hydrogeology and watershed model report (draft)

231
VA101-343/9-3 Rev 0 June 17, 2011 APPENDIX A WELL INSTALLATIONS AND LITHOLOGY Appendix A1 2009 Monitoring Well Installation Details Appendix A2 2010 Monitoring Well Installation Details Appendix A3 2010 Drillhole Logs

Upload: others

Post on 28-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX A

WELL INSTALLATIONS AND LITHOLOGY

Appendix A1 2009 Monitoring Well Installation Details Appendix A2 2010 Monitoring Well Installation Details Appendix A3 2010 Drillhole Logs

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX A1

2009 MONITORING WELL INSTALLATION DETAILS

(Pages A1-1 to A1-22)

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

TOPSOILGREYWACKE Type 10 hydraulic cement and bentonite

grout

1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 20 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of coarse grained filter sand1/2 bag of bentonite chips

0.9 m

54.9 m56.4 m

59.4 m

65.5 m67.1 m68.6 m68.8 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 20.12 mDate of Measurement Sep 10, 09

B2-1

5

10

15

20

25

30

35

40

45

50

55

60

65

70

286

281

276

271

266

261

256

251

246

241

236

231

226

221

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-01GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-01GT, Stick-up = 0.45 m

K09-01GT

Coordinates:

Contractor:

1

Tailings EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3/NQ3

6,144,043 N, 471,619 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-01GTN/A

249.76 m290.75 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

HP 200HQ/NQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 9, 09Jul 31, 09Jul 31, 09

LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-1 of 22

mmottram
Text Box
of 22

BENTONITE SEAL

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

ROAD FILL

GREYWACKE AND ARGILLITE

1 bag of bentonite chips

1 grout mix of 2 bags of grout mix per ~ 50gal water2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 4 x 5 ft pipe segmentspre-packed screen system used

1 bag of coarse grained filter sand

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

1.2 m

8.8 m

10.4 m

11.9 m

18 m

19.8 m

21.3 m21.5 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 2.80 mDate of Measurement Sep 16, 09

B2-2

5

10

15

20

25

331

326

321

316

311

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-02GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-02GT, Stick-up = 0.59 m

K09-02GT

Coordinates:

Contractor:

1

Tailings EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,487 N, 471,701 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-02GTN/A

197.7 m335.08 m278o,-57o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 30, 09Aug 9, 09Sep 1, 09

PK, LS, GM, MWJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

All depths including static water level are measured downhole at the angle of inclinationand have not been corrected to 57°. Well installation started on 8/9/09 but bridged socompleted on 9/1/09. Inconclusive hydraulic conductivity results.

A1-2 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

FILTER SANDBENTONITE SEALVAN RUTH PLUG

TOPSOILGREYWACKE Type 10 hydraulic cement and bentonite

grout

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 10 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of coarse grained filter sand2 buckets of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.3 m

42.7 m44.2 m45.7 m

51.8 m53.3 m54.9 m55.1 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 29.41 mDate of Measurement Sep 15, 09

B2-3

5

10

15

20

25

30

35

40

45

50

55

288

283

278

273

268

263

258

253

248

243

238

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-03GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-03GT, Stick-up = 1.09 m

K09-03GT

Coordinates:

Contractor:

1

Tailings EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3/NQ3

6,144,043 N, 471,619 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-03GTN/A

279.3 m292.28 m326o,-58o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

HP 200HQ/NQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 1, 09Aug 19, 09Aug 19, 09

LS, GM, MWJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

All depths including static water level are measured downhole at the angle of inclinationand have not been corrected to 58°. Well installation has sanded in or collapsed.

A1-3 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 15 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.61 m

40.5 m

42.1 m

45.1 m

51.2 m

53.7 m55.2 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 3.30 mDate of Measurement Sep 11, 09

B2-4

5

10

15

20

25

30

35

40

45

50

55

539

534

529

524

519

514

509

504

499

494

489

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-04AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-04AGT, Stick-up = 0.81 m

K09-04AGT

Coordinates:

Contractor:

1

Downgradient of Open PitLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,142,205 N, 472,756 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-04AGTN/A

55.2 m544.44 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 13, 09Aug 14, 09Aug 14, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

One bag of sand was placed inside the protective casing above the cement cap.

A1-4 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 32 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.3 m

89.63 m91.3 m93.6 m

99.7 m101.8 m103.7 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 4.46 mDate of Measurement Sep 11, 09

B2-5

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

539

534

529

524

519

514

509

504

499

494

489

484

479

474

469

464

459

454

449

444

439

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-04GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-04GT, Stick-up = 0.28 m

K09-04GT

Coordinates:

Contractor:

1

Downgradient of Open PitLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,142,207 N, 472,759 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-04GTN/A

103.7 m544.40 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 10, 09Aug 13, 09Aug 14, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Well installation screen was contaminated with bentonite slough either during or afterinstallation. Bentonite bridge was discovered when KP returned to develop the well.

A1-5 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

ROAD FILL / FAULT GOUGE

GREYWACKE AND ARGILLITE

FAULT GOUGE

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1 grout mix of 2 bags of grout mix per ~110 gal water

2-inch diameter schedule 40 solid PVCpipe 12 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

5 3/4 bags of coarse grained filter sand

2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.61 m

16.3 m17.4 m

21 m

27.1 m

29.1 m

31.1 m31.3 m

42.8 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 17.41 mDate of Measurement Sep 12, 09

B2-6

5

10

15

20

25

30

35

40

45

697

692

687

682

677

672

667

662

657

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-05GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-05GT, Stick-up = 0.69 m

K09-05GT

Coordinates:

Contractor:

1

Initial Primary CrusherLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,142,578 N, 473,401 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-05GTN/A

42.8 m701.65 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 14, 09Aug 15, 09Aug 16, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Casing removed from drillhole and protective monument installed at surface.

A1-6 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

PEAT

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1 grout mix of 2 bags of grout mix per ~110 gal water

2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.61 m

6.4 m

8.5 m

9.5 m

15.5 m

16.8 m

18.3 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 3.48 mDate of Measurement Sep 15, 09

B2-7

5

10

15

20

761

756

751

746

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-06AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-06AGT, Stick-up = 0.93 m

K09-06AGT

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,143,411 N, 473,632 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-06AGTN/A

18.3 m766.45 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 19, 09Aug 19, 09Aug 20, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Monument installed.

A1-7 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

PEATGREYWACKE AND ARGILLITE Type 10 hydraulic cement and bentonite

grout

2 grout mixes of 2.5 bags of grout mix per~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3.05 m

88.4 m89.9 m91.5 m

97.6 m99.4 m

100.9 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 25.58 mDate of Measurement Sep 15, 09

B2-8

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

761

756

751

746

741

736

731

726

721

716

711

706

701

696

691

686

681

676

671

666

661

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-06GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-06GT, Stick-up = 0.35 m

K09-06GT

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,143,409 N, 473,630 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-06GTN/A

100.9 m766.45 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 16, 09Aug 19, 09Aug 19, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No protective monument installed as per client request 14 ft of casing was left in drillholeas protection.

A1-8 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

MINE WASTE ROCK

ARGILLITE

LAMPROPHYRE DYKEARGILLITE

LAMPROPHYRE DYKEARGILLITE

Type 10 hydraulic cement and bentonitegrout

3 grout mixes of 2 bags of grout mix per ~110 gal water

2-inch diameter schedule 40 solid PVCpipe 31 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.3 m

23.5 m

27.1 m

28.8 m

31.9 m

33.7 m

35.8 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 2.53 mDate of Measurement Sep 14, 09

B2-9

5

10

15

20

25

30

35

40

708

703

698

693

688

683

678

673

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-08AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-08AGT, Stick-up = 0.78 m

K09-08AGT

Coordinates:

Contractor:

1

Downgradient of the Clary Waste DumpLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,143,629 N, 473,477 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-08AGTN/A

35.8 m712.51 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/ HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 22, 09Aug 23, 09Aug 23, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-9 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

MINE WASTE ROCK

ARGILLITE

LAMPROPHYRE DYKEARGILLITE

LAMPROPHYRE DYKEARGILLITE

LAMPROPHYRE DYKEARGILLITE

Type 10 hydraulic cement and bentonitegrout

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1 bag of coarse grained filter sand1 1/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.2 m

85.4 m

88.7 m90.9 m

97 m98.8 m

102.7 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 5.37 mDate of Measurement Sep 14, 09

B2-10

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

707

702

697

692

687

682

677

672

667

662

657

652

647

642

637

632

627

622

617

612

607

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-08GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-08GT, Stick-up = 0.44 m

K09-08GT

Coordinates:

Contractor:

1

Downgradient of the Clary Waste DumpLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,143,633 N, 473,480 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-08GTN/A

102.7 m712.36 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 20, 09Aug 22, 09Aug 19, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-10 of 22

mmottram
Text Box
of 22

CEMENT CAPBENTONITE SEAL

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

ARGILLITE AND GREYWACKE

Type 10 hydraulic cement and bentonitegrout1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 7 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.15 m0.5 m

17.8 m

19.8 m

21.3 m

27.4 m

29 m

31.1 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 5.47 mDate of Measurement Sep 13, 09

B2-11

5

10

15

20

25

30

35

710

705

700

695

690

685

680

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-09AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-09AGT, Stick-up = 0.95 m

K09-09AGT

Coordinates:

Contractor:

1

Revised Primary CrusherLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,142,747 N, 473,397 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-09AGTN/A

31.1 m715.31 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 26, 09Aug 26, 09Aug 25, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No protective monument installed as per client request 14.5 ft of casing was left indrillhole as protection.

A1-11 of 22

mmottram
Text Box
of 22

CEMENT CAPBENTONITE SEAL

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

ARGILLITE AND GREYWACKE

ARGILLITE

LAMPROPHYRE DYKEARGILLITE

GREYWACKE

ARGILLITE

GREYWACKE

Type 10 hydraulic cement and bentonitegrout1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

3 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter Schedule 40 solid PVCpipe 31 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2.4 m4.6 m

84.9 m

88.7 m

91.8 m

97.9 m99.4 m

101.2 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 36.29 mDate of Measurement Sep 13, 09

B2-12

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

710

705

700

695

690

685

680

675

670

665

660

655

650

645

640

635

630

625

620

615

610

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-09GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-09GT, Stick-up = 0.32 m

K09-09GT

Coordinates:

Contractor:

1

Revised Primary CrusherLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,142,736 N, 473,398 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-09GTN/A

101.2 m714.94 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 23, 09Aug 26, 09Aug 25, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No protective monument installed as per client request 14 ft of casing was left in drillholeas protection.Unable to get grout past 15 ft until bentonite seal installed at 8 to 15 ft, the lower 5 ft ofcasing may have spun loose during grouting.

A1-12 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

GREYWACKEType 10 hydraulic cement and bentonitegrout

1 grout mix of 2 bags of grout mix per ~110 gal water

2-inch diameter schedule 40 solid PVCpipe 7 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/8 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.3 m

17.7 m

19.5 m

21.3 m

27.4 m

29.3 m

31 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 4.19 mDate of Measurement Sep 17, 09

B2-13

5

10

15

20

25

30

35

506

501

496

491

486

481

476

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-10AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-10AGT, Stick-up = 0.84 m

K09-10AGT

Coordinates:

Contractor:

1

Upgradient of TMFLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,745 N, 473,234 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-10AGTN/A

31 m511.21 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 28, 09Aug 29, 09Aug 29, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-13 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALFILTER SAND

ROAD FILLGREYWACKE

LAMPROPHYRE DYKEGREYWACKE

Type 10 hydraulic cement and bentonitegrout

2 grout mixes of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 30 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"2 bags of coarse grained filter sand

3 m

84.5 m

88.3 m89.5 m

95.6 m97.6 m99.7 m

101.2 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 19.31 mDate of Measurement Sep 17, 09

B2-14

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

506

501

496

491

486

481

476

471

466

461

456

451

446

441

436

431

426

421

416

411

406

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-10GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-10GT, Stick-up = 0.34 m

K09-10GT

Coordinates:

Contractor:

1

Upgradient of TMFLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,742 N, 473,229 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-10GTN/A

101.2 m511.09 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 27, 09Aug 28, 09Aug 28, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Water level fluctuates possibly due to surface water influence or precipitation events.

A1-14 of 22

mmottram
Text Box
of 22

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILLGREYWACKE Type 10 hydraulic cement and bentonite

grout

1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 9 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

3/4 bag of coarse grained filter sand

3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

0.3 m

24.1 m

25.9 m

27.4 m

33.5 m

35.1 m

37.2 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 2.27 mDate of Measurement Sep 17, 09

B2-15

5

10

15

20

25

30

35

40

387

382

377

372

367

362

357

352

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-11AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-11AGT, Stick-up = 1.00 m

K09-11AGT

Coordinates:

Contractor:

1

Upgradient of TMFLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,531 N, 472,316 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-11AGTN/A

37.2 m391.91 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 31, 09Sep 1, 09Sep 1, 09BP, CD

JS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-15 of 22

mmottram
Text Box
of 22

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

FILTER SAND

ROAD FILLGREYWACKE

1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 28 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 1 x 10 ft pipe segments2/3 bag of coarse grained filter sand

1 bag of bentonite chips

3 1/3 bag of coarse grained filter sand

79.4 m81.6 m83.8 m

86.9 m

91.5 m

94.5 m

100.9 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 2.60 mDate of Measurement Sep 17, 09

B2-16

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

387

382

377

372

367

362

357

352

347

342

337

332

327

322

317

312

307

302

297

292

287

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-11GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-11GT, Stick-up = 0.25 m

K09-11GT

Coordinates:

Contractor:

1

Upgradient of TMFLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,532 N, 472,312 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-11GTN/A

100.9 m391.82 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 29, 09Aug 30, 09Aug 30, 09

BP, CDJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No cement cap.

A1-16 of 22

mmottram
Text Box
of 22

BENTONITE SEAL

SOLID PVC PIPEGROUT MIX

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GRAVELGREYWACKE 5 bags of bentonite chips

2-inch diameter schedule 40 solid PVCpipe 27 x 10 ft pipe segments3 grout mixes of 2 bags of grout mix per ~110 gal water

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments3/4 bag of coarse grained filter sand2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

5.8 m

75.9 m77.3 m79.5 m

85.7 m87.8 m

90.5 m90.7 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 33.08 mDate of Measurement Sep 18, 09

B2-17

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

124

119

114

109

104

99

94

89

84

79

74

69

64

59

54

49

44

39

34

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-13GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-13GT, Stick-up = 0.68 m

K09-13GT

Coordinates:

Contractor:

1

Downgradient of the TMFLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,145,214 N, 470,345 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-13GTN/A

165.2 m128.79 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 1, 09Sep 6, 09Sep 6, 09

BP, CD, CH, LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

A1-17 of 22

mmottram
Text Box
of 22

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

GREYWACKE AND ARGILLITE

1/2 grout mix of 2 bags of grout mix per ~110 gal water

2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 bags of coarse grained filter sand

2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

8.2 m

10.5 m

12.8 m

18.9 m

20.4 m

22 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 0.26 mDate of Measurement Sep 19, 09

B2-18

5

10

15

20

25

1

-4

-9

-14

-19

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-14AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-14AGT, Stick-up = 0.95 m

K09-14AGT

Coordinates:

Contractor:

1

Port SiteLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,719 N, 468,887 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-14AGTN/A

21.9 m6.02 m0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 8, 09Sep 8, 09Sep 15, 09

CH, LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Monitoring well water level influenced by tidal effects. Casing left in drillhole.

A1-18 of 22

mmottram
Text Box
of 22

BENTONITE SEAL

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

ROAD FILL

GREYWACKE AND ARGILLITE

1 bag of bentonite chips

1 grout mix of 2 bags of grout mix per ~110 gal water2-inch diameter schedule 40 solid PVCpipe 13 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 1/2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

1 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

1.5 m

34.5 m

36.6 m

38.7 m

44.8 m

46.6 m

49.4 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 1.37 mDate of Measurement Sep 19, 09

B2-19

5

10

15

20

25

30

35

40

45

50

1

-4

-9

-14

-19

-24

-29

-34

-39

-44

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-14GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-14GT, Stick-up = 0.64 m

K09-14GT

Coordinates:

Contractor:

1

Port SiteLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,716 N, 468,884 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-14GTN/A

49.4 m6.02 m0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 7, 09Sep 8, 09Sep 8, 09CH, LS

JS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Monitoring well water level influenced by tidal effects. Monument installed.

A1-19 of 22

mmottram
Text Box
of 22

BENTONITE SEAL

FILTER SAND

SOLID PVC PIPE

BENTONITE SEAL

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEAL

MINE WASTE ROCK

GREYWACKE AND ARGILLITE

1 bag of bentonite chips

Gas tubing installed, 2 tubes at each ofthe following depths: 2.0, 7.0 and 14.0 m

6 bags of coarse grained filter sand2-inch diameter schedule 40 solid PVCpipe 8 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

3 bag of coarse grained filter sand

2/3 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

1.2 m

5 m

18 m

19.5 m

21.6 m

27.7 m

29.3 m

31 m

2 m

7 m

14 m

}GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 16.73 mDate of Measurement Sep 26, 09

B2-20

Gas Tubing

5

10

15

20

25

30

35

679

674

669

664

659

654

649

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-15AGT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-15AGT, Stick-up = 1.15 m

K09-15AGT

Coordinates:

Contractor:

1

Patsy Waste DumpLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,141,648 N, 474,112 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-15AGTN/A

31.1 m683.63 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 11, 09Sep 12, 09Sep 12, 09

CH, LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No cement cap installed because of the additional equipment installed. Gas tubesinstalled in this drillhole can be measured at drillhole K09-15GT.

A1-20 of 22

mmottram
Text Box
of 22

FILTER SANDSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

MINE WASTE ROCK

GREYWACKE

GREYWACKE

GREYWACKE AND ARGILLITE

Gas tubing installed, 2 tubes at each ofthe following depths: 1.0, 9.1, and 13.1 m

Thermister installed: tip at 68 m withnodes at 5 m intervals and additionalnode at 1m, a total of 15 nodes.

25 bags of coarse grained filter sand

2-inch diameter schedule 40 solid PVCpipe 28 x 10 ft pipe segments

1/2 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

2 3/4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments1/2 bag of coarse grained filter sand1 bag of of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

1 m3 m

8 m

13 m

18 m

23 m

28 m

33 m

38 m

43 m

48 m

53 m

58 m

63 m

68 m

5 m

10 m

79.9 m81.7 m82.8 m

88.9 m91.5 m

95.1 m

1 m

9.1 m

13.1m

}GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 16.88 mDate of Measurement Sep 26, 09

B2-21

Gas Tubing

Ther

mis

tor

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

679

674

669

664

659

654

649

644

639

634

629

624

619

614

609

604

599

594

589

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-15GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-15GT, Stick-up = 0.95 m

K09-15GT

Coordinates:

Contractor:

1

Patsy Waste DumpLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,141,644 N, 474,116 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-15GTN/A

95.1 m683.90 m

0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTGeotech Drilling Ltd.

Fraste DR232ODEX/HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 9, 09Sep 11, 09Sep 12, 09

CH, LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

No cement cap installed because of the additional equipment, special woodenmonument constructed to protect installation gas tubes from drillhole K09-15AGT canbe measured from here.

A1-21 of 22

mmottram
Text Box
of 22

CEMENT CAP

BENTONITE CHIPS

SOLID PVC PIPE

CAVED IN

BENTONITE SEAL

CAVED IN

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEAL

CAVED IN

SAND

SAND AND GRAVEL

220 gal. Type 10 hydraulic cement andbentonite grout.

2 1/2 buckets of Wyo-Ben Ltd. Enviroplugcoated bentonite chips

2-inch diameter schedule 40 solid PVCpipe 31 x 10 ft pipe segments

caved in to 7.8 m

3/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"Caved in when casing pulled

2 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 1/2 bags of coarse grained filter sand

1 1/4 bucket of Wyo-Ben Ltd. Enviroplugcoated bentonite tablets 1/4"

infilled

0.15 m

7.8 m

17.4 m17.98 m

19.5 m

21.6 m

27.4 m

29 m

31.1 m

32.9 m

GEOLOGICAL UNIT NOTES

Water Level Reading: Depth of SWL 6.88 mDate of Measurement Sep 20, 09

B2-22

5

10

15

20

25

30

35

4

-1

-6

-11

-16

-21

-26

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

MONITORING WELL DETAILS FOR K09-16GT

GR

AP

HIC

LO

G

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

File

:M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\K

ITS

AU

LT.G

PJ

Libr

ary:

M:\1

\01\

0034

3\03

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE.G

LB,

WE

LL C

OM

PLE

TIO

N,

TEM

PLA

TE O

CT

14, 2

009.

GD

T, O

ct 1

9, 0

9

Steel Protector CapPiezometer K09-16GT, Stick-up = 0.24 m

K09-16GT

Coordinates:

Contractor:

1

Port SiteLocation:

Drilling Rig:

Drilling Method:

of 1

VA101-343/03

GENERAL REMARKS:

HQ3

6,144,464 N, 468,580 E, UTM NAD83 (m)

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

K09-16GTN/A

32.9 m9.28 m0o,-90o

PAGE

FIGURE.REV. 0 - Issued for Report

KITSAULT PROJECTDriftwood Drilling Ltd.

Hydracore 2000HQ Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Sep 12, 09Sep 13, 09Sep 14, 09

CH, LSJS

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

Drillhole was completed early as drill could not advanced any further

A1-22 of 22

mmottram
Text Box
of 22

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX A2

2010 MONITORING WELL INSTALLATION DETAILS

(Pages A2-1 to A2-36)

UCS - 80 MPa

UCS - 69 MPa

UCS - 69 MPa

UCS - 218 MPa

5/2/3

3/3/2

4/4/5

6/8/6

5/4/3

50

0

23

48

0

12

0

37

49

82

100

69

72

80

93

71

41

41

85

97

39

68

37

39

72

98

98

100

98

98

98

98

100

93

93

95

100

100

96

98

100

SPT-01-1SRK-01-1SPT-01-2SRK-01-2SPT-01-3SRK-01-3SPT-01-4SRK-01-4SPT-01-5SRK-01-5SPT-01-6SRK-01-6

UCS 01-1

UCS 01-2

UCS 01-3

UCS 01-4

MINE WASTE ROCK - GRAVEL ANDSAND(0 to 9.8)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

ORGANIC DEPOSITS(9.8 to 10.2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(10.2 to 39)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 39 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-01GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

655

650

645

640

635

630

625

620

615

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-1

Coordinates:

Contractor:

1

Primary CrusherLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,142,498 N, 473,131 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jun 30, 10Jul 1, 10Jul 1, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-01GT

SPT sampler39 m

650.41 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-1 of 36

UCS - 90 MPa

UCS - 167 MPa

UCS sample brokenduring shipping

UCS - 50 MPa

4/5/4

2/2/2

23

0

560

57

49

36

51

21

23

30

7

0

20

41

100

35

57

49

57

68

43

9696

98

98

100

100

93

95

98

100

100

100

97

100

91

100

100

100

100

100

SPT-02-1SRK-02-1SPT-02-2SRK-02-2UCS 02-1

UCS 02-2

UCS 02-3

UCS 02-4

MINE WASTE ROCK - GRAVEL ANDSAND(0 to 4)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]ORGANIC DEPOSITS(4 to 4.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(4.3 to 34.1)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 34.1 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-02GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

749

744

739

734

729

724

719

714

709

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-2

Coordinates:

Contractor:

1

Fuel StorageLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,378 N, 473,443 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 1, 10Jul 2, 10Jul 2, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-02GT

SPT sampler34.1 m

744.18 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-2 of 36

UCS - 128 MPa

UCS - 126 MPa

UCS - 82 MPa

UCS - 137 MPa

3/3/4

0/1/1

0/1

0/1

0/1

0/2

8/18/32

15

0

0

0

0

0

0

10093

96

74

44

60

85

21

75

83

95

100

73

62

37

62

100

100

100

95

98

100

100

92

96

100

95

100

100

99

96

97

SPT-03-1SRK-03-1SPT-03-2SRK-03-2SPT-03-3SRK-03-3SPT-03-4SRK-03-4SPT-03-5SRK-03-5SPT-03-6SRK-03-6SPT-03-7

UCS 03-1

UCS 03-2

UCS 03-3

UCS 03-4

MINE WASTE ROCK - GRAVEL ANDSAND(0 to 3.1)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]SILT(3.1 to 10.5)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]ORGANIC DEPOSITS(10.5 to 11.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(11.3 to 35.7)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 35.7 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-03GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

748

743

738

733

728

723

718

713

708

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-3

Coordinates:

Contractor:

1

Truckshop & WarehouseLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,498 N, 473,559 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 2, 10Jul 3, 10Jul 3, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-03GT

SPT sampler35.7 m

743.39 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-3 of 36

UCS - 78 MPa

UCS - 79 MPa

UCS - 127 MPa

UCS - 80 MPa

3/3/5

2/4/3

2/10/40

4/2/4

6/7/8

4/10/13

0

20

0

25

65

85

9980

38

39

36

7

26

79

66

56

90

33

100

34

39

45

92

9221

58

68

75

16

46

63

99

94

100

100

97

92

98

98

92

100

100

92

100

99

100

100

84

8490

100

100

100

100

89

100

SPT-04-1SRK-04-1SPT-04-2

SRK-04-2

SPT-04-3SRK-04-3SPT-04-4SRK-04-4SPT-04-5SRK-04-5SPT-04-6

UCS 04-1

UCS 04-2

UCS 04-3

UCS 04-4

MINE WASTE ROCK - GRAVEL ANDSAND(0 to 10.8)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

ORGANIC DEPOSITS(10.8 to 11.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(11.3 to 68)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

50

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-04GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

733

728

723

718

713

708

703

698

693

688

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-4

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,142,080 N, 474,680 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 3, 10Jul 6, 10Jul 6, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-04GT

SPT sampler100 m

727.90 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-4 of 36

UCS - 41 MPa

UCS sample brokenduring shipping

UCS - 46 MPa

UCS - 100 MPa

UCS - 110 MPa

51

23

73

53

40

37

37

15

33

43

30

73

33

43

0

59

5932

62

43

41

45

41

77

82

51

56

12

12

70

98

75

100

92

100

97

94

95

97

75

94

100

99

92

92

100

39

100

100

82

94

79

94

98

100

96

100

94

100

94

89

100

98

98

UCS 04-5

UCS 04-6

UCS 04-7

UCS 04-8

UCS 04-9

GREYWACKE AND ARGILLITE(11.3 to 68)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DIOMIEN DYKE(68 to 71.6)

GREYWACKE AND ARGILLITE(71.6 to 100)

End of Drillhole: 100 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

100

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-04GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

783

778

773

768

763

758

753

748

743

738

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-5

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,142,080 N, 474,680 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 3, 10Jul 6, 10Jul 6, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED. BULK SAMPLES WERE COLLECTED FORSRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-04GT

SPT sampler100 m

727.90 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-5 of 36

UCS - 20 MPa(Argillite)

UCS - 30 MPa(Argillite)

UCS - 138 MPa(Greywackie)

4/6/7

3/2/1

2/1/3

1/4/3

12/24/15

50

4/8/6

50

43

23

30

30

62

0

0

17

5674

45

13

44

39

16

44

54

70

26

72

53

89

100

100

100

94

96

79

92

94

94

100

100

96

SPT-05-1SRK-05-1SPT-05-2SRK-05-2SPT-05-3SRK-05-3SPT-05-4

SRK-05-4

SPT-05-6

SRK-05-5

SPT-05-7

SRK-05-6

SPT-05-8

SRK-05-7

SPT-05-9

SRK-05-8

UCS 05-1

UCS 05-2

UCS 05-3

MINE WASTE ROCK - GRAVEL ANDSAND(0 to 20.1)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

ORGANIC DEPOSITS(20.1 to 20.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(20.9 to 33)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DIOMIEN DYKE(33 to 33.34)GREYWACKE AND ARGILLITE(33.34 to 39.9)

End of Drillhole: 39.9 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-05GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

717

712

707

702

697

692

687

682

677

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-6

Coordinates:

Contractor:

1

Down Gradient of South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,141,755 N, 474,300 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 6, 10Jul 7, 10Jul 7, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED. BULK SAMPLES WERECOLLECTED FOR SRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-05GT

SPT sampler39.9 m

712.31 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-6 of 36

3/5/6

3/4/4

5/6/6

4/6/8

42

50

42

100

3467

39

21

75

61

34

80

70

72

98

57

72

100

93

98

91

100

95

100

96

98

98

98

95

93

SPT-06-1

SRK-06-1

SPT-06-2

SRK-06-2

SPT-06-3

SRK-06-3

SPT-06-4

GRAVEL AND SAND(0 to 15)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

ORGANIC DEPOSITS(15 to 15.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]DIORITE(15.5 to 35.5)medium-grained, porphyritic, grey to green,strong, fresh, widely spaced joints, highpersistence, smooth, planar, filled withquartz veins [INTRUSIVE PULTON]

End of Drillhole: 35.5 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-06GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

690

685

680

675

670

665

660

655

650

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-7

Coordinates:

Contractor:

1

Down Gradient of South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,141,413 N, 473,974 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 7, 10Jul 9, 10Jul 8, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED. BULK SAMPLES WERECOLLECTED FOR SRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

Fraste DR232

K10-06GT

SPT sampler35.5 m

685.00 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-7 of 36

3/3/4

3/5/3

1/2/3

5/2/1

50+6 inches

23

7

8

23

079

68

26

9

79

92

73

96

SPT-08-1

SPT-08-2

SPT-08-3

SPT-08-4

SPT-08-5

GRAVEL AND SAND(0 to 4.3)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

SILT(4.3 to 6.7)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]

ORGANIC DEPOSITS(6.7 to 7)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(7 to 12.8)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 12.8 m

DEP

TH (m

)

5

10

15

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-08GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

749

744

739

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-8

Coordinates:

Contractor:

1

Truckshop & WarehouseLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,452 N, 473,519 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 13, 10Jul 14, 10

JS/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

Fraste DR232

K10-08GT

SPT sampler12.8 m

743.55 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-8 of 36

UCS - 303 MPa

UCS - 221 MPa

2308289

79

77

86

94

96

91

89

92

39

100

75

7

21

0

28

33

56

100

54

54

48

16

85

96

99

99

87

96

98

83

63100100100100

100

100

100

99

98

100

100

99

95

100

100

82

80

13

55

100

100

100

95

99

98

97

100

100

99

99

100

97

100

100

UCS 09-2

UCS 09-1

ORGANIC DEPOSITS(0 to 0.7)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.7 to 21.11)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

(21.11 to 33.32)broken up, weak and vuggy~ contact between lava flow layers

TRACHYANDESITE(33.32 to 50.59)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-09GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

930

925

920

915

910

905

900

895

890

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-9

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 4

101-343/6

GENERAL REMARKS:

HQ3 / NQ

6,143,565 N, 474,390 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 13, 10Jul 17, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-09GT

NA162.9 m925.18 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-9 of 36

Reduced to NQ drillingat 80 m

90

49

75

56

65

64

73

76

39

83

73

45

100

100

99

100

100

100

73

100

88

35

62

93

89

94

91

97

94

100

100

98

99

96

100

100

96

99

100

100

100

99

100

100

100

100

100

94

76

93

100

98

100

100

(50.59 to 57.71)broken up, weak and vuggy~ contact between lava flow layers

TRACHYANDESITE(57.71 to 80.56)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

(80.56 to 92.77)broken up, weak and vuggy~ contact between lava flow layers

TRACHYANDESITE(92.77 to 118.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-09GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

980

975

970

965

960

955

950

945

940

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-10

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 4

101-343/6

GENERAL REMARKS:

HQ3 / NQ

6,143,565 N, 474,390 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 13, 10Jul 17, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-09GT

NA162.9 m925.18 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-10 of 36

90

98

66

53

92

31

35

5

42

42

58

23

35

16

57

54

100

100

100

100

100

46

67

35

100

100

100

100

100

100

100

100

TRACHYANDESITE(92.77 to 118.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

GREYWACKE AND ARGILLITE(118.3 to 162.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

105

110

115

120

125

130

135

140

145

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-09GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

1030

1025

1020

1015

1010

1005

1000

995

990

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-11

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 4

101-343/6

GENERAL REMARKS:

HQ3 / NQ

6,143,565 N, 474,390 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

3

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 13, 10Jul 17, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-09GT

NA162.9 m925.18 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-11 of 36

45

36

47

52

64

100

100

100

95

100

GREYWACKE AND ARGILLITE(118.3 to 162.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 162.9 m

DEP

TH (m

)

155

160

165

170

175

180

185

190

195

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-09GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

1080

1075

1070

1065

1060

1055

1050

1045

1040

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-12

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 4

101-343/6

GENERAL REMARKS:

HQ3 / NQ

6,143,565 N, 474,390 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

4

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 13, 10Jul 17, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-09GT

NA162.9 m925.18 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-12 of 36

20/50

2/4/5

4/6/5

50

4/4/9

3/5/7

4/8/4

7/6/5

4/2/2

6/4/1

2/4/5

8/3/2

6/8/11

0

33

30

0

32

32

25

5

13

7

20

17

40

0

0

45

37

34

5

83

94

SPT-10-1

SPT-10-2

SPT-10-3

SPT-10-4

SPT-10-5

SPT-10-6

SPT-10-7

SPT-10-8

SPT-10-9

SPT-10-10

SPT-10-11

SPT-10-12

SPT-10-13

GRAVEL AND SAND(0 to 22.6)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

SILT(22.6 to 26.5)SILT some clay and gravel, subroundedgravel, gap-graded, medium plasticity,medium grey, very soft, massive, moist[WASTE MATERIALS STOCKPILE]ORGANIC DEPOSITS(26.5 to 27.1)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(27.1 to 33.5)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]End of Drillhole: 33.5 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-10GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

747

742

737

732

727

722

717

712

707

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-13

Coordinates:

Contractor:

1

Truckshop & WarehouseLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,518 N, 473,537 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 14, 10Jul 16, 10

JSBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

Fraste DR232

K10-10GT

SPT sampler33.5 m

741.91 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-13 of 36

50

3/2/3

3/1/4

3/2/5

7/9/12

0

23

30

23

20

39

0

0

100

80

48

SPT-11-1

SPT-11-2

SPT-11-3

SPT-11-4

SPT-11-5

GRAVEL AND SAND(0 to 7.3)sandy GRAVEL some silt, trace clay,angular, poorly graded, non to lowplasticity, light grey, loose, dry [MINEWASTE ROCK]

ORGANIC DEPOSITS(7.3 to 7.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(7.9 to 12.8)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 12.8 m

DEP

TH (m

)

5

10

15

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-11GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

748

743

738

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-14

Coordinates:

Contractor:

1

Truckshop & WarehouseLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,541 N, 473,600 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 16, 10Jul 16, 10

JSBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

Fraste DR232

K10-11GT

SPT sampler12.8 m

743.37 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-14 of 36

UCS - 215 MPa

UCS - 24 MPa

UCS - 178 MPa

58

61

95

98

95

93

97

96

77

56

12

48

47

39

46

91

0

93

56

59

99

98

95

99

69

93

97

99

97

98

98

97

99

100

100

100

100

97

100

98

98

100

95

96

99

98

100

99

UCS 12-1

UCS 12-2

UCS 12-3

ORGANIC DEPOSITS(0 to 0.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.3 to 16.86)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(16.86 to 32)broken up, weak and vuggy~ contact between lava flow layers

TRACHYANDESITE(32 to 36.7)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]

End of Drillhole: 36.7 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-12GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

929

924

919

914

909

904

899

894

889

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-15

Coordinates:

Contractor:

1

Permanent CampLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,551 N, 474,327 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 18, 10Jul 19, 10Jul 19, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-12GT

NA36.7 m

923.83 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-15 of 36

UCS - 197 MPa

UCS - 269 MPa

UCS - 279 MPa

UCS - 231 MPa

UCS - 28 MPa

UCS - 63 MPa

31

60

56

75

97

85

63

68

98

74

0

17

89

99

100

100

100

91

76

82

100

96

100

100

100

95

97

0

77

95

89

97

58

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

96

97

100

100

96

100

100

100

100

100

100

100

97

100

100

UCS 13-1

UCS 13-2

UCS 13-3

UCS 13-4

UCS 13-5

UCS 13-6

ORGANIC DEPOSITS(0 to 0.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.5 to 10.7)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(10.7 to 19.85)broken up, weak and vuggy~ contact between lava flow layers

TRACHYANDESITE(19.85 to 42.71)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS(42.71 to 45.76)broken up, weak and vuggy~ contact between lava flow layersTRACHYANDESITE(45.76 to 50.3)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]End of Drillhole: 50.3 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

50

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-13GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

945

940

935

930

925

920

915

910

905

900

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-16

Coordinates:

Contractor:

1

Coarse Ore StockpileLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,570 N, 474,043 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 19, 10Jul 21, 10Jul 21, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-13GT

NA50.3 m

940.30 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-16 of 36

UCS - 195 MPa

21

63

4397

39

88

100

80

72

97

96

89

96

21

0

0

25

0

24

0

54

36

51

11

0

29

0

43

27

36

87

79

70

83

95

10097

58

100

100

100

100

98

100

100

98

99

92

94

96

70

45

67

88

100

83

66

47

54

25

64

98

100

100

100

100

UCS 14-1

ORGANIC DEPOSITS(0 to 0.4)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.4 to 33.66)fine grained, medium grey, very strong,fresh, massive, high persistence columnarjointed [LAVA FLOW]

CLAY AND GRAVEL(33.66 to 39.76)lava flow contact

CONGLOMERATE(39.76 to 45.85)

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-14GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

882

877

872

867

862

857

852

847

842

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-17

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,964 N, 475,929 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 22, 10Jul 24, 10Jul 24, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-14GT

NA62.6 m

878.77 m135o,45o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-17 of 36

70

56

75

61

98

56

41

51

100

95

100

100

98

96

94

98

GREYWACKE AND ARGILLITE(45.85 to 62.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 62.6 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-14GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

918

913

908

903

898

893

888

883

878

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-18

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,964 N, 475,929 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 22, 10Jul 24, 10Jul 24, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-14GT

NA62.6 m

878.77 m135o,45o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-18 of 36

Drillhole K10-15GTwas abandoned.UCS - 126 MPa

UCS - 98 MPa

UCS - 86 MPa

UCS - 76 MPa

UCS - 66 MPa

UCS - 160 MPa

70

11

30

33

25

20

58

46

33

10

0

0

13

22

51

69

31

18

24

56

58

52

62

29

100

76

16

51

55

48

79

89

30

100

89

100

93

98

98

100

100

86

97

87

0

100

100

100

100

100

100

100

100

98

100

100

100

100

100

100

96

92

98

98

100

UCS 15-1

UCS 15-2

UCS 15-3

UCS 15-4

UCS 15-5

UCS 15-6

ORGANIC DEPOSITS(0 to 1.2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(1.2 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-15AGT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

802

797

792

787

782

777

772

767

762

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-19

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,061 N, 476,805 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 25, 10Jul 27, 10Jul 27, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-15AGT

NA61 m

797.20 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-19 of 36

32

9

24

66

26

96

98

100

100

100

100

100

100

100

GREYWACKE AND ARGILLITE(1.2 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 61 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-15AGT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

852

847

842

837

832

827

822

817

812

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-20

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,061 N, 476,805 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 25, 10Jul 27, 10Jul 27, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-15AGT

NA61 m

797.20 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-20 of 36

UCS - 138 MPasample broken duringshipping

UCS - 124 MPa

UCS - 91 MPa

UCS - 67 MPa

UCS - 189 MPa

UCS - 138 MPa

56

89

43

39

94

50

42

45

83

21

33

82

64

83

92

70

100

54

85

92

93

16

49

57

66

63

52

85

84

30

7

61

100

100

100

100

100

100

96

95

97

100

100

92

100

100

98

92

98

100

98

98

100

98

81

87

100

100

100

99

99

98

100

100

UCS 16-1UCS 16-2

UCS 16-3

UCS 16-4

UCS 16-5

UCS 16-6

UCS 16-7

ORGANIC DEPOSITS(0 to 2.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(2.9 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-16GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

807

802

797

792

787

782

777

772

767

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-21

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,315 N, 476,548 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 28, 10Jul 30, 10Jul 30, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-16GT

NA61 m

802.34 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-21 of 36

38

76

86

84

68

83

37

100

94

100

100

98

96

97

GREYWACKE AND ARGILLITE(2.9 to 61)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 61 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-16GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

857

852

847

842

837

832

827

822

817

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-22

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,315 N, 476,548 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Jul 28, 10Jul 30, 10Jul 30, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-16GT

NA61 m

802.34 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-22 of 36

UCS - 70 MPa

UCS - 46 MPa

UCS - 31 MPa

UCS - 56 MPa

UCS - 51 MPa

UCS - 48 MPa

9

33

28

43

28

43

20

49

0

92

96

98

91

75

72

90

89

78

63

51

61

94

98

79

51

58

35

50

60

81

70

30

17

92

82

96

100

100

98

100

100

100

99

100

100

98

100

99

100

94

100

100

100

100

100

98

100

100

100

100

98

98

98

100

UCS 17-1

UCS 17-2

UCS 17-3

UCS 17-4

UCS 17-5

UCS 17-6

ORGANIC DEPOSITS(0 to 2.9)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(2.9 to 60.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-17GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

816

811

806

801

796

791

786

781

776

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-23

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,458 N, 476,332 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 1, 10Aug 3, 10Aug 3, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-17GT

NA60.9 m

811.26 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-23 of 36

UCS - 67 MPa

72

98

100

0

41

31

56

100

98

100

0

94

100

100

UCS 17-7

GREYWACKE AND ARGILLITE(2.9 to 60.9)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 60.9 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-17GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

866

861

856

851

846

841

836

831

826

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-24

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,458 N, 476,332 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 1, 10Aug 3, 10Aug 3, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-17GT

NA60.9 m

811.26 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-24 of 36

0

0

54

92

66

30

0

28

12

56

40

25

22

12

37

43

72

52

52

77

45

24

30

26

100

39

12

12

0

0

0

0

9

26

98

100

100

100

100

100

100

100

99

100

95

100

100

100

98

100

100

100

100

83

100

100

94

100

ORGANIC DEPOSITS(0 to 4.24)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(4.24 to 10.34)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]

GREYWACKE AND ARGILLITE(10.34 to 57.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-18GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

791

786

781

776

771

766

761

756

751

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-25

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,715 N, 476,126 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 3, 10Aug 4, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

DRILLED AT 45 DEG ANGLE AT AVANTI REQUEST TO INTERCEPT INFERREDFAULT

Drill Hole No.

