hwy 407hw407 finch we ststeeles westw york universityty centre nt highway 407 … · highway 407...
TRANSCRIPT
HIGHWAY 407 STATION CONCEPT
Designed By:
AECOM: Lead ConsultantAEDAS: Lead ArchitectPARSONS BRINCKERHOFF: Project Manager
DAVID PEARL: Public Art-Artist
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRE NTYORK UNIVERSITYTY
NNTANANNNN
HYD
RO
CO
RR
IDO
R ETR EXIT RAMP
JANE STREET
HIG
HW
AY 407 ETR
BLACK CREEK
BUS TERMINALTO BE
DEVELOPED
BRIDGE
BICYCLE PARKINGMAIN ENTRANCE
PPUDO
PARKING
STORAGE PONDFOR RUNOFF
FROM PARKING
FUTURE MTOTRANSITWAYSTATION
STORAGE POND FOR RUNOFFFROM BUS TERMINAL ANDBUS ACCESS ROAD
HIGHWAY 407 STATION - SITE PLAN
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
BUS TERMINALTO BE
DEVELOPED
HIGHWAY 407 STATION - AERIAL VIEW
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
BUS TERMINAL TO BE DEVELOPED
BLACK CREEKMAIN ENTRANCETO BE DEVELOPED
CONCOURSELEVEL
MAINTENANCE LEVEL
PLATFORM LEVEL
HIGHWAY 407 STATION - SECTION
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRE NTYORK UNIVERSITYTY
NNTANANNNN
BUSTERMINALPLATFORM
BLACK CREEK
FUTURE UNDERGROUNDMTO TRANSITWAYSTATION
MAIN ENTRANCE
600 PARKING SPACES
PPUDO
BICYCLE PARKING
EMERGENCY EXIT
BRIDGE
EMERGENCY EXIT
WINDOWS TOCONCOURSE
BUS TERMINALTO BE DEVELOPED
Public - Paid Area
Public - Unpaid Area
Non Public Area
Retail Area
Emergency Stair Exit
HIGHWAY 407 STATION - STREET LEVEL
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Public - Paid Area
Public - Unpaid Area
Non Public Area
Retail Area
Emergency Stair Exit
ELEVATOR
UP TO BUSTERMINAL
ELEVATOR TOBUS TERMINAL
UP TO MAINENTRANCE
UP TO BUSTERMINAL
FUTURETRANSITWAYCONNECTION
NOTE:Location andconfiguration of stairs,escalators and elevatorto bus terminal is underdevelopment
COLLECTORS BOOTH
ELEVATOR TO PLATFORM FARELINE
DOWN TO PLATFORM
HIGHWAY 407 STATION - CONCOURSE LEVEL
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Public - Paid Area
Public - Unpaid Area
Non Public Area
Retail Area
Emergency Stair Exit
DOWN TO PLATFORM
ELEVATOR
HIGHWAY 407 STATION - MAINTENANCE LEVEL
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRE NTYORK UNIVERSITYTY
NNTANANNNN
Public - Paid Area
Public - Unpaid Area
Non Public Area
Retail Area
Emergency Stair Exit
ELEVATORUP TO CONCOURSE
OPEN ABOVE
UP TO CONCOURSE
HIGHWAY 407 STATION - PLATFORM LEVEL
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRE NTYORK UNIVERSITYTY
NNTANANNNN
FUTURE MTOTRANSITWAY
HIGHWAY 407 STATION - TRANSITWAY
Public - Paid Area
Public - Unpaid Area
Non Public Area
Retail Area
Emergency Stair Exit
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
INTERIOR VIEWS
HIGHWAY 407 STATION - PERSPECTIVE VIEWS
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Highway 407 Station Advance ContractPurpose: Prepare the Highway 407Station site for the main station/tunnel contractConstruction Start: May 2010Construction Finish: Spring 2011Lane restrictions on Jane St.during construction
NOTE:BRIDGE, ACCESS, TRAFFIC SIGNALLING
NEW SEWER, REMOVE EXISTINGCREEK REALIGNMENTSTORM WATER PONDSITE RESTORATION / GRADING
A
BCDE
6 Lane Bridge over Black CreekWidening of Jane Street (single lane)New signalised intersection
AE
C
D
B
HIGHWAY 407 STATION - EARLY WORKS
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Approved EA alignment located tunnels under Hydro Tower 158 (500kV)
Risk to the project schedule &costs resulting from tunnelling beneath Tower 158 wasunacceptable
To minimize risk, alternative alignments were considered
Preferred alignment shift the tunnels to east of tower
HIGHWAY 407STATION
TOWER158
PROPOSED HIGHWAY 407 TRANSITWAY
HYDRO TOWER 158 AVOIDANCEENVIRONMENTAL ASSESSMENT (EA) AMENDMENT
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Sta
tion
box
Sta
tion
boxEffects of Preferred Alignment
Highway 407 Station shifts to east Need to realign Black CreekCreek realignment offers opportunities to: Improve aquatic habitat Improve creek form & function Remove invasive species & re-vegetate with Native species Improve vegetation along the Creek (Riparian Vegetation)
HYDRO TOWER 158 AVOIDANCEENVIRONMENTAL ASSESSMENT (EA) AMENDMENT
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
Implements TRCA/Humber Alliance Revegetation goals of theBlack Creek Subwatershed Plan Create/enhance natural cover in Natural Heritage System Habitat restoration site plans New stormwater management facilities - Quality & Quantity improvements
Plant trees and shrubs Remove invasive exotic species
Final EA Amendment Report available March 15th, 2010 at www.spadina.ttc.ca
RE-VEGETATION OF TERRESTRIAL ENVIRONMENT
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN
LEGEND
HIGHWAY 407 STATION - SCHEDULE
1st Public Open House March 10th, 2010 (Concept Design)
2nd Public Open House Spring/Summer 2010 (Final Design)
Early Works May 2010
Start of Station Construction Fall 2010
Start of Tunnel Construction Late 2010
End of Construction Spring 2014
Start of Service at Station Late 2015
DOWNSVIEW
SHEPPARD WESTSFINCH WEST STEELES WESTWST
HWY 407407HW
VAUGHANAHANMETROPOLITO
CENTRENTYORK UNIVERSITYTY
NNTANANNNN