hydrogeology and watershed model report (draft)
TRANSCRIPT
VA101-343/9-3 Rev 0 June 17, 2011
APPENDIX A
WELL INSTALLATIONS AND LITHOLOGY
Appendix A1 2009 Monitoring Well Installation Details Appendix A2 2010 Monitoring Well Installation Details Appendix A3 2010 Drillhole Logs
VA101-343/9-3 Rev 0 June 17, 2011
APPENDIX A1
2009 MONITORING WELL INSTALLATION DETAILS
(Pages A1-1 to A1-22)
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
TOPSOILGREYWACKE Type 10 hydraulic cement and bentonite
grout
1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 20 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of coarse grained filter sand1/2 bag of bentonite chips
0.9 m
54.9 m56.4 m
59.4 m
65.5 m67.1 m68.6 m68.8 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 20.12 mDate of Measurement Sep 10, 09
B2-1
5
10
15
20
25
30
35
40
45
50
55
60
65
70
286
281
276
271
266
261
256
251
246
241
236
231
226
221
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-01GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-01GT, Stick-up = 0.45 m
K09-01GT
Coordinates:
Contractor:
1
Tailings EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3/NQ3
6,144,043 N, 471,619 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-01GTN/A
249.76 m290.75 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
HP 200HQ/NQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 9, 09Jul 31, 09Jul 31, 09
LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-1 of 22
BENTONITE SEAL
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
ROAD FILL
GREYWACKE AND ARGILLITE
1 bag of bentonite chips
1 grout mix of 2 bags of grout mix per ~ 50gal water2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 4 x 5 ft pipe segmentspre-packed screen system used
1 bag of coarse grained filter sand
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
1.2 m
8.8 m
10.4 m
11.9 m
18 m
19.8 m
21.3 m21.5 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 2.80 mDate of Measurement Sep 16, 09
B2-2
5
10
15
20
25
331
326
321
316
311
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-02GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-02GT, Stick-up = 0.59 m
K09-02GT
Coordinates:
Contractor:
1
Tailings EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,487 N, 471,701 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-02GTN/A
197.7 m335.08 m278o,-57o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 30, 09Aug 9, 09Sep 1, 09
PK, LS, GM, MWJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
All depths including static water level are measured downhole at the angle of inclinationand have not been corrected to 57°. Well installation started on 8/9/09 but bridged socompleted on 9/1/09. Inconclusive hydraulic conductivity results.
A1-2 of 22
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
FILTER SANDBENTONITE SEALVAN RUTH PLUG
TOPSOILGREYWACKE Type 10 hydraulic cement and bentonite
grout
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 10 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of coarse grained filter sand2 buckets of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.3 m
42.7 m44.2 m45.7 m
51.8 m53.3 m54.9 m55.1 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 29.41 mDate of Measurement Sep 15, 09
B2-3
5
10
15
20
25
30
35
40
45
50
55
288
283
278
273
268
263
258
253
248
243
238
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-03GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-03GT, Stick-up = 1.09 m
K09-03GT
Coordinates:
Contractor:
1
Tailings EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3/NQ3
6,144,043 N, 471,619 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-03GTN/A
279.3 m292.28 m326o,-58o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
HP 200HQ/NQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 1, 09Aug 19, 09Aug 19, 09
LS, GM, MWJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
All depths including static water level are measured downhole at the angle of inclinationand have not been corrected to 58°. Well installation has sanded in or collapsed.
A1-3 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 15 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.61 m
40.5 m
42.1 m
45.1 m
51.2 m
53.7 m55.2 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 3.30 mDate of Measurement Sep 11, 09
B2-4
5
10
15
20
25
30
35
40
45
50
55
539
534
529
524
519
514
509
504
499
494
489
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-04AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-04AGT, Stick-up = 0.81 m
K09-04AGT
Coordinates:
Contractor:
1
Downgradient of Open PitLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,142,205 N, 472,756 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-04AGTN/A
55.2 m544.44 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 13, 09Aug 14, 09Aug 14, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
One bag of sand was placed inside the protective casing above the cement cap.
A1-4 of 22
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 32 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.3 m
89.63 m91.3 m93.6 m
99.7 m101.8 m103.7 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 4.46 mDate of Measurement Sep 11, 09
B2-5
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
539
534
529
524
519
514
509
504
499
494
489
484
479
474
469
464
459
454
449
444
439
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-04GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-04GT, Stick-up = 0.28 m
K09-04GT
Coordinates:
Contractor:
1
Downgradient of Open PitLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,142,207 N, 472,759 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-04GTN/A
103.7 m544.40 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 10, 09Aug 13, 09Aug 14, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Well installation screen was contaminated with bentonite slough either during or afterinstallation. Bentonite bridge was discovered when KP returned to develop the well.
A1-5 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
ROAD FILL / FAULT GOUGE
GREYWACKE AND ARGILLITE
FAULT GOUGE
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1 grout mix of 2 bags of grout mix per ~110 gal water
2-inch diameter schedule 40 solid PVCpipe 12 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
5 3/4 bags of coarse grained filter sand
2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.61 m
16.3 m17.4 m
21 m
27.1 m
29.1 m
31.1 m31.3 m
42.8 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 17.41 mDate of Measurement Sep 12, 09
B2-6
5
10
15
20
25
30
35
40
45
697
692
687
682
677
672
667
662
657
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-05GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-05GT, Stick-up = 0.69 m
K09-05GT
Coordinates:
Contractor:
1
Initial Primary CrusherLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,142,578 N, 473,401 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-05GTN/A
42.8 m701.65 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 14, 09Aug 15, 09Aug 16, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Casing removed from drillhole and protective monument installed at surface.
A1-6 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
PEAT
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1 grout mix of 2 bags of grout mix per ~110 gal water
2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.61 m
6.4 m
8.5 m
9.5 m
15.5 m
16.8 m
18.3 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 3.48 mDate of Measurement Sep 15, 09
B2-7
5
10
15
20
761
756
751
746
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-06AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-06AGT, Stick-up = 0.93 m
K09-06AGT
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,143,411 N, 473,632 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-06AGTN/A
18.3 m766.45 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 19, 09Aug 19, 09Aug 20, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Monument installed.
A1-7 of 22
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
PEATGREYWACKE AND ARGILLITE Type 10 hydraulic cement and bentonite
grout
2 grout mixes of 2.5 bags of grout mix per~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3.05 m
88.4 m89.9 m91.5 m
97.6 m99.4 m
100.9 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 25.58 mDate of Measurement Sep 15, 09
B2-8
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
761
756
751
746
741
736
731
726
721
716
711
706
701
696
691
686
681
676
671
666
661
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-06GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-06GT, Stick-up = 0.35 m
K09-06GT
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,143,409 N, 473,630 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-06GTN/A
100.9 m766.45 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 16, 09Aug 19, 09Aug 19, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No protective monument installed as per client request 14 ft of casing was left in drillholeas protection.
A1-8 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
MINE WASTE ROCK
ARGILLITE
LAMPROPHYRE DYKEARGILLITE
LAMPROPHYRE DYKEARGILLITE
Type 10 hydraulic cement and bentonitegrout
3 grout mixes of 2 bags of grout mix per ~110 gal water
2-inch diameter schedule 40 solid PVCpipe 31 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.3 m
23.5 m
27.1 m
28.8 m
31.9 m
33.7 m
35.8 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 2.53 mDate of Measurement Sep 14, 09
B2-9
5
10
15
20
25
30
35
40
708
703
698
693
688
683
678
673
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-08AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-08AGT, Stick-up = 0.78 m
K09-08AGT
Coordinates:
Contractor:
1
Downgradient of the Clary Waste DumpLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,143,629 N, 473,477 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-08AGTN/A
35.8 m712.51 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/ HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 22, 09Aug 23, 09Aug 23, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-9 of 22
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
MINE WASTE ROCK
ARGILLITE
LAMPROPHYRE DYKEARGILLITE
LAMPROPHYRE DYKEARGILLITE
LAMPROPHYRE DYKEARGILLITE
Type 10 hydraulic cement and bentonitegrout
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1 1/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.2 m
85.4 m
88.7 m90.9 m
97 m98.8 m
102.7 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 5.37 mDate of Measurement Sep 14, 09
B2-10
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
707
702
697
692
687
682
677
672
667
662
657
652
647
642
637
632
627
622
617
612
607
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-08GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-08GT, Stick-up = 0.44 m
K09-08GT
Coordinates:
Contractor:
1
Downgradient of the Clary Waste DumpLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,143,633 N, 473,480 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-08GTN/A
102.7 m712.36 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 20, 09Aug 22, 09Aug 19, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-10 of 22
CEMENT CAPBENTONITE SEAL
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
ARGILLITE AND GREYWACKE
Type 10 hydraulic cement and bentonitegrout1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 7 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.15 m0.5 m
17.8 m
19.8 m
21.3 m
27.4 m
29 m
31.1 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 5.47 mDate of Measurement Sep 13, 09
B2-11
5
10
15
20
25
30
35
710
705
700
695
690
685
680
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-09AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-09AGT, Stick-up = 0.95 m
K09-09AGT
Coordinates:
Contractor:
1
Revised Primary CrusherLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,142,747 N, 473,397 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-09AGTN/A
31.1 m715.31 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 26, 09Aug 26, 09Aug 25, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No protective monument installed as per client request 14.5 ft of casing was left indrillhole as protection.
A1-11 of 22
CEMENT CAPBENTONITE SEAL
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
ARGILLITE AND GREYWACKE
ARGILLITE
LAMPROPHYRE DYKEARGILLITE
GREYWACKE
ARGILLITE
GREYWACKE
Type 10 hydraulic cement and bentonitegrout1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
3 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter Schedule 40 solid PVCpipe 31 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2.4 m4.6 m
84.9 m
88.7 m
91.8 m
97.9 m99.4 m
101.2 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 36.29 mDate of Measurement Sep 13, 09
B2-12
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
710
705
700
695
690
685
680
675
670
665
660
655
650
645
640
635
630
625
620
615
610
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-09GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-09GT, Stick-up = 0.32 m
K09-09GT
Coordinates:
Contractor:
1
Revised Primary CrusherLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,142,736 N, 473,398 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-09GTN/A
101.2 m714.94 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 23, 09Aug 26, 09Aug 25, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No protective monument installed as per client request 14 ft of casing was left in drillholeas protection.Unable to get grout past 15 ft until bentonite seal installed at 8 to 15 ft, the lower 5 ft ofcasing may have spun loose during grouting.
A1-12 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
GREYWACKEType 10 hydraulic cement and bentonitegrout
1 grout mix of 2 bags of grout mix per ~110 gal water
2-inch diameter schedule 40 solid PVCpipe 7 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/8 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.3 m
17.7 m
19.5 m
21.3 m
27.4 m
29.3 m
31 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 4.19 mDate of Measurement Sep 17, 09
B2-13
5
10
15
20
25
30
35
506
501
496
491
486
481
476
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-10AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-10AGT, Stick-up = 0.84 m
K09-10AGT
Coordinates:
Contractor:
1
Upgradient of TMFLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,745 N, 473,234 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-10AGTN/A
31 m511.21 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 28, 09Aug 29, 09Aug 29, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-13 of 22
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALFILTER SAND
ROAD FILLGREYWACKE
LAMPROPHYRE DYKEGREYWACKE
Type 10 hydraulic cement and bentonitegrout
2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"2 bags of coarse grained filter sand
3 m
84.5 m
88.3 m89.5 m
95.6 m97.6 m99.7 m
101.2 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 19.31 mDate of Measurement Sep 17, 09
B2-14
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
506
501
496
491
486
481
476
471
466
461
456
451
446
441
436
431
426
421
416
411
406
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-10GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-10GT, Stick-up = 0.34 m
K09-10GT
Coordinates:
Contractor:
1
Upgradient of TMFLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,742 N, 473,229 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-10GTN/A
101.2 m511.09 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 27, 09Aug 28, 09Aug 28, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Water level fluctuates possibly due to surface water influence or precipitation events.
A1-14 of 22
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILLGREYWACKE Type 10 hydraulic cement and bentonite
grout
1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 9 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
3/4 bag of coarse grained filter sand
3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
0.3 m
24.1 m
25.9 m
27.4 m
33.5 m
35.1 m
37.2 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 2.27 mDate of Measurement Sep 17, 09
B2-15
5
10
15
20
25
30
35
40
387
382
377
372
367
362
357
352
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-11AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-11AGT, Stick-up = 1.00 m
K09-11AGT
Coordinates:
Contractor:
1
Upgradient of TMFLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,531 N, 472,316 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-11AGTN/A
37.2 m391.91 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 31, 09Sep 1, 09Sep 1, 09BP, CD
JS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-15 of 22
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
FILTER SAND
ROAD FILLGREYWACKE
1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 28 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 1 x 10 ft pipe segments2/3 bag of coarse grained filter sand
1 bag of bentonite chips
3 1/3 bag of coarse grained filter sand
79.4 m81.6 m83.8 m
86.9 m
91.5 m
94.5 m
100.9 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 2.60 mDate of Measurement Sep 17, 09
B2-16
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
387
382
377
372
367
362
357
352
347
342
337
332
327
322
317
312
307
302
297
292
287
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-11GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-11GT, Stick-up = 0.25 m
K09-11GT
Coordinates:
Contractor:
1
Upgradient of TMFLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,532 N, 472,312 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-11GTN/A
100.9 m391.82 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 29, 09Aug 30, 09Aug 30, 09
BP, CDJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No cement cap.
A1-16 of 22
BENTONITE SEAL
SOLID PVC PIPEGROUT MIX
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GRAVELGREYWACKE 5 bags of bentonite chips
2-inch diameter schedule 40 solid PVCpipe 27 x 10 ft pipe segments3 grout mixes of 2 bags of grout mix per ~110 gal water
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
5.8 m
75.9 m77.3 m79.5 m
85.7 m87.8 m
90.5 m90.7 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 33.08 mDate of Measurement Sep 18, 09
B2-17
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
124
119
114
109
104
99
94
89
84
79
74
69
64
59
54
49
44
39
34
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-13GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-13GT, Stick-up = 0.68 m
K09-13GT
Coordinates:
Contractor:
1
Downgradient of the TMFLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,145,214 N, 470,345 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-13GTN/A
165.2 m128.79 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 1, 09Sep 6, 09Sep 6, 09
BP, CD, CH, LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
A1-17 of 22
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
GREYWACKE AND ARGILLITE
1/2 grout mix of 2 bags of grout mix per ~110 gal water
2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 bags of coarse grained filter sand
2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
8.2 m
10.5 m
12.8 m
18.9 m
20.4 m
22 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 0.26 mDate of Measurement Sep 19, 09
B2-18
5
10
15
20
25
1
-4
-9
-14
-19
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-14AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-14AGT, Stick-up = 0.95 m
K09-14AGT
Coordinates:
Contractor:
1
Port SiteLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,719 N, 468,887 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-14AGTN/A
21.9 m6.02 m0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 8, 09Sep 8, 09Sep 15, 09
CH, LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Monitoring well water level influenced by tidal effects. Casing left in drillhole.
A1-18 of 22
BENTONITE SEAL
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
ROAD FILL
GREYWACKE AND ARGILLITE
1 bag of bentonite chips
1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 13 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
1.5 m
34.5 m
36.6 m
38.7 m
44.8 m
46.6 m
49.4 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 1.37 mDate of Measurement Sep 19, 09
B2-19
5
10
15
20
25
30
35
40
45
50
1
-4
-9
-14
-19
-24
-29
-34
-39
-44
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-14GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-14GT, Stick-up = 0.64 m
K09-14GT
Coordinates:
Contractor:
1
Port SiteLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,716 N, 468,884 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-14GTN/A
49.4 m6.02 m0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 7, 09Sep 8, 09Sep 8, 09CH, LS
JS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Monitoring well water level influenced by tidal effects. Monument installed.
A1-19 of 22
BENTONITE SEAL
FILTER SAND
SOLID PVC PIPE
BENTONITE SEAL
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEAL
MINE WASTE ROCK
GREYWACKE AND ARGILLITE
1 bag of bentonite chips
Gas tubing installed, 2 tubes at each ofthe following depths: 2.0, 7.0 and 14.0 m
6 bags of coarse grained filter sand2-inch diameter schedule 40 solid PVCpipe 8 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
3 bag of coarse grained filter sand
2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
1.2 m
5 m
18 m
19.5 m
21.6 m
27.7 m
29.3 m
31 m
2 m
7 m
14 m
}GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 16.73 mDate of Measurement Sep 26, 09
B2-20
Gas Tubing
5
10
15
20
25
30
35
679
674
669
664
659
654
649
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-15AGT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-15AGT, Stick-up = 1.15 m
K09-15AGT
Coordinates:
Contractor:
1
Patsy Waste DumpLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,141,648 N, 474,112 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-15AGTN/A
31.1 m683.63 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 11, 09Sep 12, 09Sep 12, 09
CH, LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No cement cap installed because of the additional equipment installed. Gas tubesinstalled in this drillhole can be measured at drillhole K09-15GT.
A1-20 of 22
FILTER SANDSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
MINE WASTE ROCK
GREYWACKE
GREYWACKE
GREYWACKE AND ARGILLITE
Gas tubing installed, 2 tubes at each ofthe following depths: 1.0, 9.1, and 13.1 m
Thermister installed: tip at 68 m withnodes at 5 m intervals and additionalnode at 1m, a total of 15 nodes.
25 bags of coarse grained filter sand
2-inch diameter schedule 40 solid PVCpipe 28 x 10 ft pipe segments
1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
2 3/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1/2 bag of coarse grained filter sand1 bag of of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
1 m3 m
8 m
13 m
18 m
23 m
28 m
33 m
38 m
43 m
48 m
53 m
58 m
63 m
68 m
5 m
10 m
79.9 m81.7 m82.8 m
88.9 m91.5 m
95.1 m
1 m
9.1 m
13.1m
}GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 16.88 mDate of Measurement Sep 26, 09
B2-21
Gas Tubing
Ther
mis
tor
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
679
674
669
664
659
654
649
644
639
634
629
624
619
614
609
604
599
594
589
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-15GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-15GT, Stick-up = 0.95 m
K09-15GT
Coordinates:
Contractor:
1
Patsy Waste DumpLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,141,644 N, 474,116 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-15GTN/A
95.1 m683.90 m
0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTGeotech Drilling Ltd.
Fraste DR232ODEX/HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 9, 09Sep 11, 09Sep 12, 09
CH, LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
No cement cap installed because of the additional equipment, special woodenmonument constructed to protect installation gas tubes from drillhole K09-15AGT canbe measured from here.
A1-21 of 22
CEMENT CAP
BENTONITE CHIPS
SOLID PVC PIPE
CAVED IN
BENTONITE SEAL
CAVED IN
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEAL
CAVED IN
SAND
SAND AND GRAVEL
220 gal. Type 10 hydraulic cement andbentonite grout.
2 1/2 buckets of Wyo-Ben Ltd. Enviroplugcoated bentonite chips
2-inch diameter schedule 40 solid PVCpipe 31 x 10 ft pipe segments
caved in to 7.8 m
3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"Caved in when casing pulled
2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 1/2 bags of coarse grained filter sand
1 1/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"
infilled
0.15 m
7.8 m
17.4 m17.98 m
19.5 m
21.6 m
27.4 m
29 m
31.1 m
32.9 m
GEOLOGICAL UNIT NOTES
Water Level Reading: Depth of SWL 6.88 mDate of Measurement Sep 20, 09
B2-22
5
10
15
20
25
30
35
4
-1
-6
-11
-16
-21
-26
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
MONITORING WELL DETAILS FOR K09-16GT
GR
AP
HIC
LO
G
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
File
:M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\K
ITS
AU
LT.G
PJ
Libr
ary:
M:\1
\01\
0034
3\03
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE.G
LB,
WE
LL C
OM
PLE
TIO
N,
TEM
PLA
TE O
CT
14, 2
009.
GD
T, O
ct 1
9, 0
9
Steel Protector CapPiezometer K09-16GT, Stick-up = 0.24 m
K09-16GT
Coordinates:
Contractor:
1
Port SiteLocation:
Drilling Rig:
Drilling Method:
of 1
VA101-343/03
GENERAL REMARKS:
HQ3
6,144,464 N, 468,580 E, UTM NAD83 (m)
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
K09-16GTN/A
32.9 m9.28 m0o,-90o
PAGE
FIGURE.REV. 0 - Issued for Report
KITSAULT PROJECTDriftwood Drilling Ltd.
Hydracore 2000HQ Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Sep 12, 09Sep 13, 09Sep 14, 09
CH, LSJS
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
Drillhole was completed early as drill could not advanced any further
A1-22 of 22
VA101-343/9-3 Rev 0 June 17, 2011
APPENDIX A2
2010 MONITORING WELL INSTALLATION DETAILS
(Pages A2-1 to A2-36)
UCS - 80 MPa
UCS - 69 MPa
UCS - 69 MPa
UCS - 218 MPa
5/2/3
3/3/2
4/4/5
6/8/6
5/4/3
50
0
23
48
0
12
0
37
49
82
100
69
72
80
93
71
41
41
85
97
39
68
37
39
72
98
98
100
98
98
98
98
100
93
93
95
100
100
96
98
100
SPT-01-1SRK-01-1SPT-01-2SRK-01-2SPT-01-3SRK-01-3SPT-01-4SRK-01-4SPT-01-5SRK-01-5SPT-01-6SRK-01-6
UCS 01-1
UCS 01-2
UCS 01-3
UCS 01-4
MINE WASTE ROCK - GRAVEL ANDSAND(0 to 9.8)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
ORGANIC DEPOSITS(9.8 to 10.2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(10.2 to 39)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 39 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-01GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
655
650
645
640
635
630
625
620
615
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-1
Coordinates:
Contractor:
1
Primary CrusherLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,142,498 N, 473,131 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jun 30, 10Jul 1, 10Jul 1, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-01GT
SPT sampler39 m
650.41 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-1 of 36
UCS - 90 MPa
UCS - 167 MPa
UCS sample brokenduring shipping
UCS - 50 MPa
4/5/4
2/2/2
23
0
560
57
49
36
51
21
23
30
7
0
20
41
100
35
57
49
57
68
43
9696
98
98
100
100
93
95
98
100
100
100
97
100
91
100
100
100
100
100
SPT-02-1SRK-02-1SPT-02-2SRK-02-2UCS 02-1
UCS 02-2
UCS 02-3
UCS 02-4
MINE WASTE ROCK - GRAVEL ANDSAND(0 to 4)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]ORGANIC DEPOSITS(4 to 4.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(4.3 to 34.1)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 34.1 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-02GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
749
744
739
734
729
724
719
714
709
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-2
Coordinates:
Contractor:
1
Fuel StorageLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,378 N, 473,443 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 1, 10Jul 2, 10Jul 2, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-02GT
SPT sampler34.1 m
744.18 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-2 of 36
UCS - 128 MPa
UCS - 126 MPa
UCS - 82 MPa
UCS - 137 MPa
3/3/4
0/1/1
0/1
0/1
0/1
0/2
8/18/32
15
0
0
0
0
0
0
10093
96
74
44
60
85
21
75
83
95
100
73
62
37
62
100
100
100
95
98
100
100
92
96
100
95
100
100
99
96
97
SPT-03-1SRK-03-1SPT-03-2SRK-03-2SPT-03-3SRK-03-3SPT-03-4SRK-03-4SPT-03-5SRK-03-5SPT-03-6SRK-03-6SPT-03-7
UCS 03-1
UCS 03-2
UCS 03-3
UCS 03-4
MINE WASTE ROCK - GRAVEL ANDSAND(0 to 3.1)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]SILT(3.1 to 10.5)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]ORGANIC DEPOSITS(10.5 to 11.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(11.3 to 35.7)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 35.7 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-03GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
748
743
738
733
728
723
718
713
708
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-3
Coordinates:
Contractor:
1
Truckshop & WarehouseLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,498 N, 473,559 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 2, 10Jul 3, 10Jul 3, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-03GT
SPT sampler35.7 m
743.39 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-3 of 36
UCS - 78 MPa
UCS - 79 MPa
UCS - 127 MPa
UCS - 80 MPa
3/3/5
2/4/3
2/10/40
4/2/4
6/7/8
4/10/13
0
20
0
25
65
85
9980
38
39
36
7
26
79
66
56
90
33
100
34
39
45
92
9221
58
68
75
16
46
63
99
94
100
100
97
92
98
98
92
100
100
92
100
99
100
100
84
8490
100
100
100
100
89
100
SPT-04-1SRK-04-1SPT-04-2
SRK-04-2
SPT-04-3SRK-04-3SPT-04-4SRK-04-4SPT-04-5SRK-04-5SPT-04-6
UCS 04-1
UCS 04-2
UCS 04-3
UCS 04-4
MINE WASTE ROCK - GRAVEL ANDSAND(0 to 10.8)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
ORGANIC DEPOSITS(10.8 to 11.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(11.3 to 68)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
50
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-04GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
733
728
723
718
713
708
703
698
693
688
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-4
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,142,080 N, 474,680 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 3, 10Jul 6, 10Jul 6, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-04GT
SPT sampler100 m
727.90 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-4 of 36
UCS - 41 MPa
UCS sample brokenduring shipping
UCS - 46 MPa
UCS - 100 MPa
UCS - 110 MPa
51
23
73
53
40
37
37
15
33
43
30
73
33
43
0
59
5932
62
43
41
45
41
77
82
51
56
12
12
70
98
75
100
92
100
97
94
95
97
75
94
100
99
92
92
100
39
100
100
82
94
79
94
98
100
96
100
94
100
94
89
100
98
98
UCS 04-5
UCS 04-6
UCS 04-7
UCS 04-8
UCS 04-9
GREYWACKE AND ARGILLITE(11.3 to 68)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DIOMIEN DYKE(68 to 71.6)
GREYWACKE AND ARGILLITE(71.6 to 100)
End of Drillhole: 100 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
100
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-04GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
783
778
773
768
763
758
753
748
743
738
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-5
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,142,080 N, 474,680 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 3, 10Jul 6, 10Jul 6, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-04GT
SPT sampler100 m
727.90 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-5 of 36
UCS - 20 MPa(Argillite)
UCS - 30 MPa(Argillite)
UCS - 138 MPa(Greywackie)
4/6/7
3/2/1
2/1/3
1/4/3
12/24/15
50
4/8/6
50
43
23
30
30
62
0
0
17
5674
45
13
44
39
16
44
54
70
26
72
53
89
100
100
100
94
96
79
92
94
94
100
100
96
SPT-05-1SRK-05-1SPT-05-2SRK-05-2SPT-05-3SRK-05-3SPT-05-4
SRK-05-4
SPT-05-6
SRK-05-5
SPT-05-7
SRK-05-6
SPT-05-8
SRK-05-7
SPT-05-9
SRK-05-8
UCS 05-1
UCS 05-2
UCS 05-3
MINE WASTE ROCK - GRAVEL ANDSAND(0 to 20.1)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
ORGANIC DEPOSITS(20.1 to 20.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(20.9 to 33)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DIOMIEN DYKE(33 to 33.34)GREYWACKE AND ARGILLITE(33.34 to 39.9)
End of Drillhole: 39.9 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-05GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
717
712
707
702
697
692
687
682
677
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-6
Coordinates:
Contractor:
1
Down Gradient of South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,141,755 N, 474,300 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 6, 10Jul 7, 10Jul 7, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED. BULK SAMPLES WERECOLLECTED FOR SRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-05GT
SPT sampler39.9 m
712.31 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-6 of 36
3/5/6
3/4/4
5/6/6
4/6/8
42
50
42
100
3467
39
21
75
61
34
80
70
72
98
57
72
100
93
98
91
100
95
100
96
98
98
98
95
93
SPT-06-1
SRK-06-1
SPT-06-2
SRK-06-2
SPT-06-3
SRK-06-3
SPT-06-4
GRAVEL AND SAND(0 to 15)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
ORGANIC DEPOSITS(15 to 15.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]DIORITE(15.5 to 35.5)medium-grained, porphyritic, grey to green,strong, fresh, widely spaced joints, highpersistence, smooth, planar, filled withquartz veins [INTRUSIVE PULTON]
End of Drillhole: 35.5 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-06GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
690
685
680
675
670
665
660
655
650
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-7
Coordinates:
Contractor:
1
Down Gradient of South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,141,413 N, 473,974 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 7, 10Jul 9, 10Jul 8, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED. BULK SAMPLES WERECOLLECTED FOR SRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
Fraste DR232
K10-06GT
SPT sampler35.5 m
685.00 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-7 of 36
3/3/4
3/5/3
1/2/3
5/2/1
50+6 inches
23
7
8
23
079
68
26
9
79
92
73
96
SPT-08-1
SPT-08-2
SPT-08-3
SPT-08-4
SPT-08-5
GRAVEL AND SAND(0 to 4.3)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
SILT(4.3 to 6.7)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]
ORGANIC DEPOSITS(6.7 to 7)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(7 to 12.8)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 12.8 m
DEP
TH (m
)
5
10
15
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-08GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
749
744
739
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-8
Coordinates:
Contractor:
1
Truckshop & WarehouseLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,452 N, 473,519 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 13, 10Jul 14, 10
JS/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
Fraste DR232
K10-08GT
SPT sampler12.8 m
743.55 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-8 of 36
UCS - 303 MPa
UCS - 221 MPa
2308289
79
77
86
94
96
91
89
92
39
100
75
7
21
0
28
33
56
100
54
54
48
16
85
96
99
99
87
96
98
83
63100100100100
100
100
100
99
98
100
100
99
95
100
100
82
80
13
55
100
100
100
95
99
98
97
100
100
99
99
100
97
100
100
UCS 09-2
UCS 09-1
ORGANIC DEPOSITS(0 to 0.7)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.7 to 21.11)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
(21.11 to 33.32)broken up, weak and vuggy~ contact between lava flow layers
TRACHYANDESITE(33.32 to 50.59)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-09GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
930
925
920
915
910
905
900
895
890
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-9
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 4
101-343/6
GENERAL REMARKS:
HQ3 / NQ
6,143,565 N, 474,390 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 13, 10Jul 17, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-09GT
NA162.9 m925.18 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-9 of 36
Reduced to NQ drillingat 80 m
90
49
75
56
65
64
73
76
39
83
73
45
100
100
99
100
100
100
73
100
88
35
62
93
89
94
91
97
94
100
100
98
99
96
100
100
96
99
100
100
100
99
100
100
100
100
100
94
76
93
100
98
100
100
(50.59 to 57.71)broken up, weak and vuggy~ contact between lava flow layers
TRACHYANDESITE(57.71 to 80.56)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
(80.56 to 92.77)broken up, weak and vuggy~ contact between lava flow layers
TRACHYANDESITE(92.77 to 118.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-09GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
980
975
970
965
960
955
950
945
940
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-10
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 4
101-343/6
GENERAL REMARKS:
HQ3 / NQ
6,143,565 N, 474,390 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 13, 10Jul 17, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-09GT
NA162.9 m925.18 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-10 of 36
90
98
66
53
92
31
35
5
42
42
58
23
35
16
57
54
100
100
100
100
100
46
67
35
100
100
100
100
100
100
100
100
TRACHYANDESITE(92.77 to 118.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
GREYWACKE AND ARGILLITE(118.3 to 162.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
105
110
115
120
125
130
135
140
145
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-09GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
1030
1025
1020
1015
1010
1005
1000
995
990
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-11
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 4
101-343/6
GENERAL REMARKS:
HQ3 / NQ
6,143,565 N, 474,390 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
3
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 13, 10Jul 17, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-09GT
NA162.9 m925.18 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-11 of 36
45
36
47
52
64
100
100
100
95
100
GREYWACKE AND ARGILLITE(118.3 to 162.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 162.9 m
DEP
TH (m
)
155
160
165
170
175
180
185
190
195
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-09GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
1080
1075
1070
1065
1060
1055
1050
1045
1040
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-12
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 4
101-343/6
GENERAL REMARKS:
HQ3 / NQ
6,143,565 N, 474,390 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
4
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 13, 10Jul 17, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-09GT
NA162.9 m925.18 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-12 of 36
20/50
2/4/5
4/6/5
50
4/4/9
3/5/7
4/8/4
7/6/5
4/2/2
6/4/1
2/4/5
8/3/2
6/8/11
0
33
30
0
32
32
25
5
13
7
20
17
40
0
0
45
37
34
5
83
94
SPT-10-1
SPT-10-2
SPT-10-3
SPT-10-4
SPT-10-5
SPT-10-6
SPT-10-7
SPT-10-8
SPT-10-9
SPT-10-10
SPT-10-11
SPT-10-12
SPT-10-13
GRAVEL AND SAND(0 to 22.6)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
SILT(22.6 to 26.5)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]ORGANIC DEPOSITS(26.5 to 27.1)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(27.1 to 33.5)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]End of Drillhole: 33.5 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-10GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
747
742
737
732
727
722
717
712
707
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-13
Coordinates:
Contractor:
1
Truckshop & WarehouseLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,518 N, 473,537 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 14, 10Jul 16, 10
JSBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
Fraste DR232
K10-10GT
SPT sampler33.5 m
741.91 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-13 of 36
50
3/2/3
3/1/4
3/2/5
7/9/12
0
23
30
23
20
39
0
0
100
80
48
SPT-11-1
SPT-11-2
SPT-11-3
SPT-11-4
SPT-11-5
GRAVEL AND SAND(0 to 7.3)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]
ORGANIC DEPOSITS(7.3 to 7.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(7.9 to 12.8)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 12.8 m
DEP
TH (m
)
5
10
15
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-11GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
748
743
738
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-14
Coordinates:
Contractor:
1
Truckshop & WarehouseLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,541 N, 473,600 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 16, 10Jul 16, 10
JSBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
Fraste DR232
K10-11GT
SPT sampler12.8 m
743.37 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-14 of 36
UCS - 215 MPa
UCS - 24 MPa
UCS - 178 MPa
58
61
95
98
95
93
97
96
77
56
12
48
47
39
46
91
0
93
56
59
99
98
95
99
69
93
97
99
97
98
98
97
99
100
100
100
100
97
100
98
98
100
95
96
99
98
100
99
UCS 12-1
UCS 12-2
UCS 12-3
ORGANIC DEPOSITS(0 to 0.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.3 to 16.86)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(16.86 to 32)broken up, weak and vuggy~ contact between lava flow layers
TRACHYANDESITE(32 to 36.7)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]
End of Drillhole: 36.7 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-12GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
929
924
919
914
909
904
899
894
889
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-15
Coordinates:
Contractor:
1
Permanent CampLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,551 N, 474,327 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 18, 10Jul 19, 10Jul 19, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-12GT
NA36.7 m
923.83 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-15 of 36
UCS - 197 MPa
UCS - 269 MPa
UCS - 279 MPa
UCS - 231 MPa
UCS - 28 MPa
UCS - 63 MPa
31
60
56
75
97
85
63
68
98
74
0
17
89
99
100
100
100
91
76
82
100
96
100
100
100
95
97
0
77
95
89
97
58
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
96
97
100
100
96
100
100
100
100
100
100
100
97
100
100
UCS 13-1
UCS 13-2
UCS 13-3
UCS 13-4
UCS 13-5
UCS 13-6
ORGANIC DEPOSITS(0 to 0.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.5 to 10.7)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(10.7 to 19.85)broken up, weak and vuggy~ contact between lava flow layers
TRACHYANDESITE(19.85 to 42.71)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(42.71 to 45.76)broken up, weak and vuggy~ contact between lava flow layersTRACHYANDESITE(45.76 to 50.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]End of Drillhole: 50.3 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
50
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-13GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
945
940
935
930
925
920
915
910
905
900
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-16
Coordinates:
Contractor:
1
Coarse Ore StockpileLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,570 N, 474,043 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 19, 10Jul 21, 10Jul 21, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-13GT
NA50.3 m
940.30 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-16 of 36
UCS - 195 MPa
21
63
4397
39
88
100
80
72
97
96
89
96
21
0
0
25
0
24
0
54
36
51
11
0
29
0
43
27
36
87
79
70
83
95
10097
58
100
100
100
100
98
100
100
98
99
92
94
96
70
45
67
88
100
83
66
47
54
25
64
98
100
100
100
100
UCS 14-1
ORGANIC DEPOSITS(0 to 0.4)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.4 to 33.66)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]
CLAY AND GRAVEL(33.66 to 39.76)lava flow contact
CONGLOMERATE(39.76 to 45.85)
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-14GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
882
877
872
867
862
857
852
847
842
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-17
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,964 N, 475,929 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 22, 10Jul 24, 10Jul 24, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-14GT
NA62.6 m
878.77 m135o,45o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-17 of 36
70
56
75
61
98
56
41
51
100
95
100
100
98
96
94
98
GREYWACKE AND ARGILLITE(45.85 to 62.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 62.6 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-14GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
918
913
908
903
898
893
888
883
878
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-18
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,964 N, 475,929 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 22, 10Jul 24, 10Jul 24, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-14GT
NA62.6 m
878.77 m135o,45o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-18 of 36
Drillhole K10-15GTwas abandoned.UCS - 126 MPa
UCS - 98 MPa
UCS - 86 MPa
UCS - 76 MPa
UCS - 66 MPa
UCS - 160 MPa
70
11
30
33
25
20
58
46
33
10
0
0
13
22
51
69
31
18
24
56
58
52
62
29
100
76
16
51
55
48
79
89
30
100
89
100
93
98
98
100
100
86
97
87
0
100
100
100
100
100
100
100
100
98
100
100
100
100
100
100
96
92
98
98
100
UCS 15-1
UCS 15-2
UCS 15-3
UCS 15-4
UCS 15-5
UCS 15-6
ORGANIC DEPOSITS(0 to 1.2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(1.2 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-15AGT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
802
797
792
787
782
777
772
767
762
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-19
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,061 N, 476,805 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 25, 10Jul 27, 10Jul 27, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-15AGT
NA61 m
797.20 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-19 of 36
32
9
24
66
26
96
98
100
100
100
100
100
100
100
GREYWACKE AND ARGILLITE(1.2 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 61 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-15AGT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
852
847
842
837
832
827
822
817
812
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-20
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,061 N, 476,805 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 25, 10Jul 27, 10Jul 27, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-15AGT
NA61 m
797.20 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-20 of 36
UCS - 138 MPasample broken duringshipping
UCS - 124 MPa
UCS - 91 MPa
UCS - 67 MPa
UCS - 189 MPa
UCS - 138 MPa
56
89
43
39
94
50
42
45
83
21
33
82
64
83
92
70
100
54
85
92
93
16
49
57
66
63
52
85
84
30
7
61
100
100
100
100
100
100
96
95
97
100
100
92
100
100
98
92
98
100
98
98
100
98
81
87
100
100
100
99
99
98
100
100
UCS 16-1UCS 16-2
UCS 16-3
UCS 16-4
UCS 16-5
UCS 16-6
UCS 16-7
ORGANIC DEPOSITS(0 to 2.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(2.9 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-16GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
807
802
797
792
787
782
777
772
767
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-21
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,315 N, 476,548 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 28, 10Jul 30, 10Jul 30, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-16GT
NA61 m
802.34 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-21 of 36
38
76
86
84
68
83
37
100
94
100
100
98
96
97
GREYWACKE AND ARGILLITE(2.9 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 61 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-16GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
857
852
847
842
837
832
827
822
817
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-22
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,315 N, 476,548 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Jul 28, 10Jul 30, 10Jul 30, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-16GT
NA61 m
802.34 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-22 of 36
UCS - 70 MPa
UCS - 46 MPa
UCS - 31 MPa
UCS - 56 MPa
UCS - 51 MPa
UCS - 48 MPa
9
33
28
43
28
43
20
49
0
92
96
98
91
75
72
90
89
78
63
51
61
94
98
79
51
58
35
50
60
81
70
30
17
92
82
96
100
100
98
100
100
100
99
100
100
98
100
99
100
94
100
100
100
100
100
98
100
100
100
100
98
98
98
100
UCS 17-1
UCS 17-2
UCS 17-3
UCS 17-4
UCS 17-5
UCS 17-6
ORGANIC DEPOSITS(0 to 2.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(2.9 to 60.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-17GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
816
811
806
801
796
791
786
781
776
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-23
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,458 N, 476,332 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 1, 10Aug 3, 10Aug 3, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-17GT
NA60.9 m
811.26 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-23 of 36
UCS - 67 MPa
72
98
100
0
41
31
56
100
98
100
0
94
100
100
UCS 17-7
GREYWACKE AND ARGILLITE(2.9 to 60.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 60.9 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-17GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
866
861
856
851
846
841
836
831
826
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-24
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,458 N, 476,332 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 1, 10Aug 3, 10Aug 3, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-17GT
NA60.9 m
811.26 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-24 of 36
0
0
54
92
66
30
0
28
12
56
40
25
22
12
37
43
72
52
52
77
45
24
30
26
100
39
12
12
0
0
0
0
9
26
98
100
100
100
100
100
100
100
99
100
95
100
100
100
98
100
100
100
100
83
100
100
94
100
ORGANIC DEPOSITS(0 to 4.24)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(4.24 to 10.34)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]
GREYWACKE AND ARGILLITE(10.34 to 57.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-18GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
791
786
781
776
771
766
761
756
751
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-25
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,715 N, 476,126 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 3, 10Aug 4, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
DRILLED AT 45 DEG ANGLE AT AVANTI REQUEST TO INTERCEPT INFERREDFAULT
Drill Hole No.
R 1500
K10-18GT
NA57.6 m
787.31 m0o,45o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-25 of 36
41
48
52
43
33
100
89
99
89
100
GREYWACKE AND ARGILLITE(10.34 to 57.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 57.6 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-18GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
826
821
816
811
806
801
796
791
786
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-26
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,143,715 N, 476,126 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 3, 10Aug 4, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
DRILLED AT 45 DEG ANGLE AT AVANTI REQUEST TO INTERCEPT INFERREDFAULT
Drill Hole No.