R 1500

K10-18GT

NA57.6 m

787.31 m0o,45o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-25 of 36

41

48

52

43

33

100

89

99

89

100

GREYWACKE AND ARGILLITE(10.34 to 57.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 57.6 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-18GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

826

821

816

811

806

801

796

791

786

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-26

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,143,715 N, 476,126 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 3, 10Aug 4, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

DRILLED AT 45 DEG ANGLE AT AVANTI REQUEST TO INTERCEPT INFERREDFAULT

Drill Hole No.

R 1500

K10-18GT

NA57.6 m

787.31 m0o,45o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-26 of 36

ARTESIAN DURINGDRILLING FROM 10.7 -16.8 M

0

0

62

54

47

82

75

85

51

40

81

91

14

0

0

0

0

12

0

20

2

15

100

87

91

100

95

100

100

99

99

100

100

49

61

73

99

82

ORGANIC DEPOSITS(0 to 3.1)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(3.1 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 30.6 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-19GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

759

754

749

744

739

734

729

724

719

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-27

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,944 N, 476,473 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 4, 10Aug 6, 10Aug 6, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-19GT

NA30.6 m

753.57 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-27 of 36

47

35

43

22

43

38

28

20

28

20

35

47

35

6

0

100

100

95

85

95

100

98

98

92

92

93

86

99

ORGANIC DEPOSITS(0 to 1.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(1.5 to 10.8)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]

GREYWACKE AND ARGILLITE(10.8 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 30.6 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-20GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

791

786

781

776

771

766

761

756

751

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-28

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,463 N, 476,965 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 12, 10Aug 13, 10Aug 13, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-20GT

NA30.6 m

786.09 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-28 of 36

38

37

56

22

22

0

29

41

49

73

80

91

82

83

47

0

72

93

100

96

96

84

89

98

101

80

113

98

102

100

98

ORGANIC DEPOSITS(0 to 1.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]BOULDERS AND GRAVEL(1.5 to 7.74)BOULDERS and gravel some silt and sand,rounded, poorly graded, grey, dense, moist[ALLUVIUM]GREYWACKE AND ARGILLITE(7.74 to 30.6)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 30.6 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-21GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

802

797

792

787

782

777

772

767

762

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-29

Coordinates:

Contractor:

1

Borrow AreaLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,118 N, 475,956 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 14, 10Aug 15, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-21GT

NA30.6 m

797.26 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-29 of 36

UCS - 154 MPa

UCS - 152 MPa

UCS - 208 MPa

100

100

100

19

0

37

39

33

37

100

100

98

100

36

75

37

38

35

52

100

100

100

95

100

81

63

78

56

75

90

64

35

91

94

79

0

98

85

96

108

96

70

101

100

98

100

102

95

90

100

98

100

100

100

103

95

100

93

105

96

92

108

97

102

102

99

94

98

UCS-22-1

UCS-22-2

UCS-22-3

ORGANIC DEPOSITS(0 to 1.22)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(1.22 to 100.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

50

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-22GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

806

801

796

791

786

781

776

771

766

761

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-30

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,142,225 N, 474,552 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 15, 10Aug 18, 10Aug 18, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-22GT

NA100.3 m800.87 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-30 of 36

UCS - 118 MPa

sample broken duringshipment

UCS - 104 MPa

100

100

100

4259

73

100

62

29

0

24

34

92

0

38

52

38

40

41

64

87

50

77

87

81

73

94

41

52

63

46

51

24

0

70

92

91100

100

100

91

67

94

97

100

92

100

96

100

66

95

98

96

98

106

97

101

94

96

102

100

100

98

100

97

100

100

98

100

UCS-22-4

UCS-22-5

UCS-22-6

GREYWACKE AND ARGILLITE(1.22 to 100.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 100.3 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

100

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-22GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

856

851

846

841

836

831

826

821

816

811

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-31

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,142,225 N, 474,552 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 15, 10Aug 18, 10Aug 18, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

1-INCH STANDPIPE WAS INSTALLED

Drill Hole No.

R 1500

K10-22GT

NA100.3 m800.87 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-31 of 36

UCS - 40 MPa

UCS - 103 MPa

UCS - 120 MPa

UCS - 60 MPa

100

100

100

100

9

0

14

16

70

0

45

0

16

52

14

27

28

65

29

54

86

62

15

17

25

45

40

29

0

0

10

8

0

19

0

100

53

96

92

100

85

98

97

62

93

52

79

89

100

92

100

100

100

100

100

100

100

91

100

100

100

100

88

63

56

UCS-23-1

UCS-23-2

UCS-23-3

UCS-23-4

ORGANIC DEPOSITS(0 to 4.5)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(4.5 to 83.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-23GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

797

792

787

782

777

772

767

762

757

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-32

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,141,751 N, 474,996 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 18, 10Aug 21, 10Aug 21, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-23GT

NA83.3 m

791.62 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-32 of 36

UCS - 81 MPa

UCS - 66 MPa

UCS - 62 MPa

100

100

100

7

45

81

62

75

35

26

37

61

25

11

25

11

10

92

67

30

0

32

72

58

53

100

98

100

100

100

100

94

100

100

97

100

97

100

62

100

96

92

98

85

89

95

100

UCS-23-5

UCS-23-6

UCS-23-7

GREYWACKE AND ARGILLITE(4.5 to 83.3)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

End of Drillhole: 83.3 m

DEP

TH (m

)

55

60

65

70

75

80

85

90

95

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-23GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

847

842

837

832

827

822

817

812

807

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-33

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 2

101-343/6

GENERAL REMARKS:

HQ3

6,141,751 N, 474,996 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

2

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 18, 10Aug 21, 10Aug 21, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

2-INCH MONITORING WELL WAS INSTALLED

Drill Hole No.

R 1500

K10-23GT

NA83.3 m

791.62 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-33 of 36

UCS - 162 MPa

UCS - 197 MPa

UCS - 207 MPa

UCS - 72 MPa

100

100

100

100

14

28

60

84

94

98

28

75

85

41

28

100

100

97

98

94

98

76

8

58

100

73

98

10

62

100

85

100

100

100

95

100

100

96

100

100

100

97

98

100

98

100

100

100

100

96

100

UCS-24-1

UCS-24-2

UCS-24-3

UCS-24-4

ORGANIC DEPOSITS(0 to 2)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(2 to 36.5)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]

End of Drillhole: 36.5 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-24GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

932

927

922

917

912

907

902

897

892

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-34

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,356 N, 474,499 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 21, 10Aug 22, 10Aug 22, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-24GT

NA36.5 m

927.21 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-34 of 36

UCS - 142 MPa

sample broken duringshiping

UCS - 191 MPa

100

100

100

20

64

92

89

92

98

90

97

95

98

100

94

93

100

100

98

100

100

95

100

100

87

92

85

62

101

101

101

87

100

95

101

100

100

102

97

101

102

100

100

101

100

98

100

101

98

100

100

UCS-25-1

UCS-25-2

UCS-25-3

ORGANIC DEPOSITS(0 to 0.3)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]TRACHYANDESITE(0.3 to 36.8)fine grained, medium grey, very strong,fresh, massive, columnar jointed, highpersistence [LAVA FLOW]

End of Drillhole: 36.8 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-25GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

939

934

929

924

919

914

909

904

899

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-35

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,379 N, 474,421 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 22, 10Aug 23, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT Drill Hole No.

R 1500

K10-25GT

NA36.8 m

934.17 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-35 of 36

H147917

H147918

H147919

H147920

H147921

H147922

H147923

H147924

H147925

H147926

H147927

H147928

H147929

ORGANIC DEPOSITS(0 to 0.6)Clay and some silt, uniformly graded,medium plasticity, dark brown, spongy,fibrous, moist to wet [TOPSOIL LAYER]GREYWACKE AND ARGILLITE(0.6 to 29.87)medium to coarse grained, grey, strong,slightly weathered to fresh, quartz rich withminor feldspar and mafic, some argillitebeds and conglomerate, quartz andcarbonate veins, trace disseminated pyriteon joint faces [BOWSER LAKE GROUP]

GREYWACKE AND ARGILLITE(29.87 to 42.1)more pyrite

End of Drillhole: 42.12 m

DEP

TH (m

)

5

10

15

20

25

30

35

40

45

DR

ILLH

OLE

NO

TES

SPT

BLO

W C

OU

NTS

Ref

usal

Pen

etra

tion

SAM

PLE

REC

OVE

RY

(%)

SPT TEST DATA 'N'VALUES

20 40 60 80SPT

'N' V

ALU

E / R

QD

(%)

GR

APH

IC L

OG

TOTA

L C

OR

ER

ECO

VER

Y (%

)

AVANTI KITSAULT MINE LTDKITSAULT PROJECT

DRILLHOLE LOG FOR K10-27GT

RQD (%)

20 40 60 80

WEL

L D

ETA

ILS

ELEV

ATI

ON

(m)

832

827

822

817

812

807

802

797

792

SAM

PLE

TYPE

SAM

PLE

NO

.MATERIAL DESCRIPTION

Appendix A1-36

Coordinates:

Contractor:

1

Borrow AreaLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,358 N, 476,119 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Aug 23, 10Aug 26, 10

AVANTIBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

DRILLHOLE LOGGED AND SAMPLED BY AVANTI. SAMPLES WERE COLLECTEDFOR SRK CONSULTING FOR ARD/ML TESTING.

Drill Hole No.

R 1500

K10-27GT

NA42.12 m826.50 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.Fi

le:M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\KIT

SA

ULT

DR

ILLH

OLE

LO

GS

201

0.G

PJ

Libr

ary:

M:\1

\01\

0014

1\06

\A\D

ATA

\GIN

T\LI

BR

AR

Y_T

EM

PLA

TE_D

EC

18,2

009.

GLB

, D

RIL

LHO

LE L

OG

, D

ATA

TE

MP

LATE

_DE

C18

,200

9.G

DT,

Dec

1, 1

0

A2-36 of 36

VA101-343/9-3

Rev 0

June 17, 2011

APPENDIX A3

2010 DRILLHOLE LOGS

(Pages A3-1 to A3-17)

0.3 m

14.02 m14.9 m

15.24 m

21.34 m

39 m

MINE WASTE ROCK - GRAVEL ANDSAND

ORGANIC DEPOSITSGREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

12 bags of coarse grained filter sand

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

GR

AP

HIC

LO

G

655

650

645

640

635

630

625

620

NOTES

5

10

15

20

25

30

35

40

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-01GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-1

Coordinates:

Contractor:

1

Primary CrusherLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,142,498 N, 473,131 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler39 m

650.41 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jun 30, 10Jul 1, 10Jul 1, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-01GT

Water Level Reading: Depth of SWL 14.2 mDate of Measurement Aug 22, 10

Piezometer K10-01GT, Stick-up = 0.98 m

A3-1 of 17

0.3 m

26.2 m27.1 m27.4 m

33.5 m34.1 m

MINE WASTE ROCK - GRAVEL ANDSAND

ORGANIC DEPOSITSGREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 2 bags of portland cementand 1 bag of grout mix ~ 40 gal water1-inch diameter schedule 40 solid PVCpipe 9 x 10 ft pipe segments

1/2 bag of bentonite chips

4 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

GR

AP

HIC

LO

G

749

744

739

734

729

724

719

NOTES

5

10

15

20

25

30

35

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-02GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-2

Coordinates:

Contractor:

1

Fuel StorageLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,378 N, 473,443 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler34.1 m

744.18 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 1, 10Jul 2, 10Jul 2, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-02GT

Water Level Reading: Depth of SWL 5.51 mDate of Measurement Aug 22, 10

Piezometer K10-02GT, Stick-up = 0.85 m

A3-2 of 17

0.3 m

10.66 m

11.58 m12.19 m

18.28 m

19.8 m

20.5 m21 m

MINE WASTE ROCK - GRAVEL ANDSAND

SILT

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

748

743

738

733

728

NOTES

5

10

15

20

25

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-03GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-3

Coordinates:

Contractor:

1

Truckshop & WarehouseLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,498 N, 473,559 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler35.7 m

743.39 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 2, 10Jul 3, 10Jul 3, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-03GT

Water Level Reading: Depth of SWL 11.89 mDate of Measurement Aug 22, 10

Piezometer K10-03GT, Stick-up = 0.97 m

A3-3 of 17

0.3 m

13.71 m

14.63 m15.24 m

21.33 m21.9 m

22.86 m

24.38 m

MINE WASTE ROCK - GRAVEL ANDSAND

ORGANIC DEPOSITSGREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

733

728

723

718

713

NOTES

5

10

15

20

25

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-04GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-4

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,142,080 N, 474,680 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler100 m

727.90 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 3, 10Jul 6, 10Jul 6, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-04GT

Water Level Reading: Depth of SWL 20.71 mDate of Measurement Aug 22, 10

Piezometer K10-04GT, Stick-up = 0.90 m

A3-4 of 17

0.3 m

21.64 m22.55 m22.86 m

28.95 m

30.5 m31 m32 m

MINE WASTE ROCK - GRAVEL ANDSAND

ORGANIC DEPOSITSGREYWACKE AND ARGILLITE

DIOMIEN DYKEGREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 1 bag of portland cement and1 bag of grout mix ~ 40 gal water2-inch diameter schedule 40 solid PVCpipe 7.5 x 10 ft pipe segments

1/2 bag of bentonite chips

4 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

717

712

707

702

697

692

687

NOTES

5

10

15

20

25

30

35

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-05GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-5

Coordinates:

Contractor:

1

Down Gradient of South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,141,755 N, 474,300 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler39.9 m

712.31 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 6, 10Jul 7, 10Jul 7, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-05GT

Water Level Reading: Depth of SWL 21.94 mDate of Measurement Aug 22, 10

Piezometer K10-05GT, Stick-up = 0.93 m

A3-5 of 17

0.3 m

14.93 m

15.84 m16.34 m

22.43 m

23.5 m

24.38 m

25.5 m

GRAVEL AND SAND

ORGANIC DEPOSITSDIORITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 2 bags of portland cementand 2 bags of grout mix ~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 5 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

690

685

680

675

670

665

NOTES

5

10

15

20

25

30

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-06GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-6

Coordinates:

Contractor:

1

Down Gradient of South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,141,413 N, 473,974 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

SPT sampler35.5 m

685.00 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Geotech Drilling Ltd.

Fraste DR232Odex / Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 7, 10Jul 9, 10Jul 8, 10JS/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-06GT

Water Level Reading: Depth of SWL 12.36 mDate of Measurement Aug 22, 10

Piezometer K10-06GT, Stick-up = 1.00 m

A3-6 of 17

0.3 m

16.76 m17.37 m

18.29 m

24.38 m

25.3 m

26.51 m27 m

ORGANIC DEPOSITSTRACHYANDESITE

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS

Type 10 hydraulic cement and bentonitegrout

grout mix of 3 bags of portland cementand 2 bags of grout mix ~ 110 gal water1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

929

924

919

914

909

904

NOTES

5

10

15

20

25

30

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-12GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-7

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,551 N, 474,327 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA36.7 m

923.83 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 18, 10Jul 19, 10Jul 19, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-12GT

Water Level Reading: Depth of SWL 21.44 mDate of Measurement Aug 20, 10

Piezometer K10-12GT, Stick-up = 0.69 m

A3-7 of 17

0.3 m

28.34 m

29.87 m

34.13 m

40.23 m

42.7 m43.59 m44.5 m

ORGANIC DEPOSITSTRACHYANDESITE

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS

TRACHYANDESITE

TRACHYANDESITE -TRANSITIONBETWEEN LAVA FLOWS

TRACHYANDESITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 3 bags of portland cementand 1.5 bags of grout mix ~ 150 gal water

1-inch diameter schedule 40 solid PVCpipe 12 x 10 ft pipe segments

1/2 bag of bentonite chips

4 bags of coarse grained filter sand

1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIX

SOLID PVC PIPE

BENTONITE SEAL

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

945

940

935

930

925

920

915

910

905

NOTES

5

10

15

20

25

30

35

40

45

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-13GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-8

Coordinates:

Contractor:

1

Coarse Ore StockpileLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,570 N, 474,043 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA50.3 m

940.30 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 19, 10Jul 21, 10Jul 21, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-13GT

Water Level Reading: Depth of SWL 38.10 mDate of Measurement Aug 20, 10

Piezometer K10-13GT, Stick-up = 0.50 m

A3-8 of 17

0.3 m

28.65 m29.87 m30.48 m

36.57 m37.8 m

39.62 m

41 m

ORGANIC DEPOSITSTRACHYANDESITE

CLAY AND GRAVEL

CONGLOMERATE

Type 10 hydraulic cement and bentonitegrout

grout mix of 3 bags of portland cementand 1 bag of grout mix ~ 110 gal water2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

1/2 bag of bentonite chips

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

882

877

872

867

862

857

852

847

842

NOTES

5

10

15

20

25

30

35

40

45

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-14GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-9

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,964 N, 475,929 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA62.6 m

878.77 m135o,45o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 22, 10Jul 24, 10Jul 24, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-14GT

Water Level Reading: Depth of SWL 36.35 mDate of Measurement Aug 20, 10

Piezometer K10-14GT, Stick-up = 0.57 m

A3-9 of 17

0.3 m

4.57 m

5.18 m

11.27 m

11.9 m

12.8 m

13.5 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

802

797

792

NOTES

5

10

15

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-15AGT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-10

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,061 N, 476,805 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA61 m

797.20 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 25, 10Jul 27, 10Jul 27, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-15AGT

Water Level Reading: Depth of SWL 0.58 mDate of Measurement Aug 20, 10

Piezometer K10-15AGT, Stick-up = 0.71 m

A3-10 of 17

0.3 m

3 m3.35 m

9.44 m

10.1 m

10.97 m

11.5 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 2 x 10 ft pipe segments

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

807

802

797

NOTES

5

10

15

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-16GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-11

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,315 N, 476,548 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA61 m

802.34 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Jul 28, 10Jul 30, 10Jul 30, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-16GT

Water Level Reading: Depth of SWL 0.93 mDate of Measurement Aug 20, 10

Piezometer K10-16GT, Stick-up = 0.60 m

A3-11 of 17

0.3 m

3.2 m

3.96 m

10.05 m

10.7 m

11.27 m

11.8 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips1-inch diameter schedule 40 solid PVCpipe 2 x 10 ft pipe segments

3 bags of coarse grained filter sand1-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

816

811

806

NOTES

5

10

15

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-17GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-12

Coordinates:

Contractor:

1

Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,458 N, 476,332 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA60.9 m

811.26 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 1, 10Aug 3, 10Aug 3, 10GW/BH

BB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-17GT

Water Level Reading: Depth of SWL -0.14 mDate of Measurement Aug 20, 10

Piezometer K10-17GT, Stick-up = 0.54 m

A3-12 of 17

0.3 m

9.08 m

10.7 m

16.7 m16.8 m

18 m

18.7 m19 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEAL

SOLID PVC PIPE

FILTER SAND

SLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

759

754

749

744

NOTES

5

10

15

20

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-19GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-13

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,944 N, 476,473 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA30.6 m

753.57 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 4, 10Aug 6, 10Aug 6, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

ARTESIAN FROM 10.7 - 16.8 M

K10-19GT

Water Level Reading: Depth of SWL 0.71 mDate of Measurement Aug 20, 10

Piezometer K10-19GT, Stick-up = 0.59 m

A3-13 of 17

0.3 m

2.1 m

2.7 m

8.8 m

11.9 m

12.8 m13.2 m

ORGANIC DEPOSITS

BOULDERS AND GRAVEL

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

791

786

781

NOTES

5

10

15

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-20GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-14

Coordinates:

Contractor:

1

Downgradient of Northeast TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,463 N, 476,965 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA30.6 m

786.09 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 12, 10Aug 13, 10Aug 13, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-20GT

Water Level Reading: Depth of SWL 1.17 mDate of Measurement Aug 20, 10

Piezometer K10-20GT, Stick-up = 0.70 m

A3-14 of 17

0.3 m

3.9 m

4.6 m

10.7 m

11.3 m

12.2 m12.6 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 4 x 10 ft pipe segments

3 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

2 bags of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

806

801

796

NOTES

5

10

15

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-22GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-15

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,142,225 N, 474,552 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA100.3 m800.87 m

0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 15, 10Aug 18, 10Aug 18, 10

JS/CGBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-22GT

Water Level Reading: Depth of SWL 1.30 mDate of Measurement Aug 20, 10

Piezometer K10-22GT, Stick-up = 0.89 m

A3-15 of 17

0.3 m

8.69 m

9.45 m

15.54 m16 m

16.9 m

17.5 m

ORGANIC DEPOSITS

GREYWACKE AND ARGILLITE

Type 10 hydraulic cement and bentonitegrout

1/2 bag of bentonite chips2-inch diameter schedule 40 solid PVCpipe 3 x 10 ft pipe segment

2.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand

1/2 bag of bentonite chips

CEMENT CAP

BENTONITE SEALSOLID PVC PIPE

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEAL

VAN RUTH PLUG

GR

AP

HIC

LO

G

797

792

787

782

NOTES

5

10

15

20

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-23GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-16

Coordinates:

Contractor:

1

South TMF EmbankmentLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,141,751 N, 474,996 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA83.3 m

791.62 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 18, 10Aug 21, 10Aug 21, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT

PVC PIPE BROKE DURING INSTALLATION. THIS WELL WAS INSTALLED ABOVETHIS ZONE.

K10-23GT

Water Level Reading: Depth of SWL 3.48 mDate of Measurement Aug 21, 10

Piezometer K10-23GT, Stick-up = 0.88 m

A3-16 of 17

0.3 m

28 m28.9 m29.6 m

35.7 m36.3 m36.5 m

37 m

ORGANIC DEPOSITS

TRACHYANDESITE

Type 10 hydraulic cement and bentonitegrout

grout mix of 4 bags of portland cementand 2 bag of grout mix ~ 100 gal water2-inch diameter schedule 40 solid PVCpipe 10x 10 ft pipe segment

1/2 bag of bentonite chips

3.5 bags of coarse grained filter sand2-inch diameter schedule 80 machineslotted PVC pipe 2 x 10 ft pipe segments

1 bag of coarse grained filter sand1/2 bag of bentonite chips

CEMENT CAP

GROUT MIXSOLID PVC PIPE

BENTONITE SEAL

FILTER SANDSLOTTED PVC PIPE

BENTONITE SEALVAN RUTH PLUG

GR

AP

HIC

LO

G

932

927

922

917

912

907

902

897

NOTES

5

10

15

20

25

30

35

40

DE

PTH

- (m

)

ELV

ATI

ON

- (m

)

AVANTI KITSAULT MINE LTD.KITSAULT PROJECT

PIEZOMETER DETAILS FOR K10-24GT

File

:M:\1

\01\

0034

3\06

\A\D

ATA

\TA

SK

020

0 (G

EO

TEC

HN

ICA

L S

ITE

INV

ES

TIG

ATI

ON

PR

OG

RA

M)\D

RIL

LHO

LE D

ATA

RE

VIE

WE

D\K

ITS

AU

LT D

RIL

LHO

LE L

OG

S 2

010.

GP

JLi

brar

y: M

:\1\0

1\00

343\

06\A

\DA

TA\T

AS

K 0

200

(GE

OTE

CH

NIC

AL

SIT

E IN

VE

STI

GA

TIO

N P

RO

GR

AM

)\DR

ILLH

OLE

DA

TA R

EV

IEW

ED

\LIB

RA

RY

_TE

MP

LATE

_DE

C18

,200

9.G

LB,

WE

LL C

OM

PLE

TIO

N,

NE

W D

ATA

TE

MP

LATE

24A

UG

10.G

DT,

Nov

15,

10

Appendix B2-17

Coordinates:

Contractor:

1

Plant SiteLocation:

Drilling Rig:

Drilling Method:

of 1

101-343/6

GENERAL REMARKS:

HQ3

6,143,356 N, 474,499 E, UTM NAD83 ZONE 9

Project:

REV. 0 - Issued for Report 0REV.

PROJECT/ASSIGNMENT NO.

NA36.5 m

927.21 m0o,90o

PAGE

FIGURE.REV. 0 - Issued for Report

Radius Drilling Corp.

R 1500Diamond Drilling

Date Started:

Date Completed:

Date Well Installed:

Logged by:

Reviewed by:

1

Logging conducted according to the Canadian Foundation Engineering Manual, 4th Edition, 2006.

REF. NO.

Drill Hole No.Aug 21, 10Aug 22, 10Aug 22, 10

GW/BHBB

In Situ Sampler:

Total Depth:

Elevation:

Azimuth,Dip

Hole size:

KITSAULT PROJECT K10-24GT

Water Level Reading: Depth of SWL 25.13 mDate of Measurement Aug 22, 10

Piezometer K10-24GT, Stick-up = 0.85 m

A3-17 of 17

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX B

PACKER TESTS

Appendix B1 2009 Packer Tests Appendix B2 2010 Packer Tests

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX B1

2009 PACKER TESTS

(Pages B1-1 to B1-93)

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]1 Rev'd 07/11/09

SHEET 1 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 16.7 m TOP OF TEST INTERVAL: 12.00 3.66

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 11-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 59.50 18.14 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 23828.0 23832.0 23834.5 23838.0 23841.0 23843.5 litres/min

Take litres 4.00 2.50 3.50 3.00 2.50

0.41 Average Take l/m 4.00 2.50 3.50 3.00 2.50 3.10 0.98

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 23848.0 23849.0 23850.0 23851.0 23852.0 23853.0 litres/min

Take litres 1.00 1.00 1.00 1.00 1.00

0.55 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.30

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 23853.0 23855.0 23856.0 23856.5 23857.5 23858.0 litres/min

Take litres 2.00 1.00 0.50 1.00 0.50

0.69 Average Take l/m 2.00 1.00 0.50 1.00 0.50 1.00 0.28

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 23859.0 23859.5 23860.5 23861.0 23862.0 23862.5 litres/min

Take litres 0.50 1.00 0.50 1.00 0.50

0.55 Average Take l/m 0.50 1.00 0.50 1.00 0.50 0.70 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 23863.0 23863.5 23864.0 23864.5 23865.0 23865.5 litres/min

Take litres 0.50 0.50 0.50 0.50 0.50

0.41 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.16

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.979 MAX k= 9.79E-06

DETERMINATION:

MIN Lu= 0.158 MIN k= 1.58E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.158 AVG k= 1.58E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7' and core barrel is 8.5' long, so test interval will be from 12.5 to 59.4 including the length of the packer bladder, double packer system is used.

Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min. The lowest psi on the gauge was 4 and the lowest we could get flow was 6psi so that was used as P1.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

0.41 0.55 0.69 0.55 0.41Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.2

2.3

2.5

2.3

2.2

2.2

2.2

2.3

2.3

2.4

2.4

2.5

2.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-1 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]2 Rev'd 07/14/09

SHEET 2 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 16.8 m TOP OF TEST INTERVAL: 57.50 17.53

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 14-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 118.50 36.13 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24023.0 24032.5 24043.0 24054.0 24063.0 24072.0 litres/min

Take litres 9.50 10.50 11.00 9.00 9.00

0.69 Average Take l/m 9.50 10.50 11.00 9.00 9.00 9.80 2.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24090.0 24104.5 24118.0 24132.0 24145.5 24160.0 litres/min

Take litres 14.50 13.50 14.00 13.50 14.50

1.38 Average Take l/m 14.50 13.50 14.00 13.50 14.50 14.00 2.38

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24195.0 24216.0 24238.0 24260.0 24280.0 24302.0 litres/min

Take litres 21.00 22.00 22.00 20.00 22.00

2.07 Average Take l/m 21.00 22.00 22.00 20.00 22.00 21.40 2.99

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24315.0 24330.0 24344.0 24359.0 24374.0 24388.0 litres/min

Take litres 15.00 14.00 15.00 15.00 14.00

1.38 Average Take l/m 15.00 14.00 15.00 15.00 14.00 14.60 2.49

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24433.0 24443.0 24453.5 24464.0 24474.5 24485.0 litres/min

Take litres 10.00 10.50 10.50 10.50 10.50

0.69 Average Take l/m 10.00 10.50 10.50 10.50 10.50 10.40 2.27

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.992 MAX k= 2.99E-05

DETERMINATION:

MIN Lu= 2.136 MIN k= 2.14E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.453 AVG k= 2.45E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.69 1.38 2.07 1.38 0.69Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.5

3.2

3.8

3.2

2.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 5.00 10.00 15.00 20.00 25.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 14JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-2 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]3 Rev'd 07/15/09

SHEET 3 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 16.2 m TOP OF TEST INTERVAL: 118.70 36.19

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 15-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 174.70 53.26 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24762.0 24763.0 24763.8 24764.8 24765.5 24766.0 litres/min

Take litres 1.00 0.80 1.00 0.70 0.50

1.38 Average Take l/m 1.00 0.80 1.00 0.70 0.50 0.80 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24769.0 24770.8 24772.3 24774.0 24776.0 24778.0 litres/min

Take litres 1.80 1.50 1.70 2.00 2.00

2.76 Average Take l/m 1.80 1.50 1.70 2.00 2.00 1.80 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24780.0 24783.0 24786.5 24790.0 24793.0 24796.0 litres/min

Take litres 3.00 3.50 3.50 3.00 3.00

4.14 Average Take l/m 3.00 3.50 3.50 3.00 3.00 3.20 0.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24798.0 24800.0 24803.0 24805.0 24807.0 24809.0 litres/min

Take litres 2.00 3.00 2.00 2.00 2.00

2.76 Average Take l/m 2.00 3.00 2.00 2.00 2.00 2.20 0.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 24811.0 24812.0 24813.5 24815.0 24816.0 24818.0 litres/min

Take litres 1.00 1.50 1.50 1.00 2.00

1.38 Average Take l/m 1.00 1.50 1.50 1.00 2.00 1.40 0.26

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.320 MAX k= 3.20E-06

DETERMINATION:

MIN Lu= 0.151 MIN k= 1.51E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.252 AVG k= 2.52E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Flow is laminar with some minor wash out.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

1.38 2.76 4.14 2.76 1.38Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.1

4.5

5.9

4.5

3.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 15JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-3 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]6 Rev'd 07/18/09

SHEET 4 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 17.5 m TOP OF TEST INTERVAL: 273.70 83.45

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 329.70 100.52 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27483.0 27503.0 27522.5 27541.0 27559.0 27578.0 litres/min

Take litres 20.00 19.50 18.50 18.00 19.00

3.10 Average Take l/m 20.00 19.50 18.50 18.00 19.00 19.00 2.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27610.0 27636.0 27661.0 27685.0 27709.0 27731.5 litres/min

Take litres 26.00 25.00 24.00 24.00 22.50

6.21 Average Take l/m 26.00 25.00 24.00 24.00 22.50 24.30 1.77

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27824.0 27852.0 27880.0 27908.0 27933.0 27960.0 litres/min

Take litres 28.00 28.00 28.00 25.00 27.00

9.31 Average Take l/m 28.00 28.00 28.00 25.00 27.00 27.20 1.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27990.0 28010.0 28030.0 28049.0 28069.0 28088.0 litres/min

Take litres 20.00 20.00 19.00 20.00 19.00

6.21 Average Take l/m 20.00 20.00 19.00 20.00 19.00 19.60 1.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28100.0 28112.0 28124.0 28136.5 28149.0 28161.0 litres/min

Take litres 12.00 12.00 12.50 12.50 12.00

3.10 Average Take l/m 12.00 12.00 12.50 12.50 12.00 12.20 1.44

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.248 MAX k= 2.25E-05

DETERMINATION:

MIN Lu= 1.426 MIN k= 1.43E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.428 AVG k= 1.43E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Void filling and possible turbulent flow.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.10 6.21 9.31 6.21 3.10Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.0

8.1

11.2

8.1

5.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 18JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-4 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]7 Rev'd 07/19/09

SHEET 5 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 7

DIP: 90 oDEPTH GROUNDWATER: 16.5 m TOP OF TEST INTERVAL: 328.70 100.21

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 399.70 121.86 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28350.0 28354.5 28359.0 28363.0 28367.0 28371.0 litres/min

Take litres 4.50 4.50 4.00 4.00 4.00

3.45 Average Take l/m 4.50 4.50 4.00 4.00 4.00 4.20 0.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28377.0 28385.0 28393.0 28401.0 28408.0 28415.0 litres/min

Take litres 8.00 8.00 8.00 7.00 7.00

6.89 Average Take l/m 8.00 8.00 8.00 7.00 7.00 7.60 0.41

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28431.0 28443.0 28457.0 28469.0 28481.0 28492.5 litres/min

Take litres 12.00 14.00 12.00 12.00 11.50

10.34 Average Take l/m 12.00 14.00 12.00 12.00 11.50 12.30 0.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28502.0 28511.0 28520.0 28529.0 28538.0 28547.0 litres/min

Take litres 9.00 9.00 9.00 9.00 9.00

6.89 Average Take l/m 9.00 9.00 9.00 9.00 9.00 9.00 0.48

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28550.0 28556.0 28562.0 28568.0 28573.5 28579.0 litres/min

Take litres 6.00 6.00 6.00 5.50 5.50

3.45 Average Take l/m 6.00 6.00 6.00 5.50 5.50 5.80 0.52

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.516 MAX k= 5.16E-06

DETERMINATION:

MIN Lu= 0.374 MIN k= 3.74E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.449 AVG k= 4.49E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Flow is laminar with some minor wash out.

