
•Boat ramp concrete slab replacement; •New aluminum cantilevered loading dock; • Demolition of the first two (2) sections of the Hāna Wharf; •Installation of boulder revetment (wave buffer).
Phase II Project Status: •Bids opened on June 12, 2014; •Project awarded on July 25, 2014 to American Marine Corporation; •Negotiated contract amount: $1,203,900; •Contract signed by Chairperson on October 22, 2014.
![Page 11: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/11.jpg)
11
Tentative EA Schedule
Community Meeting #1 Summer 2013
EA Early Consultation/Scoping Summer 2013 -2014
Community Meeting #2 Fall 2014
Draft EA Preparation Early 2015
Draft EA Public Review Mid 2015
Community Meeting #3 Mid 2015
Final EA Publication Late 2015
10/28/2014
![Page 12: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/12.jpg)
12
DOT-Harbors Planning Office Sandra Rossetter, Project Manager 79 Nimitz Highway Honolulu, HI 96813 (808) 587-1886 email: [email protected]
Helber Hastert & Fee Scott Ezer or Gail Renard 733 Bishop Street, Suite 2590 Honolulu, HI 96813 (808) 545-2055 Email: [email protected]
Contacts
7/10/13
![Page 13: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/13.jpg)
13
Project Scope
EA Purpose, Process, Scope
Alternatives to evaluate
Primary environmental issues
Marine resources
Culture/Recreation
Historic
Technical Studies
USACE Permit
10/28/2014
![Page 14: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/14.jpg)
14
Conceptual Pier Repair Sections
NEW CONCRETE PILE CAP, PRECAST DECK PLANKS, TOPPING SLAB
7/10/13
![Page 15: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/15.jpg)
15 10/28/2014
Questions?
Q & A
![Page 16: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/16.jpg)
16
Hana (HNM) Airport
Maui, Hawaii
Part 139 Improvements
![Page 17: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/17.jpg)
17
Hana (HNM) Airport
![Page 18: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/18.jpg)
18
New HNM ARFF Station
![Page 19: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/19.jpg)
19
RUNWAY 26
![Page 20: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/20.jpg)
20
RUNWAY 8
![Page 21: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/21.jpg)
21
Questions?
![Page 22: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/22.jpg)
22
State of Hawaii Department of Transportation Hana Community Meeting
Highways Division Presentation October 28, 2014
![Page 23: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/23.jpg)
23
![Page 24: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/24.jpg)
24
Hana Highway Emergency Slope Stabilization Milepost 10.4, 14 and 16
SCOPE Install anchored wired mesh system on eroded mauka and makai slopes. COST $ 8.2M SCHEDULE Completed: March 2014
![Page 25: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/25.jpg)
25
Hana Highway Improvements Uakea Road to Keawa Place
SCOPE Accommodate two way traffic; provide pedestrian path to address safety concerns for pedestrians along Hana Highway from Paaini Mai Park COST: $1.5 M SCHEDULE Completed: September 2014
![Page 26: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/26.jpg)
26
Hana Highway Resurfacing Vicinity of Waikani Bridge to Kapaula Bridge
SCOPE Resurface existing road, new pavement markings & signing, guardrails, gutter, repair cracks & spalls on bridges, clean existing drainage culverts. COST: $2.5M SCHEDULE Construction Start: July 2014 Anticipated Completion: End of November 2014
![Page 27: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/27.jpg)
27
Hana Highway Resurfacing Vicinity of Honomanu Bridge to Waikani Bridge
SCOPE Resurface existing road, new pavement markings & signing, guardrails & grated drain inlets, repair cracks & spall on bridges, clean existing drainage culverts. COST: $2.8M SCHEDULE Construction start: August 2014 Anticipated Completion: February 2015
![Page 28: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/28.jpg)
28
Kahului Airport Access Road Vicinity of Puunene Avenue to Hana Highway
SCOPE Construct portion of new access road to Kahului Airport from vicinity of Puunene Ave to Hana Hwy. COST: $21.8M SCHEDULE Anticipated Completion: March 2015
![Page 29: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/29.jpg)
29
Hana Highway Improvements (Multiple Phases) Huelo to Hana
PROJECT LIMITS
Site 2 MP 11.2
Site 3 MP 13.0
Site 4 MP 14.7 to 14.9
Site 6 MP 16.3
Site 1 MP 8.1 to 8.2
Site 7 MP 17.7
Site 8 MP 19.0
Site 9 MP 21.5
Site 5 MP 15.7
SCOPE : Reconstruct road sections, slope stabilization, upgrade drainage structures and guardrails. EST. TOTAL COST : $7M SCHEDULE: Phase 2A bids being evaluated. All future areas being programmed in 2016 and 2017.
Phase 2A MP 11.2 to 16.3
![Page 30: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/30.jpg)
30
SCOPE Cold planing, resurface existing pavement, pavement markings & signage, reconstruct weakened pavement areas EST. COST: $6-7M EST. SCHEDULE Advertise: Feb 2015
Paia
Hookipa Park
Haleakala Hwy Intersection
Hana Highway Resurfacing Haleakala Hwy. to Paia; Paia to Hookipa Park
![Page 31: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/31.jpg)
31
SCOPE Develop a historic bridge preservation plan for Hana Highway Bridges, including a prioritized implementation plan based on needs and feasibility. EST. COST: $1.5M SCHEDULE Final Report Estimated Sept. 2015
Hana Highway Historic Bridge Preservation Plan
![Page 32: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/32.jpg)
32
SCOPE Cold planing, resurface existing pavement, pavement markings & signage, reconstruct weakened pavement areas EST. COST: $ 4M EST. SCHEDULE Planned for FY 2016
Mile Post 0
Mile Post 4.5
Hana Highway Resurfacing Milepost 0 to 4.15
![Page 33: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/33.jpg)
33
SCOPE Address rock fall and landslide hazards between • MP 12.06 to MP 12.12 • MP 12.49 to MP 12.57 • MP 12.59 to MP 12.69 EST. COST $ 4M SCHEDULE Construction funding in 2016
Hana Highway Rockfall Mitigation Milepost 12
![Page 34: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/34.jpg)
34
Questions?
![Page 35: Hāna Harbor Pier Improvement Environmental Assessment](https://reader036.vdocuments.net/reader036/viewer/2022062615/62b6895407580f0faf24a3b6/html5/thumbnails/35.jpg)
35
Mahalo for coming
This presentation is available at hidot.hawaii.gov/presentations