R 1500
K10-18GT
NA57.6 m
787.31 m0o,45o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-26 of 36
ARTESIAN DURINGDRILLING FROM 10.7 -16.8 M
0
0
62
54
47
82
75
85
51
40
81
91
14
0
0
0
0
12
0
20
2
15
100
87
91
100
95
100
100
99
99
100
100
49
61
73
99
82
ORGANIC DEPOSITS(0 to 3.1)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(3.1 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 30.6 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-19GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
759
754
749
744
739
734
729
724
719
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-27
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,944 N, 476,473 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 4, 10Aug 6, 10Aug 6, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-19GT
NA30.6 m
753.57 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-27 of 36
47
35
43
22
43
38
28
20
28
20
35
47
35
6
0
100
100
95
85
95
100
98
98
92
92
93
86
99
ORGANIC DEPOSITS(0 to 1.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(1.5 to 10.8)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]
GREYWACKE AND ARGILLITE(10.8 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 30.6 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-20GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
791
786
781
776
771
766
761
756
751
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-28
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,463 N, 476,965 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 12, 10Aug 13, 10Aug 13, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-20GT
NA30.6 m
786.09 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-28 of 36
38
37
56
22
22
0
29
41
49
73
80
91
82
83
47
0
72
93
100
96
96
84
89
98
101
80
113
98
102
100
98
ORGANIC DEPOSITS(0 to 1.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(1.5 to 7.74)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]GREYWACKE AND ARGILLITE(7.74 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 30.6 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-21GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
802
797
792
787
782
777
772
767
762
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-29
Coordinates:
Contractor:
1
Borrow AreaLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,118 N, 475,956 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 14, 10Aug 15, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-21GT
NA30.6 m
797.26 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-29 of 36
UCS - 154 MPa
UCS - 152 MPa
UCS - 208 MPa
100
100
100
19
0
37
39
33
37
100
100
98
100
36
75
37
38
35
52
100
100
100
95
100
81
63
78
56
75
90
64
35
91
94
79
0
98
85
96
108
96
70
101
100
98
100
102
95
90
100
98
100
100
100
103
95
100
93
105
96
92
108
97
102
102
99
94
98
UCS-22-1
UCS-22-2
UCS-22-3
ORGANIC DEPOSITS(0 to 1.22)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(1.22 to 100.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
50
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-22GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
806
801
796
791
786
781
776
771
766
761
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-30
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,142,225 N, 474,552 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 15, 10Aug 18, 10Aug 18, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-22GT
NA100.3 m800.87 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-30 of 36
UCS - 118 MPa
sample broken duringshipment
UCS - 104 MPa
100
100
100
4259
73
100
62
29
0
24
34
92
0
38
52
38
40
41
64
87
50
77
87
81
73
94
41
52
63
46
51
24
0
70
92
91100
100
100
91
67
94
97
100
92
100
96
100
66
95
98
96
98
106
97
101
94
96
102
100
100
98
100
97
100
100
98
100
UCS-22-4
UCS-22-5
UCS-22-6
GREYWACKE AND ARGILLITE(1.22 to 100.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 100.3 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
100
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-22GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
856
851
846
841
836
831
826
821
816
811
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-31
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,142,225 N, 474,552 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 15, 10Aug 18, 10Aug 18, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
1-INCH STANDPIPE WAS INSTALLED
Drill Hole No.
R 1500
K10-22GT
NA100.3 m800.87 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-31 of 36
UCS - 40 MPa
UCS - 103 MPa
UCS - 120 MPa
UCS - 60 MPa
100
100
100
100
9
0
14
16
70
0
45
0
16
52
14
27
28
65
29
54
86
62
15
17
25
45
40
29
0
0
10
8
0
19
0
100
53
96
92
100
85
98
97
62
93
52
79
89
100
92
100
100
100
100
100
100
100
91
100
100
100
100
88
63
56
UCS-23-1
UCS-23-2
UCS-23-3
UCS-23-4
ORGANIC DEPOSITS(0 to 4.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(4.5 to 83.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-23GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
797
792
787
782
777
772
767
762
757
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-32
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,141,751 N, 474,996 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 18, 10Aug 21, 10Aug 21, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-23GT
NA83.3 m
791.62 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-32 of 36
UCS - 81 MPa
UCS - 66 MPa
UCS - 62 MPa
100
100
100
7
45
81
62
75
35
26
37
61
25
11
25
11
10
92
67
30
0
32
72
58
53
100
98
100
100
100
100
94
100
100
97
100
97
100
62
100
96
92
98
85
89
95
100
UCS-23-5
UCS-23-6
UCS-23-7
GREYWACKE AND ARGILLITE(4.5 to 83.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
End of Drillhole: 83.3 m
DEP
TH (m
)
55
60
65
70
75
80
85
90
95
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-23GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
847
842
837
832
827
822
817
812
807
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-33
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 2
101-343/6
GENERAL REMARKS:
HQ3
6,141,751 N, 474,996 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
2
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 18, 10Aug 21, 10Aug 21, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
2-INCH MONITORING WELL WAS INSTALLED
Drill Hole No.
R 1500
K10-23GT
NA83.3 m
791.62 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-33 of 36
UCS - 162 MPa
UCS - 197 MPa
UCS - 207 MPa
UCS - 72 MPa
100
100
100
100
14
28
60
84
94
98
28
75
85
41
28
100
100
97
98
94
98
76
8
58
100
73
98
10
62
100
85
100
100
100
95
100
100
96
100
100
100
97
98
100
98
100
100
100
100
96
100
UCS-24-1
UCS-24-2
UCS-24-3
UCS-24-4
ORGANIC DEPOSITS(0 to 2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(2 to 36.5)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]
End of Drillhole: 36.5 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-24GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
932
927
922
917
912
907
902
897
892
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-34
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,356 N, 474,499 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 21, 10Aug 22, 10Aug 22, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-24GT
NA36.5 m
927.21 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-34 of 36
UCS - 142 MPa
sample broken duringshiping
UCS - 191 MPa
100
100
100
20
64
92
89
92
98
90
97
95
98
100
94
93
100
100
98
100
100
95
100
100
87
92
85
62
101
101
101
87
100
95
101
100
100
102
97
101
102
100
100
101
100
98
100
101
98
100
100
UCS-25-1
UCS-25-2
UCS-25-3
ORGANIC DEPOSITS(0 to 0.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.3 to 36.8)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]
End of Drillhole: 36.8 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-25GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
939
934
929
924
919
914
909
904
899
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-35
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,379 N, 474,421 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 22, 10Aug 23, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT Drill Hole No.
R 1500
K10-25GT
NA36.8 m
934.17 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-35 of 36
H147917
H147918
H147919
H147920
H147921
H147922
H147923
H147924
H147925
H147926
H147927
H147928
H147929
ORGANIC DEPOSITS(0 to 0.6)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(0.6 to 29.87)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]
GREYWACKE AND ARGILLITE(29.87 to 42.1)more pyrite
End of Drillhole: 42.12 m
DEP
TH (m
)
5
10
15
20
25
30
35
40
45
DR
ILLH
OLE
NO
TES
SPT
BLO
W C
OU
NTS
Ref
usal
Pen
etra
tion
SAM
PLE
REC
OVE
RY
(%)
SPT TEST DATA 'N'VALUES
20 40 60 80SPT
'N' V
ALU
E / R
QD
(%)
GR
APH
IC L
OG
TOTA
L C
OR
ER
ECO
VER
Y (%
)
AVANTI KITSAULT MINE LTDKITSAULT PROJECT
DRILLHOLE LOG FOR K10-27GT
RQD (%)
20 40 60 80
WEL
L D
ETA
ILS
ELEV
ATI
ON
(m)
832
827
822
817
812
807
802
797
792
SAM
PLE
TYPE
SAM
PLE
NO
.MATERIAL DESCRIPTION
Appendix A1-36
Coordinates:
Contractor:
1
Borrow AreaLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,358 N, 476,119 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Aug 23, 10Aug 26, 10
AVANTIBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
DRILLHOLE LOGGED AND SAMPLED BY AVANTI. SAMPLES WERE COLLECTEDFOR SRK CONSULTING FOR ARD/ML TESTING.
Drill Hole No.
R 1500
K10-27GT
NA42.12 m826.50 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.Fi
le:M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\KIT
SA
ULT
DR
ILLH
OLE
LO
GS
201
0.G
PJ
Libr
ary:
M:\1
\01\
0014
1\06
\A\D
ATA
\GIN
T\LI
BR
AR
Y_T
EM
PLA
TE_D
EC
18,2
009.
GLB
, D
RIL
LHO
LE L
OG
, D
ATA
TE
MP
LATE
_DE
C18
,200
9.G
DT,
Dec
1, 1
0
A2-36 of 36
0.3 m
14.02 m14.9 m
15.24 m
21.34 m
39 m
MINE WASTE ROCK - GRAVEL ANDSAND
ORGANIC DEPOSITSGREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
12 bags of coarse grained filter sand
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
GR
AP
HIC
LO
G
655
650
645
640
635
630
625
620
NOTES
5
10
15
20
25
30
35
40
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-01GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-1
Coordinates:
Contractor:
1
Primary CrusherLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,142,498 N, 473,131 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler39 m
650.41 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jun 30, 10Jul 1, 10Jul 1, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-01GT
Water Level Reading: Depth of SWL 14.2 mDate of Measurement Aug 22, 10
Piezometer K10-01GT, Stick-up = 0.98 m
A3-1 of 17
0.3 m
26.2 m27.1 m27.4 m
33.5 m34.1 m
MINE WASTE ROCK - GRAVEL ANDSAND
ORGANIC DEPOSITSGREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 2 bags of portland cementand 1 bag of grout mix ~ 40 gal water1-inch diameter schedule 40 solid PVCpipe 9 x 10 ft pipe segments
1/2 bag of bentonite chips
4 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
GR
AP
HIC
LO
G
749
744
739
734
729
724
719
NOTES
5
10
15
20
25
30
35
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-02GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-2
Coordinates:
Contractor:
1
Fuel StorageLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,378 N, 473,443 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler34.1 m
744.18 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 1, 10Jul 2, 10Jul 2, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-02GT
Water Level Reading: Depth of SWL 5.51 mDate of Measurement Aug 22, 10
Piezometer K10-02GT, Stick-up = 0.85 m
A3-2 of 17
0.3 m
10.66 m
11.58 m12.19 m
18.28 m
19.8 m
20.5 m21 m
MINE WASTE ROCK - GRAVEL ANDSAND
SILT
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
748
743
738
733
728
NOTES
5
10
15
20
25
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-03GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-3
Coordinates:
Contractor:
1
Truckshop & WarehouseLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,498 N, 473,559 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler35.7 m
743.39 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 2, 10Jul 3, 10Jul 3, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-03GT
Water Level Reading: Depth of SWL 11.89 mDate of Measurement Aug 22, 10
Piezometer K10-03GT, Stick-up = 0.97 m
A3-3 of 17
0.3 m
13.71 m
14.63 m15.24 m
21.33 m21.9 m
22.86 m
24.38 m
MINE WASTE ROCK - GRAVEL ANDSAND
ORGANIC DEPOSITSGREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
733
728
723
718
713
NOTES
5
10
15
20
25
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-04GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-4
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,142,080 N, 474,680 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler100 m
727.90 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 3, 10Jul 6, 10Jul 6, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-04GT
Water Level Reading: Depth of SWL 20.71 mDate of Measurement Aug 22, 10
Piezometer K10-04GT, Stick-up = 0.90 m
A3-4 of 17
0.3 m
21.64 m22.55 m22.86 m
28.95 m
30.5 m31 m32 m
MINE WASTE ROCK - GRAVEL ANDSAND
ORGANIC DEPOSITSGREYWACKE AND ARGILLITE
DIOMIEN DYKEGREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 1 bag of portland cement and1 bag of grout mix ~ 40 gal water2-inch diameter schedule 40 solid PVCpipe 7.5 x 10 ft pipe segments
1/2 bag of bentonite chips
4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
717
712
707
702
697
692
687
NOTES
5
10
15
20
25
30
35
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-05GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-5
Coordinates:
Contractor:
1
Down Gradient of South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,141,755 N, 474,300 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler39.9 m
712.31 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 6, 10Jul 7, 10Jul 7, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-05GT
Water Level Reading: Depth of SWL 21.94 mDate of Measurement Aug 22, 10
Piezometer K10-05GT, Stick-up = 0.93 m
A3-5 of 17
0.3 m
14.93 m
15.84 m16.34 m
22.43 m
23.5 m
24.38 m
25.5 m
GRAVEL AND SAND
ORGANIC DEPOSITSDIORITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
690
685
680
675
670
665
NOTES
5
10
15
20
25
30
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-06GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-6
Coordinates:
Contractor:
1
Down Gradient of South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,141,413 N, 473,974 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
SPT sampler35.5 m
685.00 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Geotech Drilling Ltd.
Fraste DR232Odex / Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 7, 10Jul 9, 10Jul 8, 10JS/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-06GT
Water Level Reading: Depth of SWL 12.36 mDate of Measurement Aug 22, 10
Piezometer K10-06GT, Stick-up = 1.00 m
A3-6 of 17
0.3 m
16.76 m17.37 m
18.29 m
24.38 m
25.3 m
26.51 m27 m
ORGANIC DEPOSITSTRACHYANDESITE
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS
Type 10 hydraulic cement and bentonitegrout
grout mix of 3 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
929
924
919
914
909
904
NOTES
5
10
15
20
25
30
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-12GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-7
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,551 N, 474,327 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA36.7 m
923.83 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 18, 10Jul 19, 10Jul 19, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-12GT
Water Level Reading: Depth of SWL 21.44 mDate of Measurement Aug 20, 10
Piezometer K10-12GT, Stick-up = 0.69 m
A3-7 of 17
0.3 m
28.34 m
29.87 m
34.13 m
40.23 m
42.7 m43.59 m44.5 m
ORGANIC DEPOSITSTRACHYANDESITE
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS
TRACHYANDESITE
TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS
TRACHYANDESITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 3 bags of portland cementand 1.5 bags of grout mix ~ 150 gal water
1-inch diameter schedule 40 solid PVCpipe 12 x 10 ft pipe segments
1/2 bag of bentonite chips
4 bags of coarse grained filter sand
1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIX
SOLID PVC PIPE
BENTONITE SEAL
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
945
940
935
930
925
920
915
910
905
NOTES
5
10
15
20
25
30
35
40
45
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-13GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-8
Coordinates:
Contractor:
1
Coarse Ore StockpileLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,570 N, 474,043 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA50.3 m
940.30 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 19, 10Jul 21, 10Jul 21, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-13GT
Water Level Reading: Depth of SWL 38.10 mDate of Measurement Aug 20, 10
Piezometer K10-13GT, Stick-up = 0.50 m
A3-8 of 17
0.3 m
28.65 m29.87 m30.48 m
36.57 m37.8 m
39.62 m
41 m
ORGANIC DEPOSITSTRACHYANDESITE
CLAY AND GRAVEL
CONGLOMERATE
Type 10 hydraulic cement and bentonitegrout
grout mix of 3 bags of portland cementand 1 bag of grout mix ~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
1/2 bag of bentonite chips
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
882
877
872
867
862
857
852
847
842
NOTES
5
10
15
20
25
30
35
40
45
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-14GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-9
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,964 N, 475,929 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA62.6 m
878.77 m135o,45o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 22, 10Jul 24, 10Jul 24, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-14GT
Water Level Reading: Depth of SWL 36.35 mDate of Measurement Aug 20, 10
Piezometer K10-14GT, Stick-up = 0.57 m
A3-9 of 17
0.3 m
4.57 m
5.18 m
11.27 m
11.9 m
12.8 m
13.5 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
802
797
792
NOTES
5
10
15
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-15AGT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-10
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,061 N, 476,805 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA61 m
797.20 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 25, 10Jul 27, 10Jul 27, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-15AGT
Water Level Reading: Depth of SWL 0.58 mDate of Measurement Aug 20, 10
Piezometer K10-15AGT, Stick-up = 0.71 m
A3-10 of 17
0.3 m
3 m3.35 m
9.44 m
10.1 m
10.97 m
11.5 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 2 x 10 ft pipe segments
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
807
802
797
NOTES
5
10
15
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-16GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-11
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,315 N, 476,548 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA61 m
802.34 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Jul 28, 10Jul 30, 10Jul 30, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-16GT
Water Level Reading: Depth of SWL 0.93 mDate of Measurement Aug 20, 10
Piezometer K10-16GT, Stick-up = 0.60 m
A3-11 of 17
0.3 m
3.2 m
3.96 m
10.05 m
10.7 m
11.27 m
11.8 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 2 x 10 ft pipe segments
3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
816
811
806
NOTES
5
10
15
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-17GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-12
Coordinates:
Contractor:
1
Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,458 N, 476,332 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA60.9 m
811.26 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 1, 10Aug 3, 10Aug 3, 10GW/BH
BB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-17GT
Water Level Reading: Depth of SWL -0.14 mDate of Measurement Aug 20, 10
Piezometer K10-17GT, Stick-up = 0.54 m
A3-12 of 17
0.3 m
9.08 m
10.7 m
16.7 m16.8 m
18 m
18.7 m19 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEAL
SOLID PVC PIPE
FILTER SAND
SLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
759
754
749
744
NOTES
5
10
15
20
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-19GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-13
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,944 N, 476,473 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA30.6 m
753.57 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 4, 10Aug 6, 10Aug 6, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
ARTESIAN FROM 10.7 - 16.8 M
K10-19GT
Water Level Reading: Depth of SWL 0.71 mDate of Measurement Aug 20, 10
Piezometer K10-19GT, Stick-up = 0.59 m
A3-13 of 17
0.3 m
2.1 m
2.7 m
8.8 m
11.9 m
12.8 m13.2 m
ORGANIC DEPOSITS
BOULDERS AND GRAVEL
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
791
786
781
NOTES
5
10
15
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-20GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-14
Coordinates:
Contractor:
1
Downgradient of Northeast TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,463 N, 476,965 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA30.6 m
786.09 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 12, 10Aug 13, 10Aug 13, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-20GT
Water Level Reading: Depth of SWL 1.17 mDate of Measurement Aug 20, 10
Piezometer K10-20GT, Stick-up = 0.70 m
A3-14 of 17
0.3 m
3.9 m
4.6 m
10.7 m
11.3 m
12.2 m12.6 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments
3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
2 bags of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
806
801
796
NOTES
5
10
15
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-22GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-15
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,142,225 N, 474,552 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA100.3 m800.87 m
0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 15, 10Aug 18, 10Aug 18, 10
JS/CGBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-22GT
Water Level Reading: Depth of SWL 1.30 mDate of Measurement Aug 20, 10
Piezometer K10-22GT, Stick-up = 0.89 m
A3-15 of 17
0.3 m
8.69 m
9.45 m
15.54 m16 m
16.9 m
17.5 m
ORGANIC DEPOSITS
GREYWACKE AND ARGILLITE
Type 10 hydraulic cement and bentonitegrout
1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 3 x 10 ft pipe segment
2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand
1/2 bag of bentonite chips
CEMENT CAP
BENTONITE SEALSOLID PVC PIPE
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEAL
VAN RUTH PLUG
GR
AP
HIC
LO
G
797
792
787
782
NOTES
5
10
15
20
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-23GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-16
Coordinates:
Contractor:
1
South TMF EmbankmentLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,141,751 N, 474,996 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA83.3 m
791.62 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 18, 10Aug 21, 10Aug 21, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT
PVC PIPE BROKE DURING INSTALLATION. THIS WELL WAS INSTALLED ABOVETHIS ZONE.
K10-23GT
Water Level Reading: Depth of SWL 3.48 mDate of Measurement Aug 21, 10
Piezometer K10-23GT, Stick-up = 0.88 m
A3-16 of 17
0.3 m
28 m28.9 m29.6 m
35.7 m36.3 m36.5 m
37 m
ORGANIC DEPOSITS
TRACHYANDESITE
Type 10 hydraulic cement and bentonitegrout
grout mix of 4 bags of portland cementand 2 bag of grout mix ~ 100 gal water2-inch diameter schedule 40 solid PVCpipe 10x 10 ft pipe segment
1/2 bag of bentonite chips
3.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments
1 bag of coarse grained filter sand1/2 bag of bentonite chips
CEMENT CAP
GROUT MIXSOLID PVC PIPE
BENTONITE SEAL
FILTER SANDSLOTTED PVC PIPE
BENTONITE SEALVAN RUTH PLUG
GR
AP
HIC
LO
G
932
927
922
917
912
907
902
897
NOTES
5
10
15
20
25
30
35
40
DE
PTH
- (m
)
ELV
ATI
ON
- (m
)
AVANTI KITSAULT MINE LTD.KITSAULT PROJECT
PIEZOMETER DETAILS FOR K10-24GT
File
:M:\1
\01\
0034
3\06
\A\D
ATA
\TA
SK
020
0 (G
EO
TEC
HN
ICA
L S
ITE
INV
ES
TIG
ATI
ON
PR
OG
RA
M)\D
RIL
LHO
LE D
ATA
RE
VIE
WE
D\K
ITS
AU
LT D
RIL
LHO
LE L
OG
S 2
010.
GP
JLi
brar
y: M
:\1\0
1\00
343\
06\A
\DA
TA\T
AS
K 0
200
(GE
OTE
CH
NIC
AL
SIT
E IN
VE
STI
GA
TIO
N P
RO
GR
AM
)\DR
ILLH
OLE
DA
TA R
EV
IEW
ED
\LIB
RA
RY
_TE
MP
LATE
_DE
C18
,200
9.G
LB,
WE
LL C
OM
PLE
TIO
N,
NE
W D
ATA
TE
MP
LATE
24A
UG
10.G
DT,
Nov
15,
10
Appendix B2-17
Coordinates:
Contractor:
1
Plant SiteLocation:
Drilling Rig:
Drilling Method:
of 1
101-343/6
GENERAL REMARKS:
HQ3
6,143,356 N, 474,499 E, UTM NAD83 ZONE 9
Project:
REV. 0 - Issued for Report 0REV.
PROJECT/ASSIGNMENT NO.
NA36.5 m
927.21 m0o,90o
PAGE
FIGURE.REV. 0 - Issued for Report
Radius Drilling Corp.
R 1500Diamond Drilling
Date Started:
Date Completed:
Date Well Installed:
Logged by:
Reviewed by:
1
Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.
REF. NO.
Drill Hole No.Aug 21, 10Aug 22, 10Aug 22, 10
GW/BHBB
In Situ Sampler:
Total Depth:
Elevation:
Azimuth,Dip
Hole size:
KITSAULT PROJECT K10-24GT
Water Level Reading: Depth of SWL 25.13 mDate of Measurement Aug 22, 10
Piezometer K10-24GT, Stick-up = 0.85 m
A3-17 of 17
VA101-343/9-3 Rev 0 June 17, 2011
APPENDIX B
PACKER TESTS
Appendix B1 2009 Packer Tests Appendix B2 2010 Packer Tests
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]1 Rev'd 07/11/09
SHEET 1 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 16.7 m TOP OF TEST INTERVAL: 12.00 3.66
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 11-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 59.50 18.14 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 23828.0 23832.0 23834.5 23838.0 23841.0 23843.5 litres/min
Take litres 4.00 2.50 3.50 3.00 2.50
0.41 Average Take l/m 4.00 2.50 3.50 3.00 2.50 3.10 0.98
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 23848.0 23849.0 23850.0 23851.0 23852.0 23853.0 litres/min
Take litres 1.00 1.00 1.00 1.00 1.00
0.55 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.30
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 23853.0 23855.0 23856.0 23856.5 23857.5 23858.0 litres/min
Take litres 2.00 1.00 0.50 1.00 0.50
0.69 Average Take l/m 2.00 1.00 0.50 1.00 0.50 1.00 0.28
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 23859.0 23859.5 23860.5 23861.0 23862.0 23862.5 litres/min
Take litres 0.50 1.00 0.50 1.00 0.50
0.55 Average Take l/m 0.50 1.00 0.50 1.00 0.50 0.70 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 23863.0 23863.5 23864.0 23864.5 23865.0 23865.5 litres/min
Take litres 0.50 0.50 0.50 0.50 0.50
0.41 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.16
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.979 MAX k= 9.79E-06
DETERMINATION:
MIN Lu= 0.158 MIN k= 1.58E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.158 AVG k= 1.58E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7' and core barrel is 8.5' long, so test interval will be from 12.5 to 59.4 including the length of the packer bladder, double packer system is used.
Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min. The lowest psi on the gauge was 4 and the lowest we could get flow was 6psi so that was used as P1.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.41 0.55 0.69 0.55 0.41Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.2
2.3
2.5
2.3
2.2
2.2
2.2
2.3
2.3
2.4
2.4
2.5
2.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-1 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]2 Rev'd 07/14/09
SHEET 2 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 16.8 m TOP OF TEST INTERVAL: 57.50 17.53
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 14-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 118.50 36.13 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24023.0 24032.5 24043.0 24054.0 24063.0 24072.0 litres/min
Take litres 9.50 10.50 11.00 9.00 9.00
0.69 Average Take l/m 9.50 10.50 11.00 9.00 9.00 9.80 2.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24090.0 24104.5 24118.0 24132.0 24145.5 24160.0 litres/min
Take litres 14.50 13.50 14.00 13.50 14.50
1.38 Average Take l/m 14.50 13.50 14.00 13.50 14.50 14.00 2.38
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24195.0 24216.0 24238.0 24260.0 24280.0 24302.0 litres/min
Take litres 21.00 22.00 22.00 20.00 22.00
2.07 Average Take l/m 21.00 22.00 22.00 20.00 22.00 21.40 2.99
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24315.0 24330.0 24344.0 24359.0 24374.0 24388.0 litres/min
Take litres 15.00 14.00 15.00 15.00 14.00
1.38 Average Take l/m 15.00 14.00 15.00 15.00 14.00 14.60 2.49
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24433.0 24443.0 24453.5 24464.0 24474.5 24485.0 litres/min
Take litres 10.00 10.50 10.50 10.50 10.50
0.69 Average Take l/m 10.00 10.50 10.50 10.50 10.50 10.40 2.27
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.992 MAX k= 2.99E-05
DETERMINATION:
MIN Lu= 2.136 MIN k= 2.14E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.453 AVG k= 2.45E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.69 1.38 2.07 1.38 0.69Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.5
3.2
3.8
3.2
2.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 5.00 10.00 15.00 20.00 25.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 14JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-2 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]3 Rev'd 07/15/09
SHEET 3 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 16.2 m TOP OF TEST INTERVAL: 118.70 36.19
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 15-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 174.70 53.26 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24762.0 24763.0 24763.8 24764.8 24765.5 24766.0 litres/min
Take litres 1.00 0.80 1.00 0.70 0.50
1.38 Average Take l/m 1.00 0.80 1.00 0.70 0.50 0.80 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24769.0 24770.8 24772.3 24774.0 24776.0 24778.0 litres/min
Take litres 1.80 1.50 1.70 2.00 2.00
2.76 Average Take l/m 1.80 1.50 1.70 2.00 2.00 1.80 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24780.0 24783.0 24786.5 24790.0 24793.0 24796.0 litres/min
Take litres 3.00 3.50 3.50 3.00 3.00
4.14 Average Take l/m 3.00 3.50 3.50 3.00 3.00 3.20 0.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24798.0 24800.0 24803.0 24805.0 24807.0 24809.0 litres/min
Take litres 2.00 3.00 2.00 2.00 2.00
2.76 Average Take l/m 2.00 3.00 2.00 2.00 2.00 2.20 0.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 24811.0 24812.0 24813.5 24815.0 24816.0 24818.0 litres/min
Take litres 1.00 1.50 1.50 1.00 2.00
1.38 Average Take l/m 1.00 1.50 1.50 1.00 2.00 1.40 0.26
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.320 MAX k= 3.20E-06
DETERMINATION:
MIN Lu= 0.151 MIN k= 1.51E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.252 AVG k= 2.52E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Flow is laminar with some minor wash out.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
1.38 2.76 4.14 2.76 1.38Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.1
4.5
5.9
4.5
3.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 15JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-3 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]6 Rev'd 07/18/09
SHEET 4 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 17.5 m TOP OF TEST INTERVAL: 273.70 83.45
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 329.70 100.52 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27483.0 27503.0 27522.5 27541.0 27559.0 27578.0 litres/min
Take litres 20.00 19.50 18.50 18.00 19.00
3.10 Average Take l/m 20.00 19.50 18.50 18.00 19.00 19.00 2.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27610.0 27636.0 27661.0 27685.0 27709.0 27731.5 litres/min
Take litres 26.00 25.00 24.00 24.00 22.50
6.21 Average Take l/m 26.00 25.00 24.00 24.00 22.50 24.30 1.77
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27824.0 27852.0 27880.0 27908.0 27933.0 27960.0 litres/min
Take litres 28.00 28.00 28.00 25.00 27.00
9.31 Average Take l/m 28.00 28.00 28.00 25.00 27.00 27.20 1.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27990.0 28010.0 28030.0 28049.0 28069.0 28088.0 litres/min
Take litres 20.00 20.00 19.00 20.00 19.00
6.21 Average Take l/m 20.00 20.00 19.00 20.00 19.00 19.60 1.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28100.0 28112.0 28124.0 28136.5 28149.0 28161.0 litres/min
Take litres 12.00 12.00 12.50 12.50 12.00
3.10 Average Take l/m 12.00 12.00 12.50 12.50 12.00 12.20 1.44
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.248 MAX k= 2.25E-05
DETERMINATION:
MIN Lu= 1.426 MIN k= 1.43E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.428 AVG k= 1.43E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Void filling and possible turbulent flow.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.10 6.21 9.31 6.21 3.10Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.0
8.1
11.2
8.1
5.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 18JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-4 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]7 Rev'd 07/19/09
SHEET 5 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 7
DIP: 90 oDEPTH GROUNDWATER: 16.5 m TOP OF TEST INTERVAL: 328.70 100.21
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 399.70 121.86 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28350.0 28354.5 28359.0 28363.0 28367.0 28371.0 litres/min
Take litres 4.50 4.50 4.00 4.00 4.00
3.45 Average Take l/m 4.50 4.50 4.00 4.00 4.00 4.20 0.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28377.0 28385.0 28393.0 28401.0 28408.0 28415.0 litres/min
Take litres 8.00 8.00 8.00 7.00 7.00
6.89 Average Take l/m 8.00 8.00 8.00 7.00 7.00 7.60 0.41
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28431.0 28443.0 28457.0 28469.0 28481.0 28492.5 litres/min
Take litres 12.00 14.00 12.00 12.00 11.50
10.34 Average Take l/m 12.00 14.00 12.00 12.00 11.50 12.30 0.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28502.0 28511.0 28520.0 28529.0 28538.0 28547.0 litres/min
Take litres 9.00 9.00 9.00 9.00 9.00
6.89 Average Take l/m 9.00 9.00 9.00 9.00 9.00 9.00 0.48
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28550.0 28556.0 28562.0 28568.0 28573.5 28579.0 litres/min
Take litres 6.00 6.00 6.00 5.50 5.50
3.45 Average Take l/m 6.00 6.00 6.00 5.50 5.50 5.80 0.52
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.516 MAX k= 5.16E-06
DETERMINATION:
MIN Lu= 0.374 MIN k= 3.74E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.449 AVG k= 4.49E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Flow is laminar with some minor wash out.
TEST BY: LS REVIEWED BY:
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.2
8.6
12.1
8.6
5.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-5 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]8 Rev'd 07/19/09
SHEET 6 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 8
DIP: 90 oDEPTH GROUNDWATER: 16.5 m TOP OF TEST INTERVAL: 394.70 120.34
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 449.70 137.10 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28660.0 28662.0 28664.0 28668.0 28700.0 28670.0 litres/min
Take litres 2.00 2.00 4.00 32.00 -30.00
3.45 Average Take l/m 2.00 2.00 4.00 32.00 -30.00 2.00 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28674.0 28678.0 28681.0 28684.5 28688.0 28691.0 litres/min
Take litres 4.00 3.00 3.50 3.50 3.00
6.89 Average Take l/m 4.00 3.00 3.50 3.50 3.00 3.40 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28695.0 28701.0 28706.0 28711.5 28717.0 28722.0 litres/min
Take litres 6.00 5.00 5.50 5.50 5.00
10.34 Average Take l/m 6.00 5.00 5.50 5.50 5.00 5.40 0.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28724.0 28728.0 28732.0 28736.0 28740.0 28744.0 litres/min
Take litres 4.00 4.00 4.00 4.00 4.00
6.89 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.28
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28750.0 28752.0 28754.5 28757.0 28759.8 28762.0 litres/min
Take litres 2.00 2.50 2.50 2.75 2.25
3.45 Average Take l/m 2.00 2.50 2.50 2.75 2.25 2.40 0.28
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.276 MAX k= 2.76E-06
DETERMINATION:
MIN Lu= 0.230 MIN k= 2.30E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.257 AVG k= 2.57E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Flow is laminar with some minor wash out.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.2
8.6
12.1
8.6
5.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-6 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]9 Rev'd 07/20/09
SHEET 7 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 9
DIP: 90 oDEPTH GROUNDWATER: 17.2 m TOP OF TEST INTERVAL: 448.70 136.80
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 20-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 499.70 152.35 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28947.0 28962.0 28976.0 28989.5 29002.5 29015.0 litres/min
Take litres 15.00 14.00 13.50 13.00 12.50
3.45 Average Take l/m 15.00 14.00 13.50 13.00 12.50 13.60 1.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29055.0 29072.0 29088.0 29104.0 29118.5 29134.0 litres/min
Take litres 17.00 16.00 16.00 14.50 15.50
6.89 Average Take l/m 17.00 16.00 16.00 14.50 15.50 15.80 1.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29160.0 29181.0 29202.0 29210.5 29240.0 29258.0 litres/min
Take litres 21.00 21.00 8.50 29.50 18.00
10.34 Average Take l/m 21.00 21.00 8.50 29.50 18.00 19.60 1.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29275.0 29289.5 29303.0 29316.0 29329.0 29341.5 litres/min
Take litres 14.50 13.50 13.00 13.00 12.50
6.89 Average Take l/m 14.50 13.50 13.00 13.00 12.50 13.30 0.98
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29358.0 29366.5 29375.0 29382.5 29390.5 29398.5 litres/min
Take litres 8.50 8.50 7.50 8.00 8.00
3.45 Average Take l/m 8.50 8.50 7.50 8.00 8.00 8.10 0.99
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.660 MAX k= 1.66E-05
DETERMINATION:
MIN Lu= 0.981 MIN k= 9.81E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.989 AVG k= 9.89E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Void Filling suspected.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.3
8.7
12.2
8.7
5.3
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 5.00 10.00 15.00 20.00 25.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-7 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]10 Rev'd 07/23/09
SHEET 8 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 10
DIP: 90 oDEPTH GROUNDWATER: 18.2 m TOP OF TEST INTERVAL: 498.70 152.04
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 23-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 554.70 169.12 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29690.0 29690.5 29691.0 29691.5 29692.0 29692.5 litres/min
Take litres 0.50 0.50 0.50 0.50 0.50
3.45 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29694.0 29695.3 29696.5 29698.0 29699.0 29700.5 litres/min
Take litres 1.30 1.20 1.50 1.00 1.50
6.89 Average Take l/m 1.30 1.20 1.50 1.00 1.50 1.30 0.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29702.0 29704.3 29706.3 29708.0 29710.0 29712.0 litres/min
Take litres 2.30 2.00 1.70 2.00 2.00
10.34 Average Take l/m 2.30 2.00 1.70 2.00 2.00 2.00 0.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29713.0 29714.3 29715.3 29716.8 29718.0 29719.0 litres/min
Take litres 1.30 1.00 1.45 1.25 1.00
6.89 Average Take l/m 1.30 1.00 1.45 1.25 1.00 1.20 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29720.0 29720.5 29721.0 29722.0 29722.3 29723.0 litres/min
Take litres 0.50 0.50 1.00 0.30 0.70
3.45 Average Take l/m 0.50 0.50 1.00 0.30 0.70 0.60 0.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.096 MAX k= 9.56E-07
DETERMINATION:
MIN Lu= 0.055 MIN k= 5.46E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.076 AVG k= 7.64E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Laminar flow
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.4
8.8
12.3
8.8
5.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 0.50 1.00 1.50 2.00 2.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-8 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]11 Rev'd 07/24/09
SHEET 9 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 11
DIP: 90 oDEPTH GROUNDWATER: 17.1 m TOP OF TEST INTERVAL: 548.70 167.29
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 604.60 184.33 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29815.0 29815.3 29815.5 29815.8 29816.0 29816.3 litres/min
Take litres 0.25 0.25 0.25 0.25 0.25
3.45 Average Take l/m 0.25 0.25 0.25 0.25 0.25 0.25 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29817.0 29817.8 29818.3 29819.0 29819.5 29820.0 litres/min
Take litres 0.75 0.50 0.75 0.50 0.50
6.89 Average Take l/m 0.75 0.50 0.75 0.50 0.50 0.60 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29821.0 29822.0 29822.5 29823.3 29824.0 29824.5 litres/min
Take litres 1.00 0.50 0.75 0.75 0.50
10.34 Average Take l/m 1.00 0.50 0.75 0.75 0.50 0.70 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29825.0 29825.3 29825.8 29826.3 29826.8 29827.0 litres/min
Take litres 0.25 0.50 0.50 0.50 0.25
6.89 Average Take l/m 0.25 0.50 0.50 0.50 0.25 0.40 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29827.0 29827.3 29827.5 29827.8 29827.9 29828.0 litres/min
Take litres 0.25 0.25 0.25 0.10 0.15
3.45 Average Take l/m 0.25 0.25 0.25 0.10 0.15 0.20 0.02
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.040 MAX k= 4.04E-07
DETERMINATION:
MIN Lu= 0.022 MIN k= 2.23E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.030 AVG k= 3.03E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~15 degrees
Laminar flow with some void filling.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.3
8.7
12.2
8.7
5.3
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-9 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]12 Rev'd 07/26/09
SHEET 10 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 12
DIP: 90 oDEPTH GROUNDWATER: 26.5 m TOP OF TEST INTERVAL: 613.60 187.07
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 26-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 664.60 202.62 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29945.0 29951.5 29957.0 29963.0 29967.5 29973.0 litres/min
Take litres 6.50 5.50 6.00 4.50 5.50
3.45 Average Take l/m 6.50 5.50 6.00 4.50 5.50 5.60 0.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29982.0 29991.0 29999.5 30007.0 30014.5 30021.5 litres/min
Take litres 9.00 8.50 7.50 7.50 7.00
6.89 Average Take l/m 9.00 8.50 7.50 7.50 7.00 7.90 0.53
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30035.0 30053.0 30067.0 30082.0 30096.0 30110.5 litres/min
Take litres 18.00 14.00 15.00 14.00 14.50
10.34 Average Take l/m 18.00 14.00 15.00 14.00 14.50 15.10 0.74
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30118.0 30125.0 30132.5 30139.5 30146.0 30153.5 litres/min
Take litres 7.00 7.50 7.00 6.50 7.50
6.89 Average Take l/m 7.00 7.50 7.00 6.50 7.50 7.10 0.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30157.0 30161.0 30165.5 30170.0 30174.0 30178.5 litres/min
Take litres 4.00 4.50 4.50 4.00 4.50
3.45 Average Take l/m 4.00 4.50 4.50 4.00 4.50 4.30 0.45
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.742 MAX k= 7.42E-06
DETERMINATION:
MIN Lu= 0.446 MIN k= 4.46E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.507 AVG k= 5.07E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.
Air temperature, ~25 degrees
Dilation with some minor void filling.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.2
9.6
13.1
9.6
6.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 26JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-10 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]13 Rev'd 07/27/09
SHEET 11 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 13
DIP: 90 oDEPTH GROUNDWATER: 16.9 m TOP OF TEST INTERVAL: 663.60 202.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 719.50 219.36 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31156.0 31159.0 31161.0 31163.5 31165.5 31167.3 litres/min
Take litres 3.00 2.00 2.50 2.00 1.75
3.45 Average Take l/m 3.00 2.00 2.50 2.00 1.75 2.25 0.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31180.0 31205.0 31230.0 31255.0 31280.0 31306.0 litres/min
Take litres 25.00 25.00 25.00 25.00 26.00
6.89 Average Take l/m 25.00 25.00 25.00 25.00 26.00 25.20 1.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31350.0 31394.5 31449.0 31483.0 31529.0 31575.0 litres/min
Take litres 44.50 54.50 34.00 46.00 46.00
9.51 Average Take l/m 44.50 54.50 34.00 46.00 46.00 45.00 2.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31595.0 31622.0 31649.0 31675.0 31701.0 31728.0 litres/min
Take litres 27.00 27.00 26.00 26.00 27.00
6.89 Average Take l/m 27.00 27.00 26.00 26.00 27.00 26.60 1.80
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31739.0 31741.0 31742.5 31744.0 31745.5 31747.0 litres/min
Take litres 2.00 1.50 1.50 1.50 1.50
3.45 Average Take l/m 2.00 1.50 1.50 1.50 1.50 1.60 0.18
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.335 MAX k= 2.34E-05
DETERMINATION:
MIN Lu= 0.179 MIN k= 1.79E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.253 AVG k= 1.25E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.
Air temperature, ~27 degrees
Laminar flow with possible dilation. When test was set up there were minute bubbles coming out of stuffing box.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.45 6.89 9.51 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.2
8.7
11.3
8.7
5.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 27JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-11 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]14 Rev'd 07/28/09
SHEET 12 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 14
DIP: 90 oDEPTH GROUNDWATER: 17.1 m TOP OF TEST INTERVAL: 718.30 218.99
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 28-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 767.30 233.93 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32046.0 32048.0 32050.5 32053.0 32055.5 32058.0 litres/min
Take litres 2.00 2.50 2.50 2.50 2.50
3.45 Average Take l/m 2.00 2.50 2.50 2.50 2.50 2.40 0.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32090.0 32116.0 32141.0 32167.0 32193.0 32219.0 litres/min
Take litres 26.00 25.00 26.00 26.00 26.00
6.89 Average Take l/m 26.00 25.00 26.00 26.00 26.00 25.80 1.98
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32295.0 32342.0 32387.0 32433.0 32479.0 32524.0 litres/min
Take litres 47.00 45.00 46.00 46.00 45.00
10.00 Average Take l/m 47.00 45.00 46.00 46.00 45.00 45.80 2.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32590.0 32615.0 32641.0 32665.0 32690.0 32715.0 litres/min
Take litres 25.00 26.00 24.00 25.00 25.00
6.89 Average Take l/m 25.00 26.00 24.00 25.00 25.00 25.00 1.92
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32723.0 32725.0 32727.0 32728.5 32730.5 32732.0 litres/min
Take litres 2.00 2.00 1.50 2.00 1.50
3.45 Average Take l/m 2.00 2.00 1.50 2.00 1.50 1.80 0.23
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.597 MAX k= 2.60E-05
DETERMINATION:
MIN Lu= 0.229 MIN k= 2.29E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.408 AVG k= 1.41E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.