TEST BY: LS REVIEWED BY:

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.2

8.6

12.1

8.6

5.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-5 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]8 Rev'd 07/19/09

SHEET 6 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 8

DIP: 90 oDEPTH GROUNDWATER: 16.5 m TOP OF TEST INTERVAL: 394.70 120.34

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 449.70 137.10 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28660.0 28662.0 28664.0 28668.0 28700.0 28670.0 litres/min

Take litres 2.00 2.00 4.00 32.00 -30.00

3.45 Average Take l/m 2.00 2.00 4.00 32.00 -30.00 2.00 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28674.0 28678.0 28681.0 28684.5 28688.0 28691.0 litres/min

Take litres 4.00 3.00 3.50 3.50 3.00

6.89 Average Take l/m 4.00 3.00 3.50 3.50 3.00 3.40 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28695.0 28701.0 28706.0 28711.5 28717.0 28722.0 litres/min

Take litres 6.00 5.00 5.50 5.50 5.00

10.34 Average Take l/m 6.00 5.00 5.50 5.50 5.00 5.40 0.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28724.0 28728.0 28732.0 28736.0 28740.0 28744.0 litres/min

Take litres 4.00 4.00 4.00 4.00 4.00

6.89 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.28

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28750.0 28752.0 28754.5 28757.0 28759.8 28762.0 litres/min

Take litres 2.00 2.50 2.50 2.75 2.25

3.45 Average Take l/m 2.00 2.50 2.50 2.75 2.25 2.40 0.28

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.276 MAX k= 2.76E-06

DETERMINATION:

MIN Lu= 0.230 MIN k= 2.30E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.257 AVG k= 2.57E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Flow is laminar with some minor wash out.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.2

8.6

12.1

8.6

5.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-6 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]9 Rev'd 07/20/09

SHEET 7 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 9

DIP: 90 oDEPTH GROUNDWATER: 17.2 m TOP OF TEST INTERVAL: 448.70 136.80

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 20-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 499.70 152.35 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28947.0 28962.0 28976.0 28989.5 29002.5 29015.0 litres/min

Take litres 15.00 14.00 13.50 13.00 12.50

3.45 Average Take l/m 15.00 14.00 13.50 13.00 12.50 13.60 1.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29055.0 29072.0 29088.0 29104.0 29118.5 29134.0 litres/min

Take litres 17.00 16.00 16.00 14.50 15.50

6.89 Average Take l/m 17.00 16.00 16.00 14.50 15.50 15.80 1.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29160.0 29181.0 29202.0 29210.5 29240.0 29258.0 litres/min

Take litres 21.00 21.00 8.50 29.50 18.00

10.34 Average Take l/m 21.00 21.00 8.50 29.50 18.00 19.60 1.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29275.0 29289.5 29303.0 29316.0 29329.0 29341.5 litres/min

Take litres 14.50 13.50 13.00 13.00 12.50

6.89 Average Take l/m 14.50 13.50 13.00 13.00 12.50 13.30 0.98

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29358.0 29366.5 29375.0 29382.5 29390.5 29398.5 litres/min

Take litres 8.50 8.50 7.50 8.00 8.00

3.45 Average Take l/m 8.50 8.50 7.50 8.00 8.00 8.10 0.99

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.660 MAX k= 1.66E-05

DETERMINATION:

MIN Lu= 0.981 MIN k= 9.81E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.989 AVG k= 9.89E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Void Filling suspected.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.3

8.7

12.2

8.7

5.3

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 5.00 10.00 15.00 20.00 25.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-7 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]10 Rev'd 07/23/09

SHEET 8 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 10

DIP: 90 oDEPTH GROUNDWATER: 18.2 m TOP OF TEST INTERVAL: 498.70 152.04

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 23-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 554.70 169.12 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29690.0 29690.5 29691.0 29691.5 29692.0 29692.5 litres/min

Take litres 0.50 0.50 0.50 0.50 0.50

3.45 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29694.0 29695.3 29696.5 29698.0 29699.0 29700.5 litres/min

Take litres 1.30 1.20 1.50 1.00 1.50

6.89 Average Take l/m 1.30 1.20 1.50 1.00 1.50 1.30 0.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29702.0 29704.3 29706.3 29708.0 29710.0 29712.0 litres/min

Take litres 2.30 2.00 1.70 2.00 2.00

10.34 Average Take l/m 2.30 2.00 1.70 2.00 2.00 2.00 0.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29713.0 29714.3 29715.3 29716.8 29718.0 29719.0 litres/min

Take litres 1.30 1.00 1.45 1.25 1.00

6.89 Average Take l/m 1.30 1.00 1.45 1.25 1.00 1.20 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29720.0 29720.5 29721.0 29722.0 29722.3 29723.0 litres/min

Take litres 0.50 0.50 1.00 0.30 0.70

3.45 Average Take l/m 0.50 0.50 1.00 0.30 0.70 0.60 0.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.096 MAX k= 9.56E-07

DETERMINATION:

MIN Lu= 0.055 MIN k= 5.46E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.076 AVG k= 7.64E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Laminar flow

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.4

8.8

12.3

8.8

5.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 0.50 1.00 1.50 2.00 2.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-8 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]11 Rev'd 07/24/09

SHEET 9 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 11

DIP: 90 oDEPTH GROUNDWATER: 17.1 m TOP OF TEST INTERVAL: 548.70 167.29

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 604.60 184.33 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29815.0 29815.3 29815.5 29815.8 29816.0 29816.3 litres/min

Take litres 0.25 0.25 0.25 0.25 0.25

3.45 Average Take l/m 0.25 0.25 0.25 0.25 0.25 0.25 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29817.0 29817.8 29818.3 29819.0 29819.5 29820.0 litres/min

Take litres 0.75 0.50 0.75 0.50 0.50

6.89 Average Take l/m 0.75 0.50 0.75 0.50 0.50 0.60 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29821.0 29822.0 29822.5 29823.3 29824.0 29824.5 litres/min

Take litres 1.00 0.50 0.75 0.75 0.50

10.34 Average Take l/m 1.00 0.50 0.75 0.75 0.50 0.70 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29825.0 29825.3 29825.8 29826.3 29826.8 29827.0 litres/min

Take litres 0.25 0.50 0.50 0.50 0.25

6.89 Average Take l/m 0.25 0.50 0.50 0.50 0.25 0.40 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29827.0 29827.3 29827.5 29827.8 29827.9 29828.0 litres/min

Take litres 0.25 0.25 0.25 0.10 0.15

3.45 Average Take l/m 0.25 0.25 0.25 0.10 0.15 0.20 0.02

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.040 MAX k= 4.04E-07

DETERMINATION:

MIN Lu= 0.022 MIN k= 2.23E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.030 AVG k= 3.03E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~15 degrees

Laminar flow with some void filling.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.3

8.7

12.2

8.7

5.3

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-9 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]12 Rev'd 07/26/09

SHEET 10 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 12

DIP: 90 oDEPTH GROUNDWATER: 26.5 m TOP OF TEST INTERVAL: 613.60 187.07

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 26-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 664.60 202.62 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29945.0 29951.5 29957.0 29963.0 29967.5 29973.0 litres/min

Take litres 6.50 5.50 6.00 4.50 5.50

3.45 Average Take l/m 6.50 5.50 6.00 4.50 5.50 5.60 0.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29982.0 29991.0 29999.5 30007.0 30014.5 30021.5 litres/min

Take litres 9.00 8.50 7.50 7.50 7.00

6.89 Average Take l/m 9.00 8.50 7.50 7.50 7.00 7.90 0.53

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30035.0 30053.0 30067.0 30082.0 30096.0 30110.5 litres/min

Take litres 18.00 14.00 15.00 14.00 14.50

10.34 Average Take l/m 18.00 14.00 15.00 14.00 14.50 15.10 0.74

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30118.0 30125.0 30132.5 30139.5 30146.0 30153.5 litres/min

Take litres 7.00 7.50 7.00 6.50 7.50

6.89 Average Take l/m 7.00 7.50 7.00 6.50 7.50 7.10 0.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30157.0 30161.0 30165.5 30170.0 30174.0 30178.5 litres/min

Take litres 4.00 4.50 4.50 4.00 4.50

3.45 Average Take l/m 4.00 4.50 4.50 4.00 4.50 4.30 0.45

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.742 MAX k= 7.42E-06

DETERMINATION:

MIN Lu= 0.446 MIN k= 4.46E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.507 AVG k= 5.07E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.1L/min.

Air temperature, ~25 degrees

Dilation with some minor void filling.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.2

9.6

13.1

9.6

6.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 26JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-10 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]13 Rev'd 07/27/09

SHEET 11 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 13

DIP: 90 oDEPTH GROUNDWATER: 16.9 m TOP OF TEST INTERVAL: 663.60 202.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 719.50 219.36 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31156.0 31159.0 31161.0 31163.5 31165.5 31167.3 litres/min

Take litres 3.00 2.00 2.50 2.00 1.75

3.45 Average Take l/m 3.00 2.00 2.50 2.00 1.75 2.25 0.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31180.0 31205.0 31230.0 31255.0 31280.0 31306.0 litres/min

Take litres 25.00 25.00 25.00 25.00 26.00

6.89 Average Take l/m 25.00 25.00 25.00 25.00 26.00 25.20 1.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31350.0 31394.5 31449.0 31483.0 31529.0 31575.0 litres/min

Take litres 44.50 54.50 34.00 46.00 46.00

9.51 Average Take l/m 44.50 54.50 34.00 46.00 46.00 45.00 2.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31595.0 31622.0 31649.0 31675.0 31701.0 31728.0 litres/min

Take litres 27.00 27.00 26.00 26.00 27.00

6.89 Average Take l/m 27.00 27.00 26.00 26.00 27.00 26.60 1.80

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31739.0 31741.0 31742.5 31744.0 31745.5 31747.0 litres/min

Take litres 2.00 1.50 1.50 1.50 1.50

3.45 Average Take l/m 2.00 1.50 1.50 1.50 1.50 1.60 0.18

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.335 MAX k= 2.34E-05

DETERMINATION:

MIN Lu= 0.179 MIN k= 1.79E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.253 AVG k= 1.25E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.

Air temperature, ~27 degrees

Laminar flow with possible dilation. When test was set up there were minute bubbles coming out of stuffing box.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.45 6.89 9.51 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.2

8.7

11.3

8.7

5.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 27JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-11 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]14 Rev'd 07/28/09

SHEET 12 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 14

DIP: 90 oDEPTH GROUNDWATER: 17.1 m TOP OF TEST INTERVAL: 718.30 218.99

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 28-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 767.30 233.93 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32046.0 32048.0 32050.5 32053.0 32055.5 32058.0 litres/min

Take litres 2.00 2.50 2.50 2.50 2.50

3.45 Average Take l/m 2.00 2.50 2.50 2.50 2.50 2.40 0.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32090.0 32116.0 32141.0 32167.0 32193.0 32219.0 litres/min

Take litres 26.00 25.00 26.00 26.00 26.00

6.89 Average Take l/m 26.00 25.00 26.00 26.00 26.00 25.80 1.98

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32295.0 32342.0 32387.0 32433.0 32479.0 32524.0 litres/min

Take litres 47.00 45.00 46.00 46.00 45.00

10.00 Average Take l/m 47.00 45.00 46.00 46.00 45.00 45.80 2.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32590.0 32615.0 32641.0 32665.0 32690.0 32715.0 litres/min

Take litres 25.00 26.00 24.00 25.00 25.00

6.89 Average Take l/m 25.00 26.00 24.00 25.00 25.00 25.00 1.92

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32723.0 32725.0 32727.0 32728.5 32730.5 32732.0 litres/min

Take litres 2.00 2.00 1.50 2.00 1.50

3.45 Average Take l/m 2.00 2.00 1.50 2.00 1.50 1.80 0.23

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.597 MAX k= 2.60E-05

DETERMINATION:

MIN Lu= 0.229 MIN k= 2.29E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.408 AVG k= 1.41E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.

Air temperature, ~27 degrees

Laminar flow with possible dilation. When test was set up there were minute bubbles coming out of stuffing box.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.45 6.89 10.00 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.3

8.7

11.8

8.7

5.3

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 28JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-12 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-01GT\Completed and Reviewed by LS\[K09-01GT Packer Test Final LS.xls]15 Rev'd 07/30/09

SHEET 13 OF 15

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 15

DIP: 90 oDEPTH GROUNDWATER: 15.2 m TOP OF TEST INTERVAL: 764.20 232.99

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Jul-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 819.20 249.76 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33400.0 33431.0 33461.5 33492.0 33524.0 33555.0 litres/min

Take litres 31.00 30.50 30.50 32.00 31.00

3.45 Average Take l/m 31.00 30.50 30.50 32.00 31.00 31.00 3.65

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33590.0 33639.0 33686.0 33735.0 33783.0 33833.0 litres/min

Take litres 49.00 47.00 49.00 48.00 50.00

6.89 Average Take l/m 49.00 47.00 49.00 48.00 50.00 48.60 3.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33940.0 34000.0 34058.0 34118.0 34176.0 34236.0 litres/min

Take litres 60.00 58.00 60.00 58.00 60.00

9.24 Average Take l/m 60.00 58.00 60.00 58.00 60.00 59.20 3.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34275.0 34325.0 34375.0 34425.0 34474.0 34523.0 litres/min

Take litres 50.00 50.00 50.00 49.00 49.00

6.89 Average Take l/m 50.00 50.00 50.00 49.00 49.00 49.60 3.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34540.0 34572.0 34602.0 34633.0 34663.0 34694.0 litres/min

Take litres 32.00 30.00 31.00 30.00 31.00

3.45 Average Take l/m 32.00 30.00 31.00 30.00 31.00 30.80 3.62

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 3.648 MAX k= 3.65E-05

DETERMINATION:

MIN Lu= 3.251 MIN k= 3.25E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 3.251 AVG k= 3.25E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.5L/min.

Air temperature, ~30 degrees

Turbulent flow. Bubbles intermittantly came out of stuffing box.at first low pressure interval.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:04

101-343/3 K09-01GT

STAGE PRESSURE VERSUS LUGEON VALUE

3.0

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.45 6.89 9.24 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.1

8.5

10.9

8.5

5.1

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 30JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-13 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]1 Rev'd 07/31/09

SHEET 1 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 55 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 57.70 17.59

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 31-Jul-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 123.70 37.71 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3239.0 3242.0 3245.0 3248.0 3250.5 3253.5 litres/min

Take litres 3.00 3.00 3.00 2.50 3.00

0.48 Average Take l/m 3.00 3.00 3.00 2.50 3.00 2.90 1.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3260.0 3264.5 3269.0 3273.0 3277.0 3280.8 litres/min

Take litres 4.50 4.50 4.00 4.00 3.75

0.90 Average Take l/m 4.50 4.50 4.00 4.00 3.75 4.15 1.74

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3285.0 3290.5 3296.0 3301.0 3306.5 3311.0 litres/min

Take litres 5.50 5.50 5.00 5.50 4.50

1.38 Average Take l/m 5.50 5.50 5.00 5.50 4.50 5.20 1.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3314.0 3316.5 3319.5 3322.5 3325.5 3328.5 litres/min

Take litres 2.50 3.00 3.00 3.00 3.00

0.90 Average Take l/m 2.50 3.00 3.00 3.00 3.00 2.90 1.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3330.0 3331.5 3333.0 3334.5 3336.5 3338.5 litres/min

Take litres 1.50 1.50 1.50 2.00 2.00

0.48 Average Take l/m 1.50 1.50 1.50 2.00 2.00 1.70 1.09

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.863 MAX k= 1.86E-05

DETERMINATION:

MIN Lu= 1.092 MIN k= 1.09E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.092 AVG k= 1.09E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3, small amount of water leaking out of stuffing box, estimated at ~0.2L/min.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.48 0.90 1.38 0.90 0.48Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.8

1.2

1.7

1.2

0.8

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 31JUL'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-14 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]2 Rev'd 08/1/09

SHEET 2 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 55 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 117.70 35.88

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 1-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 168.70 51.43 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3455.0 3463.0 3471.0 3478.5 3485.5 3493.0 litres/min

Take litres 8.00 8.00 7.50 7.00 7.50

0.97 Average Take l/m 8.00 8.00 7.50 7.00 7.50 7.60 2.98

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3523.0 3535.5 3548.0 3560.0 3571.0 3582.5 litres/min

Take litres 12.50 12.50 12.00 11.00 11.50

1.93 Average Take l/m 12.50 12.50 12.00 11.00 11.50 11.90 2.94

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3647.0 3666.5 3684.5 3702.0 3719.0 3735.0 litres/min

Take litres 19.50 18.00 17.50 17.00 16.00

3.31 Average Take l/m 19.50 18.00 17.50 17.00 16.00 17.60 2.84

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3751.0 3758.0 3765.0 3773.0 3780.0 3787.5 litres/min

Take litres 7.00 7.00 8.00 7.00 7.50

1.93 Average Take l/m 7.00 7.00 8.00 7.00 7.50 7.30 1.80

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3792.5 3795.0 3798.0 3800.5 3804.0 3807.0 litres/min

Take litres 2.50 3.00 2.50 3.50 3.00

0.97 Average Take l/m 2.50 3.00 2.50 3.50 3.00 2.90 1.14

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.980 MAX k= 2.98E-05

DETERMINATION:

MIN Lu= 1.137 MIN k= 1.14E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.137 AVG k= 1.14E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Void Filling.

TEST BY: GM REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.97 1.93 3.31 1.93 0.97Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.6

2.6

4.0

2.6

1.6

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 01AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-15 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]3 Rev'd 08/3/09

SHEET 3 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 55 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 162.70 49.60

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 3-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 218.70 66.68 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3878.0 3883.0 3888.0 3892.5 3897.5 3902.0 litres/min

Take litres 5.00 5.00 4.50 5.00 4.50

1.38 Average Take l/m 5.00 5.00 4.50 5.00 4.50 4.80 1.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3905.0 3912.5 3919.5 3925.5 3931.0 3937.0 litres/min

Take litres 7.50 7.00 6.00 5.50 6.00

2.76 Average Take l/m 7.50 7.00 6.00 5.50 6.00 6.40 1.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3943.0 3951.0 3958.5 3966.0 3979.0 3981.5 litres/min

Take litres 8.00 7.50 7.50 13.00 2.50

4.27 Average Take l/m 8.00 7.50 7.50 13.00 2.50 7.70 0.91

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4008.0 4013.5 4019.0 4025.0 4030.0 4035.0 litres/min

Take litres 5.50 5.50 6.00 5.00 5.00

2.69 Average Take l/m 5.50 5.50 6.00 5.00 5.00 5.40 0.94

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4037.0 4040.5 4044.0 4047.5 4050.5 4054.0 litres/min

Take litres 3.50 3.50 3.50 3.00 3.50

1.45 Average Take l/m 3.50 3.50 3.50 3.00 3.50 3.40 0.94

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.369 MAX k= 1.37E-05

DETERMINATION:

MIN Lu= 0.911 MIN k= 9.11E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.911 AVG k= 9.11E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 1 L/min.

TEST BY: GM REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.38 2.76 4.27 2.69 1.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.1

3.4

5.0

3.4

2.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 03AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-16 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]4 Rev'd 08/4/09

SHEET 4 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 55 oDEPTH GROUNDWATER: 7.1 m TOP OF TEST INTERVAL: 212.70 64.85

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 268.70 81.92 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4118.0 4119.0 4119.8 4120.1 4120.8 4121.1 litres/min

Take litres 1.00 0.80 0.30 0.70 0.30

1.79 Average Take l/m 1.00 0.80 0.30 0.70 0.30 0.62 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4121.0 4122.9 4123.5 4124.3 4125.0 4126.0 litres/min

Take litres 1.90 0.60 0.80 0.70 1.00

3.59 Average Take l/m 1.90 0.60 0.80 0.70 1.00 1.00 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4127.0 4128.0 4129.0 4130.0 4131.0 4132.0 litres/min

Take litres 1.00 1.00 1.00 1.00 1.00

6.07 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4136.1 4136.9 4137.3 4138.0 4138.8 4139.4 litres/min

Take litres 0.80 0.40 0.70 0.80 0.60

3.65 Average Take l/m 0.80 0.40 0.70 0.80 0.60 0.66 0.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4139.6 4140.0 4140.1 4140.3 4141.0 4141.2 litres/min

Take litres 0.40 0.10 0.20 0.70 0.20

1.79 Average Take l/m 0.40 0.10 0.20 0.70 0.20 0.32 0.08

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.152 MAX k= 1.52E-06

DETERMINATION:

MIN Lu= 0.078 MIN k= 7.85E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.078 AVG k= 7.85E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.1 L/min.

TEST BY: GM REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

1.79 3.59 6.07 3.65 1.79Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.4

4.2

6.7

4.3

2.4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 04AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-17 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]5 Rev'd 07/31/09

SHEET 5 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 55 oDEPTH GROUNDWATER: 6.4 m TOP OF TEST INTERVAL: 262.70 80.09

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 318.70 97.16 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4184.0 4185.0 4185.5 4186.1 4187.0 4187.8 litres/min

Take litres 1.00 0.50 0.60 0.90 0.80

2.34 Average Take l/m 1.00 0.50 0.60 0.90 0.80 0.76 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4190.0 4191.1 4192.5 4193.9 4195.0 4196.1 litres/min

Take litres 1.10 1.40 1.40 1.10 1.10

4.41 Average Take l/m 1.10 1.40 1.40 1.10 1.10 1.22 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4198.0 4200.0 4202.0 4204.0 4205.9 4207.8 litres/min

Take litres 2.00 2.00 2.00 1.90 1.90

7.38 Average Take l/m 2.00 2.00 2.00 1.90 1.90 1.96 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4214.0 4215.0 4216.1 4217.2 4218.7 4220.0 litres/min

Take litres 1.00 1.10 1.10 1.50 1.30

4.41 Average Take l/m 1.00 1.10 1.10 1.50 1.30 1.20 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4220.2 4221.0 4221.8 4222.3 4223.0 4223.5 litres/min

Take litres 0.80 0.80 0.50 0.70 0.50

2.41 Average Take l/m 0.80 0.80 0.50 0.70 0.50 0.66 0.13

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.155 MAX k= 1.55E-06

DETERMINATION:

MIN Lu= 0.131 MIN k= 1.31E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.131 AVG k= 1.31E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.2 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.2

0.2

0.2

2.34 4.41 7.38 4.41 2.41Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.9

4.9

7.9

4.9

3.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 0.50 1.00 1.50 2.00 2.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 05AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-18 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]6 Rev'd 08/5/09

SHEET 6 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 55 oDEPTH GROUNDWATER: 6.4 m TOP OF TEST INTERVAL: 312.70 95.34

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 368.70 112.41 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4269.0 4272.5 4276.0 4279.0 4282.5 4285.5 litres/min

Take litres 3.50 3.50 3.00 3.50 3.00

2.83 Average Take l/m 3.50 3.50 3.00 3.50 3.00 3.30 0.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4289.0 4293.5 4298.0 4302.5 4307.0 4311.0 litres/min

Take litres 4.50 4.50 4.50 4.50 4.00

5.10 Average Take l/m 4.50 4.50 4.50 4.50 4.00 4.40 0.46

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4315.0 4322.0 4328.5 4335.0 4341.0 4347.5 litres/min

Take litres 7.00 6.50 6.50 6.00 6.50

8.41 Average Take l/m 7.00 6.50 6.50 6.00 6.50 6.50 0.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4360.0 4364.0 4368.5 4372.5 4377.0 4381.5 litres/min

Take litres 4.00 4.50 4.00 4.50 4.50

5.10 Average Take l/m 4.00 4.50 4.00 4.50 4.50 4.30 0.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4383.0 4386.0 4388.5 4391.0 4394.0 4391.0 litres/min

Take litres 3.00 2.50 2.50 3.00 -3.00

2.96 Average Take l/m 3.00 2.50 2.50 3.00 -3.00 1.60 0.27

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.575 MAX k= 5.75E-06

DETERMINATION:

MIN Lu= 0.268 MIN k= 2.68E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.426 AVG k= 4.26E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately >0.2 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

2.83 5.10 8.41 5.10 2.96Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.4

5.6

8.9

5.6

3.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 05AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-19 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]7 Rev'd 08/6/09

SHEET 7 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 7

DIP: 55 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 362.70 110.58

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 418.70 127.65 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4458.0 4461.5 4465.0 4468.0 4471.5 4474.5 litres/min

Take litres 3.50 3.50 3.00 3.50 3.00

1.59 Average Take l/m 3.50 3.50 3.00 3.50 3.00 3.30 0.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4479.0 4484.5 4490.0 4495.0 4500.0 4505.0 litres/min

Take litres 5.50 5.50 5.00 5.00 5.00

3.31 Average Take l/m 5.50 5.50 5.00 5.00 5.00 5.20 0.82

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4510.0 4517.5 4525.0 4532.0 4539.0 4546.0 litres/min

Take litres 7.50 7.50 7.00 7.00 7.00

5.72 Average Take l/m 7.50 7.50 7.00 7.00 7.00 7.20 0.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4572.0 4576.0 4580.0 4584.5 4588.5 4592.5 litres/min

Take litres 4.00 4.00 4.50 4.00 4.00

3.24 Average Take l/m 4.00 4.00 4.50 4.00 4.00 4.10 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4594.0 4596.0 4598.0 4600.5 4603.0 4605.0 litres/min

Take litres 2.00 2.00 2.50 2.50 2.00

1.65 Average Take l/m 2.00 2.00 2.50 2.50 2.00 2.20 0.62

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.969 MAX k= 9.69E-06

DETERMINATION:

MIN Lu= 0.624 MIN k= 6.24E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.688 AVG k= 6.88E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.59 3.31 5.72 3.24 1.65Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.0

3.7

6.1

3.7

2.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 06AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-20 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]8 Rev'd 08/6/09

SHEET 8 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 8

DIP: 55 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 412.70 125.82

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 468.70 142.90 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4629.0 4630.5 4632.0 4633.0 4634.0 4635.5 litres/min

Take litres 1.50 1.50 1.00 1.00 1.50

1.79 Average Take l/m 1.50 1.50 1.00 1.00 1.50 1.30 0.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4637.0 4639.0 4640.5 4642.0 4644.0 4645.5 litres/min

Take litres 2.00 1.50 1.50 2.00 1.50

3.17 Average Take l/m 2.00 1.50 1.50 2.00 1.50 1.70 0.28

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4649.0 4651.5 4653.5 4656.0 4658.0 4660.0 litres/min

Take litres 2.50 2.00 2.50 2.00 2.00

5.45 Average Take l/m 2.50 2.00 2.50 2.00 2.00 2.20 0.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4664.0 4665.0 4667.0 4668.0 4670.0 4671.0 litres/min

Take litres 1.00 2.00 1.00 2.00 1.00

3.24 Average Take l/m 1.00 2.00 1.00 2.00 1.00 1.40 0.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4671.0 4672.0 4673.0 4674.0 4675.0 4675.5 litres/min

Take litres 1.00 1.00 1.00 1.00 0.50

1.86 Average Take l/m 1.00 1.00 1.00 1.00 0.50 0.90 0.23

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.346 MAX k= 3.46E-06

DETERMINATION:

MIN Lu= 0.220 MIN k= 2.20E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.220 AVG k= 2.20E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.25 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.4

1.79 3.17 5.45 3.24 1.86Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.2

3.6

5.9

3.7

2.3

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.50 1.00 1.50 2.00 2.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 06AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-21 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]9 Rev'd 08/7/09

SHEET 9 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 9

DIP: 55 oDEPTH GROUNDWATER: 5.2 m TOP OF TEST INTERVAL: 462.70 141.07

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 7-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 518.70 158.14 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4716.0 4716.5 4717.0 4717.5 4718.0 4718.5 litres/min

Take litres 0.50 0.50 0.50 0.50 0.50

3.52 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.07

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4720.0 4720.8 4721.5 4722.5 4723.0 4723.8 litres/min

Take litres 0.80 0.70 1.00 0.50 0.80

6.89 Average Take l/m 0.80 0.70 1.00 0.50 0.80 0.76 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4726.0 4727.0 4728.2 4729.5 4730.5 4731.5 litres/min

Take litres 1.00 1.20 1.30 1.00 1.00

10.48 Average Take l/m 1.00 1.20 1.30 1.00 1.00 1.10 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4734.5 4735.1 4736.0 4736.9 4737.6 4738.3 litres/min

Take litres 0.60 0.90 0.90 0.70 0.70

6.89 Average Take l/m 0.60 0.90 0.90 0.70 0.70 0.76 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4738.5 4738.8 4739.0 4739.4 4740.0 4740.1 litres/min

Take litres 0.30 0.20 0.40 0.60 0.10

3.59 Average Take l/m 0.30 0.20 0.40 0.60 0.10 0.32 0.05

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.074 MAX k= 7.41E-07

DETERMINATION:

MIN Lu= 0.047 MIN k= 4.66E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.059 AVG k= 5.90E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.0

0.0

0.1

0.1

0.1

0.1

3.52 6.89 10.48 6.89 3.59Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.0

7.3

10.9

7.3

4.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 07AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-22 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]10 Rev'd 08/8/09

SHEET 10 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 10

DIP: 55 oDEPTH GROUNDWATER: 5.2 m TOP OF TEST INTERVAL: 512.70 156.31

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 568.70 173.38 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4790.0 4791.8 4793.0 4794.5 4796.0 4797.5 litres/min

Take litres 1.80 1.20 1.50 1.50 1.50

3.31 Average Take l/m 1.80 1.20 1.50 1.50 1.50 1.50 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4800.0 4802.2 4804.5 4806.8 4808.7 4810.6 litres/min

Take litres 2.20 2.30 2.30 1.90 1.90

6.69 Average Take l/m 2.20 2.30 2.30 1.90 1.90 2.12 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4813.0 4816.0 4819.0 4822.0 4825.0 4827.8 litres/min

Take litres 3.00 3.00 3.00 3.00 2.80

10.27 Average Take l/m 3.00 3.00 3.00 3.00 2.80 2.96 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4835.0 4836.9 4838.8 4840.4 4842.1 4844.0 litres/min

Take litres 1.90 1.90 1.60 1.70 1.90

6.89 Average Take l/m 1.90 1.90 1.60 1.70 1.90 1.80 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4845.0 4845.8 4846.9 4847.8 4848.8 4849.5 litres/min

Take litres 0.80 1.10 0.90 1.00 0.70

3.45 Average Take l/m 0.80 1.10 0.90 1.00 0.70 0.90 0.14

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.235 MAX k= 2.35E-06

DETERMINATION:

MIN Lu= 0.136 MIN k= 1.36E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.136 AVG k= 1.36E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffing box at approximately 0.1 L/min during P3 phase.

TEST BY: GM REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

3.31 6.69 10.27 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.7

7.1

10.7

7.3

3.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 08AUG'09 ISSUED WITH REPORT 101-343/3 GM LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-23 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]11 Rev'd 08/8/09

SHEET 11 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 11

DIP: 55 oDEPTH GROUNDWATER: 5.0 m TOP OF TEST INTERVAL: 562.70 171.55

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 618.70 188.63 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4896.0 4897.5 4899.0 4900.0 4901.5 4903.0 litres/min

Take litres 1.50 1.50 1.00 1.50 1.50

3.45 Average Take l/m 1.50 1.50 1.00 1.50 1.50 1.40 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4910.0 4912.0 4914.0 4916.0 4918.0 4920.0 litres/min

Take litres 2.00 2.00 2.00 2.00 2.00

6.76 Average Take l/m 2.00 2.00 2.00 2.00 2.00 2.00 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4928.0 4931.0 4934.0 4934.0 4940.0 4942.7 litres/min

Take litres 3.00 3.00 0.00 6.00 2.70

10.34 Average Take l/m 3.00 3.00 0.00 6.00 2.70 2.94 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4953.2 4955.5 4957.8 4959.8 4961.9 4963.8 litres/min

Take litres 2.30 2.30 2.00 2.10 1.90

7.03 Average Take l/m 2.30 2.30 2.00 2.10 1.90 2.12 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4965.0 4966.3 4967.5 4968.7 4969.9 4971.0 litres/min

Take litres 1.30 1.20 1.20 1.20 1.10

3.52 Average Take l/m 1.30 1.20 1.20 1.20 1.10 1.20 0.18

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.212 MAX k= 2.12E-06

DETERMINATION:

MIN Lu= 0.160 MIN k= 1.60E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.160 AVG k= 1.60E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffer box at approximately 0.25 L/min during P3 phase.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

3.45 6.76 10.34 7.03 3.52Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.9

7.2

10.8

7.4

3.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 08AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-24 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-02GT\Completed and Reviewed by LS\[K09-02GT Packer Test Final LS.xls]12 Rev'd 08/9/09

SHEET 12 OF 12

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 12

DIP: 55 oDEPTH GROUNDWATER: 5.0 m TOP OF TEST INTERVAL: 612.70 186.80

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 9-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 648.70 197.77 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5037.0 5040.1 5044.5 5046.5 5049.5 5052.0 litres/min

Take litres 3.10 4.40 2.00 3.00 2.50

3.45 Average Take l/m 3.10 4.40 2.00 3.00 2.50 3.00 0.71

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5058.0 5063.8 5069.0 5074.0 5079.7 5085.0 litres/min

Take litres 5.80 5.20 5.00 5.70 5.30

6.83 Average Take l/m 5.80 5.20 5.00 5.70 5.30 5.40 0.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5092.0 5099.0 5106.5 5113.0 5120.0 5127.0 litres/min

Take litres 7.00 7.50 6.50 7.00 7.00

10.34 Average Take l/m 7.00 7.50 6.50 7.00 7.00 7.00 0.59

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5147.0 5151.5 5156.0 5161.0 5165.0 5169.5 litres/min

Take litres 4.50 4.50 5.00 4.00 4.50

6.83 Average Take l/m 4.50 4.50 5.00 4.00 4.50 4.50 0.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5170.0 5173.2 5175.8 5178.0 5180.0 5182.1 litres/min

Take litres 3.20 2.60 2.20 2.00 2.10

3.45 Average Take l/m 3.20 2.60 2.20 2.00 2.10 2.42 0.57

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.708 MAX k= 7.08E-06

DETERMINATION:

MIN Lu= 0.566 MIN k= 5.66E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.593 AVG k= 5.93E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 7.5', double packer system is used.

Flowmeter in m3.

Water leakage out of stuffer box at approximately 0.125 L/min during P3 phase.

TEST BY: MW REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:08

101-343/3 K09-02GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

3.45 6.83 10.34 6.83 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.9

7.2

10.8

7.2

3.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 08AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-25 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]1 Rev'd 08/02/09

SHEET 1 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 14.8 m TOP OF TEST INTERVAL: 18.50 5.64

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 2-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 71.00 21.65 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34861.0 34868.0 34873.0 34878.5 34884.0 34889.0 litres/min

Take litres 7.00 5.00 5.50 5.50 5.00

0.28 Average Take l/m 7.00 5.00 5.50 5.50 5.00 5.60 1.89

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34894.0 34900.0 34906.0 34912.0 34918.0 34924.0 litres/min

Take litres 6.00 6.00 6.00 6.00 6.00

0.41 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 1.88

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34929.0 34935.5 34942.5 34949.0 34955.0 34962.5 litres/min

Take litres 6.50 7.00 6.50 6.00 7.50

0.55 Average Take l/m 6.50 7.00 6.50 6.00 7.50 6.70 1.96

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35015.0 35022.0 35027.5 35034.0 35040.0 35047.0 litres/min

Take litres 7.00 5.50 6.50 6.00 7.00

0.41 Average Take l/m 7.00 5.50 6.50 6.00 7.00 6.40 2.01

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35050.0 35056.0 35062.0 35068.0 35074.0 35080.0 litres/min

Take litres 6.00 6.00 6.00 6.00 6.00

0.28 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 2.02

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.020 MAX k= 2.02E-05

DETERMINATION:

MIN Lu= 1.880 MIN k= 1.88E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.020 AVG k= 2.02E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Double packer system used.

Flowmeter in m3, No water leaking out of stuffing box.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

1.8

1.9

1.9

2.0

2.0

2.1

0.28 0.41 0.55 0.41 0.28Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.9

2.0

2.1

2.0

1.9

1.8

1.9

1.9

2.0

2.0

2.1

2.1

2.2

5.40 5.60 5.80 6.00 6.20 6.40 6.60 6.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 2AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-26 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]2 Rev'd 08/2/09

SHEET 2 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 60 oDEPTH GROUNDWATER: 14.8 m TOP OF TEST INTERVAL: 68.70 20.95

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 2-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 119.70 36.49 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 36300.0 36335.5 36370.0 36403.0 36436.0 36468.0 litres/min

Take litres 35.50 34.50 33.00 33.00 32.00

0.62 Average Take l/m 35.50 34.50 33.00 33.00 32.00 33.60 10.87

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 36500.0 36545.5 36589.5 36633.0 36676.0 36717.0 litres/min

Take litres 45.50 44.00 43.50 43.00 41.00

1.17 Average Take l/m 45.50 44.00 43.50 43.00 41.00 43.40 10.99

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 37160.0 37215.0 37267.0 37319.0 37370.0 37420.0 litres/min

Take litres 55.00 52.00 52.00 51.00 50.00

1.72 Average Take l/m 55.00 52.00 52.00 51.00 50.00 52.00 10.82

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 37450.0 37485.5 37523.0 37561.0 37599.0 37637.0 litres/min

Take litres 35.50 37.50 38.00 38.00 38.00

1.17 Average Take l/m 35.50 37.50 38.00 38.00 38.00 37.40 9.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 37660.0 37685.0 37710.0 37738.0 37766.0 37793.0 litres/min

Take litres 25.00 25.00 28.00 28.00 27.00

0.62 Average Take l/m 25.00 25.00 28.00 28.00 27.00 26.60 8.60

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 10.987 MAX k= 1.10E-04

DETERMINATION:

MIN Lu= 8.602 MIN k= 8.60E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 8.602 AVG k= 8.60E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Double packer system is used.

