highway design subset 03 - highway plans - … ’b-b’ plan section (looking downstream) flow flow...
TRANSCRIPT
BEEN PERSONALLY CHECKED BY THE UNDERSIGNED.
NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE
THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS
TRANSPORTATION PRINCIPAL ENGINEER
NUMBER
DRAWING
NUMBER
DRAWING
INDEX OF DRAWINGS
DRAWING TITLE DRAWING TITLE
SUBSET 03 - HIGHWAY PLANS
03.01 INDEX OF PLANS
03.02 MISCELLANEOUS DETAILS
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\172_391_Subset_Title_Sheet_HWY.dgn
Border Version: 11/14/08
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - - HADDAM
HWY-01
MPB
EAJ
HIGHWAY PLANS
172-391
SUBSET COVER SHEET
CULVERT REHABILITATION
ROUTE 9
HIGHWAY DESIGN
03.04 PLAN SHEET CULVERT #6734 (SITE 1)
03.05 WATER HANDLING PLAN CULVERT #6734 (SITE 1)
03.06 PLANTING PLAN CULVERT #6734 (SITE 1)
03.07 PLAN SHEET CULVERT #6683 (SITE 2)
03.08 WATER HANDLING PLAN CULVERT #6683 (SITE 2)
03.09 PLANTING PLAN CULVERT #6683 (SITE 2)
03.03 MISCELLANEOUS DETAILS
03.01
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\MDS_01.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
1’-0’’
84°
55°
30"
5’-0" TYP.
6"
1"
20’-0"
TYP. R=�"
LIFTING KEY
4’’ TYP.5’’ TYP.
10’’ MIN.
VARIES
3" TYP.
2’’ COVER MIN.
R=10" TYP.
R=1" TYP.
TYP.
10’’
PLAN
CROSS SECTION
@ 12’’ MAX.
#5 BARS
19’-8’’ LONG TYP.
#5 BARS
6"
2’
45"
4.5
MIN. MAX.
C D
A
B
E
F
B
B
A
A
(in.)DIA.
60 3 X 1 43
(in.)’A’
WIDTHBAFFLE
(in.)PROFILE
CORRUGATION
(in.)’B’
(ft.)BAFFLE SPACING
6 2422
(in.)’C’
OFFSETNOTCH
4.6 14
(in.)’D’
WIDTHNOTCH
(in.)’E’
DEPTHNOTCH
(in.)’F’
HEIGHTBAFFLE
9
(ft. )OF PIPE
END AREAEFFECTIVE
20
’V’ NOTCH IN BAFFLE PLATEBOTTOM OF PIPE
FISH PASSAGE
CENTERLINE TO FACILITATE
LEFT TO RIGHT OF PIPE
NOTCH TO ALTERNATE FROM
BENT BAFFLE PLATE
SECTION ’A-A’
SECTION ’B-B’
PLAN
SECTION(LOOKING DOWNSTREAM)
FLOW
FLOW
END
UPSTREAM
INSIDE DIAMETER
MPB
EAJROUTE 9
CULVERT REHABILITATION
HADDAM
HWY-02
MISCELLANOUSDETAILS
172-391
NOT TO SCALE
CULVERT #6734 (SITE 1)
(20 ft. TYP.)
MAX. 24 ft.
MIN. 6 ft.
BAFFLE SPACING
CULVERT #6683 (SITE 2)NOTCH ELEVATION AT CULVERT #6734 (SITE 1) OUTLET: 151.25
NOTCH ELEVATION AT CULVERT #6734 (SITE 1) INLET: 154.5
NOTES:
WITHIN 2" OF WEIR NOTCH (TYP.)
REBAR TO BE DISCONTINUED
ALUMINUM SUPPORT ANGLE
ALUMINUM CORRUGATED METAL PIPE
ALUMINUM CORRUGATED METAL PIPE
ALUMINUM SUPPORT ANGLE
FISH BAFFLE
STANDARD ALUMINUM
ALUMINUM SUPPORT ANGLE
PAY ITEM: PRECAST CONCRETE BARRIER CURB (SPECIAL)
CONCRETE WEIR
ELEVATION
METAL PIPE
ALUMINUM CORRUGATED
METAL PIPE
ALUMINUM CORRUGATED
FISH BAFFLE (ALUMINUM)
TO BENT BAFFLE PLATE
WELD SUPPORT ANGLE
TO BENT BAFFLE PLATE
WELD SUPPORT ANGLE
sucksmalloy
(AS REQUIRED)
TO PIPE INVERT
ATTACH SUPPORT ANGLE
(AS REQUIRED)
TO PIPE INVERT
ATTACH BENT BAFFLE PLATE
(AS REQUIRED)
PIPE INVERT
BAFFLE ATTACHED TO
(AS REQUIRED)
TO PIPE INVERT
ATTACH SUPPORT ANGLE
(AS REQUIRED)
PLATE TO PIPE INVERT
ATTACH BENT BAFFLE
EXISTING CULVERT
LINER PIPE
ALUMINIUM
TO BE GROUTED
ANNULAR SPACE
TO BE GROUTED
ANNULAR SPACE
1:1.5 SLOPE
FORM CONCRETE BEVEL
FOR ADDITIONAL INFORMATION60" ALUMINUM CORRUGATED METAL PIPE (10 GAUGE)NOTE: SEE SPECIAL PROVISIONS ITEM NO. 0651286A
PROFILE
OF FLOWDIRECTION
INLET TREATMENT FOR CULVERT #6683 (SITE 2)
6" MIN
03.02
GENERAL NOTES:
WORK AREA
b
(PAID AS SEPARATE ITEM)
FOR INSTALLATION OF TPCBC.
EXISTING METAL BEAM RAIL REMOVED
DIRECTION OF TRAFFIC
C CL L
FACE OF RAIL
EDGE OF ROAD OR
BARRIER CURB (TPCBC)
TEMPORARY PRECAST CONCRETE
a
PLAN
AS SHOWN ON PLANS
FLARE RATE SHALL BE
ELEMENT TO BACK OF TPCBC
INSTALL W-BEAM RAIL
EXISTING GROUND
TPCBC (SEE SHEET HW-822_01)
GENERAL ACCESS ROAD NOTES:
12’ - 15’
6" - STONE
(ONLY WITHIN WETLANDS)
(SEPARATION - HIGH SURVIVABILITY)
GEOTEXTILE FILTER FABRIC
TEMPORARY ACCESS ROAD
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\MDS_02.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
EXISTING R-I METAL BEAM RAIL
BEAM RAIL
EXISTING R-I METAL
6’-3" 6’-11"
PAY LIMIT (TEMPORARY GUIDERAIL) ATTACHMENT - 12’-6"
3’
29"
RAIL AND TEMPORARY PCBC
DRILL THREE �" HOLES THROUGH
HOST PIPE
LINER PIPE
OR WOOD BLOCKING
HOLDDOWN DEVICE
(3/4" MINIMUM)
(AS REQUIRED)
ALIGNMENT BOLT
(AS REQUIRED)GROUT PORTS
(AS REQUIRED)GROUT PORTS
(AS REQUIRED)GROUT PORTS
(3/4" MINIMUM)
(AS REQUIRED)
ALIGNMENT BOLT
(AS REQUIRED)GROUT PORTS
GUIDES
GUIDES
(AS REQUIRED)GROUT PORTS
(3/4" MINIMUM)
(AS REQUIRED)
ALIGNMENT BOLT
(AS REQUIRED)GROUT PORTS
TYPICAL RELINING SECTION
BOTH CULVERT SITES
PROPOSED LINER INVERT ELEVATION (INLET): 295.42 FT
EXISTING INVERT ELEVATION (INLET): 295.08 FT
CULVERT #6683 (SITE 2):
PROPOSED LINER INVERT ELEVATION (INLET): 154.24 FT
EXISTING INVERT ELEVATION (INLET): 153.58 FT
CULVERT #6734 (SITE 1):
MPB
EAJROUTE 9
CULVERT REHABILITATION
HADDAM
HWY-03
MISCELLANEOUSDETAILS
172-391
FOR INSTALLATION AND REMOVAL OF STONE MUST BE FOLLOWED.