Air temperature, ~27 degrees
Laminar flow with possible dilation. When test was set up there were minute bubbles coming out of stuffing box.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.45 6.89 10.00 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.3
8.7
11.8
8.7
5.3
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 28JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-12 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]15 Rev'd 07/30/09
SHEET 13 OF 15
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 15
DIP: 90 oDEPTH GROUNDWATER: 15.2 m TOP OF TEST INTERVAL: 764.20 232.99
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 819.20 249.76 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33400.0 33431.0 33461.5 33492.0 33524.0 33555.0 litres/min
Take litres 31.00 30.50 30.50 32.00 31.00
3.45 Average Take l/m 31.00 30.50 30.50 32.00 31.00 31.00 3.65
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33590.0 33639.0 33686.0 33735.0 33783.0 33833.0 litres/min
Take litres 49.00 47.00 49.00 48.00 50.00
6.89 Average Take l/m 49.00 47.00 49.00 48.00 50.00 48.60 3.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33940.0 34000.0 34058.0 34118.0 34176.0 34236.0 litres/min
Take litres 60.00 58.00 60.00 58.00 60.00
9.24 Average Take l/m 60.00 58.00 60.00 58.00 60.00 59.20 3.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34275.0 34325.0 34375.0 34425.0 34474.0 34523.0 litres/min
Take litres 50.00 50.00 50.00 49.00 49.00
6.89 Average Take l/m 50.00 50.00 50.00 49.00 49.00 49.60 3.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34540.0 34572.0 34602.0 34633.0 34663.0 34694.0 litres/min
Take litres 32.00 30.00 31.00 30.00 31.00
3.45 Average Take l/m 32.00 30.00 31.00 30.00 31.00 30.80 3.62
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 3.648 MAX k= 3.65E-05
DETERMINATION:
MIN Lu= 3.251 MIN k= 3.25E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 3.251 AVG k= 3.25E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.5L/min.
Air temperature, ~30 degrees
Turbulent flow. Bubbles intermittantly came out of stuffing box.at first low pressure interval.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:04
101-343/3 K09-01GT
STAGE PRESSURE VERSUS LUGEON VALUE
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.45 6.89 9.24 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.1
8.5
10.9
8.5
5.1
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 30JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-13 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]1 Rev'd 07/31/09
SHEET 1 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 55 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 57.70 17.59
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 31-Jul-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 123.70 37.71 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3239.0 3242.0 3245.0 3248.0 3250.5 3253.5 litres/min
Take litres 3.00 3.00 3.00 2.50 3.00
0.48 Average Take l/m 3.00 3.00 3.00 2.50 3.00 2.90 1.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3260.0 3264.5 3269.0 3273.0 3277.0 3280.8 litres/min
Take litres 4.50 4.50 4.00 4.00 3.75
0.90 Average Take l/m 4.50 4.50 4.00 4.00 3.75 4.15 1.74
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3285.0 3290.5 3296.0 3301.0 3306.5 3311.0 litres/min
Take litres 5.50 5.50 5.00 5.50 4.50
1.38 Average Take l/m 5.50 5.50 5.00 5.50 4.50 5.20 1.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3314.0 3316.5 3319.5 3322.5 3325.5 3328.5 litres/min
Take litres 2.50 3.00 3.00 3.00 3.00
0.90 Average Take l/m 2.50 3.00 3.00 3.00 3.00 2.90 1.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3330.0 3331.5 3333.0 3334.5 3336.5 3338.5 litres/min
Take litres 1.50 1.50 1.50 2.00 2.00
0.48 Average Take l/m 1.50 1.50 1.50 2.00 2.00 1.70 1.09
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.863 MAX k= 1.86E-05
DETERMINATION:
MIN Lu= 1.092 MIN k= 1.09E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.092 AVG k= 1.09E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.48 0.90 1.38 0.90 0.48Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.8
1.2
1.7
1.2
0.8
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 31JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-14 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]2 Rev'd 08/1/09
SHEET 2 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 55 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 117.70 35.88
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 1-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 168.70 51.43 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3455.0 3463.0 3471.0 3478.5 3485.5 3493.0 litres/min
Take litres 8.00 8.00 7.50 7.00 7.50
0.97 Average Take l/m 8.00 8.00 7.50 7.00 7.50 7.60 2.98
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3523.0 3535.5 3548.0 3560.0 3571.0 3582.5 litres/min
Take litres 12.50 12.50 12.00 11.00 11.50
1.93 Average Take l/m 12.50 12.50 12.00 11.00 11.50 11.90 2.94
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3647.0 3666.5 3684.5 3702.0 3719.0 3735.0 litres/min
Take litres 19.50 18.00 17.50 17.00 16.00
3.31 Average Take l/m 19.50 18.00 17.50 17.00 16.00 17.60 2.84
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3751.0 3758.0 3765.0 3773.0 3780.0 3787.5 litres/min
Take litres 7.00 7.00 8.00 7.00 7.50
1.93 Average Take l/m 7.00 7.00 8.00 7.00 7.50 7.30 1.80
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3792.5 3795.0 3798.0 3800.5 3804.0 3807.0 litres/min
Take litres 2.50 3.00 2.50 3.50 3.00
0.97 Average Take l/m 2.50 3.00 2.50 3.50 3.00 2.90 1.14
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.980 MAX k= 2.98E-05
DETERMINATION:
MIN Lu= 1.137 MIN k= 1.14E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.137 AVG k= 1.14E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Void Filling.
TEST BY: GM REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.97 1.93 3.31 1.93 0.97Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.6
2.6
4.0
2.6
1.6
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 01AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-15 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]3 Rev'd 08/3/09
SHEET 3 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 55 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 162.70 49.60
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 3-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 218.70 66.68 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3878.0 3883.0 3888.0 3892.5 3897.5 3902.0 litres/min
Take litres 5.00 5.00 4.50 5.00 4.50
1.38 Average Take l/m 5.00 5.00 4.50 5.00 4.50 4.80 1.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3905.0 3912.5 3919.5 3925.5 3931.0 3937.0 litres/min
Take litres 7.50 7.00 6.00 5.50 6.00
2.76 Average Take l/m 7.50 7.00 6.00 5.50 6.00 6.40 1.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3943.0 3951.0 3958.5 3966.0 3979.0 3981.5 litres/min
Take litres 8.00 7.50 7.50 13.00 2.50
4.27 Average Take l/m 8.00 7.50 7.50 13.00 2.50 7.70 0.91
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4008.0 4013.5 4019.0 4025.0 4030.0 4035.0 litres/min
Take litres 5.50 5.50 6.00 5.00 5.00
2.69 Average Take l/m 5.50 5.50 6.00 5.00 5.00 5.40 0.94
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4037.0 4040.5 4044.0 4047.5 4050.5 4054.0 litres/min
Take litres 3.50 3.50 3.50 3.00 3.50
1.45 Average Take l/m 3.50 3.50 3.50 3.00 3.50 3.40 0.94
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.369 MAX k= 1.37E-05
DETERMINATION:
MIN Lu= 0.911 MIN k= 9.11E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.911 AVG k= 9.11E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 1 L/min.
TEST BY: GM REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.38 2.76 4.27 2.69 1.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.1
3.4
5.0
3.4
2.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 03AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-16 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]4 Rev'd 08/4/09
SHEET 4 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 55 oDEPTH GROUNDWATER: 7.1 m TOP OF TEST INTERVAL: 212.70 64.85
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 268.70 81.92 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4118.0 4119.0 4119.8 4120.1 4120.8 4121.1 litres/min
Take litres 1.00 0.80 0.30 0.70 0.30
1.79 Average Take l/m 1.00 0.80 0.30 0.70 0.30 0.62 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4121.0 4122.9 4123.5 4124.3 4125.0 4126.0 litres/min
Take litres 1.90 0.60 0.80 0.70 1.00
3.59 Average Take l/m 1.90 0.60 0.80 0.70 1.00 1.00 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4127.0 4128.0 4129.0 4130.0 4131.0 4132.0 litres/min
Take litres 1.00 1.00 1.00 1.00 1.00
6.07 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4136.1 4136.9 4137.3 4138.0 4138.8 4139.4 litres/min
Take litres 0.80 0.40 0.70 0.80 0.60
3.65 Average Take l/m 0.80 0.40 0.70 0.80 0.60 0.66 0.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4139.6 4140.0 4140.1 4140.3 4141.0 4141.2 litres/min
Take litres 0.40 0.10 0.20 0.70 0.20
1.79 Average Take l/m 0.40 0.10 0.20 0.70 0.20 0.32 0.08
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.152 MAX k= 1.52E-06
DETERMINATION:
MIN Lu= 0.078 MIN k= 7.85E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.078 AVG k= 7.85E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.1 L/min.
TEST BY: GM REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
1.79 3.59 6.07 3.65 1.79Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.4
4.2
6.7
4.3
2.4
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 04AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-17 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]5 Rev'd 07/31/09
SHEET 5 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 55 oDEPTH GROUNDWATER: 6.4 m TOP OF TEST INTERVAL: 262.70 80.09
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 318.70 97.16 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4184.0 4185.0 4185.5 4186.1 4187.0 4187.8 litres/min
Take litres 1.00 0.50 0.60 0.90 0.80
2.34 Average Take l/m 1.00 0.50 0.60 0.90 0.80 0.76 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4190.0 4191.1 4192.5 4193.9 4195.0 4196.1 litres/min
Take litres 1.10 1.40 1.40 1.10 1.10
4.41 Average Take l/m 1.10 1.40 1.40 1.10 1.10 1.22 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4198.0 4200.0 4202.0 4204.0 4205.9 4207.8 litres/min
Take litres 2.00 2.00 2.00 1.90 1.90
7.38 Average Take l/m 2.00 2.00 2.00 1.90 1.90 1.96 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4214.0 4215.0 4216.1 4217.2 4218.7 4220.0 litres/min
Take litres 1.00 1.10 1.10 1.50 1.30
4.41 Average Take l/m 1.00 1.10 1.10 1.50 1.30 1.20 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4220.2 4221.0 4221.8 4222.3 4223.0 4223.5 litres/min
Take litres 0.80 0.80 0.50 0.70 0.50
2.41 Average Take l/m 0.80 0.80 0.50 0.70 0.50 0.66 0.13
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.155 MAX k= 1.55E-06
DETERMINATION:
MIN Lu= 0.131 MIN k= 1.31E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.131 AVG k= 1.31E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.2 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
2.34 4.41 7.38 4.41 2.41Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.9
4.9
7.9
4.9
3.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 0.50 1.00 1.50 2.00 2.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 05AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-18 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]6 Rev'd 08/5/09
SHEET 6 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 55 oDEPTH GROUNDWATER: 6.4 m TOP OF TEST INTERVAL: 312.70 95.34
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 368.70 112.41 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4269.0 4272.5 4276.0 4279.0 4282.5 4285.5 litres/min
Take litres 3.50 3.50 3.00 3.50 3.00
2.83 Average Take l/m 3.50 3.50 3.00 3.50 3.00 3.30 0.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4289.0 4293.5 4298.0 4302.5 4307.0 4311.0 litres/min
Take litres 4.50 4.50 4.50 4.50 4.00
5.10 Average Take l/m 4.50 4.50 4.50 4.50 4.00 4.40 0.46
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4315.0 4322.0 4328.5 4335.0 4341.0 4347.5 litres/min
Take litres 7.00 6.50 6.50 6.00 6.50
8.41 Average Take l/m 7.00 6.50 6.50 6.00 6.50 6.50 0.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4360.0 4364.0 4368.5 4372.5 4377.0 4381.5 litres/min
Take litres 4.00 4.50 4.00 4.50 4.50
5.10 Average Take l/m 4.00 4.50 4.00 4.50 4.50 4.30 0.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4383.0 4386.0 4388.5 4391.0 4394.0 4391.0 litres/min
Take litres 3.00 2.50 2.50 3.00 -3.00
2.96 Average Take l/m 3.00 2.50 2.50 3.00 -3.00 1.60 0.27
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.575 MAX k= 5.75E-06
DETERMINATION:
MIN Lu= 0.268 MIN k= 2.68E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.426 AVG k= 4.26E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately >0.2 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
2.83 5.10 8.41 5.10 2.96Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.4
5.6
8.9
5.6
3.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 05AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-19 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]7 Rev'd 08/6/09
SHEET 7 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 7
DIP: 55 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 362.70 110.58
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 418.70 127.65 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4458.0 4461.5 4465.0 4468.0 4471.5 4474.5 litres/min
Take litres 3.50 3.50 3.00 3.50 3.00
1.59 Average Take l/m 3.50 3.50 3.00 3.50 3.00 3.30 0.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4479.0 4484.5 4490.0 4495.0 4500.0 4505.0 litres/min
Take litres 5.50 5.50 5.00 5.00 5.00
3.31 Average Take l/m 5.50 5.50 5.00 5.00 5.00 5.20 0.82
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4510.0 4517.5 4525.0 4532.0 4539.0 4546.0 litres/min
Take litres 7.50 7.50 7.00 7.00 7.00
5.72 Average Take l/m 7.50 7.50 7.00 7.00 7.00 7.20 0.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4572.0 4576.0 4580.0 4584.5 4588.5 4592.5 litres/min
Take litres 4.00 4.00 4.50 4.00 4.00
3.24 Average Take l/m 4.00 4.00 4.50 4.00 4.00 4.10 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4594.0 4596.0 4598.0 4600.5 4603.0 4605.0 litres/min
Take litres 2.00 2.00 2.50 2.50 2.00
1.65 Average Take l/m 2.00 2.00 2.50 2.50 2.00 2.20 0.62
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.969 MAX k= 9.69E-06
DETERMINATION:
MIN Lu= 0.624 MIN k= 6.24E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.688 AVG k= 6.88E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.59 3.31 5.72 3.24 1.65Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.0
3.7
6.1
3.7
2.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 06AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-20 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]8 Rev'd 08/6/09
SHEET 8 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 8
DIP: 55 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 412.70 125.82
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 468.70 142.90 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4629.0 4630.5 4632.0 4633.0 4634.0 4635.5 litres/min
Take litres 1.50 1.50 1.00 1.00 1.50
1.79 Average Take l/m 1.50 1.50 1.00 1.00 1.50 1.30 0.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4637.0 4639.0 4640.5 4642.0 4644.0 4645.5 litres/min
Take litres 2.00 1.50 1.50 2.00 1.50
3.17 Average Take l/m 2.00 1.50 1.50 2.00 1.50 1.70 0.28
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4649.0 4651.5 4653.5 4656.0 4658.0 4660.0 litres/min
Take litres 2.50 2.00 2.50 2.00 2.00
5.45 Average Take l/m 2.50 2.00 2.50 2.00 2.00 2.20 0.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4664.0 4665.0 4667.0 4668.0 4670.0 4671.0 litres/min
Take litres 1.00 2.00 1.00 2.00 1.00
3.24 Average Take l/m 1.00 2.00 1.00 2.00 1.00 1.40 0.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4671.0 4672.0 4673.0 4674.0 4675.0 4675.5 litres/min
Take litres 1.00 1.00 1.00 1.00 0.50
1.86 Average Take l/m 1.00 1.00 1.00 1.00 0.50 0.90 0.23
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.346 MAX k= 3.46E-06
DETERMINATION:
MIN Lu= 0.220 MIN k= 2.20E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.220 AVG k= 2.20E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.25 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
1.79 3.17 5.45 3.24 1.86Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.2
3.6
5.9
3.7
2.3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.50 1.00 1.50 2.00 2.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 06AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-21 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]9 Rev'd 08/7/09
SHEET 9 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 9
DIP: 55 oDEPTH GROUNDWATER: 5.2 m TOP OF TEST INTERVAL: 462.70 141.07
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 7-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 518.70 158.14 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4716.0 4716.5 4717.0 4717.5 4718.0 4718.5 litres/min
Take litres 0.50 0.50 0.50 0.50 0.50
3.52 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.07
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4720.0 4720.8 4721.5 4722.5 4723.0 4723.8 litres/min
Take litres 0.80 0.70 1.00 0.50 0.80
6.89 Average Take l/m 0.80 0.70 1.00 0.50 0.80 0.76 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4726.0 4727.0 4728.2 4729.5 4730.5 4731.5 litres/min
Take litres 1.00 1.20 1.30 1.00 1.00
10.48 Average Take l/m 1.00 1.20 1.30 1.00 1.00 1.10 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4734.5 4735.1 4736.0 4736.9 4737.6 4738.3 litres/min
Take litres 0.60 0.90 0.90 0.70 0.70
6.89 Average Take l/m 0.60 0.90 0.90 0.70 0.70 0.76 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4738.5 4738.8 4739.0 4739.4 4740.0 4740.1 litres/min
Take litres 0.30 0.20 0.40 0.60 0.10
3.59 Average Take l/m 0.30 0.20 0.40 0.60 0.10 0.32 0.05
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.074 MAX k= 7.41E-07
DETERMINATION:
MIN Lu= 0.047 MIN k= 4.66E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.059 AVG k= 5.90E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
3.52 6.89 10.48 6.89 3.59Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.0
7.3
10.9
7.3
4.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 07AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-22 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]10 Rev'd 08/8/09
SHEET 10 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 10
DIP: 55 oDEPTH GROUNDWATER: 5.2 m TOP OF TEST INTERVAL: 512.70 156.31
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 568.70 173.38 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4790.0 4791.8 4793.0 4794.5 4796.0 4797.5 litres/min
Take litres 1.80 1.20 1.50 1.50 1.50
3.31 Average Take l/m 1.80 1.20 1.50 1.50 1.50 1.50 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4800.0 4802.2 4804.5 4806.8 4808.7 4810.6 litres/min
Take litres 2.20 2.30 2.30 1.90 1.90
6.69 Average Take l/m 2.20 2.30 2.30 1.90 1.90 2.12 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4813.0 4816.0 4819.0 4822.0 4825.0 4827.8 litres/min
Take litres 3.00 3.00 3.00 3.00 2.80
10.27 Average Take l/m 3.00 3.00 3.00 3.00 2.80 2.96 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4835.0 4836.9 4838.8 4840.4 4842.1 4844.0 litres/min
Take litres 1.90 1.90 1.60 1.70 1.90
6.89 Average Take l/m 1.90 1.90 1.60 1.70 1.90 1.80 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4845.0 4845.8 4846.9 4847.8 4848.8 4849.5 litres/min
Take litres 0.80 1.10 0.90 1.00 0.70
3.45 Average Take l/m 0.80 1.10 0.90 1.00 0.70 0.90 0.14
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.235 MAX k= 2.35E-06
DETERMINATION:
MIN Lu= 0.136 MIN k= 1.36E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.136 AVG k= 1.36E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.
TEST BY: GM REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
3.31 6.69 10.27 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.7
7.1
10.7
7.3
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 08AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-23 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]11 Rev'd 08/8/09
SHEET 11 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 11
DIP: 55 oDEPTH GROUNDWATER: 5.0 m TOP OF TEST INTERVAL: 562.70 171.55
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 618.70 188.63 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4896.0 4897.5 4899.0 4900.0 4901.5 4903.0 litres/min
Take litres 1.50 1.50 1.00 1.50 1.50
3.45 Average Take l/m 1.50 1.50 1.00 1.50 1.50 1.40 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4910.0 4912.0 4914.0 4916.0 4918.0 4920.0 litres/min
Take litres 2.00 2.00 2.00 2.00 2.00
6.76 Average Take l/m 2.00 2.00 2.00 2.00 2.00 2.00 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4928.0 4931.0 4934.0 4934.0 4940.0 4942.7 litres/min
Take litres 3.00 3.00 0.00 6.00 2.70
10.34 Average Take l/m 3.00 3.00 0.00 6.00 2.70 2.94 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4953.2 4955.5 4957.8 4959.8 4961.9 4963.8 litres/min
Take litres 2.30 2.30 2.00 2.10 1.90
7.03 Average Take l/m 2.30 2.30 2.00 2.10 1.90 2.12 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4965.0 4966.3 4967.5 4968.7 4969.9 4971.0 litres/min
Take litres 1.30 1.20 1.20 1.20 1.10
3.52 Average Take l/m 1.30 1.20 1.20 1.20 1.10 1.20 0.18
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.212 MAX k= 2.12E-06
DETERMINATION:
MIN Lu= 0.160 MIN k= 1.60E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.160 AVG k= 1.60E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffer box at approximately 0.25 L/min during P3 phase.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
3.45 6.76 10.34 7.03 3.52Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.9
7.2
10.8
7.4
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 08AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-24 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]12 Rev'd 08/9/09
SHEET 12 OF 12
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 12
DIP: 55 oDEPTH GROUNDWATER: 5.0 m TOP OF TEST INTERVAL: 612.70 186.80
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 9-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 648.70 197.77 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5037.0 5040.1 5044.5 5046.5 5049.5 5052.0 litres/min
Take litres 3.10 4.40 2.00 3.00 2.50
3.45 Average Take l/m 3.10 4.40 2.00 3.00 2.50 3.00 0.71
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5058.0 5063.8 5069.0 5074.0 5079.7 5085.0 litres/min
Take litres 5.80 5.20 5.00 5.70 5.30
6.83 Average Take l/m 5.80 5.20 5.00 5.70 5.30 5.40 0.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5092.0 5099.0 5106.5 5113.0 5120.0 5127.0 litres/min
Take litres 7.00 7.50 6.50 7.00 7.00
10.34 Average Take l/m 7.00 7.50 6.50 7.00 7.00 7.00 0.59
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5147.0 5151.5 5156.0 5161.0 5165.0 5169.5 litres/min
Take litres 4.50 4.50 5.00 4.00 4.50
6.83 Average Take l/m 4.50 4.50 5.00 4.00 4.50 4.50 0.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5170.0 5173.2 5175.8 5178.0 5180.0 5182.1 litres/min
Take litres 3.20 2.60 2.20 2.00 2.10
3.45 Average Take l/m 3.20 2.60 2.20 2.00 2.10 2.42 0.57
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.708 MAX k= 7.08E-06
DETERMINATION:
MIN Lu= 0.566 MIN k= 5.66E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.593 AVG k= 5.93E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.
Flowmeter in m3.
Water leakage out of stuffer box at approximately 0.125 L/min during P3 phase.
TEST BY: MW REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:08
101-343/3 K09-02GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
3.45 6.83 10.34 6.83 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.9
7.2
10.8
7.2
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 08AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-25 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]1 Rev'd 08/02/09
SHEET 1 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 14.8 m TOP OF TEST INTERVAL: 18.50 5.64
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 2-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 71.00 21.65 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34861.0 34868.0 34873.0 34878.5 34884.0 34889.0 litres/min
Take litres 7.00 5.00 5.50 5.50 5.00
0.28 Average Take l/m 7.00 5.00 5.50 5.50 5.00 5.60 1.89
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34894.0 34900.0 34906.0 34912.0 34918.0 34924.0 litres/min
Take litres 6.00 6.00 6.00 6.00 6.00
0.41 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 1.88
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34929.0 34935.5 34942.5 34949.0 34955.0 34962.5 litres/min
Take litres 6.50 7.00 6.50 6.00 7.50
0.55 Average Take l/m 6.50 7.00 6.50 6.00 7.50 6.70 1.96
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35015.0 35022.0 35027.5 35034.0 35040.0 35047.0 litres/min
Take litres 7.00 5.50 6.50 6.00 7.00
0.41 Average Take l/m 7.00 5.50 6.50 6.00 7.00 6.40 2.01
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35050.0 35056.0 35062.0 35068.0 35074.0 35080.0 litres/min
Take litres 6.00 6.00 6.00 6.00 6.00
0.28 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 2.02
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.020 MAX k= 2.02E-05
DETERMINATION:
MIN Lu= 1.880 MIN k= 1.88E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.020 AVG k= 2.02E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Double packer system used.
Flowmeter in m3, No water leaking out of stuffing box.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
1.8
1.9
1.9
2.0
2.0
2.1
0.28 0.41 0.55 0.41 0.28Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.9
2.0
2.1
2.0
1.9
1.8
1.9
1.9
2.0
2.0
2.1
2.1
2.2
5.40 5.60 5.80 6.00 6.20 6.40 6.60 6.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 2AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-26 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]2 Rev'd 08/2/09
SHEET 2 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 60 oDEPTH GROUNDWATER: 14.8 m TOP OF TEST INTERVAL: 68.70 20.95
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 2-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 119.70 36.49 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 36300.0 36335.5 36370.0 36403.0 36436.0 36468.0 litres/min
Take litres 35.50 34.50 33.00 33.00 32.00
0.62 Average Take l/m 35.50 34.50 33.00 33.00 32.00 33.60 10.87
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 36500.0 36545.5 36589.5 36633.0 36676.0 36717.0 litres/min
Take litres 45.50 44.00 43.50 43.00 41.00
1.17 Average Take l/m 45.50 44.00 43.50 43.00 41.00 43.40 10.99
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 37160.0 37215.0 37267.0 37319.0 37370.0 37420.0 litres/min
Take litres 55.00 52.00 52.00 51.00 50.00
1.72 Average Take l/m 55.00 52.00 52.00 51.00 50.00 52.00 10.82
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 37450.0 37485.5 37523.0 37561.0 37599.0 37637.0 litres/min
Take litres 35.50 37.50 38.00 38.00 38.00
1.17 Average Take l/m 35.50 37.50 38.00 38.00 38.00 37.40 9.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 37660.0 37685.0 37710.0 37738.0 37766.0 37793.0 litres/min
Take litres 25.00 25.00 28.00 28.00 27.00
0.62 Average Take l/m 25.00 25.00 28.00 28.00 27.00 26.60 8.60
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 10.987 MAX k= 1.10E-04
DETERMINATION:
MIN Lu= 8.602 MIN k= 8.60E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 8.602 AVG k= 8.60E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Double packer system is used.
Test paused between p2 and p3 pressures to refill water tank.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.62 1.17 1.72 1.17 0.62Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.0
2.6
3.1
2.6
2.0
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 10.00 20.00 30.00 40.00 50.00 60.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 2AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-27 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]3 Rev'd 08/3/09
SHEET 3 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 60 oDEPTH GROUNDWATER: 20.6 m TOP OF TEST INTERVAL: 118.50 36.13
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 3-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 169.50 51.68 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 38220.0 38247.0 38273.0 38298.0 38324.0 38350.0 litres/min
Take litres 27.00 26.00 25.00 26.00 26.00
1.03 Average Take l/m 27.00 26.00 25.00 26.00 26.00 26.00 5.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 38410.0 38451.0 38492.0 38534.0 38576.0 38618.0 litres/min
Take litres 41.00 41.00 42.00 42.00 42.00
2.07 Average Take l/m 41.00 41.00 42.00 42.00 42.00 41.60 6.79
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 38700.0 38772.0 38844.0 38915.0 38986.0 39061.0 litres/min
Take litres 72.00 72.00 71.00 71.00 75.00
3.45 Average Take l/m 72.00 72.00 71.00 71.00 75.00 72.20 8.73
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 39090.0 39138.0 39185.0 39233.0 39282.0 39330.0 litres/min
Take litres 48.00 47.00 48.00 49.00 48.00
2.07 Average Take l/m 48.00 47.00 48.00 49.00 48.00 48.00 7.84
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 39390.0 39422.0 39455.0 39488.0 39522.0 39556.0 litres/min
Take litres 32.00 33.00 33.00 34.00 34.00
1.03 Average Take l/m 32.00 33.00 33.00 34.00 34.00 33.20 7.35
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 8.732 MAX k= 8.73E-05
DETERMINATION:
MIN Lu= 5.756 MIN k= 5.76E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.294 AVG k= 7.29E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Minute amount of water leaking out of stuffing box, ~.05L/min.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
1.03 2.07 3.45 2.07 1.03Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.9
4.0
5.3
4.0
2.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 3AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-28 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]4 Rev'd 08/04/09
SHEET 4 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 60 oDEPTH GROUNDWATER: 20.7 m TOP OF TEST INTERVAL: 168.50 51.37
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 4-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 219.50 66.92 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 39880.0 39884.0 39887.0 39891.0 39894.0 39897.0 litres/min
Take litres 4.00 3.00 4.00 3.00 3.00
1.59 Average Take l/m 4.00 3.00 4.00 3.00 3.00 3.40 0.63
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 39903.0 39910.0 39916.3 39923.0 39929.5 39936.3 litres/min
Take litres 7.00 6.25 6.75 6.50 6.75
3.17 Average Take l/m 7.00 6.25 6.75 6.50 6.75 6.65 0.85
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 39945.0 39957.0 39969.5 39981.8 39994.0 40007.0 litres/min
Take litres 12.00 12.50 12.25 12.25 13.00
4.83 Average Take l/m 12.00 12.50 12.25 12.25 13.00 12.40 1.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40015.0 40025.0 40035.0 40045.0 40055.0 40065.0 litres/min
Take litres 10.00 10.00 10.00 10.00 10.00
3.17 Average Take l/m 10.00 10.00 10.00 10.00 10.00 10.00 1.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40070.0 40077.0 40084.5 40092.0 40099.0 40106.5 litres/min
Take litres 7.00 7.50 7.50 7.00 7.50
1.59 Average Take l/m 7.00 7.50 7.50 7.00 7.50 7.30 1.36
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.356 MAX k= 1.36E-05
DETERMINATION:
MIN Lu= 0.632 MIN k= 6.32E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.356 AVG k= 1.36E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~.01L/min.
TEST BY: LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.59 3.17 4.83 3.17 1.59Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.5
5.1
6.7
5.1
3.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 4AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-29 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]5 Rev'd 08/05/09
SHEET 5 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 60 oDEPTH GROUNDWATER: 22.6 m TOP OF TEST INTERVAL: 218.50 66.62
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 269.50 82.16 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40305.0 40316.0 40327.0 40338.0 40349.0 40358.5 litres/min
Take litres 11.00 11.00 11.00 11.00 9.50
2.07 Average Take l/m 11.00 11.00 11.00 11.00 9.50 10.70 1.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40370.0 40387.0 40404.0 40420.0 40436.0 40452.5 litres/min
Take litres 17.00 17.00 16.00 16.00 16.50
4.14 Average Take l/m 17.00 17.00 16.00 16.00 16.50 16.50 1.72
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40485.0 40509.0 40532.0 40556.0 40578.5 40602.0 litres/min
Take litres 24.00 23.00 24.00 22.50 23.50
6.21 Average Take l/m 24.00 23.00 24.00 22.50 23.50 23.40 1.83
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40612.0 40629.0 40647.0 40663.5 40680.0 40697.0 litres/min
Take litres 17.00 18.00 16.50 16.50 17.00
4.14 Average Take l/m 17.00 18.00 16.50 16.50 17.00 17.00 1.77
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40703.0 40715.0 40727.0 40739.0 40752.0 40763.0 litres/min
Take litres 12.00 12.00 12.00 13.00 11.00
2.07 Average Take l/m 12.00 12.00 12.00 13.00 11.00 12.00 1.88
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.878 MAX k= 1.88E-05
DETERMINATION:
MIN Lu= 1.675 MIN k= 1.67E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.773 AVG k= 1.77E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~.01L/min. Pressure gauge needle wavering at P2 and P#. Laminar flow with Wash out.
TEST BY: MW/LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
1.6
1.6
1.7
1.7
1.8
1.8
1.9
1.9
2.07 4.14 6.21 4.14 2.07Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.1
6.2
8.3
6.2
4.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 5.00 10.00 15.00 20.00 25.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 5AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-30 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]6 Rev'd 08/06/09
SHEET 6 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 60 oDEPTH GROUNDWATER: 21.0 m TOP OF TEST INTERVAL: 268.00 81.71
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 324.00 98.78 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40940.0 40943.0 40945.3 40948.0 40950.3 40953.0 litres/min
Take litres 3.00 2.25 2.75 2.25 2.75
2.55 Average Take l/m 3.00 2.25 2.75 2.25 2.75 2.60 0.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40958.0 40963.0 40969.0 40974.0 40979.5 40985.0 litres/min
Take litres 5.00 6.00 5.00 5.50 5.50
5.10 Average Take l/m 5.00 6.00 5.00 5.50 5.50 5.40 0.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 40998.0 41007.5 41016.5 41025.5 41035.5 41045.0 litres/min
Take litres 9.50 9.00 9.00 10.00 9.50
7.58 Average Take l/m 9.50 9.00 9.00 10.00 9.50 9.40 0.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 41055.0 41061.5 41068.0 41075.0 41081.0 41087.5 litres/min
Take litres 6.50 6.50 7.00 6.00 6.50
5.03 Average Take l/m 6.50 6.50 7.00 6.00 6.50 6.50 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 41095.0 41099.0 41103.5 41108.0 41112.0 41116.0 litres/min
Take litres 4.00 4.50 4.50 4.00 4.00
2.55 Average Take l/m 4.00 4.50 4.50 4.00 4.00 4.20 0.55
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.580 MAX k= 5.80E-06
DETERMINATION:
MIN Lu= 0.342 MIN k= 3.42E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.495 AVG k= 4.95E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~.01L/min. Laminar flow with minoe wash out.
TEST BY: MW/LS REVIEWED BY: JS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
2.55 5.10 7.58 5.03 2.55Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.5
7.0
9.5
7.0
4.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 6AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-31 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]8 Rev'd 08/08/09
SHEET 7 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 8
DIP: 60 oDEPTH GROUNDWATER: 28.2 m TOP OF TEST INTERVAL: 371.50 113.26
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 412.50 125.76 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 42123.0 42147.0 42170.0 42193.0 42216.0 42240.0 litres/min
Take litres 24.00 23.00 23.00 23.00 24.00
0.69 Average Take l/m 24.00 23.00 23.00 23.00 24.00 23.40 5.82
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 42300.0 42334.0 42367.0 42399.0 42430.0 42461.0 litres/min
Take litres 34.00 33.00 32.00 31.00 31.00
1.38 Average Take l/m 34.00 33.00 32.00 31.00 31.00 32.20 6.59
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 42505.0 42548.0 42590.0 42631.0 42672.0 42713.0 litres/min
Take litres 43.00 42.00 41.00 41.00 41.00
2.14 Average Take l/m 43.00 42.00 41.00 41.00 41.00 41.60 7.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 42731.0 42761.0 42794.0 42827.0 42861.0 42894.0 litres/min
Take litres 30.00 33.00 33.00 34.00 33.00
1.38 Average Take l/m 30.00 33.00 33.00 34.00 33.00 32.60 6.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 42910.0 42934.0 42959.0 42985.0 43012.0 43038.0 litres/min
Take litres 24.00 25.00 26.00 27.00 26.00
0.69 Average Take l/m 24.00 25.00 26.00 27.00 26.00 25.60 6.36
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 7.132 MAX k= 7.13E-05
DETERMINATION:
MIN Lu= 5.817 MIN k= 5.82E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 6.516 AVG k= 6.52E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~.01L/min.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.69 1.38 2.14 1.38 0.69Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.2
3.9
4.7
3.9
3.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 8AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-32 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]9 Rev'd 08/10/09
SHEET 8 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 9
DIP: 60 oDEPTH GROUNDWATER: 32.8 m TOP OF TEST INTERVAL: 423.50 129.12
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 10-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 474.50 144.66 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 43435.0 43468.0 43501.0 43531.0 43558.0 43584.0 litres/min
Take litres 33.00 33.00 30.00 27.00 26.00
3.45 Average Take l/m 33.00 33.00 30.00 27.00 26.00 29.80 3.01
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 43670.0 43718.0 43765.0 43801.0 43854.0 43895.0 litres/min
Take litres 48.00 47.00 36.00 53.00 41.00
6.89 Average Take l/m 48.00 47.00 36.00 53.00 41.00 45.00 2.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 43955.0 44017.0 44076.0 44133.0 44187.0 44242.0 litres/min
Take litres 62.00 59.00 57.00 54.00 55.00
10.34 Average Take l/m 62.00 59.00 57.00 54.00 55.00 57.40 2.78
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 44280.0 44316.0 44355.0 44392.0 44429.0 44467.0 litres/min
Take litres 36.00 39.00 37.00 37.00 38.00
6.89 Average Take l/m 36.00 39.00 37.00 37.00 38.00 37.40 2.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 44474.0 44490.0 44509.0 44535.0 44561.0 44585.0 litres/min
Take litres 16.00 19.00 26.00 26.00 24.00
3.45 Average Take l/m 16.00 19.00 26.00 26.00 24.00 22.20 2.24
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 3.008 MAX k= 3.01E-05
DETERMINATION:
MIN Lu= 2.241 MIN k= 2.24E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.686 AVG k= 2.69E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.1L/min when water pressure is at 150psi. Void Filling flow with minor wash out.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.4
9.8
13.3
9.8
6.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-33 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]10 Rev'd 08/14/09
SHEET 9 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 10
DIP: 60 oDEPTH GROUNDWATER: 37.3 m TOP OF TEST INTERVAL: 473.50 144.36
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 14-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 529.50 161.43 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 45165.0 45214.0 45261.0 45309.0 45356.0 45403.0 litres/min
Take litres 49.00 47.00 48.00 47.00 47.00
3.45 Average Take l/m 49.00 47.00 48.00 47.00 47.00 47.60 4.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 45470.0 45533.0 45594.0 45655.0 45712.0 45771.0 litres/min
Take litres 63.00 61.00 61.00 57.00 59.00
6.89 Average Take l/m 63.00 61.00 61.00 57.00 59.00 60.20 3.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 45880.0 45952.0 45019.0 46085.0 46151.0 46213.0 litres/min
Take litres 72.00 -933.00 1066.00 66.00 62.00
10.34 Average Take l/m 72.00 -933.00 1066.00 66.00 62.00 66.60 2.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46250.0 46300.0 46351.0 46401.0 46452.0 46502.0 litres/min
Take litres 50.00 51.00 50.00 51.00 50.00
6.89 Average Take l/m 50.00 51.00 50.00 51.00 50.00 50.40 2.89
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46546.0 46577.0 45613.0 46651.0 46687.0 46725.0 litres/min
Take litres 31.00 -964.00 1038.00 36.00 38.00
3.45 Average Take l/m 31.00 -964.00 1038.00 36.00 38.00 35.80 3.10
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 4.122 MAX k= 4.12E-05
DETERMINATION:
MIN Lu= 2.856 MIN k= 2.86E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.856 AVG k= 2.86E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.2L/min when water pressure is at 150psi. Turbulent flow with minor void filling.
TEST BY: MW REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.8
10.2
13.7
10.2
6.8
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 14AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-34 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]11 Rev'd 08/15/09
SHEET 10 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 11
DIP: 60 oDEPTH GROUNDWATER: 41.9 m TOP OF TEST INTERVAL: 522.50 159.30
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 15-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 578.50 176.37 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46835.4 46835.9 46836.2 46836.6 46836.9 46837.3 litres/min
Take litres 0.50 0.30 0.40 0.30 0.40
3.45 Average Take l/m 0.50 0.30 0.40 0.30 0.40 0.38 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46838.0 46838.7 46839.3 46840.0 46840.6 46841.2 litres/min
Take litres 0.70 0.60 0.70 0.60 0.60
6.89 Average Take l/m 0.70 0.60 0.70 0.60 0.60 0.64 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46845.0 46848.0 46851.0 46853.7 46856.4 46859.2 litres/min
Take litres 3.00 3.00 2.70 2.70 2.80
10.34 Average Take l/m 3.00 3.00 2.70 2.70 2.80 2.84 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46866.0 46866.6 46867.2 46867.8 46868.3 46869.0 litres/min
Take litres 0.60 0.60 0.60 0.50 0.70
6.89 Average Take l/m 0.60 0.60 0.60 0.50 0.70 0.60 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 46869.1 46869.5 46869.8 46870.1 46870.4 46870.8 litres/min
Take litres 0.40 0.30 0.30 0.30 0.40
3.45 Average Take l/m 0.40 0.30 0.30 0.30 0.40 0.34 0.03
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.118 MAX k= 1.18E-06
DETERMINATION:
MIN Lu= 0.028 MIN k= 2.78E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.032 AVG k= 3.18E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box. Dilation.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.2
10.6
14.1
10.6
7.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 15AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-35 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]12 Rev'd 08/15/09
SHEET 11 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 12
DIP: 60 oDEPTH GROUNDWATER: 41.9 m TOP OF TEST INTERVAL: 572.00 174.39
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 15-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 628.00 191.46 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47037.5 47038.0 47038.5 47039.0 47039.5 47040.0 litres/min
Take litres 0.50 0.50 0.50 0.50 0.50
3.45 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47040.5 47041.4 47042.3 47043.2 47044.1 47045.0 litres/min
Take litres 0.90 0.90 0.90 0.90 0.90
6.89 Average Take l/m 0.90 0.90 0.90 0.90 0.90 0.90 0.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47050.0 47058.0 47066.0 47074.0 47082.0 47090.0 litres/min
Take litres 8.00 8.00 8.00 8.00 8.00
10.34 Average Take l/m 8.00 8.00 8.00 8.00 8.00 8.00 0.33
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47109.0 47110.0 47111.0 47112.0 47113.0 47114.0 litres/min
Take litres 1.00 1.00 1.00 1.00 1.00
6.89 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47114.0 47114.4 47114.8 47115.2 47115.6 47116.0 litres/min
Take litres 0.40 0.40 0.40 0.40 0.40
3.45 Average Take l/m 0.40 0.40 0.40 0.40 0.40 0.40 0.03
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.333 MAX k= 3.33E-06
DETERMINATION:
MIN Lu= 0.033 MIN k= 3.27E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.045 AVG k= 4.46E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.28L/min when water pressure is at 150psi. Dilation.
