hoosier hoops installation instructions and parts list

Upload: patrick-bothwell

Post on 02-Mar-2016

266 views

Category:

Documents


3 download

DESCRIPTION

Installation instructions and parts list for Hoosier Hoops "Pro Jam" (PJ) and "Collegiate Jam" (CJ) Basketball Systems

TRANSCRIPT

  • INSTALLATION INSTRUCTIONS & PARTS LIS',,'R(j{SERfES. ~~ '.-.-, ." : ...,-.., -.' -" ,-- -.

    Pro Jam (PJ) and Collegiate Jam (CJ) ModelsUpper-Yoke

    PJ105/ CJ105

    Backboard Frame(Factory Assembled

    to Backboard)PJ107CJ107

    ",~- .:

    Lower YokeP/CJ106Vertical Straps

    P/CJ104

    Upper PostP/CJ101

    AdjustingCrank

    P/CJ103

    r--------

    5ide View -1. _

    ltlust, #1 Complete Assembly

    +- Acrylic BackboardPJ108CJ108

    You will need the following Tools & Supplies (not included)1 - Brick; 7 1/2" x 3 1/2" x 2 1/2"1 - Set Post Hole Diggers1 - 5' Steel Bar2 - 5 Gallon Buckets1 - 3' Level5-7 Bags of 80 lb. Quikrete1 - Tape Measure1 - Drill with attachment (to secure backboard pad)

    , ~ Breakaway RimP/CJ 109

    ~i"':::~ Anchor Sleeve""'~~..f- P/CJ102

    (Factory-attachedto Upper PostP/CJ101)

    1 - 1/2" Ratchet1 - 1/2" Open-end Wrench1 - 9/16" Ratchet1 - 9/16" Open-end Wrench1 - 3/4" Ratchet1 - 3/4" Open-end Wrench1 - Phillips Screwdriver1 proVice Grips

    MANUFACTURED BY: HHBS, INC. INDIANAPOLIS, IN 46250

  • Dig hole approximately 20/lx 20/1wide x 44/1deep.Once hele is completed, place the 5' Steel Bar intothe backside of the hole. This is so Post can easilyslide down it into the hole. Lift Post (with CrankFlanqe facing the backside of hole) up and into hole.Center Post in hole and place Brick in front side ofhole 4-6/1below plate to brace Pole from movingforward. (Illustration #2) Place-Post Hole Digger inhole on backside to brace Post against Brick.Vertically level Post in both directions.Pour one bag of concrete in hole, then add waterand mix with Steel Bar. Continue adding concrete(one bag at a time) & water until hole is filled to Platelevel. Remove Post Hole Digger after hole is 1/2 -2/3 full of concrete.Besure concrete is thoroughly mixed.

    .. IMPORTANT! ..Remember while pouring concrete to continue tocheck level of the Post in both directions.

    Attach Adjusting Crank to back of Post using 3 sets:1/1x 5/16/1Bolt D with 3/8/1Flat SteeJ Washer m,5/16" Split-lock Washer m and 5/16/1Hex Nut !J .(Illustration #3) l'

    Attach Upper Yoke Arm to Post using 2 sets:2 1/2" x 1/2" Bolt Pl, three 1/2" Nylon Washers 6,two 9/16" Flat Steel WasherS m and 1/2" Hex Lock

    - ~'Nut m. (Illustration #4)Attach Lower Yoke Arm to Post using 2 sets:31/2" x 1/2/1Bolt m, two 9/16" Flat.Steel Washers m,three 1/2" Nylon Washers 6, andf!2/1 Hex Lock-Nut m. (Illustration #4)

    . IMPORTANT! .Nylon Washers are used as a bushing between allsteel-to-steel parts.

    ~Crank Flange

    Front Side5' Steel Bar

  • Lower Yoke ArmP/CJ106

    Strap toLower Yoke

    -B 1111I.1/ J'~.9 6

    Vertical StrapsP/CJ104

    B

    lIIust.#5 Vertical StrapsAssembly

    Upper Yoke ArmPJ105CJ105

    BackboardPJ108CJ108

    U-Shaped ------Backboard FramePJ107CJ107

    Lower Yoke ArmP/CJ106 ~===~~

    Top View

    lIIust. #6 BackboardAssembly

    Acrylic BackboardPJ108 Backboard FrameCJ108------ PJ107

    CJ107\Ira_Ira

    I --ro -rI I '----0(; Qo---J I ~

    Backside of Backboard ViewlIIust. #7 RimSpacers

    , 8\9

    Attach top part of Vertical Straps to Lower Yoke Armwith 2 sets: 3 1/2" x 1/2" Bolt fil, four 9/16" FlatSteel Washers m, six 1/2" Nylon Washers 6, and1/2" Hex Lock Nut fa. (Upper Illustration #5)

    IMP.oRTANT! ..Vertical Strap flange straight si9"s are to be 0positioned inward facing each other. The offsetsides are to face outward.

