hydraulics branch , a ,- official file copy office l [ cd py … · 2017-08-31 · reverse current...

25
'• HYDRAULICS BRANCH OFFICIAL FILE COPY , .. . a ,- OFFICE UNITED STATES f [ l [ CD PY DEPARTMENT OF THE INTERIOR BlJRBAU OF RSC LA M ATION BUREAU OF RECLAMATION - . ' HYDRAULI C LABO RAT O RY :WO'£ '1'0 E:S RiMOVi,IJ ,fPtQM fl:r.Ei SAFETY DEVICE FOR THE INVERTED SIPHONS ON GATEWAY CANAL WEBER BASIN PROJECT, UTAH Hydraulic Laboratory Report No. Hyd-391 ENGINEERING LABORATORIES COMMISSIONER'S OFFICE DENVER, COLORADO March 3, 1955

Upload: others

Post on 24-Apr-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

'•

HYDRAULICS BRANCH OFFICIAL FILE COPY

,... a ,-

OFFICE

UNITED STATES f [ l [ CD PY DEPARTMENT OF THE INTERIOR BlJRBAU OF RSCLA MATION

BUREAU OF RECLAMATION - . ' HYDRAULI C LABORATORY

:WO'£ '1'0 E:S RiMOVi,IJ ,fPtQM fl:r.Ei

SAFETY DEVICE FOR THE INVERTED SIPHONS

ON GATEWAY CANAL

WEBER BASIN PROJECT, UTAH

Hydraulic Laboratory Report No. Hyd-391

ENGINEERING LABORATORIES

COMMISSIONER'S OFFICE DENVER, COLORADO

March 3, 1955

Page 2: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

FOREWORD

Hydraulic model studies on safety devices for the inverted siphons on the Gateway Canal, a part of the Weber Basin Project, Utah, were conducted in the Engineering Laboratories of the Bureau of Reclamation at Denver, Colorad9, during the period of February to April 1954.

The final plans evolved from this study were developed through the cooperation of the staffs of the Canals Design Section and the Hydraulic Laboratory.

During the course of the model studies, Messrs. A. w. Kidder, J. A. Hufferd, R. D. Ridinger and w. N. Yehle and others of the Canals Design Section frequently visited the laboratory to observe the model tests and discuss the results.

The studies were conducted by T. J. Rhone under the direct supervision of A. J. Peterka.

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 3: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

Wild deer trapped in a canal just upstr~am from the entrance to an inverted siphon. Colorado-Big Thompson Project, Colorado.

Page 4: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

CONTENTS

Su.mma,ry • • • • • • • • • • • • • • • • • • • • • • • • • • • • Introduction • • • • • • • • • • • • • • • • • • • • • • • • • Tbe Model • • • • • • • • • • • • • • •. • • • • • • • • • • • • The Investigation •••••••••••••••••••••••

Preliminary Design • • • • • • • • • • • • • • • • Structure No • 2 • • • • • • • • • • • • • • • • • Structure No. 3 • • • • • • • • • • • • • • • • • Recommended Structure •••••••••••••• Alternate Recommended Structure ••••••••• Modified Design • • • • •. • • • • • • • • • • • •

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

1 1 2 2

2 3 4 5 7 7

Figure

Model Layout • • • • • • " • • • • • • • • • • • • • • • • • • 1 Preliminary Design • • • • • • • • • • • • • • • • • • • • • • 2 Flow in Preliminary Design • • • • • • • • • • • • • • • . • • • 3 Structure No. 2 • • • • • • • • • • • • • • • • • • • • • • • • 4 Flow in Structures No. 2 and 3 • • • • • • • • • • • • • • • • 5· Structure No. 3 with Solid Ramp. • • • • • • • • • • • • • • • 6 Guide Walls in Structure No. 3 • • • • • • • • • • • • • • • • 7 Structure No. 3 with Stepped Ramp. • • • • • • • • • • • • • • 8 Recomended Design • • • • • • • • • • • • • • • • • • • • • • 9 Flow ln Recommended Design • • • • • • • • • • • • • • • • • • 10 Alternate Recommended Design ~ • • • • • • • • • • • • • • • • 11 Modified Design • • • • • • • • • •. • • • • • • • • • • • • • • 12 Velocity Distribution in Modified Design • • • • • • • • • • • 13

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 5: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

Commissioner's Office Engineering· Laboratories Denver, Colorado March 3, l955

Laboratory Report No. Hyd-391 Hydraulic Laboratory Compiled by: T. J. Rhone Checked and Reviewed by: A. J. Peterka

' Subject: Safety device for the inverted siphons on Gateway Canal--Weber Basin Project, Utah

SUMMARY·

The model studies described in this report were performed to develop a·rescue device,-to be ·placed at the entrance to an inverted siphon, which 'would provide easy escape for swimming or floating humans.and aninials that had inadvertently fallen into the canal.

