hydro power operation and economic performance in a ... · •leventina (ti) (all together) project...
TRANSCRIPT
Hydro Power Operation and Economic
Performance in a Changing Market
Environment (HP-Future)
Who is this guy?
Smart Infrastructures
HP-Future
• HP is important
– Approx. 60% of Swiss Energy comes from HP
– The Energy Strategy 2050 expects an increase in HP production
– BUT:
• Average price to produce electric power 5 rp. per kWh
• Price level to sell electric power 3 rp per kWh
Life is what happens while you are busy making other plans…
A cycle or a shift?
CH the Battery of EU?
HP now and then
Hydro Power Operation and Economic Performance in a
Changing Market Environment
• Facts:
– SNSF project in the NRP 70 “Energy transition”
• Volume approx. 1,2 Mio CHF
• Start 10/14
• Duration 3,5 years
– Associated to
• More Facts:
How is involved:
Structure:
WP 1: HP-Operations
• Partner: HES-SO + Uni Bas
Role of HES-SO
• Model optimal market response behavior
• Model configuration
– On the fly configuration of the mathematical models
Code that creates Models
What means integrated?
• Covering the fields
– Short term operation
– Long term investments
– Social Acceptance / Regional Impact
– Sharing the case studies:
• Lago Bianco, Valposchiavo (GR) (WP-3 only)
• Alpiq HP Plant VS (all together)
• Leventina (TI) (all together)
Project structure
The 1st workshop 12.3
Workshop: The Future of Swiss Hydropower
Bern,12.03.2015
SchweizerischerNationalfonds(SNF)
Wildhainweg3,Plenum21,Gebäude21
Program
09:15 Registration and Coffee 09:45 Welcome, Int roduct ion and Goals for the Day
10:00 The Future of HP – A Central European Perspect ive Christian von Hirschhausen (TU Berlin/DIW Berlin)
10:45 The Future of HP – A Scandinavian Perspect ive
Atle Midttun (BI Norwegian Business School)
11:30 Break 11:45 The Future of Swiss HP – Relevant Drivers and Factors
Results and Insights from the Questionnaire
12:30 Lunch 13:30 Panel Discussion: HP-Challenges in the Short -Run
14:30 Break 14:45 Panel Discussion: HP-Challenges in the Long-Run
15:45 Discussion – Summary – Next Steps
16:15 End of Workshop
TheWorkshopisfreeofcharge.
PleaseregisterwithDr.PatrickBaur([email protected])
Participantsare invited to fill out the Questionnaire on the Future ofSwiss Hydropower (Link
follows)
Formoreinformationontheproject‘HPFuture’pleasevisit:
https://fonew.unibas.ch/forschungprojekte/projekte/hp-future/
HP Needs & Drivers
• Questionnaire & Discussions at the Workshop
50 questions, filled out by people register for the workshop
Business/Industry 16 Parliament/Council 0 NGO 1 Administration (federal, cantonal) 3 University/Research Institute 12 Other 3
Next steps
• Report of the WS (all)
• Work in all WPs
• Beginning of the first joined case study in VS (second half of 2015).
• Interested? Please talk to me!