TEST BY: MW REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.2
10.6
14.1
10.6
7.2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 15AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-36 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]13 Rev'd 08/16/09
SHEET 12 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 13
DIP: 60 oDEPTH GROUNDWATER: 44.2 m TOP OF TEST INTERVAL: 627.00 191.16
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 678.00 206.71 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47591.0 47592.8 47594.6 47596.4 47598.2 47600.0 litres/min
Take litres 1.80 1.80 1.80 1.80 1.80
3.45 Average Take l/m 1.80 1.80 1.80 1.80 1.80 1.80 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47616.0 47635.2 47656.0 47674.8 47694.8 47714.9 litres/min
Take litres 19.20 20.80 18.80 20.00 20.10
6.89 Average Take l/m 19.20 20.80 18.80 20.00 20.10 19.78 1.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 47920.0 47995.0 48069.0 48144.0 48217.0 48291.0 litres/min
Take litres 75.00 74.00 75.00 73.00 74.00
10.20 Average Take l/m 75.00 74.00 75.00 73.00 74.00 74.20 3.38
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 48485.0 48515.0 48544.0 48573.0 48601.0 48629.0 litres/min
Take litres 30.00 29.00 29.00 28.00 28.00
6.89 Average Take l/m 30.00 29.00 29.00 28.00 28.00 28.80 1.71
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 48635.0 48637.3 48639.6 48641.7 48643.8 48645.1 litres/min
Take litres 2.30 2.30 2.10 2.10 1.30
3.45 Average Take l/m 2.30 2.30 2.10 2.10 1.30 2.02 0.18
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 3.380 MAX k= 3.38E-05
DETERMINATION:
MIN Lu= 0.157 MIN k= 1.57E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.806 AVG k= 8.06E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.28L/min when water pressure is at 150psi. Dilation.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
3.45 6.89 10.20 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.4
10.8
14.1
10.8
7.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 16AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-37 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]14 Rev'd 08/16/09
SHEET 13 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 14
DIP: 60 oDEPTH GROUNDWATER: 44.2 m TOP OF TEST INTERVAL: 677.00 206.40
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 728.00 221.95 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 48704.1 48706.3 48708.5 48710.7 48712.9 48715.0 litres/min
Take litres 2.20 2.20 2.20 2.20 2.10
3.45 Average Take l/m 2.20 2.20 2.20 2.20 2.10 2.18 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 48845.0 48877.0 48909.0 48941.0 48973.0 49005.0 litres/min
Take litres 32.00 32.00 32.00 32.00 32.00
6.89 Average Take l/m 32.00 32.00 32.00 32.00 32.00 32.00 1.90
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 49105.0 49173.0 49241.0 49309.0 49377.0 49445.0 litres/min
Take litres 68.00 68.00 68.00 68.00 68.00
10.20 Average Take l/m 68.00 68.00 68.00 68.00 68.00 68.00 3.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 49590.0 49623.0 49655.0 49687.0 49718.0 49749.0 litres/min
Take litres 33.00 32.00 32.00 31.00 31.00
6.89 Average Take l/m 33.00 32.00 32.00 31.00 31.00 31.80 1.89
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 49758.0 49762.4 49766.8 49770.5 49774.2 49777.8 litres/min
Take litres 4.40 4.40 3.70 3.70 3.60
3.45 Average Take l/m 4.40 4.40 3.70 3.70 3.60 3.96 0.35
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 3.097 MAX k= 3.10E-05
DETERMINATION:
MIN Lu= 0.190 MIN k= 1.90E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.083 AVG k= 1.08E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.25L/min when water pressure is at 150psi.
TEST BY: MW REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GTKITSAULT
Embankment Abutment
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
3.45 6.89 10.20 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.4
10.8
14.1
10.8
7.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 16AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-38 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]15 Rev'd 08/17/09
SHEET 14 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 15
DIP: 60 oDEPTH GROUNDWATER: 60.7 m TOP OF TEST INTERVAL: 727.00 221.65
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 778.00 237.20 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 49853.0 49868.0 49884.0 49900.0 49915.0 49931.0 litres/min
Take litres 15.00 16.00 16.00 15.00 16.00
3.45 Average Take l/m 15.00 16.00 16.00 15.00 16.00 15.60 1.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 49982.0 50020.0 50059.0 50099.0 50139.0 50179.0 litres/min
Take litres 38.00 39.00 40.00 40.00 40.00
6.62 Average Take l/m 38.00 39.00 40.00 40.00 40.00 39.40 2.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 50290.0 50352.0 50413.0 50473.0 50533.0 50595.0 litres/min
Take litres 62.00 61.00 60.00 60.00 62.00
10.27 Average Take l/m 62.00 61.00 60.00 60.00 62.00 61.00 2.51
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 50790.0 50838.0 50884.0 50930.0 50976.0 51022.0 litres/min
Take litres 48.00 46.00 46.00 46.00 46.00
6.89 Average Take l/m 48.00 46.00 46.00 46.00 46.00 46.40 2.44
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51045.0 51061.0 51075.0 51091.0 51106.0 51121.0 litres/min
Take litres 16.00 14.00 16.00 15.00 15.00
3.45 Average Take l/m 16.00 14.00 16.00 15.00 15.00 15.20 1.11
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.513 MAX k= 2.51E-05
DETERMINATION:
MIN Lu= 1.112 MIN k= 1.11E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.865 AVG k= 1.86E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.23L/min when water pressure is at 150psi.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.45 6.62 10.27 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
8.8
12.0
15.6
12.2
8.8
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 17AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-39 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]16 Rev'd 08/18/09
SHEET 15 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 16
DIP: 60 oDEPTH GROUNDWATER: 45.0 m TOP OF TEST INTERVAL: 777.00 236.89
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 828.00 252.44 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51282.0 51299.0 51315.0 51331.0 51347.0 51363.0 litres/min
Take litres 17.00 16.00 16.00 16.00 16.00
3.59 Average Take l/m 17.00 16.00 16.00 16.00 16.00 16.20 1.38
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51425.0 51446.0 51468.0 51489.0 51508.0 51528.0 litres/min
Take litres 21.00 22.00 21.00 19.00 20.00
6.89 Average Take l/m 21.00 22.00 21.00 19.00 20.00 20.60 1.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51572.0 51598.0 51624.0 51648.0 51673.0 51697.0 litres/min
Take litres 26.00 26.00 24.00 25.00 24.00
10.34 Average Take l/m 26.00 26.00 24.00 25.00 24.00 25.00 1.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51800.0 51818.0 51836.0 51854.0 51872.0 51890.0 litres/min
Take litres 18.00 18.00 18.00 18.00 18.00
6.89 Average Take l/m 18.00 18.00 18.00 18.00 18.00 18.00 1.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 51902.0 51912.0 51925.0 51938.0 51950.0 51962.0 litres/min
Take litres 10.00 13.00 13.00 12.00 12.00
3.45 Average Take l/m 10.00 13.00 13.00 12.00 12.00 12.00 1.04
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.376 MAX k= 1.38E-05
DETERMINATION:
MIN Lu= 1.038 MIN k= 1.04E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.038 AVG k= 1.04E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.
Water leaking out of stuffing box, ~0.2L/min when water pressure is at 150psi.
Void Filling.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
3.59 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.6
10.9
14.3
10.9
7.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 18AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-40 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]18 Rev'd 08/18/09
SHEET 16 OF 16
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 18
DIP: 60 oDEPTH GROUNDWATER: 44.9 m TOP OF TEST INTERVAL: 875.50 266.92
(FROM HORIZONTAL) m (DOWN HOLE)
DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 916.50 279.42 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 54147.0 54156.0 54164.5 54173.0 54182.0 54190.5 litres/min
Take litres 9.00 8.50 8.50 9.00 8.50
3.45 Average Take l/m 9.00 8.50 8.50 9.00 8.50 8.70 0.94
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 54205.0 54218.5 54232.0 54245.0 54258.0 54271.0 litres/min
Take litres 13.50 13.50 13.00 13.00 13.00
6.89 Average Take l/m 13.50 13.50 13.00 13.00 13.00 13.20 0.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 54300.0 54321.0 54342.0 54363.0 54383.0 54404.0 litres/min
Take litres 21.00 21.00 21.00 20.00 21.00
10.34 Average Take l/m 21.00 21.00 21.00 20.00 21.00 20.80 1.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 54450.0 54463.5 54477.0 54490.5 54504.0 54518.0 litres/min
Take litres 13.50 13.50 13.50 13.50 14.00
6.89 Average Take l/m 13.50 13.50 13.50 13.50 14.00 13.60 1.00
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 54539.0 54548.0 54557.0 54565.5 54574.0 54583.0 litres/min
Take litres 9.00 9.00 8.50 8.50 9.00
3.45 Average Take l/m 9.00 9.00 8.50 8.50 9.00 8.80 0.95
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.162 MAX k= 1.16E-05
DETERMINATION:
MIN Lu= 0.938 MIN k= 9.38E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.004 AVG k= 1.00E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used. Water leaking out of stuffing box, ~0.25L/min when water pressure is at 150psi.
TEST BY: MW REVIEWED BY: LS
KITSAULT
Embankment Abutment
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 20:11
101-343/3 K09-03GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.4
10.9
14.3
10.9
7.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 5.00 10.00 15.00 20.00 25.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 19AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-41 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]1 Rev'd 08/11/09
SHEET 1 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 6.5 m TOP OF TEST INTERVAL: 29.00 8.84
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 80.00 24.39 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5262.7 5262.8 5262.8 5262.9 5262.9 5263.0 litres/min
Take litres 0.10 0.00 0.10 0.00 0.10
0.45 Average Take l/m 0.10 0.00 0.10 0.00 0.10 0.06 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5263.6 5263.9 5264.1 5264.4 5264.7 5264.9 litres/min
Take litres 0.30 0.20 0.30 0.30 0.20
0.66 Average Take l/m 0.30 0.20 0.30 0.30 0.20 0.26 0.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5265.7 5266.2 5266.8 5267.2 5267.8 5268.1 litres/min
Take litres 0.50 0.60 0.40 0.60 0.30
0.97 Average Take l/m 0.50 0.60 0.40 0.60 0.30 0.48 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5268.1 5268.2 5268.3 5268.6 5268.9 5269.0 litres/min
Take litres 0.10 0.10 0.30 0.30 0.10
0.66 Average Take l/m 0.10 0.10 0.30 0.30 0.10 0.18 0.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5269.0 5269.0 5269.1 5269.2 5269.2 5269.4 litres/min
Take litres 0.00 0.10 0.10 0.00 0.20
0.45 Average Take l/m 0.00 0.10 0.10 0.00 0.20 0.08 0.05
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.190 MAX k= 1.90E-06
DETERMINATION:
MIN Lu= 0.035 MIN k= 3.48E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.097 AVG k= 9.73E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GTKITSAULT
Open Pit Area
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.45 0.66 0.97 0.66 0.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.1
1.3
1.6
1.3
1.1
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
0.00 0.10 0.20 0.30 0.40 0.50 0.60
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11AUG'09 ISSUED WITH REPORT 101-343/3 BP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-42 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]2 Rev'd 08/11/09
SHEET 2 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 6.5 m TOP OF TEST INTERVAL: 74.00 22.56
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 130.00 39.63 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5354.0 5354.6 5355.0 5355.5 5356.0 5356.2 litres/min
Take litres 0.60 0.40 0.50 0.50 0.20
0.81 Average Take l/m 0.60 0.40 0.50 0.50 0.20 0.44 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5357.0 5358.0 5358.7 5359.7 5360.3 5361.0 litres/min
Take litres 1.00 0.70 1.00 0.60 0.70
1.61 Average Take l/m 1.00 0.70 1.00 0.60 0.70 0.80 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5361.8 5363.0 5364.1 5365.1 5366.3 5367.3 litres/min
Take litres 1.20 1.10 1.00 1.20 1.00
2.41 Average Take l/m 1.20 1.10 1.00 1.20 1.00 1.10 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5368.0 5368.5 5369.0 5369.5 5370.0 5370.5 litres/min
Take litres 0.50 0.50 0.50 0.50 0.50
1.61 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5370.8 5370.9 5371.0 5371.1 5371.1 5371.1 litres/min
Take litres 0.10 0.10 0.10 0.00 0.00
0.81 Average Take l/m 0.10 0.10 0.10 0.00 0.00 0.06 0.02
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.210 MAX k= 2.10E-06
DETERMINATION:
MIN Lu= 0.024 MIN k= 2.40E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.149 AVG k= 1.49E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: BP, MW REVIEWED BY: LS
KITSAULT
Open Pit Area
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.81 1.61 2.41 1.61 0.81Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.5
2.3
3.1
2.3
1.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.20 0.40 0.60 0.80 1.00 1.20
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11AUG'09 ISSUED WITH REPORT 101-343/3 BP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-43 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]3 Rev'd 08/11/09
SHEET 3 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 124.00 37.80
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 180.00 54.88 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5420.0 5470.0 5520.0 5570.0 5622.0 5674.0 litres/min
Take litres 50.00 50.00 50.00 52.00 52.00
1.45 Average Take l/m 50.00 50.00 50.00 52.00 52.00 50.80 13.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5780.0 5873.0 5965.0 6057.0 6151.0 6243.0 litres/min
Take litres 93.00 92.00 92.00 94.00 92.00
2.83 Average Take l/m 93.00 92.00 92.00 94.00 92.00 92.60 14.88
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6300.0 6424.0 6546.0 6668.0 6788.0 6910.0 litres/min
Take litres 124.00 122.00 122.00 120.00 122.00
4.27 Average Take l/m 124.00 122.00 122.00 120.00 122.00 122.00 14.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6950.0 7040.0 7131.0 7223.0 7313.0 7405.0 litres/min
Take litres 90.00 91.00 92.00 90.00 92.00
2.83 Average Take l/m 90.00 91.00 92.00 90.00 92.00 91.00 14.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7430.0 7486.0 7542.0 7599.0 7655.0 7711.0 litres/min
Take litres 56.00 56.00 57.00 56.00 56.00
1.45 Average Take l/m 56.00 56.00 57.00 56.00 56.00 56.20 14.53
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 14.880 MAX k= 1.49E-04
DETERMINATION:
MIN Lu= 13.131 MIN k= 1.31E-04
INTERPRETATION cm/s
REFERENCE: AVG Lu= 14.031 AVG k= 1.40E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
Some leakage abserved at highest pressure only.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GTKITSAULT
Open Pit Area
STAGE PRESSURE VERSUS LUGEON VALUE
12.0
12.5
13.0
13.5
14.0
14.5
15.0
15.5
1.45 2.83 4.27 2.83 1.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.3
3.6
5.1
3.6
2.3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-44 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]4 Rev'd 08/11/09
SHEET 4 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 174.00 53.05
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 230.00 70.12 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8265.0 8265.0 8265.0 8265.0 8265.0 8265.0 litres/min
Take litres 0.00 0.00 0.00 0.00 0.00
2.00 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8269.0 8269.7 8270.2 8271.2 8272.1 8273.1 litres/min
Take litres 0.70 0.50 1.00 0.90 1.00
4.00 Average Take l/m 0.70 0.50 1.00 0.90 1.00 0.82 0.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8275.5 8277.0 8278.5 8280.0 8281.5 8283.0 litres/min
Take litres 1.50 1.50 1.50 1.50 1.50
6.00 Average Take l/m 1.50 1.50 1.50 1.50 1.50 1.50 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8283.0 8283.5 8284.2 8285.0 8285.5 8286.2 litres/min
Take litres 0.50 0.70 0.80 0.50 0.70
4.00 Average Take l/m 0.50 0.70 0.80 0.50 0.70 0.64 0.07
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8286.2 8286.7 8287.0 8287.4 8287.8 8288.2 litres/min
Take litres 0.50 0.30 0.40 0.40 0.40
2.00 Average Take l/m 0.50 0.30 0.40 0.40 0.40 0.40 0.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.120 MAX k= 1.20E-06
DETERMINATION:
MIN Lu= 0.000 MIN k= 0.00E+00
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.120 AVG k= 1.20E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
Some leakage abserved at highest pressure only.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Open Pit Area
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
2.00 4.00 6.00 4.00 2.00Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.3
5.3
7.3
5.3
3.3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-45 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]5 Rev'd 08/12/09
SHEET 5 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 234.00 71.34
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 12-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 280.00 85.37 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8308.2 8310.0 8310.9 8311.8 8312.8 8313.8 litres/min
Take litres 1.80 0.90 0.90 1.00 1.00
2.69 Average Take l/m 1.80 0.90 0.90 1.00 1.00 1.12 0.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8315.0 8317.5 8319.1 8320.8 8322.1 8323.1 litres/min
Take litres 2.50 1.60 1.70 1.30 1.00
5.52 Average Take l/m 2.50 1.60 1.70 1.30 1.00 1.62 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8325.0 8326.8 8328.4 8330.1 8331.6 8333.1 litres/min
Take litres 1.80 1.60 1.70 1.50 1.50
8.14 Average Take l/m 1.80 1.60 1.70 1.50 1.50 1.62 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8334.0 8335.0 8335.9 8336.8 8337.9 8338.8 litres/min
Take litres 1.00 0.90 0.90 1.10 0.90
5.38 Average Take l/m 1.00 0.90 0.90 1.10 0.90 0.96 0.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8339.0 8339.4 8339.9 8340.2 8340.7 8341.1 litres/min
Take litres 0.40 0.50 0.30 0.50 0.40
2.76 Average Take l/m 0.40 0.50 0.30 0.50 0.40 0.42 0.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.198 MAX k= 1.98E-06
DETERMINATION:
MIN Lu= 0.073 MIN k= 7.31E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.073 AVG k= 7.31E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
Some leakage observed from stuffing box. Rate is <0.5 L/min.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GTKITSAULT
Open Pit Area
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
2.69 5.52 8.14 5.38 2.76Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.0
6.9
9.5
6.7
4.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 12AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-46 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]6 Rev'd 08/12/09
SHEET 6 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 284.00 86.59
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 12-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 340.00 103.66 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8364.8 8364.8 8364.9 8365.1 8365.5 8365.9 litres/min
Take litres 0.00 0.10 0.20 0.40 0.40
3.45 Average Take l/m 0.00 0.10 0.20 0.40 0.40 0.22 0.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8367.1 8368.0 8368.5 8369.0 8369.5 8370.0 litres/min
Take litres 0.90 0.50 0.50 0.50 0.50
6.89 Average Take l/m 0.90 0.50 0.50 0.50 0.50 0.58 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8371.0 8371.9 8372.5 8373.1 8373.9 8374.6 litres/min
Take litres 0.90 0.60 0.60 0.80 0.70
10.34 Average Take l/m 0.90 0.60 0.60 0.80 0.70 0.72 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8375.5 8376.0 8676.7 8377.1 8377.6 8378.0 litres/min
Take litres 0.50 300.70 -299.60 0.50 0.40
6.89 Average Take l/m 0.50 300.70 -299.60 0.50 0.40 0.50 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8378.0 8378.2 8378.4 8378.8 8379.0 8379.1 litres/min
Take litres 0.20 0.20 0.40 0.20 0.10
3.45 Average Take l/m 0.20 0.20 0.40 0.20 0.10 0.22 0.03
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.041 MAX k= 4.13E-07
DETERMINATION:
MIN Lu= 0.027 MIN k= 2.69E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.033 AVG k= 3.33E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.
Water level not measured, assumed 13.3 m, same as last test.
TEST BY: BDP REVIEWED BY: LS
KITSAULT
Open Pit Area
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:20
101-343/3 K09-04GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.8
8.2
11.7
8.2
4.8
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 12AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-47 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-05GT\Completed and Reviewed by LS\[K09-05GT Packer Test.xls]1 Rev'd 08/14/09
SHEET 1 OF 1
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 17.8 m TOP OF TEST INTERVAL: 94.00 28.66
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 14-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 140.50 42.84 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8535.0 8535.0 8535.0 8535.0 8535.0 8535.0 litres/min
Take litres 0.00 0.00 0.00 0.00 0.00
1.10 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8535.5 8536.0 8536.1 8536.5 8536.8 8537.0 litres/min
Take litres 0.50 0.10 0.40 0.30 0.20
2.14 Average Take l/m 0.50 0.10 0.40 0.30 0.20 0.30 0.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8538.0 8538.6 8539.1 8539.7 8540.3 8540.9 litres/min
Take litres 0.60 0.50 0.60 0.60 0.60
3.24 Average Take l/m 0.60 0.50 0.60 0.60 0.60 0.58 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8541.0 8541.4 8541.8 8542.1 8542.4 8542.8 litres/min
Take litres 0.40 0.40 0.30 0.30 0.40
2.14 Average Take l/m 0.40 0.40 0.30 0.30 0.40 0.36 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8543.0 8543.0 8543.0 8543.0 8543.0 8543.0 litres/min
Take litres 0.00 0.00 0.00 0.00 0.00
1.10 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.081 MAX k= 8.13E-07
DETERMINATION:
MIN Lu= 0.000 MIN k= 0.00E+00
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.040 AVG k= 4.00E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~88'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Initial Primary Crusher Location
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 19:59
101-343/3 K09-05GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
1.10 2.14 3.24 2.14 1.10Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.9
3.9
5.0
3.9
2.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 14AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-48 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]1 Rev'd 08/16/09
SHEET 1 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 24.00 7.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 70.00 21.34 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8587.0 8593.7 8599.9 8605.9 8611.0 8616.2 litres/min
Take litres 6.70 6.20 6.00 5.10 5.20
0.28 Average Take l/m 6.70 6.20 6.00 5.10 5.20 5.84 11.64
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8629.0 8654.0 8672.0 8686.2 8700.3 8714.2 litres/min
Take litres 25.00 18.00 14.20 14.10 13.90
0.55 Average Take l/m 25.00 18.00 14.20 14.10 13.90 17.04 19.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8735.0 8760.5 8784.0 8807.0 8829.5 8852.0 litres/min
Take litres 25.50 23.50 23.00 22.50 22.50
0.83 Average Take l/m 25.50 23.50 23.00 22.50 22.50 23.40 18.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8853.0 8861.9 8870.2 8878.9 8887.5 8896.0 litres/min
Take litres 8.90 8.30 8.70 8.60 8.50
0.55 Average Take l/m 8.90 8.30 8.70 8.60 8.50 8.60 9.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8846.0 8852.9 8858.9 8864.0 8870.0 8876.1 litres/min
Take litres 6.90 6.00 5.10 6.00 6.10
0.28 Average Take l/m 6.90 6.00 5.10 6.00 6.10 6.02 12.00
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 19.177 MAX k= 1.92E-04
DETERMINATION:
MIN Lu= 9.679 MIN k= 9.68E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 18.348 AVG k= 1.83E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
No leakage observed at stuff box. After second interval at P2, water ovserved flowing backwards through flow meter, turned down pump and dissipated excess back pressure and then continued test.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GTKITSAULT
Plant Site
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
5.0
10.0
15.0
20.0
25.0
0.28 0.55 0.83 0.55 0.28Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.4
0.6
0.9
0.6
0.4
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.00 5.00 10.00 15.00 20.00 25.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 16AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-49 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]2 Rev'd 08/17/09
SHEET 2 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 55.00 16.77
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 121.00 36.89 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1161.0 1183.0 1205.0 1227.0 1248.0 1270.0 litres/min
Take litres 22.00 22.00 22.00 21.00 22.00
0.57 Average Take l/m 22.00 22.00 22.00 21.00 22.00 21.80 16.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1295.0 1351.0 1406.0 1459.0 1512.0 1565.0 litres/min
Take litres 56.00 55.00 53.00 53.00 53.00
1.14 Average Take l/m 56.00 55.00 53.00 53.00 53.00 54.00 21.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1630.0 1697.0 1765.0 1832.0 1900.0 1967.0 litres/min
Take litres 67.00 68.00 67.00 68.00 67.00
1.72 Average Take l/m 67.00 68.00 67.00 68.00 67.00 67.40 18.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1978.0 2003.0 2034.0 2067.0 2099.0 2132.0 litres/min
Take litres 25.00 31.00 33.00 32.00 33.00
1.14 Average Take l/m 25.00 31.00 33.00 32.00 33.00 30.80 12.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2046.0 2083.0 2120.0 2157.0 2192.0 2228.0 litres/min
Take litres 37.00 37.00 37.00 35.00 36.00
0.57 Average Take l/m 37.00 37.00 37.00 35.00 36.00 36.40 27.05
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 27.047 MAX k= 2.70E-04
DETERMINATION:
MIN Lu= 12.368 MIN k= 1.24E-04
INTERPRETATION cm/s
REFERENCE: AVG Lu= 18.367 AVG k= 1.84E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Plant Site
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
5.0
10.0
15.0
20.0
25.0
30.0
0.57 1.14 1.72 1.14 0.57Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.7
1.2
1.8
1.2
0.7
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 17AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-50 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]3 Rev'd 08/17/09
SHEET 3 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 125.00 38.11
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 171.00 52.13 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2251.0 2252.5 2253.8 2255.0 2256.0 2257.0 litres/min
Take litres 1.50 1.30 1.20 1.00 1.00
1.37 Average Take l/m 1.50 1.30 1.20 1.00 1.00 1.20 0.52
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2258.5 2260.0 2261.2 2262.5 2263.9 2265.0 litres/min
Take litres 1.50 1.20 1.30 1.40 1.10
2.73 Average Take l/m 1.50 1.20 1.30 1.40 1.10 1.30 0.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2266.0 2267.8 2269.5 2271.2 2273.0 2274.6 litres/min
Take litres 1.80 1.70 1.70 1.80 1.60
4.14 Average Take l/m 1.80 1.70 1.70 1.80 1.60 1.72 0.28
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2275.5 2276.8 2277.7 2278.7 2279.7 2280.6 litres/min
Take litres 1.30 0.90 1.00 1.00 0.90
2.73 Average Take l/m 1.30 0.90 1.00 1.00 0.90 1.02 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2281.0 2281.5 2282.2 2282.9 2283.3 2284.0 litres/min
Take litres 0.50 0.70 0.70 0.40 0.70
1.37 Average Take l/m 0.50 0.70 0.70 0.40 0.70 0.60 0.26
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.522 MAX k= 5.22E-06
DETERMINATION:
MIN Lu= 0.242 MIN k= 2.42E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.261 AVG k= 2.61E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GTKITSAULT
Plant Site
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
1.37 2.73 4.14 2.73 1.37Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.6
3.0
4.4
3.0
1.6
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 17AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-51 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]4 Rev'd 08/18/09
SHEET 4 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 165.00 50.30
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 231.00 70.43 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12380.0 12385.1 12390.1 12395.0 12399.8 12404.1 litres/min
Take litres 5.10 5.00 4.90 4.80 4.30
1.79 Average Take l/m 5.10 5.00 4.90 4.80 4.30 4.82 1.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12410.0 12417.2 12424.0 12430.7 12437.4 12443.9 litres/min
Take litres 7.20 6.80 6.70 6.70 6.50
3.86 Average Take l/m 7.20 6.80 6.70 6.70 6.50 6.78 0.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12452.0 12459.9 12467.5 12474.9 12482.3 12489.7 litres/min
Take litres 7.90 7.60 7.40 7.40 7.40
5.72 Average Take l/m 7.90 7.60 7.40 7.40 7.40 7.54 0.65
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12525.0 12530.5 12535.7 12541.2 12546.5 12551.5 litres/min
Take litres 5.50 5.20 5.50 5.30 5.00
3.86 Average Take l/m 5.50 5.20 5.50 5.30 5.00 5.30 0.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12560.0 12563.8 12567.0 12570.0 12573.7 12577.5 litres/min
Take litres 3.80 3.20 3.00 3.70 3.80
1.86 Average Take l/m 3.80 3.20 3.00 3.70 3.80 3.50 0.90
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.286 MAX k= 1.29E-05
DETERMINATION:
MIN Lu= 0.647 MIN k= 6.47E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.647 AVG k= 6.47E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
Negigible leakage observed at stuffing box.
Some void filling occuring during test based on interpretation of pressure vs. flowplot.
TEST BY: BDP REVIEWED BY: LS
KITSAULT
Plant Site
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.79 3.86 5.72 3.86 1.86Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.9
3.9
5.8
3.9
1.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 18AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-52 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]5 Rev'd 08/18/09
SHEET 5 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 3.5 m TOP OF TEST INTERVAL: 225.00 68.60
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 281.00 85.67 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2559.0 2566.5 2574.0 2581.0 2588.0 2594.5 litres/min
Take litres 7.50 7.50 7.00 7.00 6.50
2.51 Average Take l/m 7.50 7.50 7.00 7.00 6.50 7.10 1.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2604.0 2616.0 2627.5 2639.0 2649.5 2660.0 litres/min
Take litres 12.00 11.50 11.50 10.50 10.50
5.03 Average Take l/m 12.00 11.50 11.50 10.50 10.50 11.20 1.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2673.0 2689.0 2704.0 2719.0 2733.5 2748.0 litres/min
Take litres 16.00 15.00 15.00 14.50 14.50
7.62 Average Take l/m 16.00 15.00 15.00 14.50 14.50 15.00 1.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2754.0 2764.5 2775.0 2785.5 2796.0 2806.5 litres/min
Take litres 10.50 10.50 10.50 10.50 10.50
5.03 Average Take l/m 10.50 10.50 10.50 10.50 10.50 10.50 1.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2810.5 2817.0 2823.5 2830.0 2837.0 2843.0 litres/min
Take litres 6.50 6.50 6.50 7.00 6.00
2.51 Average Take l/m 6.50 6.50 6.50 7.00 6.00 6.50 1.30
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.420 MAX k= 1.42E-05
DETERMINATION:
MIN Lu= 1.094 MIN k= 1.09E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.094 AVG k= 1.09E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
Negigible leakage observed at stuffing box.
Pressure fluxtuating between 105 and 115 psi during third test interval. Water level taken after test completed.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GTKITSAULT
Plant Site
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
2.51 5.03 7.62 5.03 2.51Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.9
5.4
8.0
5.4
2.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 18AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-53 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]6 Rev'd 08/18/09
SHEET 6 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 4.0 m TOP OF TEST INTERVAL: 285.00 86.89
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 331.00 100.91 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2897.0 2898.8 2900.2 2901.8 2903.2 2904.8 litres/min
Take litres 1.80 1.40 1.60 1.40 1.60
3.41 Average Take l/m 1.80 1.40 1.60 1.40 1.60 1.56 0.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2908.0 2910.5 2912.8 2915.2 2917.5 2919.8 litres/min
Take litres 2.50 2.30 2.40 2.30 2.30
6.83 Average Take l/m 2.50 2.30 2.40 2.30 2.30 2.36 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2923.5 2927.4 2931.2 2934.8 2938.2 2941.8 litres/min
Take litres 3.90 3.80 3.60 3.40 3.60
10.34 Average Take l/m 3.90 3.80 3.60 3.40 3.60 3.66 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2944.0 2946.5 2948.8 2951.2 2953.5 2955.8 litres/min
Take litres 2.50 2.30 2.40 2.30 2.30
6.83 Average Take l/m 2.50 2.30 2.40 2.30 2.30 2.36 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2956.5 2958.0 2959.5 2960.8 2962.2 2963.8 litres/min
Take litres 1.50 1.50 1.30 1.40 1.60
3.41 Average Take l/m 1.50 1.50 1.30 1.40 1.60 1.46 0.27
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.287 MAX k= 2.87E-06
DETERMINATION:
MIN Lu= 0.231 MIN k= 2.31E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.252 AVG k= 2.52E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.
Negigible leakage observed at stuffing box.
Water level taken after test completed.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Plant Site
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:24
101-343/3 K09-06GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
3.41 6.83 10.34 6.83 3.41Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.9
7.3
10.8
7.3
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 18AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-54 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]1 Rev'd 08/20/09
SHEET 1 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
13
DIP: 90 oDEPTH GROUNDWATER: 2.4 m TOP OF TEST INTERVAL: 26.00 7.93
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 20-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 82.00 25.00 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3009.9 3010.0 3010.2 3011.2 3012.2 3013.0 litres/min
Take litres 0.10 0.20 1.00 1.00 0.80
0.30 Average Take l/m 0.10 0.20 1.00 1.00 0.80 0.62 0.61
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3014.0 3015.0 3016.0 3017.0 3018.0 3019.0 litres/min
Take litres 1.00 1.00 1.00 1.00 1.00
0.59 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3020.0 3021.1 3022.2 3023.3 3024.6 3025.8 litres/min
Take litres 1.10 1.10 1.10 1.30 1.20
0.90 Average Take l/m 1.10 1.10 1.10 1.30 1.20 1.16 0.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3026.3 3027.1 3027.8 3028.6 3029.4 3030.1 litres/min
Take litres 0.80 0.70 0.80 0.80 0.70
0.59 Average Take l/m 0.80 0.70 0.80 0.80 0.70 0.76 0.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3030.4 3030.9 3031.1 3031.5 3031.9 3032.2 litres/min
Take litres 0.50 0.20 0.40 0.40 0.30
0.30 Average Take l/m 0.50 0.20 0.40 0.40 0.30 0.36 0.35
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.658 MAX k= 6.58E-06
DETERMINATION:
MIN Lu= 0.355 MIN k= 3.55E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.355 AVG k= 3.55E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box. Void Filling.
TEST BY: CD REVIEWED BY: LS
KITSAULT
CLARY WASTE DUMP
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.30 0.59 0.90 0.59 0.30Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.6
0.9
1.2
0.9
0.6
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-55 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]2 Rev'd 08/21/09
SHEET 2 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
13
DIP: 90 oDEPTH GROUNDWATER: 2.4 m TOP OF TEST INTERVAL: 81.00 24.70
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 132.00 40.24 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12925.1 12925.8 12926.8 12927.9 12928.8 12929.9 litres/min
Take litres 0.70 1.00 1.10 0.90 1.10
0.83 Average Take l/m 0.70 1.00 1.10 0.90 1.10 0.96 0.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12938.2 12935.9 12938.0 12940.0 12942.5 12944.8 litres/min
Take litres -2.30 2.10 2.00 2.50 2.30
1.79 Average Take l/m -2.30 2.10 2.00 2.50 2.30 1.32 0.41
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12949.0 12952.1 12955.0 12958.0 12961.0 12964.9 litres/min
Take litres 3.10 2.90 3.00 3.00 3.90
2.62 Average Take l/m 3.10 2.90 3.00 3.00 3.90 3.18 0.71
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12965.0 12967.0 12969.2 12971.2 12973.2 12975.2 litres/min
Take litres 2.00 2.20 2.00 2.00 2.00
1.86 Average Take l/m 2.00 2.20 2.00 2.00 2.00 2.04 0.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12978.0 12978.9 12979.9 12980.8 12981.6 12982.5 litres/min
Take litres 0.90 1.00 0.90 0.80 0.90
0.90 Average Take l/m 0.90 1.00 0.90 0.80 0.90 0.90 0.50
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.710 MAX k= 7.10E-06
DETERMINATION:
MIN Lu= 0.414 MIN k= 4.14E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.562 AVG k= 5.62E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GTKITSAULT
CLARY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.83 1.79 2.62 1.86 0.90Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.1
2.1
2.9
2.1
1.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-56 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]3 Rev'd 08/21/09
SHEET 3 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
13
DIP: 90 oDEPTH GROUNDWATER: 9.0 m TOP OF TEST INTERVAL: 131.00 39.94
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 182.00 55.49 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3017.0 3018.0 3018.8 3019.6 3020.1 3020.9 litres/min
Take litres 1.00 0.80 0.80 0.50 0.80
1.50 Average Take l/m 1.00 0.80 0.80 0.50 0.80 0.78 0.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3023.2 3024.9 3026.2 3027.8 3029.2 3030.3 litres/min
Take litres 1.70 1.30 1.60 1.40 1.10
3.00 Average Take l/m 1.70 1.30 1.60 1.40 1.10 1.42 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3033.0 3036.2 3039.0 3042.7 3044.2 3046.8 litres/min
Take litres 3.20 2.80 3.70 1.50 2.60
4.55 Average Take l/m 3.20 2.80 3.70 1.50 2.60 2.76 0.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3048.8 3050.0 3051.2 3052.5 3053.8 3055.0 litres/min
Take litres 1.20 1.20 1.30 1.30 1.20
3.00 Average Take l/m 1.20 1.20 1.30 1.30 1.20 1.24 0.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3055.7 3056.2 3056.7 3057.2 3057.8 3058.4 litres/min
Take litres 0.50 0.50 0.50 0.60 0.60
1.50 Average Take l/m 0.50 0.50 0.50 0.60 0.60 0.54 0.14
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.322 MAX k= 3.22E-06
DETERMINATION:
MIN Lu= 0.141 MIN k= 1.41E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.220 AVG k= 2.20E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GTKITSAULT
CLARY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
1.50 3.00 4.55 3.00 1.50Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.5
4.0
5.5
4.0
2.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-57 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]4 Rev'd 08/21/09
SHEET 4 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
13
DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 181.00 55.18
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 232.00 70.73 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3140.5 3144.0 3147.2 3150.3 3153.2 3155.5 litres/min
Take litres 3.50 3.20 3.10 2.90 2.30
2.05 Average Take l/m 3.50 3.20 3.10 2.90 2.30 3.00 0.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3161.0 3166.0 3170.5 3174.8 3178.8 3182.5 litres/min
Take litres 5.00 4.50 4.30 4.00 3.70
4.10 Average Take l/m 5.00 4.50 4.30 4.00 3.70 4.30 0.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3196.0 3202.0 3208.0 3213.2 3219.0 3224.5 litres/min
Take litres 6.00 6.00 5.20 5.80 5.50
6.21 Average Take l/m 6.00 6.00 5.20 5.80 5.50 5.70 0.46
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3227.0 3230.4 3233.8 3237.4 3240.7 3244.2 litres/min
Take litres 3.40 3.40 3.60 3.30 3.50
4.10 Average Take l/m 3.40 3.40 3.60 3.30 3.50 3.44 0.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3245.0 3246.1 3247.6 3249.2 3251.0 3252.8 litres/min
Take litres 1.10 1.50 1.60 1.80 1.80
2.05 Average Take l/m 1.10 1.50 1.60 1.80 1.80 1.56 0.26
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.498 MAX k= 4.98E-06
DETERMINATION:
MIN Lu= 0.259 MIN k= 2.59E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.259 AVG k= 2.59E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box.
TEST BY: CD REVIEWED BY: LS
KITSAULT
CLARY WASTE DUMP
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
2.05 4.10 6.21 4.10 2.05Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.9
5.9
8.0
5.9
3.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-58 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]5 Rev'd 08/22/09
SHEET 5 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
13
DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 231.00 70.43
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 22-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 282.00 85.98 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13382.0 13383.4 13384.9 13386.0 13387.0 13388.0 litres/min
Take litres 1.40 1.50 1.10 1.00 1.00
2.62 Average Take l/m 1.40 1.50 1.10 1.00 1.00 1.20 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13391.0 13392.8 13394.4 13396.0 13397.8 13399.2 litres/min
Take litres 1.80 1.60 1.60 1.80 1.40
5.24 Average Take l/m 1.80 1.60 1.60 1.80 1.40 1.64 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13402.0 13404.0 13406.0 13408.0 13410.1 13412.0 litres/min
Take litres 2.00 2.00 2.00 2.10 1.90
8.00 Average Take l/m 2.00 2.00 2.00 2.10 1.90 2.00 0.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13413.5 13414.8 13415.8 13417.0 13418.1 13419.4 litres/min
Take litres 1.30 1.00 1.20 1.10 1.30
5.24 Average Take l/m 1.30 1.00 1.20 1.10 1.30 1.18 0.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13425.0 13425.1 13425.6 13426.0 13426.8 13427.2 litres/min
Take litres 0.10 0.50 0.40 0.80 0.40
2.34 Average Take l/m 0.10 0.50 0.40 0.80 0.40 0.44 0.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.175 MAX k= 1.75E-06
DETERMINATION:
MIN Lu= 0.069 MIN k= 6.85E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.069 AVG k= 6.85E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box.
TEST BY: BDP REVIEWED BY: LS
KITSAULT
CLARY WASTE DUMP
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
2.62 5.24 8.00 5.24 2.34Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.4
7.0
9.8
7.0
4.1
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.50 1.00 1.50 2.00 2.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 22OCT'09 ISSUED WITH REPORT 101-343/3 BDP - -
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-59 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]6 Rev'd 08/22/09
SHEET 6 OF 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
13
DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 286.00 87.20
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 22-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 337.00 102.74 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13465.0 13467.8 13469.9 13472.2 13474.7 13477.0 litres/min
Take litres 2.80 2.10 2.30 2.50 2.30
3.52 Average Take l/m 2.80 2.10 2.30 2.50 2.30 2.40 0.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13480.0 13483.4 13486.8 13490.0 13493.1 13496.3 litres/min
Take litres 3.40 3.40 3.20 3.10 3.20
6.89 Average Take l/m 3.40 3.40 3.20 3.10 3.20 3.26 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13504.0 13507.6 13511.0 13514.6 13518.0 13521.5 litres/min
Take litres 3.60 3.40 3.60 3.40 3.50
10.00 Average Take l/m 3.60 3.40 3.60 3.40 3.50 3.50 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13523.5 13526.2 13528.8 13531.0 13533.5 13536.0 litres/min
Take litres 2.70 2.60 2.20 2.50 2.50
7.03 Average Take l/m 2.70 2.60 2.20 2.50 2.50 2.50 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13539.0 13540.0 13541.5 13542.8 13544.0 13545.3 litres/min
Take litres 1.00 1.50 1.30 1.20 1.30
3.59 Average Take l/m 1.00 1.50 1.30 1.20 1.30 1.26 0.15
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.291 MAX k= 2.91E-06
DETERMINATION:
MIN Lu= 0.151 MIN k= 1.51E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.151 AVG k= 1.51E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.
