how to create a cut list for metal roofing materials

6
1. The rst step in guring your metal roong is to make a sketch of it, complete with the roof measurements. Take the house below as an example: Note: Explanaon R = Ridge EW = Endwall V = Valley E = Eave P = Panel Length 52’ R 19’ P 16’ E 19’ P 16’ E 10’-7” P 12’-8” P 12’ E 21’-6” V 18’ E EW 4:12 PITCH 36’ R Detailed measurements & informaon allow for a more accurate esmate. How to Create a Cut List for Metal Roofing Materials ST. GEORGE, UTAH 3113 East Deseret Drive (435) 627-1829 [email protected] PAYSON, UTAH 1688 West American Way (385) 297-7663 [email protected] (844) 99-METAL Tri-StateMetalRoofing.com

Upload: others

Post on 03-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: How to Create a Cut List for Metal Roofing Materials

1. The first step in figuring your metal roofing is to make a sketch of it, complete with the roof measurements.

Take the house below as an example:

Note:

Explanation R = Ridge EW = Endwall V = Valley E = Eave P = Panel Length

52’ R

19’ P

16’ E

19’ P

16’ E

10’-7” P

12’-8” P

12’ E

21’-6” V

18’ E

EW

4:12 PITCH

36’ R

Detailed measurements & information allow for a more accurate estimate.

How to Create a Cut List forMetal Roofing Materials

ST. GEORGE, UTAH3113 East Deseret Drive

(435) [email protected]

PAYSON, UTAH1688 West American Way

(385) [email protected]

(844) 99-METALTri-StateMetalRoofing.com

Page 2: How to Create a Cut List for Metal Roofing Materials

2. The second step is to break it into rectangles and triangles like this:

16’ E

19’ P

10’-7” P

12’-8” P

12’ E

21’-6” V

18’ E

EW

19’ P

52’ R

19’ P

10’ R

21’-6” V 19’ P

10’ R

21’-6” V

10’-7” P

18’ R

16’ E

19’ P

10’-7” P

18’ R 21’-6” V

10’-7” P

18’ E

Explanation R = Ridge EW = Endwall V = Valley E = Eave P = Panel Length

ST. GEORGE, UTAH3113 East Deseret Drive

(435) [email protected]

PAYSON, UTAH1688 West American Way

(385) [email protected]

(844) 99-METALTri-StateMetalRoofing.com

Page 3: How to Create a Cut List for Metal Roofing Materials

Figuring Vertical Panel Materials:

16’ E

19’ P

21’-6” V 19’ P

10’ R

Panels

Rectangles:

Divide the width of each section by the width of the panel you are using to get the number of panels. Specify the panel lengths, to the half-inch.

In this example, for a 3’ wide panel you would need 6pc at 19’ long for this section.

Triangles:

Measure each panel getting shorter every X length across (replace X with the width of your panel). There will be one panel of each length for each triangle.

Make a list showing the quantity needed for each length. We recommend that you add 2 panels of the longest length.

Trim

Add up the total footage of each type of trim; ridge, gable, eave, valley, transition, endwall, sidewall, etc and put it in a list like this:

Ridge – 88 feet

Gable – 124 feet

Eave – 132 feet

Valley – 44 feet

Endwall – 12 feet

It is recommended that you add about 10% to each trim quantity for waste, trim laps, etc…

Or if you don’t mind a little waste, divide the width (10’ in this case) by the width of the panel you are using to get the number of panels. The length is as needed.

If you did it this way for the above example, for a 3’ wide panel you would need 4pc at 19’ long for this section.

All trim is made in 10’ lengths

ST. GEORGE, UTAH3113 East Deseret Drive

(435) [email protected]

PAYSON, UTAH1688 West American Way

(385) [email protected]

(844) 99-METALTri-StateMetalRoofing.com

Page 4: How to Create a Cut List for Metal Roofing Materials

M E T A L A C C E S S O R Y P R O F I L E SSTANDARD TRIM CHART

J-Mold

Ridge Cap

All Trim Comes in 10’ Lengths. We can bend any custom trim. Please email drawing & dimensions

Transition

Endwall

Fascia

Sidewall4

Snow Bar10

11

1

Z-Closure3

Valley6

9

Gable Rake5

Rat Guard

2

14

Eave (Drip Edge)

13

7

FHA Eave8

12 Rake& Corner

Rake &Corner

Paint Side Paint Side Paint Side

41/4”

41/4”

3/4”

3/4”

3/4”

3/4”

1/2”

1/2”

J-Mold StandingSeam

Wall So�tJ-Mold

Tu�-RibJ-Mold

PBRJ-Mold

1”

7/8”

21/2”

1/2”1/2”1/2”

1/2”

1/2”

Paint Side

21/2”21/2”

15/8” 11/8”

1”1”

PaintSide

PaintSide

PaintSide

11/4”

13/8”

31/4”

1/2”

Paint SideSpecify Pitch Specify Pitch Paint Side

Paint Side

3/4”31/2” 31/2”

23/4”

3/4”

23/4”

4

11

12

1 1A

4A

11A 11B 11C 11D

4B

2A 2B1B 3

65

2

1413

7

Ridge Cap Single Break Ridge Cap Gable Rake Standing Seam Z-Closure

Rat Guard

Paint Side Paint Side

Paint Side

1/2”1/2” 1/2”

1/2”

7” 7”

1/2”

33/8”

21/2”

11/16”1/2”

7/8”

1/2”

Paint Side

Standing Seam Gable Rake

1/2”

4”

3”

15/8”

1/2”

3/4”

1/2”

Eave Flashing (Drip Edge)

Specify Pitch Paint Side

3”

1/2”

21/2”

Valley Flashing

Specify Pitch Paint Side

1”

