high brightness erl injector development and erl planning...

44
High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Upload: duonganh

Post on 28-Jan-2019

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

High Brightness Injector Development and ERL Planning at Cornell

Charlie SinclairCornell University

Laboratory for Elementary-Particle Physics

Page 2: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 2

Background

• During 2000-2001, Cornell, with much help from JLab, prepared an NSF proposal to build a 100 MeV ERL to resolve technical issues prior to proposing an ERL-based hard X-ray light source

• In February 2005, the NSF funded Cornell to build the injector portion of the original proposal

• Construction of a fully coherent hard X-ray source is on NSF’s long range MRE plan

• In 2006, New York funded Cornell for studies and work related to completing the proposal for the full light source

Page 3: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 3

Proposal vs. fundedGun, buncher, and SRF accelerator

Merger, precision diagnostics, and dump

Main linacRecirculation loop

Two stages – Operate gun and diagnostics in gun laboratory, then operate complete injector (5 to 15 MeV) in the L0 area of Wilson Lab

Page 4: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 4

Injector Specifications

• Average current – 100 mA(77 pC/ bunch, 1300 MHz repetition rate)

• Variable final energy – 5 to 15 MeV• Beam power – 575 kW average• Bunch length – < 2 ps, rms• Transverse emittances – < 0.1 μm-rad

(normalized, rms)• Photocathode operational lifetime – 100 hours

Page 5: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 5

Injector OptimizationWe developed a genetic algorithm based computational optimization of our injector, which showed that we should be able to make very small emittance beams.

(Bazarov et al., Phys. Rev. ST-AB 034202 (2005))

Page 6: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 6

Injector Optimization

• Optimum transverse emittance is dominated by the cathode thermal emittance – this is a tremendous advantage for NEA photocathodes, and implies emittance reduction with cathode cooling

• Emittance compensation works just fine for the DC gun case

• Gentle (adiabatic?) bunching is preferred• Solutions are insensitive to small parameter

variations

Page 7: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 7

Injector Elements

• Photoemission electron gun, 750 kV maximum cathode potential, NEA GaAs or GaAsPcathode, 1300 MHz laser system

• Normal conducting single cell 1300 MHz buncher

• Cryomodule with five 2-cell SRF cavities• Precision controlled high power RF systems• Merger magnet system• Precision diagnostic beam line• Full power beam dump

Page 8: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 8

750 Photoemission Gun

This gun design incorporates a number of novel features, such as a resistive coated ceramic, photocathode cooling, a cooled beryllium anode, and over 20 m3/sec of hydrogen pumping speed

Beam Out

Cathode Entry

The gun was assembled without touching any cathode electrode surface

Page 9: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 9

Gun Ceramic from CPI

Page 10: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 10

Cathode Electrode Assembly

Page 11: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 11

SF6 Tank Installation

Page 12: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 12

Photocathode Load Lock and Preparation System

Page 13: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 13

300 kV, 100 mA Power Supply

Page 14: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 14

Gun and Power Supply in Tank

Page 15: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 15

Beam Line looking toward Gun

Page 16: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 16

Beam Dump during assembly

Page 17: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 17

Starting the shielding

Page 18: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 18

Lasers

• With our CW argon ion laser, the present setup will allow us to study– Photocathode thermal emittance– Photocathode operational lifetime at high average

current • Adding a laser with RF time structure and

additional diagnostics, we will study– Emittance as a function of bunch charge– Temporal structure of the bunches

• 50 MHz, and 1300 MHz frequency doubled Ybfiber lasers in development with A&EP

Page 19: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 19

Laser Development

• 50 MHz fundamental frequency mode-locked Yb fiber oscillator

• Harmonic mode-locking to reach 1300 MHz• Yb fiber amplifier(s) to reach ~ 130 W in the IR.

(100 nj/pulse)• Frequency multiplication in LBO to give > 20 W

in the green after pulse shaping• Initial transverse shaping with aspherics,

temporal shaping with pulse stacking• Pattern control with BBO Pockels cell

Page 20: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 20

30

25

20

15

10

5

0

Out

put P

ower

(W)

8006004002000

Input Power (mW)

20

15

10

5

0

Out

put p

ower

[W]

302520151050 Pump power [W]

Slope efficiency 85%

4.4

4.0

3.6

3.2 Out

put p

ower

[Wat

ts]

50403020100 Input power [mW]

8

6

4

2

0 O

utpu

t [w

atts

]20151050

Pump power [watts]

Slope efficiency = 78%

First measurementsOn amplifier

Simulation with LiekkiApplication designer

Page 21: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 21

1.20

0.80

0.40

0.00

Dia

met

er [m

m]

800700600500 Distance [mm]

M2 = 1.87

0.6

0.4

0.2

0.0

SH

G [w

atts

]