Investigations were performed on several types of ramps placed over the siphon entrance and inclined into the flow. In each case the ramp was placed in o·r downstream :f'rom a specially designed transition. The preliminary investigations showed that unles.s the approaches and the device were properly designed; vortices and eddies in the siphon entrance were more violent and dangerous than in an unprotected entrance. To provide satisfactory performance it was found necessary to direct the flow_toward the center of the channel by converging the side walls to eliminate the dead water areas where vortices and eddies formed.

To provide optimum performance it was necessary to replace the solid ramp of ·the preliminary design· with a ramp composed of five steps having part of the riser of each step left open to allow passage · of the surface flow,· Figure 9. Proper arrangement of the structure resulted in a·very effective safety device with excellent flow conditions, Figure 10, which was recommended for field construction.

. . '

INTRODUCTION

Operation of various canal systemg indicated there was a need for a device that would prov1d'e a measure of safety at the entrance to inverted siphons (see frontispiece). To satisfy this need, model studies were performed to develop a safety device for use on the Gateway·canal, Weber Basin Project, utah. It was originally :intended

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 6: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

to construct the devices on only two of the inverted siphons of the canal for the dual purpose of preventing the bodies of dead animals from clogging the siphon and also to permit swimming or floating animals or humans to escape before being swept into the siphons. These two installations were to be field tested before additional devices were constructed; however, when the model studies showed that the safety devices were reliable, would provide a measure of safety for humans as well as animals, and were not expensive to construct, they were adopted for all seven inverted siphons on the canal.

THE MODEL

A scale ratio of 1:12.22 was chosen for the model so that an available part of an existing canal model and siphon pipe could be used for these tests. The model included a short section of the canal upstream from the siphon, constructed of plywood, the transition between the canal and the entrance to the inverted siphon constructed from clear plastic, Figure 1. The ramps or safety devices were made of waterproofed wood. Structure No. 2, Figure 1, was constructed later and was not in the model for the ·first tests.

Water was supplied to the model through the permanent labora­tory supply system and measured with a 6-inch venturi meter. The flow depth in the canal was controlled by a slide gate placed on the downstream side of the plastic· pipe.

THE INVESTIGATION

All devices were first tested at the maximum discharge of 700 cfs with the flow depth in the canal maintained at 6.90 feet or normal depth at this discharge. The performance of the device being investi­gated was judged by the velocity and direction of the surface flow as indicated by floating confetti and a partially submerged model "deer," and by the direction of the subsurface flow as indicated by dye streams injected into the flow. If the device being tested caused dangerous eddies, large vortices, or other poor flow conditions, or if the flow did not carry the "deer" to safety on the rescue device, the design being investigated was considered unsatisfactory. Devices which showed promise or operated well were further tested at 350 cfs and normal depth 4.85 feet.

Preliminary Design

The preliminary rescue device consisted of a sloping solid ramp placed in the specially shaped transition upstream from the siphon entrance, Figure 2.

2

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 7: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

The flow appearance with this device was very poor. Two large vortices formed at the upstream edge of the ramp that were of such magnitude that floating or partially submerged objects in the canal were,swept into one or the other of the vortices ~d immediately carried down. into the inverted siphon. Figure 3 shows the flow appearance with this safety device. Also shown is the flow appearance at the siphon entrance with the safety device removed. A comparison of these pictures shows that the preliminary safety device produced a flow condition at the siphon entrance more dangerous than was present without a safety device.

Without the safety device the flow up to the siphon entrance was very smooth with only very slight local disturbance directly over the entrance. Floating objects were carried to the headwall of the siphon entrance where they were held; however, since the wall was vertic~l, ·there was no. chance for-escape. Partially or totally submerged objects on the other hand were immediately swept down into the siphon barrel.

The violent downward flow currents at the siphon entrance indicated that it might be necessary to separate the safety device and the siphon entrance structure in order to develop a satisfactory safety device. It was also felt that a greater flow area between the ramp and _the transition_ floor was necessary. The next tests were made to determine the area requirements.

Structure No. 2

The second safety device was a separate structure entirely removed from the siphon entrance, Structure No. 2, Figure l. About 100 feet upstream from the inverted·siphon a wide rectangular basin was built into the canal and connected to the canal by means of short transitions, Figure 4. A solid escape ramp, inclined into the flow so that floating or partially submerged objects would be washed up on it, was placed over the rectangular section so .that the area under the ramp was equivalent to that of the wetted canal section.