Test paused between p2 and p3 pressures to refill water tank.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.62 1.17 1.72 1.17 0.62Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.0

2.6

3.1

2.6

2.0

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 10.00 20.00 30.00 40.00 50.00 60.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 2AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-27 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]3 Rev'd 08/3/09

SHEET 3 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 60 oDEPTH GROUNDWATER: 20.6 m TOP OF TEST INTERVAL: 118.50 36.13

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 3-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 169.50 51.68 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 38220.0 38247.0 38273.0 38298.0 38324.0 38350.0 litres/min

Take litres 27.00 26.00 25.00 26.00 26.00

1.03 Average Take l/m 27.00 26.00 25.00 26.00 26.00 26.00 5.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 38410.0 38451.0 38492.0 38534.0 38576.0 38618.0 litres/min

Take litres 41.00 41.00 42.00 42.00 42.00

2.07 Average Take l/m 41.00 41.00 42.00 42.00 42.00 41.60 6.79

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 38700.0 38772.0 38844.0 38915.0 38986.0 39061.0 litres/min

Take litres 72.00 72.00 71.00 71.00 75.00

3.45 Average Take l/m 72.00 72.00 71.00 71.00 75.00 72.20 8.73

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 39090.0 39138.0 39185.0 39233.0 39282.0 39330.0 litres/min

Take litres 48.00 47.00 48.00 49.00 48.00

2.07 Average Take l/m 48.00 47.00 48.00 49.00 48.00 48.00 7.84

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 39390.0 39422.0 39455.0 39488.0 39522.0 39556.0 litres/min

Take litres 32.00 33.00 33.00 34.00 34.00

1.03 Average Take l/m 32.00 33.00 33.00 34.00 34.00 33.20 7.35

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 8.732 MAX k= 8.73E-05

DETERMINATION:

MIN Lu= 5.756 MIN k= 5.76E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.294 AVG k= 7.29E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Minute amount of water leaking out of stuffing box, ~.05L/min.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

1.03 2.07 3.45 2.07 1.03Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.9

4.0

5.3

4.0

2.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 3AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-28 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]4 Rev'd 08/04/09

SHEET 4 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 60 oDEPTH GROUNDWATER: 20.7 m TOP OF TEST INTERVAL: 168.50 51.37

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 4-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 219.50 66.92 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 39880.0 39884.0 39887.0 39891.0 39894.0 39897.0 litres/min

Take litres 4.00 3.00 4.00 3.00 3.00

1.59 Average Take l/m 4.00 3.00 4.00 3.00 3.00 3.40 0.63

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 39903.0 39910.0 39916.3 39923.0 39929.5 39936.3 litres/min

Take litres 7.00 6.25 6.75 6.50 6.75

3.17 Average Take l/m 7.00 6.25 6.75 6.50 6.75 6.65 0.85

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 39945.0 39957.0 39969.5 39981.8 39994.0 40007.0 litres/min

Take litres 12.00 12.50 12.25 12.25 13.00

4.83 Average Take l/m 12.00 12.50 12.25 12.25 13.00 12.40 1.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40015.0 40025.0 40035.0 40045.0 40055.0 40065.0 litres/min

Take litres 10.00 10.00 10.00 10.00 10.00

3.17 Average Take l/m 10.00 10.00 10.00 10.00 10.00 10.00 1.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40070.0 40077.0 40084.5 40092.0 40099.0 40106.5 litres/min

Take litres 7.00 7.50 7.50 7.00 7.50

1.59 Average Take l/m 7.00 7.50 7.50 7.00 7.50 7.30 1.36

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.356 MAX k= 1.36E-05

DETERMINATION:

MIN Lu= 0.632 MIN k= 6.32E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.356 AVG k= 1.36E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~.01L/min.

TEST BY: LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.59 3.17 4.83 3.17 1.59Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.5

5.1

6.7

5.1

3.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 4AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-29 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]5 Rev'd 08/05/09

SHEET 5 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 60 oDEPTH GROUNDWATER: 22.6 m TOP OF TEST INTERVAL: 218.50 66.62

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 5-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 269.50 82.16 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40305.0 40316.0 40327.0 40338.0 40349.0 40358.5 litres/min

Take litres 11.00 11.00 11.00 11.00 9.50

2.07 Average Take l/m 11.00 11.00 11.00 11.00 9.50 10.70 1.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40370.0 40387.0 40404.0 40420.0 40436.0 40452.5 litres/min

Take litres 17.00 17.00 16.00 16.00 16.50

4.14 Average Take l/m 17.00 17.00 16.00 16.00 16.50 16.50 1.72

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40485.0 40509.0 40532.0 40556.0 40578.5 40602.0 litres/min

Take litres 24.00 23.00 24.00 22.50 23.50

6.21 Average Take l/m 24.00 23.00 24.00 22.50 23.50 23.40 1.83

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40612.0 40629.0 40647.0 40663.5 40680.0 40697.0 litres/min

Take litres 17.00 18.00 16.50 16.50 17.00

4.14 Average Take l/m 17.00 18.00 16.50 16.50 17.00 17.00 1.77

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40703.0 40715.0 40727.0 40739.0 40752.0 40763.0 litres/min

Take litres 12.00 12.00 12.00 13.00 11.00

2.07 Average Take l/m 12.00 12.00 12.00 13.00 11.00 12.00 1.88

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.878 MAX k= 1.88E-05

DETERMINATION:

MIN Lu= 1.675 MIN k= 1.67E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.773 AVG k= 1.77E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~.01L/min. Pressure gauge needle wavering at P2 and P#. Laminar flow with Wash out.

TEST BY: MW/LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

1.6

1.6

1.7

1.7

1.8

1.8

1.9

1.9

2.07 4.14 6.21 4.14 2.07Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.1

6.2

8.3

6.2

4.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 5.00 10.00 15.00 20.00 25.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 5AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-30 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]6 Rev'd 08/06/09

SHEET 6 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 60 oDEPTH GROUNDWATER: 21.0 m TOP OF TEST INTERVAL: 268.00 81.71

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 6-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 324.00 98.78 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40940.0 40943.0 40945.3 40948.0 40950.3 40953.0 litres/min

Take litres 3.00 2.25 2.75 2.25 2.75

2.55 Average Take l/m 3.00 2.25 2.75 2.25 2.75 2.60 0.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40958.0 40963.0 40969.0 40974.0 40979.5 40985.0 litres/min

Take litres 5.00 6.00 5.00 5.50 5.50

5.10 Average Take l/m 5.00 6.00 5.00 5.50 5.50 5.40 0.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 40998.0 41007.5 41016.5 41025.5 41035.5 41045.0 litres/min

Take litres 9.50 9.00 9.00 10.00 9.50

7.58 Average Take l/m 9.50 9.00 9.00 10.00 9.50 9.40 0.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 41055.0 41061.5 41068.0 41075.0 41081.0 41087.5 litres/min

Take litres 6.50 6.50 7.00 6.00 6.50

5.03 Average Take l/m 6.50 6.50 7.00 6.00 6.50 6.50 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 41095.0 41099.0 41103.5 41108.0 41112.0 41116.0 litres/min

Take litres 4.00 4.50 4.50 4.00 4.00

2.55 Average Take l/m 4.00 4.50 4.50 4.00 4.00 4.20 0.55

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.580 MAX k= 5.80E-06

DETERMINATION:

MIN Lu= 0.342 MIN k= 3.42E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.495 AVG k= 4.95E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~.01L/min. Laminar flow with minoe wash out.

TEST BY: MW/LS REVIEWED BY: JS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

2.55 5.10 7.58 5.03 2.55Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.5

7.0

9.5

7.0

4.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 6AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-31 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]8 Rev'd 08/08/09

SHEET 7 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 8

DIP: 60 oDEPTH GROUNDWATER: 28.2 m TOP OF TEST INTERVAL: 371.50 113.26

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 8-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 412.50 125.76 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 42123.0 42147.0 42170.0 42193.0 42216.0 42240.0 litres/min

Take litres 24.00 23.00 23.00 23.00 24.00

0.69 Average Take l/m 24.00 23.00 23.00 23.00 24.00 23.40 5.82

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 42300.0 42334.0 42367.0 42399.0 42430.0 42461.0 litres/min

Take litres 34.00 33.00 32.00 31.00 31.00

1.38 Average Take l/m 34.00 33.00 32.00 31.00 31.00 32.20 6.59

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 42505.0 42548.0 42590.0 42631.0 42672.0 42713.0 litres/min

Take litres 43.00 42.00 41.00 41.00 41.00

2.14 Average Take l/m 43.00 42.00 41.00 41.00 41.00 41.60 7.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 42731.0 42761.0 42794.0 42827.0 42861.0 42894.0 litres/min

Take litres 30.00 33.00 33.00 34.00 33.00

1.38 Average Take l/m 30.00 33.00 33.00 34.00 33.00 32.60 6.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 42910.0 42934.0 42959.0 42985.0 43012.0 43038.0 litres/min

Take litres 24.00 25.00 26.00 27.00 26.00

0.69 Average Take l/m 24.00 25.00 26.00 27.00 26.00 25.60 6.36

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 7.132 MAX k= 7.13E-05

DETERMINATION:

MIN Lu= 5.817 MIN k= 5.82E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 6.516 AVG k= 6.52E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~.01L/min.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.69 1.38 2.14 1.38 0.69Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.2

3.9

4.7

3.9

3.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 8AUG'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-32 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]9 Rev'd 08/10/09

SHEET 8 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 9

DIP: 60 oDEPTH GROUNDWATER: 32.8 m TOP OF TEST INTERVAL: 423.50 129.12

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 10-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 474.50 144.66 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 43435.0 43468.0 43501.0 43531.0 43558.0 43584.0 litres/min

Take litres 33.00 33.00 30.00 27.00 26.00

3.45 Average Take l/m 33.00 33.00 30.00 27.00 26.00 29.80 3.01

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 43670.0 43718.0 43765.0 43801.0 43854.0 43895.0 litres/min

Take litres 48.00 47.00 36.00 53.00 41.00

6.89 Average Take l/m 48.00 47.00 36.00 53.00 41.00 45.00 2.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 43955.0 44017.0 44076.0 44133.0 44187.0 44242.0 litres/min

Take litres 62.00 59.00 57.00 54.00 55.00

10.34 Average Take l/m 62.00 59.00 57.00 54.00 55.00 57.40 2.78

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 44280.0 44316.0 44355.0 44392.0 44429.0 44467.0 litres/min

Take litres 36.00 39.00 37.00 37.00 38.00

6.89 Average Take l/m 36.00 39.00 37.00 37.00 38.00 37.40 2.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 44474.0 44490.0 44509.0 44535.0 44561.0 44585.0 litres/min

Take litres 16.00 19.00 26.00 26.00 24.00

3.45 Average Take l/m 16.00 19.00 26.00 26.00 24.00 22.20 2.24

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 3.008 MAX k= 3.01E-05

DETERMINATION:

MIN Lu= 2.241 MIN k= 2.24E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.686 AVG k= 2.69E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.1L/min when water pressure is at 150psi. Void Filling flow with minor wash out.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.4

9.8

13.3

9.8

6.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-33 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]10 Rev'd 08/14/09

SHEET 9 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 10

DIP: 60 oDEPTH GROUNDWATER: 37.3 m TOP OF TEST INTERVAL: 473.50 144.36

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 14-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 529.50 161.43 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 45165.0 45214.0 45261.0 45309.0 45356.0 45403.0 litres/min

Take litres 49.00 47.00 48.00 47.00 47.00

3.45 Average Take l/m 49.00 47.00 48.00 47.00 47.00 47.60 4.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 45470.0 45533.0 45594.0 45655.0 45712.0 45771.0 litres/min

Take litres 63.00 61.00 61.00 57.00 59.00

6.89 Average Take l/m 63.00 61.00 61.00 57.00 59.00 60.20 3.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 45880.0 45952.0 45019.0 46085.0 46151.0 46213.0 litres/min

Take litres 72.00 -933.00 1066.00 66.00 62.00

10.34 Average Take l/m 72.00 -933.00 1066.00 66.00 62.00 66.60 2.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46250.0 46300.0 46351.0 46401.0 46452.0 46502.0 litres/min

Take litres 50.00 51.00 50.00 51.00 50.00

6.89 Average Take l/m 50.00 51.00 50.00 51.00 50.00 50.40 2.89

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46546.0 46577.0 45613.0 46651.0 46687.0 46725.0 litres/min

Take litres 31.00 -964.00 1038.00 36.00 38.00

3.45 Average Take l/m 31.00 -964.00 1038.00 36.00 38.00 35.80 3.10

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 4.122 MAX k= 4.12E-05

DETERMINATION:

MIN Lu= 2.856 MIN k= 2.86E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.856 AVG k= 2.86E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.2L/min when water pressure is at 150psi. Turbulent flow with minor void filling.

TEST BY: MW REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.8

10.2

13.7

10.2

6.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 14AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-34 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]11 Rev'd 08/15/09

SHEET 10 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 11

DIP: 60 oDEPTH GROUNDWATER: 41.9 m TOP OF TEST INTERVAL: 522.50 159.30

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 15-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 578.50 176.37 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46835.4 46835.9 46836.2 46836.6 46836.9 46837.3 litres/min

Take litres 0.50 0.30 0.40 0.30 0.40

3.45 Average Take l/m 0.50 0.30 0.40 0.30 0.40 0.38 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46838.0 46838.7 46839.3 46840.0 46840.6 46841.2 litres/min

Take litres 0.70 0.60 0.70 0.60 0.60

6.89 Average Take l/m 0.70 0.60 0.70 0.60 0.60 0.64 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46845.0 46848.0 46851.0 46853.7 46856.4 46859.2 litres/min

Take litres 3.00 3.00 2.70 2.70 2.80

10.34 Average Take l/m 3.00 3.00 2.70 2.70 2.80 2.84 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46866.0 46866.6 46867.2 46867.8 46868.3 46869.0 litres/min

Take litres 0.60 0.60 0.60 0.50 0.70

6.89 Average Take l/m 0.60 0.60 0.60 0.50 0.70 0.60 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 46869.1 46869.5 46869.8 46870.1 46870.4 46870.8 litres/min

Take litres 0.40 0.30 0.30 0.30 0.40

3.45 Average Take l/m 0.40 0.30 0.30 0.30 0.40 0.34 0.03

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.118 MAX k= 1.18E-06

DETERMINATION:

MIN Lu= 0.028 MIN k= 2.78E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.032 AVG k= 3.18E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box. Dilation.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.2

10.6

14.1

10.6

7.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 15AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-35 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]12 Rev'd 08/15/09

SHEET 11 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 12

DIP: 60 oDEPTH GROUNDWATER: 41.9 m TOP OF TEST INTERVAL: 572.00 174.39

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 15-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 628.00 191.46 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47037.5 47038.0 47038.5 47039.0 47039.5 47040.0 litres/min

Take litres 0.50 0.50 0.50 0.50 0.50

3.45 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47040.5 47041.4 47042.3 47043.2 47044.1 47045.0 litres/min

Take litres 0.90 0.90 0.90 0.90 0.90

6.89 Average Take l/m 0.90 0.90 0.90 0.90 0.90 0.90 0.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47050.0 47058.0 47066.0 47074.0 47082.0 47090.0 litres/min

Take litres 8.00 8.00 8.00 8.00 8.00

10.34 Average Take l/m 8.00 8.00 8.00 8.00 8.00 8.00 0.33

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47109.0 47110.0 47111.0 47112.0 47113.0 47114.0 litres/min

Take litres 1.00 1.00 1.00 1.00 1.00

6.89 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47114.0 47114.4 47114.8 47115.2 47115.6 47116.0 litres/min

Take litres 0.40 0.40 0.40 0.40 0.40

3.45 Average Take l/m 0.40 0.40 0.40 0.40 0.40 0.40 0.03

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.333 MAX k= 3.33E-06

DETERMINATION:

MIN Lu= 0.033 MIN k= 3.27E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.045 AVG k= 4.46E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.28L/min when water pressure is at 150psi. Dilation.

TEST BY: MW REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.2

10.6

14.1

10.6

7.2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 15AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-36 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]13 Rev'd 08/16/09

SHEET 12 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 13

DIP: 60 oDEPTH GROUNDWATER: 44.2 m TOP OF TEST INTERVAL: 627.00 191.16

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 678.00 206.71 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47591.0 47592.8 47594.6 47596.4 47598.2 47600.0 litres/min

Take litres 1.80 1.80 1.80 1.80 1.80

3.45 Average Take l/m 1.80 1.80 1.80 1.80 1.80 1.80 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47616.0 47635.2 47656.0 47674.8 47694.8 47714.9 litres/min

Take litres 19.20 20.80 18.80 20.00 20.10

6.89 Average Take l/m 19.20 20.80 18.80 20.00 20.10 19.78 1.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 47920.0 47995.0 48069.0 48144.0 48217.0 48291.0 litres/min

Take litres 75.00 74.00 75.00 73.00 74.00

10.20 Average Take l/m 75.00 74.00 75.00 73.00 74.00 74.20 3.38

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 48485.0 48515.0 48544.0 48573.0 48601.0 48629.0 litres/min

Take litres 30.00 29.00 29.00 28.00 28.00

6.89 Average Take l/m 30.00 29.00 29.00 28.00 28.00 28.80 1.71

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 48635.0 48637.3 48639.6 48641.7 48643.8 48645.1 litres/min

Take litres 2.30 2.30 2.10 2.10 1.30

3.45 Average Take l/m 2.30 2.30 2.10 2.10 1.30 2.02 0.18

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 3.380 MAX k= 3.38E-05

DETERMINATION:

MIN Lu= 0.157 MIN k= 1.57E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.806 AVG k= 8.06E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.28L/min when water pressure is at 150psi. Dilation.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

3.45 6.89 10.20 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.4

10.8

14.1

10.8

7.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 16AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-37 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]14 Rev'd 08/16/09

SHEET 13 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 14

DIP: 60 oDEPTH GROUNDWATER: 44.2 m TOP OF TEST INTERVAL: 677.00 206.40

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 728.00 221.95 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 48704.1 48706.3 48708.5 48710.7 48712.9 48715.0 litres/min

Take litres 2.20 2.20 2.20 2.20 2.10

3.45 Average Take l/m 2.20 2.20 2.20 2.20 2.10 2.18 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 48845.0 48877.0 48909.0 48941.0 48973.0 49005.0 litres/min

Take litres 32.00 32.00 32.00 32.00 32.00

6.89 Average Take l/m 32.00 32.00 32.00 32.00 32.00 32.00 1.90

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 49105.0 49173.0 49241.0 49309.0 49377.0 49445.0 litres/min

Take litres 68.00 68.00 68.00 68.00 68.00

10.20 Average Take l/m 68.00 68.00 68.00 68.00 68.00 68.00 3.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 49590.0 49623.0 49655.0 49687.0 49718.0 49749.0 litres/min

Take litres 33.00 32.00 32.00 31.00 31.00

6.89 Average Take l/m 33.00 32.00 32.00 31.00 31.00 31.80 1.89

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 49758.0 49762.4 49766.8 49770.5 49774.2 49777.8 litres/min

Take litres 4.40 4.40 3.70 3.70 3.60

3.45 Average Take l/m 4.40 4.40 3.70 3.70 3.60 3.96 0.35

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 3.097 MAX k= 3.10E-05

DETERMINATION:

MIN Lu= 0.190 MIN k= 1.90E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.083 AVG k= 1.08E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.25L/min when water pressure is at 150psi.

TEST BY: MW REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GTKITSAULT

Embankment Abutment

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

3.45 6.89 10.20 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.4

10.8

14.1

10.8

7.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 16AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-38 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]15 Rev'd 08/17/09

SHEET 14 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 15

DIP: 60 oDEPTH GROUNDWATER: 60.7 m TOP OF TEST INTERVAL: 727.00 221.65

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 778.00 237.20 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 49853.0 49868.0 49884.0 49900.0 49915.0 49931.0 litres/min

Take litres 15.00 16.00 16.00 15.00 16.00

3.45 Average Take l/m 15.00 16.00 16.00 15.00 16.00 15.60 1.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 49982.0 50020.0 50059.0 50099.0 50139.0 50179.0 litres/min

Take litres 38.00 39.00 40.00 40.00 40.00

6.62 Average Take l/m 38.00 39.00 40.00 40.00 40.00 39.40 2.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 50290.0 50352.0 50413.0 50473.0 50533.0 50595.0 litres/min

Take litres 62.00 61.00 60.00 60.00 62.00

10.27 Average Take l/m 62.00 61.00 60.00 60.00 62.00 61.00 2.51

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 50790.0 50838.0 50884.0 50930.0 50976.0 51022.0 litres/min

Take litres 48.00 46.00 46.00 46.00 46.00

6.89 Average Take l/m 48.00 46.00 46.00 46.00 46.00 46.40 2.44

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51045.0 51061.0 51075.0 51091.0 51106.0 51121.0 litres/min

Take litres 16.00 14.00 16.00 15.00 15.00

3.45 Average Take l/m 16.00 14.00 16.00 15.00 15.00 15.20 1.11

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.513 MAX k= 2.51E-05

DETERMINATION:

MIN Lu= 1.112 MIN k= 1.11E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.865 AVG k= 1.86E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.23L/min when water pressure is at 150psi.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.45 6.62 10.27 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

8.8

12.0

15.6

12.2

8.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 17AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-39 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]16 Rev'd 08/18/09

SHEET 15 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 16

DIP: 60 oDEPTH GROUNDWATER: 45.0 m TOP OF TEST INTERVAL: 777.00 236.89

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 828.00 252.44 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51282.0 51299.0 51315.0 51331.0 51347.0 51363.0 litres/min

Take litres 17.00 16.00 16.00 16.00 16.00

3.59 Average Take l/m 17.00 16.00 16.00 16.00 16.00 16.20 1.38

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51425.0 51446.0 51468.0 51489.0 51508.0 51528.0 litres/min

Take litres 21.00 22.00 21.00 19.00 20.00

6.89 Average Take l/m 21.00 22.00 21.00 19.00 20.00 20.60 1.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51572.0 51598.0 51624.0 51648.0 51673.0 51697.0 litres/min

Take litres 26.00 26.00 24.00 25.00 24.00

10.34 Average Take l/m 26.00 26.00 24.00 25.00 24.00 25.00 1.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51800.0 51818.0 51836.0 51854.0 51872.0 51890.0 litres/min

Take litres 18.00 18.00 18.00 18.00 18.00

6.89 Average Take l/m 18.00 18.00 18.00 18.00 18.00 18.00 1.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 51902.0 51912.0 51925.0 51938.0 51950.0 51962.0 litres/min

Take litres 10.00 13.00 13.00 12.00 12.00

3.45 Average Take l/m 10.00 13.00 13.00 12.00 12.00 12.00 1.04

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.376 MAX k= 1.38E-05

DETERMINATION:

MIN Lu= 1.038 MIN k= 1.04E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.038 AVG k= 1.04E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used.

Water leaking out of stuffing box, ~0.2L/min when water pressure is at 150psi.

Void Filling.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

3.59 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.6

10.9

14.3

10.9

7.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 18AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-40 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-03GT\Completed and Reviewed by LS\[K09-03GT Packer Test Final LS.xls]18 Rev'd 08/18/09

SHEET 16 OF 16

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 18

DIP: 60 oDEPTH GROUNDWATER: 44.9 m TOP OF TEST INTERVAL: 875.50 266.92

(FROM HORIZONTAL) m (DOWN HOLE)

DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 916.50 279.42 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 54147.0 54156.0 54164.5 54173.0 54182.0 54190.5 litres/min

Take litres 9.00 8.50 8.50 9.00 8.50

3.45 Average Take l/m 9.00 8.50 8.50 9.00 8.50 8.70 0.94

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 54205.0 54218.5 54232.0 54245.0 54258.0 54271.0 litres/min

Take litres 13.50 13.50 13.00 13.00 13.00

6.89 Average Take l/m 13.50 13.50 13.00 13.00 13.00 13.20 0.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 54300.0 54321.0 54342.0 54363.0 54383.0 54404.0 litres/min

Take litres 21.00 21.00 21.00 20.00 21.00

10.34 Average Take l/m 21.00 21.00 21.00 20.00 21.00 20.80 1.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 54450.0 54463.5 54477.0 54490.5 54504.0 54518.0 litres/min

Take litres 13.50 13.50 13.50 13.50 14.00

6.89 Average Take l/m 13.50 13.50 13.50 13.50 14.00 13.60 1.00

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 54539.0 54548.0 54557.0 54565.5 54574.0 54583.0 litres/min

Take litres 9.00 9.00 8.50 8.50 9.00

3.45 Average Take l/m 9.00 9.00 8.50 8.50 9.00 8.80 0.95

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.162 MAX k= 1.16E-05

DETERMINATION:

MIN Lu= 0.938 MIN k= 9.38E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.004 AVG k= 1.00E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter in m3, double packer system used. Water leaking out of stuffing box, ~0.25L/min when water pressure is at 150psi.

TEST BY: MW REVIEWED BY: LS

KITSAULT

Embankment Abutment

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 20:11

101-343/3 K09-03GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.4

10.9

14.3

10.9

7.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 5.00 10.00 15.00 20.00 25.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 19AUG'09 ISSUED WITH REPORT 101-343/3 MW LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-41 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]1 Rev'd 08/11/09

SHEET 1 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 6.5 m TOP OF TEST INTERVAL: 29.00 8.84

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 80.00 24.39 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5262.7 5262.8 5262.8 5262.9 5262.9 5263.0 litres/min

Take litres 0.10 0.00 0.10 0.00 0.10

0.45 Average Take l/m 0.10 0.00 0.10 0.00 0.10 0.06 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5263.6 5263.9 5264.1 5264.4 5264.7 5264.9 litres/min

Take litres 0.30 0.20 0.30 0.30 0.20

0.66 Average Take l/m 0.30 0.20 0.30 0.30 0.20 0.26 0.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5265.7 5266.2 5266.8 5267.2 5267.8 5268.1 litres/min

Take litres 0.50 0.60 0.40 0.60 0.30

0.97 Average Take l/m 0.50 0.60 0.40 0.60 0.30 0.48 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5268.1 5268.2 5268.3 5268.6 5268.9 5269.0 litres/min

Take litres 0.10 0.10 0.30 0.30 0.10

0.66 Average Take l/m 0.10 0.10 0.30 0.30 0.10 0.18 0.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5269.0 5269.0 5269.1 5269.2 5269.2 5269.4 litres/min

Take litres 0.00 0.10 0.10 0.00 0.20

0.45 Average Take l/m 0.00 0.10 0.10 0.00 0.20 0.08 0.05

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.190 MAX k= 1.90E-06

DETERMINATION:

MIN Lu= 0.035 MIN k= 3.48E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.097 AVG k= 9.73E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GTKITSAULT

Open Pit Area

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

0.2

0.45 0.66 0.97 0.66 0.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.1

1.3

1.6

1.3

1.1

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

0.00 0.10 0.20 0.30 0.40 0.50 0.60

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11AUG'09 ISSUED WITH REPORT 101-343/3 BP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-42 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]2 Rev'd 08/11/09

SHEET 2 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 6.5 m TOP OF TEST INTERVAL: 74.00 22.56

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 130.00 39.63 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5354.0 5354.6 5355.0 5355.5 5356.0 5356.2 litres/min

Take litres 0.60 0.40 0.50 0.50 0.20

0.81 Average Take l/m 0.60 0.40 0.50 0.50 0.20 0.44 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5357.0 5358.0 5358.7 5359.7 5360.3 5361.0 litres/min

Take litres 1.00 0.70 1.00 0.60 0.70

1.61 Average Take l/m 1.00 0.70 1.00 0.60 0.70 0.80 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5361.8 5363.0 5364.1 5365.1 5366.3 5367.3 litres/min

Take litres 1.20 1.10 1.00 1.20 1.00

2.41 Average Take l/m 1.20 1.10 1.00 1.20 1.00 1.10 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5368.0 5368.5 5369.0 5369.5 5370.0 5370.5 litres/min

Take litres 0.50 0.50 0.50 0.50 0.50

1.61 Average Take l/m 0.50 0.50 0.50 0.50 0.50 0.50 0.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5370.8 5370.9 5371.0 5371.1 5371.1 5371.1 litres/min

Take litres 0.10 0.10 0.10 0.00 0.00

0.81 Average Take l/m 0.10 0.10 0.10 0.00 0.00 0.06 0.02

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.210 MAX k= 2.10E-06

DETERMINATION:

MIN Lu= 0.024 MIN k= 2.40E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.149 AVG k= 1.49E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: BP, MW REVIEWED BY: LS

KITSAULT

Open Pit Area

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.81 1.61 2.41 1.61 0.81Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.5

2.3

3.1

2.3

1.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.20 0.40 0.60 0.80 1.00 1.20

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11AUG'09 ISSUED WITH REPORT 101-343/3 BP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-43 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]3 Rev'd 08/11/09

SHEET 3 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 8.1 m TOP OF TEST INTERVAL: 124.00 37.80

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 180.00 54.88 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5420.0 5470.0 5520.0 5570.0 5622.0 5674.0 litres/min

Take litres 50.00 50.00 50.00 52.00 52.00

1.45 Average Take l/m 50.00 50.00 50.00 52.00 52.00 50.80 13.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5780.0 5873.0 5965.0 6057.0 6151.0 6243.0 litres/min

Take litres 93.00 92.00 92.00 94.00 92.00

2.83 Average Take l/m 93.00 92.00 92.00 94.00 92.00 92.60 14.88

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6300.0 6424.0 6546.0 6668.0 6788.0 6910.0 litres/min

Take litres 124.00 122.00 122.00 120.00 122.00

4.27 Average Take l/m 124.00 122.00 122.00 120.00 122.00 122.00 14.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6950.0 7040.0 7131.0 7223.0 7313.0 7405.0 litres/min

Take litres 90.00 91.00 92.00 90.00 92.00

2.83 Average Take l/m 90.00 91.00 92.00 90.00 92.00 91.00 14.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7430.0 7486.0 7542.0 7599.0 7655.0 7711.0 litres/min

Take litres 56.00 56.00 57.00 56.00 56.00

1.45 Average Take l/m 56.00 56.00 57.00 56.00 56.00 56.20 14.53

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 14.880 MAX k= 1.49E-04

DETERMINATION:

MIN Lu= 13.131 MIN k= 1.31E-04

INTERPRETATION cm/s

REFERENCE: AVG Lu= 14.031 AVG k= 1.40E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

Some leakage abserved at highest pressure only.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GTKITSAULT

Open Pit Area

STAGE PRESSURE VERSUS LUGEON VALUE

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

1.45 2.83 4.27 2.83 1.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.3

3.6

5.1

3.6

2.3

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-44 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]4 Rev'd 08/11/09

SHEET 4 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 174.00 53.05

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 11-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 230.00 70.12 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8265.0 8265.0 8265.0 8265.0 8265.0 8265.0 litres/min

Take litres 0.00 0.00 0.00 0.00 0.00

2.00 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8269.0 8269.7 8270.2 8271.2 8272.1 8273.1 litres/min

Take litres 0.70 0.50 1.00 0.90 1.00

4.00 Average Take l/m 0.70 0.50 1.00 0.90 1.00 0.82 0.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8275.5 8277.0 8278.5 8280.0 8281.5 8283.0 litres/min

Take litres 1.50 1.50 1.50 1.50 1.50

6.00 Average Take l/m 1.50 1.50 1.50 1.50 1.50 1.50 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8283.0 8283.5 8284.2 8285.0 8285.5 8286.2 litres/min

Take litres 0.50 0.70 0.80 0.50 0.70

4.00 Average Take l/m 0.50 0.70 0.80 0.50 0.70 0.64 0.07

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8286.2 8286.7 8287.0 8287.4 8287.8 8288.2 litres/min

Take litres 0.50 0.30 0.40 0.40 0.40

2.00 Average Take l/m 0.50 0.30 0.40 0.40 0.40 0.40 0.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.120 MAX k= 1.20E-06

DETERMINATION:

MIN Lu= 0.000 MIN k= 0.00E+00

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.120 AVG k= 1.20E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

Some leakage abserved at highest pressure only.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Open Pit Area

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

2.00 4.00 6.00 4.00 2.00Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.3

5.3

7.3

5.3

3.3

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-45 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]5 Rev'd 08/12/09

SHEET 5 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 234.00 71.34

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 12-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 280.00 85.37 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8308.2 8310.0 8310.9 8311.8 8312.8 8313.8 litres/min

Take litres 1.80 0.90 0.90 1.00 1.00

2.69 Average Take l/m 1.80 0.90 0.90 1.00 1.00 1.12 0.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8315.0 8317.5 8319.1 8320.8 8322.1 8323.1 litres/min

Take litres 2.50 1.60 1.70 1.30 1.00

5.52 Average Take l/m 2.50 1.60 1.70 1.30 1.00 1.62 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8325.0 8326.8 8328.4 8330.1 8331.6 8333.1 litres/min

Take litres 1.80 1.60 1.70 1.50 1.50

8.14 Average Take l/m 1.80 1.60 1.70 1.50 1.50 1.62 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8334.0 8335.0 8335.9 8336.8 8337.9 8338.8 litres/min

Take litres 1.00 0.90 0.90 1.10 0.90

5.38 Average Take l/m 1.00 0.90 0.90 1.10 0.90 0.96 0.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8339.0 8339.4 8339.9 8340.2 8340.7 8341.1 litres/min

Take litres 0.40 0.50 0.30 0.50 0.40

2.76 Average Take l/m 0.40 0.50 0.30 0.50 0.40 0.42 0.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.198 MAX k= 1.98E-06

DETERMINATION:

MIN Lu= 0.073 MIN k= 7.31E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.073 AVG k= 7.31E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

Some leakage observed from stuffing box. Rate is <0.5 L/min.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GTKITSAULT

Open Pit Area

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

2.69 5.52 8.14 5.38 2.76Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.0

6.9

9.5

6.7

4.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 12AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-46 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-04GT\Completed and Reviewed by LS\[K09-04GT Packer Test.xls]6 Rev'd 08/12/09

SHEET 6 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 13.3 m TOP OF TEST INTERVAL: 284.00 86.59

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 12-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 340.00 103.66 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8364.8 8364.8 8364.9 8365.1 8365.5 8365.9 litres/min

Take litres 0.00 0.10 0.20 0.40 0.40

3.45 Average Take l/m 0.00 0.10 0.20 0.40 0.40 0.22 0.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8367.1 8368.0 8368.5 8369.0 8369.5 8370.0 litres/min

Take litres 0.90 0.50 0.50 0.50 0.50

6.89 Average Take l/m 0.90 0.50 0.50 0.50 0.50 0.58 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8371.0 8371.9 8372.5 8373.1 8373.9 8374.6 litres/min

Take litres 0.90 0.60 0.60 0.80 0.70

10.34 Average Take l/m 0.90 0.60 0.60 0.80 0.70 0.72 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8375.5 8376.0 8676.7 8377.1 8377.6 8378.0 litres/min

Take litres 0.50 300.70 -299.60 0.50 0.40

6.89 Average Take l/m 0.50 300.70 -299.60 0.50 0.40 0.50 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8378.0 8378.2 8378.4 8378.8 8379.0 8379.1 litres/min

Take litres 0.20 0.20 0.40 0.20 0.10

3.45 Average Take l/m 0.20 0.20 0.40 0.20 0.10 0.22 0.03

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.041 MAX k= 4.13E-07

DETERMINATION:

MIN Lu= 0.027 MIN k= 2.69E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.033 AVG k= 3.33E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~24'. Double packer system used.

Water level not measured, assumed 13.3 m, same as last test.

