January 13, 2005 PACS IQR - SCI-PT/33202 1
Herschel/Planckggonzale:ggonzale:
ggonzale:ggonzale:
Herschel PACS
Instrument Qualification Review
Review Objectives
and
Organisation
G.Crone/G.Pilbratt Herschel/Planck Project
January 13, 2005 PACS IQR - SCI-PT/33202 2
Herschel/Planck
Instruments Review Cycles in Perspective
1999 2000 2001 2002 2003 2004 2005 2006 2007
Instruments: ISVR IIDR IBDR IHDR IQR … IFAR
Spacecraft ITT SRR PDR CDR …
Phase B Phase C/D Launch
January 13, 2005 PACS IQR - SCI-PT/33202 3
Herschel/Planck
From Qualification to Flight Acceptance
• CQM at module (EQM) level : Delivery (DRB) Test readiness (TRR) Test review (PTR) 2005
After CQM System Campaign hold a Instrument Status Review
• FM at instrument level:ILT TRR ILTs ILT Test review prior to warm-up (PTR) 2005
To decide on need for further tests or to terminate & deliver
• FM at module (PLM) and system level:Delivery (DRB) Test readiness (TRR) Test review (PTR) 2006
In preparation of FAR Instrument Status Review
January 13, 2005 PACS IQR - SCI-PT/33202 4
Herschel/Planck
Herschel Status• Herschel Payload Module CDR completed in July and Space Segment
CDR completed in October with official close-out end 2004
• Herschel EQM - Ready for Herschel CQM Focal Plane Units.
• All Herschel Instruments: HIFI, PACS and SPIRE have successfully completed CQM Instrument Level Tests.
• All instruments delivered and in ASED OTN. (N.B. SPIRE to be returned 17th January)
• Instrument testing to commence April 2005
• Instrument FM program underway – Baseline delivery Nov 2005
January 13, 2005 PACS IQR - SCI-PT/33202 5
Herschel/Planck
Herschel EQM
January 13, 2005 PACS IQR - SCI-PT/33202 6
Herschel/Planck
Herschel PFM status• All units passed CDR, manufacturing well
underway
• Optical bench delivered
• HTT delivered, most cryo-components, instrumentation, MLI integrated
• HOT delivered instrumentation, cryo-
components and MLI mounted. Tank integrated on framework. Both fully integrated
• Cylinder thermal shields delivered-Others completed
• CVV cylinder delivered-Upper and lower bulk head imminent.
• Integration to be completed by May 2005; first cool-down with MTD instrument prior to shipment to ESTEC for STM campaign
January 13, 2005 PACS IQR - SCI-PT/33202 7
Herschel/Planck
Instrument Qualification Review - Objectives
Ref: IQR Proceedings - v2 Aug 26, 2004 - SCI-PT/27108
Confirmation of instrument CQM hardware/software qualification
Completion of instrument design verification
Assessment of performance and compliance with sci. reqs
Identification and confirmation of improvements for FM
Completion of OBSW design and demonstration of functionality
Confirmation of EGSE design and demonstration of functionality
Confirmation of instrument operability - User Manual
January 13, 2005 PACS IQR - SCI-PT/33202 8
Herschel/Planck
IQR - Proceedings
Data Package – complete delivery at K.O. [PACS] Documents as identified in SCI-PT/27108 Presentations as given during the K.O. meeting
Review of Data Package [Board] Discrepancies and open issues raised as RIDs RIDs issued up to one week before co-location
Answers to RIDs [PACS] Provided, discussed and resolved at co-location
Board Report = Result of the three items above [Board]
January 13, 2005 PACS IQR - SCI-PT/33202 9
Herschel/Planck
IQR Timeline
K.O. Meeting and Data Pack today
Preliminary feedback 18 Jan 2005
Issue of RIDs 02 Feb 2005
Co-location 10-11 Feb 2005
Issue of Board Report 25 Feb 2005
January 13, 2005 PACS IQR - SCI-PT/33202 10
Herschel/Planck
Review Board / Representatives of third parties
Herschel/Planck Project (ESTEC)
G. Crone (chair)
G. Pilbratt (co-chair)
A. Heske (secretary)
P. Estaria
J. Rautakoski
F. Pedersen
T. van der Laan
Industry Representative
G. Doubrovik (Alcatel)
SPIRE RepresentativeB. Swinyard (RAL)
Funding Agency RepresentativesM. Falvella (ASI)K. Mercier (CNES)K. Proetel (DLR)H. Schroeven-Deceuninck (Prodex)
Experts
D. Schink (Astrium)B. Collaudin (Alcatel)G. Coe (ESTEC)F. Marliani (ESTEC)
January 13, 2005 PACS IQR - SCI-PT/33202 11
Herschel/Planck
PACS IQR K.O. - Agenda09:00 Welcome MPE09:05 Review Organization and Objectives ESA09:15 Introduction – IHDR close-out and docs MPE09:45 Instrument Qualification Status and plans for PFM MPE
Mechanical, Thermal, Electrical I/Fs and EMC, Optical11:45 PhFPU Qualification and plans for PFM CEA12:15 Ge:Ga detector arrays Qualification MPE
with Coffee Break at 11:00
12:45 Lunch
13:45 On-Board Software and UM MPE14:15 EGSE, I-EGSE and MIB MPE14:25 CQM/AVM ILT Results MPE15:30 PA/QA Status MPE15:40 Management and Schedule MPE15:55 Critical Items and next steps MPE16:15 Lessons learnt from CQM Integration in Industry MPE16:30 Questions and Clarifications All17:00 First Impressions and Feedback ESA
with Coffee Break at 15:15