In operation., this arrangement was not satisfactory since the ramp caused several small vortices to form along each side wall upstream from the ramp, Figure 5A. There were also eddy currents that forced objects, floating anywhere except down the exact center, into one or the other of the vortices.

Since this device was unsatisfactory and it appeared that improvement could only be obtained by increasing its size and the length of the approach transition, it was decided to continue development of the device at the siphon entrance.

3

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 8: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

Structure No. 3

The third structure was located at the siphon entrance and differed from the preliminary design in that the transition between the canal and the siphon entrance was made longer and was divided into two s~ctions, Figure 6. In the upstream section the canal floor dropped about 6 feet and the side slopes, while converging slightly, changed from a 1-1/2:l slope to vertical in a length of 30 feet. The second section, about 20 feet in length, had only a slight bottom slope and the vertical side walls converged to the siphon entrance, Figure 6. The safety device, located in the downstream or second section, con­sisted of a solid ramp placed over the siphon entrance and sloped downward into the flow, so that it could intercept a floating or partially submerged object. It was thought that by separating the two features, (1) the transition between the canal and the siphon entrance, and (2) the safety device, that the action of one would not interfere with the action of the other.and that a satisfactory design would result.

Flow through this device was definitely improved over that pre­viously obtained but still was not entirely satisfactory, Figure 5B. Although a floating or partially submerged object was carried up onto the ramp, there was a reverse flow along both walls from the safety device upstream, and unless the object was able to walk up the ramp immediately after being deposited thereon, the reverse current carried it upstream to re-enter the downstream flow again. The .reverse current also caused vortices to form at the upstream edge of the ramp and the chances were about even that an object washed off the ramp by the reverse current would be trapped in a vortex rather than carried back onto the ramp.

The reverse flow at the safety device was caused partly by the solid ramp. The surface flow passed onto the ramp and not being able to continue downstream was forced to turn and flow against the current along each wall.

It was believed that this reverse flow could be utilized in providing an effective safety device. Vertical converging guide walls extending only sufficiently deep to control the flow at half discharge were added to the structure so that the current passed along the inside faces of the walls and turned to flow upstream around the downstream end of the wall. Floating objects and the model deer were carried behind the wall and thus could conceivably escape if a ramp could be devised, Figure 7.

Experiments with this arrangement showed that in order to maintain the reverse flow a partial bottom opening between the guide

4

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 9: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

walls and the transition .had to be provided. Difficulti.es in developing a practical escape ramp and maintaining the bottom opening at the same time combined-with the general complexity of the structure made this device impractical.

Tests were continued on the basic features of Structure No. 3, however, to prevent or minimize the reverse flow by perforating or removing the middle portion of the ramp to allow the surface flow to continue do~stream.

. . . . With the center portion of the ramp removed the safety device ~ons·i:,$."\:i.ed- of a ledge a.round the outer edge of the transition. Perfor­~~ce was. -\Ulsatisfactory.

"'. . Tlle. ,slight .improvement in the flow conditions when the per­for~ted ramp was used indicated that a ramp with larger perforations or openings might perform better. In order to provide larger openings which woul~ not in themselves beco~e.a hazard to animals or humans, the solid ramp with holes was replaced by a stepped ramp, which in . effect was a stairway. The steps had 5-5-foot treads and 1-1/4-foot risers. Six inches of the risers were left open to allow flow passage, Fi~e-8.

Fi~e 5C shows the flow appearance with the stepped ramp. The operation was very good and in the majority of the trials a floating or p~rtially submerged object was carried to safety by being depositedwell_-up.o:a the stepped ramp. However, there was still a slight return flow along both walls that sometimes returned the object into the approaching flow. ·It was found that this undesirable feature could be corrected by using converging guide walls to direct the surface flow to:ward the center of the stepped ramp.

Recommended Structure

The recommended structure combined the best features and modifications of Structure No. 3, including simplification of certain features to eliminate unusual field construction problems. The recommended :structure c_pnsisted of two separate sections, an upstream and a-downstJ-eam section, Figure 9.

The upstream section, 30 feet long, contained vertical walls on each side· that converged from the 35-toot top width of the canal to the· ll-f'oot -siphon entrance width; the floor dropped about 7-feet in elevation on a trajectory curve; and at the intersection of the side walls and the .. tloor a variable height fillet was used on each side to complete the transition from the sloping canal banks to the vertical wall of the downstream section.

5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 10: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

The downstream section of the recommended structure was about 12 feet long and had vertical side walls set 11 feet apart, with the steps of the safety device spanning this opening. Each of the five steps had a 2-1/2-foot tread and a 15-inch riser. The lowest step of the ramp was 8-1/2 feet above the floor at its upstream edge, Figure 9.

