haz_form
TRANSCRIPT
-
8/13/2019 haz_form
1/3
-
8/13/2019 haz_form
2/3
-
8/13/2019 haz_form
3/3
Page 3of 3
(vii)Method of disposal (details in brief be given)
(viii)Quantity of waste to be disposed per day
(ix) Nature and composition of waste
(x) Methodology and operational details of landfilling/incineration
(xi) Measures to be taken for prevention and control of environmental pollution including
treatment of leachate
(xii) Investment on Project and expected returns
(xiii) Measures to be taken for safety of workers working in the plant
Place : Signature : .
Date : Designation :