TEST BY: BDP REVIEWED BY: LS

KITSAULT

Open Pit Area

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:20

101-343/3 K09-04GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.8

8.2

11.7

8.2

4.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 12AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-47 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-05GT\Completed and Reviewed by LS\[K09-05GT Packer Test.xls]1 Rev'd 08/14/09

SHEET 1 OF 1

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 17.8 m TOP OF TEST INTERVAL: 94.00 28.66

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 14-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.1 m BOTTOM OF TEST INTERVAL: 140.50 42.84 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8535.0 8535.0 8535.0 8535.0 8535.0 8535.0 litres/min

Take litres 0.00 0.00 0.00 0.00 0.00

1.10 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8535.5 8536.0 8536.1 8536.5 8536.8 8537.0 litres/min

Take litres 0.50 0.10 0.40 0.30 0.20

2.14 Average Take l/m 0.50 0.10 0.40 0.30 0.20 0.30 0.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8538.0 8538.6 8539.1 8539.7 8540.3 8540.9 litres/min

Take litres 0.60 0.50 0.60 0.60 0.60

3.24 Average Take l/m 0.60 0.50 0.60 0.60 0.60 0.58 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8541.0 8541.4 8541.8 8542.1 8542.4 8542.8 litres/min

Take litres 0.40 0.40 0.30 0.30 0.40

2.14 Average Take l/m 0.40 0.40 0.30 0.30 0.40 0.36 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8543.0 8543.0 8543.0 8543.0 8543.0 8543.0 litres/min

Take litres 0.00 0.00 0.00 0.00 0.00

1.10 Average Take l/m 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.081 MAX k= 8.13E-07

DETERMINATION:

MIN Lu= 0.000 MIN k= 0.00E+00

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.040 AVG k= 4.00E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to ~88'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Initial Primary Crusher Location

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 19:59

101-343/3 K09-05GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

1.10 2.14 3.24 2.14 1.10Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.9

3.9

5.0

3.9

2.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 14AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-48 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]1 Rev'd 08/16/09

SHEET 1 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 24.00 7.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 16-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 70.00 21.34 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8587.0 8593.7 8599.9 8605.9 8611.0 8616.2 litres/min

Take litres 6.70 6.20 6.00 5.10 5.20

0.28 Average Take l/m 6.70 6.20 6.00 5.10 5.20 5.84 11.64

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8629.0 8654.0 8672.0 8686.2 8700.3 8714.2 litres/min

Take litres 25.00 18.00 14.20 14.10 13.90

0.55 Average Take l/m 25.00 18.00 14.20 14.10 13.90 17.04 19.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8735.0 8760.5 8784.0 8807.0 8829.5 8852.0 litres/min

Take litres 25.50 23.50 23.00 22.50 22.50

0.83 Average Take l/m 25.50 23.50 23.00 22.50 22.50 23.40 18.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8853.0 8861.9 8870.2 8878.9 8887.5 8896.0 litres/min

Take litres 8.90 8.30 8.70 8.60 8.50

0.55 Average Take l/m 8.90 8.30 8.70 8.60 8.50 8.60 9.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8846.0 8852.9 8858.9 8864.0 8870.0 8876.1 litres/min

Take litres 6.90 6.00 5.10 6.00 6.10

0.28 Average Take l/m 6.90 6.00 5.10 6.00 6.10 6.02 12.00

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 19.177 MAX k= 1.92E-04

DETERMINATION:

MIN Lu= 9.679 MIN k= 9.68E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 18.348 AVG k= 1.83E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

No leakage observed at stuff box. After second interval at P2, water ovserved flowing backwards through flow meter, turned down pump and dissipated excess back pressure and then continued test.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GTKITSAULT

Plant Site

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

5.0

10.0

15.0

20.0

25.0

0.28 0.55 0.83 0.55 0.28Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.4

0.6

0.9

0.6

0.4

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.00 5.00 10.00 15.00 20.00 25.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 16AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-49 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]2 Rev'd 08/17/09

SHEET 2 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 55.00 16.77

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 121.00 36.89 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1161.0 1183.0 1205.0 1227.0 1248.0 1270.0 litres/min

Take litres 22.00 22.00 22.00 21.00 22.00

0.57 Average Take l/m 22.00 22.00 22.00 21.00 22.00 21.80 16.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1295.0 1351.0 1406.0 1459.0 1512.0 1565.0 litres/min

Take litres 56.00 55.00 53.00 53.00 53.00

1.14 Average Take l/m 56.00 55.00 53.00 53.00 53.00 54.00 21.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1630.0 1697.0 1765.0 1832.0 1900.0 1967.0 litres/min

Take litres 67.00 68.00 67.00 68.00 67.00

1.72 Average Take l/m 67.00 68.00 67.00 68.00 67.00 67.40 18.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1978.0 2003.0 2034.0 2067.0 2099.0 2132.0 litres/min

Take litres 25.00 31.00 33.00 32.00 33.00

1.14 Average Take l/m 25.00 31.00 33.00 32.00 33.00 30.80 12.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2046.0 2083.0 2120.0 2157.0 2192.0 2228.0 litres/min

Take litres 37.00 37.00 37.00 35.00 36.00

0.57 Average Take l/m 37.00 37.00 37.00 35.00 36.00 36.40 27.05

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 27.047 MAX k= 2.70E-04

DETERMINATION:

MIN Lu= 12.368 MIN k= 1.24E-04

INTERPRETATION cm/s

REFERENCE: AVG Lu= 18.367 AVG k= 1.84E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Plant Site

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

5.0

10.0

15.0

20.0

25.0

30.0

0.57 1.14 1.72 1.14 0.57Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.7

1.2

1.8

1.2

0.7

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 17AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-50 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]3 Rev'd 08/17/09

SHEET 3 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 125.00 38.11

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 17-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 171.00 52.13 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2251.0 2252.5 2253.8 2255.0 2256.0 2257.0 litres/min

Take litres 1.50 1.30 1.20 1.00 1.00

1.37 Average Take l/m 1.50 1.30 1.20 1.00 1.00 1.20 0.52

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2258.5 2260.0 2261.2 2262.5 2263.9 2265.0 litres/min

Take litres 1.50 1.20 1.30 1.40 1.10

2.73 Average Take l/m 1.50 1.20 1.30 1.40 1.10 1.30 0.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2266.0 2267.8 2269.5 2271.2 2273.0 2274.6 litres/min

Take litres 1.80 1.70 1.70 1.80 1.60

4.14 Average Take l/m 1.80 1.70 1.70 1.80 1.60 1.72 0.28

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2275.5 2276.8 2277.7 2278.7 2279.7 2280.6 litres/min

Take litres 1.30 0.90 1.00 1.00 0.90

2.73 Average Take l/m 1.30 0.90 1.00 1.00 0.90 1.02 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2281.0 2281.5 2282.2 2282.9 2283.3 2284.0 litres/min

Take litres 0.50 0.70 0.70 0.40 0.70

1.37 Average Take l/m 0.50 0.70 0.70 0.40 0.70 0.60 0.26

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.522 MAX k= 5.22E-06

DETERMINATION:

MIN Lu= 0.242 MIN k= 2.42E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.261 AVG k= 2.61E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GTKITSAULT

Plant Site

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

1.37 2.73 4.14 2.73 1.37Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.6

3.0

4.4

3.0

1.6

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 17AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-51 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]4 Rev'd 08/18/09

SHEET 4 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 165.00 50.30

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 231.00 70.43 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12380.0 12385.1 12390.1 12395.0 12399.8 12404.1 litres/min

Take litres 5.10 5.00 4.90 4.80 4.30

1.79 Average Take l/m 5.10 5.00 4.90 4.80 4.30 4.82 1.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12410.0 12417.2 12424.0 12430.7 12437.4 12443.9 litres/min

Take litres 7.20 6.80 6.70 6.70 6.50

3.86 Average Take l/m 7.20 6.80 6.70 6.70 6.50 6.78 0.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12452.0 12459.9 12467.5 12474.9 12482.3 12489.7 litres/min

Take litres 7.90 7.60 7.40 7.40 7.40

5.72 Average Take l/m 7.90 7.60 7.40 7.40 7.40 7.54 0.65

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12525.0 12530.5 12535.7 12541.2 12546.5 12551.5 litres/min

Take litres 5.50 5.20 5.50 5.30 5.00

3.86 Average Take l/m 5.50 5.20 5.50 5.30 5.00 5.30 0.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12560.0 12563.8 12567.0 12570.0 12573.7 12577.5 litres/min

Take litres 3.80 3.20 3.00 3.70 3.80

1.86 Average Take l/m 3.80 3.20 3.00 3.70 3.80 3.50 0.90

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.286 MAX k= 1.29E-05

DETERMINATION:

MIN Lu= 0.647 MIN k= 6.47E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.647 AVG k= 6.47E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

Negigible leakage observed at stuffing box.

Some void filling occuring during test based on interpretation of pressure vs. flowplot.

TEST BY: BDP REVIEWED BY: LS

KITSAULT

Plant Site

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.79 3.86 5.72 3.86 1.86Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.9

3.9

5.8

3.9

1.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 18AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-52 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]5 Rev'd 08/18/09

SHEET 5 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 3.5 m TOP OF TEST INTERVAL: 225.00 68.60

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 281.00 85.67 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2559.0 2566.5 2574.0 2581.0 2588.0 2594.5 litres/min

Take litres 7.50 7.50 7.00 7.00 6.50

2.51 Average Take l/m 7.50 7.50 7.00 7.00 6.50 7.10 1.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2604.0 2616.0 2627.5 2639.0 2649.5 2660.0 litres/min

Take litres 12.00 11.50 11.50 10.50 10.50

5.03 Average Take l/m 12.00 11.50 11.50 10.50 10.50 11.20 1.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2673.0 2689.0 2704.0 2719.0 2733.5 2748.0 litres/min

Take litres 16.00 15.00 15.00 14.50 14.50

7.62 Average Take l/m 16.00 15.00 15.00 14.50 14.50 15.00 1.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2754.0 2764.5 2775.0 2785.5 2796.0 2806.5 litres/min

Take litres 10.50 10.50 10.50 10.50 10.50

5.03 Average Take l/m 10.50 10.50 10.50 10.50 10.50 10.50 1.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2810.5 2817.0 2823.5 2830.0 2837.0 2843.0 litres/min

Take litres 6.50 6.50 6.50 7.00 6.00

2.51 Average Take l/m 6.50 6.50 6.50 7.00 6.00 6.50 1.30

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.420 MAX k= 1.42E-05

DETERMINATION:

MIN Lu= 1.094 MIN k= 1.09E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.094 AVG k= 1.09E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

Negigible leakage observed at stuffing box.

Pressure fluxtuating between 105 and 115 psi during third test interval. Water level taken after test completed.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GTKITSAULT

Plant Site

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

2.51 5.03 7.62 5.03 2.51Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.9

5.4

8.0

5.4

2.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 18AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-53 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-06GT\Completed and Reviewed by LS\[K09-06GT Packer Test.xls]6 Rev'd 08/18/09

SHEET 6 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 4.0 m TOP OF TEST INTERVAL: 285.00 86.89

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.7 m BOTTOM OF TEST INTERVAL: 331.00 100.91 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2897.0 2898.8 2900.2 2901.8 2903.2 2904.8 litres/min

Take litres 1.80 1.40 1.60 1.40 1.60

3.41 Average Take l/m 1.80 1.40 1.60 1.40 1.60 1.56 0.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2908.0 2910.5 2912.8 2915.2 2917.5 2919.8 litres/min

Take litres 2.50 2.30 2.40 2.30 2.30

6.83 Average Take l/m 2.50 2.30 2.40 2.30 2.30 2.36 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2923.5 2927.4 2931.2 2934.8 2938.2 2941.8 litres/min

Take litres 3.90 3.80 3.60 3.40 3.60

10.34 Average Take l/m 3.90 3.80 3.60 3.40 3.60 3.66 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2944.0 2946.5 2948.8 2951.2 2953.5 2955.8 litres/min

Take litres 2.50 2.30 2.40 2.30 2.30

6.83 Average Take l/m 2.50 2.30 2.40 2.30 2.30 2.36 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2956.5 2958.0 2959.5 2960.8 2962.2 2963.8 litres/min

Take litres 1.50 1.50 1.30 1.40 1.60

3.41 Average Take l/m 1.50 1.50 1.30 1.40 1.60 1.46 0.27

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.287 MAX k= 2.87E-06

DETERMINATION:

MIN Lu= 0.231 MIN k= 2.31E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.252 AVG k= 2.52E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14'. Double packer system used.

Negigible leakage observed at stuffing box.

Water level taken after test completed.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Plant Site

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:24

101-343/3 K09-06GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

3.41 6.83 10.34 6.83 3.41Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.9

7.3

10.8

7.3

3.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 18AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-54 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]1 Rev'd 08/20/09

SHEET 1 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

13

DIP: 90 oDEPTH GROUNDWATER: 2.4 m TOP OF TEST INTERVAL: 26.00 7.93

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 20-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 82.00 25.00 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3009.9 3010.0 3010.2 3011.2 3012.2 3013.0 litres/min

Take litres 0.10 0.20 1.00 1.00 0.80

0.30 Average Take l/m 0.10 0.20 1.00 1.00 0.80 0.62 0.61

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3014.0 3015.0 3016.0 3017.0 3018.0 3019.0 litres/min

Take litres 1.00 1.00 1.00 1.00 1.00

0.59 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3020.0 3021.1 3022.2 3023.3 3024.6 3025.8 litres/min

Take litres 1.10 1.10 1.10 1.30 1.20

0.90 Average Take l/m 1.10 1.10 1.10 1.30 1.20 1.16 0.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3026.3 3027.1 3027.8 3028.6 3029.4 3030.1 litres/min

Take litres 0.80 0.70 0.80 0.80 0.70

0.59 Average Take l/m 0.80 0.70 0.80 0.80 0.70 0.76 0.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3030.4 3030.9 3031.1 3031.5 3031.9 3032.2 litres/min

Take litres 0.50 0.20 0.40 0.40 0.30

0.30 Average Take l/m 0.50 0.20 0.40 0.40 0.30 0.36 0.35

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.658 MAX k= 6.58E-06

DETERMINATION:

MIN Lu= 0.355 MIN k= 3.55E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.355 AVG k= 3.55E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box. Void Filling.

TEST BY: CD REVIEWED BY: LS

KITSAULT

CLARY WASTE DUMP

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.30 0.59 0.90 0.59 0.30Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.6

0.9

1.2

0.9

0.6

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-55 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]2 Rev'd 08/21/09

SHEET 2 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

13

DIP: 90 oDEPTH GROUNDWATER: 2.4 m TOP OF TEST INTERVAL: 81.00 24.70

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 132.00 40.24 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12925.1 12925.8 12926.8 12927.9 12928.8 12929.9 litres/min

Take litres 0.70 1.00 1.10 0.90 1.10

0.83 Average Take l/m 0.70 1.00 1.10 0.90 1.10 0.96 0.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12938.2 12935.9 12938.0 12940.0 12942.5 12944.8 litres/min

Take litres -2.30 2.10 2.00 2.50 2.30

1.79 Average Take l/m -2.30 2.10 2.00 2.50 2.30 1.32 0.41

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12949.0 12952.1 12955.0 12958.0 12961.0 12964.9 litres/min

Take litres 3.10 2.90 3.00 3.00 3.90

2.62 Average Take l/m 3.10 2.90 3.00 3.00 3.90 3.18 0.71

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12965.0 12967.0 12969.2 12971.2 12973.2 12975.2 litres/min

Take litres 2.00 2.20 2.00 2.00 2.00

1.86 Average Take l/m 2.00 2.20 2.00 2.00 2.00 2.04 0.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12978.0 12978.9 12979.9 12980.8 12981.6 12982.5 litres/min

Take litres 0.90 1.00 0.90 0.80 0.90

0.90 Average Take l/m 0.90 1.00 0.90 0.80 0.90 0.90 0.50

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.710 MAX k= 7.10E-06

DETERMINATION:

MIN Lu= 0.414 MIN k= 4.14E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.562 AVG k= 5.62E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GTKITSAULT

CLARY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.83 1.79 2.62 1.86 0.90Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.1

2.1

2.9

2.1

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-56 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]3 Rev'd 08/21/09

SHEET 3 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

13

DIP: 90 oDEPTH GROUNDWATER: 9.0 m TOP OF TEST INTERVAL: 131.00 39.94

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 182.00 55.49 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3017.0 3018.0 3018.8 3019.6 3020.1 3020.9 litres/min

Take litres 1.00 0.80 0.80 0.50 0.80

1.50 Average Take l/m 1.00 0.80 0.80 0.50 0.80 0.78 0.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3023.2 3024.9 3026.2 3027.8 3029.2 3030.3 litres/min

Take litres 1.70 1.30 1.60 1.40 1.10

3.00 Average Take l/m 1.70 1.30 1.60 1.40 1.10 1.42 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3033.0 3036.2 3039.0 3042.7 3044.2 3046.8 litres/min

Take litres 3.20 2.80 3.70 1.50 2.60

4.55 Average Take l/m 3.20 2.80 3.70 1.50 2.60 2.76 0.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3048.8 3050.0 3051.2 3052.5 3053.8 3055.0 litres/min

Take litres 1.20 1.20 1.30 1.30 1.20

3.00 Average Take l/m 1.20 1.20 1.30 1.30 1.20 1.24 0.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3055.7 3056.2 3056.7 3057.2 3057.8 3058.4 litres/min

Take litres 0.50 0.50 0.50 0.60 0.60

1.50 Average Take l/m 0.50 0.50 0.50 0.60 0.60 0.54 0.14

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.322 MAX k= 3.22E-06

DETERMINATION:

MIN Lu= 0.141 MIN k= 1.41E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.220 AVG k= 2.20E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GTKITSAULT

CLARY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

1.50 3.00 4.55 3.00 1.50Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.5

4.0

5.5

4.0

2.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-57 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]4 Rev'd 08/21/09

SHEET 4 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

13

DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 181.00 55.18

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 21-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 232.00 70.73 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3140.5 3144.0 3147.2 3150.3 3153.2 3155.5 litres/min

Take litres 3.50 3.20 3.10 2.90 2.30

2.05 Average Take l/m 3.50 3.20 3.10 2.90 2.30 3.00 0.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3161.0 3166.0 3170.5 3174.8 3178.8 3182.5 litres/min

Take litres 5.00 4.50 4.30 4.00 3.70

4.10 Average Take l/m 5.00 4.50 4.30 4.00 3.70 4.30 0.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3196.0 3202.0 3208.0 3213.2 3219.0 3224.5 litres/min

Take litres 6.00 6.00 5.20 5.80 5.50

6.21 Average Take l/m 6.00 6.00 5.20 5.80 5.50 5.70 0.46

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3227.0 3230.4 3233.8 3237.4 3240.7 3244.2 litres/min

Take litres 3.40 3.40 3.60 3.30 3.50

4.10 Average Take l/m 3.40 3.40 3.60 3.30 3.50 3.44 0.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3245.0 3246.1 3247.6 3249.2 3251.0 3252.8 litres/min

Take litres 1.10 1.50 1.60 1.80 1.80

2.05 Average Take l/m 1.10 1.50 1.60 1.80 1.80 1.56 0.26

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.498 MAX k= 4.98E-06

DETERMINATION:

MIN Lu= 0.259 MIN k= 2.59E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.259 AVG k= 2.59E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box.

TEST BY: CD REVIEWED BY: LS

KITSAULT

CLARY WASTE DUMP

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

2.05 4.10 6.21 4.10 2.05Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.9

5.9

8.0

5.9

3.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-58 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]5 Rev'd 08/22/09

SHEET 5 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

13

DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 231.00 70.43

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 22-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 282.00 85.98 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13382.0 13383.4 13384.9 13386.0 13387.0 13388.0 litres/min

Take litres 1.40 1.50 1.10 1.00 1.00

2.62 Average Take l/m 1.40 1.50 1.10 1.00 1.00 1.20 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13391.0 13392.8 13394.4 13396.0 13397.8 13399.2 litres/min

Take litres 1.80 1.60 1.60 1.80 1.40

5.24 Average Take l/m 1.80 1.60 1.60 1.80 1.40 1.64 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13402.0 13404.0 13406.0 13408.0 13410.1 13412.0 litres/min

Take litres 2.00 2.00 2.00 2.10 1.90

8.00 Average Take l/m 2.00 2.00 2.00 2.10 1.90 2.00 0.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13413.5 13414.8 13415.8 13417.0 13418.1 13419.4 litres/min

Take litres 1.30 1.00 1.20 1.10 1.30

5.24 Average Take l/m 1.30 1.00 1.20 1.10 1.30 1.18 0.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13425.0 13425.1 13425.6 13426.0 13426.8 13427.2 litres/min

Take litres 0.10 0.50 0.40 0.80 0.40

2.34 Average Take l/m 0.10 0.50 0.40 0.80 0.40 0.44 0.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.175 MAX k= 1.75E-06

DETERMINATION:

MIN Lu= 0.069 MIN k= 6.85E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.069 AVG k= 6.85E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box.

TEST BY: BDP REVIEWED BY: LS

KITSAULT

CLARY WASTE DUMP

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

0.2

2.62 5.24 8.00 5.24 2.34Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.4

7.0

9.8

7.0

4.1

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.50 1.00 1.50 2.00 2.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 22OCT'09 ISSUED WITH REPORT 101-343/3 BDP - -

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-59 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-08GT\[K09-08GT Packer Test.xls]6 Rev'd 08/22/09

SHEET 6 OF 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

13

DIP: 90 oDEPTH GROUNDWATER: 17.7 m TOP OF TEST INTERVAL: 286.00 87.20

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 22-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.2 m BOTTOM OF TEST INTERVAL: 337.00 102.74 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13465.0 13467.8 13469.9 13472.2 13474.7 13477.0 litres/min

Take litres 2.80 2.10 2.30 2.50 2.30

3.52 Average Take l/m 2.80 2.10 2.30 2.50 2.30 2.40 0.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13480.0 13483.4 13486.8 13490.0 13493.1 13496.3 litres/min

Take litres 3.40 3.40 3.20 3.10 3.20

6.89 Average Take l/m 3.40 3.40 3.20 3.10 3.20 3.26 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13504.0 13507.6 13511.0 13514.6 13518.0 13521.5 litres/min

Take litres 3.60 3.40 3.60 3.40 3.50

10.00 Average Take l/m 3.60 3.40 3.60 3.40 3.50 3.50 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13523.5 13526.2 13528.8 13531.0 13533.5 13536.0 litres/min

Take litres 2.70 2.60 2.20 2.50 2.50

7.03 Average Take l/m 2.70 2.60 2.20 2.50 2.50 2.50 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13539.0 13540.0 13541.5 13542.8 13544.0 13545.3 litres/min

Take litres 1.00 1.50 1.30 1.20 1.30

3.59 Average Take l/m 1.00 1.50 1.30 1.20 1.30 1.26 0.15

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.291 MAX k= 2.91E-06

DETERMINATION:

MIN Lu= 0.151 MIN k= 1.51E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.151 AVG k= 1.51E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 19'. Double packer system used.

No leakage observed at stuff box.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 17:09

101-343/3 K09-08GTKITSAULT

CLARY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

3.52 6.89 10.00 7.03 3.59Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.3

8.7

11.8

8.8

5.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 22AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-60 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]2 Rev'd 08/24/09

SHEET 1 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 39.00 11.89

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 102.00 31.10 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4365.0 4368.8 4372.0 4376.0 4379.0 4382.0 litres/min

Take litres 3.80 3.20 4.00 3.00 3.00

0.46 Average Take l/m 3.80 3.20 4.00 3.00 3.00 3.40 1.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4386.0 4390.5 4395.0 4399.4 4403.9 4408.0 litres/min

Take litres 4.50 4.50 4.40 4.50 4.10

0.91 Average Take l/m 4.50 4.50 4.40 4.50 4.10 4.40 1.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4413.0 4419.0 4424.2 4430.0 4435.8 4441.2 litres/min

Take litres 6.00 5.20 5.80 5.80 5.40

1.38 Average Take l/m 6.00 5.20 5.80 5.80 5.40 5.64 1.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4444.0 4448.2 4453.5 4457.0 4461.8 4466.0 litres/min

Take litres 4.20 5.30 3.50 4.80 4.20

0.91 Average Take l/m 4.20 5.30 3.50 4.80 4.20 4.40 1.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4469.0 4472.5 4476.5 4480.0 4483.5 4487.1 litres/min

Take litres 3.50 4.00 3.50 3.50 3.60

0.46 Average Take l/m 3.50 4.00 3.50 3.50 3.60 3.62 1.65

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.646 MAX k= 1.65E-05

DETERMINATION:

MIN Lu= 1.419 MIN k= 1.42E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.419 AVG k= 1.42E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

No leakage observed at stuff box.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GTKITSAULT

Primary Crusher (Second Proposed Location)

STAGE PRESSURE VERSUS LUGEON VALUE

1.3

1.4

1.4

1.5

1.5

1.6

1.6

1.7

1.7

0.46 0.91 1.38 0.91 0.46Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.1

1.6

2.1

1.6

1.1

0.0

0.5

1.0

1.5

2.0

2.5

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-61 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]3 Rev'd 08/24/09

SHEET 2 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 10.0 m TOP OF TEST INTERVAL: 101.00 30.79

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 152.00 46.34 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4535.0 4536.0 4537.5 4538.5 4539.5 4540.5 litres/min

Take litres 1.00 1.50 1.00 1.00 1.00

1.14 Average Take l/m 1.00 1.50 1.00 1.00 1.00 1.10 0.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4541.5 4542.5 4543.8 4544.8 4546.0 4547.0 litres/min

Take litres 1.00 1.30 1.00 1.20 1.00

2.28 Average Take l/m 1.00 1.30 1.00 1.20 1.00 1.10 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4549.0 4550.8 4552.2 4553.8 4555.1 4556.3 litres/min

Take litres 1.80 1.40 1.60 1.30 1.20

3.45 Average Take l/m 1.80 1.40 1.60 1.30 1.20 1.46 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4557.0 4558.2 4559.5 4560.8 4561.9 4563.2 litres/min

Take litres 1.20 1.30 1.30 1.10 1.30

2.28 Average Take l/m 1.20 1.30 1.30 1.10 1.30 1.24 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4564.0 4565.0 4566.1 4567.1 4568.1 4569.2 litres/min

Take litres 1.00 1.10 1.00 1.00 1.10

1.14 Average Take l/m 1.00 1.10 1.00 1.00 1.10 1.04 0.30

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.318 MAX k= 3.18E-06

DETERMINATION:

MIN Lu= 0.207 MIN k= 2.07E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.207 AVG k= 2.07E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT Yes

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

Leakage observed at stuffing box throughout test.

Water level continuously rising when taken.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Primary Crusher (Second Proposed Location)

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

1.14 2.28 3.45 2.28 1.14Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.2

3.4

4.5

3.4

2.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-62 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]4 Rev'd 08/24/09

SHEET 3 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 4.9 m TOP OF TEST INTERVAL: 151.00 46.04

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 202.00 61.59 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4618.5 4621.0 4623.0 4625.1 4627.2 4629.1 litres/min

Take litres 2.50 2.00 2.10 2.10 1.90

1.71 Average Take l/m 2.50 2.00 2.10 2.10 1.90 2.12 0.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4660.0 4706.0 4749.0 4793.0 4837.0 4879.0 litres/min

Take litres 46.00 43.00 44.00 44.00 42.00

3.41 Average Take l/m 46.00 43.00 44.00 44.00 42.00 43.80 7.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4905.0 4971.0 5033.0 5096.0 5156.0 5215.0 litres/min

Take litres 66.00 62.00 63.00 60.00 59.00

5.17 Average Take l/m 66.00 62.00 63.00 60.00 59.00 62.00 6.93

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5235.0 5282.0 5330.0 5378.0 5425.0 5471.0 litres/min

Take litres 47.00 48.00 48.00 47.00 46.00

3.41 Average Take l/m 47.00 48.00 48.00 47.00 46.00 47.20 7.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5490.0 5524.5 5559.0 5593.0 5628.0 5662.0 litres/min

Take litres 34.50 34.50 34.00 35.00 34.00

1.71 Average Take l/m 34.50 34.50 34.00 35.00 34.00 34.40 9.66

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 9.663 MAX k= 9.66E-05

DETERMINATION:

MIN Lu= 0.596 MIN k= 5.96E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 6.930 AVG k= 6.93E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

No leakage observed at stuffing box throughout test.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GTKITSAULT

Primary Crusher (Second Proposed Location)

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

2.0

4.0

6.0

8.0

10.0

12.0

1.71 3.41 5.17 3.41 1.71Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.3

4.0

5.8

4.0

2.3

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 24AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-63 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]5 Rev'd 08/25/09

SHEET 4 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 201.00 61.28

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 252.00 76.83 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 15838.0 15841.4 15844.0 15846.8 15849.1 15851.5 litres/min

Take litres 3.40 2.60 2.80 2.30 2.40

2.28 Average Take l/m 3.40 2.60 2.80 2.30 2.40 2.70 0.59

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 15855.0 15858.9 15862.3 15865.5 15869.0 15872.1 litres/min

Take litres 3.90 3.40 3.20 3.50 3.10

4.55 Average Take l/m 3.90 3.40 3.20 3.50 3.10 3.42 0.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 15880.0 15886.1 15891.5 15896.5 15901.5 15906.6 litres/min

Take litres 6.10 5.40 5.00 5.00 5.10

6.89 Average Take l/m 6.10 5.40 5.00 5.00 5.10 5.32 0.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 15909.0 15912.5 15915.8 15919.0 15922.0 15925.2 litres/min

Take litres 3.50 3.30 3.20 3.00 3.20

4.55 Average Take l/m 3.50 3.30 3.20 3.00 3.20 3.24 0.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 15927.0 15928.9 15930.8 15932.9 15934.9 15936.9 litres/min

Take litres 1.90 1.90 2.10 2.00 2.00

2.21 Average Take l/m 1.90 1.90 2.10 2.00 2.00 1.98 0.44

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.586 MAX k= 5.86E-06

DETERMINATION:

MIN Lu= 0.398 MIN k= 3.98E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.459 AVG k= 4.59E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

No leakage observed at stuffing box.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GTKITSAULT

Primary Crusher (Second Proposed Location)

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

2.28 4.55 6.89 4.55 2.21Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.0

5.2

7.6

5.2

2.9

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 25AUG'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-64 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]6 Rev'd 08/25/09

SHEET 5 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 251.00 76.52

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 292.00 89.02 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6022.2 6023.9 6025.2 6026.9 6028.2 6029.8 litres/min

Take litres 1.70 1.30 1.70 1.30 1.60

2.84 Average Take l/m 1.70 1.30 1.70 1.30 1.60 1.52 0.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6031.0 6033.5 6036.1 6038.8 6041.0 6043.2 litres/min

Take litres 2.50 2.60 2.70 2.20 2.20

5.69 Average Take l/m 2.50 2.60 2.70 2.20 2.20 2.44 0.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6046.0 6050.5 6054.8 6059.0 6063.0 6067.0 litres/min

Take litres 4.50 4.30 4.20 4.00 4.00

8.62 Average Take l/m 4.50 4.30 4.20 4.00 4.00 4.20 0.36

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6070.5 6073.2 6076.2 6078.8 6081.3 6084.1 litres/min

Take litres 2.70 3.00 2.60 2.50 2.80

5.69 Average Take l/m 2.70 3.00 2.60 2.50 2.80 2.72 0.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6085.0 6086.7 6088.1 6090.0 6091.4 6093.0 litres/min

Take litres 1.70 1.40 1.90 1.40 1.60

2.84 Average Take l/m 1.70 1.40 1.90 1.40 1.60 1.60 0.36

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.362 MAX k= 3.62E-06

DETERMINATION:

MIN Lu= 0.306 MIN k= 3.06E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.343 AVG k= 3.43E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

No leakage observed at stuffing box throughout test.

Water level rising when taken.

TEST BY: CD REVIEWED BY: LS

KITSAULT

Primary Crusher (Second Proposed Location)

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.27

0.28

0.29

0.30

0.31

0.32

0.33

0.34

0.35

0.36

0.37

2.84 5.69 8.62 5.69 2.84Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.5

6.4

9.3

6.4

3.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 25AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-65 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-09GT\Completed and Reviewed by LS\[K09-09GT Packer Test.xls]7 Rev'd 08/25/09

SHEET 6 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 7

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 291.00 88.72

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 25-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 332.00 101.22 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6280.0 6283.0 6285.2 6287.8 6290.0 6292.4 litres/min

Take litres 3.00 2.20 2.60 2.20 2.40

3.41 Average Take l/m 3.00 2.20 2.60 2.20 2.40 2.48 0.48

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6294.1 6298.4 6302.2 6306.0 6309.5 6313.1 litres/min

Take litres 4.30 3.80 3.80 3.50 3.60

6.83 Average Take l/m 4.30 3.80 3.80 3.50 3.60 3.80 0.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6321.0 6329.0 6336.5 6343.7 6350.5 6357.1 litres/min

Take litres 8.00 7.50 7.20 6.80 6.60

10.34 Average Take l/m 8.00 7.50 7.20 6.80 6.60 7.22 0.52

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6360.0 6365.0 6369.8 6374.5 6379.0 6384.0 litres/min

Take litres 5.00 4.80 4.70 4.50 5.00

6.83 Average Take l/m 5.00 4.80 4.70 4.50 5.00 4.80 0.51

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6386.0 6388.3 6392.6 6395.5 6398.9 6402.0 litres/min

Take litres 2.30 4.30 2.90 3.40 3.10

3.41 Average Take l/m 2.30 4.30 2.90 3.40 3.10 3.20 0.62

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.624 MAX k= 6.24E-06

DETERMINATION:

MIN Lu= 0.404 MIN k= 4.04E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.509 AVG k= 5.09E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 14.5'. Double packer system used.

No leakage observed at stuffing box throughout test.

Water level rising when taken.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/05/09 21:28

101-343/3 K09-09GTKITSAULT

Primary Crusher (Second Proposed Location)

STAGE PRESSURE VERSUS LUGEON VALUE

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3.41 6.83 10.34 6.83 3.41Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.1

7.5

11.0

7.5

4.1

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 25AUG'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-66 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]1 Rev'd 08/27/09

SHEET 1 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 19.50 5.95

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 62.00 18.90 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 16579.2 16580.0 16580.7 16581.5 16582.5 16583.5 litres/min

Take litres 0.80 0.70 0.80 1.00 1.00

0.21 Average Take l/m 0.80 0.70 0.80 1.00 1.00 0.86 0.74

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 16608.7 16616.0 16622.7 16628.5 16634.0 16639.5 litres/min

Take litres 7.30 6.70 5.80 5.50 5.50

0.41 Average Take l/m 7.30 6.70 5.80 5.50 5.50 6.16 4.33

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 16667.5 16675.5 16683.5 16691.0 16699.0 16707.0 litres/min

Take litres 8.00 8.00 7.50 8.00 8.00

0.62 Average Take l/m 8.00 8.00 7.50 8.00 8.00 7.90 4.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 16721.0 16725.0 16729.0 16732.9 16737.0 16741.0 litres/min

Take litres 4.00 4.00 3.90 4.10 4.00

0.41 Average Take l/m 4.00 4.00 3.90 4.10 4.00 4.00 2.81

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 16744.9 16747.0 16749.0 16751.1 16753.2 16755.4 litres/min

Take litres 2.10 2.00 2.10 2.10 2.20

0.28 Average Take l/m 2.10 2.00 2.10 2.10 2.20 2.10 1.69

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 4.670 MAX k= 4.67E-05

DETERMINATION:

MIN Lu= 0.744 MIN k= 7.44E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.848 AVG k= 2.85E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Pressure gauge limited to pressures above 3 psi. Results for first stage of test are suspect.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.21 0.41 0.62 0.41 0.28Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.9

1.1

1.3

1.1

1.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-67 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]2 Rev'd 08/27/09

SHEET 2 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 3.5 m TOP OF TEST INTERVAL: 61.00 18.60

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 112.00 34.15 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6920.0 6946.0 6971.5 6997.0 7021.5 7047.0 litres/min

Take litres 26.00 25.50 25.50 24.50 25.50

0.71 Average Take l/m 26.00 25.50 25.50 24.50 25.50 25.40 14.33

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7067.0 7102.0 7140.0 7177.0 7213.0 7249.0 litres/min

Take litres 35.00 38.00 37.00 36.00 36.00

1.41 Average Take l/m 35.00 38.00 37.00 36.00 36.00 36.40 12.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7270.0 7309.0 7347.0 7385.0 7421.5 7458.0 litres/min

Take litres 39.00 38.00 38.00 36.50 36.50

2.14 Average Take l/m 39.00 38.00 38.00 36.50 36.50 37.60 9.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7475.0 7502.5 7530.5 7558.5 7585.0 7615.0 litres/min

Take litres 27.50 28.00 28.00 26.50 30.00

1.41 Average Take l/m 27.50 28.00 28.00 26.50 30.00 28.00 9.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7624.0 7641.0 7659.0 7676.5 7693.5 7711.0 litres/min

Take litres 17.00 18.00 17.50 17.00 17.50

0.71 Average Take l/m 17.00 18.00 17.50 17.00 17.50 17.40 9.81

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 14.325 MAX k= 1.43E-04

DETERMINATION:

MIN Lu= 9.401 MIN k= 9.40E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 9.401 AVG k= 9.40E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Pressure steadily increasing during second interval.

TEST BY: CD REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.71 1.41 2.14 1.41 0.71Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.1

1.8

2.6

1.8

1.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-68 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]3 Rev'd 08/27/09

SHEET 3 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 6.0 m TOP OF TEST INTERVAL: 111.00 33.84

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 161.58 49.26 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8065.0 8103.0 8140.0 8177.0 8213.0 8249.0 litres/min

Take litres 38.00 37.00 37.00 36.00 36.00

1.25 Average Take l/m 38.00 37.00 37.00 36.00 36.00 36.80 12.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8280.0 8332.0 8386.0 8436.0 8487.0 8539.0 litres/min

Take litres 52.00 54.00 50.00 51.00 52.00

2.50 Average Take l/m 52.00 54.00 50.00 51.00 52.00 51.80 10.54

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8570.0 8635.0 8696.0 8756.0 8815.0 8874.0 litres/min

Take litres 65.00 61.00 60.00 59.00 59.00

3.79 Average Take l/m 65.00 61.00 60.00 59.00 59.00 60.80 8.81

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8900.0 8945.0 8989.0 9033.0 9078.0 9123.0 litres/min

Take litres 45.00 44.00 44.00 45.00 45.00

2.50 Average Take l/m 45.00 44.00 44.00 45.00 45.00 44.60 9.07

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9144.0 9174.5 9205.0 9234.0 9265.0 9295.0 litres/min

Take litres 30.50 30.50 29.00 31.00 30.00

1.25 Average Take l/m 30.50 30.50 29.00 31.00 30.00 30.20 10.11

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 12.324 MAX k= 1.23E-04

DETERMINATION:

MIN Lu= 8.806 MIN k= 8.81E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 8.806 AVG k= 8.81E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level rising when taken

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

1.25 2.50 3.79 2.50 1.25Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.9

3.2

4.5

3.2

1.9

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-69 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]4 Rev'd 08/27/09

SHEET 4 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 6.3 m TOP OF TEST INTERVAL: 161.00 49.09

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 212.00 64.63 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9495.0 9515.0 9535.0 9555.0 9575.0 9594.0 litres/min

Take litres 20.00 20.00 20.00 20.00 19.00

1.82 Average Take l/m 20.00 20.00 20.00 20.00 19.00 19.80 5.02

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9610.0 9639.5 9668.0 9696.0 9724.0 9751.0 litres/min

Take litres 29.50 28.50 28.00 28.00 27.00

3.64 Average Take l/m 29.50 28.50 28.00 28.00 27.00 28.20 4.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9775.0 9814.0 9851.5 9889.0 9926.0 9962.0 litres/min

Take litres 39.00 37.50 37.50 37.00 36.00

5.52 Average Take l/m 39.00 37.50 37.50 37.00 36.00 37.40 3.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9979.0 10009.0 10038.0 10067.0 10097.0 10127.0 litres/min

Take litres 30.00 29.00 29.00 30.00 30.00

3.64 Average Take l/m 30.00 29.00 29.00 30.00 30.00 29.60 4.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10140.0 10162.0 10183.0 10204.0 10225.0 10247.0 litres/min

Take litres 22.00 21.00 21.00 21.00 22.00

1.82 Average Take l/m 22.00 21.00 21.00 21.00 22.00 21.40 5.43

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 5.429 MAX k= 5.43E-05

DETERMINATION:

MIN Lu= 3.860 MIN k= 3.86E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 3.860 AVG k= 3.86E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level rising when taken

TEST BY: CD REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

1.0

2.0

3.0

4.0

5.0

6.0

1.82 3.64 5.52 3.64 1.82Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.5

4.4

6.2

4.4

2.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-70 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]5 Rev'd 08/28/09

SHEET 5 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 7.0 m TOP OF TEST INTERVAL: 211.00 64.33

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 28-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 262.00 79.88 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20363.0 20366.0 20368.9 20371.2 20373.8 20376.4 litres/min

Take litres 3.00 2.90 2.30 2.60 2.60

2.41 Average Take l/m 3.00 2.90 2.30 2.60 2.60 2.68 0.54

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20416.5 20421.5 20426.5 20431.5 20436.5 20441.5 litres/min

Take litres 5.00 5.00 5.00 5.00 5.00

4.90 Average Take l/m 5.00 5.00 5.00 5.00 5.00 5.00 0.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20468.0 20475.0 20482.0 20488.5 20495.5 20501.5 litres/min

Take litres 7.00 7.00 6.50 7.00 6.00

7.24 Average Take l/m 7.00 7.00 6.50 7.00 6.00 6.70 0.54

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20513.0 20516.1 20519.5 20522.5 20526.0 20529.0 litres/min

Take litres 3.10 3.40 3.00 3.50 3.00

4.76 Average Take l/m 3.10 3.40 3.00 3.50 3.00 3.20 0.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20523.2 20524.6 20526.0 20527.4 20528.9 20530.4 litres/min

Take litres 1.40 1.40 1.40 1.50 1.50

2.34 Average Take l/m 1.40 1.40 1.40 1.50 1.50 1.44 0.30

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.566 MAX k= 5.66E-06

DETERMINATION:

MIN Lu= 0.296 MIN k= 2.96E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.462 AVG k= 4.62E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Took some time for pressure to equalize between test steps

TEST BY: BDP REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

2.41 4.90 7.24 4.76 2.34Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.2

5.7

8.0

5.5

3.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-71 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-10GT\[K09-10GT Packer Test.xls]6 Rev'd 08/28/09

SHEET 6 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 7.5 m TOP OF TEST INTERVAL: 261.00 79.57

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 28-Aug-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 332.00 101.22 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 736.6 742.1 747.2 752.1 756.9 761.5 litres/min

Take litres 5.50 5.10 4.90 4.80 4.60

3.45 Average Take l/m 5.50 5.10 4.90 4.80 4.60 4.98 0.54

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 818.0 826.5 834.9 843.0 851.0 859.0 litres/min

Take litres 8.50 8.40 8.10 8.00 8.00

6.89 Average Take l/m 8.50 8.40 8.10 8.00 8.00 8.20 0.49

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 904.0 918.0 933.0 951.0 968.0 984.5 litres/min

Take litres 14.00 15.00 18.00 17.00 16.50

10.34 Average Take l/m 14.00 15.00 18.00 17.00 16.50 16.10 0.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1039.0 1047.0 1054.5 1062.0 1069.5 1077.0 litres/min

Take litres 8.00 7.50 7.50 7.50 7.50

6.89 Average Take l/m 8.00 7.50 7.50 7.50 7.50 7.60 0.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1080.0 1085.5 1090.4 1095.5 1100.5 1105.5 litres/min

Take litres 5.50 4.90 5.10 5.00 5.00

3.45 Average Take l/m 5.50 4.90 5.10 5.00 5.00 5.10 0.55

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.666 MAX k= 6.66E-06

DETERMINATION:

MIN Lu= 0.455 MIN k= 4.55E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.508 AVG k= 5.08E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Pressure fluctuating during test.