The recommended structure was checked at the maximum discharge of 700 cfs and at half discharge of 350 cfs. The flow appearance was very good at both discharges, Figure 10, indicating that the device would operate satisfactorily for the most prevalent discharge range. The performance of the structure was also checked by means of floating confetti and by dye streams injected into the flow at varying depths. The confetti showed that the surface flow lines were very smooth as the flow approached the inverted siphon and the safety device caused no objectionable vortices or other eddy currents. The flow lines for the 700 cfs di~charge are shown by the white confetti traces in the picture on the right side of Figure 10. The subsurface currents, checked at the two discharges by means of dye streams injected into the flow at varying depths, also showed that the flow approaching t~e inverted siphon was very smooth with no objectionable eddy currents.

In making the tests on this structure, objects and the model deer were usually thrown into the canal a short distance upstream from the safety device so that they were floating or only partially submerged when they passed through the test section. The deer or other objects were always carried to safety on th~ ramp. It was found, however, that the deer, when pushed off the side wall directly upstream from the ramp, sometimes penetrated the top current which ordinarily carried him to safety, and was swept into the siphon by the undercurrents.

It is very unlikely that an animal would fall into the canal at t~is particular spot. It is more likely, however, that small boys seeking a swimming hole might be deceived by the quiet surface water and dive into the water from the top of the wall. To prevent acci­dents of this type a short length of high fence extending about 30 feet upstream from the ramp should be installed.

Another. auxiliary protective device, this one tested in the model, consisted of a grid placed across the.flow opening beneath the ramp at the upstream edge of the lower step. The grid had 6-inch openings between 1/2-inch bars and was placed either vertically or tilted slightly downstream. The tests showed that the grid did not interfere with the flow and that the mesh could become about 15 percent clogged with debris without affecting the usual flow patterns. This device need not be installed unless field experiences show the need.

6

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 11: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

To obtain maximum benefit from the safety device the canal should flow at or near the normal depth. Model studies showed that the device was ver:, satisfactor:, for all discharges greater than 200 cfs if the normal depth in the canal was maintained; however, if this depth was decreased about l foot the operation, while still adequate, was not completely satisfactory. For discharges less than 200 cfs, the water surface was below the bottom step of the device, however, under most conditions the flow in the canal was sufficiently shallow that it was felt there was slight danger of humans or animals not being able to maintain their footing.

Alternate Recormnended Structure

To simplify the concrete form work for the field structure an investigation was made with the curved surfaces of the bottom end of the fillet. in the upstream section replaced with plane surfaces, Figure 11. Operation at maximum discharge showed that the flow condi­tions at the structure were satisfactor:, although the water surface was rougher than it was in the recommended structure. When the open portion of the step,risers were partially blocked, there was a tendency for vortices to form at the upstream edge of the safety device. On the basis of these tests, it was decided that the curved surfaces in the structure were helpful in providing good operating conditions.

Modified Design

After ·completion of the above-described tests and in the course of making the construction drawings, the designers felt that a streamlined and warped transition which had a uniform area change with respect to length would provide better performance and the laborator:, was asked to test the transition shown on Figure 12. The flow appear­ance with this transition was similar to that obtained in the alternate recormnended design. The modified structure was considered satisf•ctor:, but because of the decreased cross sectional area in the streamlined transition the flow was somewhat rougher than that for the recommended structure.

An additional test was made on·the modified structure to show the velocity distribution at the upstream edge of the safety ramp. Figure 13 is a plot of the velocity distribution for a discharge of 700 cfs at normal depth. The distribution was comparatively uniform with the highest velocity occurring near the center of the cross section. The veloclty decreased uniformly toward the surface and toward the floor from the center.

7

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 12: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

I I I I

Stilling well

~-supp I y I ine

502

r<----5' Cana I sect ion ----->,<.-- -- --- Structure No. 2 -- ------ ->+<-- 5' Cana I section->r<--Transition : r or Canal Section : :

section -->t<-lnverted I : ;

siphon entrance ->i :

I I • I I I ........

I I~' =-1 _,.. -y

FLOW . --->

'

A.

=-1 -IN ,,

PLAN

' ' '

/ ,, /I ,,

_;11 ! ',I It V • /...___ ' '

,, A

-11

NOTE Strpctures No. I and 3 and the

recommended structure were placed in the transition section.

Structure No. 2 tested separately, not in conjunction with I or 3

I

: I I I I

.--------------t I 1 _______ :f:j l . _ SI ide gate-,

,.-~Laboratory floor

SECT ION ALONG i.