GEOTEXTILE FILTER FABRIC IS NOT REQUIRED. THE SAME PROCEDURE
NOTE: FOR INSTALLATION OF ACCESS ROADS OUTSIDE OF WETLANDS,
REGRADING, TOP SOIL, AND TURF ESTABLISHMENT.
RESTORE WETLAND AREA TO ORIGINAL CONDITION, WHICH INCLUDES3.
REMOVE GEOTEXTILE FILTER FABRIC.2.
REMOVE 6" OF STONE.1.
FOR REMOVAL WITHIN WETLANDS:
INSTALL 6" OF PROCESSED AGGREGATE ON TOP OF GEOTEXTILE FILTER FABRIC. 3.
INSTALL GEOTEXTILE FILTER FABRIC (SEPARATION - HIGH SURVIVABILITY).2.
EXCAVATE APPROXIMATELY 6" OF SOIL.1.
FOR INSTALLATION WITHIN WETLANDS:
TEMPORARY GUIDERAIL ATTACHMENT
ELEVATION
ROADWAYS FOR TEMPORARY WORK CONDITIONS.
3. THIS ATTACHMENT SHALL ONLY BE USED ON THE TRAILING END OF TPCBC ON SINGLE DIRECTION
THE THREE BOLTS SHOULD BE SPACED 8"(203) APART.
THE BACK SIDE. THE METAL BEAM RAIL ATTACHMENT SHOULD OVERLAP THE BARRIER 3’(914).
BOLT HEAD SHOULD BE LOCATED ON THE TRAFFIC SIDE OF THE BARRIER AND THE NUT ON
2. USE �"(16) BOLTS-12"(305)LONG WITH �"(16) WASHERS ON EACH SIDE OF BARRIER. THE
IT SHALL INCLUDE ALL LABOR AND MATERIALS PLUS ANCHORAGE TO TPCBC.
(TEMPORARY GUIDERAIL) ATTACHMENT ITEM NO. 0910700A AND THE PAY LIMIT SHOWN.
1. TEMPORARY ATTACHMENT OF METAL BEAM RAIL TO TPCBC SHALL BE PAID FOR UNDER
ELEVATION.
AT EXISTING PAVEMENT
TPCBC SHALL BE INSTALLED
03.03
CT. R
OUT
E 9 N
ORT
HB
OU
ND
CT. R
OU
TE 9
OF
F
RA
MP
CT. R
OUT
E 9 S
OUT
HB
OU
ND
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WOODS
CT. R
OUT
E 9 ON
RA
MP
WO
ODS
HU
BB
AR
D
RO
AD
WOODS
BEA
VER
MEA
DO
W
RO
AD
VIRGINIA L. EVENSEN
N/F
(60-88-2A)
STATE PARK AND FOREST (DEP)
STATE OF CONNECTICUT
ET AL
DANIEL F. VAN DEUSEN
N/F
ET AL
DANIEL F. VAN DEUSEN
N/F
TO
MID
DLET
OW
N
TO
CHESTER
B-8629
(FND.)
I.P.
(N.F.)
CHD
(FND.)
CHD
(N.F.)
CHD
(N.F.)
CHD
(FND.)
CHD
BE
AV
ER
ME
AD
OW
BR
OO
K
’’C’’ C
B
RAILROAD SPIKE IN 20" PINE TREE
’’C’’ C
B
’’C’’ C
B
BOT=171.57
FL=171.67 SE FL=171.57 NE
TF=176.87
"C"CB
BOT=184.23 FL=184.43 SW FL=184.23 NE
TF=188.93
"C"CB
BOT=182.85
FL=184.95
TF=188.55
"C"CB
BOT=187.83 FL=187.93 SW FL=187.83 NE
TF=192.58
"C"CB
BOT=159.22 FL=159.32 SW FL=159.22 NE
TF=166.02
"C"CB
BOT=162.93 FL=164.83 S FL=164.93 N
TF=167.23
"C"CB
BOT=164.43
FL=(FILLED)
TF=167.83
"C"CB
BOT=161.25
FL=162.85
TF=166.85
"CL"CB
BOT=160.03 FL=161.93 NW FL=161.93 W FL=161.83 NE
TF=165.83
"C"CB
BOT=155.23 FL=157.33 SW FL=157.23 NE
TF=161.33
"C"CB
BOT=156.01 FL=156.31 NW FL=157.01 SW FL=156.21 SE
TF=160.41
"C"CB
RAILROAD SPIKE IN 12" ORNAMENTAL
20" PINE
’’C’’ C
B
WIR
E
RO
PE
RAIL
WIR
E
RO
PE
RAIL
WIR
E R
OPE R
AIL
BILLBOARDS
WOOD POSTS
LE
DG
E
LED
GE
36’’
ACCMP
36’’
ACCMP
15’’ ACCMP
’’C’’
CB
’’C’’
CB
’’CL’’ CB
15’’ C
MP
15’’
RCP
’’C’’
CB
BIT. L
EA
KOFF
12" PINE
BOULDER
LEDGE
GR
AN. C
UR
B
15’’ C
MP
’’C’’ C
B
21’’ PERF. ACCMP
WALL
STONE
15’’ C
MP
12’’ C
MP
RS-1332
2A
8
FIE
LD
LO
C. W
ET
LA
ND
S
FIE
LD
LO
C. W
ET
LA
NDS
FIE
LD
LO
C. W
ET
LA
ND
S
FIELD LOC. WETLANDS
NO
N
AC
CESS
HIG
HW
AY
LIN
E
NO
N
AC
CESS
HIG
HW
AY
LIN
E
R.O.W. M
AP 60-04
SH. 6
OF 6
R.O.W. M
AP 60-04
SH. 6
OF 6
NON ACCESS HIGHWAY LINE
R.O.W. MAP 60-04 SH. 6 OF 6
NO
N
ACCESS
HIG
HW
AY LIN
E
R.O.W. M
AP 60-0
5 S
H. 1 O
F 6
432.8
5’
480.15
’
STREET LI
NE
STREET LI
NE
(N.F.)
MON.
STREET LIN
E
EASEMENT TO DRAIN
SUBJECT TO AN
Pole Line(s) In Favor Of SNET
Subject To An Easement For
(60-100-2)
(DOT)
Favor Of State Of Connecticut
Relocate Brook Channel In
Subject To An Easement To
(60-88-23), (60-100-2)
(DOT)
Favor Of State Of Connecticut
Discharge Surface Water In
Subject To An Easement To
#3342
SNET
BCLC
#307
5SNET
MBR
MBR
ENDWALL
CONC.
24’’ R
CP
30’’ C
MP
15’’
ACC
MP
15’’ R
CP
108" P
LATE PI
PE
RIP
RAP
RIP
RAP
NGVD 1929
B.M.-1 Elev. 170.91
BCLC
BCLC
BCLC
MBR
MBR
BIT. L.O.
BCLC
BC
LC
BC
LC B
CL
C
BCLC
108"
PLA
TE PIP
E
24’’
RCP
BCLC
15"
RCP
15"
ACC
MP
MBR
MBR
ENDWALL
CONC.