TEST BY: BDP/CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 21:27

101-343/3 K09-10GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.3

7.7

11.2

7.7

4.3

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 BDP/CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-72 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]1 Rev'd 08/29/09

SHEET 1 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.7 m TOP OF TEST INTERVAL: 25.00 7.62

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 29-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 71.00 21.65 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1201.0 1211.5 1222.0 1231.5 1241.0 1249.0 litres/min

Take litres 10.50 10.50 9.50 9.50 8.00

0.23 Average Take l/m 10.50 10.50 9.50 9.50 8.00 9.60 17.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1263.0 1275.5 1287.5 1299.5 1311.0 1323.0 litres/min

Take litres 12.50 12.00 12.00 11.50 12.00

0.46 Average Take l/m 12.50 12.00 12.00 11.50 12.00 12.00 13.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1332.0 1348.0 1362.0 1377.0 1392.0 1406.5 litres/min

Take litres 16.00 14.00 15.00 15.00 14.50

0.69 Average Take l/m 16.00 14.00 15.00 15.00 14.50 14.90 12.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1417.0 1426.5 1436.0 1444.5 1455.0 1464.5 litres/min

Take litres 9.50 9.50 8.50 10.50 9.50

0.46 Average Take l/m 9.50 9.50 8.50 10.50 9.50 9.50 10.89

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1477.0 1483.0 1489.0 1495.0 1501.5 1508.0 litres/min

Take litres 6.00 6.00 6.00 6.50 6.50

0.23 Average Take l/m 6.00 6.00 6.00 6.50 6.50 6.20 11.21

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 17.350 MAX k= 1.74E-04

DETERMINATION:

MIN Lu= 10.890 MIN k= 1.09E-04

INTERPRETATION cm/s

REFERENCE: AVG Lu= 11.205 AVG k= 1.12E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level taken after test.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

0.23 0.46 0.69 0.46 0.23Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

0.4

0.6

0.9

0.6

0.4

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-73 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]2 Rev'd 08/30/09

SHEET 2 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 3.0 m TOP OF TEST INTERVAL: 68.00 20.73

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 121.00 36.89 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21561.0 21565.5 21569.9 21574.5 21578.5 21583.0 litres/min

Take litres 4.50 4.40 4.60 4.00 4.50

0.90 Average Take l/m 4.50 4.40 4.60 4.00 4.50 4.40 2.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21613.5 21620.0 21628.6 21636.3 21644.0 21651.5 litres/min

Take litres 6.50 8.60 7.70 7.70 7.50

1.65 Average Take l/m 6.50 8.60 7.70 7.70 7.50 7.60 2.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21675.0 21686.0 21698.0 21708.0 21718.5 21729.0 litres/min

Take litres 11.00 12.00 10.00 10.50 10.50

2.41 Average Take l/m 11.00 12.00 10.00 10.50 10.50 10.80 2.38

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21740.0 21746.9 21753.5 21760.2 21767.3 21774.1 litres/min

Take litres 6.90 6.60 6.70 7.10 6.80

1.65 Average Take l/m 6.90 6.60 6.70 7.10 6.80 6.82 2.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21777.0 21780.0 21783.1 21786.5 21789.8 21793.1 litres/min

Take litres 3.00 3.10 3.40 3.30 3.30

0.83 Average Take l/m 3.00 3.10 3.40 3.30 3.30 3.22 1.63

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.380 MAX k= 2.38E-05

DETERMINATION:

MIN Lu= 1.630 MIN k= 1.63E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.095 AVG k= 2.09E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level taken pior to test, but is influenced by drilling. Water level rising when taken.

TEST BY: BDP REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

0.90 1.65 2.41 1.65 0.83Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.3

2.0

2.8

2.0

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-74 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]3 Rev'd 08/30/09

SHEET 3 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 3.0 m TOP OF TEST INTERVAL: 118.00 35.98

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 171.00 52.13 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21831.0 21834.0 21836.5 21839.0 21841.5 21843.9 litres/min

Take litres 3.00 2.50 2.50 2.50 2.40

1.38 Average Take l/m 3.00 2.50 2.50 2.50 2.40 2.58 0.90

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21853.0 21856.9 21860.5 21864.0 21867.3 21870.5 litres/min

Take litres 3.90 3.60 3.50 3.30 3.20

2.76 Average Take l/m 3.90 3.60 3.50 3.30 3.20 3.50 0.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21881.0 21886.5 21891.5 21896.5 21901.5 21906.3 litres/min

Take litres 5.50 5.00 5.00 5.00 4.80

4.14 Average Take l/m 5.50 5.00 5.00 5.00 4.80 5.06 0.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21910.0 21913.0 21916.0 21919.0 21922.0 21925.0 litres/min

Take litres 3.00 3.00 3.00 3.00 3.00

2.69 Average Take l/m 3.00 3.00 3.00 3.00 3.00 3.00 0.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21924.0 21925.0 21926.3 21927.5 21928.8 21929.9 litres/min

Take litres 1.00 1.30 1.20 1.30 1.10

1.31 Average Take l/m 1.00 1.30 1.20 1.30 1.10 1.18 0.43

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.900 MAX k= 9.00E-06

DETERMINATION:

MIN Lu= 0.428 MIN k= 4.28E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.428 AVG k= 4.28E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level taken pior to test, but is influenced by drilling. Water level rising when taken.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.38 2.76 4.14 2.69 1.31Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.8

3.2

4.5

3.1

1.7

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-75 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]4 Rev'd 08/30/09

SHEET 4 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 23.4 m TOP OF TEST INTERVAL: 170.00 51.83

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 221.00 67.38 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1973.0 1974.5 1975.8 1977.0 1978.0 1979.1 litres/min

Take litres 1.50 1.30 1.20 1.00 1.10

1.93 Average Take l/m 1.50 1.30 1.20 1.00 1.10 1.22 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1981.2 1982.5 1983.8 1985.0 1986.0 1987.0 litres/min

Take litres 1.30 1.30 1.20 1.00 1.00

3.87 Average Take l/m 1.30 1.30 1.20 1.00 1.00 1.16 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1989.5 1991.0 1992.8 1994.2 1995.8 1997.3 litres/min

Take litres 1.50 1.80 1.40 1.60 1.50

5.86 Average Take l/m 1.50 1.80 1.40 1.60 1.50 1.56 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1998.0 1999.0 2000.2 2001.2 2002.5 2003.5 litres/min

Take litres 1.00 1.20 1.00 1.30 1.00

3.87 Average Take l/m 1.00 1.20 1.00 1.30 1.00 1.10 0.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2004.0 2004.8 2005.2 2006.0 2006.8 2007.3 litres/min

Take litres 0.80 0.40 0.80 0.80 0.50

1.93 Average Take l/m 0.80 0.40 0.80 0.80 0.50 0.66 0.10

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.179 MAX k= 1.79E-06

DETERMINATION:

MIN Lu= 0.097 MIN k= 9.71E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.126 AVG k= 1.26E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

TEST BY: CD REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

0.2

1.93 3.87 5.86 3.87 1.93Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.4

6.3

8.3

6.3

4.4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-76 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]5 Rev'd 08/30/09

SHEET 5 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 2.3 m TOP OF TEST INTERVAL: 220.00 67.07

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 271.00 82.62 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2058.0 2065.0 2072.0 2078.5 2084.5 2090.5 litres/min

Take litres 7.00 7.00 6.50 6.00 6.00

2.50 Average Take l/m 7.00 7.00 6.50 6.00 6.00 6.50 1.48

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2099.0 2109.5 2119.0 2128.5 2138.5 2148.5 litres/min

Take litres 10.50 9.50 9.50 10.00 10.00

5.01 Average Take l/m 10.50 9.50 9.50 10.00 10.00 9.90 1.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2158.0 2172.0 2185.0 2197.0 2209.0 2220.5 litres/min

Take litres 14.00 13.00 12.00 12.00 11.50

7.58 Average Take l/m 14.00 13.00 12.00 12.00 11.50 12.50 1.02

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2225.0 2234.0 2243.0 2252.0 2260.0 2269.0 litres/min

Take litres 9.00 9.00 9.00 8.00 9.00

5.01 Average Take l/m 9.00 9.00 9.00 8.00 9.00 8.80 1.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2271.5 2277.0 2282.5 2288.5 2294.0 2299.8 litres/min

Take litres 5.50 5.50 6.00 5.50 5.80

2.50 Average Take l/m 5.50 5.50 6.00 5.50 5.80 5.66 1.29

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.476 MAX k= 1.48E-05

DETERMINATION:

MIN Lu= 1.016 MIN k= 1.02E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.016 AVG k= 1.02E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level taken after test.

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

2.50 5.01 7.58 5.01 2.50Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.8

5.3

7.9

5.3

2.8

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-77 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-11GT Packer Test.xls]6 Rev'd 08/31/09

SHEET 6 of 6

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 270.00 82.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 31-Aug-09 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 331.00 100.91 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 22445.0 22452.6 22460.0 22467.5 22475.0 22482.7 litres/min

Take litres 7.60 7.40 7.50 7.50 7.70

3.10 Average Take l/m 7.60 7.40 7.50 7.50 7.70 7.54 1.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 22540.0 22549.7 22558.9 22568.5 22578.0 22587.2 litres/min

Take litres 9.70 9.20 9.60 9.50 9.20

6.07 Average Take l/m 9.70 9.20 9.60 9.50 9.20 9.44 0.78

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 22622.0 22636.5 22649.5 22663.0 22676.0 22689.0 litres/min

Take litres 14.50 13.00 13.50 13.00 13.00

9.10 Average Take l/m 14.50 13.00 13.50 13.00 13.00 13.40 0.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 22721.0 22730.0 22739.0 22748.0 22757.0 22766.0 litres/min

Take litres 9.00 9.00 9.00 9.00 9.00

5.93 Average Take l/m 9.00 9.00 9.00 9.00 9.00 9.00 0.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 22780.0 22785.5 22791.0 22796.5 22802.0 22807.5 litres/min

Take litres 5.50 5.50 5.50 5.50 5.50

2.96 Average Take l/m 5.50 5.50 5.50 5.50 5.50 5.50 0.87

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.146 MAX k= 1.15E-05

DETERMINATION:

MIN Lu= 0.756 MIN k= 7.56E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.756 AVG k= 7.56E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 9'. Double packer system used.

No leakage observed at stuff box.

Water level taken pior to test, but is influenced by drilling. Water level rising when taken.

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:51

101-343/3 K09-11GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

3.10 6.07 9.10 5.93 2.96Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.5

6.5

9.5

6.4

3.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-78 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]4 Rev'd 09/04/09

SHEET 1 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 206.00 62.80

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 252.00 76.83 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 26670.0 26701.5 26732.0 26762.0 26793.0 26824.0 litres/min

Take litres 31.50 30.50 30.00 31.00 31.00

2.34 Average Take l/m 31.50 30.50 30.00 31.00 31.00 30.80 3.77

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27010.0 27055.5 27101.5 27147.0 27193.0 27237.5 litres/min

Take litres 45.50 46.00 45.50 46.00 44.50

4.69 Average Take l/m 45.50 46.00 45.50 46.00 44.50 45.50 3.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27390.0 27459.0 27527.5 27597.5 27667.5 27736.5 litres/min

Take litres 69.00 68.50 70.00 70.00 69.00

6.76 Average Take l/m 69.00 68.50 70.00 70.00 69.00 69.30 4.82

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 27986.0 28040.0 28095.0 28151.0 28205.0 28259.0 litres/min

Take litres 54.00 55.00 56.00 54.00 54.00

4.96 Average Take l/m 54.00 55.00 56.00 54.00 54.00 54.60 4.61

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28350.0 28384.0 28417.5 28450.5 28483.5 28516.0 litres/min

Take litres 34.00 33.50 33.00 33.00 32.50

2.07 Average Take l/m 34.00 33.50 33.00 33.00 32.50 33.20 4.26

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 4.825 MAX k= 4.82E-05

DETERMINATION:

MIN Lu= 3.768 MIN k= 3.77E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 4.286 AVG k= 4.29E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

During first attempt, leak observed in packer. On second (final) attempt quite some time to fill rods required. Suspect some leakage around packer at P3

TEST BY: BDP REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

1.0

2.0

3.0

4.0

5.0

6.0

2.34 4.69 6.76 4.96 2.07Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

5.8

8.2

10.2

8.4

5.6

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CD LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-79 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]5 Rev'd 09/4/09

SHEET 2 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 245.00 74.70

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 292.00 89.02 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 28967.0 28976.0 28984.5 28993.0 29001.0 29009.0 litres/min

Take litres 9.00 8.50 8.50 8.00 8.00

2.90 Average Take l/m 9.00 8.50 8.50 8.00 8.00 8.40 0.92

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29021.0 29035.0 29048.0 29061.0 29073.0 29085.0 litres/min

Take litres 14.00 13.00 13.00 12.00 12.00

5.79 Average Take l/m 14.00 13.00 13.00 12.00 12.00 12.80 0.96

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29172.0 29188.0 29203.0 29218.0 29233.0 29248.0 litres/min

Take litres 16.00 15.00 15.00 15.00 15.00

8.55 Average Take l/m 16.00 15.00 15.00 15.00 15.00 15.20 0.88

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29258.0 29269.0 29280.0 29290.0 29301.0 29312.0 litres/min

Take litres 11.00 11.00 10.00 11.00 11.00

5.72 Average Take l/m 11.00 11.00 10.00 11.00 11.00 10.80 0.82

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 29320.0 29328.0 29336.0 29344.0 29351.5 29359.0 litres/min

Take litres 8.00 8.00 8.00 7.50 7.50

2.90 Average Take l/m 8.00 8.00 8.00 7.50 7.50 7.80 0.85

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.963 MAX k= 9.63E-06

DETERMINATION:

MIN Lu= 0.819 MIN k= 8.19E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.853 AVG k= 8.53E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

Nitrogen bottle changed, water leaking out of stuffing box estimated at .25L/min

TEST BY: LS REVIEWED BY: CD

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

0.8

0.8

0.9

0.9

1.0

1.0

2.90 5.79 8.55 5.72 2.90Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.4

9.3

12.0

9.2

6.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 4SEP'09 ISSUED WITH REPORT 101-343/3-1 LS CD KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-80 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]6 Rev'd 09/4/09

SHEET 3 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 6

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 296.00 90.24

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 342.00 104.27 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9618.0 9627.5 9636.5 9645.0 9653.0 9660.5 litres/min

Take litres 9.50 9.00 8.50 8.00 7.50

3.45 Average Take l/m 9.50 9.00 8.50 8.00 7.50 8.50 0.87

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9666.0 9677.0 9686.5 9695.5 9705.0 9714.0 litres/min

Take litres 11.00 9.50 9.00 9.50 9.00

6.89 Average Take l/m 11.00 9.50 9.00 9.50 9.00 9.60 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9735.0 9746.0 9757.0 9768.0 9778.0 9788.0 litres/min

Take litres 11.00 11.00 11.00 10.00 10.00

10.34 Average Take l/m 11.00 11.00 11.00 10.00 10.00 10.60 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9795.0 9803.0 9810.0 9817.5 9825.0 9832.0 litres/min

Take litres 8.00 7.00 7.50 7.50 7.00

6.89 Average Take l/m 8.00 7.00 7.50 7.50 7.00 7.40 0.51

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9836.0 9841.0 9846.0 9851.0 9856.0 9860.5 litres/min

Take litres 5.00 5.00 5.00 5.00 4.50

3.45 Average Take l/m 5.00 5.00 5.00 5.00 4.50 4.90 0.50

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.874 MAX k= 8.74E-06

DETERMINATION:

MIN Lu= 0.504 MIN k= 5.04E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.504 AVG k= 5.04E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

No leakage from stuff box

TEST BY: CD REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.9

10.4

13.8

10.4

6.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 4SEP'09 ISSUED WITH REPORT 101-343/3-1 CDCD

LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-81 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]7 Rev'd 09/5/09

SHEET 4 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 7

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 346.00 105.49

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 392.00 119.51 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30054.0 30057.0 30060.0 30062.0 30065.0 30067.0 litres/min

Take litres 3.00 3.00 2.00 3.00 2.00

3.45 Average Take l/m 3.00 3.00 2.00 3.00 2.00 2.60 0.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30077.0 30080.0 30084.0 30087.0 30090.0 30093.0 litres/min

Take litres 3.00 4.00 3.00 3.00 3.00

6.89 Average Take l/m 3.00 4.00 3.00 3.00 3.00 3.20 0.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30101.0 30105.0 30109.0 30113.0 30117.0 30121.0 litres/min

Take litres 4.00 4.00 4.00 4.00 4.00

10.34 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30125.0 30128.0 30131.0 30133.0 30136.0 30139.0 litres/min

Take litres 3.00 3.00 2.00 3.00 3.00

6.89 Average Take l/m 3.00 3.00 2.00 3.00 3.00 2.80 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30142.0 30143.0 30145.0 30147.0 30149.0 30150.0 litres/min

Take litres 1.00 2.00 2.00 2.00 1.00

3.45 Average Take l/m 1.00 2.00 2.00 2.00 1.00 1.60 0.16

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.267 MAX k= 2.67E-06

DETERMINATION:

MIN Lu= 0.165 MIN k= 1.65E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.165 AVG k= 1.65E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

No leakage from stuff box

TEST BY: CNH REVIEWED BY: LS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.9

10.4

13.8

10.4

6.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CNHCD

LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-82 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]8 Rev'd 09/5/09

SHEET 5 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 8

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 396.00 120.73

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 442.00 134.76 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30348.0 30350.0 30353.0 30356.0 30358.0 30360.0 litres/min

Take litres 2.00 3.00 3.00 2.00 2.00

3.45 Average Take l/m 2.00 3.00 3.00 2.00 2.00 2.40 0.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30368.0 30371.0 30374.0 30378.0 30381.0 30384.0 litres/min

Take litres 3.00 3.00 4.00 3.00 3.00

6.89 Average Take l/m 3.00 3.00 4.00 3.00 3.00 3.20 0.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30393.0 30397.0 30401.0 30405.0 30409.0 30413.0 litres/min

Take litres 4.00 4.00 4.00 4.00 4.00

10.34 Average Take l/m 4.00 4.00 4.00 4.00 4.00 4.00 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30418.0 30421.0 30424.0 30427.0 30430.0 30432.0 litres/min

Take litres 3.00 3.00 3.00 3.00 2.00

6.89 Average Take l/m 3.00 3.00 3.00 3.00 2.00 2.80 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30436.0 30437.0 30439.0 30441.0 30443.0 30444.0 litres/min

Take litres 1.00 2.00 2.00 2.00 1.00

3.45 Average Take l/m 1.00 2.00 2.00 2.00 1.00 1.60 0.16

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.247 MAX k= 2.47E-06

DETERMINATION:

MIN Lu= 0.165 MIN k= 1.65E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.165 AVG k= 1.65E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

No leakage from stuff box

TEST BY: CNH REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

3.45 6.89 10.34 6.89 3.45Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

6.9

10.4

13.8

10.4

6.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 CNHCD

LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-83 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]9 Rev'd 09/5/09

SHEET 6 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 9

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 446.00 135.98

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 492.00 150.00 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30652.0 30656.0 30660.0 30663.5 30667.0 30670.0 litres/min

Take litres 4.00 4.00 3.50 3.50 3.00

3.52 Average Take l/m 4.00 4.00 3.50 3.50 3.00 3.60 0.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30675.0 30679.0 30683.5 30687.0 30691.0 30695.0 litres/min

Take litres 4.00 4.50 3.50 4.00 4.00

7.03 Average Take l/m 4.00 4.50 3.50 4.00 4.00 4.00 0.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30704.0 30785.0 30712.3 30716.5 30721.0 30724.5 litres/min

Take litres 81.00 -72.75 4.25 4.50 3.50

10.34 Average Take l/m 81.00 -72.75 4.25 4.50 3.50 4.10 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30731.0 30733.5 30736.0 30739.0 30742.0 30745.0 litres/min

Take litres 2.50 2.50 3.00 3.00 3.00

6.89 Average Take l/m 2.50 2.50 3.00 3.00 3.00 2.80 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30746.0 30748.0 30749.5 30751.0 30753.0 30755.0 litres/min

Take litres 2.00 1.50 1.50 2.00 2.00

3.52 Average Take l/m 2.00 1.50 1.50 2.00 2.00 1.80 0.18

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.367 MAX k= 3.67E-06

DETERMINATION:

MIN Lu= 0.183 MIN k= 1.83E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.183 AVG k= 1.83E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

Water leaking from stuffing box, ~0.1L/min, flowmeter in m3.

TEST BY: LS REVIEWED BY: JS

KITSAULT

TAILINGS MANAGEMENT FACILITY

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.4

3.52 7.03 10.34 6.89 3.52Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.0

10.5

13.8

10.4

7.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 LSCD

JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-84 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-13GT Packer Test.xls]10 Rev'd 09/6/09

SHEET 7 of 7

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 10

DIP: 90 oDEPTH GROUNDWATER: 34.0 m TOP OF TEST INTERVAL: 496.00 151.22

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 6-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 542.00 165.24 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30945.0 30946.0 30948.0 30949.0 30950.0 30952.0 litres/min

Take litres 1.00 2.00 1.00 1.00 2.00

3.52 Average Take l/m 1.00 2.00 1.00 1.00 2.00 1.40 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30956.0 30958.0 30960.0 30961.0 30963.0 30964.0 litres/min

Take litres 2.00 2.00 1.00 2.00 1.00

7.03 Average Take l/m 2.00 2.00 1.00 2.00 1.00 1.60 0.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30970.0 30972.0 30973.0 30975.0 30977.0 30978.0 litres/min

Take litres 2.00 1.00 2.00 2.00 1.00

10.34 Average Take l/m 2.00 1.00 2.00 2.00 1.00 1.60 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30979.0 30980.0 30981.0 30982.0 30983.0 30985.0 litres/min

Take litres 1.00 1.00 1.00 1.00 2.00

6.89 Average Take l/m 1.00 1.00 1.00 1.00 2.00 1.20 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 30985.5 30986.0 30987.0 30988.0 30988.5 30989.0 litres/min

Take litres 0.50 1.00 1.00 0.50 0.50

3.52 Average Take l/m 0.50 1.00 1.00 0.50 0.50 0.70 0.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.143 MAX k= 1.43E-06

DETERMINATION:

MIN Lu= 0.071 MIN k= 7.13E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.071 AVG k= 7.13E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:HW casing is installed to 95'. Double packer system used.

Flowmeter in m3.

TEST BY: CNH REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/12/09 12:26

101-343/3 K09-13GTKITSAULT

TAILINGS MANAGEMENT FACILITY

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

3.52 7.03 10.34 6.89 3.52Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

7.0

10.5

13.8

10.4

7.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 11OCT'09 ISSUED WITH REPORT 101-343/3-1 LSCD

JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-85 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]1 Rev'd 09/07/09

SHEET 1 of 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 26.00 7.93

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 7-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 72.00 21.95 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31371.0 31371.3 31371.8 31372.3 31372.8 31373.3 litres/min

Take litres 0.25 0.50 0.50 0.50 0.50

0.41 Average Take l/m 0.25 0.50 0.50 0.50 0.50 0.45 0.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31374.0 31374.3 31374.5 31374.8 31375.0 31375.3 litres/min

Take litres 0.25 0.25 0.25 0.25 0.25

0.62 Average Take l/m 0.25 0.25 0.25 0.25 0.25 0.25 0.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31375.5 31376.0 31376.3 31376.8 31377.0 31377.3 litres/min

Take litres 0.50 0.25 0.50 0.25 0.25

0.83 Average Take l/m 0.50 0.25 0.50 0.25 0.25 0.35 0.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31378.0 31378.1 31378.3 31378.5 31378.8 31379.0 litres/min

Take litres 0.10 0.15 0.25 0.25 0.25

0.62 Average Take l/m 0.10 0.15 0.25 0.25 0.25 0.20 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31379.0 31379.0 31379.1 31379.3 31379.5 31379.8 litres/min

Take litres 0.00 0.10 0.15 0.25 0.25

0.41 Average Take l/m 0.00 0.10 0.15 0.25 0.25 0.15 0.06

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.192 MAX k= 1.92E-06

DETERMINATION:

MIN Lu= 0.064 MIN k= 6.41E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.110 AVG k= 1.10E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water pressure gauge zeros at 5psi, all values adjusted accordingly.

No water leaking out of stuffing box,

Flowmeter moving very slowly.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 22:34

101-343/3 K09-14GTKITSAULT

PORT SITE

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.1

0.1

0.2

0.2

0.3

0.41 0.62 0.83 0.62 0.41Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

1.7

1.9

2.1

1.9

1.7

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 20SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-86 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]2 Rev'd 09/07/09

SHEET 1 of 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 71.00 21.65

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 8-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 121.67 37.09 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31413.5 31413.7 31413.9 31414.0 31414.0 31414.1 litres/min

Take litres 0.20 0.20 0.10 0.00 0.10

0.83 Average Take l/m 0.20 0.20 0.10 0.00 0.10 0.12 0.04

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31415.0 31415.3 31415.7 31416.0 31416.3 31416.7 litres/min

Take litres 0.30 0.40 0.30 0.30 0.40

1.59 Average Take l/m 0.30 0.40 0.30 0.30 0.40 0.34 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31417.8 31418.2 31418.8 31419.2 31419.8 31420.1 litres/min

Take litres 0.40 0.60 0.40 0.60 0.30

2.41 Average Take l/m 0.40 0.60 0.40 0.60 0.30 0.46 0.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31420.5 31420.8 31421.1 31421.3 31421.5 31421.8 litres/min

Take litres 0.30 0.30 0.20 0.20 0.30

1.59 Average Take l/m 0.30 0.30 0.20 0.20 0.30 0.26 0.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31421.9 31422.0 31422.1 31422.1 31422.2 31422.3 litres/min

Take litres 0.10 0.10 0.00 0.10 0.10

0.83 Average Take l/m 0.10 0.10 0.00 0.10 0.10 0.08 0.02

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.081 MAX k= 8.12E-07

DETERMINATION:

MIN Lu= 0.025 MIN k= 2.49E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.056 AVG k= 5.60E-07

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.

No water leaking out of stuffing box,

Flowmeter moving very slowly.

TEST BY: CNH REVIEWED BY: LS

KITSAULT

PORT SITE

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 22:34

101-343/3 K09-14GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.83 1.59 2.41 1.59 0.83Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.1

2.8

3.7

2.8

2.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CNH LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-87 of 93

M:\1\01\00343\03\A\Data\2009 SI Program\2009 WMF SI\Kitsault WMF SI 2009\K09-14GT\[K09-14GT Packer Test.xls]3 Rev'd 09/08/09

SHEET 1 of 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 11.8 m TOP OF TEST INTERVAL: 106.00 32.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 8-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 162.00 49.39 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31509.8 31510.3 31511.0 31511.7 31512.3 31513.0 litres/min

Take litres 0.50 0.70 0.70 0.60 0.70

1.24 Average Take l/m 0.50 0.70 0.70 0.60 0.70 0.64 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31515.2 31516.2 31517.1 31518.1 31519.2 31520.1 litres/min

Take litres 1.00 0.90 1.00 1.10 0.90

2.41 Average Take l/m 1.00 0.90 1.00 1.10 0.90 0.98 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31523.0 31524.3 31525.5 31526.8 31528.0 31529.2 litres/min

Take litres 1.30 1.20 1.30 1.20 1.20

3.65 Average Take l/m 1.30 1.20 1.30 1.20 1.20 1.24 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31530.3 31531.0 31531.7 31532.3 31533.0 31533.7 litres/min

Take litres 0.70 0.70 0.60 0.70 0.70

2.41 Average Take l/m 0.70 0.70 0.60 0.70 0.70 0.68 0.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 31533.9 31534.1 31534.2 31534.4 31534.7 31535.0 litres/min

Take litres 0.20 0.10 0.20 0.30 0.30

1.24 Average Take l/m 0.20 0.10 0.20 0.30 0.30 0.22 0.05

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.157 MAX k= 1.57E-06

DETERMINATION:

MIN Lu= 0.052 MIN k= 5.16E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.123 AVG k= 1.23E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.

No water leaking out of stuffing box,

Flowmeter moving very slowly.

TEST BY: CNH REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/07/09 22:34

101-343/3 K09-14GTKITSAULT

PORT SITE

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

1.24 2.41 3.65 2.41 1.24Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.5

3.7

4.9

3.7

2.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10OCT'09 ISSUED WITH REPORT 101-343/3 CNH LS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-88 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]1 Rev'd 09/10/09

SHEET 1 of 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 56.00 17.07

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 102.00 31.10 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32466.0 32499.0 32532.0 32566.0 32598.0 32633.0 litres/min

Take litres 33.00 33.00 34.00 32.00 35.00

1.17 Average Take l/m 33.00 33.00 34.00 32.00 35.00 33.40 8.88

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 32829.0 32871.0 32912.0 32953.0 32993.0 33031.0 litres/min

Take litres 42.00 41.00 41.00 40.00 38.00

1.59 Average Take l/m 42.00 41.00 41.00 40.00 38.00 40.40 9.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33136.0 33184.0 33227.0 33270.0 33312.0 33354.0 litres/min

Take litres 48.00 43.00 43.00 42.00 42.00

1.86 Average Take l/m 48.00 43.00 43.00 42.00 42.00 43.60 9.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33439.0 33467.0 33495.0 33524.0 33552.0 33581.0 litres/min

Take litres 28.00 28.00 29.00 28.00 29.00

1.52 Average Take l/m 28.00 28.00 29.00 28.00 29.00 28.40 6.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33628.0 33651.0 33675.0 33700.0 33724.0 33748.0 litres/min

Take litres 23.00 24.00 25.00 24.00 24.00

1.31 Average Take l/m 23.00 24.00 25.00 24.00 24.00 24.00 6.07

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 9.305 MAX k= 9.31E-05

DETERMINATION:

MIN Lu= 6.068 MIN k= 6.07E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 8.033 AVG k= 8.03E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close to bedrock contact.

TEST BY: CNH REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:33

101-343/3 K09-15GTKITSAULT

PATSY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

1.17 1.59 1.86 1.52 1.31Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.7

3.1

3.4

3.02.8

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-89 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]2 Rev'd 09/10/09

SHEET 2 of 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 106.00 32.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 152.00 46.34 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33828.0 33832.4 33837.5 33840.5 33844.3 33847.2 litres/min

Take litres 4.40 5.10 3.00 3.80 2.90

1.31 Average Take l/m 4.40 5.10 3.00 3.80 2.90 3.84 0.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33877.5 33883.6 33889.7 33895.6 33900.8 33906.2 litres/min

Take litres 6.10 6.10 5.90 5.20 5.40

2.48 Average Take l/m 6.10 6.10 5.90 5.20 5.40 5.74 1.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33940.8 33949.0 33956.3 33963.2 33970.5 33978.0 litres/min

Take litres 8.20 7.30 6.90 7.30 7.50

3.65 Average Take l/m 8.20 7.30 6.90 7.30 7.50 7.44 1.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 33982.2 33986.2 33990.0 33994.1 33997.9 34001.8 litres/min

Take litres 4.00 3.80 4.10 3.80 3.90

2.34 Average Take l/m 4.00 3.80 4.10 3.80 3.90 3.92 0.73

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34002.8 34004.1 34005.6 34007.0 34008.5 34010.3 litres/min

Take litres 1.30 1.50 1.40 1.50 1.80

1.17 Average Take l/m 1.30 1.50 1.40 1.50 1.80 1.50 0.40

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 1.027 MAX k= 1.03E-05

DETERMINATION:

MIN Lu= 0.399 MIN k= 3.99E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.829 AVG k= 8.29E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close to bedrock contact.

TEST BY: CNH REVIEWED BY: LS

KITSAULT

PATSY WASTE DUMP

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:33

101-343/3 K09-15GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.31 2.48 3.65 2.34 1.17Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

2.8

4.0

5.2

3.9

2.7

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-90 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]3 Rev'd 09/10/09

SHEET 3 of 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 14.2 m TOP OF TEST INTERVAL: 156.00 47.56

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 202.00 61.59 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34270.0 34290.0 34310.0 34330.0 34349.0 34368.0 litres/min

Take litres 20.00 20.00 20.00 19.00 19.00

1.79 Average Take l/m 20.00 20.00 20.00 19.00 19.00 19.60 4.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34395.0 34423.0 34451.0 34478.0 34505.0 34532.0 litres/min

Take litres 28.00 28.00 27.00 27.00 27.00

3.59 Average Take l/m 28.00 28.00 27.00 27.00 27.00 27.40 3.83

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34587.0 34626.0 34662.0 34698.0 34736.0 34773.0 litres/min

Take litres 39.00 36.00 36.00 38.00 37.00

5.38 Average Take l/m 39.00 36.00 36.00 38.00 37.00 37.20 3.85

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34814.0 34840.0 34866.0 34892.0 34918.0 34943.0 litres/min

Take litres 26.00 26.00 26.00 26.00 25.00

3.52 Average Take l/m 26.00 26.00 26.00 26.00 25.00 25.80 3.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 34960.0 34973.0 34986.0 35000.0 35014.0 35028.0 litres/min

Take litres 13.00 13.00 14.00 14.00 14.00

1.72 Average Take l/m 13.00 13.00 14.00 14.00 14.00 13.60 3.00

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 4.232 MAX k= 4.23E-05

DETERMINATION:

MIN Lu= 2.999 MIN k= 3.00E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 3.715 AVG k= 3.72E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres, water level assumed to be close bedrock contact.

TEST BY: CNH REVIEWED BY: LS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:33

101-343/3 K09-15GTKITSAULT

PATSY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

1.79 3.59 5.38 3.52 1.72Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.3

5.1

6.9

5.0

3.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-91 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]4 Rev'd 09/10/09

SHEET 4 of 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 12.0 m TOP OF TEST INTERVAL: 201.00 61.28

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 262.00 79.88 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35119.0 35120.0 35121.0 35122.0 35123.0 35124.0 litres/min

Take litres 1.00 1.00 1.00 1.00 1.00

2.21 Average Take l/m 1.00 1.00 1.00 1.00 1.00 1.00 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35128.0 35129.0 35131.0 35132.0 35134.0 35136.0 litres/min

Take litres 1.00 2.00 1.00 2.00 2.00

4.48 Average Take l/m 1.00 2.00 1.00 2.00 2.00 1.60 0.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35137.0 35139.0 35141.5 35143.5 35145.5 35147.5 litres/min

Take litres 2.00 2.50 2.00 2.00 2.00

6.76 Average Take l/m 2.00 2.50 2.00 2.00 2.00 2.10 0.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35149.0 35150.0 35151.5 35152.5 35154.0 35155.0 litres/min

Take litres 1.00 1.50 1.00 1.50 1.00

4.48 Average Take l/m 1.00 1.50 1.00 1.50 1.00 1.20 0.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35156.0 35156.8 35156.3 35158.0 35158.5 35159.0 litres/min

Take litres 0.75 -0.50 1.75 0.50 0.50

2.21 Average Take l/m 0.75 -0.50 1.75 0.50 0.50 0.60 0.09

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.154 MAX k= 1.54E-06

DETERMINATION:

MIN Lu= 0.092 MIN k= 9.22E-07

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.092 AVG k= 9.22E-07

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.

Water leaking out of stuffing box estimated at 0.2L/min.

Pressure gauge zeros at 4psi, all values adjusted accordingly.

TEST BY: LS REVIEWED BY: JS

KITSAULT

PATSY WASTE DUMP

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:33

101-343/3 K09-15GT

STAGE PRESSURE VERSUS LUGEON VALUE

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

2.21 4.48 6.76 4.48 2.21Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

3.5

5.8

8.0

5.8

3.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 0.50 1.00 1.50 2.00 2.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-92 of 93

C:\Documents and Settings\lshannon\Desktop\[K09-15GT Packer Test.xls]5 Rev'd 09/10/09

SHEET 5 of 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 12.0 m TOP OF TEST INTERVAL: 256.00 78.05

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 10-Sep-09 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 312.00 95.12 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35392.1 35394.1 35396.0 35397.9 35399.8 35401.4 litres/min

Take litres 2.00 1.90 1.90 1.90 1.60

3.10 Average Take l/m 2.00 1.90 1.90 1.90 1.60 1.86 0.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35405.9 35408.9 35411.7 35414.6 35417.3 35420.1 litres/min

Take litres 3.00 2.80 2.90 2.70 2.80

6.21 Average Take l/m 3.00 2.80 2.90 2.70 2.80 2.84 0.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35427.2 35431.4 35435.3 35439.2 35443.2 35447.4 litres/min

Take litres 4.20 3.90 3.90 4.00 4.20

9.10 Average Take l/m 4.20 3.90 3.90 4.00 4.20 4.04 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35450.8 35453.7 35456.6 35459.8 35462.7 35465.8 litres/min

Take litres 2.90 2.90 3.20 2.90 3.10

6.21 Average Take l/m 2.90 2.90 3.20 2.90 3.10 3.00 0.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 35468.8 35470.3 35471.9 35473.7 35475.4 35477.0 litres/min

Take litres 1.50 1.60 1.80 1.70 1.60

3.10 Average Take l/m 1.50 1.60 1.80 1.70 1.60 1.64 0.22

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.248 MAX k= 2.48E-06

DETERMINATION:

MIN Lu= 0.219 MIN k= 2.19E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.219 AVG k= 2.19E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Flowmeter in cubic metres.