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

SCHEMATIC MODEL LAYOUT

I I

,., "' -0 0"11 ,u·--1Gl

C: :z:~ <l'I 0

... !!

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 13: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

FIGURE 2 REPORT HYO 391

=f

.:fl N T I I y I I I I I I

----------- 1s' o·--------- --

,._---' I I I I I I I I

=~ _, ~

-t-- -I -b--1 _, I ~ I I I I

I I I

~-...L.-l--------t-illtt.J_ __ t---- -------------..G-,-.........,..------t I I I

I

502

I I I

I =' : I 'fl I

I : ·cp ·-r : Y. I •o' -~--" -!. ----lf-,--r

I ~ I

I : I "10 I -,;., I I

I I

'o ·' ,n

I

' 'o I

",n

i I I ,--rr-------~~T--~-----------------c:s,.....__.__~

A

-11

7 I I I ·o

QI co

I I I I

I I I I I ,,

"'" -~

I : I I I I I I

I I I 1_ ,-

I 0 5

SCALt OF FEET

PLAN

t< -- ----- --- 1 s'-0"- - --- - - - --·>-r<--- -- - -- --- ----- 20' o" - - - - - - - - -- - ---->i I I • I I I : ,.- ---} ------------------- - ---- ---- -------- - -: r'-s.s" 1 !

SECTION ALONG 'i.

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

PRELIMINARY DESIGN

10

To Inverted siphon-,

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 14: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

Vortices form over ramp

Undulating canal surface induced by vortex action

Solid ramp in place

Figure 3

Unprotected siphon entrance Ramp removed

GATEWAY CANAL MODEL STUDIES Safety Device for Inverted Siphon

Flow in preliminary design at 700 cfs

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 15: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

502

f I I I I

~ -ID

~ I, y I ,

I I

v ~ -J, ~

·J

i<- - --- -rs'-o'!... --- -~ - - - - - -- ---- --2s'-1" - - -------- -><- - -----,s'-o"-------~ I I I . I

' ' ....... I ' I

' I I ' I

' I

' =' ' ID

' _1

' .... ', i

I , __ I I I

' I I

I.I -· -

FLOW'>-,,/

/ ,/

/ /

/ ,,/

/ / ~

I

FIGURE4 REPORT HYO. 391

..:..!!" ~

' ¥

A

.. -IN -

I I Canal l Trans1tron 1 <<- - --------- - - - - --- - --- - >'

I Trans1t1on , Canal Section ' from rf I to vert. 1

t< -------- --- - -----~ ---- -·-:.> 1 from vert. to rt 1 ' Section

0 5 10 I '' t , I I , I I I SCA LE OF FE ET

PLAN

, - -Water surface at 700 c.f.s. :..,_ -- ------- -- 1a'-2!!.- -- ---*4!..o'-J I I •

I~

"q- ~ -c;, f -~ -~

I I

SECTION A LONG CENTERLINE

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

STR UOTURE NO. 2

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 16: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

A. Structure No. 2 Solid ramp in canal section

B. Structure No. 3 Solid ramp at siphon entrance·

C. Structure No. 3 Stepped ramp at siphon entrance

GATEWAY CANAL MODEL STUDIES Inverted Siphon Safety Device

Flow appearance in structures nos. 2 & 3 at 700 cfs

Figure 5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 17: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

FIGURE 6 REPORT HYO 591

r< -- -- - - - - ---- ---- - -- -- 30·-o· ------ - - ----------><-- ------------ 20·-o·--· - - ------->< I I I I

t---"T""-i'-- i

502

I I I I I

-1~ -i ~

·' 0 ;i, ,.

·' 0 -.;, I

i I I I I I

"u, _, A ~

..:11

I I I

•' <t _, ID I I I I

FLOW -->-

: : I I I I

' !. I I I I I I I

ti) ~-----"'

I O 5 10 lwl , , , , I I , , I

PLAN

SECTION ALONG Ii.

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE STRUCTURE NO.3 WITH SOLID RAMP

SCALE OF FEET

-~ 'i ________ _

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 18: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

The action of the "deer" being swept around the wall is shown in this series of pictures enlarged from motion pictures of the model studies. The order of pictures is from the top down in each row, rows left to right. The wall is near the center of each frame; flow from the bottom up.

GATEWAY CANAL MODEL STUDIES Inverted Siphon Safety Device Guide walls in structure No. 3

-Inverted siphon entrance

-inclined solid romp

ransition 1from t! :I to vertical,~

J V

-Symmetrical about~ 0

HALF PLAN

::u ~"11 o­::u Ci) --1 C :i::. :::0 -< £Tl 0

~ .....

