Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Upload: others

Post on 07-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Helmand Valley Water Management Plan

Presented By: Jason Needham, P.E. (HEC)

Project Team: HEC, AED, USAID

USACE, Hydrologic Engineering Center

Page 2: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Problem Statement

� Over 25 years of turmoil has lead to deficientwater management in Afghanistan� Construction� Maintenance� Operations� Technical

� Capacity� Equipment

Page 3: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Project Overview

� Purpose� Develop water management plans for Helmand

Valley� Restore water management institutional capacity

in Afghanistan

� Two phase process� Funded and managed by US Agency for

International Development (USAID)� Contracted with USACE Afghanistan Engineering

District (AED) and USACE Hydrologic EngineeringCenter (HEC)

Page 4: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

The Helmand Valley

� Drainage area� 160,000 km2

� 31% of country

� Helmand River� AY~14 Billion m3

� Kajakai Reservoir

Page 5: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Kajakai Reservoir

� Max Capacity - 3.2 Billion m3

� Water supply� Irrigation� Wetlands� Iran

� Hydropower� Existing - 33 MW� Design - 150 MW

Page 6: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I

� Goals� Provide updated information on the capacity of the

Helmand system to support water resourcedemands.

� Evaluate immediate improvements to the systemand provide information for long-term planning ofwater resources.

� Begin capacity building process.

Page 7: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Tasks

� Hydrologic Data� Data gathering and validation

� 42 stream gages� 1950s through late 1970s

� USGS – 1991 event� Institutional capacity building

� Ministry of Water and Energy Engineers (6)� Two week water management training in US

� Site visits� Joint Operation Center (DWR, USGS, NWS, USACE)� Gage sites� Irrigation districts� Large reservoirs and hydropower facilities� Small reservoir and water diversion structures� Irrigation management information system

� Introduction to water management software

Page 8: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Water Management Tour

Page 9: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Water Management Tour

Page 10: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Tasks (Continued)

� Preliminary Water Budget Analysis� Update information on capacity of Kajakai

Reservoir for irrigation supply and powergeneration� Simulation Model

� Existing configuration� Existing power/gated spillway� Expanded power/gated spillway� Raised dam/expanded power/gated spillway

� Use historic inflow record� Demands

� Various levels of irrigation demand� Iran treaty requirements

Page 11: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Tasks

� Inflows vs. demand

0

500

1000

1500

2000

2500

3000

3500

Nov

-46

Nov

-47

Nov

-48

Nov

-49

Nov

-50

Nov

-51

Nov

-52

Nov

-53

Nov

-54

Nov

-55

Nov

-56

Nov

-57

Nov

-58

Nov

-59

Nov

-60

Nov

-61

Nov

-62

Nov

-63

Nov

-64

Nov

-65

Nov

-66

Nov

-67

Nov

-68

Nov

-69

Nov

-70

Nov

-71

Nov

-72

Nov

-73

Nov

-74

Nov

-75

Nov

-76

Nov

-77

Nov

-78

Nov

-79

Flow

(Mm

3)

Inflow Demand

Page 12: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Simulation Model – HEC-ResSim

� Rule-based� Multi-purpose

systemsimulation

� Networkstructure –objectstructured.

Page 13: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Water Supply Comparison – 50% Demand

With Gates

Without Gates

Page 14: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Water Supply Comparison – 50% Demand

With Gates

Without Gates

Page 15: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Water Supply Comparison – 100% Demand

With Gates

Without Gates

Page 16: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Water Supply Comparison – Raised Dam

0

500

1000

1500

2000

2500

3000

3500

4000

1947

1948

1949

1950

1951

1952

1953

1954

1955

1956

1957

1958

1959

1960

1961

1962

1963

1964

1965

1966

1967

1968

1969

1970

1971

1972

1973

1974

1975

1976

1977

1978

1979

Date

Shor

tage

(Mm

3 )

Total Shortage - Proposed + Raise

Total Shortage - Proposed

Page 17: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase I – Tasks (Continued)

� Preliminary Water Budget Analysis (cont.)� Preliminary rule curves� Time to fill estimate� Report

� Define Phase II

Page 18: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Phase II

� Comprehensive simulation model� Tributaries� Demands� Hydropower vs. irrigation trade-off

� Reservoir regulation manuals� Training

Page 19: Helmand Valley Water Management Plan...Helmand Valley Water Management Plan Presented By: Jason Needham, P.E. (HEC) Project Team: HEC, AED, USAID USACE, Hydrologic Engineering Center

Contact

� Jason Needham� US Army Corps of Engineers� Hydrologic Engineering Center� Davis, CA 95616� (530) 756-1104� [email protected]