Water leaking out of stuffing box estimated at 0.2L/min.

Pressure gauge zeros at 4psi, all values adjusted accordingly.

TEST BY: LS REVIEWED BY: JS

LUGEON TEST FIELD DATA SHEET

Print 10/08/09 14:33

101-343/3 K09-15GTKITSAULT

PATSY WASTE DUMP

STAGE PRESSURE VERSUS LUGEON VALUE

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.3

0.3

3.10 6.21 9.10 6.21 3.10Stage Gauge Pressure (BAR)

Lu

geo

ns

FLOW VERSUS PRESSURE PLOT

4.4

7.5

10.4

7.5

4.4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Q (l/m)

Pre

ss

ure

(B

ars

)

Note: Permeability calculation dependent upon flow classification:

0 10SEP'09 ISSUED WITH REPORT 101-343/3 LS JS KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

B1-93 of 93

VA101-343/9-3 Rev 0 June 17, 2011

APPENDIX B2

2010 PACKER TESTS

(Pages B2-1 to B2-56)

SHEET 1 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 13.2 m TOP OF TEST INTERVAL: 49.50 15.09

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 128.00 39.02 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 407.0 442.0 476.0 512.0 545.0 580.0 litres/min

Take litres 35.00 34.00 36.00 33.00 35.00

0.55 Average Take l/m 35.00 34.00 36.00 33.00 35.00 34.60 7.49

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 609.0 647.0 685.0 723.0 761.0 800.0 litres/min

Take litres 38.00 38.00 38.00 38.00 39.00

0.97 Average Take l/m 38.00 38.00 38.00 38.00 39.00 38.20 6.81

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 839.0 886.0 931.0 979.0 1027.0 1075.0 litres/min

Take litres 47.00 45.00 48.00 48.00 48.00

1.38 Average Take l/m 47.00 45.00 48.00 48.00 48.00 47.20 7.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1097.0 1138.0 1197.0 1219.0 1260.0 1301.0 litres/min

Take litres 41.00 59.00 22.00 41.00 41.00

0.90 Average Take l/m 41.00 59.00 22.00 41.00 41.00 40.80 7.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1322.0 1354.0 1386.0 1419.0 1452.0 1486.0 litres/min

Take litres 32.00 32.00 33.00 33.00 34.00

0.55 Average Take l/m 32.00 32.00 33.00 33.00 34.00 32.80 7.10

K10-04GTKITSAULT PROJECT

Centre of Southeast Embankment

Print 11/12/10 10:37

LUGEON TEST FIELD DATA SHEET

VA101-343/6

7.6 STAGE PRESSURE VERSUS LUGEON VALUE

2.8

3.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 7.496 MAX k= 7.50E-05

DETERMINATION:

MIN Lu= 6.812 MIN k= 6.81E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.496 AVG k= 7.50E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 1

6.4

6.6

6.8

7.0

7.2

7.4

7.6

0.55 0.97 1.38 0.90 0.55

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.9

2.3

2.8

2.3

1.9

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

B2-1 of 56

SHEET 2 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 11.5 m TOP OF TEST INTERVAL: 124.50 37.96

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 198.00 60.37 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1562.0 1567.0 1572.0 1577.0 1582.0 1587.0 litres/min

Take litres 5.00 5.00 5.00 5.00 5.00

1.65 Average Take l/m 5.00 5.00 5.00 5.00 5.00 5.00 0.78

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1593.0 1599.0 1605.0 1611.0 1617.0 1623.0 litres/min

Take litres 6.00 6.00 6.00 6.00 6.00

3.10 Average Take l/m 6.00 6.00 6.00 6.00 6.00 6.00 0.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1628.0 1636.0 1643.0 1652.0 1695.0 1666.0 litres/min

Take litres 8.00 7.00 9.00 43.00 -29.00

4.69 Average Take l/m 8.00 7.00 9.00 43.00 -29.00 7.60 0.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1670.0 1676.0 1681.0 1687.0 1693.0 1699.0 litres/min

Take litres 6.00 5.00 6.00 6.00 6.00

2.76 Average Take l/m 6.00 5.00 6.00 6.00 6.00 5.80 0.65

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1703.0 1707.0 1712.0 1716.0 1721.0 1725.0 litres/min

Take litres 4.00 5.00 4.00 5.00 4.00

1.59 Average Take l/m 4.00 5.00 4.00 5.00 4.00 4.40 0.70

K10-04GTKITSAULT PROJECT

Centre of Southeast Embankment

Print 11/12/10 10:37

LUGEON TEST FIELD DATA SHEET

VA101-343/6

0.8

0.9 STAGE PRESSURE VERSUS LUGEON VALUE

5 96 0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.779 MAX k= 7.79E-06

DETERMINATION:

MIN Lu= 0.575 MIN k= 5.75E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.575 AVG k= 5.75E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: JS / BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 2

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.65 3.10 4.69 2.76 1.59

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.9

4.3

5.9

4.0

2.8

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

B2-2 of 56

SHEET 3 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 14.1 m TOP OF TEST INTERVAL: 192.50 58.69

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 263.00 80.18 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1849.8 1851.3 1852.8 1854.4 1855.9 1857.4 litres/min

Take litres 1.50 1.50 1.60 1.50 1.50

2.14 Average Take l/m 1.50 1.50 1.60 1.50 1.50 1.52 0.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1841.6 1843.1 1846.5 1841.1 1851.3 1853.6 litres/min

Take litres 1.50 3.40 -5.40 10.20 2.30

4.14 Average Take l/m 1.50 3.40 -5.40 10.20 2.30 2.40 0.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1855.1 1857.3 1859.7 1862.0 1864.3 1866.6 litres/min

Take litres 2.20 2.40 2.30 2.30 2.30

6.69 Average Take l/m 2.20 2.40 2.30 2.30 2.30 2.30 0.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1868.7 1870.6 1872.6 1874.6 1876.6 1878.6 litres/min

Take litres 1.90 2.00 2.00 2.00 2.00

3.86 Average Take l/m 1.90 2.00 2.00 2.00 2.00 1.98 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1879.7 1881.3 1882.8 1884.4 1885.9 1887.3 litres/min

Take litres 1.60 1.50 1.60 1.50 1.40

2.48 Average Take l/m 1.60 1.50 1.60 1.50 1.40 1.52 0.18

VA101-343/6 K10-04GTKITSAULT PROJECT

Centre of Southeast Embankment

Print 11/12/10 10:37

LUGEON TEST FIELD DATA SHEET

0.3 STAGE PRESSURE VERSUS LUGEON VALUE

8.28.0

9.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.199 MAX k= 1.99E-06

DETERMINATION:

MIN Lu= 0.131 MIN k= 1.31E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.131 AVG k= 1.31E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 3

0.0

0.1

0.1

0.2

0.2

0.3

2.14 4.14 6.69 3.86 2.48

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

3.6

5.6

8.2

5.3

4.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 4 B2-3 of 56

SHEET 4 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 19.7 m TOP OF TEST INTERVAL: 254.50 77.59

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 328.00 100.00 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2564.0 2660.0 2743.0 2833.0 2919.0 3010.0 litres/min

Take litres 96.00 83.00 90.00 86.00 91.00

2.96 Average Take l/m 96.00 83.00 90.00 86.00 91.00 89.20 7.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3212.0 3322.0 3440.0 3540.0 3650.0 3770.0 litres/min

Take litres 110.00 118.00 100.00 110.00 120.00

6.00 Average Take l/m 110.00 118.00 100.00 110.00 120.00 111.60 6.20

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3970.0 4107.0 4245.0 4384.0 4524.0 4660.0 litres/min

Take litres 137.00 138.00 139.00 140.00 136.00

8.96 Average Take l/m 137.00 138.00 139.00 140.00 136.00 138.00 5.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4765.0 4895.0 5024.0 5150.0 5278.0 5408.0 litres/min

Take litres 130.00 129.00 126.00 128.00 130.00

6.00 Average Take l/m 130.00 129.00 126.00 128.00 130.00 128.60 7.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5612.0 5727.0 5839.0 5944.0 6054.0 6162.0 litres/min

Take litres 115.00 112.00 105.00 110.00 108.00

2.96 Average Take l/m 115.00 112.00 105.00 110.00 108.00 110.00 9.83

K10-04GTKITSAULT PROJECT

Centre of Southeast Embankment

Print 11/12/10 10:37

LUGEON TEST FIELD DATA SHEET

VA101-343/6

12.0 STAGE PRESSURE VERSUS LUGEON VALUE

11.0

12.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 9.828 MAX k= 9.83E-05

DETERMINATION:

MIN Lu= 5.602 MIN k= 5.60E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 5.602 AVG k= 5.60E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: BH REVIEWED BY: JS

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-04GT packer tests.xls]Test 4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

2.96 6.00 8.96 6.00 2.96

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

5.0

8.0

11.0

8.0

5.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 20SEPT'10 BH JSISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 4 B2-4 of 56

SHEET 1 OF 1

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 22.0 m TOP OF TEST INTERVAL: 74.50 22.71

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 6-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.6 m BOTTOM OF TEST INTERVAL: 131.00 39.94 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6920.0 6932.6 6944.5 6956.4 6968.7 6980.1 litres/min

Take litres 12.60 11.90 11.90 12.30 11.40

1.03 Average Take l/m 12.60 11.90 11.90 12.30 11.40 12.02 2.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6987.0 7001.4 7015.4 7028.8 7042.7 7056.5 litres/min

Take litres 14.40 14.00 13.40 13.90 13.80

1.45 Average Take l/m 14.40 14.00 13.40 13.90 13.80 13.90 2.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7063.0 7083.0 7103.0 7123.0 7142.6 7162.1 litres/min

Take litres 20.00 20.00 20.00 19.60 19.50

2.34 Average Take l/m 20.00 20.00 20.00 19.60 19.50 19.82 2.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7168.0 7182.5 7197.0 7212.0 7228.8 7244.7 litres/min

Take litres 14.50 14.50 15.00 16.80 15.90

1.24 Average Take l/m 14.50 14.50 15.00 16.80 15.90 15.34 2.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7252.7 7263.2 7275.0 7286.8 7298.7 7310.2 litres/min

Take litres 10.50 11.80 11.80 11.90 11.50

0.90 Average Take l/m 10.50 11.80 11.80 11.90 11.50 11.50 2.12

VA101-343/6 K10-05GT

Print 11/12/10 10:36

KITSAULT PROJECT

Centre of Southeast Embankment

LUGEON TEST FIELD DATA SHEET

3.0 STAGE PRESSURE VERSUS LUGEON VALUE

4.64.5

5.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 2.547 MAX k= 2.55E-05

DETERMINATION:

MIN Lu= 2.118 MIN k= 2.12E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.293 AVG k= 2.29E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-05GT packer tests.xls]Test 1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

1.03 1.45 2.34 1.24 0.90

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

3.3

3.7

4.6

3.5

3.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 5.00 10.00 15.00 20.00 25.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30 NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 1 B2-5 of 56

SHEET 1 OF 1

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 4.0 m TOP OF TEST INTERVAL: 61.00 18.60

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 8-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.9 m BOTTOM OF TEST INTERVAL: 116.50 35.52 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7554.5 7555.6 7556.8 7558.0 7559.2 7560.3 litres/min

Take litres 1.10 1.20 1.20 1.20 1.10

0.76 Average Take l/m 1.10 1.20 1.20 1.20 1.10 1.16 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7561.5 7562.8 7564.1 7565.3 7566.5 7567.7 litres/min

Take litres 1.30 1.30 1.20 1.20 1.20

1.59 Average Take l/m 1.30 1.30 1.20 1.20 1.20 1.24 0.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7568.7 7570.3 7572.1 7573.6 7575.3 7576.9 litres/min

Take litres 1.60 1.80 1.50 1.70 1.60

2.28 Average Take l/m 1.60 1.80 1.50 1.70 1.60 1.64 0.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7577.6 7578.8 7580.0 7581.3 7582.5 7583.7 litres/min

Take litres 1.20 1.20 1.30 1.20 1.20

1.59 Average Take l/m 1.20 1.20 1.30 1.20 1.20 1.22 0.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7583.9 7584.8 7585.7 7586.6 7587.5 7588.5 litres/min

Take litres 0.90 0.90 0.90 0.90 1.00

0.69 Average Take l/m 0.90 0.90 0.90 0.90 1.00 0.92 0.46

VA101-343/6 K10-06GTKITSAULT PROJECT

Down gradient of TMF South Embankment

Print 11/12/10 10:40

LUGEON TEST FIELD DATA SHEET

0.6 STAGE PRESSURE VERSUS LUGEON VALUE

2.8

3.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 0.552 MAX k= 5.52E-06

DETERMINATION:

MIN Lu= 0.348 MIN k= 3.48E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.351 AVG k= 3.51E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units: PSI

TEST BY: JS REVIEWED BY: JS

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-06GT packer tests.xls]Test 1

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.76 1.59 2.28 1.59 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.2

2.1

2.8

2.1

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 1 B2-6 of 56

SHEET 1 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 20.9 m TOP OF TEST INTERVAL: 138.80 42.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 15-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 214.25 65.32 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 540.0 593.0 644.0 695.0 746.0 797.0 litres/min

Take litres 53.00 51.00 51.00 51.00 51.00

1.52 Average Take l/m 53.00 51.00 51.00 51.00 51.00 51.40 5.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 835.0 905.0 971.0 1040.0 1108.0 1176.0 litres/min

Take litres 70.00 66.00 69.00 68.00 68.00

2.96 Average Take l/m 70.00 66.00 69.00 68.00 68.00 68.20 5.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1206.0 1288.0 1371.0 1454.0 1536.0 1619.0 litres/min

Take litres 82.00 83.00 83.00 82.00 83.00

4.48 Average Take l/m 82.00 83.00 83.00 82.00 83.00 82.60 5.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1683.0 1750.0 1818.0 1888.0 1950.0 2017.0 litres/min

Take litres 67.00 68.00 70.00 62.00 67.00

2.96 Average Take l/m 67.00 68.00 70.00 62.00 67.00 66.80 5.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2043.0 2095.0 2145.0 2191.0 2242.0 2292.0 litres/min

Take litres 52.00 50.00 46.00 51.00 50.00

1.52 Average Take l/m 52.00 50.00 46.00 51.00 50.00 49.80 5.76

VA101-343/6 K10-09GT

Print 11/12/10 10:50

KITSAULT PROJECT

Plant Site

LUGEON TEST FIELD DATA SHEET

5.9

6.0 STAGE PRESSURE VERSUS LUGEON VALUE

6 77.0

8.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL MAX Lu= 5.948 MAX k= 5.95E-05

DETERMINATION:

MIN Lu= 5.342 MIN k= 5.34E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 5.342 AVG k= 5.34E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Flowmeter units:

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-09GT packer tests.xls]Test 1

5.0

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8

5.9

6.0

1.52 2.96 4.48 2.96 1.52

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

3.8

5.2

6.7

5.2

3.8

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED WITH REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 2 B2-7 of 56

SHEET 2 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 21.6 m TOP OF TEST INTERVAL: 208.25 63.49

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 16-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 264.25 80.56 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2523.0 2584.0 2649.0 2716.0 2784.0 2852.0 litres/min

Take litres 61.00 65.00 67.00 68.00 68.00

1.79 Average Take l/m 61.00 65.00 67.00 68.00 68.00 65.80 9.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3577.0 3654.0 3730.0 3807.0 3883.0 3960.0 litres/min

Take litres 77.00 76.00 77.00 76.00 77.00

2.90 Average Take l/m 77.00 76.00 77.00 76.00 77.00 76.60 8.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3074.0 3160.0 3246.0 3331.0 3416.0 3501.0 litres/min

Take litres 86.00 86.00 85.00 85.00 85.00

4.14 Average Take l/m 86.00 86.00 85.00 85.00 85.00 85.40 7.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4964.0 5038.0 5113.0 5188.0 5263.0 5340.0 litres/min

Take litres 74.00 75.00 75.00 75.00 77.00

2.69 Average Take l/m 74.00 75.00 75.00 75.00 77.00 75.20 8.81

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4564.0 4629.0 4694.0 4760.0 4824.0 4890.0 litres/min

Take litres 65.00 65.00 66.00 64.00 66.00

2.07 Average Take l/m 65.00 65.00 66.00 64.00 66.00 65.20 8.73

KITSAULT PROJECT

Plant Site

Print 11/12/10 10:50

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-09GT

9.0

10.0 STAGE PRESSURE VERSUS LUGEON VALUE

6.46 0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 9.399 MAX k= 9.40E-05

DETERMINATION:

MIN Lu= 7.761 MIN k= 7.76E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.761 AVG k= 7.76E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-09GT packer tests.xls]Test 2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

1.79 2.90 4.14 2.69 2.07

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.1

5.2

6.4

5.0

4.4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 2 B2-8 of 56

SHEET 1 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 49.50 15.09

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 75.30 22.96 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5412.0 5415.1 5418.3 5421.4 5424.4 5427.3 litres/min

Take litres 3.10 3.20 3.10 3.00 2.90

0.55 Average Take l/m 3.10 3.20 3.10 3.00 2.90 3.06 5.90

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5432.0 5435.9 5439.6 5443.2 5446.7 5450.1 litres/min

Take litres 3.90 3.70 3.60 3.50 3.40

1.17 Average Take l/m 3.90 3.70 3.60 3.50 3.40 3.62 3.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5455.0 5459.1 5463.1 5467.1 5471.0 5474.9 litres/min

Take litres 4.10 4.00 4.00 3.90 3.90

1.65 Average Take l/m 4.10 4.00 4.00 3.90 3.90 3.98 2.87

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5477.4 5480.6 5484.0 5486.8 5490.0 5493.1 litres/min

Take litres 3.20 3.40 2.80 3.20 3.10

1.10 Average Take l/m 3.20 3.40 2.80 3.20 3.10 3.14 3.30

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5495.0 5497.5 5500.0 5502.5 5505.0 5507.4 litres/min

Take litres 2.50 2.50 2.50 2.50 2.40

0.55 Average Take l/m 2.50 2.50 2.50 2.50 2.40 2.48 4.78

VA101-343/6 K10-12GTKITSAULT PROJECT

Plant Site

Print 11/12/10 10:59

LUGEON TEST FIELD DATA SHEET

6 0

7.0 STAGE PRESSURE VERSUS LUGEON VALUE

1.81.8

2.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 5.898 MAX k= 5.90E-05

DETERMINATION:

MIN Lu= 2.870 MIN k= 2.87E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.870 AVG k= 2.87E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Gauge pressures were steady for test, no leaks were noticed.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-12GT packer tests.xls]Test 1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.55 1.17 1.65 1.10 0.55

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

1.3

1.8

1.2

0.7

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 2 B2-9 of 56

SHEET 2 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 17.3 m TOP OF TEST INTERVAL: 69.50 21.19

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 120.30 36.68 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5629.0 5655.0 5682.0 5710.0 5737.0 5764.0 litres/min

Take litres 26.00 27.00 28.00 27.00 27.00

0.48 Average Take l/m 26.00 27.00 28.00 27.00 27.00 27.00 7.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 5806.0 5846.0 5885.0 5925.0 5964.0 6004.0 litres/min

Take litres 40.00 39.00 40.00 39.00 40.00

1.38 Average Take l/m 40.00 39.00 40.00 39.00 40.00 39.60 7.92

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6116.0 6169.0 6223.0 6276.0 6326.0 6377.0 litres/min

Take litres 53.00 54.00 53.00 50.00 51.00

2.07 Average Take l/m 53.00 54.00 53.00 50.00 51.00 52.20 8.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6420.0 6463.0 6505.0 6547.0 6589.0 6632.0 litres/min

Take litres 43.00 42.00 42.00 42.00 43.00

1.45 Average Take l/m 43.00 42.00 42.00 42.00 43.00 42.40 8.30

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6686.0 6718.0 6749.0 6780.0 6812.0 6844.0 litres/min

Take litres 32.00 31.00 31.00 32.00 32.00

0.76 Average Take l/m 32.00 31.00 31.00 32.00 32.00 31.60 7.82

Print 11/12/10 10:59

KITSAULT PROJECT

Plant Site

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-12GT

8.6

8.8 STAGE PRESSURE VERSUS LUGEON VALUE

3.94.0

4.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 8.601 MAX k= 8.60E-05

DETERMINATION:

MIN Lu= 7.474 MIN k= 7.47E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.879 AVG k= 7.88E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS: NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-12GT packer tests.xls]Test 2

6.8

7.0

7.2

7.4

7.6

7.8

8.0

8.2

8.4

8.6

8.8

0.48 1.38 2.07 1.45 0.76

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.3

3.2

3.9

3.3

2.6

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 10.00 20.00 30.00 40.00 50.00 60.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 2 B2-10 of 56

SHEET 1 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 34.50 10.52

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 20-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 60.00 18.29 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6958.0 6972.0 6986.0 7000.0 7014.0 7027.0 litres/min

Take litres 14.00 14.00 14.00 14.00 13.00

0.48 Average Take l/m 14.00 14.00 14.00 14.00 13.00 13.80 28.51

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7065.0 7080.0 7096.0 7111.0 7127.0 7142.0 litres/min

Take litres 15.00 16.00 15.00 16.00 15.00

0.76 Average Take l/m 15.00 16.00 15.00 16.00 15.00 15.40 22.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7194.0 7213.5 7233.4 7253.4 7273.4 7293.1 litres/min

Take litres 19.50 19.90 20.00 20.00 19.70

1.24 Average Take l/m 19.50 19.90 20.00 20.00 19.70 19.82 18.46

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7313.0 7326.0 7339.4 7352.6 7366.0 7379.7 litres/min

Take litres 13.00 13.40 13.20 13.40 13.70

0.76 Average Take l/m 13.00 13.40 13.20 13.40 13.70 13.34 19.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7395.0 7405.7 7416.4 7427.4 7438.4 7449.0 litres/min

Take litres 10.70 10.70 11.00 11.00 10.60

0.34 Average Take l/m 10.70 10.70 11.00 11.00 10.60 10.80 28.66

Print 11/12/10 11:04

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-13GTKITSAULT PROJECT

Coarse Ore Stockpile

30 0

35.0 STAGE PRESSURE VERSUS LUGEON VALUE

1.41.4

1.6FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 28.658 MAX k= 2.87E-04

DETERMINATION:

MIN Lu= 18.460 MIN k= 1.85E-04

INTERPRETATION cm/s

REFERENCE: AVG Lu= 18.460 AVG k= 1.85E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 1

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

0.48 0.76 1.24 0.76 0.34

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.6

0.9

1.4

0.9

0.5

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

0.00 5.00 10.00 15.00 20.00 25.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 4 B2-11 of 56

SHEET 2 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 54.50 16.62

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 95.10 28.99 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7504.0 7518.0 7533.0 7547.0 7561.0 7575.0 litres/min

Take litres 14.00 15.00 14.00 14.00 14.00

0.69 Average Take l/m 14.00 15.00 14.00 14.00 14.00 14.20 13.83

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7582.0 7602.0 7621.0 7636.0 7654.0 7672.0 litres/min

Take litres 20.00 19.00 15.00 18.00 18.00

1.38 Average Take l/m 20.00 19.00 15.00 18.00 18.00 18.00 9.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7689.0 7710.0 7732.0 7753.0 7774.0 7795.0 litres/min

Take litres 21.00 22.00 21.00 21.00 21.00

2.07 Average Take l/m 21.00 22.00 21.00 21.00 21.00 21.20 7.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7814.0 7829.0 7845.0 7860.0 7875.0 7891.0 litres/min

Take litres 15.00 16.00 15.00 15.00 16.00

1.38 Average Take l/m 15.00 16.00 15.00 15.00 16.00 15.40 8.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7901.0 7915.0 7921.0 7932.0 7942.0 7952.0 litres/min

Take litres 14.00 6.00 11.00 10.00 10.00

0.69 Average Take l/m 14.00 6.00 11.00 10.00 10.00 10.20 9.93

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-13GTKITSAULT PROJECT

Coarse Ore Stockpile

Print 11/12/10 11:04

14.0

16.0 STAGE PRESSURE VERSUS LUGEON VALUE

2.2

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 13.830 MAX k= 1.38E-04

DETERMINATION:

MIN Lu= 7.755 MIN k= 7.76E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.755 AVG k= 7.76E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Results are misleading because the rock from 55-65ft is highly fractured and the rock from 65-95is very tight with almost no joints.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.5

2.2

1.5

0.8

0.0

0.5

1.0

1.5

2.0

2.5

0.00 5.00 10.00 15.00 20.00 25.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 4 B2-12 of 56

SHEET 3 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 30.2 m TOP OF TEST INTERVAL: 94.60 28.84

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 130.10 39.66 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7977.3 7979.0 7980.5 7981.9 7983.4 7984.8 litres/min

Take litres 1.70 1.50 1.40 1.50 1.40

0.97 Average Take l/m 1.70 1.50 1.40 1.50 1.40 1.50 0.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7987.0 7989.0 7990.8 7992.7 7994.5 7996.4 litres/min

Take litres 2.00 1.80 1.90 1.80 1.90

2.07 Average Take l/m 2.00 1.80 1.90 1.80 1.90 1.88 0.33

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7999.0 8001.2 8003.1 8005.2 8007.0 8008.9 litres/min

Take litres 2.20 1.90 2.10 1.80 1.90

3.10 Average Take l/m 2.20 1.90 2.10 1.80 1.90 1.98 0.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8009.7 8011.2 8012.7 8014.2 8015.6 8017.1 litres/min

Take litres 1.50 1.50 1.50 1.40 1.50

2.07 Average Take l/m 1.50 1.50 1.50 1.40 1.50 1.48 0.26

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8017.7 8018.8 8019.9 8021.0 8022.0 8023.1 litres/min

Take litres 1.10 1.10 1.10 1.00 1.10

0.97 Average Take l/m 1.10 1.10 1.10 1.00 1.10 1.08 0.24

Print 11/12/10 11:04

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-13GTKITSAULT PROJECT

Coarse Ore Stockpile

0.4

0.4 STAGE PRESSURE VERSUS LUGEON VALUE

6.36 0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.336 MAX k= 3.36E-06

DETERMINATION:

MIN Lu= 0.242 MIN k= 2.42E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.242 AVG k= 2.42E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Gauge pressures were very erratic for P2 and P3. Minor leak out of casing was noticed. Rock RQD was very high.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 3

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.4

0.97 2.07 3.10 2.07 0.97

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.1

5.2

6.3

5.2

4.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.50 1.00 1.50 2.00 2.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 4 B2-13 of 56

SHEET 4 OF 4

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 30.2 m TOP OF TEST INTERVAL: 129.00 39.33

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 21-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 165.00 50.30 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8302.0 8356.0 8409.0 8462.0 8516.0 8570.0 litres/min

Take litres 54.00 53.00 53.00 54.00 54.00

1.45 Average Take l/m 54.00 53.00 53.00 54.00 54.00 53.60 10.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 8760.0 8825.0 8889.0 8954.0 9017.0 9082.0 litres/min

Take litres 65.00 64.00 65.00 63.00 65.00

2.96 Average Take l/m 65.00 64.00 65.00 63.00 65.00 64.40 9.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9265.0 9338.0 9410.0 9483.0 9556.0 9628.0 litres/min

Take litres 73.00 72.00 73.00 73.00 72.00

4.14 Average Take l/m 73.00 72.00 73.00 73.00 72.00 72.60 9.07

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 9799.0 9860.0 9921.0 9982.0 10043.0 10104.0 litres/min

Take litres 61.00 61.00 61.00 61.00 61.00

2.76 Average Take l/m 61.00 61.00 61.00 61.00 61.00 61.00 9.39

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10313.0 10365.0 10417.0 10468.0 10520.0 10572.0 litres/min

Take litres 52.00 52.00 51.00 52.00 52.00

1.17 Average Take l/m 52.00 52.00 51.00 52.00 52.00 51.80 10.89

Print 11/12/10 11:04

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-13GTKITSAULT PROJECT

Coarse Ore Stockpile

12.0 STAGE PRESSURE VERSUS LUGEON VALUE

7.37.0

8.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 10.894 MAX k= 1.09E-04

DETERMINATION:

MIN Lu= 9.065 MIN k= 9.07E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 9.065 AVG k= 9.07E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-13GT packer tests.xls]Test 4

0.0

2.0

4.0

6.0

8.0

10.0

12.0

1.45 2.96 4.14 2.76 1.17

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.6

6.1

7.3

5.9

4.3

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 230NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 4 B2-14 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 34.90 10.64

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 22-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 70.40 21.46 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10757.5 10759.3 10761.2 10763.1 10764.9 10766.8 10768.6 litres/min

Take litres 1.80 1.90 1.90 1.80 1.90 1.8

0.48 Average Take l/m 1.80 1.90 1.90 1.80 1.90 1.8 1.85 2.88

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10773.4 10775.6 10777.6 10779.7 10781.8 10783.8 litres/min

Take litres 2.15 2.05 2.10 2.10 2.00

0.69 Average Take l/m 2.15 2.05 2.10 2.10 2.00 2.08 2.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10787.4 10789.8 10792.1 10794.5 10796.8 10799.1 litres/min

Take litres 2.40 2.30 2.35 2.35 2.30

1.17 Average Take l/m 2.40 2.30 2.35 2.35 2.30 2.34 1.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10801.0 10803.1 10805.1 10807.2 10809.2 10811.2 litres/min

Take litres 2.10 2.00 2.10 2.00 2.00

0.76 Average Take l/m 2.10 2.00 2.10 2.00 2.00 2.04 2.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10813.0 10814.8 10816.5 10818.1 10819.8 10821.5 litres/min

Take litres 1.75 1.70 1.65 1.70 1.65

0.55 Average Take l/m 1.75 1.70 1.65 1.70 1.65 1.69 2.36

Print 11/12/10 11:15

KITSAULT PROJECT

Downgradient of Northeast TMF Embankment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-14GT

3 0

3.5 STAGE PRESSURE VERSUS LUGEON VALUE

1.31 2

1.4FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.884 MAX k= 2.88E-05

DETERMINATION:

MIN Lu= 1.686 MIN k= 1.69E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.686 AVG k= 1.69E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:SOME LEAKING FROM THE WATER SWIVEL WAS NOTICED

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.48 0.69 1.17 0.76 0.55

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.6

0.8

1.3

0.9

0.7

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

0.00 0.50 1.00 1.50 2.00 2.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

JS BB KJB

DESCRIPTION PREP'D CHK'D APP'D

0 30NOV'2010 ISSUED FOR REPORT

DATEREV

Page 1 of 5 B2-15 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 17.0 m TOP OF TEST INTERVAL: 64.90 19.79

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 23-Jul-10 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 100.40 30.61 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10856.0 10865.0 10873.5 10882.2 10890.6 10899.0 litres/min

Take litres 9.00 8.50 8.70 8.40 8.40

0.76 Average Take l/m 9.00 8.50 8.70 8.40 8.40 8.60 3.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 10918.2 10932.0 10946.0 10960.6 10975.4 10990.2 litres/min

Take litres 13.80 14.00 14.60 14.80 14.80

1.38 Average Take l/m 13.80 14.00 14.60 14.80 14.80 14.40 4.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11009.0 11028.0 11054.0 11086.0 11118.0 11149.0 litres/min

Take litres 19.00 26.00 32.00 32.00 31.00

2.07 Average Take l/m 19.00 26.00 32.00 32.00 31.00 28.00 6.72

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11187.5 11208.8 11229.2 11250.4 11271.4 11292.6 litres/min

Take litres 21.30 20.40 21.20 21.00 21.20

1.38 Average Take l/m 21.30 20.40 21.20 21.00 21.20 21.02 6.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11301.6 11317.9 11334.0 11350.5 11366.6 11382.8 litres/min

Take litres 16.30 16.10 16.50 16.10 16.20

0.76 Average Take l/m 16.30 16.10 16.50 16.10 16.20 16.24 5.90

Print 11/15/10 11:10

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-14GTKITSAULT PROJECT

Downgradient of Northeast TMF Embankment

6.0

7.0

8.0 STAGE PRESSURE VERSUS LUGEON VALUE

3.2

3.9

3.23 0

3.5

4.0

4.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL Transducer data and water meter MAX Lu= 6.715 MAX k= 6.72E-05DETERMINATION:

MIN Lu= 3.125 MIN k= 3.13E-05INTERPRETATION cm/s

REFERENCE: AVG Lu= 4.843 AVG k= 4.84E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Report\1-SI Report\Appendices\Appendix B\SUPERSEDED-B1\[K10-14GT Packer Tests.xls]Test 2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.76 1.38 2.07 1.38 0.76

Lu

ge

on

s

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.5

3.2

3.9

3.2

2.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 5.00 10.00 15.00 20.00 25.00 30.00

Pre

ss

ure

(B

ars

)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

JS BB KJB

DESCRIPTION PREP'D CHK'D APP'D

0 30NOV'2010 ISSUED FOR REPORT

DATEREV

Page 1 of 1 B2-16 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 19.0 m TOP OF TEST INTERVAL: 94.90 28.93

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 23-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 130.40 39.76 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11428.5 11433.8 11438.6 11443.3 11448.1 11452.7 litres/min

Take litres 5.30 4.80 4.70 4.80 4.60

1.03 Average Take l/m 5.30 4.80 4.70 4.80 4.60 4.84 1.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11460.0 11468.3 11475.0 11482.0 11489.0 11495.8 litres/min

Take litres 8.30 6.70 7.00 7.00 6.80

2.07 Average Take l/m 8.30 6.70 7.00 7.00 6.80 7.16 1.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11506.6 11517.2 11528.1 11538.2 11549.0 11560.3 litres/min

Take litres 10.60 10.90 10.10 10.80 11.30

3.10 Average Take l/m 10.60 10.90 10.10 10.80 11.30 10.74 1.94

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11569.4 11579.0 11588.7 11596.8 11605.9 11614.7 litres/min

Take litres 9.60 9.70 8.10 9.10 8.80

2.07 Average Take l/m 9.60 9.70 8.10 9.10 8.80 9.06 2.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11622.0 11629.5 11636.6 11643.8 11651.2 11658.6 litres/min

Take litres 7.50 7.10 7.20 7.40 7.40

1.03 Average Take l/m 7.50 7.10 7.20 7.40 7.40 7.32 2.22

Print 11/12/10 11:15

KITSAULT PROJECT

Downgradient of Northeast TMF Embankment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-14GT

2.5 STAGE PRESSURE VERSUS LUGEON VALUE

5 1

6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL Transducer pressures MAX Lu= 2.223 MAX k= 2.22E-05

DETERMINATION:

MIN Lu= 1.470 MIN k= 1.47E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.223 AVG k= 2.22E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT YES5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS VERY ERRATIC AT ALL PRESSURES. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 3

0.0

0.5

1.0

1.5

2.0

2.5

1.03 2.07 3.10 2.07 1.03

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

3.0

4.1

5.1

4.1

3.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

JS BB KJB

DESCRIPTION PREP'D CHK'D APP'D

0 30NOV'2010 ISSUED FOR REPORT

DATEREV

Page 3 of 5 B2-17 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 30.5 m TOP OF TEST INTERVAL: 124.90 38.08

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 160.40 48.90 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11717.0 11726.8 11736.0 11745.2 11754.2 11762.9 litres/min

Take litres 9.80 9.20 9.20 9.00 8.70

2.31 Average Take l/m 9.80 9.20 9.20 9.00 8.70 9.18 1.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11829.0 11838.9 11849.0 11859.4 11869.6 11879.9 litres/min

Take litres 9.90 10.10 10.40 10.20 10.30

3.69 Average Take l/m 9.90 10.10 10.40 10.20 10.30 10.18 1.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11898.0 11904.5 11930.3 11946.4 11962.0 11978.0 litres/min

Take litres 6.50 25.80 16.10 15.60 16.00

5.07 Average Take l/m 6.50 25.80 16.10 15.60 16.00 16.00 1.80

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11991.0 12002.7 12014.3 12025.6 12037.0 12048.3 litres/min

Take litres 11.70 11.60 11.30 11.40 11.30

3.55 Average Take l/m 11.70 11.60 11.30 11.40 11.30 11.46 1.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 11776.0 11784.5 11792.8 11800.8 11808.8 11816.6 litres/min

Take litres 8.50 8.30 8.00 8.00 7.80

2.07 Average Take l/m 8.50 8.30 8.00 8.00 7.80 8.12 1.43

VA101-343/6 K10-14GTKITSAULT PROJECT

Downgradient of Northeast TMF Embankment

Print 11/12/10 11:15

LUGEON TEST FIELD DATA SHEET

1.8

2.0 STAGE PRESSURE VERSUS LUGEON VALUE

8.28.0

9.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.797 MAX k= 1.80E-05

DETERMINATION:

MIN Lu= 1.373 MIN k= 1.37E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.547 AVG k= 1.55E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS EXTREMLY ERRATIC. LOW CONFIDENCE ON WATER PRESSURE READINGS. Pressures adjusted from transducer.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 4

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.31 3.69 5.07 3.55 2.07

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

5.5

6.8

8.2

6.7

5.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

JS BB KJB

DESCRIPTION PREP'D CHK'D APP'D

0 30NOV'2010 ISSUED FOR REPORT

DATEREV

Page 4 of 5 B2-18 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 30.5 m TOP OF TEST INTERVAL: 154.90 47.23

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 24-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 190.40 58.05 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12164.0 12200.0 12236.0 12270.0 12306.0 12341.0 litres/min

Take litres 36.00 36.00 34.00 36.00 35.00

1.72 Average Take l/m 36.00 36.00 34.00 36.00 35.00 35.40 6.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12383.0 12428.0 12469.0 12513.0 12560.0 12600.0 litres/min

Take litres 45.00 41.00 44.00 47.00 40.00

3.10 Average Take l/m 45.00 41.00 44.00 47.00 40.00 43.40 6.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12617.0 12668.0 12719.0 12771.0 12823.0 12876.0 litres/min