Page 19: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

CD _, --++------+-..---• . (.\I

PLAN

FIGURE 8 REPORT HYO 391

b --++-------- ~ T I I I I I I

Except tor safety ramp details of the structure are the same as shown in Figure 6,

.-:-.~:.-.-:-. :"'?-'..:

r.-:-_p.·_. :-:-.;::.: -.:_1 I K -5'•0'!.--a._-<,· .v .. ··:- ·. q. :- :J =Y. I "'""1: • • a!· I • • • • -

cp::., ·.·:.o.,: . ·. · :t!l ... ·\-- X /\ _, I I l I II I ;,. K -- 1 5-6-·>t -

I I I

=co _, CD I I I I

: ,• .·. =·' ....... ·. : ··. · .. :ca .. ·.· .... ··.• .. ·_. :,1·. • ·. · .. ::. ·.:.:. > ·i,.: ·_- ·_- · .. .

502 ·

SECTION ALONG I.

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

STRUCTURE NO. 3 -WITH STE.PPED RAMP

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 20: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

5D2

FIGURE 9 REPORT HYO. 591

l.c------------------30' o·----------------~ --------12' s• ___ ,.: 1------1, ... --- - A I

:>-

' ., ·o ., on I

*1 "co -~

I I I I I I

Ii.

~~I

PLAN

1.57

SECTION ALONG Ci.

:~ .

••

SECTION A-A

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

R ECOMMEN OED DESIGN

~ I

I

"o -~ I

0 5 I I I I I ·I I I

SCALE Of FEET

IO I I

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 21: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

No flow 350 cfs

GATEWAY CANAL MODEL STUDIES Inverted Siphon Safety Device

Recommended design

700 cfs Note model "deer" carried to safety on stepped ramp

l%j .... ~ 'i ro .... 0

Page 22: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

502

FIGURE 11 REPORT HYO 391

K--- - - - - - - - - - - - - -30'-o"- ---- -- -- -- - ----~----- -, 2' 6"--- -- -~ 1-----k,::--- - A I I

,._ I :

A

~11

",t

cb I

' ' I '

"u, _, "'" T

I I I I I I

"u, _, C\J

-...--- I I I I

--L 7--

: I I I I I I I I I I

I I I

I I

(.I) il,

I I

I 0

I (.I) _, It) I I

5

SCALE OF

PLAN

~--1.57'

j:·,·,:.·,<::,,j

I I I I I I

'b -_I_ T I I

FEET

.:~_:,~~~~~'.~~}~·:/ 3-0' r-~ "' /

10

:.1·. :: _. -~-:· :,-r--.:·.":: ::'. ':-~-- ·: .. ·. ··"': -: ... "-': -: -~,-... , .. - ----- - -- ---------~- __ ,z_ -- -- - ----:1;-r,; I

_: : : / tq i -~ ~P 'r I 5'' I U) I : ;:

------11-09 ---->i: r<-, / . . ·,: ·4:.... : y: : /

SECT 10 N AL ON~- ·:: .. :'.:.·ii.}:.:,:: y: ·. •:a::' •. { ~: :'i ;;;;-,,,.

V.

~·.

SECTION A-A

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE ALTERNATE RECOMMENDED DESIGN

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 23: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

. <o

~ -;[ : y

I

I

<o _,

,--Undisturbed earth or · compacted backfill

--Buttresses moy be omitted d bockforms ore not required

SIPHON NO.

I

2 3 4

5 6 7

STA. A E.L. A

64+72.50 4959.46 96+-8256 4958. 04 21 Ot 72. 50 4953.56 297+76.56 4949. 93 314 tOOOO 4 9 48 9 7 336 t78.57 4947 75 401t6750 4945.01

, Precost concrete stub pipe

r s,mm about f.

l [i----See longitudinal section hi,, for size and spoc, ng

.-.:::· of transverse bors

I I I

i ~ ' I

... i"' I -- y y y / (\ ~ ' -- p <:.: --li;

'-:c Dr>-/,/ 11

~ - J!

<o -.:.

I T I

~I . I ~,

(/)I '-

I I I

-?1 ~ I I I I I I

I I

I

I I I

1 11 I , H 1

:--5- 0 --~ -- 5- 0 --;.-! 1--· I • l-<-8 I --11•

---- r Elastic filler

..., ' I I

! Top of bonk--.,

,, <o

.., _( : '? I

~-s! o"--:- +-- s·- o·- -

I ,, <o -' '?

I

--,; I

_.-Controct,on joint

'I"' '···-Symm. about f.

