health facilities planning seminar

19
Health Facilities Planning Seminar Plan Review Division Irvin J. Poke, AIA, Chief Todd Y. Cordill, NCARB, Assistant Chief Providing for Michigan’s Safety in the Built Environment

Upload: cameron-rush

Post on 02-Jan-2016

28 views

Category:

Documents


1 download

DESCRIPTION

Health Facilities Planning Seminar. Plan Review Division Irvin J. Poke, AIA, Chief Todd Y. Cordill, NCARB, Assistant Chief. Providing for Michigan’s Safety in the Built Environment. Federal Register. Adopted the 2000-edition of the Life Safety Code (LSC), NFPA 101. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Health Facilities Planning Seminar

Health Facilities Planning Seminar

Plan Review Division

Irvin J. Poke, AIA, Chief

Todd Y. Cordill, NCARB, Assistant Chief

Providing for Michigan’s Safety in the Built Environment

Page 2: Health Facilities Planning Seminar

Federal Register

Adopted the 2000-edition of the Life Safety Code (LSC), NFPA 101.No “grandfather clauses”; eliminates references to all earlier editions.Effective Date: March 11, 2003Compliance Date: September 11, 2003All Medicare & Medicaid participating facilities become 2000-existing, (Chapter19).

Page 3: Health Facilities Planning Seminar

Roller Latches

The Federal Register has not adopted 19.3.6.3.2 Exception 2, “Existing roller latches demonstrated to keep the door closed against a force of 5 lbf shall be permitted to be kept in service.” CMS is giving a 3-year phase in period for this

requirement.

2001 Health Care Facilities Fire Safety Rules does not allow roller latches, so this requirement should already be met by Michigan facilities.

Page 4: Health Facilities Planning Seminar

Emergency Lighting

2000 LSC, 7.9.2.1, requires 1½ hours capacity. CMS is giving a 3-year phase in period

for this requirement.

1997 LSC requires 1½ hours, so this requirement should already be met by Michigan facilities.

Page 5: Health Facilities Planning Seminar

Protection of Vertical Openings

2001 Health Care Facilities Fire Safety Rules only require ½-hour separation for existing.

2000 LSC, 19.3.1.1, requires 1-hour separation for existing.

Page 6: Health Facilities Planning Seminar

What is a Vertical Opening ?

An opening through a floor, ceiling or roof Stairways Trash Chutes Linen Chutes Elevators Dumbwaiters Mechanical Shafts

Page 7: Health Facilities Planning Seminar

What effect does the 2000 Life Safety Code have?

Many requirements of the 2000 LSC are also requirements in the 1997 LSC. In many instances, facilities should already be in compliance with certain requirements. In some areas the 2001 Health Care Facilities Fire Safety Rules (that adopts the 1997 LSC) may be more restrictive than the 2000 LSC. To maintain their state license facilities will be required to meet the 2001 Health Care Facilities Fire Safety Rules.

Page 8: Health Facilities Planning Seminar

Door Locking

2000 LSC, 18/19.2.2.2.4, Exception 1“Door-locking arrangements without delayed egress shall be permitted in health care occupancies, or portions of health care occupancies, where the clinical needs of the patients require specialized security measures for their safety, provided that staff can readily unlock such doors at all times.”

Page 9: Health Facilities Planning Seminar

Report Incidents

2001 Health Care Facilities Fire Safety RulesR 29.1809 Fire reportingRule 9. After the occurrence of a fire that results in personal injury or loss of life or property, the administrative authority of a health care facility shall immediately notify the local fire department of all details of the fire.

Page 10: Health Facilities Planning Seminar

Report Incidents

Bureau of Construction Codes and Fire Safety

Page 11: Health Facilities Planning Seminar

Fire Watch

9.6.1.8 & 9.7.6.1, Where a required fire alarm system or sprinkler system is out of service for more than 4-hours in a 24-hour period, the AHJ shall be notified and the building shall be evacuated or an approved fire watch shall be provided for all parties left unprotected by the shutdown until the fire alarm or sprinkler system has been returned to service.

Page 12: Health Facilities Planning Seminar

Alcohol-Based Hand Cleaner Dispensers

These dispensers may not be mounted on egress corridor walls.The dispensers may be mounted in rooms or suites of rooms.Storage is prohibited in corridors including medication carts that are not in use.

Page 13: Health Facilities Planning Seminar
Page 14: Health Facilities Planning Seminar
Page 15: Health Facilities Planning Seminar

Where can I find a copy of the 2001 Michigan Health Care Facilities Fire Safety Rules?

www.michigan.gov/bccfs Administrative Rules Fire Safety Administrative Rules Health Care Facilities Fire Safety

R 29.1801  - 29.1861

Page 16: Health Facilities Planning Seminar

Plan Submittal Update

Fire Safety plan review staff are now part of the BCCFS, Plan Review Division.Plan review for fire safety rules continues unchanged.Applications are on the website.

(www.michigan.gov/bccfs)

Page 17: Health Facilities Planning Seminar

Power Generators

New or replacement installations shall comply with: NFPA 110, Standard for Emergency

and Standby Power Systems NFPA 99, Standard for Health Care

Facilities NFPA 70, National Electrical Code

Page 18: Health Facilities Planning Seminar

Storage in Corridors

Storage is not permitted in corridors unless it meets the requirements of OFS Policy #4-8 Approved equipment in Alcoves that do not

obstruct required corridor width

Corridor Charting Unit, OFS Policy #4-15

Page 19: Health Facilities Planning Seminar

Plan Submission Delivery

U.S. Mail

BCCFS

Plan Review Division

P.O. Box 30700

Lansing, MI 48909

Express Courier Delivery

BCCFS

Plan Review Division

7150 Harris Drive

Lansing, MI. 48909