Agenda

Introduction01

Company Overview02

Hotel Energy & Water Use03

05

06

07

04 Design Philosophy

Hotel Project Examples

Hotel Energy Conservation

Hotel System Options

Page 3: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Introduction to Vanderweil

� Mechanical� Electrical� Plumbing� Fire Protection� Power & Utilities� Transmission &

Distribution� Substation� Sustainability� LEED® Services� Energy Modeling� Commissioning

New York, NYNew York, NYNew York, NYNew York, NY

Boston, MABoston, MABoston, MABoston, MA

Alexandria, VAAlexandria, VAAlexandria, VAAlexandria, VA

Princeton, NJPrinceton, NJPrinceton, NJPrinceton, NJ

Los Angeles, Los Angeles, Los Angeles, Los Angeles, CACACACA

Atlanta, GAAtlanta, GAAtlanta, GAAtlanta, GAPhoenix, AZPhoenix, AZPhoenix, AZPhoenix, AZ

Orlando, FLOrlando, FLOrlando, FLOrlando, FL

Miami, FLMiami, FLMiami, FLMiami, FL

Philadelphia, PAPhiladelphia, PAPhiladelphia, PAPhiladelphia, PA

Page 4: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Markets We Serve

Envoy Hotel, Boston, MA

Government

Institutional

Academic

Commercial

Cultural

Hospitality & Entertainment

Healthcare

Industrial

Power & Utilities

Science & Technology

Sports, Venue and Event

Transmission & Distribution

Marina Bay Sands Hotel & Casino

Page 5: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project
Page 6: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Where to start? Where to go next?

Reduce the Energy and Water Demand (load)

Serve the loads efficiently

Recover energy & water

Renewable

Page 7: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

0500010000150002000025000

Jan

Feb

Ma

r

Ap

r

Ma

y

Jun

Jul

Au

g

Sep

Oct

No

v

De

c

BT

U/f

t2

South Solar Gain

05000

10000150002000025000

1 2 3 4 5 6 7 8 9 10 11 12BT

U/f

t2

East Solar Gain

05000

10000150002000025000

1 2 3 4 5 6 7 8 9 10 11 12BT

U/f

t2

West Solar Gain

Consider the load: climate, massing, and orientation

Page 8: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

What’s wrapped up in the envelope?

15-20% of the energy!

Page 9: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Envelope performance

reflects glazing properties

and insulation levels

typically found in buildings

during the 1970s

ENERGY– where does it go?

Page 10: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

What’s going down the drain?

Page 11: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Guestroom Mechanical System Options

• PTAC / VTAC

• Variable Refrigerant Flow (VRF)

• Heat Pumps

• 2-pipe FCU / Electric Heat

• 4-pipe chilled water / hot water

Page 12: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Ventilation Options

• Fixed Ventilation / Code Minimum

• Increased Ventilation: LEED, WELL

• Variable/Demand Controlled Ventilation

Page 13: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Ventilation Options

• Energy Recovery

o Fixed Plates

o Run-around Loops

o High Pressure Glycol

o Energy Wheels

Page 14: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Hotel Energy Conservation Measures:Tier 1

o LED lighting upgrades

o Low flow plumbing fixtures

o Constant airflow regulators / code OA level

o Base room control system / HVAC occupancy based

o Commissioning

Page 15: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Energy Conservation Measures:Tier 1I

o Increased room controls – lighting, plug control

o High efficiency chiller / boiler replacements

o Variable speed drives – pumps, kitchen hoods, fans

Page 16: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

o Envelope upgrades

o Demand ventilation control

o Room HVAC upgrades – 2-pipe to 4-pipe

o Full room controls – w/ plug load controls, blind

control, door interface, front desk interface

Energy Conservation Measures:Tier III

Page 17: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

o Building Automation System

o Heat recovery

o Heat recovery chiller

o Fuel Cells, Combined Heat and Power

o Renewables

Energy Conservation Measures:Energy Conservation Measures:Energy Conservation Measures:Energy Conservation Measures:Tier IIITier IIITier IIITier III

Page 18: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Hotel Renovation Projects

• Courtyard by Marriott Tremont

• Lighting upgrades

• Plumbing fixture upgrades

• Hilton Hotel Boston

• Multiple bay suites converted to individual

guestrooms

• Lighting

• Plumbing

• Outdoor air upgrades

Page 19: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Making the Case: Energy + Deferred Issues

• Mold and mildew = Poor Air Quality• Leaking pipes = Excess Water, Excess Energy • Malfunctioning Equipment = Excess Energy

Page 20: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

“Smart” keycard to enable guest room lighting

Pathway to Reduction

Energy

Conservation

Measures

Glazing replacement

Low flow domestic hot water fixtures

Increased insulation in wall/roof assemblies

Dedicated outdoor air system with energy

recovery

Advanced lighting systems

Decoupled ventilation & space conditioning

systems

Page 21: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Energy Conservation Measure Analysis

0.8%1.4% 1.9% 1.6%

2.4%

0.3% 0.8% 1.0% 1.2%

3.4%3.0%

-0.1

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

20%

Improve

Envelope

by 20%

Improve

Glazing by

20%

Reduce

Glazing to

40%

Reduce

Lighting

by 20%

Reduce

Lighting

by 30%

Reduce

Kitched

Load

Reduce

SP by 25%

DOAS

with FCUs

ilo VAV

Air

Cascade

Air

Cascade

w/ DOAS

+ FCUs

Solar

Thermal

DHW

Remove

East

Canopy

EN

ER

GY

CO

ST

SA

VIN

GS

(%

)

Page 22: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Hotel ECMs: Update Controls

Page 23: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Before and After: Energy Upgrades

Reflects inclusion of all

energy conservation

measures

Page 24: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Before and… AFTER

• LED lighting

• Low flow plumbing fixtures

• Low-e glass upgrade

• Complete MEP demolition and

replacement

• New fan coil units

• Room control systems

Page 25: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Measurement: The Final Frontier

$0.00

$2,000.00

$4,000.00

$6,000.00

$8,000.00

$10,000.00

0

5,000

10,000

15,000

20,000

25,000

8/23/2012 8/23/2013 8/23/2014

En

erg

y U

se (

BT

U)

Axis Title

Energy Usage: 2012-2015

Usage (Therms) Usage (Cost)

0

200000

400000

600000

800000

29

-Ja

n

28

-Fe

b

30

-Ma

r

29

-Ap

r

29

-Ma

y

28

-Ju

n

28

-Ju

l

27

-Au

g

26

-Se

p

26

-Oct

25

-No

v

25

-De

c

Annual Electrical Usage

Peak Off Peak

Page 26: Hotels: Water and Energy - Constant Contactfiles.constantcontact.com/9772c893201/19660062-89ef-4823-94f9-3… · 03Hotel Energy & Water Use 05 06 07 04Design Philosophy Hotel Project

Thank you! Questions?

Presented by:

Julia Rogers, LEED AP BD+C

Sustainable Design Practice Leader

[email protected]

617-556-9388

Paul Van Kauwenberg, PE, LEED AP BD+C

Associate Principal

[email protected]