Human Exploration & Operations
Mission Directorate Updates
Bill Gerstenmaier | July 24, 2012
SpaceX Demonstration
2
J-2X Engine Tests
NASA conducted a 260-second J-2X engine test at NASA’s Stennis Space Center on June 13, 2012
Soyuz TMA-05M Launch
4
Orion EFT-1 Updates
5
Orion EFT-1 in route to NASA’s
Kennedy Space Center
SLS Top Level Milestone Schedule (1/3)
6
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Element
Flight Manifest
HEO / ESD Milestones
SLS Major Milestones
SE&I
Integrated Avionics & SW
Booster
New Booster
Core Stage
EFT-1 AA-2 EM-1 Uncrewed EM-2 Crewed EM-3 Crewed EM-4 Crewed
C-SRR
C-SRR KDP
C-SDR
C-SDR KDP
Checkpoint Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
MCR
ASM
PSM
SRR Ckpt
KDP-A
SRR/SDR
KDP-B
Board
Reconvene
KDP-C
PDR CDR
KDP-D
DCR
SRR
Data DropSDR Data
Drop
QTA GSE
PDR
PDR Data
Drop
QTA GSE
CDR
FA GSE
PDR
FA GSE
CDRCDR Data
Drop
DCR Data Drop
SIL
Proto Models Fin Flt Models SIL Cert
STIF
SIM SW AV SITF Cert
SITF Re-Cert
SDF
SDF Cert
SDF Re-Cert
SIM SW Blds
Rel. 6.6 7.2 8.0 8.2 9.0 9.110.0
FLT SW
Rel. 5.2 6 7 8 9 10 11 12 13 14
DM-3 QRR'S
BRR
PDR
QM-1
CDR QM-2 DCR Flt-1 Flt-2
NRA New Booster Demonstration DDT&E PDR
Production
CDR
Flt-3 Flt-4
ATP SRR/SDR PDRPDR CDR DCR
Flt-1 H/W Flt-2 H/W Flt-3 H/W Flt-4 H/W
Pre-decisional. NASA Internal Use Only.
SLS Top Level Milestone Schedule (2/3)
7
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Element
Flight Manifest
HEO / ESD Milestones
SLS Major Milestones
Engines
Core Stage Engine
- Common Engine Controller Development
- A-1 Test
- RS-25d
J-2X DDT&E
- Component Dev
- J-2X Engine Testing
EFT-1 AA-2 EM-1Uncrewed
EM-2Crewed
EM-3Crewed
EM-4Crewed
C-SRR
C-SRR KDP
C-SDR
C-SDR KDP
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
MCR
ASM
PSM
SRR Ckpt
KDP-A
SRR/SDR
KDP-B
SRB
Reconvene
KDP-C
PDR CDR
KDP-D
DCR
J-2X TestingStart UCA ATP
J-2X
Capability
Certification
RS-25 Engine Delivery Flt #1 [L-21M]
RS-25 Engine DeliveryFlt #2 (L-18M)
RS-25 Engine DeliveryFlt #3 (L-12M)
RS-25 Engine Delivery
#4 (3)L-13M
Controller
SDR/CoDR
Controller
PDR
Controller
CDR DCR#1 (4 Engines)Contingency Delivery
#2 (4 Engines)Contingency Delivery
#3 (4 Engines)Contingency Delivery
#4 (4 Engines)Contingency Delivery
Repair/Recycle/ObsolescenceIPSR
Engines Assembly>
PSR
Engines Assembly>
Procure
A-1 Test Stand Mods A-1 Test Stand Mods
J-2X Capability
Certification
< E10001 (A-2)< E10001 (A-2)
<E10003 (A-2)
<E10004 (A-2)< PPA-2 (A-1)
<E10002 (A-1) <E10005 (A-2)
Pre-decisional. NASA Internal Use Only.
