Prepared by
Wry a Hade Nadir
![Page 2: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/2.jpg)
Contents Introduction
Steps in rout location
Principle of highway location
Reconnaissance survey
Preliminary location survey
Final location survey
![Page 3: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/3.jpg)
Introduction
Alignment :-The position or the layout of the central line of the highway.
– Horizontal alignment includes straight and curved paths.– Vertical alignment includes curves and gradients.
The aim of alignment selection process is to find a location for the new road that will result in the lowest total construction, land, traffic and environmental costs
.
![Page 4: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/4.jpg)
Steps in Route location Location of proposed highway is an important first step
in its design and the steps as follow:
1- known the termini point
2-identify and locate
3-reconnaissance survey
4-draw a corridor
5-possible center line
6-examine each of the alternative alignment
7-final design
![Page 5: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/5.jpg)
Principle of highway location
There are there difference faces for the location of a highway
1-Reconnaissane survey
2-preliminary location survey
3-final location survey
![Page 6: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/6.jpg)
Reconnaissance surveyThe purpose of the reconnaissance survey is to evaluate the feasibility of one or more corridor routes for a
highway between specific points that may be many kilometers away and can taking in to account the following:
1-topography,geology,climate,and traffic volume
2-social and demographic , land use
3-environment al
4- economic(unit cost for construction and trends of agricultural, commercial industrial activity)
![Page 7: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/7.jpg)
Preliminary location SurveyPreliminary horizontal and vertical alignment determined and all feasible routes are evaluated for:
1-Minimize the instruction cost
2-Minimize the impact on the Environment
3-Function of term Safety
4-maximise of the economic investment(cost/benefit)
![Page 8: Highway route location](https://reader035.vdocuments.net/reader035/viewer/2022071814/55a69e341a28abe77d8b4877/html5/thumbnails/8.jpg)
Final location surveyFixed the center line of the selected alignment and
collect additional data for the design and preparation
of working drawings:
Pegging the centre line
Centre-line Leveling
Cross-section Leveling:
Intersecting Roads
Ditches and Streams