No leakage observed at stuff box.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 17:09
101-343/3 K09-08GTKITSAULT
CLARY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
3.52 6.89 10.00 7.03 3.59Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.3
8.7
11.8
8.8
5.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 22AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-60 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]2 Rev'd 08/24/09
SHEET 1 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 39.00 11.89
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 102.00 31.10 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4365.0 4368.8 4372.0 4376.0 4379.0 4382.0 litres/min
Take litres 3.80 3.20 4.00 3.00 3.00
0.46 Average Take l/m 3.80 3.20 4.00 3.00 3.00 3.40 1.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4386.0 4390.5 4395.0 4399.4 4403.9 4408.0 litres/min
Take litres 4.50 4.50 4.40 4.50 4.10
0.91 Average Take l/m 4.50 4.50 4.40 4.50 4.10 4.40 1.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4413.0 4419.0 4424.2 4430.0 4435.8 4441.2 litres/min
Take litres 6.00 5.20 5.80 5.80 5.40
1.38 Average Take l/m 6.00 5.20 5.80 5.80 5.40 5.64 1.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4444.0 4448.2 4453.5 4457.0 4461.8 4466.0 litres/min
Take litres 4.20 5.30 3.50 4.80 4.20
0.91 Average Take l/m 4.20 5.30 3.50 4.80 4.20 4.40 1.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4469.0 4472.5 4476.5 4480.0 4483.5 4487.1 litres/min
Take litres 3.50 4.00 3.50 3.50 3.60
0.46 Average Take l/m 3.50 4.00 3.50 3.50 3.60 3.62 1.65
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.646 MAX k= 1.65E-05
DETERMINATION:
MIN Lu= 1.419 MIN k= 1.42E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.419 AVG k= 1.42E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
No leakage observed at stuff box.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GTKITSAULT
Primary Crusher (Second Proposed Location)
STAGE PRESSURE VERSUS LUGEON VALUE
1.3
1.4
1.4
1.5
1.5
1.6
1.6
1.7
1.7
0.46 0.91 1.38 0.91 0.46Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.1
1.6
2.1
1.6
1.1
0.0
0.5
1.0
1.5
2.0
2.5
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-61 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]3 Rev'd 08/24/09
SHEET 2 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 10.0 m TOP OF TEST INTERVAL: 101.00 30.79
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 152.00 46.34 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4535.0 4536.0 4537.5 4538.5 4539.5 4540.5 litres/min
Take litres 1.00 1.50 1.00 1.00 1.00
1.14 Average Take l/m 1.00 1.50 1.00 1.00 1.00 1.10 0.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4541.5 4542.5 4543.8 4544.8 4546.0 4547.0 litres/min
Take litres 1.00 1.30 1.00 1.20 1.00
2.28 Average Take l/m 1.00 1.30 1.00 1.20 1.00 1.10 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4549.0 4550.8 4552.2 4553.8 4555.1 4556.3 litres/min
Take litres 1.80 1.40 1.60 1.30 1.20
3.45 Average Take l/m 1.80 1.40 1.60 1.30 1.20 1.46 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4557.0 4558.2 4559.5 4560.8 4561.9 4563.2 litres/min
Take litres 1.20 1.30 1.30 1.10 1.30
2.28 Average Take l/m 1.20 1.30 1.30 1.10 1.30 1.24 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4564.0 4565.0 4566.1 4567.1 4568.1 4569.2 litres/min
Take litres 1.00 1.10 1.00 1.00 1.10
1.14 Average Take l/m 1.00 1.10 1.00 1.00 1.10 1.04 0.30
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.318 MAX k= 3.18E-06
DETERMINATION:
MIN Lu= 0.207 MIN k= 2.07E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.207 AVG k= 2.07E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT Yes
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
Leakage observed at stuffing box throughout test.
Water level continuously rising when taken.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Primary Crusher (Second Proposed Location)
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
1.14 2.28 3.45 2.28 1.14Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.2
3.4
4.5
3.4
2.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-62 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]4 Rev'd 08/24/09
SHEET 3 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 151.00 46.04
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 202.00 61.59 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4618.5 4621.0 4623.0 4625.1 4627.2 4629.1 litres/min
Take litres 2.50 2.00 2.10 2.10 1.90
1.71 Average Take l/m 2.50 2.00 2.10 2.10 1.90 2.12 0.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4660.0 4706.0 4749.0 4793.0 4837.0 4879.0 litres/min
Take litres 46.00 43.00 44.00 44.00 42.00
3.41 Average Take l/m 46.00 43.00 44.00 44.00 42.00 43.80 7.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4905.0 4971.0 5033.0 5096.0 5156.0 5215.0 litres/min
Take litres 66.00 62.00 63.00 60.00 59.00
5.17 Average Take l/m 66.00 62.00 63.00 60.00 59.00 62.00 6.93
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5235.0 5282.0 5330.0 5378.0 5425.0 5471.0 litres/min
Take litres 47.00 48.00 48.00 47.00 46.00
3.41 Average Take l/m 47.00 48.00 48.00 47.00 46.00 47.20 7.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5490.0 5524.5 5559.0 5593.0 5628.0 5662.0 litres/min
Take litres 34.50 34.50 34.00 35.00 34.00
1.71 Average Take l/m 34.50 34.50 34.00 35.00 34.00 34.40 9.66
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 9.663 MAX k= 9.66E-05
DETERMINATION:
MIN Lu= 0.596 MIN k= 5.96E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 6.930 AVG k= 6.93E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
No leakage observed at stuffing box throughout test.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GTKITSAULT
Primary Crusher (Second Proposed Location)
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
2.0
4.0
6.0
8.0
10.0
12.0
1.71 3.41 5.17 3.41 1.71Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.3
4.0
5.8
4.0
2.3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-63 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]5 Rev'd 08/25/09
SHEET 4 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 201.00 61.28
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 252.00 76.83 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 15838.0 15841.4 15844.0 15846.8 15849.1 15851.5 litres/min
Take litres 3.40 2.60 2.80 2.30 2.40
2.28 Average Take l/m 3.40 2.60 2.80 2.30 2.40 2.70 0.59
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 15855.0 15858.9 15862.3 15865.5 15869.0 15872.1 litres/min
Take litres 3.90 3.40 3.20 3.50 3.10
4.55 Average Take l/m 3.90 3.40 3.20 3.50 3.10 3.42 0.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 15880.0 15886.1 15891.5 15896.5 15901.5 15906.6 litres/min
Take litres 6.10 5.40 5.00 5.00 5.10
6.89 Average Take l/m 6.10 5.40 5.00 5.00 5.10 5.32 0.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 15909.0 15912.5 15915.8 15919.0 15922.0 15925.2 litres/min
Take litres 3.50 3.30 3.20 3.00 3.20
4.55 Average Take l/m 3.50 3.30 3.20 3.00 3.20 3.24 0.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 15927.0 15928.9 15930.8 15932.9 15934.9 15936.9 litres/min
Take litres 1.90 1.90 2.10 2.00 2.00
2.21 Average Take l/m 1.90 1.90 2.10 2.00 2.00 1.98 0.44
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.586 MAX k= 5.86E-06
DETERMINATION:
MIN Lu= 0.398 MIN k= 3.98E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.459 AVG k= 4.59E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
No leakage observed at stuffing box.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GTKITSAULT
Primary Crusher (Second Proposed Location)
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
2.28 4.55 6.89 4.55 2.21Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.0
5.2
7.6
5.2
2.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 25AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-64 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]6 Rev'd 08/25/09
SHEET 5 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 251.00 76.52
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 292.00 89.02 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6022.2 6023.9 6025.2 6026.9 6028.2 6029.8 litres/min
Take litres 1.70 1.30 1.70 1.30 1.60
2.84 Average Take l/m 1.70 1.30 1.70 1.30 1.60 1.52 0.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6031.0 6033.5 6036.1 6038.8 6041.0 6043.2 litres/min
Take litres 2.50 2.60 2.70 2.20 2.20
5.69 Average Take l/m 2.50 2.60 2.70 2.20 2.20 2.44 0.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6046.0 6050.5 6054.8 6059.0 6063.0 6067.0 litres/min
Take litres 4.50 4.30 4.20 4.00 4.00
8.62 Average Take l/m 4.50 4.30 4.20 4.00 4.00 4.20 0.36
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6070.5 6073.2 6076.2 6078.8 6081.3 6084.1 litres/min
Take litres 2.70 3.00 2.60 2.50 2.80
5.69 Average Take l/m 2.70 3.00 2.60 2.50 2.80 2.72 0.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6085.0 6086.7 6088.1 6090.0 6091.4 6093.0 litres/min
Take litres 1.70 1.40 1.90 1.40 1.60
2.84 Average Take l/m 1.70 1.40 1.90 1.40 1.60 1.60 0.36
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.362 MAX k= 3.62E-06
DETERMINATION:
MIN Lu= 0.306 MIN k= 3.06E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.343 AVG k= 3.43E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
No leakage observed at stuffing box throughout test.
Water level rising when taken.
TEST BY: CD REVIEWED BY: LS
KITSAULT
Primary Crusher (Second Proposed Location)
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
2.84 5.69 8.62 5.69 2.84Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.5
6.4
9.3
6.4
3.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 25AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-65 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]7 Rev'd 08/25/09
SHEET 6 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 7
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 291.00 88.72
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 332.00 101.22 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6280.0 6283.0 6285.2 6287.8 6290.0 6292.4 litres/min
Take litres 3.00 2.20 2.60 2.20 2.40
3.41 Average Take l/m 3.00 2.20 2.60 2.20 2.40 2.48 0.48
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6294.1 6298.4 6302.2 6306.0 6309.5 6313.1 litres/min
Take litres 4.30 3.80 3.80 3.50 3.60
6.83 Average Take l/m 4.30 3.80 3.80 3.50 3.60 3.80 0.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6321.0 6329.0 6336.5 6343.7 6350.5 6357.1 litres/min
Take litres 8.00 7.50 7.20 6.80 6.60
10.34 Average Take l/m 8.00 7.50 7.20 6.80 6.60 7.22 0.52
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6360.0 6365.0 6369.8 6374.5 6379.0 6384.0 litres/min
Take litres 5.00 4.80 4.70 4.50 5.00
6.83 Average Take l/m 5.00 4.80 4.70 4.50 5.00 4.80 0.51
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6386.0 6388.3 6392.6 6395.5 6398.9 6402.0 litres/min
Take litres 2.30 4.30 2.90 3.40 3.10
3.41 Average Take l/m 2.30 4.30 2.90 3.40 3.10 3.20 0.62
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.624 MAX k= 6.24E-06
DETERMINATION:
MIN Lu= 0.404 MIN k= 4.04E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.509 AVG k= 5.09E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.
No leakage observed at stuffing box throughout test.
Water level rising when taken.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/05/09 21:28
101-343/3 K09-09GTKITSAULT
Primary Crusher (Second Proposed Location)
STAGE PRESSURE VERSUS LUGEON VALUE
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
3.41 6.83 10.34 6.83 3.41Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.1
7.5
11.0
7.5
4.1
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 25AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-66 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]1 Rev'd 08/27/09
SHEET 1 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 19.50 5.95
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 62.00 18.90 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 16579.2 16580.0 16580.7 16581.5 16582.5 16583.5 litres/min
Take litres 0.80 0.70 0.80 1.00 1.00
0.21 Average Take l/m 0.80 0.70 0.80 1.00 1.00 0.86 0.74
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 16608.7 16616.0 16622.7 16628.5 16634.0 16639.5 litres/min
Take litres 7.30 6.70 5.80 5.50 5.50
0.41 Average Take l/m 7.30 6.70 5.80 5.50 5.50 6.16 4.33
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 16667.5 16675.5 16683.5 16691.0 16699.0 16707.0 litres/min
Take litres 8.00 8.00 7.50 8.00 8.00
0.62 Average Take l/m 8.00 8.00 7.50 8.00 8.00 7.90 4.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 16721.0 16725.0 16729.0 16732.9 16737.0 16741.0 litres/min
Take litres 4.00 4.00 3.90 4.10 4.00
0.41 Average Take l/m 4.00 4.00 3.90 4.10 4.00 4.00 2.81
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 16744.9 16747.0 16749.0 16751.1 16753.2 16755.4 litres/min
Take litres 2.10 2.00 2.10 2.10 2.20
0.28 Average Take l/m 2.10 2.00 2.10 2.10 2.20 2.10 1.69
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 4.670 MAX k= 4.67E-05
DETERMINATION:
MIN Lu= 0.744 MIN k= 7.44E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.848 AVG k= 2.85E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Pressure gauge limited to pressures above 3 psi. Results for first stage of test are suspect.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.21 0.41 0.62 0.41 0.28Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.9
1.1
1.3
1.1
1.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-67 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]2 Rev'd 08/27/09
SHEET 2 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 3.5 m TOP OF TEST INTERVAL: 61.00 18.60
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 112.00 34.15 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6920.0 6946.0 6971.5 6997.0 7021.5 7047.0 litres/min
Take litres 26.00 25.50 25.50 24.50 25.50
0.71 Average Take l/m 26.00 25.50 25.50 24.50 25.50 25.40 14.33
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7067.0 7102.0 7140.0 7177.0 7213.0 7249.0 litres/min
Take litres 35.00 38.00 37.00 36.00 36.00
1.41 Average Take l/m 35.00 38.00 37.00 36.00 36.00 36.40 12.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7270.0 7309.0 7347.0 7385.0 7421.5 7458.0 litres/min
Take litres 39.00 38.00 38.00 36.50 36.50
2.14 Average Take l/m 39.00 38.00 38.00 36.50 36.50 37.60 9.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7475.0 7502.5 7530.5 7558.5 7585.0 7615.0 litres/min
Take litres 27.50 28.00 28.00 26.50 30.00
1.41 Average Take l/m 27.50 28.00 28.00 26.50 30.00 28.00 9.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7624.0 7641.0 7659.0 7676.5 7693.5 7711.0 litres/min
Take litres 17.00 18.00 17.50 17.00 17.50
0.71 Average Take l/m 17.00 18.00 17.50 17.00 17.50 17.40 9.81
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 14.325 MAX k= 1.43E-04
DETERMINATION:
MIN Lu= 9.401 MIN k= 9.40E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 9.401 AVG k= 9.40E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Pressure steadily increasing during second interval.
TEST BY: CD REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.71 1.41 2.14 1.41 0.71Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.1
1.8
2.6
1.8
1.1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-68 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]3 Rev'd 08/27/09
SHEET 3 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 111.00 33.84
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 161.58 49.26 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8065.0 8103.0 8140.0 8177.0 8213.0 8249.0 litres/min
Take litres 38.00 37.00 37.00 36.00 36.00
1.25 Average Take l/m 38.00 37.00 37.00 36.00 36.00 36.80 12.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8280.0 8332.0 8386.0 8436.0 8487.0 8539.0 litres/min
Take litres 52.00 54.00 50.00 51.00 52.00
2.50 Average Take l/m 52.00 54.00 50.00 51.00 52.00 51.80 10.54
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8570.0 8635.0 8696.0 8756.0 8815.0 8874.0 litres/min
Take litres 65.00 61.00 60.00 59.00 59.00
3.79 Average Take l/m 65.00 61.00 60.00 59.00 59.00 60.80 8.81
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8900.0 8945.0 8989.0 9033.0 9078.0 9123.0 litres/min
Take litres 45.00 44.00 44.00 45.00 45.00
2.50 Average Take l/m 45.00 44.00 44.00 45.00 45.00 44.60 9.07
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9144.0 9174.5 9205.0 9234.0 9265.0 9295.0 litres/min
Take litres 30.50 30.50 29.00 31.00 30.00
1.25 Average Take l/m 30.50 30.50 29.00 31.00 30.00 30.20 10.11
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 12.324 MAX k= 1.23E-04
DETERMINATION:
MIN Lu= 8.806 MIN k= 8.81E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 8.806 AVG k= 8.81E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level rising when taken
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
1.25 2.50 3.79 2.50 1.25Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.9
3.2
4.5
3.2
1.9
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-69 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]4 Rev'd 08/27/09
SHEET 4 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 6.3 m TOP OF TEST INTERVAL: 161.00 49.09
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 212.00 64.63 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9495.0 9515.0 9535.0 9555.0 9575.0 9594.0 litres/min
Take litres 20.00 20.00 20.00 20.00 19.00
1.82 Average Take l/m 20.00 20.00 20.00 20.00 19.00 19.80 5.02
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9610.0 9639.5 9668.0 9696.0 9724.0 9751.0 litres/min
Take litres 29.50 28.50 28.00 28.00 27.00
3.64 Average Take l/m 29.50 28.50 28.00 28.00 27.00 28.20 4.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9775.0 9814.0 9851.5 9889.0 9926.0 9962.0 litres/min
Take litres 39.00 37.50 37.50 37.00 36.00
5.52 Average Take l/m 39.00 37.50 37.50 37.00 36.00 37.40 3.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9979.0 10009.0 10038.0 10067.0 10097.0 10127.0 litres/min
Take litres 30.00 29.00 29.00 30.00 30.00
3.64 Average Take l/m 30.00 29.00 29.00 30.00 30.00 29.60 4.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10140.0 10162.0 10183.0 10204.0 10225.0 10247.0 litres/min
Take litres 22.00 21.00 21.00 21.00 22.00
1.82 Average Take l/m 22.00 21.00 21.00 21.00 22.00 21.40 5.43
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 5.429 MAX k= 5.43E-05
DETERMINATION:
MIN Lu= 3.860 MIN k= 3.86E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 3.860 AVG k= 3.86E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level rising when taken
TEST BY: CD REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
1.0
2.0
3.0
4.0
5.0
6.0
1.82 3.64 5.52 3.64 1.82Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.5
4.4
6.2
4.4
2.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-70 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]5 Rev'd 08/28/09
SHEET 5 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 7.0 m TOP OF TEST INTERVAL: 211.00 64.33
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 28-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 262.00 79.88 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20363.0 20366.0 20368.9 20371.2 20373.8 20376.4 litres/min
Take litres 3.00 2.90 2.30 2.60 2.60
2.41 Average Take l/m 3.00 2.90 2.30 2.60 2.60 2.68 0.54
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20416.5 20421.5 20426.5 20431.5 20436.5 20441.5 litres/min
Take litres 5.00 5.00 5.00 5.00 5.00
4.90 Average Take l/m 5.00 5.00 5.00 5.00 5.00 5.00 0.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20468.0 20475.0 20482.0 20488.5 20495.5 20501.5 litres/min
Take litres 7.00 7.00 6.50 7.00 6.00
7.24 Average Take l/m 7.00 7.00 6.50 7.00 6.00 6.70 0.54
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20513.0 20516.1 20519.5 20522.5 20526.0 20529.0 litres/min
Take litres 3.10 3.40 3.00 3.50 3.00
4.76 Average Take l/m 3.10 3.40 3.00 3.50 3.00 3.20 0.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20523.2 20524.6 20526.0 20527.4 20528.9 20530.4 litres/min
Take litres 1.40 1.40 1.40 1.50 1.50
2.34 Average Take l/m 1.40 1.40 1.40 1.50 1.50 1.44 0.30
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.566 MAX k= 5.66E-06
DETERMINATION:
MIN Lu= 0.296 MIN k= 2.96E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.462 AVG k= 4.62E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Took some time for pressure to equalize between test steps
TEST BY: BDP REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
2.41 4.90 7.24 4.76 2.34Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.2
5.7
8.0
5.5
3.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-71 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]6 Rev'd 08/28/09
SHEET 6 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 7.5 m TOP OF TEST INTERVAL: 261.00 79.57
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 28-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 332.00 101.22 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 736.6 742.1 747.2 752.1 756.9 761.5 litres/min
Take litres 5.50 5.10 4.90 4.80 4.60
3.45 Average Take l/m 5.50 5.10 4.90 4.80 4.60 4.98 0.54
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 818.0 826.5 834.9 843.0 851.0 859.0 litres/min
Take litres 8.50 8.40 8.10 8.00 8.00
6.89 Average Take l/m 8.50 8.40 8.10 8.00 8.00 8.20 0.49
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 904.0 918.0 933.0 951.0 968.0 984.5 litres/min
Take litres 14.00 15.00 18.00 17.00 16.50
10.34 Average Take l/m 14.00 15.00 18.00 17.00 16.50 16.10 0.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1039.0 1047.0 1054.5 1062.0 1069.5 1077.0 litres/min
Take litres 8.00 7.50 7.50 7.50 7.50
6.89 Average Take l/m 8.00 7.50 7.50 7.50 7.50 7.60 0.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1080.0 1085.5 1090.4 1095.5 1100.5 1105.5 litres/min
Take litres 5.50 4.90 5.10 5.00 5.00
3.45 Average Take l/m 5.50 4.90 5.10 5.00 5.00 5.10 0.55
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.666 MAX k= 6.66E-06
DETERMINATION:
MIN Lu= 0.455 MIN k= 4.55E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.508 AVG k= 5.08E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Pressure fluctuating during test.
TEST BY: BDP/CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 21:27
101-343/3 K09-10GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.3
7.7
11.2
7.7
4.3
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP/CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-72 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]1 Rev'd 08/29/09
SHEET 1 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.7 m TOP OF TEST INTERVAL: 25.00 7.62
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 29-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 71.00 21.65 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1201.0 1211.5 1222.0 1231.5 1241.0 1249.0 litres/min
Take litres 10.50 10.50 9.50 9.50 8.00
0.23 Average Take l/m 10.50 10.50 9.50 9.50 8.00 9.60 17.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1263.0 1275.5 1287.5 1299.5 1311.0 1323.0 litres/min
Take litres 12.50 12.00 12.00 11.50 12.00
0.46 Average Take l/m 12.50 12.00 12.00 11.50 12.00 12.00 13.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1332.0 1348.0 1362.0 1377.0 1392.0 1406.5 litres/min
Take litres 16.00 14.00 15.00 15.00 14.50
0.69 Average Take l/m 16.00 14.00 15.00 15.00 14.50 14.90 12.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1417.0 1426.5 1436.0 1444.5 1455.0 1464.5 litres/min
Take litres 9.50 9.50 8.50 10.50 9.50
0.46 Average Take l/m 9.50 9.50 8.50 10.50 9.50 9.50 10.89
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1477.0 1483.0 1489.0 1495.0 1501.5 1508.0 litres/min
Take litres 6.00 6.00 6.00 6.50 6.50
0.23 Average Take l/m 6.00 6.00 6.00 6.50 6.50 6.20 11.21
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 17.350 MAX k= 1.74E-04
DETERMINATION:
MIN Lu= 10.890 MIN k= 1.09E-04
INTERPRETATION cm/s
REFERENCE: AVG Lu= 11.205 AVG k= 1.12E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level taken after test.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
0.23 0.46 0.69 0.46 0.23Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
0.4
0.6
0.9
0.6
0.4
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-73 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]2 Rev'd 08/30/09
SHEET 2 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 3.0 m TOP OF TEST INTERVAL: 68.00 20.73
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 121.00 36.89 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21561.0 21565.5 21569.9 21574.5 21578.5 21583.0 litres/min
Take litres 4.50 4.40 4.60 4.00 4.50
0.90 Average Take l/m 4.50 4.40 4.60 4.00 4.50 4.40 2.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21613.5 21620.0 21628.6 21636.3 21644.0 21651.5 litres/min
Take litres 6.50 8.60 7.70 7.70 7.50
1.65 Average Take l/m 6.50 8.60 7.70 7.70 7.50 7.60 2.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21675.0 21686.0 21698.0 21708.0 21718.5 21729.0 litres/min
Take litres 11.00 12.00 10.00 10.50 10.50
2.41 Average Take l/m 11.00 12.00 10.00 10.50 10.50 10.80 2.38
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21740.0 21746.9 21753.5 21760.2 21767.3 21774.1 litres/min
Take litres 6.90 6.60 6.70 7.10 6.80
1.65 Average Take l/m 6.90 6.60 6.70 7.10 6.80 6.82 2.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21777.0 21780.0 21783.1 21786.5 21789.8 21793.1 litres/min
Take litres 3.00 3.10 3.40 3.30 3.30
0.83 Average Take l/m 3.00 3.10 3.40 3.30 3.30 3.22 1.63
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.380 MAX k= 2.38E-05
DETERMINATION:
MIN Lu= 1.630 MIN k= 1.63E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.095 AVG k= 2.09E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level taken pior to test, but is influenced by drilling. Water level rising when taken.
TEST BY: BDP REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
0.90 1.65 2.41 1.65 0.83Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.3
2.0
2.8
2.0
1.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-74 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]3 Rev'd 08/30/09
SHEET 3 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 3.0 m TOP OF TEST INTERVAL: 118.00 35.98
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 171.00 52.13 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21831.0 21834.0 21836.5 21839.0 21841.5 21843.9 litres/min
Take litres 3.00 2.50 2.50 2.50 2.40
1.38 Average Take l/m 3.00 2.50 2.50 2.50 2.40 2.58 0.90
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21853.0 21856.9 21860.5 21864.0 21867.3 21870.5 litres/min
Take litres 3.90 3.60 3.50 3.30 3.20
2.76 Average Take l/m 3.90 3.60 3.50 3.30 3.20 3.50 0.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21881.0 21886.5 21891.5 21896.5 21901.5 21906.3 litres/min
Take litres 5.50 5.00 5.00 5.00 4.80
4.14 Average Take l/m 5.50 5.00 5.00 5.00 4.80 5.06 0.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21910.0 21913.0 21916.0 21919.0 21922.0 21925.0 litres/min
Take litres 3.00 3.00 3.00 3.00 3.00
2.69 Average Take l/m 3.00 3.00 3.00 3.00 3.00 3.00 0.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21924.0 21925.0 21926.3 21927.5 21928.8 21929.9 litres/min
Take litres 1.00 1.30 1.20 1.30 1.10
1.31 Average Take l/m 1.00 1.30 1.20 1.30 1.10 1.18 0.43
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.900 MAX k= 9.00E-06
DETERMINATION:
MIN Lu= 0.428 MIN k= 4.28E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.428 AVG k= 4.28E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level taken pior to test, but is influenced by drilling. Water level rising when taken.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.38 2.76 4.14 2.69 1.31Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.8
3.2
4.5
3.1
1.7
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-75 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]4 Rev'd 08/30/09
SHEET 4 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 23.4 m TOP OF TEST INTERVAL: 170.00 51.83
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 221.00 67.38 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1973.0 1974.5 1975.8 1977.0 1978.0 1979.1 litres/min
Take litres 1.50 1.30 1.20 1.00 1.10
1.93 Average Take l/m 1.50 1.30 1.20 1.00 1.10 1.22 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1981.2 1982.5 1983.8 1985.0 1986.0 1987.0 litres/min
Take litres 1.30 1.30 1.20 1.00 1.00
3.87 Average Take l/m 1.30 1.30 1.20 1.00 1.00 1.16 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1989.5 1991.0 1992.8 1994.2 1995.8 1997.3 litres/min
Take litres 1.50 1.80 1.40 1.60 1.50
5.86 Average Take l/m 1.50 1.80 1.40 1.60 1.50 1.56 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1998.0 1999.0 2000.2 2001.2 2002.5 2003.5 litres/min
Take litres 1.00 1.20 1.00 1.30 1.00
3.87 Average Take l/m 1.00 1.20 1.00 1.30 1.00 1.10 0.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2004.0 2004.8 2005.2 2006.0 2006.8 2007.3 litres/min
Take litres 0.80 0.40 0.80 0.80 0.50
1.93 Average Take l/m 0.80 0.40 0.80 0.80 0.50 0.66 0.10
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.179 MAX k= 1.79E-06
DETERMINATION:
MIN Lu= 0.097 MIN k= 9.71E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.126 AVG k= 1.26E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
TEST BY: CD REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
1.93 3.87 5.86 3.87 1.93Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.4
6.3
8.3
6.3
4.4
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-76 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]5 Rev'd 08/30/09
SHEET 5 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 2.3 m TOP OF TEST INTERVAL: 220.00 67.07
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 271.00 82.62 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2058.0 2065.0 2072.0 2078.5 2084.5 2090.5 litres/min
Take litres 7.00 7.00 6.50 6.00 6.00
2.50 Average Take l/m 7.00 7.00 6.50 6.00 6.00 6.50 1.48
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2099.0 2109.5 2119.0 2128.5 2138.5 2148.5 litres/min
Take litres 10.50 9.50 9.50 10.00 10.00
5.01 Average Take l/m 10.50 9.50 9.50 10.00 10.00 9.90 1.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2158.0 2172.0 2185.0 2197.0 2209.0 2220.5 litres/min
Take litres 14.00 13.00 12.00 12.00 11.50
7.58 Average Take l/m 14.00 13.00 12.00 12.00 11.50 12.50 1.02
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2225.0 2234.0 2243.0 2252.0 2260.0 2269.0 litres/min
Take litres 9.00 9.00 9.00 8.00 9.00
5.01 Average Take l/m 9.00 9.00 9.00 8.00 9.00 8.80 1.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2271.5 2277.0 2282.5 2288.5 2294.0 2299.8 litres/min
Take litres 5.50 5.50 6.00 5.50 5.80
2.50 Average Take l/m 5.50 5.50 6.00 5.50 5.80 5.66 1.29
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.476 MAX k= 1.48E-05
DETERMINATION:
MIN Lu= 1.016 MIN k= 1.02E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.016 AVG k= 1.02E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level taken after test.
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
2.50 5.01 7.58 5.01 2.50Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.8
5.3
7.9
5.3
2.8
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-77 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]6 Rev'd 08/31/09
SHEET 6 of 6
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 270.00 82.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 31-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 331.00 100.91 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 22445.0 22452.6 22460.0 22467.5 22475.0 22482.7 litres/min
Take litres 7.60 7.40 7.50 7.50 7.70
3.10 Average Take l/m 7.60 7.40 7.50 7.50 7.70 7.54 1.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 22540.0 22549.7 22558.9 22568.5 22578.0 22587.2 litres/min
Take litres 9.70 9.20 9.60 9.50 9.20
6.07 Average Take l/m 9.70 9.20 9.60 9.50 9.20 9.44 0.78
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 22622.0 22636.5 22649.5 22663.0 22676.0 22689.0 litres/min
Take litres 14.50 13.00 13.50 13.00 13.00
9.10 Average Take l/m 14.50 13.00 13.50 13.00 13.00 13.40 0.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 22721.0 22730.0 22739.0 22748.0 22757.0 22766.0 litres/min
Take litres 9.00 9.00 9.00 9.00 9.00
5.93 Average Take l/m 9.00 9.00 9.00 9.00 9.00 9.00 0.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 22780.0 22785.5 22791.0 22796.5 22802.0 22807.5 litres/min
Take litres 5.50 5.50 5.50 5.50 5.50
2.96 Average Take l/m 5.50 5.50 5.50 5.50 5.50 5.50 0.87
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.146 MAX k= 1.15E-05
DETERMINATION:
MIN Lu= 0.756 MIN k= 7.56E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.756 AVG k= 7.56E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.
No leakage observed at stuff box.
Water level taken pior to test, but is influenced by drilling. Water level rising when taken.
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:51
101-343/3 K09-11GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
3.10 6.07 9.10 5.93 2.96Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.5
6.5
9.5
6.4
3.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-78 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]4 Rev'd 09/04/09
SHEET 1 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 206.00 62.80
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 252.00 76.83 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 26670.0 26701.5 26732.0 26762.0 26793.0 26824.0 litres/min
Take litres 31.50 30.50 30.00 31.00 31.00
2.34 Average Take l/m 31.50 30.50 30.00 31.00 31.00 30.80 3.77
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27010.0 27055.5 27101.5 27147.0 27193.0 27237.5 litres/min
Take litres 45.50 46.00 45.50 46.00 44.50
4.69 Average Take l/m 45.50 46.00 45.50 46.00 44.50 45.50 3.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27390.0 27459.0 27527.5 27597.5 27667.5 27736.5 litres/min
Take litres 69.00 68.50 70.00 70.00 69.00
6.76 Average Take l/m 69.00 68.50 70.00 70.00 69.00 69.30 4.82
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 27986.0 28040.0 28095.0 28151.0 28205.0 28259.0 litres/min
Take litres 54.00 55.00 56.00 54.00 54.00
4.96 Average Take l/m 54.00 55.00 56.00 54.00 54.00 54.60 4.61
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28350.0 28384.0 28417.5 28450.5 28483.5 28516.0 litres/min
Take litres 34.00 33.50 33.00 33.00 32.50
2.07 Average Take l/m 34.00 33.50 33.00 33.00 32.50 33.20 4.26
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 4.825 MAX k= 4.82E-05
DETERMINATION:
MIN Lu= 3.768 MIN k= 3.77E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 4.286 AVG k= 4.29E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
During first attempt, leak observed in packer. On second (final) attempt quite some time to fill rods required. Suspect some leakage around packer at P3
TEST BY: BDP REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
1.0
2.0
3.0
4.0
5.0
6.0
2.34 4.69 6.76 4.96 2.07Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
5.8
8.2
10.2
8.4
5.6
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CD LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-79 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]5 Rev'd 09/4/09
SHEET 2 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 245.00 74.70
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 292.00 89.02 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 28967.0 28976.0 28984.5 28993.0 29001.0 29009.0 litres/min
Take litres 9.00 8.50 8.50 8.00 8.00
2.90 Average Take l/m 9.00 8.50 8.50 8.00 8.00 8.40 0.92
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29021.0 29035.0 29048.0 29061.0 29073.0 29085.0 litres/min
Take litres 14.00 13.00 13.00 12.00 12.00
5.79 Average Take l/m 14.00 13.00 13.00 12.00 12.00 12.80 0.96
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29172.0 29188.0 29203.0 29218.0 29233.0 29248.0 litres/min
Take litres 16.00 15.00 15.00 15.00 15.00
8.55 Average Take l/m 16.00 15.00 15.00 15.00 15.00 15.20 0.88
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29258.0 29269.0 29280.0 29290.0 29301.0 29312.0 litres/min
Take litres 11.00 11.00 10.00 11.00 11.00
5.72 Average Take l/m 11.00 11.00 10.00 11.00 11.00 10.80 0.82
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 29320.0 29328.0 29336.0 29344.0 29351.5 29359.0 litres/min
Take litres 8.00 8.00 8.00 7.50 7.50
2.90 Average Take l/m 8.00 8.00 8.00 7.50 7.50 7.80 0.85
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.963 MAX k= 9.63E-06
DETERMINATION:
MIN Lu= 0.819 MIN k= 8.19E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.853 AVG k= 8.53E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
Nitrogen bottle changed, water leaking out of stuffing box estimated at .25L/min
TEST BY: LS REVIEWED BY: CD
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
0.8
0.8
0.9
0.9
1.0
1.0
2.90 5.79 8.55 5.72 2.90Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.4
9.3
12.0
9.2
6.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 4SEP'09 ISSUED WITH REPORT 101-343/3-1 LS CD KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-80 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]6 Rev'd 09/4/09
SHEET 3 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 6
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 296.00 90.24
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 342.00 104.27 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9618.0 9627.5 9636.5 9645.0 9653.0 9660.5 litres/min
Take litres 9.50 9.00 8.50 8.00 7.50
3.45 Average Take l/m 9.50 9.00 8.50 8.00 7.50 8.50 0.87
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9666.0 9677.0 9686.5 9695.5 9705.0 9714.0 litres/min
Take litres 11.00 9.50 9.00 9.50 9.00
6.89 Average Take l/m 11.00 9.50 9.00 9.50 9.00 9.60 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9735.0 9746.0 9757.0 9768.0 9778.0 9788.0 litres/min
Take litres 11.00 11.00 11.00 10.00 10.00
10.34 Average Take l/m 11.00 11.00 11.00 10.00 10.00 10.60 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9795.0 9803.0 9810.0 9817.5 9825.0 9832.0 litres/min
Take litres 8.00 7.00 7.50 7.50 7.00
6.89 Average Take l/m 8.00 7.00 7.50 7.50 7.00 7.40 0.51
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9836.0 9841.0 9846.0 9851.0 9856.0 9860.5 litres/min
Take litres 5.00 5.00 5.00 5.00 4.50
3.45 Average Take l/m 5.00 5.00 5.00 5.00 4.50 4.90 0.50
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.874 MAX k= 8.74E-06
DETERMINATION:
MIN Lu= 0.504 MIN k= 5.04E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.504 AVG k= 5.04E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
No leakage from stuff box
TEST BY: CD REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.9
10.4
13.8
10.4
6.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 4SEP'09 ISSUED WITH REPORT 101-343/3-1 CDCD
LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-81 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]7 Rev'd 09/5/09
SHEET 4 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 7
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 346.00 105.49
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 392.00 119.51 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30054.0 30057.0 30060.0 30062.0 30065.0 30067.0 litres/min
Take litres 3.00 3.00 2.00 3.00 2.00
3.45 Average Take l/m 3.00 3.00 2.00 3.00 2.00 2.60 0.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30077.0 30080.0 30084.0 30087.0 30090.0 30093.0 litres/min
Take litres 3.00 4.00 3.00 3.00 3.00
6.89 Average Take l/m 3.00 4.00 3.00 3.00 3.00 3.20 0.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30101.0 30105.0 30109.0 30113.0 30117.0 30121.0 litres/min
Take litres 4.00 4.00 4.00 4.00 4.00
10.34 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30125.0 30128.0 30131.0 30133.0 30136.0 30139.0 litres/min
Take litres 3.00 3.00 2.00 3.00 3.00
6.89 Average Take l/m 3.00 3.00 2.00 3.00 3.00 2.80 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30142.0 30143.0 30145.0 30147.0 30149.0 30150.0 litres/min
Take litres 1.00 2.00 2.00 2.00 1.00
3.45 Average Take l/m 1.00 2.00 2.00 2.00 1.00 1.60 0.16
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.267 MAX k= 2.67E-06
DETERMINATION:
MIN Lu= 0.165 MIN k= 1.65E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.165 AVG k= 1.65E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
No leakage from stuff box
TEST BY: CNH REVIEWED BY: LS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.9
10.4
13.8
10.4
6.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CNHCD
LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-82 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]8 Rev'd 09/5/09
SHEET 5 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 8
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 396.00 120.73
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 442.00 134.76 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30348.0 30350.0 30353.0 30356.0 30358.0 30360.0 litres/min
Take litres 2.00 3.00 3.00 2.00 2.00
3.45 Average Take l/m 2.00 3.00 3.00 2.00 2.00 2.40 0.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30368.0 30371.0 30374.0 30378.0 30381.0 30384.0 litres/min
Take litres 3.00 3.00 4.00 3.00 3.00
6.89 Average Take l/m 3.00 3.00 4.00 3.00 3.00 3.20 0.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30393.0 30397.0 30401.0 30405.0 30409.0 30413.0 litres/min
Take litres 4.00 4.00 4.00 4.00 4.00
10.34 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30418.0 30421.0 30424.0 30427.0 30430.0 30432.0 litres/min
Take litres 3.00 3.00 3.00 3.00 2.00
6.89 Average Take l/m 3.00 3.00 3.00 3.00 2.00 2.80 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30436.0 30437.0 30439.0 30441.0 30443.0 30444.0 litres/min
Take litres 1.00 2.00 2.00 2.00 1.00
3.45 Average Take l/m 1.00 2.00 2.00 2.00 1.00 1.60 0.16
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.247 MAX k= 2.47E-06
DETERMINATION:
MIN Lu= 0.165 MIN k= 1.65E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.165 AVG k= 1.65E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
No leakage from stuff box
TEST BY: CNH REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
6.9
10.4
13.8
10.4
6.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CNHCD
LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-83 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]9 Rev'd 09/5/09
SHEET 6 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 9
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 446.00 135.98
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 492.00 150.00 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30652.0 30656.0 30660.0 30663.5 30667.0 30670.0 litres/min
Take litres 4.00 4.00 3.50 3.50 3.00
3.52 Average Take l/m 4.00 4.00 3.50 3.50 3.00 3.60 0.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30675.0 30679.0 30683.5 30687.0 30691.0 30695.0 litres/min
Take litres 4.00 4.50 3.50 4.00 4.00
7.03 Average Take l/m 4.00 4.50 3.50 4.00 4.00 4.00 0.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30704.0 30785.0 30712.3 30716.5 30721.0 30724.5 litres/min
Take litres 81.00 -72.75 4.25 4.50 3.50
10.34 Average Take l/m 81.00 -72.75 4.25 4.50 3.50 4.10 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30731.0 30733.5 30736.0 30739.0 30742.0 30745.0 litres/min
Take litres 2.50 2.50 3.00 3.00 3.00
6.89 Average Take l/m 2.50 2.50 3.00 3.00 3.00 2.80 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30746.0 30748.0 30749.5 30751.0 30753.0 30755.0 litres/min
Take litres 2.00 1.50 1.50 2.00 2.00
3.52 Average Take l/m 2.00 1.50 1.50 2.00 2.00 1.80 0.18
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.367 MAX k= 3.67E-06
DETERMINATION:
MIN Lu= 0.183 MIN k= 1.83E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.183 AVG k= 1.83E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
Water leaking from stuffing box, ~0.1L/min, flowmeter in m3.
TEST BY: LS REVIEWED BY: JS
KITSAULT
TAILINGS MANAGEMENT FACILITY
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
3.52 7.03 10.34 6.89 3.52Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.0
10.5
13.8
10.4
7.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 LSCD
JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-84 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]10 Rev'd 09/6/09
SHEET 7 of 7
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 10
DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 496.00 151.22
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 6-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 542.00 165.24 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30945.0 30946.0 30948.0 30949.0 30950.0 30952.0 litres/min
Take litres 1.00 2.00 1.00 1.00 2.00
3.52 Average Take l/m 1.00 2.00 1.00 1.00 2.00 1.40 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30956.0 30958.0 30960.0 30961.0 30963.0 30964.0 litres/min
Take litres 2.00 2.00 1.00 2.00 1.00
7.03 Average Take l/m 2.00 2.00 1.00 2.00 1.00 1.60 0.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30970.0 30972.0 30973.0 30975.0 30977.0 30978.0 litres/min
Take litres 2.00 1.00 2.00 2.00 1.00
10.34 Average Take l/m 2.00 1.00 2.00 2.00 1.00 1.60 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30979.0 30980.0 30981.0 30982.0 30983.0 30985.0 litres/min
Take litres 1.00 1.00 1.00 1.00 2.00
6.89 Average Take l/m 1.00 1.00 1.00 1.00 2.00 1.20 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 30985.5 30986.0 30987.0 30988.0 30988.5 30989.0 litres/min
Take litres 0.50 1.00 1.00 0.50 0.50
3.52 Average Take l/m 0.50 1.00 1.00 0.50 0.50 0.70 0.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.143 MAX k= 1.43E-06
DETERMINATION:
MIN Lu= 0.071 MIN k= 7.13E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.071 AVG k= 7.13E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.
Flowmeter in m3.
TEST BY: CNH REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/12/09 12:26
101-343/3 K09-13GTKITSAULT
TAILINGS MANAGEMENT FACILITY
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
3.52 7.03 10.34 6.89 3.52Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
7.0
10.5
13.8
10.4
7.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 LSCD
JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-85 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]1 Rev'd 09/07/09
SHEET 1 of 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 26.00 7.93
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 7-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 72.00 21.95 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31371.0 31371.3 31371.8 31372.3 31372.8 31373.3 litres/min
Take litres 0.25 0.50 0.50 0.50 0.50
0.41 Average Take l/m 0.25 0.50 0.50 0.50 0.50 0.45 0.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31374.0 31374.3 31374.5 31374.8 31375.0 31375.3 litres/min
Take litres 0.25 0.25 0.25 0.25 0.25
0.62 Average Take l/m 0.25 0.25 0.25 0.25 0.25 0.25 0.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31375.5 31376.0 31376.3 31376.8 31377.0 31377.3 litres/min
Take litres 0.50 0.25 0.50 0.25 0.25
0.83 Average Take l/m 0.50 0.25 0.50 0.25 0.25 0.35 0.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31378.0 31378.1 31378.3 31378.5 31378.8 31379.0 litres/min
Take litres 0.10 0.15 0.25 0.25 0.25
0.62 Average Take l/m 0.10 0.15 0.25 0.25 0.25 0.20 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31379.0 31379.0 31379.1 31379.3 31379.5 31379.8 litres/min
Take litres 0.00 0.10 0.15 0.25 0.25
0.41 Average Take l/m 0.00 0.10 0.15 0.25 0.25 0.15 0.06
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.192 MAX k= 1.92E-06
DETERMINATION:
MIN Lu= 0.064 MIN k= 6.41E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.110 AVG k= 1.10E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water pressure gauge zeros at 5psi, all values adjusted accordingly.