SLS Top Level Milestone Schedule (3/3)
8
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Element
Flight Manifest
HEO / ESD Milestones
SLS Major Milestones
SPIO Major Milestones
Launch Vehicle/Stage Adapter (LVSA)
MPCV/Stage Adapter (MSA)
Interim Cryogenic Propulsion
Fairing
Cargo / Payload Adapter (CPA)
EFT-1 AA-2 EM-1Uncrewed
EM-2Crewed
EM-3Crewed
EM-4Crewed
C-SRR
C-SRR KDP
C-SDR
C-SDR KDP
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
Checkpoint
MCR
ASM
PSM
SRR Ckpt
KDP-A
SRR/SDR
KDP-B
SRBReconvene
KDP-C
PDR CDR
KDP-D
DCR
SRRSDR PDR CDR DCR
MSFC Design/Dev Compl
StartDesign
@ Prime
StartSTAMFG
STAMFGCompl
STATest
Compl
MSFCDesign/DevCompl
FinishSTA MFG
MSA Ring Fit Check@ ULA
MSA Delivery to Orion @ KSC
Flt. Unit 1 Flt. Unit 2 Flt. Unit 3
Start
TradeStudies
Start
Prod
Initiate Design@ Prime Flt-1 HW Flt-2 H/W Flt-3 H/W Flt 4 HW
MSFC Trade Studies
StartFairingStudies
TPS TestFinished
Sep SysTest
Finish
ShroudTesting
Complete
QualCompl
Flt. Unit 1
Start
Design
@ Prime
7/27/2012 Pre-decisional. NASA Internal Use Only.
SLS Program Life Cycle
• We are Following NPR 7120.5
NASA Life
Cycle
Phases
Program Life
Cycle Gates
and
Major Events
Agency
Reviews
Program
Life Cycle
Phases
Human Space
Flight Project
Reviews
FORMULATION
Approval for
Formulation
Pre-Phase A:
Concept
Studies
Phase A:
Concept & Technology
Development
Phase B:
Preliminary Design &
Technology Completion
Phase C:
Final Design &
Fabrication
Phase D:
System Assembly, Int. &
Test, Launch &
Checkout
Phase E:
Operations &
Sustainment
Phase F:
Closeout
Approval for
Implementation IMPLEMENTATION
KDP A ✔
FAD ✔
Draft Project
Requirements
✔ Preliminary
Program
Plan
KDP B
Baseline
Program Plan
KDP C KDP D KDP E
Launch
ASM ✔
MCR ✔ PDR CDR SIR PLAR FRR DR DRR
KDP F
End of
Missions Final
Archival
of Data
SRR/SDR
Steps 1 & 2
Draft
PCA
Final
PCA
✔
✔
July 25
In Review
Standing by for signature
01_T.May_SRR SDR Board Reconvene.9
10
NeuroSpat investigates
the ways in which crew
members' three-
dimensional visual and
space perception is
affected by long-duration
stay in weightlessness.
ISS Research
TDRS-K Updates
12
Launch Services Program - CY 2012 Highlights
6/13/2012 8/23/2012 12/6/2012
June 13, 2012 - Complete August 23, 2012 December 6, 2012
Launch Services Program
• Safely fly the launches planned this fiscal year (i.e., CY2012) – June 13, 2012 successful launch of Nuclear Spectroscopic Telescope Array (NuSTAR) on Pegasus XL from
Reagan Test Site in Kwajalein, Marshall Islands
– In launch flow for Radiation Belt Storm Probes (RBSP)
• ILC August 23, 2012, Atlas V 401 from Cape Canaveral Air Force Station (CCAFS), FL
– Tracking and Data Relay Satellite (TDRS)-K, Atlas V 401 launch from CCAFS, FL planned for December 6, 2012
• Establish a plan with the Science Mission Directorate (SMD) for launching several
medium-class missions in the future – Multi-Mission RLSP for two intermediate-class SMD/NOAA missions (i.e., Geostationary Operational Environmental
Satellite (GOES) R and S) awarded on April 5, 2012 to United Launch Services, LLC
• The spacecraft will launch in October 2015 and February 2017, respectively, aboard Atlas V 541 rockets from
Space Launch Complex-41 at CCAFS, FL
– Multi-Mission RLSP for three medium-class SMD missions (i.e., Soil Moisture Active-Passive (SMAP) & Orbiting
Carbon Observatory-2 (OCO-2)) along with a National Oceanic & Atmospheric Administration (NOAA) mission (i.e.,
Joint Polar Satellite System (JPSS-1)) awarded on July 16, 2012 to United Launch Services, LLC
• The spacecraft will launch in October 2014, July 2014 and November 2016, respectively, aboard Delta II rockets
from Complex 2 at Vandenberg Air Force Base (VAFB), CA
– RLSP for one medium-class SMD/NOAA mission (i.e., Jason-3)) awarded on 7/16/12 to Space Exploration
Technologies (SpaceX)
• The spacecraft will launch in December 2014 aboard a Falcon 9 v1.0 rocket from Complex 4 at VAFB, CA
– Conducting proposal evaluations for 1 SMD small-class mission (i.e., Gravity and Extreme Magnetism Small Explorer
(GEMS))
– Supporting SMD to select a launch service for the Ice, Cloud, and land Elevation Satellite-2 (ICESat-2) mission