Br>- ----+-~ --t--1--___J__--+++--.? IL -----

--- - - -- - 30' 0"-- - - -- ------ ------- ---

cl:-PLAN OF INLET I 0 10

SCALE OF FEET

ESTIMATED QUANTITIES Eoch inlet

Concrete _______________ ,oo Cu. Yds. Reinforcement__ _____ , 7,500 Lbs.

-----12'- 6"--------->iBP--- -----12. o' t. I ________ ,....I

' I I

·- '-<-2'6-' - - --- ~ : 1!4@12" Bond into sidewalls

.-·a!. 4 (@/2'

/,!' ,._.

! I i Broom surface and ' -Ty;ical reinf---~·-,a. -~---~.] .• I I roughen by rokmg - - --~---. __ 11 5@,o'- _ \ "'.. ·· · ~

-~ I I I I • .. I !. ,,__ ----, ~ J .. 5!.o'!.-,+c-- 5!.o"----..,-.--5·-o·--- --5·-o·--·>t<-· ft·0 ·-->t<--5 o ~;., ~ •

;<---6"Fillet ,-contraction joint, for detail , see Owg. 526· 0-I6 7

al : ... ' ~~ I t : I I : : -2!5• .D .·1::i, ', ....... 4(§)12 -- I

I : 1 I I 1 1 1 -"" _ \ ,, " 1 / ;,~ •

, 1 I I , , -i- : •.<>' ,· 1 Q_ --~4 (ii) JO "= ,' I I • '--: \ : - I 1 : : ·r· :·-., Type A 9"rubber / I

-,.. : :e I , 1 ' 3!0"+-1 ~ woterstop- - < / ' 7 : ( ____ J L ______ :_.- ______ l_, ______ --i:----L-----------r---.---.., 1

• rx-';''..-' ·7SJ· \i··-4"Fillet .... -f.! +--- -" -,.-----,,.~ I 3 4

- --- -:- - I I .. • : ' ; I ' : / /

~ ,: I ~ ;, : ·,i,. : \ . ~ c:, / / ~ ~ \l'I I "° I ~' ~ ~ a (,() ~/ / V,5(ii)12·

I I

I I

-~, : ,.: I <::) ~ • -.. ~ (,Q '/ / 11 J I I t\l r.:i, (,Q ~ r.:i, I I /

1 "' _/ 1--~j-.. ! 5.-12· 2- ~--"" : •l t

'·' I I (,0 'Cl I l.t) 'Cl ,.1 /

_1 - : j ::_ 3•- L<- : .. , ~ -~ 18 r;<f 'I -,.,8~-

' I I o I I

I I

End inside reinforcement , ':{·\ :·:"~ ; : f;:

:-.'?~ I -.-.. ~: I -~ l LY~;_ : I I l I I

; : : : where slob thickness is 7•/

#4@12',,

: : : : I I I I '

I ! l 1 I J j 1 : 1 3"~~----14- # 5@10"--------~Jt:.­: .: II 1.: 9- ~5 : l. 7--6 : :,. s-•7 : :,. • :~I If I :

·></4 '-<-----15· 114 (ii) 9 ______ ..,Q..., ______ >'6>-<---.~---.-»6>-<-/4- 11 7@5 ->< -2 I I I" : 8) 6 I I (§)6 1 I @6 1 r ;

' / ' ><-------------------- .,-----------,.., End olternote bors ot holf wo/1 height---' '

LONGITUDINAL SECTION OF INLET

, ,J... ___

/\

1~---

ol>--

-- r ' I I

\:,

T I

i

--/.-"' --~ -

I ' ~- 3! 6''-~, .. ,t.·/' I

: l

@. ~ ,,---Bose of sidewall some ,,, Ii!, f 1 /: thickness os adjacent ·~ ~ ,- :t '. floor slab.

;\ : ( -~1 \ \ I _I.-~

-. .. .1 ,----, I ' -,-4,2~-

SECTION B-B

_.,-End 11 7 bars from sides, : ex tend 116 bars as shown

'----~-3'-6"-~ ~ I

11 7 (ii) 12' alternate with 11 6@12'-----------

II 4@12'----

,:. ,,, __

I

T ·,

, -For dimensions of transition at bell iaint,see Owg. 526-0-I64

I I I

->-11.?°f-<-3'- 6"->i -..! 6@12·c: l I

t-<-3';.6"-~

Symm about f------,-j

NORMAL SECTION

,Stub pipe with reinforcement same as : adjoining pipe.Longitudinal steel shall ; extend bond distance into round to

tf!Jr-- square transition

~---2- 114 Hoops @12"

I ~ ~ ~<;I

<:;'<:i ~-~

-s:./:?

\... -- -I. , ' ( __ ~-·it·

I

' ,,

I I

I

!'