NGVD 1929
B.M.-3 Elev. 170.22
82"
X10
8" R
CP
B.M.-2 Elev. 188.43
’’C’’ C
B
’’C’’ C
B
INSIDE INVERT=153.82
INSIDE TOP=161.51
INSIDE INVERT=153.33
INSIDE TOP=161.23INSIDE INVERT=151.63
INSIDE TOP=160.61
INSIDE TOP=160.75
INSIDE INVERT=151.07
INSIDE TOP=159.91
INSIDE INVERT=150.45
FL=155.11
FL=146.65
FL=154.89
FL=153.58
FL=150.57
FL=158.68
FL=160.99
FL=164.76
FL=169.92
AD
83
CO
OR
DIN
AT
E
GRID
CO
NN
EC
TIC
UT
149.73’
+
+149.85’
+
150.12’
+
151.73’
152.61
+
153.65’
+
154.40’
+
154.71’
+
154.94’
+155
155
155
155
155
150
155.67’
+
155.71’
+
+
156.08’
156.14’
+
+
156.40’
156.62’
+
+
157.60’
+
157.74’
160
160
160
165
170
175
165
160
155
150
S59° -47’-32"E
743.16’
S31°-41’-
46""E
799.5
2’
162.57’+
163.90’+
164.90’
+
165
165
165
170
175
170
170
170
165
160
155
170
170
165
170
170
175
175
175
175
175
175
175
180
180
180
180
185
180
180
180
185
185
185
185
190
190
190
190
190
195
41+00
42+00
43+00
44+00
45+00
46+00
E 10
6121
8.93
N 72
7124.34
PT S
TA 44
+97
47+00
48+00
49+00
50+00
E 1061076.5
N 727354.6
1
PT ST
A 47+67
E 10
6142
7.51
N 72
6787.14
POB
PT S
TA 41
+00
E 1060817.6
0
N 727473.9
0
PT ST
A 50+00
CONSTRUCTION FACING
LIMIT OF SHOTCRETE
(TEMPORARILY GRADE AS REQUIRED FOR ACCESS)
TEMPORARY ACCESS ROAD
AS REQUIRED FOR ACCESS)
(TEMPORARILY GRADE
TEMPORARY ACCESS ROAD
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\06734\MSH_PLN_06734.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
ROUTE 9
CULVERT REHABILITATION
HWY-04HADDAM
PLAN SHEET
172-391MPB
EAJ
SEDIMENTATION CONTROL SYSTEM
SYSTEM
CONTROL
SEDIMENTATION
SEDIMENTATION CONTROL SYSTEM
SEDIMENTATION CONTROL SYSTEM
ENVIRONMENTAL PLANNING.
WILL BE REMOVED BY THE CONTRACTOR, UNDER THE DIRECTION OF THE DEPARTMENT’S OFFICE OF
4) DEPOSITED SEDIMENTS WHICH HAVE BUILT UP IMMEDIATELY ADJACENT TO THE CULVERT INLET
SEE WATER HANDLING PLAN AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
INTERIOR PIPE PLACED INSIDE THE LARGER CULVERT WILL BE USED FOR WATER HANDLING.
REQUIRED DURING GROUTING AND ANY CONCRETE WORK. DURING THIS TIME, A SMOOTH
WATER IS FLOWING THROUGH THE PIPE (STREAM BASEFLOW). WATER HANDLING WILL BE
3) IT IS EXPECTED THAT THE INSTALLATION OF THE 96" PIPE LINER WILL TAKE PLACE WHILE
TOPOGRAPHY AND/OR TO MINIMIZE REMOVAL OF MATURE TREES.
2) THE LOCATION OF TEMPORARY CONSTRUCTION ACCESS SHALL BE ADJUSTED SLIGHTLY FOR
BE FROM THE OUTLET END OF THE CULVERT.
1) THE PRIMARY CONSTRUCTION ACCESS AND WORK AREA FOR CULVERT LINER INSTALLATION WILL
GENERAL NOTES:
CULVERT #6734 (SITE 1)
OBJECT MARKER
OBJECT MARKER
CONCRETE WEIR (SEE DETAILS)
SCALE 1" = 20’
CULVERT #6734 INLET
(PAID FOR AS CHANNEL EXCAVATION - EARTH)
REMOVE SEDIMENT
#0980102 CONSTRUCTION STAKING SITE 2: SECTION 9.80
#0980101 CONSTRUCTION STAKING SITE 1: SECTION 9.80
#0975012 MOBILIZATION SITE 2: SECTION 9.75
#0975011 MOBILIZATION SITE 1: SECTION 9.75
#0201031 CLEARING AND GRUBBING SITE 2: SECTION 2.01
#0201030 CLEARING AND GRUBBING SITE 1: SECTION 2.01
SUPPLEMENTAL SPECIFICATIONS:
FOR THE FOLLOWING ITEMS, REFER TO FORM 816 AND
NOTE:
ANTI-TRACKING PAD
(INCLUDED IN PAY ITEM)
GROUT SPACE BETWEEN PIPES
CORRUGATED METAL PIPE
290 - 96" ALUMINUM
CONCRETE WEIR (SEE DETAILS)
ROUNDED STONE RIP-RAP
(AS REQUIRED)
REGRADE RIP-RAP CHANNEL
ANTI-TRACKING PAD
(FOR PIPE LINING)
PRIMARY WORK AREA
03.04
WO
ODS
WO
ODS
WO
ODS
CT. R
OUT
E 9 N
ORT
HB
OU
ND
WO
ODS
CT. R
OUT
E 9 N
ORT
HB
OU
ND
WO
ODS
CT. R
OU
TE 9
OF
F
RA
MP
WO
ODS
WO
ODS
CT. R
OU
TE 9
OF
F
RA
MP
WO
ODS
COFFERDAM
SANDBAG
PAST WORK AREA
DIVERT FLOW
(FND.)
I.P.
(FND.)
I.P.
(FND.)
CHD
B-8629
TO
MID
DLET
OW
N
TO
MID
DLET
OW
N
(FND.)
CHD
B-8629
’’C’’ C
B
’’C’’ C
B
’’C’’ C
B
’’C’’ C
B
RIP-RAP
STONE
MODIFIED
’’C’’ C
B
WIR
E
RO
PE
RAIL
’’C’’ C
B
RS-1332
FIE
LD
LO
C. W
ET
LA
ND
S ’’C’’ C
B
RS-1332
FIE
LD
LO
C. W
ET
LA
ND
S
2A
8 8
BIT. L
EA
KOFF
12" PINE
WIR
E R
OPE R
AIL
15’’ C
MP
’’C’’ C
B
NO
N
AC
CESS
HIG
HW
AY
LIN
E
R.O.W. M
AP 60-04
SH. 6
OF 6
WIR
E
RO
PE
RAIL
36’’
ACCMP
36’’
ACCMP
BOULDER
20" PINE
’’C’’
CB
15’’
RCP
WOOD POSTS
BILLBOARDS
’’C’’
CB
15’’ C
MP
’’CL’’ CB
15’’ ACCMP’’C’’
CB
EASEMENT TO DRAIN
SUBJECT TO AN
21’’ PERF. ACCMP
WIR
E R
OPE R
AIL
WOOD POSTS
BILLBOARDS
15’’
RCP
’’C’’
CB
20" PINE
36’’
ACCMP
BOULDER
12" PINE
BIT. L
EA
KOFF
15’’ C
MP
NO
N
AC
CESS
HIG
HW
AY
LIN
E
R.O.W. M
AP 60-04
SH. 6
OF 6
EASEMENT TO DRAIN
SUBJECT TO AN
2A
21’’ PERF. ACCMP
’’C’’
CB
15’’ ACCMP
’’CL’’ CB
15’’ C
MP
’’C’’
CB
36’’
ACCMP
PAST RIP-RAP WORK AREA
DISCHARGE BASE FLOW
WATER HANDLING PIPE
108" P
LATE PI
PE
BCLC
BCLC
24’’
RCP
RIP
RAP
BCLC
BC
LC
BC
LC
108" P
LATE PI
PE
MBR
MBR
BCLC
108"
PLA
TE PIP
E
RIP
RAP
RIP
RAP
RIP
RAP
BCLC
MBR
MBR
15"
RCP
BCLC
15"
ACC
MP
BCLC
#307
5SNET
24’’
RCP
MBR
MBR
108"
PLA
TE PIP
E
15"
RCP
15"
ACC
MP
MBR
MBR
BC
LC B
CL
C
BCLC
#307
5SNET
SANDBAG COFFERDAM
FOR PIPE INSTALLATION
(MODIFIED RIP-RAP PAD)
PRIMARY WORK AREA
ACCESS
TEMPORARY CONSTRUCTION
COFFERDAM
SANDBAG
ACCESS
CONSTRUCTION
TEMPORARY
ACCESS
CONCTRUCTION
TEMPORARY
TEMPORARY CONSTRUCTION ACCESS
FIELD LOCATED WETLANDS
FIELD LOCATED WETLANDS
RESTORE DISTURBED AREAS. INSTALL PLANTINGS, TOPSOIL AND SEED TO RESTORE AS REQUIRED OR AS DIRECTED BY THE ENGINEER.12)
REMOVE WATER HANDLING EQUIPMENT, PIPING AND TEMPORARY WORK PAD.11)
INSTALL ROUNDED STONE RIP-RAP AROUND CONCRETE WEIRS AS REQUIRED OR AS DIRECTED.10)
INSTALL CONCRETE WEIRS AT INLET AND OUTLET.9)
SHOT-CRETE THE EXISTING RIP-RAP AROUND THE PIPE INLET.8)
GROUT SPACE BETWEEN EXISTING CULVERT AND PIPE LINER.7)
REMOVE SEDIMENT DEPOSITS AT INLET. SHAPE CHANNEL AS REQUIRED FOR UNIMPEDED FLOW TO INLET.6)
MAINTAIN AREA TO RECEIVE STREAM BASE FLOW FROM WATER HANDLING PIPE.