543210 Pump [watts]

15 mm LBO doublerNon-critical phase matched5 cm focal length

Page 22: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 22

Plan View – Gun Test Lab

Page 23: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 23

Additional Activities

• Outgassing studies– Best result to date, following VIRGO prescription, is

an outgassing rate of ~ 2 x 10-13 torr-liter/sec-cm2

• Photocathode preparation– Routinely prepare ~ 17% QE photocathodes on

both GaAs and GaAsP wafers• Field emission reduction

– Evaluated 316 LN, Ti4V6Al, and GCIB treated materials

– Have achieved “zero” emission up to 20-22 MV/m

Page 24: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 24

Bare Ti4V6Al Electrode

Ti4V6Al Electrode

-500

0

500

1000

1500

2000

2500

3000

3500

0 5 10 15 20 25

Electric Field (MV/m)

Curr

ent (

pA)

Page 25: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 25

GCIB treated 304 SS

GCIB treated 304 SS

-50

0

50

100

150

200

250

300

350

400

450

0 5 10 15 20 25 30

Electric Field (MV/m)

Cur

rent

(pA

)

Page 26: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 26

Ion Back Bombardment

• A very bright undergrad student has been modeling ion creation and back bombardment in the gun

• We have been using sputtering of cesium fluoride as a surrogate for what is degrading the cathode quantum efficiency under ion bombarment

• I can almost explain the QE degradation as due solely to sputtering of the NEA activation layer

• We have detailed predictions we can test with our gun

Page 27: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 27

Current Status

• Gun, preparation system, beam line, and dump are all assembled and baked

• We have been plagued by a series of leaks ion the preparation system, and most recently, in the gun

• We see strong field emission at relatively low voltages on the gun, and so far, have not been able to process through this

• I am starting to survey the local bridges

Page 28: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 28

SRF Cavity Design

Page 29: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 29

First 2-cell Niobium Cavity Weldment

Page 30: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 30

First Vertical Test

Page 31: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 31

RF Power Coupler Design

Page 32: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 32

RF Power Coupler

Page 33: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 33

HOM Loads

RF absorbing tiles (three types)

Extensive program to find absorbers over the full frequency range at low temperature completed. Three different materials necessary

Fabrication of first load nearly complete

RFP ready to send to vendors for remaining loads

RF pickups

Page 34: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 34

The fully dressed cavity

Page 35: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 35

Cryomodule Design Concept

Cold Part of RF Power Coupler

MotorizedFrequencyTuner

Cold He Gas Return Pipe

Support Posts

2K Liquid Supply Line

PiezoTuners

Page 36: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 36

Cryomodule Status

• Fabrication of five two-cell cavities underway• First test of RF power coupler pair in July, with

procurement of ten more couplers to follow• First article HOM load test soon, procurement in

process• Blade tuner development underway in

collaboration with University of Pennsylvania• 2K cryogenic plant under construction• First horizontal test of fully dressed cavity early

in March 2007

Page 37: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 37

1300 MHz RF Power Sources

• 16 kW IOT transmitter in house, passed acceptance test. Will be used for:– RF power coupler tests– Buncher power– Transverse deflecting cavity diagnostic

• 160 kW klystron in development at e2v Technologies (England)– First tube on pump stand, should begin RF testing

in early July– First tube delivered in early August– Five additional tubes by April, 2007

Page 38: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 38

First Klystron on Pump Stand

Klystron Specifications

• > 120 kW CW output with incremental gain > 0.5• Efficiency > 50% at 120 kW, 0.5 incremental gain• Small signal gain > 45 dB• +/- 2 MHz at – 1 dB• +/- 3 MHz at -3 dB

Seven cavity design required tomeet specifications

Page 39: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 39

Injector Layout in L0

Page 40: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 40

L0 Layout with Mezzanine

Page 41: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 41

Time Line

• 750 kV Gun Power Supply delivered in November 2006

• Gun tests in lab continue through 2007• Begin clearing area for control room, and

starting installation later this year• Three (at most) horizontal cavity tests will be

completed by October 2007• L0 area ready for installation in November 2007• Begin beam operations in September 2008

Page 42: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 42

ERL @ CESR

Page 43: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 43

ERL @ CESR

Page 44: High Brightness ERL Injector Development and ERL Planning ...casa.jlab.org/seminars/2006/slides/sinclair_060622.pdf · High Brightness Injector Development and ERL Planning at Cornell

June 22, 2006 JLab CASA Seminar 44

Full Machine Planning• Detailed lattice design underway, with a total of

18 X-ray beam lines• Detailed WBS in development, prepatory to

developing a full budget and schedule for the full machine

• Test borings of site underway with NYS funds• Six X-ray workshops held this month, to build

the science case for the full machine• Plan to submit a proposal for a 5 GeV ERL light

source in December, 2007• Construction start in 2011???