helmand valley water management plan...helmand valley water management plan presented by: jason...
TRANSCRIPT
Helmand Valley Water Management Plan
Presented By: Jason Needham, P.E. (HEC)
Project Team: HEC, AED, USAID
USACE, Hydrologic Engineering Center
Problem Statement
� Over 25 years of turmoil has lead to deficientwater management in Afghanistan� Construction� Maintenance� Operations� Technical
� Capacity� Equipment
Project Overview
� Purpose� Develop water management plans for Helmand
Valley� Restore water management institutional capacity
in Afghanistan
� Two phase process� Funded and managed by US Agency for
International Development (USAID)� Contracted with USACE Afghanistan Engineering
District (AED) and USACE Hydrologic EngineeringCenter (HEC)
The Helmand Valley
� Drainage area� 160,000 km2
� 31% of country
� Helmand River� AY~14 Billion m3
� Kajakai Reservoir
Kajakai Reservoir
� Max Capacity - 3.2 Billion m3
� Water supply� Irrigation� Wetlands� Iran
� Hydropower� Existing - 33 MW� Design - 150 MW
Phase I
� Goals� Provide updated information on the capacity of the
Helmand system to support water resourcedemands.
� Evaluate immediate improvements to the systemand provide information for long-term planning ofwater resources.
� Begin capacity building process.
Phase I – Tasks
� Hydrologic Data� Data gathering and validation
� 42 stream gages� 1950s through late 1970s
� USGS – 1991 event� Institutional capacity building
� Ministry of Water and Energy Engineers (6)� Two week water management training in US
� Site visits� Joint Operation Center (DWR, USGS, NWS, USACE)� Gage sites� Irrigation districts� Large reservoirs and hydropower facilities� Small reservoir and water diversion structures� Irrigation management information system
� Introduction to water management software
Phase I – Water Management Tour
Phase I – Water Management Tour
Phase I – Tasks (Continued)
� Preliminary Water Budget Analysis� Update information on capacity of Kajakai
Reservoir for irrigation supply and powergeneration� Simulation Model
� Existing configuration� Existing power/gated spillway� Expanded power/gated spillway� Raised dam/expanded power/gated spillway
� Use historic inflow record� Demands
� Various levels of irrigation demand� Iran treaty requirements
Phase I – Tasks
� Inflows vs. demand
0
500
1000
1500
2000
2500
3000
3500
Nov
-46
Nov
-47
Nov
-48
Nov
-49
Nov
-50
Nov
-51
Nov
-52
Nov
-53
Nov
-54
Nov
-55
Nov
-56
Nov
-57
Nov
-58
Nov
-59
Nov
-60
Nov
-61
Nov
-62
Nov
-63
Nov
-64
Nov
-65
Nov
-66
Nov
-67
Nov
-68
Nov
-69
Nov
-70
Nov
-71
Nov
-72
Nov
-73
Nov
-74
Nov
-75
Nov
-76
Nov
-77
Nov
-78
Nov
-79
Flow
(Mm
3)
Inflow Demand
Simulation Model – HEC-ResSim
� Rule-based� Multi-purpose
systemsimulation
� Networkstructure –objectstructured.
Water Supply Comparison – 50% Demand
With Gates
Without Gates
Water Supply Comparison – 50% Demand
With Gates
Without Gates
Water Supply Comparison – 100% Demand
With Gates
Without Gates
Water Supply Comparison – Raised Dam
0
500
1000
1500
2000
2500
3000
3500
4000
1947
1948
1949
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
Date
Shor
tage
(Mm
3 )
Total Shortage - Proposed + Raise
Total Shortage - Proposed
Phase I – Tasks (Continued)
� Preliminary Water Budget Analysis (cont.)� Preliminary rule curves� Time to fill estimate� Report
� Define Phase II
Phase II
� Comprehensive simulation model� Tributaries� Demands� Hydropower vs. irrigation trade-off
� Reservoir regulation manuals� Training
Contact
� Jason Needham� US Army Corps of Engineers� Hydrologic Engineering Center� Davis, CA 95616� (530) 756-1104� [email protected]