DISCHARGE STREAM BASE FLOW DOWNSTREAM OF THE SANDBAG COFFERDAM CONSTRUCTED AT THE OUTLET. 5)
INSTALL COFFERDAM AND DE-WATERING SYSTEM AT THE PIPE OUTLET.4)
ESTABLISH A SUITABLE TEMPORARY INLET FOR THE WATER HANDLING PIPE BY CONSTRUCTING A SANDBAG COFFERDAM AT THE INLET.3)
CONVEYED PAST THE WORK AREAS AT THE INLET AND OUTLET.
INSTALL 24�WATER HANDLING PIPE INSIDE THE 96" LINER PIPE. INSTALL THE PIPE SO THAT THE STREAM BASE FLOW WILL BE 2)
PRIOR TO INSTALLATION OF WATER HANDLING PIPE.
WATER HANDLING METHODS AND INLET AND OUTLET LOCATIONS MUST BE VERIFIED BY THE DEPARTMENT (ENVIRONMENTAL PERSONNEL) 1)
STAGE 2 NOTES:
FL=155.11
FL=158.68
FL=169.92
FL=155.11
FL=150.57
FL=150.57
FL=158.68
FL=160.99
FL=164.76
FL=164.76
FL=160.99
WEIR
CONCRETE
WEIR
CONCRETE
155
155
155
155
155
155
160
160
175
170
165
165
175
170
165
165
160
170
170
170
170
165
170
170
165
155
170
170
165
170
170
165
160
155
175
175
175
180
175
180
175
175
175
175
175
175
175
175
180
180
180
180
185
180
180
180
180180
185
180
185
185
185
185
185
185
185
185
190
190
190
190
190
190
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\06734\WTR_PLN_06734.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
STAGE 1 STAGE 2
ROUTE 9
CULVERT REHABILITATION HWY-05
MPB
EAJ HADDAM
STAGING ANDWATER HANDLING PLAN
172-391
CULVERT # 6734 (SITE 1)
AS THE PRIMARY WORK AREA, THE CONTRACTOR MUST SEEK APPROVAL IN WRITING FROM THE ENGINEER PRIOR TO STARTING WORK.
PIPE INTO POSITION. CONNECT EACH LINER SECTION USING THE INTERNAL COUPLING BANDS. IN THE EVENT THE INLET WILL BE USED
THE LINER PIPE SECTIONS HAVE BEEN PUSHED INTO THE PIPE. ALIGNMENT BOLTS SHALL BE INSTALLED TO SECURELY FIX THE LINER
FINAL POSITION. THE NEXT SECTION WILL BE PUSHED UNTIL IT MEETS THE PREVIOUS SECTION. THIS WILL CONTINUE UNTIL ALL OF
PRIMARY WORK AREA (OUTLET SIDE) AND PUSHING EACH SECTION INDIVIDUALLY TOWARD THE INLET UNTIL IT IS INSTALLED IN ITS
INSTALL 96" CORRUGATED ALUMINUM PIPE (LINER). THIS IS EXPECTED TO BE ACCOMPLISHED BY BRINGING PIPE SECTIONS TO THE 6)
STOCK PILE PIPE SECTIONS IN NON-REGULATED AREAS AND DELIVER FOR USE AS NEEDED. AREAS MUST BE APPROVED PRIOR TO USE.5)
AND RAIL INSTALLATION.
PREPARE EXISTING CULVERT AS REQUIRED FOR LINER INSTALLATION; THIS MAY INCLUDE DEBRIS REMOVAL, SPOT REPAIR 4)
WORK AREA AT THE PIPE OUTLET.
INSTALL MODIFIED RIP-RAP ONLY AS NECESSARY TO CREATE A LEVEL AND STABLE SURFACE FOR THE EQUIPMENT 3)
UNDERLINE ACCESS ROAD WITH GEOTEXTILE FILTER FABRIC (SEPARATION - HIGH SURVIVABILITY) IN WETLAND AREAS.
ESTABLISH TEMPORARY ACCESS ROADS, ADJUST FOR BEST PATH TO MINIMIZE THE REMOVAL OF MATURE TREES.2)
INSTALL EROSION AND SEDIMENTATION CONTROL SYSTEMS.
MEASURES SHALL BE TAKEN TO PREVENT POLLUTION OR SEDIMENTATION OF THE WATERCOURSE OR REGULATED AREA.1)
STAGE 1 NOTES:
03.05
CT. R
OUT
E 9 N
ORT
HB
OU
ND
CT. R
OU
TE 9
OF
F
RA
MP
CT. R
OUT
E 9 S
OUT
HB
OU
ND
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WOODS
CT. R
OUT
E 9 ON
RA
MP
WO
ODS
HU
BB
AR
D
RO
AD
WOODS
BEA
VER
MEA
DO
W
RO
AD
VIRGINIA L. EVENSEN
N/F
(60-88-2A)
STATE PARK AND FOREST (DEP)
STATE OF CONNECTICUT
ET AL
DANIEL F. VAN DEUSEN
N/F
ET AL
DANIEL F. VAN DEUSEN
N/F
TO
MID
DLET
OW
N
B-8629
(FND.)
I.P.
(FND.)
CHD
(N.F.)
CHD
(N.F.)
CHD
(FND.)
