himalayan pre-fab p - kinderhuis nepal · nepal dear sir/madam, regarding the subject matter, we...
TRANSCRIPT
Ref: SIL/HPF/SS –20180627
Date: June 27, 2018
Nepal
Dear Sir/Madam,
Regarding the subject matter, we are pleased to Submit our most competitive offer as under:-
SN Particular House size
(L*W*H) in ft.
Total Area In
Sqft
Price per
Sq.Ft.(NPR)
Price per Set
(NPR)No.
Total Price in
NPR
1 Building See Drawing 838 1610 1,349,180.00 1 1,349,180.00
2 Flooring See Drawing 838 150 125,700.00 1 125,700.00
Total 1,474,880.00
VAT 13% 191,734.40 Total Including VAT 1,666,614.40
In Words: Say NPR Sixteen Lakh Sixtysix Thousand Six Hundred and Fourteen Only
Note : This price Includes VAT.
Included Items-50 mm EPS Wall Panel, CGI Roof, Door window, False ceiling, Light Steel Structure, Gutter, Normal Electric wiring with Installation,
PCC Flooring with cement punning .
Excluded Items- Sanitary and Plumbing items.
This offer include Transportation cost also.
Payment terms :60% during time of agreement 20% after material reaches to site and Remaining After Completion of Project.
Delivery Time: 5 -7 Weeks after advance paid date.
HIMALAYAN PRE-FAB P.LTDThamel, Kathmandu, Nepal, Ph: +977 1 4024039/8, email: [email protected],[email protected]
www.ecohomesnepal.com
Sub : Offer for supply and Installation of pre-fab room
Ref: SIL/HPF/SS –20180627
Date: June 27, 2018
Nepal
Dear Sir/Madam,
Regarding the subject matter, we are pleased to Submit our most competitive offer as under:-
SN Particular House size
(L*W*H) in ft.
Total Area In
Sqft
Price per
Sq.Ft.(NPR)
Price per Set
(NPR)No.
Total Price in
NPR
1 Building See Drawing 838 1610 1,349,180.00 1 1,349,180.00
2 Foundation and Flooring See Drawing 838 400 335,200.00 1 335,200.00
Total 1,684,380.00
VAT 13% 218,969.40 Total Including VAT 1,903,349.40
In Words: Say NPR Nineteen Lakh Three Thousand Three Hundred and Fourtynine Only
Note : This price Includes VAT.
Included Items-50 mm EPS Wall Panel, CGI Roof, Door window, False ceiling, Light Steel Structure, Gutter, Normal Electric wiring with Installation,
Cement Foundation ,PCC Flooring with cement punning .
Excluded Items- Sanitary and Plumbing items.
This offer include Transportation cost also.
Payment terms :60% during time of agreement 20% after material reaches to site and Remaining After Completion of Project.
Delivery Time: 5 -7 Weeks after advance paid date.
HIMALAYAN PRE-FAB P.LTDThamel, Kathmandu, Nepal, Ph: +977 1 4024039/8, email: [email protected],[email protected]
www.ecohomesnepal.com
Sub : Offer for supply and Installation of pre-fab room