., ..,

D-D

-~ V)

~~ ,::,.!:: :1:-::, -c::-<> -"'-~"' . '-~ ~ @, :'ii ... <.:, ...

-8'

~-' .... _.,.,:: __ ,--2· #4

,.: .... # 4 @12' 'r<-24~,.;.

l'~ .,Q?: ~ I

.::i ~ TYPICAL BUTTRESS DETAIL

,"- I

·--.1. ,' :--.y

7, • -'-- .. -:::, , r-

'·J-•4 Hoops @ 9•

I I

FIGURE 12 REPORT HYO 391

Symm about f -----~

I 15@10'

. #4@12"-'·'

SECTION c-c

~----11 5@10'

·-!4@12" --

l-------- --- -_,,,' "-- -----------~-,,,..; ····-Symm about [ ~

r ' '

SECTION A-A

NOTES For general notes see Dwg. 526-0-164 For outlet transition see Owg 526-0 - 165. For siphon profiles see Dwg. 526-0· 164.

9 - I 7- 54 I REVISED CONNECTION TO PRECAST PIPE ·ADDED CONTRACTION D gaJI JD/NT

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

WEBER BASIN PROJECT-UTAH

GATEWAY CANAL MAN AND ANIMAL ESCAPE

$1_PHQN INLET TRANSITIONS

DRAWN" ____ &.J'!J. _____ SUBMITTED ______ ~--~--- ________ _

::::::~--!'ae~"I. __ --:::::;:DNO,:O __ ~_ ---------£.tR.p.1(- A"-cHTE-1$&i.~TN6ilt ____ _

DENVER, COLORAOO. = 526-D-166

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 24: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse

502

1,.,,./-Left wall I

: . ~ .... · .. : :- . ·"· ... . . · .• ..

. ~--. .' .. ~-. .... _·,.

FIGURE 13 REPORT HYO 391

:~:. ': .,: . .....

· ... ; . _. : .•. . ... -...~: ::·· --~- ~- _:· ~~ :_

·.: ,p: :·: _ . .- ... 1--------------,-,,-,---,,.----,---.,.-------------t .... : . :

..---Water surface at 100 cfs----... ... • ... . . l-:==~~~~~~~====----------__:~~~~~~~===-1-~-- .. ·.o·

·. :.-.- _b."· . ·"· ·. · ..

' . . .

A . .. -~- .. 1----1--i----1--4--1-+-1--------------1.----+--+--+--1,----1--+--1

-_,~_ ·. _: -~: ' .. .

. . . ·-. :--.·. ~.:_-. : ,;_ · ... ·1-----,l-+'---+--+-+-+------------~-+-+-+-+-+--+-+----'""'I . ., .

. · .. _-.:, . . ,,L.~~':.':.':'.:7..:.....-t--\-+------------.....::,,,;;:-;.--n,~-+-t-+-..::.._::---, . . • . -c : : • i_::.: :

.. • ·o·, ,

· ..... ··-~;:::::;;;;;;;;;;;;;;;;:::::;;~F~~======:=======::::=.,....=====:::::::~~~2~~-- : . l ·. _. •. <?"' : • ' -- -~·-:: ... _ ....

.... ~--·. :-.·,__ __ : : : ·.;,.· . . . . . . ·_:,· ...

·:· ... . ·. :- :o: : :

.o . ...

: : : :~-: .. · ..

. . . :~-:. ·. ·.

... . .. ·. _,,. . ~- . . . ·. ·. -~-:.

: ,_· .. : . ·.·. :-?:.

6.s

6.5

!o·o

. ., ... : .. -~- ·. .o. ·, 'p : ',

: : ~-. :_.._ . .. ' ...... .,. .

·. ·,j . . l,'

: .. • ... :·:: . . · .<f .

:··.·-;':· . .'· . .­

. -~·-·. : ~-: .... · ... '!'.',

· ... i-------5.5 5.5 ----------

·. 41: . :o·~ .. -~ ·. ~ .. •

......

. .. . . : ... 5.o--------5.o-----5-o----,:-~·.-.·::

VELOCITY DISTRIBUTION IN CHANNEL CROSS SECTION AT UPSTREAM EDGE OF SAFETY RAMP

(Looking downstream)

GATEWAY CANAL MODEL STUDIES INVERTED SIPHON SAFETY DEVICE

MODIFIED DESIGN VELOCITY DISTRIBUTION

.... ·. ~- :

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 25: HYDRAULICS BRANCH , a ,- OFFICIAL FILE COPY OFFICE l [ CD PY … · 2017-08-31 · reverse current would be trapped in a vortex rather than carried back onto the ramp. The reverse