CHD
BE
AV
ER
ME
AD
OW
BR
OO
K
’’C’’ C
B
RAILROAD SPIKE IN 20" PINE TREE
’’C’’ C
B
’’C’’ C
B
BOT=171.57
FL=171.67 SE FL=171.57 NE
TF=176.87
"C"CB
BOT=184.23 FL=184.43 SW FL=184.23 NE
TF=188.93
"C"CB
BOT=182.85
FL=184.95
TF=188.55
"C"CB
BOT=187.83 FL=187.93 SW FL=187.83 NE
TF=192.58
"C"CB
BOT=159.22 FL=159.32 SW FL=159.22 NE
TF=166.02
"C"CB
BOT=162.93 FL=164.83 S FL=164.93 N
TF=167.23
"C"CB
BOT=164.43
FL=(FILLED)
TF=167.83
"C"CB
BOT=161.25
FL=162.85
TF=166.85
"CL"CB
BOT=160.03 FL=161.93 NW FL=161.93 W FL=161.83 NE
TF=165.83
"C"CB
BOT=155.23 FL=157.33 SW FL=157.23 NE
TF=161.33
"C"CB
BOT=156.01 FL=156.31 NW FL=157.01 SW FL=156.21 SE
TF=160.41
"C"CB
RAILROAD SPIKE IN 12" ORNAMENTAL
20" PINE
’’C’’ C
B
WIR
E
RO
PE
RAIL
WIR
E
RO
PE
RAIL
WIR
E R
OPE R
AIL
BILLBOARDS
WOOD POSTS
LE
DG
E
LED
GE
36’’
ACCMP
36’’
ACCMP
15’’ ACCMP
’’C’’
CB
’’C’’
CB
’’CL’’ CB
15’’ C
MP
15’’
RCP
’’C’’
CB
BIT. L
EA
KOFF
12" PINE
BOULDER
LEDGE
GR
AN. C
UR
B
15’’ C
MP
’’C’’ C
B
21’’ PERF. ACCMP
WALL
STONE
15’’ C
MP
12’’ C
MP
RS-1332
2A
8
FIE
LD
LO
C. W
ET
LA
ND
S
FIE
LD
LO
C. W
ET
LA
NDS
FIE
LD
LO
C. W
ET
LA
ND
S
FIELD LOC. WETLANDS
NO
N
AC
CESS
HIG
HW
AY
LIN
E
NO
N
AC
CESS
HIG
HW
AY
LIN
E
R.O.W. M
AP 60-04
SH. 6
OF 6
R.O.W. M
AP 60-04
SH. 6
OF 6
NO
N
ACCESS
HIG
HW
AY LIN
E
R.O.W. M
AP 60-0
5 S
H. 1 O
F 6
432.8
5’
480.15
’
STREET LI
NE
STREET LI
NE
(N.F.)
MON.
STREET LIN
E
EASEMENT TO DRAIN
SUBJECT TO AN
Pole Line(s) In Favor Of SNET
Subject To An Easement For
(60-100-2)
(DOT)
Favor Of State Of Connecticut
Relocate Brook Channel In
Subject To An Easement To
(60-88-23), (60-100-2)
(DOT)
Favor Of State Of Connecticut
Discharge Surface Water In
Subject To An Easement To
#3342
SNET
BCLC
#307
5SNET
MBR
MBR
ENDWALL
CONC.
24’’ R
CP
30’’ C
MP
15’’
ACC
MP
15’’ R
CP
108" P
LATE PI
PE
RIP
RAP
RIP
RAP
NGVD 1929
B.M.-1 Elev. 170.91
BCLC
BCLC
BCLC
MBR
MBR
BIT. L.O.
BCLC
BC
LC
BC
LC B
CL
C
BCLC
108"
PLA
TE PIP
E
24’’
RCP
BCLC
15"
RCP
15"
ACC
MP
MBR
MBR
ENDWALL
CONC.
NGVD 1929
B.M.-3 Elev. 170.22
82"
X10
8" R
CP
B.M.-2 Elev. 188.43
’’C’’ C
B
’’C’’ C
B
INSIDE INVERT=153.82
INSIDE TOP=161.51
INSIDE INVERT=153.33
INSIDE TOP=161.23INSIDE INVERT=151.63
INSIDE TOP=160.61
INSIDE TOP=160.75
INSIDE INVERT=151.07
INSIDE TOP=159.91
INSIDE INVERT=150.45
FL=155.11
FL=146.65
FL=154.89
FL=153.58
FL=150.57
FL=158.68
FL=160.99
FL=164.76
FL=169.92
AD
83
CO
OR
DIN
AT
E
GRID
CO
NN
EC
TIC
UT
149.73’
+
+149.85’
+
150.12’
+
151.73’
152.61
+
153.65’
+
154.40’
+
154.71’
+
154.94’
+155
155
155
155
155
150
155.67’
+
155.71’
+
+
156.08’
156.14’
+
+
156.40’
156.62’
+
+
157.60’
+
157.74’
160
160
160
165
170
175
165
160
155
150
S59° -47’-32"E
743.16’
S31°-41’-
46""E
799.5
2’
162.57’+
163.90’+
164.90’
+
165
165
165
170
175
170
170
170
165
160
155
170
170
165
170
170
175
175
175
175
175
175
175
180
180
180
180
185
180
180
180
185
185
185
185
190
190
190
190
190
195
41+00
42+00
43+00
44+00
45+00
46+00
E 10
6121
8.93
N 72
7124.34
PT S
TA 44
+97
47+00
48+00
49+00
50+00
E 1061076.5
N 727354.6
1
PT ST
A 47+67
E 10
6142
7.51
N 72
6787.14
POB
PT S
TA 41
+00
E 1060817.6
0
N 727473.9
0
PT ST
A 50+00
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\MSH_PLN_06734-Planting.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
ROUTE 9
CULVERT REHABILITATION
HWY-06HADDAM
SCIENTIFIC NAME
CULVERT # 6734 PLANTING SPECIFICATIONS
COMMON NAME SIZE WETLAND INDICATOR STATUS TOTAL
CORNUS RACEMOSA GRAY DOGWOOD
VIBURNUM LENTAGO
YELLOW BIRCH
3
6
3
3
3
FAC
FAC
FAC
FACU
FACU
24" - 36"
24" - 36"
24" - 36"
2’ - 3’
2’ - 3’
NANNYBERRY
CLETHRA ALNIFOLIA
BETULA ALLEGHANIENSIS
SYMBOL
PINUS STROBUS WHITE PINE
BEAL
PIST
CA
CR
VL
BEAL
BEAL
BEAL
PIST
PIST
PIST
CA
CACA
VL
VL
VL
CR
CR
CR
CR
172-391
PLANTING PLAN
SUMMERSWEET
A. SAUL
K. LESAY
SEE PLAN SHEET (HWY-04) FOR DESIGN INFORMATION.
THIS PLAN IS FOR PLANTING INFORMATION ONLY.
NOTE:
CULVERT #6734 (SITE 1)
FIELD LOCATED WETLANDS
CR
CR
03.06
ENDWALLCONC.
WINGWALLCONC.
72’’ C
MP
CT. ROUTE 9 NORTHBOUND
CT. ROUTE 9 SOUTHBOUND
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
BCLC
BCLC
BCLC
BCLC
BIT. LEAKOFF
BIT.
APRON
SWAMP
MBR
MBR BCLC
BCLC
CLUMP OF CEDAR
DIRT ROAD
TO MIDDLETOWN
HILL BROOK
TURKEY HILL
TURKEY
BROOK
INSIDE TOP=298.84
INSIDE TOP=297.40
INSIDE INVERT=291.80
INSIDE INVERT=292.32
INSIDE INVERT=293.13
INSIDE INVERT=293.89
INSIDE TOP=299.63
INSIDE INVERT=294.84
INSIDE TOP=300.57
INSIDE INVERT=291.16
INSIDE TOP=296.93
INSIDE INVERT=291.09
INSIDE TOP=297.03
FL=295.08
INLET
FL=291.24
OUTLET
’’C’’ CB
’’C’’ CB
’’C’’ CB’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
15"
RC
P
BOT=342.27
FL=344.67
TF=347.87
"C"CB
BOT=344.50
FL=344.50 W
FL=344.60 E
TF=348.30
"C"CB
15"
RC
P
BOT=339.73
FL=339.73 W
FL=339.73 E
TF=345.13
"C"CB
BOT=339.02
FL=339.82
TF=345.02
"C"CB
BOT=342.37
FL=343.67
TF=348.07
"C"CB
BOT=342.42
FL=342.42 W
FL=342.72 E
TF=348.12
"C"CB
15"
RC
P15"
CM
P
FL=334.82
15" CMP
15" CMP
BOT=338.66
FL=338.66 S
FL=338.96 N
TF=342.56
"C"CB
18’’ R
CP
FL=336.07
BOT=336.63
FL=336.63
TF=340.13
"C"CB
SIZE UNKNOWN SIZE UNKNOWN
BOT=339.41
FL=341.11
TF=344.81
"C"CB 18’’ R
CP
FL=340.41
"DG" ENDWALL
BOT=309.97
FL=313.67 S
FL=313.67 N
TF=334.67
"DG" ENDWALL
15"
AC
CM
P
15"
AC
CM
P
(FND.)