9” 9”3/4”

Sidewall Flashing

Paint Side

3”

11/2”

3”

1/2”

3/4”

Paint Side

3”

15/8”

3”

1/2”

Flat SheetPeak Flashing

41”

10’

PBR Rake &Corner

Small Rake &Corner

21/2”

21/2”11/4”

11/4”

1/2”

1/2”

3/4”

3/4”

4”

4”

11/2”

11/2”

3/4”

3/4”

1/2”

1/2”

3”

3”

3”

4”

1/2”

1”

Snow Bar

Paint Side

23/4”

1” 1”

2”

11/2”

11/2”

11/2”

11/2”

21/2”

1/2”

Paint Side

Specify Pitch

Specify Pitch

Specify Pitch

8”

1/2”

4”

TransitionFlashing

Fascia

Paint Side

11/2”

8”

10”or

6”or

4”

or

12”or

Endwall Flashing

Specify Pitch Paint Side

8”

1/2”

4”

FHA Eave8 9 10

Standing Seam Sidewall Flashing

PaintSide

ST. GEORGE, UTAH3113 East Deseret Drive

(435) [email protected]

PAYSON, UTAH1688 West American Way

(385) [email protected]

(844) 99-METALTri-StateMetalRoofing.com

12A 12B 12C

Page 5: How to Create a Cut List for Metal Roofing Materials

CUSTOMER NAME:

EMAIL ADDRESS:

Delivery(CIRCLE ONE) OR In Store Pick-Up

SPECIAL INSTRUCTIONS

DELIVERY ADDRESS:

DATE:

PHONE NUMBER:

JOB NAME:

CITY: STATE: ZIP:

(CIRCLE ONE)

(CIRCLE ONE) OR

PANEL COLOR

PANEL STYLE Tu�-Rib

PANEL GAUGE 29 26

QUANTITY FOOT INCH

Standing Seam

PBR

Wall/So�t(CIRCLE ONE)

(CIRCLE ONE) OR

PANEL COLOR

PANEL STYLE Tu�-Rib

PANEL GAUGE 29 26

QUANTITY FOOT INCH

Standing Seam

PBR

Wall/So�t

S E E O T H E R S I D E F O R M O R E O R D E R D E T A I L S

Page 6: How to Create a Cut List for Metal Roofing Materials

COLOR: QTY:

1A

1B Single Break Ridge Cap Roof Pitch __:12

Ridge Cap Roof Pitch __:12

Roof Pitch __:12

Roof Pitch __:12

Roof Pitch __:12

COLOR: QTY:2A Gable Rake

2B Standing Seam Gable Rake

COLOR: QTY:3 Standing Seam Z Closure

COLOR: QTY:4A Sidewall Flashing

4B Standing Seam Sidewall Flashing

COLOR: QTY:5 Roof Pitch __:12Endwall Flashing

6 Roof Pitch __:12Valley Flashing

7 Eave Flashing (Drip Edge)

8 FHA Eave (Standing Seam Drip Edge)

9 Transition Flashing Pitch __:12 to __:12

10 Snow Bar

COLOR: QTY:11A J-Mold (Standing Seam)

11B J-Mold (So�t / Wall)

11C J-Mold (Tu�-Rib)

11D J-Mold (PBR)

COLOR: QTY:12A Rake & Corner

12B PBR Rake & Corner

12C Small Rake & Corner

COLOR: QTY:Fascia

4"

6"

8"

10"

12"

COLOR: QTY:14 Rat Guard

COLOR: QTY:Peak Flashing

COLOR: QTY:Flat Sheet

COLOR: QTY:Special Trim

STANDARD 10' TRIM

13

See Attached Special Trim Drawing - A -

See Attached Special Trim Drawing - B -

See Attached Special Trim Drawing - C -

See Attached Special Trim Drawing - D -

See Attached Special Trim Drawing - E -

For special trim please attach drawings with dimentions

COLOR: QTY:

QTY:ACCESSORIES

TUFF-RIB VENTED OUTSIDE CLOSURES

HIP & VALLEY CLOSURE

PEEL &SEAL

3/4" TUFF-RIB INSIDE CLOSURES

3/4" TUFF-RIB OUTSIDE CLOSURES

PBR PANEL INSIDE CLOSURES

PBR PANEL OUTSIDE CLOSURES

B8- 7" to 13" BOOT

B9- 1/2" to 20 1/2" BOOT

ELECTRICAL BOOT

TACKY TAPE 3/8" wide x 45' long

TACKY TAPE 1" wide x 45' long

B3- 1/4" to 5" BOOT

B5- 3" to 7" BOOT

SCREWS

3/4" #12 WOOD GRIP (STITCH)

3/4" #12 WOOD GRIP (STITCH)

1" # 10 PANCAKE N/A

1 1/4" #12 SELF DRILL (Metal to Metal)

2 1/4" #12 SELF DRILL (Metal to Metal)

1 1/2" #9 WOOD GRIP

1 1/2" #9 WOOD GRIP

1 1/2" #14 WOOD GRIP

1 1/2" #14 WOOD GRIP

2 1/2" #9 WOOD GRIP

1/4" DRILL DRIVER for #9 & #12 Screws N/A

5/16" DRILL DRIVER for #14 Screws N/A

8' Skylight Panel Tu�-Rib Profile N/A

12' Skylight Panel Tu�-Rib Profile N/A

CUSTOMER NAME:

EMAIL ADDRESS:

PHONE NUMBER:

ST. GEORGE, UTAH3113 East Deseret Drive • (435) 627-1829

[email protected]

PAYSON, UTAH1688 West American Way • (385) 297-7663

[email protected]

Tri-StateMetalRoofing.com