Herndon Metro Station: Cost Estimates for Town Requests
August 6, 2014
Herndon Station North Side Pavilion2 August 6, 2014
Herndon Metro Station
TOWN OF HERNDON
RESTON
Herndon Station North Side Pavilion3
Town requested at the Metro Town-Side Pavilion:
August 6, 2014
3. Decorative black handrail/fence both sides of sidewalk (approx. 1000’) – VDOT special standard
1. Imprinted concrete along retaining wall (approx. 400’) – VDOT special standard
2. Metro Sign at Herndon Parkway
4. Canopy for 30 bike racks
5. More durable sidewalk standard
Herndon Station North Side Pavilion4 August 6, 2014
For Today’s Consideration
Review MWAA Cost Estimates
Consider Town Options
Direct Staff
Herndon Station North Side Pavilion5 August 6, 2014
Land to be acquired
Permanent Easement to be acquired
Temporary Easement
Land to sold after construction
Town-side entry pavilion
Land Transactions for Town-Side Entry Pavilion
Herndon Station North Side Pavilion6
Town Easements to be Affected: trail, water and sewer
August 6, 2014
Approx. location existing trail and utility easement
Town water and sewer lines &
easements to be relocated
Herndon Station North Side Pavilion7 August 6, 2014
Town Actions Associated with Town-Side Metro Facilities
Planning participation since 2010
Letter Agreement Town-Fairfax County-MWAA 2013
Authorization of Relocated water-sewer-trail easements
Consideration of Special Exception
Herndon Station North Side Pavilion
Explanation of Cost Estimates
August 6, 2014
Herndon Station North Side Pavilion9 August 6, 2014
Herndon Station North Side Pavilion10 August 6, 2014
Questions?