CHD (N/F)
CHD (FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(FND.)
CHD
(FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(N/F)
I.P.
(N/F)
I.P.
(N/F)
I.P.
TRUSTEES
ET AL
JOHN J. LAVIN
N/F
TOWN OF HADDAM
N/F
ET AL
KET BOUNPHAKDY
N/F
ET AL
PETER ARSENAULT
N/F
(FND.)
I.P.
(60-88-12)
In Favor Of The State Of Connecticut
Subject To An Easement To Drain
E 1063400
N 7215
00
E 1064000
N 7215
00
293.47’
++
293.50’
+
293.72’
294.25’
+
294.49’
+
292.51’
+
294.81’+
295
295
295
295
295
295
295.45’
+
295.70
+
295.78’
296.59’
+
298.78’
299.20’
+
299.30’
+
299.42’+
300
300
300
300
300
+
300.52’
+
301.72’
301.86’
+ 301.91’
+
+
301.93’
+
301.93’
+
302.17’
+
+
305
305
305
305
305
305
305
305
310
310
310
310
310
310
310
310
+
310.75’
315
315
315
315
315
315
315
315
+
317.59’
317.70’
++
317.75’
+318.19’
320
320
320
320
320
320
320
345
320
325
325
325325325
325
330330330
330330
330
+
334.96’
335335335
335335
335
340
340
340
340
340 340
340
340
340340
340
340
345
345
345
345
345
345 345
345
345
350
350
350
350
355
63+0064+0065+0066+0067+00
E 1063709.5
9N
721019.1
8
PT 67+
13
E 1063863.5
8N
720636.4
5
PT S
TA 63+
00
68+0069+0070+0071+0072+0073+00
90+00
83+0084+00
85+0086+00
87+0088+00
89+0091+00
92+0093+00
E 1063813.2
1
N
721382.5
2
PT S
TA 90+
18
E 1063697.0
5
N
721707.4
5
PT S
TA 93+
63
E 1064058.0
5
N
720707.7
9
PT S
TA 83+
00
E 1063468.7
4N
721616.5
2
PT S
TA 73+
57
CMS
TEMPORARY WORK AREA REQUIREDA
EASEMENT TO FLOOD REQUIREDC
A
AC
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\06683\MSH_PLN_06683.dgn
Border Version: 11/14/08
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
ROUTE 9
CULVERT REHABILITATION
HWY-07
MPB
EAJ HADDAM
PLAN SHEET
172-391
ANTI-TRACKING PAD
(INLET SIDE)
PRIMARY WORK AREA
WORK AREA
LIMIT OF PROPOSED
WORK AREA
LIMIT OF PROPOSED
SYSTEM
CONTROL
SEDIMENTATION
CULVERT #6683 (SITE 2)
OBJECT MARKER
OBJECT MARKER
CONCRETE BARRIER CURB
TEMPORARY PRECAST
ATTENUATION SYSTEM
TEMPORARY IMPACT
IN THE VICINITY OF THE CULVERT INLET. ANY DAMAGE TO THE CMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
7) THE CONTRACTOR SHALL AVOID CONTACT WITH THE CHANGEABLE MESSAGE SIGN (CMS) LOCATED
SHALL BE PAID FOR AS RESET 3-CABLE GUIDERAIL (I-BEAM POSTS).
6) REMOVAL, STORAGE AND REPLACEMENT OF 3-CABLE GUIDERAIL ON THE NORTHBOUND SIDE OF ROUTE 9
ENVIRONMENTAL PLANNING.
INLET WILL BE REMOVED BY THE CONTRACTOR, UNDER THE DIRECTION OF THE DEPARTMENT’S OFFICE OF
5) DEPOSITED SEDIMENTS WHICH HAVE BUILT UP IMMEDIATELY ADJACENT TO THE CULVERT
4) RIP-RAP WILL BE INSTALLED BEHIND THE OUTLET ENDWALL TO STABILIZE THE SLOPE.
SEE WATER HANDLING PLAN AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
INTERIOR PIPE PLACED INSIDE THE LARGER CULVERT WILL BE USED FOR WATER HANDLING.
REQUIRED DURING GROUTING AND ANY CONCRETE WORK. DURING THIS TIME, A SMOOTH
WATER IS FLOWING THROUGH THE PIPE (STREAM BASEFLOW). WATER HANDLING WILL BE
3) IT IS EXPECTED THAT THE INSTALLATION OF THE 60" PIPE LINER WILL TAKE PLACE WHILE
TOPOGRAPHY OR TO MINIMIZE REMOVAL OF MATURE TREES.
2) THE LOCATION OF TEMPORARY CONSTRUCTION ACCESS SHALL BE ADJUSTED SLIGHTLY FOR
WILL BE FROM THE INLET END OF THE CULVERT.
1) THE PRIMARY CONSTRUCTION ACCESS AND WORK AREA FOR CULVERT LINER INSTALLATION
GENERAL NOTES:
FOR ACCESS)
(TEMPORARILY GRADE AS REQUIRED
TEMPORARY ACCESS ROAD
ATTACHMENT
TEMPORARY GUIDERAIL
#0980102 CONSTRUCTION STAKING SITE 2: SECTION 9.80
#0980101 CONSTRUCTION STAKING SITE 1: SECTION 9.80
#0975012 MOBILIZATION SITE 2: SECTION 9.75
#0975011 MOBILIZATION SITE 1: SECTION 9.75
#0201031 CLEARING AND GRUBBING SITE 2: SECTION 2.01
#0201030 CLEARING AND GRUBBING SITE 1: SECTION 2.01
SUPPLEMENTAL SPECIFICATIONS:
FOR THE FOLLOWING ITEMS, REFER TO FORM 816 AND
NOTE:
FOR ACCESS)
(TEMPORARILY GRADE AS REQUIRED
TEMPORARY ACCESS ROAD
ANTI-TRACKING PADMODIFIED RIP-RAP
SYSTEM
CONTROL
SEDIMENTATION
(INCLUDED IN PAY ITEM FOR PIPE)
INSTALL BAFFLES INSIDE PIPE
CHANNEL EXCAVATION - EARTH)
REMOVE SEDIMENT (PAID FOR AS
EASEMENT LIMIT
APPROXIMATE PONDING
AD
83
COORDINATE GRID
CONNECTICUT
(185 FEET)
RESET METAL BEAM RAIL
(LOCATION APPROXIMATE)
CHANGEABLE MESSAGE SIGN
(INCLUDED IN PAY ITEM FOR PIPE)
GROUT SPACE BETWEEN PIPES
CORRUGATED METAL PIPE
408’ - 60" ALUMINUM
BEAM RAIL (185 FEET)
REMOVE METAL
ANCHOR SHALL REMAIN
TYPE 1 (TEMPORARY)
END ANCHORAGE
RESET 3-CABLE GUIDE RAIL (388 FEET)
LEGEND
03.07
WINGWALLCONC.
72’’ C
MP
CT. ROUTE 9 NORTHBOUND
ENDWALLCONC.
WINGWALLCONC.
72’’ C
MP
CT. ROUTE 9 NORTHBOUND
BIT.
APRON
SWAMP
CLUMP OF CEDAR
BIT.
APRON
SWAMP
CLUMP OF CEDAR
HILL BROOKTURKEY HILL BROOK
TURKEY HILL
TURKEY
BROOK
BROOK
HILL
TURKEY
WATER HANDLING PIPE
(LOCATION APPROXIMATE)
DE-WATERING BASIN
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\Plan\06683\WTR_PLN_06683.dgn
Border Version: 11/14/08
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
STAGE 1 STAGE 2
ROUTE 9
CULVERT REHABILITATION HWY-08
MPB
EAJ HADDAM
STAGING ANDWATER HANDLING PLAN
172-391
’’C’’ CB’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
15"
RC
P
BOT=342.42
FL=342.42 W
FL=342.72 E
TF=348.12
"C"CB
15"
RC
P15"
CM
P
18’’ R
CP
FL=336.07
SIZE UNKNOWN SIZE UNKNOWN
BOT=339.41
FL=341.11
TF=344.81
"C"CB 18’’ R
CP
"DG" ENDWALL
BOT=309.97
FL=313.67 S
FL=313.67 N
TF=334.67
"DG" ENDWALL
15"
AC
CM
P
WL1
(FND.)