    Attach bottom part fVertical Straps to Crank Flangewith: 8" x 1/2" Bolt mJ, two 9;:t6'bFlat Steel Washersm, six 1/2" Nylon Washers 6, 1/2" Hex Lock Nutfa ,and two black Steel Spacers 1m.(Lower Illustration #5)

    .. IMPORTANT! ..Tighten all bolts snug. Do not over tighten nuts.

    43 Lower Yoke Arms to lowest position.Attach Backboard to Upper Yoke Arms with 2 sets:2 1/2" x 1/2" Bolt la, 9/16" Flat Steel Washer m,three 1/2" Nylon Washers 6,9/16" Split-lock WasherlEI, and 1/2" Hex Nut m1 (Illustration #6).Attach Backboard to Lower Yoke Arms with 2 sets:4" x 1/2" Bolt m, two 9/16" Flat Steel Washers m,four or more 1/2" Nylon Washers 6, and 1/2"Hex Lock Nut m (Illustration #6).

    .. IMPORTANT! ..* It may be necessary to insert additional Nylon Washersbetween Yoke Flange and Backboard U-Flange.

    Level Backboard by loosening the bottom two andone of the top corner nuts of the factory assembledU-shaped Backboard Frame and the Backboard.Place level on horizontal portion of Backboard andmove Backboard until it is level. Check to ensurethat the Rim Holes in Acrylic Backboard align withBackboard Frame holes. Retighten all corner nuts.

    Place four 1" x 9/16" gray plastic Rim Spacers Irainto Backboard mounting holes (Illustration #7),and then follow Rim Installation Instructions foundin the Rim Hardware box.

  • Apply Calibration Decal to Post (Illustration #8)unless optional Pole Pad is being installed inwhich case consult end user.

    ADDITIONAL INSTRUCTIONS(NOT SHOWN)o Breakaway Rim

    Mounting instructions found inside Rim Hardware box.

    Backboard PadsU-shaped black urethane pads for bottom portion ofbackboard. Instructions found inside pad box.

    "IMPORTANT! .After installation is complete, this instruction sheetshould be given to the end user for future reference,warranty and replacement parts.

    CalibrationDecal

    P/CJ110

    Upper PostP/CJ 101

    White VinylStrip

    P/CJ111

    Left SideView

    lIIust. #8 Calibration Sticker

    HARDWARE, PARTS & ACCESSORIES LISTKey PJ Model CJ Model Qty. DescriptionNo. Part No. Part No. Req. >1 201 201 3 1" x 5/16" -18 Hex Head Bolt2 301 301 3 3/8" Flat Steel Washer3 202 202 3 5/16" Slit-lock Washer4 203 203 3 5/16" - 18 Hex Head Nut5 501 501 4 21/2" X 1/2" -13 Hex Head Bolt6 505 505 22 9/16" Flat Steel Washers7 507 507 40 1/2" Nylon Washers8 508 508 9 1/2" -13 Hex Lock Nut9 502 502 4 31/2" X 1/2" -13 Hex Head Bolt10 504 504 1 8" x 1/2" -13 Hex Head Bolt11 503 503 2 4" x 1/2" -13 Hex Head Bolt12 506 506 2 1/2" Solit-Lock Washer13 509 509- 2 1/2" -13 Hex Head Nut14 001 001 2 Tubular Steel Spacers 2" x 1" (Black)15 002 002 4 Tubular Plastic Spacers 1" x 9/16" (Gray)III. 1 P/CJ 101 1 Vertical Post - 6" x 6" X 13'4"III. 1 P/CJ 102 1 Anchor Sleeve - 6" x 6" X 44" w/ HardwareIII. 1 P/CJ 103 1 Adiustable CrankIII. 1 P/CJ 104 2 Vertical Straps - Tubular Steel 1 1/2" x 1" X 80"III. 1 PJ 105 CJ 105 1 Upper Yoke (Tubular Steel) PJ: 2" x 1"/72 112" wide CJ: 1 1/2" x 1"/60 1/2" wideIII. 1 P/CJ 106 1 Lower Yoke (Tubular Steel) 3" x 2"/53 112" wideIII. 6 PJ 107 CJ 107 1 Backboard Frame (Tubular Steel) PJ: 70" x 40 1/2" wide CJ: 58" x 381/2" wideIII. 1 PJ 108 CJ 108 1 Acrylic Backboard wi Aluminum Frame PJ: 72"x42"x1/2" wide CJ: 60"x40"x1/2"III. 1 P/CJ 109 1 Rim - Heaw Duty BreakawayIII. 8 P/CJ 110 1 Calibration DecalIII. 8 P/CJ 111 1 White Vinvl Strio

    PJ 112 CJ 112 1 Backboard Pads (Optional)P/CJ 113 1 Pole Pad (Optional)