huawai optix rtn 620 implementation

Upload: kk19841

Post on 02-Jun-2018

544 views

Category:

Documents


51 download

TRANSCRIPT

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    1/25

    HUAWAI IDU Optix RTN 620 Installation and commissioning

    RTN 620 Features

    The air interface of the OptiX RTN620

    supports 7MHz to 56MHz channel bandwidth

    and QPSK to 256 QAM modulation mode.The TDM air interface is flexibly configurable

    from 4E1 to 75E1; while the throughput of

    native Ethernet service is flexibly

    configurable from 10 Mbit/s to 400 Mbit/s.

    http://www.huawei.com/en/products/transport-network/microwave/index.htmhttp://www.huawei.com/en/products/transport-network/microwave/index.htm
  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    2/25

    Common interfaces of IDU

    Connect LAN Cable at

    ETH Port For Login &

    Commissioning

    IF1A Card

    PXC Card For

    Power -48/-60 v

    DC

    SCC CardPH1 /PDH

    DROP

    CARD

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    3/25

    You must power off the ODU,before removing or inserting the IF

    Jumper.

    You must power off the ODU,before removing or inserting the IF

    cable.

    You must power off the ODU,

    before removing or inserting the IF

    board.ON

    ON

    ON

    Installation

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    4/25

    Horizontally Polarized AntennaVertically Polarized Antenna

    Polarization Marking

    Installation

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    5/25

    Login WebLCT

    The IP address of your laptop must be of the range 129.9.x.x, & the subnet mask

    must be 255.255.0.0

    WebLCT: User name is admin and password is admin.

    IDU Commissioning.. Set in LapTop Foll. IP and

    Download Huawei LCT s/w and

    Open

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    6/25

    Search NE

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    7/25

    Search NE

    Please be sure that the domain must be 129.9.255.255 that is by default.

    Then click search.

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    8/25

    After Search we will Connect with IDU Select thenGo to Click NE Login

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    9/25

    After Click on NE Login Get Foll. Dialog Box. At place of Password

    Enter:- password then ok

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    10/25

    Click the Add logical board button to add the logical

    board.

    Right Click on Every dialog box and add then Select the NE From the

    Object Tree Choose Configuration ---NE attribute From Function tree.

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    11/25

    In NE Attributes Set Site Name also click on Modify NE ID Set as per Plan NE ID

    then apply NE will Reset

    After modifying the NE ID, the SCC board will be

    set to reset. You can close the NE Explore and deletethe NE in NE list. Then you can search the NE and

    login again again.

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    12/25

    After that Close the NE Explorer and Remove the NE From NE List

    Search NE again we will get modified NE ID and NE Name then Login

    again we will get following Window Put Password at place of

    password and apply then Open the NE Explorer

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    13/25

    So after Creating New ID and NE Name in NE Attributes Click

    on NE Explorer we will get this window then right click and

    add of all physical boards.

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    14/25

    After adding all physical Board Select NEConfigurationIF 1+1 protection

    then Click New you will get 1+1 Protection Dialog Box take HSB Protection

    For 1+1 IF Protection and 5-IF1A-1 as working board Select as given below for

    1+1 then ok and apply. Then Next window you will get details..

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    15/25

    Now Select NE 1873(Ex.) Click on Link Configuration and Set Modulation, Tx Frequency and Power and Tx

    Status should be UNMUTE and ATPC Disabled.

    Here you can also Select 5-IF1A and Change Modulation also Select 15-ODU and Configuration Set Tx/Rx

    Value and ATPC Capability

    Modulation

    Select Unmute

    IF/ODU Configuration

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    16/25

    Select Orderwire and Select Orderwire Port and apply then

    Query

    Click Query to Check if the setting is successful.

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    17/25

    NE TIME SYNCRONIZATION

    Set Synchronous Mode to NM apply then Click on Query

    Cross Connection Configuration

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    18/25

    Cross Connection Configuration

    Select NE Go to Configuration Select Cross connection Synchronization then Click New we will

    get Fol. window

    Select VC12

    Source Port 4-

    PH1

    1-4

    5-IF-1A

    Here From Main Site Tata E1 is taking So at Source Port we select 4-PH1 and Drop to Sink 5-IF1A

    and at BTS End this will opposite at Source Port 5-IF1A and at Sink Place 4-PH1 Set So E! will

    Bypass

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    19/25

    Performance

    Click on Configuration Performance and Performance Monitor Time

    Check in 15 Min and 24-Hr apply and query

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    20/25

    E1 Loop Back TestClick PH1 PDH Interface INLOOP in Drop Down List apply and

    Query

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    21/25

    Check Transmit Frequency and Transmit PowerClick on ODU ConfigurationODU Interface and Check Receive

    level and Tx. Power

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    22/25

    MW RSL Print Screen

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    23/25

    Color code of BTS & MW

    BTS IDU 620 IDU 950

    TX RX TX RX TX RX

    1 Gray-White Blue-White Blue-White Blue-White Orange-White Blue-White

    2 Blue-Red Orange-White Orange-White Orange-White Brown-White Green-White

    3 Orange-Red Green-White Green-White Green-White Blue-Red Grey-White

    4 Green-Red Brown-White Brown-White Brown-White Green-Red Orange-Red

    5 Grey-White Grey-White

    6 Blue-Red Blue-Red

    7 Orange-Red Orange-Red

    8 Green-Red Green-Red

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    24/25

    E1 Cable Termination Color Code

    BTS

    BTS E1 Cable IDU E1 Cable

    BTS

    BTS DDF IDU DDF

    IDU

    Blue-White Blue-White

    Gray-White Blue-White

    Orange-White Orange-White

    Blue-Red Orange-White

    Green-White Green-White

    Orange-Red Green-White

    Brown-White Brown-White

    Green-Red Brown-White

  • 8/10/2019 HUAWAI Optix RTN 620 Implementation

    25/25

    Conclusion:--

    Comparison of Ericsson & Huawei RBS

    EDRU - DTPU/GRFU/DRFU

    DXU - GTMU

    TMA - DATU

    Y-LINK - CPRI

    Remark:-----

    1) Before Removing Card and IF Cable Power Should be Off

    2) Set IP in Laptop

    3) Define Basic NE attributes

    4) Define 1+1 IF Protection

    5) Define Tx Frequency and Power and Modulation6) Finally For E1 Bypass take Same Color Code cable at both End

    7) Main Site Cross connection Interface Source will be 4PH1 and Sink will

    be 5-IF1A and BTS End Define Source 5-IF1A and Sink 4PH1 Like NPU

    to MMU and BTS End MMUto NPUKrishna kumar

    Sasaram RBSC