No water leaking out of stuffing box,
Flowmeter moving very slowly.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 22:34
101-343/3 K09-14GTKITSAULT
PORT SITE
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.1
0.1
0.2
0.2
0.3
0.41 0.62 0.83 0.62 0.41Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
1.7
1.9
2.1
1.9
1.7
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 20SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-86 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]2 Rev'd 09/07/09
SHEET 1 of 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 71.00 21.65
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 8-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 121.67 37.09 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31413.5 31413.7 31413.9 31414.0 31414.0 31414.1 litres/min
Take litres 0.20 0.20 0.10 0.00 0.10
0.83 Average Take l/m 0.20 0.20 0.10 0.00 0.10 0.12 0.04
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31415.0 31415.3 31415.7 31416.0 31416.3 31416.7 litres/min
Take litres 0.30 0.40 0.30 0.30 0.40
1.59 Average Take l/m 0.30 0.40 0.30 0.30 0.40 0.34 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31417.8 31418.2 31418.8 31419.2 31419.8 31420.1 litres/min
Take litres 0.40 0.60 0.40 0.60 0.30
2.41 Average Take l/m 0.40 0.60 0.40 0.60 0.30 0.46 0.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31420.5 31420.8 31421.1 31421.3 31421.5 31421.8 litres/min
Take litres 0.30 0.30 0.20 0.20 0.30
1.59 Average Take l/m 0.30 0.30 0.20 0.20 0.30 0.26 0.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31421.9 31422.0 31422.1 31422.1 31422.2 31422.3 litres/min
Take litres 0.10 0.10 0.00 0.10 0.10
0.83 Average Take l/m 0.10 0.10 0.00 0.10 0.10 0.08 0.02
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.081 MAX k= 8.12E-07
DETERMINATION:
MIN Lu= 0.025 MIN k= 2.49E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.056 AVG k= 5.60E-07
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.
No water leaking out of stuffing box,
Flowmeter moving very slowly.
TEST BY: CNH REVIEWED BY: LS
KITSAULT
PORT SITE
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 22:34
101-343/3 K09-14GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.83 1.59 2.41 1.59 0.83Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.1
2.8
3.7
2.8
2.1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CNH LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-87 of 93
M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]3 Rev'd 09/08/09
SHEET 1 of 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 106.00 32.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 8-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 162.00 49.39 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31509.8 31510.3 31511.0 31511.7 31512.3 31513.0 litres/min
Take litres 0.50 0.70 0.70 0.60 0.70
1.24 Average Take l/m 0.50 0.70 0.70 0.60 0.70 0.64 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31515.2 31516.2 31517.1 31518.1 31519.2 31520.1 litres/min
Take litres 1.00 0.90 1.00 1.10 0.90
2.41 Average Take l/m 1.00 0.90 1.00 1.10 0.90 0.98 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31523.0 31524.3 31525.5 31526.8 31528.0 31529.2 litres/min
Take litres 1.30 1.20 1.30 1.20 1.20
3.65 Average Take l/m 1.30 1.20 1.30 1.20 1.20 1.24 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31530.3 31531.0 31531.7 31532.3 31533.0 31533.7 litres/min
Take litres 0.70 0.70 0.60 0.70 0.70
2.41 Average Take l/m 0.70 0.70 0.60 0.70 0.70 0.68 0.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 31533.9 31534.1 31534.2 31534.4 31534.7 31535.0 litres/min
Take litres 0.20 0.10 0.20 0.30 0.30
1.24 Average Take l/m 0.20 0.10 0.20 0.30 0.30 0.22 0.05
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.157 MAX k= 1.57E-06
DETERMINATION:
MIN Lu= 0.052 MIN k= 5.16E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.123 AVG k= 1.23E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.
No water leaking out of stuffing box,
Flowmeter moving very slowly.
TEST BY: CNH REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/07/09 22:34
101-343/3 K09-14GTKITSAULT
PORT SITE
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
1.24 2.41 3.65 2.41 1.24Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.5
3.7
4.9
3.7
2.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10OCT'09 ISSUED WITH REPORT 101-343/3 CNH LS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-88 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]1 Rev'd 09/10/09
SHEET 1 of 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 56.00 17.07
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 102.00 31.10 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32466.0 32499.0 32532.0 32566.0 32598.0 32633.0 litres/min
Take litres 33.00 33.00 34.00 32.00 35.00
1.17 Average Take l/m 33.00 33.00 34.00 32.00 35.00 33.40 8.88
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 32829.0 32871.0 32912.0 32953.0 32993.0 33031.0 litres/min
Take litres 42.00 41.00 41.00 40.00 38.00
1.59 Average Take l/m 42.00 41.00 41.00 40.00 38.00 40.40 9.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33136.0 33184.0 33227.0 33270.0 33312.0 33354.0 litres/min
Take litres 48.00 43.00 43.00 42.00 42.00
1.86 Average Take l/m 48.00 43.00 43.00 42.00 42.00 43.60 9.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33439.0 33467.0 33495.0 33524.0 33552.0 33581.0 litres/min
Take litres 28.00 28.00 29.00 28.00 29.00
1.52 Average Take l/m 28.00 28.00 29.00 28.00 29.00 28.40 6.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33628.0 33651.0 33675.0 33700.0 33724.0 33748.0 litres/min
Take litres 23.00 24.00 25.00 24.00 24.00
1.31 Average Take l/m 23.00 24.00 25.00 24.00 24.00 24.00 6.07
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 9.305 MAX k= 9.31E-05
DETERMINATION:
MIN Lu= 6.068 MIN k= 6.07E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 8.033 AVG k= 8.03E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close to bedrock contact.
TEST BY: CNH REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:33
101-343/3 K09-15GTKITSAULT
PATSY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
1.17 1.59 1.86 1.52 1.31Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.7
3.1
3.4
3.02.8
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-89 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]2 Rev'd 09/10/09
SHEET 2 of 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 106.00 32.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 152.00 46.34 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33828.0 33832.4 33837.5 33840.5 33844.3 33847.2 litres/min
Take litres 4.40 5.10 3.00 3.80 2.90
1.31 Average Take l/m 4.40 5.10 3.00 3.80 2.90 3.84 0.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33877.5 33883.6 33889.7 33895.6 33900.8 33906.2 litres/min
Take litres 6.10 6.10 5.90 5.20 5.40
2.48 Average Take l/m 6.10 6.10 5.90 5.20 5.40 5.74 1.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33940.8 33949.0 33956.3 33963.2 33970.5 33978.0 litres/min
Take litres 8.20 7.30 6.90 7.30 7.50
3.65 Average Take l/m 8.20 7.30 6.90 7.30 7.50 7.44 1.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 33982.2 33986.2 33990.0 33994.1 33997.9 34001.8 litres/min
Take litres 4.00 3.80 4.10 3.80 3.90
2.34 Average Take l/m 4.00 3.80 4.10 3.80 3.90 3.92 0.73
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34002.8 34004.1 34005.6 34007.0 34008.5 34010.3 litres/min
Take litres 1.30 1.50 1.40 1.50 1.80
1.17 Average Take l/m 1.30 1.50 1.40 1.50 1.80 1.50 0.40
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 1.027 MAX k= 1.03E-05
DETERMINATION:
MIN Lu= 0.399 MIN k= 3.99E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.829 AVG k= 8.29E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close to bedrock contact.
TEST BY: CNH REVIEWED BY: LS
KITSAULT
PATSY WASTE DUMP
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:33
101-343/3 K09-15GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.31 2.48 3.65 2.34 1.17Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
2.8
4.0
5.2
3.9
2.7
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-90 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]3 Rev'd 09/10/09
SHEET 3 of 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 156.00 47.56
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 202.00 61.59 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34270.0 34290.0 34310.0 34330.0 34349.0 34368.0 litres/min
Take litres 20.00 20.00 20.00 19.00 19.00
1.79 Average Take l/m 20.00 20.00 20.00 19.00 19.00 19.60 4.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34395.0 34423.0 34451.0 34478.0 34505.0 34532.0 litres/min
Take litres 28.00 28.00 27.00 27.00 27.00
3.59 Average Take l/m 28.00 28.00 27.00 27.00 27.00 27.40 3.83
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34587.0 34626.0 34662.0 34698.0 34736.0 34773.0 litres/min
Take litres 39.00 36.00 36.00 38.00 37.00
5.38 Average Take l/m 39.00 36.00 36.00 38.00 37.00 37.20 3.85
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34814.0 34840.0 34866.0 34892.0 34918.0 34943.0 litres/min
Take litres 26.00 26.00 26.00 26.00 25.00
3.52 Average Take l/m 26.00 26.00 26.00 26.00 25.00 25.80 3.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 34960.0 34973.0 34986.0 35000.0 35014.0 35028.0 litres/min
Take litres 13.00 13.00 14.00 14.00 14.00
1.72 Average Take l/m 13.00 13.00 14.00 14.00 14.00 13.60 3.00
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 4.232 MAX k= 4.23E-05
DETERMINATION:
MIN Lu= 2.999 MIN k= 3.00E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 3.715 AVG k= 3.72E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close bedrock contact.
TEST BY: CNH REVIEWED BY: LS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:33
101-343/3 K09-15GTKITSAULT
PATSY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
1.79 3.59 5.38 3.52 1.72Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.3
5.1
6.9
5.0
3.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-91 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]4 Rev'd 09/10/09
SHEET 4 of 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 12.0 m TOP OF TEST INTERVAL: 201.00 61.28
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 262.00 79.88 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35119.0 35120.0 35121.0 35122.0 35123.0 35124.0 litres/min
Take litres 1.00 1.00 1.00 1.00 1.00
2.21 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35128.0 35129.0 35131.0 35132.0 35134.0 35136.0 litres/min
Take litres 1.00 2.00 1.00 2.00 2.00
4.48 Average Take l/m 1.00 2.00 1.00 2.00 2.00 1.60 0.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35137.0 35139.0 35141.5 35143.5 35145.5 35147.5 litres/min
Take litres 2.00 2.50 2.00 2.00 2.00
6.76 Average Take l/m 2.00 2.50 2.00 2.00 2.00 2.10 0.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35149.0 35150.0 35151.5 35152.5 35154.0 35155.0 litres/min
Take litres 1.00 1.50 1.00 1.50 1.00
4.48 Average Take l/m 1.00 1.50 1.00 1.50 1.00 1.20 0.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35156.0 35156.8 35156.3 35158.0 35158.5 35159.0 litres/min
Take litres 0.75 -0.50 1.75 0.50 0.50
2.21 Average Take l/m 0.75 -0.50 1.75 0.50 0.50 0.60 0.09
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.154 MAX k= 1.54E-06
DETERMINATION:
MIN Lu= 0.092 MIN k= 9.22E-07
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.092 AVG k= 9.22E-07
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.
Water leaking out of stuffing box estimated at 0.2L/min.
Pressure gauge zeros at 4psi, all values adjusted accordingly.
TEST BY: LS REVIEWED BY: JS
KITSAULT
PATSY WASTE DUMP
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:33
101-343/3 K09-15GT
STAGE PRESSURE VERSUS LUGEON VALUE
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
2.21 4.48 6.76 4.48 2.21Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
3.5
5.8
8.0
5.8
3.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 0.50 1.00 1.50 2.00 2.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-92 of 93
C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]5 Rev'd 09/10/09
SHEET 5 of 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 12.0 m TOP OF TEST INTERVAL: 256.00 78.05
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 312.00 95.12 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35392.1 35394.1 35396.0 35397.9 35399.8 35401.4 litres/min
Take litres 2.00 1.90 1.90 1.90 1.60
3.10 Average Take l/m 2.00 1.90 1.90 1.90 1.60 1.86 0.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35405.9 35408.9 35411.7 35414.6 35417.3 35420.1 litres/min
Take litres 3.00 2.80 2.90 2.70 2.80
6.21 Average Take l/m 3.00 2.80 2.90 2.70 2.80 2.84 0.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35427.2 35431.4 35435.3 35439.2 35443.2 35447.4 litres/min
Take litres 4.20 3.90 3.90 4.00 4.20
9.10 Average Take l/m 4.20 3.90 3.90 4.00 4.20 4.04 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35450.8 35453.7 35456.6 35459.8 35462.7 35465.8 litres/min
Take litres 2.90 2.90 3.20 2.90 3.10
6.21 Average Take l/m 2.90 2.90 3.20 2.90 3.10 3.00 0.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 35468.8 35470.3 35471.9 35473.7 35475.4 35477.0 litres/min
Take litres 1.50 1.60 1.80 1.70 1.60
3.10 Average Take l/m 1.50 1.60 1.80 1.70 1.60 1.64 0.22
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.248 MAX k= 2.48E-06
DETERMINATION:
MIN Lu= 0.219 MIN k= 2.19E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.219 AVG k= 2.19E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.
Water leaking out of stuffing box estimated at 0.2L/min.
Pressure gauge zeros at 4psi, all values adjusted accordingly.
TEST BY: LS REVIEWED BY: JS
LUGEON TEST FIELD DATA SHEET
Print 10/08/09 14:33
101-343/3 K09-15GTKITSAULT
PATSY WASTE DUMP
STAGE PRESSURE VERSUS LUGEON VALUE
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.3
0.3
3.10 6.21 9.10 6.21 3.10Stage Gauge Pressure (BAR)
Lu
geo
ns
FLOW VERSUS PRESSURE PLOT
4.4
7.5
10.4
7.5
4.4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Q (l/m)
Pre
ss
ure
(B
ars
)
Note: Permeability calculation dependent upon flow classification:
0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB
DATE DESCRIPTION PREP'D CHK'D APP'DREV
B1-93 of 93
SHEET 1 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 13.2 m TOP OF TEST INTERVAL: 49.50 15.09
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 128.00 39.02 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 407.0 442.0 476.0 512.0 545.0 580.0 litres/min
Take litres 35.00 34.00 36.00 33.00 35.00
0.55 Average Take l/m 35.00 34.00 36.00 33.00 35.00 34.60 7.49
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 609.0 647.0 685.0 723.0 761.0 800.0 litres/min
Take litres 38.00 38.00 38.00 38.00 39.00
0.97 Average Take l/m 38.00 38.00 38.00 38.00 39.00 38.20 6.81
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 839.0 886.0 931.0 979.0 1027.0 1075.0 litres/min
Take litres 47.00 45.00 48.00 48.00 48.00
1.38 Average Take l/m 47.00 45.00 48.00 48.00 48.00 47.20 7.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1097.0 1138.0 1197.0 1219.0 1260.0 1301.0 litres/min
Take litres 41.00 59.00 22.00 41.00 41.00
0.90 Average Take l/m 41.00 59.00 22.00 41.00 41.00 40.80 7.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1322.0 1354.0 1386.0 1419.0 1452.0 1486.0 litres/min
Take litres 32.00 32.00 33.00 33.00 34.00
0.55 Average Take l/m 32.00 32.00 33.00 33.00 34.00 32.80 7.10
K10-04GTKITSAULT PROJECT
Centre of Southeast Embankment
Print 11/12/10 10:37
LUGEON TEST FIELD DATA SHEET
VA101-343/6
7.6 STAGE PRESSURE VERSUS LUGEON VALUE
2.8
3.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 7.496 MAX k= 7.50E-05
DETERMINATION:
MIN Lu= 6.812 MIN k= 6.81E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.496 AVG k= 7.50E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 1
6.4
6.6
6.8
7.0
7.2
7.4
7.6
0.55 0.97 1.38 0.90 0.55
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.9
2.3
2.8
2.3
1.9
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
B2-1 of 56
SHEET 2 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 11.5 m TOP OF TEST INTERVAL: 124.50 37.96
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 198.00 60.37 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1562.0 1567.0 1572.0 1577.0 1582.0 1587.0 litres/min
Take litres 5.00 5.00 5.00 5.00 5.00
1.65 Average Take l/m 5.00 5.00 5.00 5.00 5.00 5.00 0.78
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1593.0 1599.0 1605.0 1611.0 1617.0 1623.0 litres/min
Take litres 6.00 6.00 6.00 6.00 6.00
3.10 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 0.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1628.0 1636.0 1643.0 1652.0 1695.0 1666.0 litres/min
Take litres 8.00 7.00 9.00 43.00 -29.00
4.69 Average Take l/m 8.00 7.00 9.00 43.00 -29.00 7.60 0.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1670.0 1676.0 1681.0 1687.0 1693.0 1699.0 litres/min
Take litres 6.00 5.00 6.00 6.00 6.00
2.76 Average Take l/m 6.00 5.00 6.00 6.00 6.00 5.80 0.65
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1703.0 1707.0 1712.0 1716.0 1721.0 1725.0 litres/min
Take litres 4.00 5.00 4.00 5.00 4.00
1.59 Average Take l/m 4.00 5.00 4.00 5.00 4.00 4.40 0.70
K10-04GTKITSAULT PROJECT
Centre of Southeast Embankment
Print 11/12/10 10:37
LUGEON TEST FIELD DATA SHEET
VA101-343/6
0.8
0.9 STAGE PRESSURE VERSUS LUGEON VALUE
5 96 0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.779 MAX k= 7.79E-06
DETERMINATION:
MIN Lu= 0.575 MIN k= 5.75E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.575 AVG k= 5.75E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: JS / BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 2
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.65 3.10 4.69 2.76 1.59
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.9
4.3
5.9
4.0
2.8
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
B2-2 of 56
SHEET 3 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 14.1 m TOP OF TEST INTERVAL: 192.50 58.69
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 263.00 80.18 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1849.8 1851.3 1852.8 1854.4 1855.9 1857.4 litres/min
Take litres 1.50 1.50 1.60 1.50 1.50
2.14 Average Take l/m 1.50 1.50 1.60 1.50 1.50 1.52 0.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1841.6 1843.1 1846.5 1841.1 1851.3 1853.6 litres/min
Take litres 1.50 3.40 -5.40 10.20 2.30
4.14 Average Take l/m 1.50 3.40 -5.40 10.20 2.30 2.40 0.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1855.1 1857.3 1859.7 1862.0 1864.3 1866.6 litres/min
Take litres 2.20 2.40 2.30 2.30 2.30
6.69 Average Take l/m 2.20 2.40 2.30 2.30 2.30 2.30 0.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1868.7 1870.6 1872.6 1874.6 1876.6 1878.6 litres/min
Take litres 1.90 2.00 2.00 2.00 2.00
3.86 Average Take l/m 1.90 2.00 2.00 2.00 2.00 1.98 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1879.7 1881.3 1882.8 1884.4 1885.9 1887.3 litres/min
Take litres 1.60 1.50 1.60 1.50 1.40
2.48 Average Take l/m 1.60 1.50 1.60 1.50 1.40 1.52 0.18
VA101-343/6 K10-04GTKITSAULT PROJECT
Centre of Southeast Embankment
Print 11/12/10 10:37
LUGEON TEST FIELD DATA SHEET
0.3 STAGE PRESSURE VERSUS LUGEON VALUE
8.28.0
9.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.199 MAX k= 1.99E-06
DETERMINATION:
MIN Lu= 0.131 MIN k= 1.31E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.131 AVG k= 1.31E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 3
0.0
0.1
0.1
0.2
0.2
0.3
2.14 4.14 6.69 3.86 2.48
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
3.6
5.6
8.2
5.3
4.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 4 B2-3 of 56
SHEET 4 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 19.7 m TOP OF TEST INTERVAL: 254.50 77.59
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 328.00 100.00 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2564.0 2660.0 2743.0 2833.0 2919.0 3010.0 litres/min
Take litres 96.00 83.00 90.00 86.00 91.00
2.96 Average Take l/m 96.00 83.00 90.00 86.00 91.00 89.20 7.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3212.0 3322.0 3440.0 3540.0 3650.0 3770.0 litres/min
Take litres 110.00 118.00 100.00 110.00 120.00
6.00 Average Take l/m 110.00 118.00 100.00 110.00 120.00 111.60 6.20
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3970.0 4107.0 4245.0 4384.0 4524.0 4660.0 litres/min
Take litres 137.00 138.00 139.00 140.00 136.00
8.96 Average Take l/m 137.00 138.00 139.00 140.00 136.00 138.00 5.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4765.0 4895.0 5024.0 5150.0 5278.0 5408.0 litres/min
Take litres 130.00 129.00 126.00 128.00 130.00
6.00 Average Take l/m 130.00 129.00 126.00 128.00 130.00 128.60 7.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5612.0 5727.0 5839.0 5944.0 6054.0 6162.0 litres/min
Take litres 115.00 112.00 105.00 110.00 108.00
2.96 Average Take l/m 115.00 112.00 105.00 110.00 108.00 110.00 9.83
K10-04GTKITSAULT PROJECT
Centre of Southeast Embankment
Print 11/12/10 10:37
LUGEON TEST FIELD DATA SHEET
VA101-343/6
12.0 STAGE PRESSURE VERSUS LUGEON VALUE
11.0
12.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 9.828 MAX k= 9.83E-05
DETERMINATION:
MIN Lu= 5.602 MIN k= 5.60E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 5.602 AVG k= 5.60E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: BH REVIEWED BY: JS
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
2.96 6.00 8.96 6.00 2.96
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
5.0
8.0
11.0
8.0
5.0
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 4 B2-4 of 56
SHEET 1 OF 1
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 22.0 m TOP OF TEST INTERVAL: 74.50 22.71
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 6-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 131.00 39.94 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6920.0 6932.6 6944.5 6956.4 6968.7 6980.1 litres/min
Take litres 12.60 11.90 11.90 12.30 11.40
1.03 Average Take l/m 12.60 11.90 11.90 12.30 11.40 12.02 2.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6987.0 7001.4 7015.4 7028.8 7042.7 7056.5 litres/min
Take litres 14.40 14.00 13.40 13.90 13.80
1.45 Average Take l/m 14.40 14.00 13.40 13.90 13.80 13.90 2.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7063.0 7083.0 7103.0 7123.0 7142.6 7162.1 litres/min
Take litres 20.00 20.00 20.00 19.60 19.50
2.34 Average Take l/m 20.00 20.00 20.00 19.60 19.50 19.82 2.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7168.0 7182.5 7197.0 7212.0 7228.8 7244.7 litres/min
Take litres 14.50 14.50 15.00 16.80 15.90
1.24 Average Take l/m 14.50 14.50 15.00 16.80 15.90 15.34 2.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7252.7 7263.2 7275.0 7286.8 7298.7 7310.2 litres/min
Take litres 10.50 11.80 11.80 11.90 11.50
0.90 Average Take l/m 10.50 11.80 11.80 11.90 11.50 11.50 2.12
VA101-343/6 K10-05GT
Print 11/12/10 10:36
KITSAULT PROJECT
Centre of Southeast Embankment
LUGEON TEST FIELD DATA SHEET
3.0 STAGE PRESSURE VERSUS LUGEON VALUE
4.64.5
5.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 2.547 MAX k= 2.55E-05
DETERMINATION:
MIN Lu= 2.118 MIN k= 2.12E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.293 AVG k= 2.29E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-05GT packer tests.xls]Test 1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
1.03 1.45 2.34 1.24 0.90
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
3.3
3.7
4.6
3.5
3.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 5.00 10.00 15.00 20.00 25.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30 NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 1 B2-5 of 56
SHEET 1 OF 1
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 4.0 m TOP OF TEST INTERVAL: 61.00 18.60
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 8-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 116.50 35.52 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7554.5 7555.6 7556.8 7558.0 7559.2 7560.3 litres/min
Take litres 1.10 1.20 1.20 1.20 1.10
0.76 Average Take l/m 1.10 1.20 1.20 1.20 1.10 1.16 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7561.5 7562.8 7564.1 7565.3 7566.5 7567.7 litres/min
Take litres 1.30 1.30 1.20 1.20 1.20
1.59 Average Take l/m 1.30 1.30 1.20 1.20 1.20 1.24 0.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7568.7 7570.3 7572.1 7573.6 7575.3 7576.9 litres/min
Take litres 1.60 1.80 1.50 1.70 1.60
2.28 Average Take l/m 1.60 1.80 1.50 1.70 1.60 1.64 0.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7577.6 7578.8 7580.0 7581.3 7582.5 7583.7 litres/min
Take litres 1.20 1.20 1.30 1.20 1.20
1.59 Average Take l/m 1.20 1.20 1.30 1.20 1.20 1.22 0.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7583.9 7584.8 7585.7 7586.6 7587.5 7588.5 litres/min
Take litres 0.90 0.90 0.90 0.90 1.00
0.69 Average Take l/m 0.90 0.90 0.90 0.90 1.00 0.92 0.46
VA101-343/6 K10-06GTKITSAULT PROJECT
Down gradient of TMF South Embankment
Print 11/12/10 10:40
LUGEON TEST FIELD DATA SHEET
0.6 STAGE PRESSURE VERSUS LUGEON VALUE
2.8
3.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 0.552 MAX k= 5.52E-06
DETERMINATION:
MIN Lu= 0.348 MIN k= 3.48E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.351 AVG k= 3.51E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI
TEST BY: JS REVIEWED BY: JS
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-06GT packer tests.xls]Test 1
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.76 1.59 2.28 1.59 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.2
2.1
2.8
2.1
1.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 1 B2-6 of 56
SHEET 1 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 20.9 m TOP OF TEST INTERVAL: 138.80 42.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 15-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 214.25 65.32 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 540.0 593.0 644.0 695.0 746.0 797.0 litres/min
Take litres 53.00 51.00 51.00 51.00 51.00
1.52 Average Take l/m 53.00 51.00 51.00 51.00 51.00 51.40 5.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 835.0 905.0 971.0 1040.0 1108.0 1176.0 litres/min
Take litres 70.00 66.00 69.00 68.00 68.00
2.96 Average Take l/m 70.00 66.00 69.00 68.00 68.00 68.20 5.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1206.0 1288.0 1371.0 1454.0 1536.0 1619.0 litres/min
Take litres 82.00 83.00 83.00 82.00 83.00
4.48 Average Take l/m 82.00 83.00 83.00 82.00 83.00 82.60 5.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1683.0 1750.0 1818.0 1888.0 1950.0 2017.0 litres/min
Take litres 67.00 68.00 70.00 62.00 67.00
2.96 Average Take l/m 67.00 68.00 70.00 62.00 67.00 66.80 5.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2043.0 2095.0 2145.0 2191.0 2242.0 2292.0 litres/min
Take litres 52.00 50.00 46.00 51.00 50.00
1.52 Average Take l/m 52.00 50.00 46.00 51.00 50.00 49.80 5.76
VA101-343/6 K10-09GT
Print 11/12/10 10:50
KITSAULT PROJECT
Plant Site
LUGEON TEST FIELD DATA SHEET
5.9
6.0 STAGE PRESSURE VERSUS LUGEON VALUE
6 77.0
8.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL MAX Lu= 5.948 MAX k= 5.95E-05
DETERMINATION:
MIN Lu= 5.342 MIN k= 5.34E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 5.342 AVG k= 5.34E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Flowmeter units:
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-09GT packer tests.xls]Test 1
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6.0
1.52 2.96 4.48 2.96 1.52
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
3.8
5.2
6.7
5.2
3.8
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 2 B2-7 of 56
SHEET 2 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 21.6 m TOP OF TEST INTERVAL: 208.25 63.49
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 16-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 264.25 80.56 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2523.0 2584.0 2649.0 2716.0 2784.0 2852.0 litres/min
Take litres 61.00 65.00 67.00 68.00 68.00
1.79 Average Take l/m 61.00 65.00 67.00 68.00 68.00 65.80 9.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3577.0 3654.0 3730.0 3807.0 3883.0 3960.0 litres/min
Take litres 77.00 76.00 77.00 76.00 77.00
2.90 Average Take l/m 77.00 76.00 77.00 76.00 77.00 76.60 8.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3074.0 3160.0 3246.0 3331.0 3416.0 3501.0 litres/min
Take litres 86.00 86.00 85.00 85.00 85.00
4.14 Average Take l/m 86.00 86.00 85.00 85.00 85.00 85.40 7.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4964.0 5038.0 5113.0 5188.0 5263.0 5340.0 litres/min
Take litres 74.00 75.00 75.00 75.00 77.00
2.69 Average Take l/m 74.00 75.00 75.00 75.00 77.00 75.20 8.81
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4564.0 4629.0 4694.0 4760.0 4824.0 4890.0 litres/min
Take litres 65.00 65.00 66.00 64.00 66.00
2.07 Average Take l/m 65.00 65.00 66.00 64.00 66.00 65.20 8.73
KITSAULT PROJECT
Plant Site
Print 11/12/10 10:50
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-09GT
9.0
10.0 STAGE PRESSURE VERSUS LUGEON VALUE
6.46 0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 9.399 MAX k= 9.40E-05
DETERMINATION:
MIN Lu= 7.761 MIN k= 7.76E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.761 AVG k= 7.76E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-09GT packer tests.xls]Test 2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
1.79 2.90 4.14 2.69 2.07
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.1
5.2
6.4
5.0
4.4
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 2 B2-8 of 56
SHEET 1 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 49.50 15.09
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 75.30 22.96 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5412.0 5415.1 5418.3 5421.4 5424.4 5427.3 litres/min
Take litres 3.10 3.20 3.10 3.00 2.90
0.55 Average Take l/m 3.10 3.20 3.10 3.00 2.90 3.06 5.90
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5432.0 5435.9 5439.6 5443.2 5446.7 5450.1 litres/min
Take litres 3.90 3.70 3.60 3.50 3.40
1.17 Average Take l/m 3.90 3.70 3.60 3.50 3.40 3.62 3.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5455.0 5459.1 5463.1 5467.1 5471.0 5474.9 litres/min
Take litres 4.10 4.00 4.00 3.90 3.90
1.65 Average Take l/m 4.10 4.00 4.00 3.90 3.90 3.98 2.87
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5477.4 5480.6 5484.0 5486.8 5490.0 5493.1 litres/min
Take litres 3.20 3.40 2.80 3.20 3.10
1.10 Average Take l/m 3.20 3.40 2.80 3.20 3.10 3.14 3.30
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5495.0 5497.5 5500.0 5502.5 5505.0 5507.4 litres/min
Take litres 2.50 2.50 2.50 2.50 2.40
0.55 Average Take l/m 2.50 2.50 2.50 2.50 2.40 2.48 4.78
VA101-343/6 K10-12GTKITSAULT PROJECT
Plant Site
Print 11/12/10 10:59
LUGEON TEST FIELD DATA SHEET
6 0
7.0 STAGE PRESSURE VERSUS LUGEON VALUE
1.81.8
2.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 5.898 MAX k= 5.90E-05
DETERMINATION:
MIN Lu= 2.870 MIN k= 2.87E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.870 AVG k= 2.87E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Gauge pressures were steady for test, no leaks were noticed.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-12GT packer tests.xls]Test 1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.55 1.17 1.65 1.10 0.55
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
1.3
1.8
1.2
0.7
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 2 B2-9 of 56
SHEET 2 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 17.3 m TOP OF TEST INTERVAL: 69.50 21.19
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 120.30 36.68 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5629.0 5655.0 5682.0 5710.0 5737.0 5764.0 litres/min
Take litres 26.00 27.00 28.00 27.00 27.00
0.48 Average Take l/m 26.00 27.00 28.00 27.00 27.00 27.00 7.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 5806.0 5846.0 5885.0 5925.0 5964.0 6004.0 litres/min
Take litres 40.00 39.00 40.00 39.00 40.00
1.38 Average Take l/m 40.00 39.00 40.00 39.00 40.00 39.60 7.92
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6116.0 6169.0 6223.0 6276.0 6326.0 6377.0 litres/min
Take litres 53.00 54.00 53.00 50.00 51.00
2.07 Average Take l/m 53.00 54.00 53.00 50.00 51.00 52.20 8.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6420.0 6463.0 6505.0 6547.0 6589.0 6632.0 litres/min
Take litres 43.00 42.00 42.00 42.00 43.00
1.45 Average Take l/m 43.00 42.00 42.00 42.00 43.00 42.40 8.30
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6686.0 6718.0 6749.0 6780.0 6812.0 6844.0 litres/min
Take litres 32.00 31.00 31.00 32.00 32.00
0.76 Average Take l/m 32.00 31.00 31.00 32.00 32.00 31.60 7.82
Print 11/12/10 10:59
KITSAULT PROJECT
Plant Site
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-12GT
8.6
8.8 STAGE PRESSURE VERSUS LUGEON VALUE
3.94.0
4.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 8.601 MAX k= 8.60E-05
DETERMINATION:
MIN Lu= 7.474 MIN k= 7.47E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.879 AVG k= 7.88E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS: NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-12GT packer tests.xls]Test 2
6.8
7.0
7.2
7.4
7.6
7.8
8.0
8.2
8.4
8.6
8.8
0.48 1.38 2.07 1.45 0.76
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.3
3.2
3.9
3.3
2.6
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 10.00 20.00 30.00 40.00 50.00 60.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 2 B2-10 of 56
SHEET 1 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 34.50 10.52
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 20-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 60.00 18.29 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6958.0 6972.0 6986.0 7000.0 7014.0 7027.0 litres/min
Take litres 14.00 14.00 14.00 14.00 13.00
0.48 Average Take l/m 14.00 14.00 14.00 14.00 13.00 13.80 28.51
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7065.0 7080.0 7096.0 7111.0 7127.0 7142.0 litres/min
Take litres 15.00 16.00 15.00 16.00 15.00
0.76 Average Take l/m 15.00 16.00 15.00 16.00 15.00 15.40 22.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7194.0 7213.5 7233.4 7253.4 7273.4 7293.1 litres/min
Take litres 19.50 19.90 20.00 20.00 19.70
1.24 Average Take l/m 19.50 19.90 20.00 20.00 19.70 19.82 18.46
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7313.0 7326.0 7339.4 7352.6 7366.0 7379.7 litres/min
Take litres 13.00 13.40 13.20 13.40 13.70
0.76 Average Take l/m 13.00 13.40 13.20 13.40 13.70 13.34 19.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7395.0 7405.7 7416.4 7427.4 7438.4 7449.0 litres/min
Take litres 10.70 10.70 11.00 11.00 10.60
0.34 Average Take l/m 10.70 10.70 11.00 11.00 10.60 10.80 28.66
Print 11/12/10 11:04
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-13GTKITSAULT PROJECT
Coarse Ore Stockpile
30 0
35.0 STAGE PRESSURE VERSUS LUGEON VALUE
1.41.4
1.6FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 28.658 MAX k= 2.87E-04
DETERMINATION:
MIN Lu= 18.460 MIN k= 1.85E-04
INTERPRETATION cm/s
REFERENCE: AVG Lu= 18.460 AVG k= 1.85E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 1
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.48 0.76 1.24 0.76 0.34
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.6
0.9
1.4
0.9
0.5
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
0.00 5.00 10.00 15.00 20.00 25.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 4 B2-11 of 56
SHEET 2 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 54.50 16.62
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 95.10 28.99 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7504.0 7518.0 7533.0 7547.0 7561.0 7575.0 litres/min
Take litres 14.00 15.00 14.00 14.00 14.00
0.69 Average Take l/m 14.00 15.00 14.00 14.00 14.00 14.20 13.83
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7582.0 7602.0 7621.0 7636.0 7654.0 7672.0 litres/min
Take litres 20.00 19.00 15.00 18.00 18.00
1.38 Average Take l/m 20.00 19.00 15.00 18.00 18.00 18.00 9.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7689.0 7710.0 7732.0 7753.0 7774.0 7795.0 litres/min
Take litres 21.00 22.00 21.00 21.00 21.00
2.07 Average Take l/m 21.00 22.00 21.00 21.00 21.00 21.20 7.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7814.0 7829.0 7845.0 7860.0 7875.0 7891.0 litres/min
Take litres 15.00 16.00 15.00 15.00 16.00
1.38 Average Take l/m 15.00 16.00 15.00 15.00 16.00 15.40 8.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7901.0 7915.0 7921.0 7932.0 7942.0 7952.0 litres/min
Take litres 14.00 6.00 11.00 10.00 10.00
0.69 Average Take l/m 14.00 6.00 11.00 10.00 10.00 10.20 9.93
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-13GTKITSAULT PROJECT
Coarse Ore Stockpile
Print 11/12/10 11:04
14.0
16.0 STAGE PRESSURE VERSUS LUGEON VALUE
2.2
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 13.830 MAX k= 1.38E-04
DETERMINATION:
MIN Lu= 7.755 MIN k= 7.76E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.755 AVG k= 7.76E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Results are misleading because the rock from 55-65ft is highly fractured and the rock from 65-95is very tight with almost no joints.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.5
2.2
1.5
0.8
0.0
0.5
1.0
1.5
2.0
2.5
0.00 5.00 10.00 15.00 20.00 25.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 4 B2-12 of 56
SHEET 3 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 30.2 m TOP OF TEST INTERVAL: 94.60 28.84
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 130.10 39.66 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7977.3 7979.0 7980.5 7981.9 7983.4 7984.8 litres/min
Take litres 1.70 1.50 1.40 1.50 1.40
0.97 Average Take l/m 1.70 1.50 1.40 1.50 1.40 1.50 0.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7987.0 7989.0 7990.8 7992.7 7994.5 7996.4 litres/min
Take litres 2.00 1.80 1.90 1.80 1.90
2.07 Average Take l/m 2.00 1.80 1.90 1.80 1.90 1.88 0.33
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7999.0 8001.2 8003.1 8005.2 8007.0 8008.9 litres/min
Take litres 2.20 1.90 2.10 1.80 1.90
3.10 Average Take l/m 2.20 1.90 2.10 1.80 1.90 1.98 0.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8009.7 8011.2 8012.7 8014.2 8015.6 8017.1 litres/min
Take litres 1.50 1.50 1.50 1.40 1.50
2.07 Average Take l/m 1.50 1.50 1.50 1.40 1.50 1.48 0.26
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8017.7 8018.8 8019.9 8021.0 8022.0 8023.1 litres/min
Take litres 1.10 1.10 1.10 1.00 1.10
0.97 Average Take l/m 1.10 1.10 1.10 1.00 1.10 1.08 0.24
Print 11/12/10 11:04
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-13GTKITSAULT PROJECT
Coarse Ore Stockpile
0.4
0.4 STAGE PRESSURE VERSUS LUGEON VALUE
6.36 0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.336 MAX k= 3.36E-06
DETERMINATION:
MIN Lu= 0.242 MIN k= 2.42E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.242 AVG k= 2.42E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Gauge pressures were very erratic for P2 and P3. Minor leak out of casing was noticed. Rock RQD was very high.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 3
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.97 2.07 3.10 2.07 0.97
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.1
5.2
6.3
5.2
4.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.50 1.00 1.50 2.00 2.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 4 B2-13 of 56
SHEET 4 OF 4
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 30.2 m TOP OF TEST INTERVAL: 129.00 39.33
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 21-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 165.00 50.30 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8302.0 8356.0 8409.0 8462.0 8516.0 8570.0 litres/min
Take litres 54.00 53.00 53.00 54.00 54.00
1.45 Average Take l/m 54.00 53.00 53.00 54.00 54.00 53.60 10.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 8760.0 8825.0 8889.0 8954.0 9017.0 9082.0 litres/min
Take litres 65.00 64.00 65.00 63.00 65.00
2.96 Average Take l/m 65.00 64.00 65.00 63.00 65.00 64.40 9.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9265.0 9338.0 9410.0 9483.0 9556.0 9628.0 litres/min
Take litres 73.00 72.00 73.00 73.00 72.00
4.14 Average Take l/m 73.00 72.00 73.00 73.00 72.00 72.60 9.07
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 9799.0 9860.0 9921.0 9982.0 10043.0 10104.0 litres/min
Take litres 61.00 61.00 61.00 61.00 61.00
2.76 Average Take l/m 61.00 61.00 61.00 61.00 61.00 61.00 9.39
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10313.0 10365.0 10417.0 10468.0 10520.0 10572.0 litres/min
Take litres 52.00 52.00 51.00 52.00 52.00
1.17 Average Take l/m 52.00 52.00 51.00 52.00 52.00 51.80 10.89
Print 11/12/10 11:04
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-13GTKITSAULT PROJECT
Coarse Ore Stockpile
12.0 STAGE PRESSURE VERSUS LUGEON VALUE
7.37.0
8.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 10.894 MAX k= 1.09E-04
DETERMINATION:
MIN Lu= 9.065 MIN k= 9.07E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 9.065 AVG k= 9.07E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 4
0.0
2.0
4.0
6.0
8.0
10.0
12.0
1.45 2.96 4.14 2.76 1.17
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.6
6.1
7.3
5.9
4.3
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 230NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 4 B2-14 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 34.90 10.64
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 22-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 70.40 21.46 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10757.5 10759.3 10761.2 10763.1 10764.9 10766.8 10768.6 litres/min
Take litres 1.80 1.90 1.90 1.80 1.90 1.8
0.48 Average Take l/m 1.80 1.90 1.90 1.80 1.90 1.8 1.85 2.88
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10773.4 10775.6 10777.6 10779.7 10781.8 10783.8 litres/min
Take litres 2.15 2.05 2.10 2.10 2.00
0.69 Average Take l/m 2.15 2.05 2.10 2.10 2.00 2.08 2.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10787.4 10789.8 10792.1 10794.5 10796.8 10799.1 litres/min
Take litres 2.40 2.30 2.35 2.35 2.30
1.17 Average Take l/m 2.40 2.30 2.35 2.35 2.30 2.34 1.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10801.0 10803.1 10805.1 10807.2 10809.2 10811.2 litres/min
Take litres 2.10 2.00 2.10 2.00 2.00
0.76 Average Take l/m 2.10 2.00 2.10 2.00 2.00 2.04 2.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10813.0 10814.8 10816.5 10818.1 10819.8 10821.5 litres/min
Take litres 1.75 1.70 1.65 1.70 1.65
0.55 Average Take l/m 1.75 1.70 1.65 1.70 1.65 1.69 2.36
Print 11/12/10 11:15
KITSAULT PROJECT
Downgradient of Northeast TMF Embankment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-14GT
3 0
3.5 STAGE PRESSURE VERSUS LUGEON VALUE
1.31 2
1.4FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.884 MAX k= 2.88E-05
DETERMINATION:
MIN Lu= 1.686 MIN k= 1.69E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.686 AVG k= 1.69E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:SOME LEAKING FROM THE WATER SWIVEL WAS NOTICED
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.48 0.69 1.17 0.76 0.55
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.6
0.8
1.3
0.9
0.7
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
0.00 0.50 1.00 1.50 2.00 2.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
JS BB KJB
DESCRIPTION PREP'D CHK'D APP'D
0 30NOV'2010 ISSUED FOR REPORT
DATEREV
Page 1 of 5 B2-15 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 17.0 m TOP OF TEST INTERVAL: 64.90 19.79
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 23-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 100.40 30.61 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10856.0 10865.0 10873.5 10882.2 10890.6 10899.0 litres/min
Take litres 9.00 8.50 8.70 8.40 8.40
0.76 Average Take l/m 9.00 8.50 8.70 8.40 8.40 8.60 3.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 10918.2 10932.0 10946.0 10960.6 10975.4 10990.2 litres/min
Take litres 13.80 14.00 14.60 14.80 14.80
1.38 Average Take l/m 13.80 14.00 14.60 14.80 14.80 14.40 4.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11009.0 11028.0 11054.0 11086.0 11118.0 11149.0 litres/min
Take litres 19.00 26.00 32.00 32.00 31.00
2.07 Average Take l/m 19.00 26.00 32.00 32.00 31.00 28.00 6.72
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11187.5 11208.8 11229.2 11250.4 11271.4 11292.6 litres/min
Take litres 21.30 20.40 21.20 21.00 21.20
1.38 Average Take l/m 21.30 20.40 21.20 21.00 21.20 21.02 6.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11301.6 11317.9 11334.0 11350.5 11366.6 11382.8 litres/min
Take litres 16.30 16.10 16.50 16.10 16.20
0.76 Average Take l/m 16.30 16.10 16.50 16.10 16.20 16.24 5.90
Print 11/15/10 11:10
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-14GTKITSAULT PROJECT
Downgradient of Northeast TMF Embankment
6.0
7.0
8.0 STAGE PRESSURE VERSUS LUGEON VALUE
3.2
3.9
3.23 0
3.5
4.0
4.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL Transducer data and water meter MAX Lu= 6.715 MAX k= 6.72E-05DETERMINATION:
MIN Lu= 3.125 MIN k= 3.13E-05INTERPRETATION cm/s
REFERENCE: AVG Lu= 4.843 AVG k= 4.84E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Report\1-SI Report\Appendices\Appendix B\SUPERSEDED-B1\[K10-14GT Packer Tests.xls]Test 2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.76 1.38 2.07 1.38 0.76
Lu
ge
on
s
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.5
3.2
3.9
3.2
2.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 5.00 10.00 15.00 20.00 25.00 30.00
Pre
ss
ure
(B
ars
)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
JS BB KJB
DESCRIPTION PREP'D CHK'D APP'D