CHD (N/F)
CHD
NON ACCESS HIGHWAY LINE
(FND.)
CHD
NON ACCESS HIGHWAY LINE
TOWN OF HADDAM
N/F
(FND.)
I.P.
’’C’’ CB’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
15"
RC
P
BOT=342.42
FL=342.42 W
FL=342.72 E
TF=348.12
"C"CB
15"
RC
P15"
CM
P
18’’ R
CP
FL=336.07
SIZE UNKNOWN SIZE UNKNOWN
BOT=339.41
FL=341.11
TF=344.81
"C"CB 18’’ R
CP
"DG" ENDWALL
BOT=309.97
FL=313.67 S
FL=313.67 N
TF=334.67
"DG" ENDWALL
15"
AC
CM
P
WL1
(FND.)
CHD (N/F)
CHD
NON ACCESS HIGHWAY LINE
(FND.)
CHD
NON ACCESS HIGHWAY LINE
TOWN OF HADDAM
N/F
(FND.)
I.P.
ACCESS
CONSTRUCTION
TEMPORARY
TEMPORARY CONSTRUCTION ACCESS
SANDBAG COFFERDAM
ACCESS
CONSTRUCTION
TEMPORARY
TEMPORARY CONSTRUCTION ACCESS
THE CONTRACTOR MUST SEEK APPROVAL IN WRITING FROM THE ENGINEER PRIOR TO STARTING WORK.
ALIGNMENT BOLTS AND INTERNAL COUPLING BANDS. IN THE EVENT THE INLET WILL BE USED AS THE PRIMARY WORK AREA,
CONTINUE UNTIL ALL OF THE LINER PIPE SECTIONS HAVE BEEN PUSHED INTO THE PIPE. CONNECT EACH LINER SECTION USING THE
IS NOT ABLE TO MOVE FURTHER UP THE PIPE. THE NEXT SECTION WILL BE PUSHED UNTIL IT MEETS THE PREVIOUS SECTION. THIS WILL
SECTIONS TO THE PRIMARY WORK AREA (OUTLET SIDE) AND PUSHING EACH SECTION INDIVIDUALLY TOWARD THE INLET UNTIL IT
INSTALL 96" CORRUGATED ALUMINUM PIPE (LINER). THIS IS EXPECTED TO BE ACCOMPLISHED BY BRINGING PIPE 6)
STOCK PILE PIPE SECTIONS IN NON-REGULATED AREAS AND DELIVER FOR USE AS NEEDED. AREAS MUST BE APPROVED PRIOR TO USE.5)
AND RAIL INSTALLATION.
PREPARE EXISTING CULVERT AS REQUIRED FOR LINER INSTALLATION; THIS MAY INCLUDE DEBRIS REMOVAL, SPOT REPAIR 4)
WORK AREA AT THE PIPE OUTLET.
INSTALL MODIFIED RIP-RAP ONLY AS NECESSARY TO CREATE A LEVEL AND STABLE SURFACE FOR THE EQUIPMENT 3)
UNDERLINE ACCESS ROAD WITH GEOTEXTILE FILTER FABRIC (SEPARATION - HIGH SURVIVABILITY) IN WETLAND AREAS.
ESTABLISH TEMPORARY ACCESS ROADS, ADJUST FOR BEST PATH TO MINIMIZE THE REMOVAL OF MATURE TREES.2)
INSTALL EROSION AND SEDIMENTATION CONTROL SYSTEMS.
MEASURES SHALL BE TAKEN TO PREVENT POLLUTION OR SEDIMENTATION OF THE WATERCOURSE OR REGULATED AREA.1)
STAGE 1 NOTES:
RESTORE ALL DISTURBED AREAS. INSTALL PLANTINGS, TOPSOIL AND SEED TO RESTORE AS REQUIRED OR AS DIRECTED BY THE ENGINEER.12)
REMOVE WATER HANDLING EQUIPMENT AND TEMPORARY WORK PAD.11)
INSTALL RIP-RAP BEHIND ENDWALL AT THE OUTLET.10)
REMOVE CRUSHED STONE PAD AT INLET, CLEAN SEDIMENT DEPOSITS AND SHAPE CHANNEL AS REQUIRED FOR UNIMPEDED FLOW TO INLET.9)
INSTALL ALUMINUM BAFFLES INSIDE THE LINER PIPE.8)
GROUT SPACE BETWEEN EXISTING CULVERT AND THE NEW PIPE LINER.7)
ESTABLISH SUITABLE PUMP INLET FOR REMOVAL EXCESS WATER IN WORK AREA TAKING CARE TO MINIMIZE SCOURING OF THE STREAMBED. 6)
TO RECEIVE STREAM BASE FLOW FROM WATER HANDLING PIPE.
DISCHARGE STREAM BASE FLOW DOWNSTREAM OF THE SANDBAG COFFERDAM CONSTRUCTED AT THE OUTLET. MAINTAIN AREA 5)
INSTALL COFFERDAM AND DEWATERING BASIN AT OUTLET TO ALLOW DE-WATERING OF OUTLET AREA.4)
PLACE SANDBAG COFFERDAM(S) AT INLET AND DISCHARGE STREAM BASEFLOW FROM THE TWO CHANNELS INTO THE WATER HANDLING PIPE. 3)
BASE FLOW WILL BE CONVEYED PAST THE WORK AREAS AT THE INLET AND OUTLET.
INSTALL 18�WATER HANDLING PIPE INSIDE THE 60" LINER PIPE. INSTALL THE PIPE SO THAT THE STREAM 2)
(ENVIRONMENTAL PERSONNEL) PRIOR TO INSTALLATION OF WATER HANDLING PIPE.
WATER HANDLING METHODS AND INLET AND OUTLET LOCATIONS MUST BE VERIFIED BY THE DEPARTMENT 1)
STAGE 2 NOTES:
WORK AREA
LIMIT OF TEMPORARYWORK AREA
LIMIT OF TEMPORARY
CULVERT # 6683 (SITE 2)
PRIMARY WORK AREA, THE CONTRACTOR MUST SEEK APPROVAL IN WRITING FROM THE ENGINEER PRIOR TO STARTING WORK.
INTO POSITION. CONNECT EACH LINER SECTION USING THE INTERNAL COUPLING BANDS. IN THE EVENT THE OUTLET WILL BE USED AS THE
THE LINER PIPE SECTIONS HAVE BEEN PUSHED INTO THE PIPE. ALIGNMENT BOLTS SHALL BE INSTALLED TO SECURELY FIX THE LINER PIPE
IN ITS FINAL POSITION. THE NEXT SECTION WILL BE PUSHED UNTIL IT MEETS THE PREVIOUS SECTION. THIS WILL CONTINUE UNTIL ALL OF
SECTIONS TO THE PRIMARY WORK AREA (INLET SIDE) AND PUSHING EACH SECTION INDIVIDUALLY TOWARD THE OUTLET UNTIL IT IS INSTALLED
INSTALL 60" CORRUGATED ALUMINUM PIPE (LINER). THIS IS EXPECTED TO BE ACCOMPLISHED BY BRINGING PIPE 6)
STOCK PILE PIPE SECTIONS IN NON-REGULATED AREAS AND DELIVER FOR USE AS NEEDED. AREAS MUST BE APPROVED PRIOR TO USE.5)
AND RAIL INSTALLATION.
PREPARE EXISTING CULVERT AS REQUIRED FOR LINER INSTALLATION; THIS MAY INCLUDE DEBRIS REMOVAL, SPOT REPAIR 4)
AREA AT THE PIPE INLET.