0 30NOV'2010 ISSUED FOR REPORT
DATEREV
Page 1 of 1 B2-16 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 19.0 m TOP OF TEST INTERVAL: 94.90 28.93
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 23-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 130.40 39.76 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11428.5 11433.8 11438.6 11443.3 11448.1 11452.7 litres/min
Take litres 5.30 4.80 4.70 4.80 4.60
1.03 Average Take l/m 5.30 4.80 4.70 4.80 4.60 4.84 1.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11460.0 11468.3 11475.0 11482.0 11489.0 11495.8 litres/min
Take litres 8.30 6.70 7.00 7.00 6.80
2.07 Average Take l/m 8.30 6.70 7.00 7.00 6.80 7.16 1.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11506.6 11517.2 11528.1 11538.2 11549.0 11560.3 litres/min
Take litres 10.60 10.90 10.10 10.80 11.30
3.10 Average Take l/m 10.60 10.90 10.10 10.80 11.30 10.74 1.94
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11569.4 11579.0 11588.7 11596.8 11605.9 11614.7 litres/min
Take litres 9.60 9.70 8.10 9.10 8.80
2.07 Average Take l/m 9.60 9.70 8.10 9.10 8.80 9.06 2.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11622.0 11629.5 11636.6 11643.8 11651.2 11658.6 litres/min
Take litres 7.50 7.10 7.20 7.40 7.40
1.03 Average Take l/m 7.50 7.10 7.20 7.40 7.40 7.32 2.22
Print 11/12/10 11:15
KITSAULT PROJECT
Downgradient of Northeast TMF Embankment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-14GT
2.5 STAGE PRESSURE VERSUS LUGEON VALUE
5 1
6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL Transducer pressures MAX Lu= 2.223 MAX k= 2.22E-05
DETERMINATION:
MIN Lu= 1.470 MIN k= 1.47E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.223 AVG k= 2.22E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS VERY ERRATIC AT ALL PRESSURES. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 3
0.0
0.5
1.0
1.5
2.0
2.5
1.03 2.07 3.10 2.07 1.03
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
3.0
4.1
5.1
4.1
3.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
JS BB KJB
DESCRIPTION PREP'D CHK'D APP'D
0 30NOV'2010 ISSUED FOR REPORT
DATEREV
Page 3 of 5 B2-17 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 30.5 m TOP OF TEST INTERVAL: 124.90 38.08
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 160.40 48.90 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11717.0 11726.8 11736.0 11745.2 11754.2 11762.9 litres/min
Take litres 9.80 9.20 9.20 9.00 8.70
2.31 Average Take l/m 9.80 9.20 9.20 9.00 8.70 9.18 1.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11829.0 11838.9 11849.0 11859.4 11869.6 11879.9 litres/min
Take litres 9.90 10.10 10.40 10.20 10.30
3.69 Average Take l/m 9.90 10.10 10.40 10.20 10.30 10.18 1.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11898.0 11904.5 11930.3 11946.4 11962.0 11978.0 litres/min
Take litres 6.50 25.80 16.10 15.60 16.00
5.07 Average Take l/m 6.50 25.80 16.10 15.60 16.00 16.00 1.80
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11991.0 12002.7 12014.3 12025.6 12037.0 12048.3 litres/min
Take litres 11.70 11.60 11.30 11.40 11.30
3.55 Average Take l/m 11.70 11.60 11.30 11.40 11.30 11.46 1.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 11776.0 11784.5 11792.8 11800.8 11808.8 11816.6 litres/min
Take litres 8.50 8.30 8.00 8.00 7.80
2.07 Average Take l/m 8.50 8.30 8.00 8.00 7.80 8.12 1.43
VA101-343/6 K10-14GTKITSAULT PROJECT
Downgradient of Northeast TMF Embankment
Print 11/12/10 11:15
LUGEON TEST FIELD DATA SHEET
1.8
2.0 STAGE PRESSURE VERSUS LUGEON VALUE
8.28.0
9.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.797 MAX k= 1.80E-05
DETERMINATION:
MIN Lu= 1.373 MIN k= 1.37E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.547 AVG k= 1.55E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS EXTREMLY ERRATIC. LOW CONFIDENCE ON WATER PRESSURE READINGS. Pressures adjusted from transducer.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 4
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.31 3.69 5.07 3.55 2.07
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
5.5
6.8
8.2
6.7
5.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
JS BB KJB
DESCRIPTION PREP'D CHK'D APP'D
0 30NOV'2010 ISSUED FOR REPORT
DATEREV
Page 4 of 5 B2-18 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 30.5 m TOP OF TEST INTERVAL: 154.90 47.23
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 24-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 190.40 58.05 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12164.0 12200.0 12236.0 12270.0 12306.0 12341.0 litres/min
Take litres 36.00 36.00 34.00 36.00 35.00
1.72 Average Take l/m 36.00 36.00 34.00 36.00 35.00 35.40 6.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12383.0 12428.0 12469.0 12513.0 12560.0 12600.0 litres/min
Take litres 45.00 41.00 44.00 47.00 40.00
3.10 Average Take l/m 45.00 41.00 44.00 47.00 40.00 43.40 6.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12617.0 12668.0 12719.0 12771.0 12823.0 12876.0 litres/min
Take litres 51.00 51.00 52.00 52.00 53.00
4.48 Average Take l/m 51.00 51.00 52.00 52.00 53.00 51.80 6.26
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 12897.0 12943.0 12987.0 13034.0 13077.0 13122.0 litres/min
Take litres 46.00 44.00 47.00 43.00 45.00
3.45 Average Take l/m 46.00 44.00 47.00 43.00 45.00 45.00 6.29
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13224.0 13263.0 13301.0 13339.0 13378.0 13416.0 litres/min
Take litres 39.00 38.00 38.00 39.00 38.00
2.07 Average Take l/m 39.00 38.00 38.00 39.00 38.00 38.40 6.79
VA101-343/6 K10-14GTKITSAULT PROJECT
Downgradient of Northeast TMF Embankment
Print 11/12/10 11:15
LUGEON TEST FIELD DATA SHEET
6.8
6.9 STAGE PRESSURE VERSUS LUGEON VALUE
7 68.0
9.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 6.786 MAX k= 6.79E-05
DETERMINATION:
MIN Lu= 6.263 MIN k= 6.26E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 6.263 AVG k= 6.26E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. A LARGE AMOUNT OF WATER WAS NOTICED TO BE SPILLING OUT OF THE CASING.THE PACKER MAY NOT HAVE SEALED CORRECTLY SO THESE RESULTS SHOULD NOT BE RELIED UPON
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 5
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
1.72 3.10 4.48 3.45 2.07
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.9
6.3
7.6
6.6
5.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
JS BB KJB
DESCRIPTION PREP'D CHK'D APP'D
0 30NOV'2010 ISSUED FOR REPORT
DATEREV
Page 5 of 5 B2-19 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 54.50 16.62
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 26-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 95.00 28.96 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13478.0 13478.9 13479.7 13480.6 13481.4 13482.2 litres/min
Take litres 0.90 0.80 0.90 0.80 0.80
0.55 Average Take l/m 0.90 0.80 0.90 0.80 0.80 0.84 0.98
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13483.7 13485.6 13487.3 13488.9 13490.5 13492.1 litres/min
Take litres 1.85 1.70 1.65 1.60 1.60
1.24 Average Take l/m 1.85 1.70 1.65 1.60 1.60 1.68 0.99
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13493.5 13495.6 13497.6 13499.6 13501.6 13503.5 litres/min
Take litres 2.10 2.00 2.00 1.95 1.90
1.79 Average Take l/m 2.10 2.00 2.00 1.95 1.90 1.99 0.83
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13504.5 13505.9 13508.4 13509.7 13511.0 13512.2 litres/min
Take litres 1.35 2.55 1.30 1.25 1.25
1.17 Average Take l/m 1.35 2.55 1.30 1.25 1.25 1.54 0.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13512.9 13513.5 13514.2 13514.8 13515.4 13516.0 litres/min
Take litres 0.60 0.65 0.60 0.60 0.65
0.55 Average Take l/m 0.60 0.65 0.60 0.60 0.65 0.62 0.73
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-15AGTKITSAULT PROJECT
Downstream of South Abutment
Print 11/12/10 11:25
1.2 STAGE PRESSURE VERSUS LUGEON VALUE2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.985 MAX k= 9.85E-06
DETERMINATION:
MIN Lu= 0.726 MIN k= 7.26E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.896 AVG k= 8.96E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER GAUGE WAS STEADY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 1
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.55 1.24 1.79 1.17 0.55
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
1.4
1.9
1.3
0.7
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.50 1.00 1.50 2.00 2.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 GW JSISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 5 B2-20 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 89.60 27.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 120.10 36.62 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 533.5 534.5 535.6 536.5 537.5 538.4 litres/min
Take litres 1.00 1.10 0.90 1.00 0.90
1.03 Average Take l/m 1.00 1.10 0.90 1.00 0.90 0.98 0.90
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 539.1 540.5 541.9 543.3 544.6 545.9 litres/min
Take litres 1.40 1.40 1.40 1.30 1.30
2.07 Average Take l/m 1.40 1.40 1.40 1.30 1.30 1.36 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 547.5 549.1 550.8 552.5 554.1 555.8 litres/min
Take litres 1.60 1.70 1.70 1.60 1.70
3.10 Average Take l/m 1.60 1.70 1.70 1.60 1.70 1.66 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 557.0 558.3 559.5 560.8 562.0 563.2 litres/min
Take litres 1.30 1.20 1.30 1.20 1.20
2.14 Average Take l/m 1.30 1.20 1.30 1.20 1.20 1.24 0.59
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 564.0 564.7 565.5 566.3 567.0 567.8 litres/min
Take litres 0.70 0.80 0.80 0.70 0.80
1.03 Average Take l/m 0.70 0.80 0.80 0.70 0.80 0.76 0.70
Print 11/12/10 11:25
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-15AGTKITSAULT PROJECT
Downstream of South Abutment
0.9
1.0 STAGE PRESSURE VERSUS LUGEON VALUE
3.2
3 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.898 MAX k= 8.98E-06
DETERMINATION:
MIN Lu= 0.551 MIN k= 5.51E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.551 AVG k= 5.51E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS STEADY, P3 WAS A LITTLE JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 2
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.03 2.07 3.10 2.14 1.03
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.2
2.2
3.2
2.3
1.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 130NOV'201 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 5 B2-21 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 114.60 34.94
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 160.10 48.81 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13598.8 13600.7 13602.4 13604.1 13605.8 13607.4 litres/min
Take litres 1.85 1.75 1.70 1.65 1.60
1.24 Average Take l/m 1.85 1.75 1.70 1.65 1.60 1.71 0.89
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13610.0 13612.7 13615.2 13617.7 13620.1 13622.5 litres/min
Take litres 2.65 2.55 2.50 2.40 2.40
2.76 Average Take l/m 2.65 2.55 2.50 2.40 2.40 2.50 0.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13630.0 13633.0 13636.0 13638.9 13641.8 13644.7 litres/min
Take litres 3.00 3.00 2.90 2.90 2.85
4.07 Average Take l/m 3.00 3.00 2.90 2.90 2.85 2.93 0.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13646.6 13648.6 13650.6 13652.6 13654.6 13656.6 litres/min
Take litres 2.00 2.00 2.00 2.00 2.00
2.48 Average Take l/m 2.00 2.00 2.00 2.00 2.00 2.00 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13657.7 13659.0 13660.3 13661.6 13662.9 13664.2 litres/min
Take litres 1.30 1.30 1.30 1.30 1.30
1.24 Average Take l/m 1.30 1.30 1.30 1.30 1.30 1.30 0.68
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-15AGTKITSAULT PROJECT
Downstream of South Abutment
Print 11/12/10 11:25
0.9
1.0 STAGE PRESSURE VERSUS LUGEON VALUE
4.24.0
4.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.893 MAX k= 8.93E-06
DETERMINATION:
MIN Lu= 0.502 MIN k= 5.02E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.502 AVG k= 5.02E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 3
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.24 2.76 4.07 2.48 1.24
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.4
2.9
4.2
2.6
1.4
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 GW JSISSUED FOR REPORT BBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 5 B2-22 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 154.50 47.10
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.10 61.01 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13700.0 13702.7 13705.1 13707.4 13709.6 13711.6 litres/min
Take litres 2.65 2.45 2.25 2.20 2.05
1.79 Average Take l/m 2.65 2.45 2.25 2.20 2.05 2.32 0.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13719.4 13722.1 13724.7 13727.2 13729.7 13732.2 litres/min
Take litres 2.70 2.55 2.55 2.50 2.50
3.38 Average Take l/m 2.70 2.55 2.55 2.50 2.50 2.56 0.52
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13739.4 13743.3 13747.0 13750.7 13754.2 13757.6 litres/min
Take litres 3.90 3.70 3.65 3.55 3.40
5.45 Average Take l/m 3.90 3.70 3.65 3.55 3.40 3.64 0.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13761.5 13764.3 13767.0 13769.7 13772.2 13774.8 litres/min
Take litres 2.80 2.70 2.65 2.55 2.55
3.34 Average Take l/m 2.80 2.70 2.65 2.55 2.55 2.65 0.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13776.1 13777.8 13779.4 13780.9 13782.5 13784.0 litres/min
Take litres 1.65 1.60 1.55 1.55 1.55
1.86 Average Take l/m 1.65 1.60 1.55 1.55 1.55 1.58 0.57
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-15AGTKITSAULT PROJECT
Downstream of South Abutment
Print 11/12/10 11:25
0.9
1.0 STAGE PRESSURE VERSUS LUGEON VALUE
5.6
6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.863 MAX k= 8.63E-06
DETERMINATION:
MIN Lu= 0.469 MIN k= 4.69E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.469 AVG k= 4.69E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. STABLE FOR P1. NO LEAKS WERE NOTICED DURING THE TEST. WATER WAS COMING OUT OF THE CASING
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 4
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.79 3.38 5.45 3.34 1.86
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.9
3.5
5.6
3.5
2.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 5 B2-23 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 39.60 12.07
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.10 61.01 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13802.4 13804.2 13805.8 13807.4 13809.0 13810.7 litres/min
Take litres 1.80 1.60 1.60 1.60 1.70
0.69 Average Take l/m 1.80 1.60 1.60 1.60 1.70 1.66 0.41
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13813.2 13815.9 13818.5 13821.0 13823.4 13825.9 litres/min
Take litres 2.70 2.60 2.50 2.40 2.50
1.38 Average Take l/m 2.70 2.60 2.50 2.40 2.50 2.54 0.34
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13828.8 13832.5 13836.1 13839.5 13842.9 13846.3 litres/min
Take litres 3.70 3.60 3.40 3.40 3.40
2.07 Average Take l/m 3.70 3.60 3.40 3.40 3.40 3.50 0.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13847.3 13849.5 13851.6 13853.8 13856.1 13858.4 litres/min
Take litres 2.20 2.10 2.20 2.30 2.30
1.38 Average Take l/m 2.20 2.10 2.20 2.30 2.30 2.22 0.30
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13859.2 13860.3 13861.5 13862.7 13863.9 13865.1 litres/min
Take litres 1.10 1.20 1.20 1.20 1.20
0.69 Average Take l/m 1.10 1.20 1.20 1.20 1.20 1.18 0.29
Print 11/12/10 11:25
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-15AGTKITSAULT PROJECT
Downstream of South Abutment
0.4
0.5 STAGE PRESSURE VERSUS LUGEON VALUE
2.2
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.407 MAX k= 4.07E-06
DETERMINATION:
MIN Lu= 0.289 MIN k= 2.89E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.289 AVG k= 2.89E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. STABLE FOR P1. NO LEAKS WERE NOTICED DURING THE TEST. WATER WAS COMING OUT OF THE CASING
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 5
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.5
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.5
2.2
1.5
0.8
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 5 of 5 B2-24 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 29.50 8.99
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 28/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 60.00 18.29 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13956.8 13961.9 13967.3 13972.9 13978.5 13984.0 litres/min
Take litres 5.10 5.40 5.60 5.60 5.50
0.34 Average Take l/m 5.10 5.40 5.60 5.60 5.50 5.44 12.87
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13987.9 13993.6 13999.3 14004.9 14010.5 14016.1 litres/min
Take litres 5.70 5.65 5.65 5.60 5.60
0.48 Average Take l/m 5.70 5.65 5.65 5.60 5.60 5.64 10.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14027.0 14036.2 14045.2 14054.0 14062.8 14071.6 litres/min
Take litres 9.20 9.00 8.80 8.80 8.80
0.97 Average Take l/m 9.20 9.00 8.80 8.80 8.80 8.92 8.92
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14074.8 14080.8 14086.7 14092.6 14098.6 14104.6 litres/min
Take litres 5.95 5.95 5.90 6.00 6.00
0.55 Average Take l/m 5.95 5.95 5.90 6.00 6.00 5.96 9.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14109.7 14114.6 14119.6 14124.5 14129.4 14134.4 litres/min
Take litres 4.90 5.00 4.85 4.95 4.95
0.34 Average Take l/m 4.90 5.00 4.85 4.95 4.95 4.93 11.66
Print 11/12/10 11:32
KITSAULT PROJECT
Along South Embankment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-16GT
12 0
14.0 STAGE PRESSURE VERSUS LUGEON VALUE
1.1
1.2FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 12.865 MAX k= 1.29E-04
DETERMINATION:
MIN Lu= 8.921 MIN k= 8.92E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 8.921 AVG k= 8.92E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 1
NO LEAKS WERE NOTICED DURING TESTING. FLOW RATE SEEMED HIGH. ALLOWED APPROX 5MIN FOR TEST ZONE TO FILL BEFORE STARTING TEST. HOLE WAS WASHED FOR APPROX 35MIN BEFORE TEST AS EACH ROD WAS BEING GREASED BEFORE DRILLING.
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.34 0.48 0.97 0.55 0.34
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.5
0.6
1.1
0.7
0.5
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 5 B2-25 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 59.50 18.14
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 29-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 90.00 27.44 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14156.9 14157.5 14158.1 14158.7 14159.2 14159.7 litres/min
Take litres 0.60 0.60 0.60 0.50 0.50
0.69 Average Take l/m 0.60 0.60 0.60 0.50 0.50 0.56 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14160.4 14161.1 14161.8 14162.4 14162.9 14163.5 litres/min
Take litres 0.70 0.70 0.60 0.50 0.60
1.38 Average Take l/m 0.70 0.70 0.60 0.50 0.60 0.62 0.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14164.2 14165.0 14165.6 14166.2 14166.9 14167.5 litres/min
Take litres 0.80 0.60 0.60 0.70 0.55
2.07 Average Take l/m 0.80 0.60 0.60 0.70 0.55 0.65 0.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14167.6 14168.1 14168.5 14168.9 14169.3 14169.6 litres/min
Take litres 0.50 0.40 0.40 0.35 0.35
1.38 Average Take l/m 0.50 0.40 0.40 0.35 0.35 0.40 0.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14169.8 14170.0 14170.2 14170.4 14170.6 14170.8 litres/min
Take litres 0.20 0.20 0.20 0.20 0.20
0.69 Average Take l/m 0.20 0.20 0.20 0.20 0.20 0.20 0.24
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-16GTKITSAULT PROJECT
Downstream of South Abutment
Print 11/12/10 11:32
0 6
0.7 STAGE PRESSURE VERSUS LUGEON VALUE
2.3
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.660 MAX k= 6.60E-06
DETERMINATION:
MIN Lu= 0.236 MIN k= 2.36E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.236 AVG k= 2.36E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:
GAUGE WAS STEADY THROUGHOUT TEST, NOL EAKS WERE NOTICED.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 2
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.9
1.6
2.3
1.6
0.9
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 5 B2-26 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 89.50 27.29
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 125.00 38.11 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14196.7 14197.8 14199.0 14200.1 14201.3 14202.4 litres/min
Take litres 1.10 1.20 1.10 1.20 1.10
1.03 Average Take l/m 1.10 1.20 1.10 1.20 1.10 1.14 0.84
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14203.4 14205.5 14207.5 14209.4 14211.4 14213.3 litres/min
Take litres 2.10 2.00 1.90 2.00 1.90
2.07 Average Take l/m 2.10 2.00 1.90 2.00 1.90 1.98 0.80
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14216.1 14218.9 14221.6 14224.3 14227.0 14229.7 litres/min
Take litres 2.80 2.70 2.70 2.70 2.70
3.03 Average Take l/m 2.80 2.70 2.70 2.70 2.70 2.72 0.77
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14230.6 14232.4 14234.2 14236.0 14237.8 14239.5 litres/min
Take litres 1.80 1.80 1.80 1.80 1.70
2.07 Average Take l/m 1.80 1.80 1.80 1.80 1.70 1.78 0.72
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14240.3 14241.3 14242.3 14243.4 14244.4 14245.5 litres/min
Take litres 1.00 1.00 1.10 1.00 1.10
1.03 Average Take l/m 1.00 1.00 1.10 1.00 1.10 1.04 0.77
Print 11/12/10 11:32
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-16GTKITSAULT PROJECT
Downstream of South Abutment
0.8
0.9 STAGE PRESSURE VERSUS LUGEON VALUE
3.3
3 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.840 MAX k= 8.40E-06
DETERMINATION:
MIN Lu= 0.719 MIN k= 7.19E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.772 AVG k= 7.72E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
PRESSURE GAUGE WAS STEADY, NO LEAKS WERE NOTICED.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 3
0.6
0.7
0.7
0.7
0.7
0.7
0.8
0.8
0.8
0.8
0.8
0.9
1.03 2.07 3.03 2.07 1.03
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.3
2.3
3.3
2.3
1.3
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 5 B2-27 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 124.50 37.96
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 29/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 165.00 50.30 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14275.0 14277.5 14280.3 14283.1 14285.6 14288.6 14291.3 litres/min
Take litres 2.50 2.80 2.75 2.55 3.00 2.7
1.38 Average Take l/m 2.50 2.80 2.75 2.55 3.00 2.7 2.72 1.39
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14294.1 14298.3 14302.5 14306.7 14310.8 14315.0 litres/min
Take litres 4.20 4.20 4.20 4.10 4.15
2.55 Average Take l/m 4.20 4.20 4.20 4.10 4.15 4.17 1.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14320.0 14325.9 14331.5 14337.0 14342.5 14347.9 litres/min
Take litres 5.90 5.60 5.50 5.50 5.40
4.27 Average Take l/m 5.90 5.60 5.50 5.50 5.40 5.58 1.01
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14353.5 14357.4 14361.1 14364.9 14368.6 14372.3 litres/min
Take litres 3.85 3.75 3.75 3.75 3.70
2.48 Average Take l/m 3.85 3.75 3.75 3.75 3.70 3.76 1.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14375.0 14377.8 14380.5 14383.2 14385.8 14388.5 litres/min
Take litres 2.75 2.75 2.65 2.65 2.70
1.45 Average Take l/m 2.75 2.75 2.65 2.65 2.70 2.70 1.33
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-16GTKITSAULT PROJECT
Downstream of South Abutment
Print 11/12/10 11:32
1.4
1.6 STAGE PRESSURE VERSUS LUGEON VALUE
4.54.5
5.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.393 MAX k= 1.39E-05
DETERMINATION:
MIN Lu= 1.010 MIN k= 1.01E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.010 AVG k= 1.01E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 4
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.38 2.55 4.27 2.48 1.45
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.6
2.8
4.5
2.7
1.6
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 5 B2-28 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 164.50 50.15
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 29/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.00 60.98 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13638.0 13638.8 13639.5 13640.3 13641.0 13641.8 litres/min
Take litres 0.80 0.70 0.75 0.75 0.75
2.07 Average Take l/m 0.80 0.70 0.75 0.75 0.75 0.75 0.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13642.7 13643.9 13645.1 13646.2 13647.3 13648.3 litres/min
Take litres 1.20 1.15 1.15 1.05 1.05
4.07 Average Take l/m 1.20 1.15 1.15 1.05 1.05 1.12 0.24
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13649.2 13650.6 13652.0 13653.3 13654.6 13655.8 litres/min
Take litres 1.40 1.35 1.30 1.30 1.25
5.72 Average Take l/m 1.40 1.35 1.30 1.30 1.25 1.32 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13656.5 13657.4 13658.2 13659.1 13659.9 13660.8 litres/min
Take litres 0.83 0.85 0.85 0.85 0.85
3.46 Average Take l/m 0.83 0.85 0.85 0.85 0.85 0.85 0.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13661.3 13662.1 13663.0 13663.9 13664.8 13665.7 litres/min
Take litres 0.80 0.90 0.90 0.85 0.90
2.62 Average Take l/m 0.80 0.90 0.90 0.85 0.90 0.87 0.28
Print 11/12/10 11:32
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-16GTKITSAULT PROJECT
Downstream of South Abutment
0 3
0.4 STAGE PRESSURE VERSUS LUGEON VALUE
5 96 0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.305 MAX k= 3.05E-06
DETERMINATION:
MIN Lu= 0.206 MIN k= 2.06E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.206 AVG k= 2.06E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER GAUGE WAS ERRATIC THROUGHOUT THE TEST. LOW CONFIDENCE ON PRESSURE DATAPRESSURES WERE CORRECTED WITH TRANSDUCER DATA.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 5
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
2.07 4.07 5.72 3.46 2.62
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.3
4.3
5.9
3.7
2.8
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 5 of 5 B2-29 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 29.40 8.96
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 64.90 19.79 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13689.5 13691.4 13693.3 13695.1 13696.8 13698.5 litres/min
Take litres 1.90 1.85 1.80 1.75 1.70
0.34 Average Take l/m 1.90 1.85 1.80 1.75 1.70 1.80 3.43
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13700.0 13702.0 13703.9 13705.8 13707.7 13709.5 litres/min
Take litres 2.00 1.90 1.85 1.90 1.85
0.55 Average Take l/m 2.00 1.90 1.85 1.90 1.85 1.90 2.54
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13711.5 13713.8 13716.1 13718.3 13720.5 13722.6 13724.7 litres/min
Take litres 2.30 2.30 2.20 2.15 2.15 2.1
0.90 Average Take l/m 2.30 2.30 2.20 2.15 2.15 2.1 2.20 1.96
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13727.3 13728.9 13730.5 13732.0 13733.5 13735.0 13736.55 litres/min
Take litres 1.55 1.60 1.55 1.50 1.50 1.55
0.52 Average Take l/m 1.55 1.60 1.55 1.50 1.50 1.55 1.54 2.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13737.7 13739.0 13740.3 13741.5 13742.8 13744.0 litres/min
Take litres 1.30 1.25 1.25 1.25 1.25
0.34 Average Take l/m 1.30 1.25 1.25 1.25 1.25 1.26 2.40
VA101-343/6 K10-17GTKITSAULT PROJECT
Northeast Embankment (site I)
Print 11/12/10 11:39
LUGEON TEST FIELD DATA SHEET
3.5
4.0 STAGE PRESSURE VERSUS LUGEON VALUE
1.0
1.2FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER METER AND TRANSDUCER MAX Lu= 3.431 MAX k= 3.43E-05
DETERMINATION:
MIN Lu= 1.961 MIN k= 1.96E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.961 AVG k= 1.96E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:NO LEAKS DURING TEST. THE PRESSURE GAUGE WAS ERRATIC FOR P3
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0.34 0.55 0.90 0.52 0.34
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.5
0.7
1.0
0.7
0.5
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.00 0.50 1.00 1.50 2.00 2.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
A0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 5 B2-30 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 59.40 18.11
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 30-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 99.90 30.46 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13764.8 13765.9 13767.0 13767.9 13768.9 13769.8 litres/min
Take litres 1.10 1.05 0.95 0.95 0.90
0.55 Average Take l/m 1.10 1.05 0.95 0.95 0.90 0.99 1.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13771.0 13772.2 13773.2 13774.3 13775.4 13776.4 litres/min
Take litres 1.15 1.05 1.10 1.10 1.00
1.24 Average Take l/m 1.15 1.05 1.10 1.10 1.00 1.08 0.63
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13777.8 13779.1 13780.3 13781.5 13782.7 13783.8 litres/min
Take litres 1.25 1.20 1.20 1.20 1.15
1.72 Average Take l/m 1.25 1.20 1.20 1.20 1.15 1.20 0.52
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13785.0 13786.0 13786.9 13787.8 13788.7 13789.5 litres/min
Take litres 0.95 0.90 0.90 0.90 0.85
0.90 Average Take l/m 0.95 0.90 0.90 0.90 0.85 0.90 0.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13790.1 13790.9 13791.7 13792.4 13793.2 13793.9 litres/min
Take litres 0.80 0.75 0.75 0.75 0.75
0.62 Average Take l/m 0.80 0.75 0.75 0.75 0.75 0.76 0.81
Print 11/12/10 11:39
KITSAULT PROJECT
Northeast Embankment (site I)
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-17GT
1 2
1.4 STAGE PRESSURE VERSUS LUGEON VALUE
1.91.8
2.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.159 MAX k= 1.16E-05
DETERMINATION:
MIN Lu= 0.521 MIN k= 5.21E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.521 AVG k= 5.21E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
0.55 1.24 1.72 0.90 0.62
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
1.4
1.9
1.0
0.8
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 5 B2-31 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 94.40 28.78
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 129.90 39.60 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13816.8 13817.9 13819.2 13820.4 13821.5 13822.7 litres/min
Take litres 1.10 1.30 1.20 1.10 1.20
1.03 Average Take l/m 1.10 1.30 1.20 1.10 1.20 1.18 0.93
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13823.9 13825.7 13827.4 13829.1 13830.7 13832.3 litres/min
Take litres 1.80 1.70 1.70 1.60 1.60
2.07 Average Take l/m 1.80 1.70 1.70 1.60 1.60 1.68 0.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13834.4 13837.0 13839.4 13841.8 13844.1 13846.4 litres/min
Take litres 2.60 2.40 2.40 2.30 2.30
3.10 Average Take l/m 2.60 2.40 2.40 2.30 2.30 2.40 0.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13847.7 13849.4 13851.0 13852.7 13854.3 13855.9 litres/min
Take litres 1.70 1.60 1.70 1.60 1.60
2.07 Average Take l/m 1.70 1.60 1.70 1.60 1.60 1.64 0.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13856.6 13857.6 13858.9 13860.0 13861.2 13862.3 litres/min
Take litres 1.00 1.30 1.10 1.20 1.10
0.97 Average Take l/m 1.00 1.30 1.10 1.20 1.10 1.14 0.95
Print 11/12/10 11:39
KITSAULT PROJECT
Northeast Embankment (site I)
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-17GT
1.2 STAGE PRESSURE VERSUS LUGEON VALUE
3.2
3 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.953 MAX k= 9.53E-06
DETERMINATION:
MIN Lu= 0.684 MIN k= 6.84E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.684 AVG k= 6.84E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Good seal around landing ring, no leaks during test, gauge was jumpy especially at higher pressures.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 3
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.03 2.07 3.10 2.07 0.97
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.2
2.2
3.2
2.2
1.1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 5 B2-32 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 124.40 37.93
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 164.90 50.27 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13894.6 13897.2 13899.8 13902.4 13904.9 13907.3 litres/min
Take litres 2.60 2.60 2.60 2.50 2.40
1.38 Average Take l/m 2.60 2.60 2.60 2.50 2.40 2.54 1.35
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13912.0 13917.2 13922.2 13927.1 13931.9 13936.6 litres/min
Take litres 5.20 5.00 4.90 4.80 4.70
2.76 Average Take l/m 5.20 5.00 4.90 4.80 4.70 4.92 1.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13940.0 13947.0 13954.2 13960.4 13967.0 13973.6 litres/min
Take litres 7.00 7.20 6.20 6.60 6.60
4.14 Average Take l/m 7.00 7.20 6.20 6.60 6.60 6.72 1.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 13976.4 13981.3 13986.0 13990.6 13995.2 13999.8 litres/min
Take litres 4.90 4.70 4.60 4.60 4.60
2.76 Average Take l/m 4.90 4.70 4.60 4.60 4.60 4.68 1.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14001.2 14003.2 14005.1 14007.1 14009.3 14010.4 litres/min
Take litres 2.00 1.90 2.00 2.20 1.10
1.38 Average Take l/m 2.00 1.90 2.00 2.20 1.10 1.84 0.98
VA101-343/6 K10-17GTKITSAULT PROJECT
Northeast Embankment (site I)
Print 11/12/10 11:39
LUGEON TEST FIELD DATA SHEET
1.4
1.6 STAGE PRESSURE VERSUS LUGEON VALUE4.3
4.0
4.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.375 MAX k= 1.37E-05
DETERMINATION:
MIN Lu= 0.981 MIN k= 9.81E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.258 AVG k= 1.26E-05
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST. After test water in rods was observed to rise up to 2.0m above ground, after 30min the level began to drop again, cracks in rock likely swelled during test and then squeezed water back out.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 4
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.38 2.76 4.14 2.76 1.38
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.5
2.9
4.3
2.9
1.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 5 B2-33 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 154.90 47.23
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 199.90 60.95 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14058.2 14062.4 14066.4 14070.2 14074.0 14077.7 litres/min
Take litres 4.15 4.00 3.85 3.80 3.70
1.79 Average Take l/m 4.15 4.00 3.85 3.80 3.70 3.90 1.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14090.6 14097.6 14104.4 14111.1 14117.7 14124.3 litres/min
Take litres 7.00 6.80 6.70 6.60 6.60
3.38 Average Take l/m 7.00 6.80 6.70 6.60 6.60 6.74 1.40
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14151.5 14161.2 14170.8 14180.3 14189.8 14199.2 litres/min
Take litres 9.70 9.60 9.50 9.50 9.40
5.17 Average Take l/m 9.70 9.60 9.50 9.50 9.40 9.54 1.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14207.4 14212.9 14218.5 14224.2 14229.9 14235.7 litres/min
Take litres 5.50 5.60 5.70 5.70 5.75
3.24 Average Take l/m 5.50 5.60 5.70 5.70 5.75 5.65 1.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14238.0 14240.0 14242.4 14245.0 14247.6 14250.4 litres/min
Take litres 2.00 2.40 2.60 2.60 2.75
1.86 Average Take l/m 2.00 2.40 2.60 2.60 2.75 2.47 0.90
VA101-343/6 K10-17GTKITSAULT PROJECT
Northeast Embankment (site I)
Print 11/12/10 11:39
LUGEON TEST FIELD DATA SHEET
1.4
1.6 STAGE PRESSURE VERSUS LUGEON VALUE
5.3
6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.471 MAX k= 1.47E-05
DETERMINATION:
MIN Lu= 0.899 MIN k= 8.99E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.899 AVG k= 8.99E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P3
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 5
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.79 3.38 5.17 3.24 1.86
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.9
3.5
5.3
3.4
2.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 5 of 5 B2-34 of 56
SHEET 1 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 45 oDEPTH GROUNDWATER: -1.5 m TOP OF TEST INTERVAL: 88.40 26.95
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 3-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 123.90 37.77 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14286.7 14288.6 14290.3 14292.2 14293.9 14295.7 litres/min
Take litres 1.90 1.70 1.90 1.70 1.80
0.69 Average Take l/m 1.90 1.70 1.90 1.70 1.80 1.80 2.50
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14298.7 14302.0 14305.3 14308.5 14311.5 14314.6 litres/min
Take litres 3.30 3.30 3.20 3.00 3.10
1.38 Average Take l/m 3.30 3.30 3.20 3.00 3.10 3.18 2.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14321.2 14325.3 14329.3 14333.2 14337.1 14341.0 litres/min
Take litres 4.10 4.00 3.90 3.90 3.90
2.10 Average Take l/m 4.10 4.00 3.90 3.90 3.90 3.96 1.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14342.8 14345.4 14348.0 14350.5 14353.1 14355.7 litres/min
Take litres 2.60 2.60 2.50 2.60 2.60
1.38 Average Take l/m 2.60 2.60 2.50 2.60 2.60 2.58 1.76
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14356.6 14357.8 14359.1 14360.4 14361.7 14363.0 litres/min
Take litres 1.20 1.30 1.30 1.30 1.30
0.72 Average Take l/m 1.20 1.30 1.30 1.30 1.30 1.28 1.69
VA101-343/6 K10-18GTKITSAULT PROJECT
South Abutment
Print 11/12/10 11:46
LUGEON TEST FIELD DATA SHEET
3.0 STAGE PRESSURE VERSUS LUGEON VALUE
2 1
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.502 MAX k= 2.50E-05
DETERMINATION:
MIN Lu= 1.691 MIN k= 1.69E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.691 AVG k= 1.69E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:Some water was observed to be coming out of the casing, however the test caused artesian water pressure at the test depth and this water likely flowed around the packer.Water was at ground level before test and 2.9m above after test, depth to groundwater was taken as the average of these two values.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.69 1.38 2.10 1.38 0.72
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
1.4
2.1
1.4
0.7
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 3 B2-35 of 56
SHEET 2 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 45 oDEPTH GROUNDWATER: -1.1 m TOP OF TEST INTERVAL: 123.40 37.62
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 158.90 48.45 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14458.5 14466.8 14475.9 14483.1 14491.0 14499.0 litres/min
Take litres 8.30 9.10 7.20 7.90 8.00
1.03 Average Take l/m 8.30 9.10 7.20 7.90 8.00 8.10 7.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14503.0 14515.3 14527.1 14539.0 14551.0 14562.7 litres/min
Take litres 12.30 11.80 11.90 12.00 11.70
2.07 Average Take l/m 12.30 11.80 11.90 12.00 11.70 11.94 5.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14572.0 14587.2 14602.0 14617.5 14630.9 14644.4 litres/min
Take litres 15.20 14.80 15.50 13.40 13.50
3.10 Average Take l/m 15.20 14.80 15.50 13.40 13.50 14.48 4.31
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14649.1 14660.4 14669.8 14679.9 14690.0 14700.1 litres/min
Take litres 11.30 9.40 10.10 10.10 10.10
2.07 Average Take l/m 11.30 9.40 10.10 10.10 10.10 10.20 4.55
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14708.0 14715.0 14721.8 14728.6 14735.4 14742.1 litres/min
Take litres 7.00 6.80 6.80 6.80 6.70
1.03 Average Take l/m 7.00 6.80 6.80 6.80 6.70 6.82 6.07
Print 11/12/10 11:46
KITSAULT PROJECT
South Abutment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-18GT
7.0
8.0 STAGE PRESSURE VERSUS LUGEON VALUE
3.13 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 7.212 MAX k= 7.21E-05
DETERMINATION:
MIN Lu= 4.307 MIN k= 4.31E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 4.307 AVG k= 4.31E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:GAUGE WAS ERRATIC AT P3 PRESSURE, A LEAK WAS NOTICED TO INCREASE WITH PRESSURE IN THE CASING BUT IT ONLY ACCOUNTED FOR 5% OF THE FLOW REGISTERED ON THE FLOWMETER, ARTESIAN PRESSURES TO 2.1M ABOVE GROUND AFTER TEST.Water was at ground level before test and 2.1m above after test, depth to groundwater was taken as the average of these two values.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
1.03 2.07 3.10 2.07 1.03
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.1
2.1
3.1
2.1
1.1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 3 B2-36 of 56
SHEET 3 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 45 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 153.40 46.77
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 4-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 188.90 57.59 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14769.0 14772.7 14776.2 14779.7 14783.1 14786.3 litres/min
Take litres 3.70 3.50 3.50 3.40 3.20
1.21 Average Take l/m 3.70 3.50 3.50 3.40 3.20 3.46 2.49
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14791.0 14796.3 14801.4 14806.5 14811.3 14816.2 litres/min
Take litres 5.30 5.10 5.10 4.80 4.90
2.31 Average Take l/m 5.30 5.10 5.10 4.80 4.90 5.04 1.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14822.0 14829.5 14835.9 14842.6 14849.2 14855.7 litres/min
Take litres 7.50 6.40 6.70 6.60 6.50
3.52 Average Take l/m 7.50 6.40 6.70 6.60 6.50 6.74 1.73
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14860.0 14864.3 14868.5 14872.8 14877.1 14881.4 litres/min
Take litres 4.30 4.20 4.30 4.30 4.30
2.34 Average Take l/m 4.30 4.20 4.30 4.30 4.30 4.28 1.63
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 14882.6 14884.8 14887.2 14889.5 14891.9 14894.4 litres/min
Take litres 2.20 2.40 2.30 2.40 2.50
1.10 Average Take l/m 2.20 2.40 2.30 2.40 2.50 2.36 1.85
VA101-343/6 K10-18GTKITSAULT PROJECT
South Abutment
Print 11/12/10 11:46
LUGEON TEST FIELD DATA SHEET
3.0 STAGE PRESSURE VERSUS LUGEON VALUE
3.63.5
4.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.489 MAX k= 2.49E-05
DETERMINATION:
MIN Lu= 1.633 MIN k= 1.63E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.733 AVG k= 1.73E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:Pressure gauge was steady, a trickle of water was noted coming out of the casing during the test.1.5L/min lost at 100psi after packer was inflated but pin was not broken yet.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 3
0.0
0.5
1.0
1.5
2.0
2.5
3.0
1.21 2.31 3.52 2.34 1.10
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.3
2.4
3.6
2.5
1.2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 3 B2-37 of 56
SHEET 1 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 0 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 29.70 9.05
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 60.20 18.35 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 908.0 910.8 913.3 915.8 918.5 921.0 litres/min
Take litres 2.80 2.50 2.50 2.70 2.50
1.77 Average Take l/m 2.80 2.50 2.50 2.70 2.50 2.60 1.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 924.2 927.4 930.7 933.9 937.4 940.5 litres/min
Take litres 3.20 3.30 3.20 3.50 3.10
2.46 Average Take l/m 3.20 3.30 3.20 3.50 3.10 3.26 1.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 943.8 946.5 950.0 953.8 957.4 961.0 litres/min
Take litres 2.70 3.50 3.80 3.60 3.60
2.94 Average Take l/m 2.70 3.50 3.80 3.60 3.60 3.44 1.26
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 962.3 965.3 968.3 971.3 974.2 977.2 litres/min
Take litres 3.00 3.00 3.00 2.90 3.00
2.19 Average Take l/m 3.00 3.00 3.00 2.90 3.00 2.98 1.47
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 978.6 980.8 982.8 984.8 986.9 989.1 litres/min
Take litres 2.20 2.00 2.00 2.10 2.20
1.29 Average Take l/m 2.20 2.00 2.00 2.10 2.20 2.10 1.75
Print 11/12/10 11:51
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-19GTKITSAULT PROJECT
South Abutment Monitoring Well Installation
1.8
2.0 STAGE PRESSURE VERSUS LUGEON VALUE
3.03 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.752 MAX k= 1.75E-05
DETERMINATION:
MIN Lu= 1.257 MIN k= 1.26E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.257 AVG k= 1.26E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.All pressures were adjusted off transducer data.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-19GT Packer Tests.xls]Test 1
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
1.77 2.46 2.94 2.19 1.29
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.9
2.6
3.0
2.3
1.4
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 2 B2-38 of 56
SHEET 2 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 0 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 59.70 18.20
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 5-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 100.20 30.55 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 313.2 316.2 319.0 321.7 324.4 327.1 litres/min
Take litres 3.00 2.80 2.70 2.70 2.70
0.69 Average Take l/m 3.00 2.80 2.70 2.70 2.70 2.78 3.27
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 330.7 334.4 338.1 341.7 345.2 348.9 litres/min
Take litres 3.70 3.70 3.60 3.50 3.70
1.38 Average Take l/m 3.70 3.70 3.60 3.50 3.70 3.64 2.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 351.2 355.3 359.3 363.2 367.2 371.4 litres/min
Take litres 4.10 4.00 3.90 4.00 4.20
2.07 Average Take l/m 4.10 4.00 3.90 4.00 4.20 4.04 1.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 373.2 376.8 380.3 383.9 387.2 391.0 litres/min
Take litres 3.60 3.50 3.60 3.30 3.80
1.38 Average Take l/m 3.60 3.50 3.60 3.30 3.80 3.56 2.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 393.8 396.7 399.5 402.3 405.1 407.9 litres/min
Take litres 2.90 2.80 2.80 2.80 2.80
0.69 Average Take l/m 2.90 2.80 2.80 2.80 2.80 2.82 3.31
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-19GTKITSAULT PROJECT
South Abutment Monitoring Well Installation
Print 11/12/10 11:51
3 0
3.5 STAGE PRESSURE VERSUS LUGEON VALUE
2.2
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 3.312 MAX k= 3.31E-05
DETERMINATION:
MIN Lu= 1.582 MIN k= 1.58E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.582 AVG k= 1.58E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:SOME WATER WAS COMING UP THROUGH THE CASING FOR THE DURATION OF THE TEST (~1 L/min)~0.8 L/min LOSS THROUGH THE RODS (MEASURED WHILE INCREASING PRESSURE TO SHEAR THE PIN).