INSTALL MODIFIED RIP-RAP AS NEEDED TO CREATE A LEVEL AND STABLE SURFACE FOR THE EQUIPMENT WORK 3)
UNDERLINE ACCESS ROAD WITH FILTER FABRIC (HIGH SURVIVABILITY) IN WETLAND AREAS.
ESTABLISH TEMPORARY ACCESS ROADS, ADJUST FOR BEST PATH TO MINIMIZE THE REMOVAL OF MATURE TREES.2)
INSTALL EROSION AND SEDIMENTATION CONTROL SYSTEMS.
MEASURES SHALL BE TAKEN TO PREVENT POLLUTION OR SEDIMENTATION OF THE WATERCOURSE OR REGULATED AREA.1)
STAGE 1 NOTES:
BEHIND ENDWALL
INSTALL RIP-RAP
295 295
3" CRUSHED STONE PAD
(MODIFIED RIP-RAP)
CONSTRUCTION WORK AREA SANDBAG COFFERDAM
SANDBAG COFFERDAM
300
300
300
300
300
300
300
300
300
300
305
305
305
305
305
305
305
305
305
305
310
310
310
310
310
310
310
310
310
310
315
315
315
315
315
315
315
315
320
320
320
320
320
320
325
325
325
325
330330
330
330330
330
AD
83
COORDINATE GRID
CONNECTICUT
335335
335
335
335335
335
335
WATER HANDLING PIPE
CE
DA
R
CL
MP
CE
DA
R
CL
MP
340
340
340
340340
340
340
340
340
340340
340
345
345
345
345 345
345
345
345 345
345
350 350
03.08
ENDWALLCONC.
WINGWALLCONC.
72’’ C
MP
CT. ROUTE 9 NORTHBOUND
CT. ROUTE 9 SOUTHBOUND
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
BCLC
BCLC
BCLC
BCLC
BIT. LEAKOFF
BIT.
APRON
SWAMP
MBR
MBR BCLC
BCLC
CLUMP OF CEDAR
DIRT ROAD
TO MIDDLETOWN
HILL BROOK
TURKEY HILL
TURKEY
BROOK
INSIDE TOP=298.84
INSIDE TOP=297.40
INSIDE INVERT=291.80
INSIDE INVERT=292.32
INSIDE INVERT=293.13
INSIDE INVERT=293.89
INSIDE TOP=299.63
INSIDE INVERT=294.84
INSIDE TOP=300.57
INSIDE INVERT=291.16
INSIDE TOP=296.93
INSIDE INVERT=291.09
INSIDE TOP=297.03
FL=295.08
INLET
FL=291.24
OUTLET
’’C’’ CB
’’C’’ CB
’’C’’ CB’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
’’C’’ CB
15"
RC
P
BOT=342.27
FL=344.67
TF=347.87
"C"CB
BOT=344.50
FL=344.50 W
FL=344.60 E
TF=348.30
"C"CB
15"
RC
P
BOT=339.73
FL=339.73 W
FL=339.73 E
TF=345.13
"C"CB
BOT=339.02
FL=339.82
TF=345.02
"C"CB
BOT=342.37
FL=343.67
TF=348.07
"C"CB
BOT=342.42
FL=342.42 W
FL=342.72 E
TF=348.12
"C"CB
15"
RC
P15"
CM
P
FL=334.82
15" CMP
15" CMP
BOT=338.66
FL=338.66 S
FL=338.96 N
TF=342.56
"C"CB
18’’ R
CP
FL=336.07
BOT=336.63
FL=336.63
TF=340.13
"C"CB
SIZE UNKNOWN SIZE UNKNOWN
BOT=339.41
FL=341.11
TF=344.81
"C"CB 18’’ R
CP
FL=340.41
"DG" ENDWALL
BOT=309.97
FL=313.67 S
FL=313.67 N
TF=334.67
"DG" ENDWALL
15"
AC
CM
P
15"
AC
CM
P
(FND.)
CHD (N/F)
CHD (FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(FND.)
CHD
(FND.)
CHD
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
NON ACCESS HIGHWAY LINE R.O.W. MAP 60-04 SH. 3 OF 6
(N/F)
I.P.
(N/F)
I.P.
(N/F)
I.P.
TRUSTEES
ET AL
JOHN J. LAVIN
N/F
TOWN OF HADDAM
N/F
ET AL
KET BOUNPHAKDY
N/F
ET AL
PETER ARSENAULT
N/F
(FND.)
I.P.
(60-88-12)
In Favor Of The State Of Connecticut
Subject To An Easement To Drain
E 1063400
N 7215
00
E 1064000
N 7215
00
293.47’
++
293.50’
+
293.72’
294.25’
+
294.49’
+
292.51’
+
294.81’+
295
295
295
295
295
295
295.45’
+
295.70
+
295.78’
296.59’
+
298.78’
299.20’
+
299.30’
+
299.42’+
300
300
300
300
300
+
300.52’
+
301.72’
301.86’
+ 301.91’
+
+
301.93’
+
301.93’
+
302.17’
+
+
305
305
305
305
305
305
305
305
310
310
310
310
310
310
310
310
+
310.75’
315
315
315
315
315
315
315
315
+
317.59’
317.70’
++
317.75’
+318.19’
320
320
320
320
320
320
320
345
320
325
325
325325325
325
330330330
330330
330
+
334.96’
335335335
335335
335
340
340
340
340
340 340
340
340
340340
340
340
345
345
345
345
345
345 345
345
345
350
350
350
350
355
63+0064+0065+0066+0067+00
E 1063709.5
9N
721019.1
8
PT 67+
13
E 1063863.5
8N
720636.4
5
PT S
TA 63+
00
68+0069+0070+0071+0072+0073+00
90+00
83+0084+00
85+0086+00
87+0088+00
89+0091+00
92+0093+00
E 1063813.2
1
N
721382.5
2
PT S
TA 90+
18
E 1063697.0
5
N
721707.4
5
PT S
TA 93+
63
E 1064058.0
5
N
720707.7
9
PT S
TA 83+
00
E 1063468.7
4N
721616.5
2
PT S
TA 73+
57
CMS
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40’
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
6/3/2013
BLOCK:
SIGNATURE/
DATE: APPROVED BY:
OFFICE OF ENGINEERING
...\MSH_PLN_06683-PLANTING.dgn
Border Version: 11/14/08
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
- -
-
-
-
- -
- - -
- - - -
- - -
- - -
- - - -
ROUTE 9
CULVERT REHABILITATION
HWY-09HADDAM
172-391
CULVERT # 6683 PLANTING SPECIFICATIONS
COMMON NAME SIZE WETLAND INDICATOR STATUS TOTAL
8
8
9
4
FAC
FAC
FAC
FAC
24" - 36"
24" - 36"
24" - 36"NANNYBERRY
SYMBOL
CLETHRA ALNIFOLIA
SCIENTIFIC NAME
VIBURNUM LENTAGO
3FACUQUERCUS RUBRA
ACRU
QURU
CA
LB
VL
10FACW24" - 36"VC VACCINIUM CORYMBOSUM HIGHBUSH BLUEBERRY
1�-2" CAL
1�-2" CAL
SPICEBUSHLINDERA BENZOIN
VLVL
VLVL
VL
CACA
CA CA
VC VC LB
LB
CA
LB
VC
VCVCVC
VCCA
CACAVLVLVLLB
LBLB
LBLB
ACRUQURU
ACRU
QURUACRU QURU ACRU
SUMMERSWEET
ACER RUBRUM RED MAPLE
RED OAK
SEE PLAN SHEET (HWY-04) FOR DESIGN INFORMATION.
THIS PLAN IS FOR PLANTING INFORMATION ONLY.
NOTE:
A. SAUL
K. LESAY
CULVERT #6683 (SITE 2)PLANTING PLAN
VL
VC
VC
VC
AD
83
COORDINATE GRID
CONNECTICUT
302’
03.09