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-19GT Packer Tests.xls]Test 2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.5
2.2
1.5
0.8
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 2 B2-39 of 56
SHEET 1 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 1.0 m TOP OF TEST INTERVAL: 39.50 12.04
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 13-Aug-10 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 75.00 22.87 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 436.0 443.6 450.9 458.6 466.1 473.5 litres/min
Take litres 7.60 7.30 7.70 7.50 7.40
0.69 Average Take l/m 7.60 7.30 7.70 7.50 7.40 7.50 7.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 477.4 487.9 497.8 507.4 517.0 525.9 litres/min
Take litres 10.50 9.90 9.60 9.60 8.90
1.38 Average Take l/m 10.50 9.90 9.60 9.60 8.90 9.70 5.75
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 533.0 544.8 556.3 567.7 579.3 590.5 litres/min
Take litres 11.80 11.50 11.40 11.60 11.20
2.07 Average Take l/m 11.80 11.50 11.40 11.60 11.20 11.50 4.73
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 595.4 603.6 611.8 619.8 627.8 635.8 litres/min
Take litres 8.20 8.20 8.00 8.00 8.00
1.38 Average Take l/m 8.20 8.20 8.00 8.00 8.00 8.08 4.79
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 638.5 643.8 649.3 654.4 659.5 664.8 litres/min
Take litres 5.30 5.50 5.10 5.10 5.30
0.69 Average Take l/m 5.30 5.50 5.10 5.10 5.30 5.26 5.59
Print 11/12/10 11:54
VA101-343/6 K10-20GTKITSAULT PROJECT
Downstream of Northeast Embankment
LUGEON TEST FIELD DATA SHEET
8.0
9.0 STAGE PRESSURE VERSUS LUGEON VALUE
2.2
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 7.970 MAX k= 7.97E-05
DETERMINATION:
MIN Lu= 4.726 MIN k= 4.73E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 4.726 AVG k= 4.73E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-20GT packer tests.xls]Test 1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.9
1.6
2.2
1.6
0.9
0.0
0.5
1.0
1.5
2.0
2.5
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 2 B2-40 of 56
SHEET 2 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.4 m TOP OF TEST INTERVAL: 74.60 22.74
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 13-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 100.30 30.58 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 718.6 725.0 731.8 738.1 743.9 749.8 litres/min
Take litres 6.40 6.80 6.30 5.80 5.90
0.90 Average Take l/m 6.40 6.80 6.30 5.80 5.90 6.24 7.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 760.4 768.7 776.9 785.0 793.2 801.3 litres/min
Take litres 8.30 8.20 8.10 8.20 8.10
1.72 Average Take l/m 8.30 8.20 8.10 8.20 8.10 8.18 5.60
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 823.5 833.9 844.6 855.2 865.8 876.7 litres/min
Take litres 10.40 10.70 10.60 10.60 10.90
2.65 Average Take l/m 10.40 10.70 10.60 10.60 10.90 10.64 4.86
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 889.8 898.2 906.8 915.3 923.9 932.7 litres/min
Take litres 8.40 8.60 8.50 8.60 8.80
1.65 Average Take l/m 8.40 8.60 8.50 8.60 8.80 8.58 6.10
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 940.6 947.5 954.4 961.9 969.4 977.3 litres/min
Take litres 6.90 6.90 7.50 7.50 7.90
0.90 Average Take l/m 6.90 6.90 7.50 7.50 7.90 7.34 9.04
KITSAULT PROJECT
Downstream of Northeast Embankment
Print 11/12/10 11:54
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-20GT
9.0
10.0 STAGE PRESSURE VERSUS LUGEON VALUE
2.8
3.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 9.039 MAX k= 9.04E-05
DETERMINATION:
MIN Lu= 4.859 MIN k= 4.86E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 4.859 AVG k= 4.86E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC DURING P MAX (MORE STEADY FOR P1 AND P2). P3 ADJUSTED OFF TRANSDUCER.NEGLIGIBLE LEAK FROM SWIVEL HEAD. NO OTHER LEAKS DETECTED.~0.8 L/MIN SYSTEM LOSSES AT 37 PSI (MEASURED DURING BLADDER INFLATION). THESE SYSTEM LOSSES HAVE NOT BEEN ACCOUNTED FOR YET.
TEST BY: CG REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-20GT packer tests.xls]Test 2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.90 1.72 2.65 1.65 0.90
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.0
1.9
2.8
1.8
1.0
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 2 B2-41 of 56
SHEET 1 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 1.3 m TOP OF TEST INTERVAL: 29.40 8.96
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 14-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 60.30 18.38 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 355.4 363.4 371.7 379.9 387.9 395.9 litres/min
Take litres 8.00 8.30 8.20 8.00 8.00
0.55 Average Take l/m 8.00 8.30 8.20 8.00 8.00 8.10 10.59
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 404.0 417.1 429.8 442.2 455.0 467.7 litres/min
Take litres 13.10 12.70 12.40 12.80 12.70
1.03 Average Take l/m 13.10 12.70 12.40 12.80 12.70 12.74 10.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 569.0 584.7 600.6 616.6 632.4 648.2 litres/min
Take litres 15.70 15.90 16.00 15.80 15.80
1.59 Average Take l/m 15.70 15.90 16.00 15.80 15.80 15.84 9.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 771.3 783.3 795.1 807.2 819.0 830.9 litres/min
Take litres 12.00 11.80 12.10 11.80 11.90
1.03 Average Take l/m 12.00 11.80 12.10 11.80 11.90 11.92 9.78
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 839.7 848.0 856.4 864.9 873.5 881.9 litres/min
Take litres 8.30 8.40 8.50 8.60 8.40
0.55 Average Take l/m 8.30 8.40 8.50 8.60 8.40 8.44 11.04
VA101-343/6 K10-21GTKITSAULT PROJECT
Upstream of Northeast Embankment
Print 11/12/10 12:34
LUGEON TEST FIELD DATA SHEET
12.0 STAGE PRESSURE VERSUS LUGEON VALUE
1.81.8
2.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 11.039 MAX k= 1.10E-04
DETERMINATION:
MIN Lu= 9.109 MIN k= 9.11E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 9.109 AVG k= 9.11E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:2nd attempt. First attempt bit was 5 ft higher, water was coming out through the casing.
TEST BY: started by JS, finished by CG REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-21GT packer tests.xls]Test 1
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.55 1.03 1.59 1.03 0.55
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.3
1.8
1.3
0.8
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 2 B2-42 of 56
SHEET 2 OF 2
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 59.90 18.26
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 15-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 100.40 30.61 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 6958.0 6973.5 6987.0 7000.0 7014.0 7027.0 litres/min
Take litres 15.50 13.50 13.00 14.00 13.00
0.69 Average Take l/m 15.50 13.50 13.00 14.00 13.00 13.80 13.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7034.0 7052.0 7068.0 7085.5 7102.5 7119.0 litres/min
Take litres 18.00 16.00 17.50 17.00 16.50
1.38 Average Take l/m 18.00 16.00 17.50 17.00 16.50 17.00 8.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7128.0 7147.0 7167.0 7186.0 7206.0 7226.0 litres/min
Take litres 19.00 20.00 19.00 20.00 20.00
2.07 Average Take l/m 19.00 20.00 19.00 20.00 20.00 19.60 7.12
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7233.0 7248.0 7264.0 7279.0 7296.0 7311.0 litres/min
Take litres 15.00 16.00 15.00 17.00 15.00
1.38 Average Take l/m 15.00 16.00 15.00 17.00 15.00 15.60 8.21
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 7316.0 7327.0 7339.1 7350.8 7362.2 7374.0 litres/min
Take litres 11.00 12.10 11.70 11.40 11.80
0.69 Average Take l/m 11.00 12.10 11.70 11.40 11.80 11.60 11.06
K10-21GTKITSAULT PROJECT
Upstream of Northeast Embankment
Print 11/12/10 12:34
LUGEON TEST FIELD DATA SHEET
VA101-343/6
12 0
14.0 STAGE PRESSURE VERSUS LUGEON VALUE
2.2
2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 13.157 MAX k= 1.32E-04
DETERMINATION:
MIN Lu= 7.123 MIN k= 7.12E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 7.123 AVG k= 7.12E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-21GT packer tests.xls]Test 2
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
0.69 1.38 2.07 1.38 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.5
2.2
1.5
0.8
0.0
0.5
1.0
1.5
2.0
2.5
0.00 5.00 10.00 15.00 20.00 25.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 2 B2-43 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 34.50 10.52
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 15-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 84.00 25.61 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 403.2 405.6 407.9 410.2 412.4 414.6 litres/min
Take litres 2.40 2.30 2.25 2.25 2.20
0.55 Average Take l/m 2.40 2.30 2.25 2.25 2.20 2.28 2.15
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 415.8 418.7 421.4 424.1 426.8 429.4 litres/min
Take litres 2.90 2.70 2.70 2.65 2.65
1.10 Average Take l/m 2.90 2.70 2.70 2.65 2.65 2.72 1.44
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 430.5 433.9 437.1 440.4 443.6 446.8 litres/min
Take litres 3.35 3.25 3.25 3.25 3.20
1.79 Average Take l/m 3.35 3.25 3.25 3.25 3.20 3.26 1.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 447.9 450.5 453.0 455.5 458.1 460.8 litres/min
Take litres 2.55 2.55 2.50 2.60 2.65
1.24 Average Take l/m 2.55 2.55 2.50 2.60 2.65 2.57 1.22
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 461.4 463.2 465.1 466.9 468.8 470.7 litres/min
Take litres 1.80 1.85 1.85 1.85 1.90
0.69 Average Take l/m 1.80 1.85 1.85 1.85 1.90 1.85 1.46
K10-22GTKITSAULT PROJECT
TMF South Abutment (site D)
Print 11/12/10 12:40
LUGEON TEST FIELD DATA SHEET
VA101-343/6
2.5 STAGE PRESSURE VERSUS LUGEON VALUE2.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 2.153 MAX k= 2.15E-05
DETERMINATION:
MIN Lu= 1.112 MIN k= 1.11E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.112 AVG k= 1.11E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 1
0.0
0.5
1.0
1.5
2.0
2.5
0.55 1.10 1.79 1.24 0.69
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.7
1.3
1.9
1.4
0.8
0.0
0.5
1.0
1.5
2.0
2.5
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 5 B2-44 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.5 m TOP OF TEST INTERVAL: 78.30 23.87
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 16-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 129.00 39.33 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 556.0 564.8 573.7 582.4 590.9 599.3 litres/min
Take litres 8.80 8.90 8.70 8.50 8.40
0.90 Average Take l/m 8.80 8.90 8.70 8.50 8.40 8.66 5.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 619.0 631.5 643.7 656.2 668.3 680.2 litres/min
Take litres 12.50 12.20 12.50 12.10 11.90
1.79 Average Take l/m 12.50 12.20 12.50 12.10 11.90 12.24 3.97
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 700.0 717.8 734.9 751.4 768.5 785.8 litres/min
Take litres 17.80 17.10 16.50 17.10 17.30
2.69 Average Take l/m 17.80 17.10 16.50 17.10 17.30 17.16 3.84
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 801.0 812.2 823.7 835.0 846.1 857.6 litres/min
Take litres 11.20 11.50 11.30 11.10 11.50
1.79 Average Take l/m 11.20 11.50 11.30 11.10 11.50 11.32 3.68
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 869.9 877.5 885.1 892.7 900.2 907.8 litres/min
Take litres 7.60 7.60 7.60 7.50 7.60
0.90 Average Take l/m 7.60 7.60 7.60 7.50 7.60 7.58 4.47
VA101-343/6 K10-22GTKITSAULT PROJECT
TMF South Abutment (Site D)
Print 11/12/10 12:40
LUGEON TEST FIELD DATA SHEET
6.0 STAGE PRESSURE VERSUS LUGEON VALUE
3 0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 5.110 MAX k= 5.11E-05
DETERMINATION:
MIN Lu= 3.675 MIN k= 3.68E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 3.843 AVG k= 3.84E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:SYSTEM LOSSES AT Pmax ~3.6 l/min. THESE LOSSES HAVE NOT BEEN ACCOUNTED FOR YET.PRESSURE GAUGE UNSTEADY AT P2 AND PMAX.TEST DONE IN COMPETENT GREYWACKE.
TEST BY: CG REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.90 1.79 2.69 1.79 0.90
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.1
2.0
2.9
2.0
1.1
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 5 B2-45 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 3.3 m TOP OF TEST INTERVAL: 133.50 40.70
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 16-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 189.00 57.62 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4.0 16.5 28.2 39.8 51.0 62.3 litres/min
Take litres 12.50 11.70 11.60 11.20 11.30
1.72 Average Take l/m 12.50 11.70 11.60 11.20 11.30 11.66 3.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 67.6 83.4 99.4 115.2 130.2 145.6 litres/min
Take litres 15.80 16.00 15.80 15.00 15.40
3.10 Average Take l/m 15.80 16.00 15.80 15.00 15.40 15.60 2.57
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 154.0 176.4 198.5 221.0 244.6 266.8 litres/min
Take litres 22.40 22.10 22.50 23.60 22.20
4.48 Average Take l/m 22.40 22.10 22.50 23.60 22.20 22.56 2.69
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 273.0 289.0 306.0 323.5 342.0 361.5 litres/min
Take litres 16.00 17.00 17.50 18.50 19.50
3.10 Average Take l/m 16.00 17.00 17.50 18.50 19.50 17.70 2.92
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 365.5 376.3 389.4 402.6 417.8 432.3 litres/min
Take litres 10.80 13.10 13.20 15.20 14.50
1.72 Average Take l/m 10.80 13.10 13.20 15.20 14.50 13.36 3.58
K10-22GTKITSAULT PROJECT
TMF South Abutment (Site D)
Print 11/12/10 12:40
LUGEON TEST FIELD DATA SHEET
VA101-343/6
3.5
4.0 STAGE PRESSURE VERSUS LUGEON VALUE6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 3.583 MAX k= 3.58E-05
DETERMINATION:
MIN Lu= 2.573 MIN k= 2.57E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.687 AVG k= 2.69E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 3
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
1.72 3.10 4.48 3.10 1.72
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.2
3.6
5.0
3.6
2.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 5.00 10.00 15.00 20.00 25.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 5 B2-46 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 189.50 57.77
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 17-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 234.00 71.34 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 479.8 483.8 487.6 491.3 495.0 498.6 litres/min
Take litres 4.00 3.80 3.70 3.70 3.60
1.72 Average Take l/m 4.00 3.80 3.70 3.70 3.60 3.76 1.25
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 501.4 505.2 509.0 512.7 516.2 520.2 litres/min
Take litres 3.80 3.80 3.70 3.50 4.00
3.45 Average Take l/m 3.80 3.80 3.70 3.50 4.00 3.76 0.70
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 522.9 527.9 532.8 537.5 542.3 547.0 litres/min
Take litres 5.00 4.90 4.70 4.80 4.70
5.17 Average Take l/m 5.00 4.90 4.70 4.80 4.70 4.82 0.63
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 548.4 552.0 555.5 559.0 562.4 565.9 litres/min
Take litres 3.60 3.50 3.50 3.40 3.50
3.45 Average Take l/m 3.60 3.50 3.50 3.40 3.50 3.50 0.66
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 567.0 569.7 572.4 575.0 577.7 580.3 litres/min
Take litres 2.70 2.70 2.60 2.70 2.60
1.72 Average Take l/m 2.70 2.70 2.60 2.70 2.60 2.66 0.89
VA101-343/6 K10-22GTKITSAULT PROJECT
TMF South Abutment (Site D)
Print 11/12/10 12:40
LUGEON TEST FIELD DATA SHEET
1 2
1.4 STAGE PRESSURE VERSUS LUGEON VALUE
5.76.0
FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 1.252 MAX k= 1.25E-05
DETERMINATION:
MIN Lu= 0.628 MIN k= 6.28E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.628 AVG k= 6.28E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.
TEST BY: JS REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 4
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.72 3.45 5.17 3.45 1.72
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.2
3.9
5.7
3.9
2.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010' JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 5 B2-47 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 0.6 m TOP OF TEST INTERVAL: 233.50 71.19
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 18-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 329.00 100.30 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18630.0 18636.0 18641.7 18647.1 18652.8 18658.0 litres/min
Take litres 6.00 5.70 5.40 5.70 5.20
4.07 Average Take l/m 6.00 5.70 5.40 5.70 5.20 5.60 0.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18665.4 18672.8 18680.1 18687.0 18694.0 18700.8 litres/min
Take litres 7.40 7.30 6.90 7.00 6.80
6.62 Average Take l/m 7.40 7.30 6.90 7.00 6.80 7.08 0.36
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18706.0 18716.5 18727.0 18737.3 18747.4 18757.4 litres/min
Take litres 10.50 10.50 10.30 10.10 10.00
10.76 Average Take l/m 10.50 10.50 10.30 10.10 10.00 10.28 0.32
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18761.6 18767.8 18773.5 18779.3 18785.3 18791.0 litres/min
Take litres 6.20 5.70 5.80 6.00 5.70
5.24 Average Take l/m 6.20 5.70 5.80 6.00 5.70 5.88 0.37
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18793.0 18797.6 18802.0 18806.7 18811.3 18815.7 litres/min
Take litres 4.60 4.40 4.70 4.60 4.40
3.72 Average Take l/m 4.60 4.40 4.70 4.60 4.40 4.54 0.40
K10-22GTKITSAULT PROJECT
TMF South Abutment (Site D)
Print 11/12/10 12:40
LUGEON TEST FIELD DATA SHEET
VA101-343/6
0.5
0.5 STAGE PRESSURE VERSUS LUGEON VALUE
11.0
12.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 0.450 MAX k= 4.50E-06
DETERMINATION:
MIN Lu= 0.322 MIN k= 3.22E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.322 AVG k= 3.22E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS HIGHLY ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST but 5.6L/min were lost during the packer inflating.Pressures were adjusted from transducer data.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 5
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.5
0.5
4.07 6.62 10.76 5.24 3.72
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.3
6.8
11.0
5.5
3.9
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 5 of 5 B2-48 of 56
SHEET 1 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 1.3 m TOP OF TEST INTERVAL: 24.30 7.41
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 74.80 22.80 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 18928.0 18956.0 18982.0 19009.0 19035.0 19061.0 litres/min
Take litres 28.00 26.00 27.00 26.00 26.00
0.52 Average Take l/m 28.00 26.00 27.00 26.00 26.00 26.60 22.23
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 19102.0 19135.0 19166.0 19198.0 19230.0 19262.0 litres/min
Take litres 33.00 31.00 32.00 32.00 32.00
0.86 Average Take l/m 33.00 31.00 32.00 32.00 32.00 32.00 18.53
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 19283.0 19317.0 19352.0 19384.0 19417.0 19450.0 litres/min
Take litres 34.00 35.00 32.00 33.00 33.00
1.28 Average Take l/m 34.00 35.00 32.00 33.00 33.00 33.40 14.13
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 19481.0 19506.0 19531.0 19558.0 19584.0 19610.0 litres/min
Take litres 25.00 25.00 27.00 26.00 26.00
0.76 Average Take l/m 25.00 25.00 27.00 26.00 26.00 25.80 16.45
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 19623.0 19642.0 19663.0 19683.0 19705.0 19727.0 litres/min
Take litres 19.00 21.00 20.00 22.00 22.00
0.41 Average Take l/m 19.00 21.00 20.00 22.00 22.00 20.80 20.05
KITSAULT PROJECT
Downstream of South Abutment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-17GT
Print 11/12/10 12:48
25.0 STAGE PRESSURE VERSUS LUGEON VALUE
1 51.6
1.8FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 22.232 MAX k= 2.22E-04
DETERMINATION:
MIN Lu= 14.128 MIN k= 1.41E-04
INTERPRETATION cm/s
REFERENCE: AVG Lu= 18.279 AVG k= 1.83E-04
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS VERY ERRATIC. Very minor leak was noticed out of swivel head, no other leaks. During packer inflate .4L/min were lost at 100psi.LAMINAR was picked because the gauge readings should not be trusted, averaging all of the Lugeon values hopefully gives a more accurate result.
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 1
0.0
5.0
10.0
15.0
20.0
25.0
0.52 0.86 1.28 0.76 0.41
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
0.8
1.1
1.5
1.0
0.7
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 5 B2-49 of 56
SHEET 2 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 74.30 22.65
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 109.80 33.48 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 19820.0 19862.5 19904.0 19946.0 19988.0 20029.0 litres/min
Take litres 42.50 41.50 42.00 42.00 41.00
1.03 Average Take l/m 42.50 41.50 42.00 42.00 41.00 41.80 32.75
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20071.0 20121.0 20171.0 20221.0 20271.0 20321.0 litres/min
Take litres 50.00 50.00 50.00 50.00 50.00
1.79 Average Take l/m 50.00 50.00 50.00 50.00 50.00 50.00 23.84
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20350.0 20406.0 20463.0 20519.0 20575.0 20632.0 litres/min
Take litres 56.00 57.00 56.00 56.00 57.00
2.76 Average Take l/m 56.00 57.00 56.00 56.00 57.00 56.40 17.95
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20673.0 20716.0 20758.0 20802.0 20845.0 20889.0 litres/min
Take litres 43.00 42.00 44.00 43.00 44.00
1.38 Average Take l/m 43.00 42.00 44.00 43.00 44.00 43.20 26.19
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 20912.0 20949.0 20986.0 21024.0 21061.0 21098.0 litres/min
Take litres 37.00 37.00 38.00 37.00 37.00
0.90 Average Take l/m 37.00 37.00 38.00 37.00 37.00 37.20 33.01
K10-23GTKITSAULT PROJECT
Downstream of South Abutment
VA101-343/6
Print 11/12/10 12:48
LUGEON TEST FIELD DATA SHEET
25.0
30.0
35.0 STAGE PRESSURE VERSUS LUGEON VALUE
2.9
2.5
3.0
3.5FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 33.007 MAX k= 3.30E-04DETERMINATION:
MIN Lu= 17.951 MIN k= 1.80E-04INTERPRETATION cm/s
REFERENCE: AVG Lu= 17.951 AVG k= 1.80E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 2
RODS HAD BEEN GREASED DURING DRILLING. HOLE WASHED AT BOTTOM AND 70FT FOR TOTAL OF 25MIN. NO SEAL AT START BETWEEN 'O' RING AND LANDING RING, LOOSNG APPROX 0.5 L/MIN. ATTEMPTS TO SEAL WITH OVERSHOT UNSUCCESSFUL. RODS PULLED LEAVING CORE BARREL IN STICKUP. PACKER CLEANED. LANDING RING IN CORE BARREL VISIBLE IN STICKUP TO DETERMINE ISSUE. SEAL OK. ASSUMED RODS WERE LEAKING. RODS (WITH ADDITIONAL THREAD GREASE) AND PACKER PUT BACK IN HOLE, SEAL SUCCESSFUL. THEREFORE INITIAL LEAKS POSSIBLY DUE TO LEAKS IN RODS? NO LEAKS WERE NOTICED DURING THE TEST. TRANSDUCER WAS NOT AVAILABLE. WATER GAUGE WAS STEADY
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
1.03 1.79 2.76 1.38 0.90
Lu
ge
on
s
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.2
1.9
2.9
1.5
1.0
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0.00 10.00 20.00 30.00 40.00 50.00 60.00
Pre
ss
ure
(B
ars
)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 5 B2-50 of 56
SHEET 3 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 2.3 m TOP OF TEST INTERVAL: 109.30 33.32
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 144.80 44.15 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21177.7 21183.2 21188.4 21193.6 21198.6 21203.6 litres/min
Take litres 5.50 5.20 5.20 5.00 5.00
1.17 Average Take l/m 5.50 5.20 5.20 5.00 5.00 5.18 3.14
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21209.7 21216.6 21223.4 21230.1 21236.8 21243.6 litres/min
Take litres 6.90 6.80 6.70 6.70 6.80
2.69 Average Take l/m 6.90 6.80 6.70 6.70 6.80 6.78 2.06
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21261.5 21273.4 21285.3 21296.8 21308.5 21320.0 litres/min
Take litres 11.90 11.90 11.50 11.70 11.50
4.83 Average Take l/m 11.90 11.90 11.50 11.70 11.50 11.70 2.09
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21334.0 21340.6 21347.1 21353.6 21360.0 21366.4 litres/min
Take litres 6.60 6.50 6.50 6.40 6.40
2.48 Average Take l/m 6.60 6.50 6.50 6.40 6.40 6.48 2.11
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 21373.0 21378.6 21384.1 21389.7 21395.2 21400.7 litres/min
Take litres 5.60 5.50 5.60 5.50 5.50
1.24 Average Take l/m 5.60 5.50 5.60 5.50 5.50 5.54 3.22
KITSAULT PROJECT
Downstream of South Abutment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-23GT
Print 11/12/10 12:48
3 0
3.5 STAGE PRESSURE VERSUS LUGEON VALUE
5 2
6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 3.217 MAX k= 3.22E-05
DETERMINATION:
MIN Lu= 2.061 MIN k= 2.06E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 2.088 AVG k= 2.09E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC.THE TRANSDUCER WAS NOT AVAILABLE
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 3
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
1.17 2.69 4.83 2.48 1.24
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
1.5
3.0
5.2
2.8
1.6
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 5 B2-51 of 56
SHEET 4 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 4
DIP: 90 oDEPTH GROUNDWATER: 0.4 m TOP OF TEST INTERVAL: 174.30 53.14
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 20/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 209.80 63.96 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1087.0 1139.0 1191.0 1242.0 1293.0 1345.0 litres/min
Take litres 52.00 52.00 51.00 51.00 52.00
2.07 Average Take l/m 52.00 52.00 51.00 51.00 52.00 51.60 21.44
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1396.0 1454.0 1512.0 1570.0 1629.0 1687.0 litres/min
Take litres 58.00 58.00 58.00 59.00 58.00
3.86 Average Take l/m 58.00 58.00 58.00 59.00 58.00 58.20 13.39
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 1735.0 1800.0 1866.0 1931.0 1997.0 2063.0 litres/min
Take litres 65.00 66.00 65.00 66.00 66.00
5.86 Average Take l/m 65.00 66.00 65.00 66.00 66.00 65.60 10.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2105.0 2161.0 2217.0 2269.0 2321.0 litres/min
Take litres 56.00 56.00 52.00 52.00
3.86 Average Take l/m 56.00 56.00 52.00 52.00 54.00 12.42
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2367.0 2414.0 2461.0 2508.0 2555.0 2602.0 litres/min
Take litres 47.00 47.00 47.00 47.00 47.00
1.93 Average Take l/m 47.00 47.00 47.00 47.00 47.00 47.00 20.82
K10-15GTKITSAULT PROJECT
Downstream of South Abutment
VA101-343/6
Print 11/12/10 12:48
LUGEON TEST FIELD DATA SHEET
20.0
25.0 STAGE PRESSURE VERSUS LUGEON VALUE
6.0
5.0
6.0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 21.442 MAX k= 2.14E-04DETERMINATION:
MIN Lu= 10.076 MIN k= 1.01E-04INTERPRETATION cm/s
REFERENCE: AVG Lu= 10.076 AVG k= 1.01E-04
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 4
MINOR LOSS IN WATER WHEN SEAL CHECK WAS DONE. ASSUMED WATER WAS ESCAPING THROUGH RODS (SEE PACKER 2). TEST WAS RUN. THE WATER GAUGE WAS VERY ERRATIC. TRANSDUCER WAS IN THE PACKER SETUP SO ASSUMED THAT PRESSURES COULD BE READ FROM TRANSDUCER DATA. DURING THE TEST 0.03L/S WAS NOTICED ESCAPING FROM THE TOP OF THE CASING I.E SEAL NOT TIGHT.WATER SOURCE EMPTIED DURING THE SECOND P2 TEST. WATER SOURCE REFILLED AND THEN SECOND P1 READING WAS COMPLETED.VERY LOW CONFIDENCE WITH DATA ESPECIALLY WATER PRESSURE READINGS I.E ASSUMED. TRANSDUCER PRESSURES ARE ODD?
0.0
5.0
10.0
15.0
20.0
25.0
2.07 3.86 5.86 3.86 1.93
Lu
ge
on
s
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.2
4.0
6.0
4.0
2.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Pre
ss
ure
(B
ars
)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 4 of 5 B2-52 of 56
SHEET 5 OF 5
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 5
DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 174.30 53.14
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 20/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 244.80 74.63 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 2722.0 2778.0 2834.0 2890.0 2947.0 3003.0 litres/min
Take litres 56.00 56.00 56.00 57.00 56.00
2.07 Average Take l/m 56.00 56.00 56.00 57.00 56.00 56.20 11.79
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3092.0 3157.0 3222.0 3286.0 3351.0 3417.0 litres/min
Take litres 65.00 65.00 64.00 65.00 66.00
3.79 Average Take l/m 65.00 65.00 64.00 65.00 66.00 65.00 7.67
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3473.0 3545.0 3616.0 3687.0 3758.0 3830.0 litres/min
Take litres 72.00 71.00 71.00 71.00 72.00
4.90 Average Take l/m 72.00 71.00 71.00 71.00 72.00 71.40 6.58
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 3887.0 3950.0 4015.0 4080.0 4144.0 4210.0 litres/min
Take litres 63.00 65.00 65.00 64.00 66.00
3.79 Average Take l/m 63.00 65.00 65.00 64.00 66.00 64.60 7.62
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4375.0 4427.0 4478.0 4530.0 4582.0 4634.0 litres/min
Take litres 52.00 51.00 52.00 52.00 52.00
2.07 Average Take l/m 52.00 51.00 52.00 52.00 52.00 51.80 10.86
KITSAULT PROJECT
Downstream of South Abutment
LUGEON TEST FIELD DATA SHEET
VA101-343/6 K10-23GT
Print 11/12/10 12:48
12 0
14.0 STAGE PRESSURE VERSUS LUGEON VALUE
5 0
6.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 11.786 MAX k= 1.18E-04
DETERMINATION:
MIN Lu= 6.584 MIN k= 6.58E-05
INTERPRETATION cm/s
REFERENCE: AVG Lu= 6.584 AVG k= 6.58E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:LARGER TEST ZONE DUE TO LOW CONFIDENCE WITH PACKER 5. MINOR LEAKS FROM CASING
TEST BY: GW REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 5
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
2.07 3.79 4.90 3.79 2.07
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.2
3.9
5.0
3.9
2.2
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 5 of 5 B2-53 of 56
SHEET 1 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 1
DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 19.30 5.88
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 59.80 18.23 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4721.3 4722.0 4722.6 4723.2 4723.9 4724.5 litres/min
Take litres 0.70 0.60 0.60 0.70 0.60
0.34 Average Take l/m 0.70 0.60 0.60 0.70 0.60 0.64 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4725.0 4725.8 4726.5 4727.2 4727.9 4728.6 litres/min
Take litres 0.80 0.70 0.70 0.70 0.70
0.72 Average Take l/m 0.80 0.70 0.70 0.70 0.70 0.72 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4729.6 4730.4 4731.2 4732.0 4732.8 4733.6 litres/min
Take litres 0.80 0.80 0.80 0.80 0.80
1.00 Average Take l/m 0.80 0.80 0.80 0.80 0.80 0.80 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4733.9 4734.5 4735.2 4735.8 4736.4 4737.0 litres/min
Take litres 0.60 0.65 0.60 0.60 0.65
0.69 Average Take l/m 0.60 0.65 0.60 0.60 0.65 0.62 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4737.3 4737.8 4738.3 4738.9 4739.4 4739.9 litres/min
Take litres 0.50 0.50 0.60 0.50 0.50
0.34 Average Take l/m 0.50 0.50 0.60 0.50 0.50 0.52 0.15
VA101-343/6 K10-24GTKITSAULT PROJECT
Plant Site
Print 11/12/10 13:02
LUGEON TEST FIELD DATA SHEET
0.2
0.2 STAGE PRESSURE VERSUS LUGEON VALUE
3.53.5
4.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.183 MAX k= 1.83E-06
DETERMINATION:
MIN Lu= 0.145 MIN k= 1.45E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.168 AVG k= 1.68E-06
INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:1L/min loss during 100psi packer inflate, no leaks noticed.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 1
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.34 0.72 1.00 0.69 0.34
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
2.9
3.3
3.5
3.2
2.9
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 1 of 3 B2-54 of 56
SHEET 2 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 2
DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 59.30 18.08
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 89.80 27.38 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4758.5 4759.2 4759.9 4760.6 4761.3 4762.0 litres/min
Take litres 0.70 0.70 0.70 0.70 0.70
1.78 Average Take l/m 0.70 0.70 0.70 0.70 0.70 0.70 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4763.3 4764.1 4764.9 4765.8 4766.6 4767.4 litres/min
Take litres 0.80 0.80 0.90 0.80 0.80
2.47 Average Take l/m 0.80 0.80 0.90 0.80 0.80 0.82 0.18
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4768.0 4768.9 4769.8 4770.7 4771.7 4772.6 litres/min
Take litres 0.90 0.90 0.90 1.00 0.90
3.30 Average Take l/m 0.90 0.90 0.90 1.00 0.90 0.92 0.17
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4773.0 4773.8 4774.5 4775.3 4776.0 4776.7 litres/min
Take litres 0.80 0.70 0.75 0.75 0.70
2.40 Average Take l/m 0.80 0.70 0.75 0.75 0.70 0.74 0.16
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4777.0 4777.7 4778.3 4778.9 4779.5 4780.1 litres/min
Take litres 0.65 0.65 0.60 0.60 0.60
1.99 Average Take l/m 0.65 0.65 0.60 0.60 0.60 0.62 0.15
Print 11/12/10 13:02
LUGEON TEST FIELD DATA SHEET
KITSAULT PROJECT
Plant Site
VA101-343/6 K10-24GT
0.2
0.2
0.2
0.2 STAGE PRESSURE VERSUS LUGEON VALUE
5.0
5.8
4.95.0
6.0
7.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.176 MAX k= 1.76E-06DETERMINATION:
MIN Lu= 0.147 MIN k= 1.47E-06INTERPRETATION cm/s
REFERENCE: AVG Lu= 0.147 AVG k= 1.47E-06
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES
DRILLING / TEST RESULTS COMMENTS:
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 2
1.7L/min loss during 100psi packer inflate, no leaks noticed. Gauge was erratic at P2 and P3 pressures. Pressures were adjusted with transducer data.
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
1.78 2.47 3.30 2.40 1.99
Lu
ge
on
s
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.3
5.0
5.8
4.94.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
Pre
ss
ure
(B
ars
)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010' JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 2 of 3 B2-55 of 56
SHEET 3 OF 3
PROJECT: PROJECT NO: DRILLHOLE:
AREA: TEST NO: 3
DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 94.30 28.75
(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)
DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 119.80 36.52 ft (DOWN HOLE) m (DOWN HOLE)
GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4805.2 4809.6 4813.3 4817.2 4821.1 4824.9 litres/min
Take litres 4.40 3.70 3.90 3.90 3.80
2.39 Average Take l/m 4.40 3.70 3.90 3.90 3.80 3.94 1.03
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4827.7 4832.6 4837.5 4842.5 4847.3 4852.0 litres/min
Take litres 4.90 4.90 5.00 4.80 4.70
3.43 Average Take l/m 4.90 4.90 5.00 4.80 4.70 4.86 1.05
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4854.1 4861.0 4867.7 4874.8 4882.0 4889.0 litres/min
Take litres 6.90 6.70 7.10 7.20 7.00
4.60 Average Take l/m 6.90 6.70 7.10 7.20 7.00 6.98 1.26
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4890.2 4894.8 4899.3 4904.0 4909.1 4914.1 litres/min
Take litres 4.60 4.50 4.70 5.10 5.00
3.15 Average Take l/m 4.60 4.50 4.70 5.10 5.00 4.78 1.08
GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON
(BAR) Flowmeter litres 4916.0 4919.6 4923.5 4927.6 4931.6 4935.6 litres/min
Take litres 3.60 3.90 4.10 4.00 4.00
2.53 Average Take l/m 3.60 3.90 4.10 4.00 4.00 3.92 0.99
VA101-343/6 K10-24GTKITSAULT PROJECT
Plant Site
Print 11/12/10 13:02
LUGEON TEST FIELD DATA SHEET
1 2
1.4 STAGE PRESSURE VERSUS LUGEON VALUE
7.17.0
8.0FLOW VERSUS PRESSURE PLOT
LUGEONS APPROXIMATE PERMEABILITY, cm/s
STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.256 MAX k= 1.26E-05
DETERMINATION:
MIN Lu= 0.992 MIN k= 9.92E-06
INTERPRETATION cm/s
REFERENCE: AVG Lu= 1.036 AVG k= 1.04E-05
INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO
3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO
DRILLING / TEST RESULTS COMMENTS:The gauge was totally unreliable for this test, use transducer pressures. 2.3L/min were lost during the packer inflate at 100psi, no leaks were noticed during test.Pressures were corrected from the transducer data.
TEST BY: BH REVIEWED BY: BB
M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 3
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
2.39 3.43 4.60 3.15 2.53
Lu
geo
ns
Stage Gauge Pressure (BAR)
STAGE PRESSURE VERSUS LUGEON VALUE
4.9
6.0
7.1
5.7
5.1
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Pre
ssu
re (
Bar
s)
Q (l/m)
FLOW VERSUS PRESSURE PLOT
Note: Permeability calculation dependent upon flow classification:
0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV
Page 3 of 3 B2-56 of 56