Take litres 51.00 51.00 52.00 52.00 53.00

4.48 Average Take l/m 51.00 51.00 52.00 52.00 53.00 51.80 6.26

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 12897.0 12943.0 12987.0 13034.0 13077.0 13122.0 litres/min

Take litres 46.00 44.00 47.00 43.00 45.00

3.45 Average Take l/m 46.00 44.00 47.00 43.00 45.00 45.00 6.29

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13224.0 13263.0 13301.0 13339.0 13378.0 13416.0 litres/min

Take litres 39.00 38.00 38.00 39.00 38.00

2.07 Average Take l/m 39.00 38.00 38.00 39.00 38.00 38.40 6.79

VA101-343/6 K10-14GTKITSAULT PROJECT

Downgradient of Northeast TMF Embankment

Print 11/12/10 11:15

LUGEON TEST FIELD DATA SHEET

6.8

6.9 STAGE PRESSURE VERSUS LUGEON VALUE

7 68.0

9.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 6.786 MAX k= 6.79E-05

DETERMINATION:

MIN Lu= 6.263 MIN k= 6.26E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 6.263 AVG k= 6.26E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. A LARGE AMOUNT OF WATER WAS NOTICED TO BE SPILLING OUT OF THE CASING.THE PACKER MAY NOT HAVE SEALED CORRECTLY SO THESE RESULTS SHOULD NOT BE RELIED UPON

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-14GT Packer Tests.xls]Test 5

6.0

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.9

1.72 3.10 4.48 3.45 2.07

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.9

6.3

7.6

6.6

5.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

JS BB KJB

DESCRIPTION PREP'D CHK'D APP'D

0 30NOV'2010 ISSUED FOR REPORT

DATEREV

Page 5 of 5 B2-19 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 54.50 16.62

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 26-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 95.00 28.96 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13478.0 13478.9 13479.7 13480.6 13481.4 13482.2 litres/min

Take litres 0.90 0.80 0.90 0.80 0.80

0.55 Average Take l/m 0.90 0.80 0.90 0.80 0.80 0.84 0.98

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13483.7 13485.6 13487.3 13488.9 13490.5 13492.1 litres/min

Take litres 1.85 1.70 1.65 1.60 1.60

1.24 Average Take l/m 1.85 1.70 1.65 1.60 1.60 1.68 0.99

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13493.5 13495.6 13497.6 13499.6 13501.6 13503.5 litres/min

Take litres 2.10 2.00 2.00 1.95 1.90

1.79 Average Take l/m 2.10 2.00 2.00 1.95 1.90 1.99 0.83

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13504.5 13505.9 13508.4 13509.7 13511.0 13512.2 litres/min

Take litres 1.35 2.55 1.30 1.25 1.25

1.17 Average Take l/m 1.35 2.55 1.30 1.25 1.25 1.54 0.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13512.9 13513.5 13514.2 13514.8 13515.4 13516.0 litres/min

Take litres 0.60 0.65 0.60 0.60 0.65

0.55 Average Take l/m 0.60 0.65 0.60 0.60 0.65 0.62 0.73

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-15AGTKITSAULT PROJECT

Downstream of South Abutment

Print 11/12/10 11:25

1.2 STAGE PRESSURE VERSUS LUGEON VALUE2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.985 MAX k= 9.85E-06

DETERMINATION:

MIN Lu= 0.726 MIN k= 7.26E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.896 AVG k= 8.96E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER GAUGE WAS STEADY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 1

0.0

0.2

0.4

0.6

0.8

1.0

1.2

0.55 1.24 1.79 1.17 0.55

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

1.4

1.9

1.3

0.7

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.50 1.00 1.50 2.00 2.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 GW JSISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 5 B2-20 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 89.60 27.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 120.10 36.62 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 533.5 534.5 535.6 536.5 537.5 538.4 litres/min

Take litres 1.00 1.10 0.90 1.00 0.90

1.03 Average Take l/m 1.00 1.10 0.90 1.00 0.90 0.98 0.90

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 539.1 540.5 541.9 543.3 544.6 545.9 litres/min

Take litres 1.40 1.40 1.40 1.30 1.30

2.07 Average Take l/m 1.40 1.40 1.40 1.30 1.30 1.36 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 547.5 549.1 550.8 552.5 554.1 555.8 litres/min

Take litres 1.60 1.70 1.70 1.60 1.70

3.10 Average Take l/m 1.60 1.70 1.70 1.60 1.70 1.66 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 557.0 558.3 559.5 560.8 562.0 563.2 litres/min

Take litres 1.30 1.20 1.30 1.20 1.20

2.14 Average Take l/m 1.30 1.20 1.30 1.20 1.20 1.24 0.59

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 564.0 564.7 565.5 566.3 567.0 567.8 litres/min

Take litres 0.70 0.80 0.80 0.70 0.80

1.03 Average Take l/m 0.70 0.80 0.80 0.70 0.80 0.76 0.70

Print 11/12/10 11:25

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-15AGTKITSAULT PROJECT

Downstream of South Abutment

0.9

1.0 STAGE PRESSURE VERSUS LUGEON VALUE

3.2

3 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.898 MAX k= 8.98E-06

DETERMINATION:

MIN Lu= 0.551 MIN k= 5.51E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.551 AVG k= 5.51E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS STEADY, P3 WAS A LITTLE JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 2

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.03 2.07 3.10 2.14 1.03

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.2

2.2

3.2

2.3

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 130NOV'201 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 5 B2-21 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 114.60 34.94

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 160.10 48.81 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13598.8 13600.7 13602.4 13604.1 13605.8 13607.4 litres/min

Take litres 1.85 1.75 1.70 1.65 1.60

1.24 Average Take l/m 1.85 1.75 1.70 1.65 1.60 1.71 0.89

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13610.0 13612.7 13615.2 13617.7 13620.1 13622.5 litres/min

Take litres 2.65 2.55 2.50 2.40 2.40

2.76 Average Take l/m 2.65 2.55 2.50 2.40 2.40 2.50 0.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13630.0 13633.0 13636.0 13638.9 13641.8 13644.7 litres/min

Take litres 3.00 3.00 2.90 2.90 2.85

4.07 Average Take l/m 3.00 3.00 2.90 2.90 2.85 2.93 0.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13646.6 13648.6 13650.6 13652.6 13654.6 13656.6 litres/min

Take litres 2.00 2.00 2.00 2.00 2.00

2.48 Average Take l/m 2.00 2.00 2.00 2.00 2.00 2.00 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13657.7 13659.0 13660.3 13661.6 13662.9 13664.2 litres/min

Take litres 1.30 1.30 1.30 1.30 1.30

1.24 Average Take l/m 1.30 1.30 1.30 1.30 1.30 1.30 0.68

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-15AGTKITSAULT PROJECT

Downstream of South Abutment

Print 11/12/10 11:25

0.9

1.0 STAGE PRESSURE VERSUS LUGEON VALUE

4.24.0

4.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.893 MAX k= 8.93E-06

DETERMINATION:

MIN Lu= 0.502 MIN k= 5.02E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.502 AVG k= 5.02E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 3

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.24 2.76 4.07 2.48 1.24

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.4

2.9

4.2

2.6

1.4

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 GW JSISSUED FOR REPORT BBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 5 B2-22 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 154.50 47.10

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.10 61.01 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13700.0 13702.7 13705.1 13707.4 13709.6 13711.6 litres/min

Take litres 2.65 2.45 2.25 2.20 2.05

1.79 Average Take l/m 2.65 2.45 2.25 2.20 2.05 2.32 0.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13719.4 13722.1 13724.7 13727.2 13729.7 13732.2 litres/min

Take litres 2.70 2.55 2.55 2.50 2.50

3.38 Average Take l/m 2.70 2.55 2.55 2.50 2.50 2.56 0.52

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13739.4 13743.3 13747.0 13750.7 13754.2 13757.6 litres/min

Take litres 3.90 3.70 3.65 3.55 3.40

5.45 Average Take l/m 3.90 3.70 3.65 3.55 3.40 3.64 0.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13761.5 13764.3 13767.0 13769.7 13772.2 13774.8 litres/min

Take litres 2.80 2.70 2.65 2.55 2.55

3.34 Average Take l/m 2.80 2.70 2.65 2.55 2.55 2.65 0.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13776.1 13777.8 13779.4 13780.9 13782.5 13784.0 litres/min

Take litres 1.65 1.60 1.55 1.55 1.55

1.86 Average Take l/m 1.65 1.60 1.55 1.55 1.55 1.58 0.57

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-15AGTKITSAULT PROJECT

Downstream of South Abutment

Print 11/12/10 11:25

0.9

1.0 STAGE PRESSURE VERSUS LUGEON VALUE

5.6

6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.863 MAX k= 8.63E-06

DETERMINATION:

MIN Lu= 0.469 MIN k= 4.69E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.469 AVG k= 4.69E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. STABLE FOR P1. NO LEAKS WERE NOTICED DURING THE TEST. WATER WAS COMING OUT OF THE CASING

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 4

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.79 3.38 5.45 3.34 1.86

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.9

3.5

5.6

3.5

2.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 5 B2-23 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 39.60 12.07

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 27-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.10 61.01 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13802.4 13804.2 13805.8 13807.4 13809.0 13810.7 litres/min

Take litres 1.80 1.60 1.60 1.60 1.70

0.69 Average Take l/m 1.80 1.60 1.60 1.60 1.70 1.66 0.41

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13813.2 13815.9 13818.5 13821.0 13823.4 13825.9 litres/min

Take litres 2.70 2.60 2.50 2.40 2.50

1.38 Average Take l/m 2.70 2.60 2.50 2.40 2.50 2.54 0.34

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13828.8 13832.5 13836.1 13839.5 13842.9 13846.3 litres/min

Take litres 3.70 3.60 3.40 3.40 3.40

2.07 Average Take l/m 3.70 3.60 3.40 3.40 3.40 3.50 0.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13847.3 13849.5 13851.6 13853.8 13856.1 13858.4 litres/min

Take litres 2.20 2.10 2.20 2.30 2.30

1.38 Average Take l/m 2.20 2.10 2.20 2.30 2.30 2.22 0.30

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13859.2 13860.3 13861.5 13862.7 13863.9 13865.1 litres/min

Take litres 1.10 1.20 1.20 1.20 1.20

0.69 Average Take l/m 1.10 1.20 1.20 1.20 1.20 1.18 0.29

Print 11/12/10 11:25

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-15AGTKITSAULT PROJECT

Downstream of South Abutment

0.4

0.5 STAGE PRESSURE VERSUS LUGEON VALUE

2.2

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.407 MAX k= 4.07E-06

DETERMINATION:

MIN Lu= 0.289 MIN k= 2.89E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.289 AVG k= 2.89E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P2 AND P3. STABLE FOR P1. NO LEAKS WERE NOTICED DURING THE TEST. WATER WAS COMING OUT OF THE CASING

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-15AGT Packer Tests.xls]Test 5

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.4

0.5

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.5

2.2

1.5

0.8

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 5 of 5 B2-24 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 29.50 8.99

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 28/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 60.00 18.29 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13956.8 13961.9 13967.3 13972.9 13978.5 13984.0 litres/min

Take litres 5.10 5.40 5.60 5.60 5.50

0.34 Average Take l/m 5.10 5.40 5.60 5.60 5.50 5.44 12.87

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13987.9 13993.6 13999.3 14004.9 14010.5 14016.1 litres/min

Take litres 5.70 5.65 5.65 5.60 5.60

0.48 Average Take l/m 5.70 5.65 5.65 5.60 5.60 5.64 10.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14027.0 14036.2 14045.2 14054.0 14062.8 14071.6 litres/min

Take litres 9.20 9.00 8.80 8.80 8.80

0.97 Average Take l/m 9.20 9.00 8.80 8.80 8.80 8.92 8.92

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14074.8 14080.8 14086.7 14092.6 14098.6 14104.6 litres/min

Take litres 5.95 5.95 5.90 6.00 6.00

0.55 Average Take l/m 5.95 5.95 5.90 6.00 6.00 5.96 9.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14109.7 14114.6 14119.6 14124.5 14129.4 14134.4 litres/min

Take litres 4.90 5.00 4.85 4.95 4.95

0.34 Average Take l/m 4.90 5.00 4.85 4.95 4.95 4.93 11.66

Print 11/12/10 11:32

KITSAULT PROJECT

Along South Embankment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-16GT

12 0

14.0 STAGE PRESSURE VERSUS LUGEON VALUE

1.1

1.2FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 12.865 MAX k= 1.29E-04

DETERMINATION:

MIN Lu= 8.921 MIN k= 8.92E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 8.921 AVG k= 8.92E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 1

NO LEAKS WERE NOTICED DURING TESTING. FLOW RATE SEEMED HIGH. ALLOWED APPROX 5MIN FOR TEST ZONE TO FILL BEFORE STARTING TEST. HOLE WAS WASHED FOR APPROX 35MIN BEFORE TEST AS EACH ROD WAS BEING GREASED BEFORE DRILLING.

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.34 0.48 0.97 0.55 0.34

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.5

0.6

1.1

0.7

0.5

0.0

0.2

0.4

0.6

0.8

1.0

1.2

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 5 B2-25 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 59.50 18.14

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 29-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 90.00 27.44 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14156.9 14157.5 14158.1 14158.7 14159.2 14159.7 litres/min

Take litres 0.60 0.60 0.60 0.50 0.50

0.69 Average Take l/m 0.60 0.60 0.60 0.50 0.50 0.56 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14160.4 14161.1 14161.8 14162.4 14162.9 14163.5 litres/min

Take litres 0.70 0.70 0.60 0.50 0.60

1.38 Average Take l/m 0.70 0.70 0.60 0.50 0.60 0.62 0.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14164.2 14165.0 14165.6 14166.2 14166.9 14167.5 litres/min

Take litres 0.80 0.60 0.60 0.70 0.55

2.07 Average Take l/m 0.80 0.60 0.60 0.70 0.55 0.65 0.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14167.6 14168.1 14168.5 14168.9 14169.3 14169.6 litres/min

Take litres 0.50 0.40 0.40 0.35 0.35

1.38 Average Take l/m 0.50 0.40 0.40 0.35 0.35 0.40 0.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14169.8 14170.0 14170.2 14170.4 14170.6 14170.8 litres/min

Take litres 0.20 0.20 0.20 0.20 0.20

0.69 Average Take l/m 0.20 0.20 0.20 0.20 0.20 0.20 0.24

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-16GTKITSAULT PROJECT

Downstream of South Abutment

Print 11/12/10 11:32

0 6

0.7 STAGE PRESSURE VERSUS LUGEON VALUE

2.3

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.660 MAX k= 6.60E-06

DETERMINATION:

MIN Lu= 0.236 MIN k= 2.36E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.236 AVG k= 2.36E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:

GAUGE WAS STEADY THROUGHOUT TEST, NOL EAKS WERE NOTICED.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 2

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.9

1.6

2.3

1.6

0.9

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 5 B2-26 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 89.50 27.29

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 125.00 38.11 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14196.7 14197.8 14199.0 14200.1 14201.3 14202.4 litres/min

Take litres 1.10 1.20 1.10 1.20 1.10

1.03 Average Take l/m 1.10 1.20 1.10 1.20 1.10 1.14 0.84

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14203.4 14205.5 14207.5 14209.4 14211.4 14213.3 litres/min

Take litres 2.10 2.00 1.90 2.00 1.90

2.07 Average Take l/m 2.10 2.00 1.90 2.00 1.90 1.98 0.80

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14216.1 14218.9 14221.6 14224.3 14227.0 14229.7 litres/min

Take litres 2.80 2.70 2.70 2.70 2.70

3.03 Average Take l/m 2.80 2.70 2.70 2.70 2.70 2.72 0.77

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14230.6 14232.4 14234.2 14236.0 14237.8 14239.5 litres/min

Take litres 1.80 1.80 1.80 1.80 1.70

2.07 Average Take l/m 1.80 1.80 1.80 1.80 1.70 1.78 0.72

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14240.3 14241.3 14242.3 14243.4 14244.4 14245.5 litres/min

Take litres 1.00 1.00 1.10 1.00 1.10

1.03 Average Take l/m 1.00 1.00 1.10 1.00 1.10 1.04 0.77

Print 11/12/10 11:32

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-16GTKITSAULT PROJECT

Downstream of South Abutment

0.8

0.9 STAGE PRESSURE VERSUS LUGEON VALUE

3.3

3 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.840 MAX k= 8.40E-06

DETERMINATION:

MIN Lu= 0.719 MIN k= 7.19E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.772 AVG k= 7.72E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

PRESSURE GAUGE WAS STEADY, NO LEAKS WERE NOTICED.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 3

0.6

0.7

0.7

0.7

0.7

0.7

0.8

0.8

0.8

0.8

0.8

0.9

1.03 2.07 3.03 2.07 1.03

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.3

2.3

3.3

2.3

1.3

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 5 B2-27 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 124.50 37.96

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 29/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 165.00 50.30 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14275.0 14277.5 14280.3 14283.1 14285.6 14288.6 14291.3 litres/min

Take litres 2.50 2.80 2.75 2.55 3.00 2.7

1.38 Average Take l/m 2.50 2.80 2.75 2.55 3.00 2.7 2.72 1.39

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14294.1 14298.3 14302.5 14306.7 14310.8 14315.0 litres/min

Take litres 4.20 4.20 4.20 4.10 4.15

2.55 Average Take l/m 4.20 4.20 4.20 4.10 4.15 4.17 1.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14320.0 14325.9 14331.5 14337.0 14342.5 14347.9 litres/min

Take litres 5.90 5.60 5.50 5.50 5.40

4.27 Average Take l/m 5.90 5.60 5.50 5.50 5.40 5.58 1.01

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14353.5 14357.4 14361.1 14364.9 14368.6 14372.3 litres/min

Take litres 3.85 3.75 3.75 3.75 3.70

2.48 Average Take l/m 3.85 3.75 3.75 3.75 3.70 3.76 1.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14375.0 14377.8 14380.5 14383.2 14385.8 14388.5 litres/min

Take litres 2.75 2.75 2.65 2.65 2.70

1.45 Average Take l/m 2.75 2.75 2.65 2.65 2.70 2.70 1.33

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-16GTKITSAULT PROJECT

Downstream of South Abutment

Print 11/12/10 11:32

1.4

1.6 STAGE PRESSURE VERSUS LUGEON VALUE

4.54.5

5.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.393 MAX k= 1.39E-05

DETERMINATION:

MIN Lu= 1.010 MIN k= 1.01E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.010 AVG k= 1.01E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 4

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.38 2.55 4.27 2.48 1.45

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.6

2.8

4.5

2.7

1.6

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 5 B2-28 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 0.9 m TOP OF TEST INTERVAL: 164.50 50.15

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 29/7/10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 200.00 60.98 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13638.0 13638.8 13639.5 13640.3 13641.0 13641.8 litres/min

Take litres 0.80 0.70 0.75 0.75 0.75

2.07 Average Take l/m 0.80 0.70 0.75 0.75 0.75 0.75 0.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13642.7 13643.9 13645.1 13646.2 13647.3 13648.3 litres/min

Take litres 1.20 1.15 1.15 1.05 1.05

4.07 Average Take l/m 1.20 1.15 1.15 1.05 1.05 1.12 0.24

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13649.2 13650.6 13652.0 13653.3 13654.6 13655.8 litres/min

Take litres 1.40 1.35 1.30 1.30 1.25

5.72 Average Take l/m 1.40 1.35 1.30 1.30 1.25 1.32 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13656.5 13657.4 13658.2 13659.1 13659.9 13660.8 litres/min

Take litres 0.83 0.85 0.85 0.85 0.85

3.46 Average Take l/m 0.83 0.85 0.85 0.85 0.85 0.85 0.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13661.3 13662.1 13663.0 13663.9 13664.8 13665.7 litres/min

Take litres 0.80 0.90 0.90 0.85 0.90

2.62 Average Take l/m 0.80 0.90 0.90 0.85 0.90 0.87 0.28

Print 11/12/10 11:32

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-16GTKITSAULT PROJECT

Downstream of South Abutment

0 3

0.4 STAGE PRESSURE VERSUS LUGEON VALUE

5 96 0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.305 MAX k= 3.05E-06

DETERMINATION:

MIN Lu= 0.206 MIN k= 2.06E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.206 AVG k= 2.06E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER GAUGE WAS ERRATIC THROUGHOUT THE TEST. LOW CONFIDENCE ON PRESSURE DATAPRESSURES WERE CORRECTED WITH TRANSDUCER DATA.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-16GT packer test.xls]Test 5

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

2.07 4.07 5.72 3.46 2.62

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.3

4.3

5.9

3.7

2.8

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 5 of 5 B2-29 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 29.40 8.96

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 64.90 19.79 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13689.5 13691.4 13693.3 13695.1 13696.8 13698.5 litres/min

Take litres 1.90 1.85 1.80 1.75 1.70

0.34 Average Take l/m 1.90 1.85 1.80 1.75 1.70 1.80 3.43

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13700.0 13702.0 13703.9 13705.8 13707.7 13709.5 litres/min

Take litres 2.00 1.90 1.85 1.90 1.85

0.55 Average Take l/m 2.00 1.90 1.85 1.90 1.85 1.90 2.54

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13711.5 13713.8 13716.1 13718.3 13720.5 13722.6 13724.7 litres/min

Take litres 2.30 2.30 2.20 2.15 2.15 2.1

0.90 Average Take l/m 2.30 2.30 2.20 2.15 2.15 2.1 2.20 1.96

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13727.3 13728.9 13730.5 13732.0 13733.5 13735.0 13736.55 litres/min

Take litres 1.55 1.60 1.55 1.50 1.50 1.55

0.52 Average Take l/m 1.55 1.60 1.55 1.50 1.50 1.55 1.54 2.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13737.7 13739.0 13740.3 13741.5 13742.8 13744.0 litres/min

Take litres 1.30 1.25 1.25 1.25 1.25

0.34 Average Take l/m 1.30 1.25 1.25 1.25 1.25 1.26 2.40

VA101-343/6 K10-17GTKITSAULT PROJECT

Northeast Embankment (site I)

Print 11/12/10 11:39

LUGEON TEST FIELD DATA SHEET

3.5

4.0 STAGE PRESSURE VERSUS LUGEON VALUE

1.0

1.2FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER METER AND TRANSDUCER MAX Lu= 3.431 MAX k= 3.43E-05

DETERMINATION:

MIN Lu= 1.961 MIN k= 1.96E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.961 AVG k= 1.96E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:NO LEAKS DURING TEST. THE PRESSURE GAUGE WAS ERRATIC FOR P3

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0.34 0.55 0.90 0.52 0.34

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.5

0.7

1.0

0.7

0.5

0.0

0.2

0.4

0.6

0.8

1.0

1.2

0.00 0.50 1.00 1.50 2.00 2.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

A0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 5 B2-30 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 59.40 18.11

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 30-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 99.90 30.46 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13764.8 13765.9 13767.0 13767.9 13768.9 13769.8 litres/min

Take litres 1.10 1.05 0.95 0.95 0.90

0.55 Average Take l/m 1.10 1.05 0.95 0.95 0.90 0.99 1.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13771.0 13772.2 13773.2 13774.3 13775.4 13776.4 litres/min

Take litres 1.15 1.05 1.10 1.10 1.00

1.24 Average Take l/m 1.15 1.05 1.10 1.10 1.00 1.08 0.63

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13777.8 13779.1 13780.3 13781.5 13782.7 13783.8 litres/min

Take litres 1.25 1.20 1.20 1.20 1.15

1.72 Average Take l/m 1.25 1.20 1.20 1.20 1.15 1.20 0.52

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13785.0 13786.0 13786.9 13787.8 13788.7 13789.5 litres/min

Take litres 0.95 0.90 0.90 0.90 0.85

0.90 Average Take l/m 0.95 0.90 0.90 0.90 0.85 0.90 0.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13790.1 13790.9 13791.7 13792.4 13793.2 13793.9 litres/min

Take litres 0.80 0.75 0.75 0.75 0.75

0.62 Average Take l/m 0.80 0.75 0.75 0.75 0.75 0.76 0.81

Print 11/12/10 11:39

KITSAULT PROJECT

Northeast Embankment (site I)

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-17GT

1 2

1.4 STAGE PRESSURE VERSUS LUGEON VALUE

1.91.8

2.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.159 MAX k= 1.16E-05

DETERMINATION:

MIN Lu= 0.521 MIN k= 5.21E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.521 AVG k= 5.21E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 2

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

0.55 1.24 1.72 0.90 0.62

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

1.4

1.9

1.0

0.8

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 5 B2-31 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 94.40 28.78

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 129.90 39.60 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13816.8 13817.9 13819.2 13820.4 13821.5 13822.7 litres/min

Take litres 1.10 1.30 1.20 1.10 1.20

1.03 Average Take l/m 1.10 1.30 1.20 1.10 1.20 1.18 0.93

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13823.9 13825.7 13827.4 13829.1 13830.7 13832.3 litres/min

Take litres 1.80 1.70 1.70 1.60 1.60

2.07 Average Take l/m 1.80 1.70 1.70 1.60 1.60 1.68 0.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13834.4 13837.0 13839.4 13841.8 13844.1 13846.4 litres/min

Take litres 2.60 2.40 2.40 2.30 2.30

3.10 Average Take l/m 2.60 2.40 2.40 2.30 2.30 2.40 0.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13847.7 13849.4 13851.0 13852.7 13854.3 13855.9 litres/min

Take litres 1.70 1.60 1.70 1.60 1.60

2.07 Average Take l/m 1.70 1.60 1.70 1.60 1.60 1.64 0.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13856.6 13857.6 13858.9 13860.0 13861.2 13862.3 litres/min

Take litres 1.00 1.30 1.10 1.20 1.10

0.97 Average Take l/m 1.00 1.30 1.10 1.20 1.10 1.14 0.95

Print 11/12/10 11:39

KITSAULT PROJECT

Northeast Embankment (site I)

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-17GT

1.2 STAGE PRESSURE VERSUS LUGEON VALUE

3.2

3 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.953 MAX k= 9.53E-06

DETERMINATION:

MIN Lu= 0.684 MIN k= 6.84E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.684 AVG k= 6.84E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Good seal around landing ring, no leaks during test, gauge was jumpy especially at higher pressures.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 3

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.03 2.07 3.10 2.07 0.97

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.2

2.2

3.2

2.2

1.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 5 B2-32 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 124.40 37.93

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 164.90 50.27 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13894.6 13897.2 13899.8 13902.4 13904.9 13907.3 litres/min

Take litres 2.60 2.60 2.60 2.50 2.40

1.38 Average Take l/m 2.60 2.60 2.60 2.50 2.40 2.54 1.35

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13912.0 13917.2 13922.2 13927.1 13931.9 13936.6 litres/min

Take litres 5.20 5.00 4.90 4.80 4.70

2.76 Average Take l/m 5.20 5.00 4.90 4.80 4.70 4.92 1.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13940.0 13947.0 13954.2 13960.4 13967.0 13973.6 litres/min

Take litres 7.00 7.20 6.20 6.60 6.60

4.14 Average Take l/m 7.00 7.20 6.20 6.60 6.60 6.72 1.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 13976.4 13981.3 13986.0 13990.6 13995.2 13999.8 litres/min

Take litres 4.90 4.70 4.60 4.60 4.60

2.76 Average Take l/m 4.90 4.70 4.60 4.60 4.60 4.68 1.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14001.2 14003.2 14005.1 14007.1 14009.3 14010.4 litres/min

Take litres 2.00 1.90 2.00 2.20 1.10

1.38 Average Take l/m 2.00 1.90 2.00 2.20 1.10 1.84 0.98

VA101-343/6 K10-17GTKITSAULT PROJECT

Northeast Embankment (site I)

Print 11/12/10 11:39

LUGEON TEST FIELD DATA SHEET

1.4

1.6 STAGE PRESSURE VERSUS LUGEON VALUE4.3

4.0

4.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.375 MAX k= 1.37E-05

DETERMINATION:

MIN Lu= 0.981 MIN k= 9.81E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.258 AVG k= 1.26E-05

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST. After test water in rods was observed to rise up to 2.0m above ground, after 30min the level began to drop again, cracks in rock likely swelled during test and then squeezed water back out.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 4

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.38 2.76 4.14 2.76 1.38

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.5

2.9

4.3

2.9

1.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 5 B2-33 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 154.90 47.23

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 31-Jul-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 199.90 60.95 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14058.2 14062.4 14066.4 14070.2 14074.0 14077.7 litres/min

Take litres 4.15 4.00 3.85 3.80 3.70

1.79 Average Take l/m 4.15 4.00 3.85 3.80 3.70 3.90 1.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14090.6 14097.6 14104.4 14111.1 14117.7 14124.3 litres/min

Take litres 7.00 6.80 6.70 6.60 6.60

3.38 Average Take l/m 7.00 6.80 6.70 6.60 6.60 6.74 1.40

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14151.5 14161.2 14170.8 14180.3 14189.8 14199.2 litres/min

Take litres 9.70 9.60 9.50 9.50 9.40

5.17 Average Take l/m 9.70 9.60 9.50 9.50 9.40 9.54 1.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14207.4 14212.9 14218.5 14224.2 14229.9 14235.7 litres/min

Take litres 5.50 5.60 5.70 5.70 5.75

3.24 Average Take l/m 5.50 5.60 5.70 5.70 5.75 5.65 1.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14238.0 14240.0 14242.4 14245.0 14247.6 14250.4 litres/min

Take litres 2.00 2.40 2.60 2.60 2.75

1.86 Average Take l/m 2.00 2.40 2.60 2.60 2.75 2.47 0.90

VA101-343/6 K10-17GTKITSAULT PROJECT

Northeast Embankment (site I)

Print 11/12/10 11:39

LUGEON TEST FIELD DATA SHEET

1.4

1.6 STAGE PRESSURE VERSUS LUGEON VALUE

5.3

6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.471 MAX k= 1.47E-05

DETERMINATION:

MIN Lu= 0.899 MIN k= 8.99E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.899 AVG k= 8.99E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC FOR P3

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-17GT packer tests.xls]Test 5

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.79 3.38 5.17 3.24 1.86

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.9

3.5

5.3

3.4

2.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 5 of 5 B2-34 of 56

SHEET 1 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 45 oDEPTH GROUNDWATER: -1.5 m TOP OF TEST INTERVAL: 88.40 26.95

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 3-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 123.90 37.77 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14286.7 14288.6 14290.3 14292.2 14293.9 14295.7 litres/min

Take litres 1.90 1.70 1.90 1.70 1.80

0.69 Average Take l/m 1.90 1.70 1.90 1.70 1.80 1.80 2.50

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14298.7 14302.0 14305.3 14308.5 14311.5 14314.6 litres/min

Take litres 3.30 3.30 3.20 3.00 3.10

1.38 Average Take l/m 3.30 3.30 3.20 3.00 3.10 3.18 2.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14321.2 14325.3 14329.3 14333.2 14337.1 14341.0 litres/min

Take litres 4.10 4.00 3.90 3.90 3.90

2.10 Average Take l/m 4.10 4.00 3.90 3.90 3.90 3.96 1.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14342.8 14345.4 14348.0 14350.5 14353.1 14355.7 litres/min

Take litres 2.60 2.60 2.50 2.60 2.60

1.38 Average Take l/m 2.60 2.60 2.50 2.60 2.60 2.58 1.76

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14356.6 14357.8 14359.1 14360.4 14361.7 14363.0 litres/min

Take litres 1.20 1.30 1.30 1.30 1.30

0.72 Average Take l/m 1.20 1.30 1.30 1.30 1.30 1.28 1.69

VA101-343/6 K10-18GTKITSAULT PROJECT

South Abutment

Print 11/12/10 11:46

LUGEON TEST FIELD DATA SHEET

3.0 STAGE PRESSURE VERSUS LUGEON VALUE

2 1

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.502 MAX k= 2.50E-05

DETERMINATION:

MIN Lu= 1.691 MIN k= 1.69E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.691 AVG k= 1.69E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:Some water was observed to be coming out of the casing, however the test caused artesian water pressure at the test depth and this water likely flowed around the packer.Water was at ground level before test and 2.9m above after test, depth to groundwater was taken as the average of these two values.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.69 1.38 2.10 1.38 0.72

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

1.4

2.1

1.4

0.7

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 3 B2-35 of 56

SHEET 2 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 45 oDEPTH GROUNDWATER: -1.1 m TOP OF TEST INTERVAL: 123.40 37.62

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 158.90 48.45 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14458.5 14466.8 14475.9 14483.1 14491.0 14499.0 litres/min

Take litres 8.30 9.10 7.20 7.90 8.00

1.03 Average Take l/m 8.30 9.10 7.20 7.90 8.00 8.10 7.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14503.0 14515.3 14527.1 14539.0 14551.0 14562.7 litres/min

Take litres 12.30 11.80 11.90 12.00 11.70

2.07 Average Take l/m 12.30 11.80 11.90 12.00 11.70 11.94 5.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14572.0 14587.2 14602.0 14617.5 14630.9 14644.4 litres/min

Take litres 15.20 14.80 15.50 13.40 13.50

3.10 Average Take l/m 15.20 14.80 15.50 13.40 13.50 14.48 4.31

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14649.1 14660.4 14669.8 14679.9 14690.0 14700.1 litres/min

Take litres 11.30 9.40 10.10 10.10 10.10

2.07 Average Take l/m 11.30 9.40 10.10 10.10 10.10 10.20 4.55

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14708.0 14715.0 14721.8 14728.6 14735.4 14742.1 litres/min

Take litres 7.00 6.80 6.80 6.80 6.70

1.03 Average Take l/m 7.00 6.80 6.80 6.80 6.70 6.82 6.07

Print 11/12/10 11:46

KITSAULT PROJECT

South Abutment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-18GT

7.0

8.0 STAGE PRESSURE VERSUS LUGEON VALUE

3.13 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 7.212 MAX k= 7.21E-05

DETERMINATION:

MIN Lu= 4.307 MIN k= 4.31E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 4.307 AVG k= 4.31E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:GAUGE WAS ERRATIC AT P3 PRESSURE, A LEAK WAS NOTICED TO INCREASE WITH PRESSURE IN THE CASING BUT IT ONLY ACCOUNTED FOR 5% OF THE FLOW REGISTERED ON THE FLOWMETER, ARTESIAN PRESSURES TO 2.1M ABOVE GROUND AFTER TEST.Water was at ground level before test and 2.1m above after test, depth to groundwater was taken as the average of these two values.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

1.03 2.07 3.10 2.07 1.03

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.1

2.1

3.1

2.1

1.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 3 B2-36 of 56

SHEET 3 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 45 oDEPTH GROUNDWATER: 0.0 m TOP OF TEST INTERVAL: 153.40 46.77

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 4-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.1 m BOTTOM OF TEST INTERVAL: 188.90 57.59 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14769.0 14772.7 14776.2 14779.7 14783.1 14786.3 litres/min

Take litres 3.70 3.50 3.50 3.40 3.20

1.21 Average Take l/m 3.70 3.50 3.50 3.40 3.20 3.46 2.49

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14791.0 14796.3 14801.4 14806.5 14811.3 14816.2 litres/min

Take litres 5.30 5.10 5.10 4.80 4.90

2.31 Average Take l/m 5.30 5.10 5.10 4.80 4.90 5.04 1.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14822.0 14829.5 14835.9 14842.6 14849.2 14855.7 litres/min

Take litres 7.50 6.40 6.70 6.60 6.50

3.52 Average Take l/m 7.50 6.40 6.70 6.60 6.50 6.74 1.73

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14860.0 14864.3 14868.5 14872.8 14877.1 14881.4 litres/min

Take litres 4.30 4.20 4.30 4.30 4.30

2.34 Average Take l/m 4.30 4.20 4.30 4.30 4.30 4.28 1.63

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 14882.6 14884.8 14887.2 14889.5 14891.9 14894.4 litres/min

Take litres 2.20 2.40 2.30 2.40 2.50

1.10 Average Take l/m 2.20 2.40 2.30 2.40 2.50 2.36 1.85

VA101-343/6 K10-18GTKITSAULT PROJECT

South Abutment

Print 11/12/10 11:46

LUGEON TEST FIELD DATA SHEET

3.0 STAGE PRESSURE VERSUS LUGEON VALUE

3.63.5

4.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 2.489 MAX k= 2.49E-05

DETERMINATION:

MIN Lu= 1.633 MIN k= 1.63E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.733 AVG k= 1.73E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:Pressure gauge was steady, a trickle of water was noted coming out of the casing during the test.1.5L/min lost at 100psi after packer was inflated but pin was not broken yet.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-18GT packer tests.xls]Test 3

0.0

0.5

1.0

1.5

2.0

2.5

3.0

1.21 2.31 3.52 2.34 1.10

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.3

2.4

3.6

2.5

1.2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 3 B2-37 of 56

SHEET 1 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 0 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 29.70 9.05

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 60.20 18.35 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 908.0 910.8 913.3 915.8 918.5 921.0 litres/min

Take litres 2.80 2.50 2.50 2.70 2.50

1.77 Average Take l/m 2.80 2.50 2.50 2.70 2.50 2.60 1.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 924.2 927.4 930.7 933.9 937.4 940.5 litres/min

Take litres 3.20 3.30 3.20 3.50 3.10

2.46 Average Take l/m 3.20 3.30 3.20 3.50 3.10 3.26 1.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 943.8 946.5 950.0 953.8 957.4 961.0 litres/min

Take litres 2.70 3.50 3.80 3.60 3.60

2.94 Average Take l/m 2.70 3.50 3.80 3.60 3.60 3.44 1.26

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 962.3 965.3 968.3 971.3 974.2 977.2 litres/min

Take litres 3.00 3.00 3.00 2.90 3.00

2.19 Average Take l/m 3.00 3.00 3.00 2.90 3.00 2.98 1.47

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 978.6 980.8 982.8 984.8 986.9 989.1 litres/min

Take litres 2.20 2.00 2.00 2.10 2.20

1.29 Average Take l/m 2.20 2.00 2.00 2.10 2.20 2.10 1.75

Print 11/12/10 11:51

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-19GTKITSAULT PROJECT

South Abutment Monitoring Well Installation

1.8

2.0 STAGE PRESSURE VERSUS LUGEON VALUE

3.03 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.752 MAX k= 1.75E-05

DETERMINATION:

MIN Lu= 1.257 MIN k= 1.26E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.257 AVG k= 1.26E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.All pressures were adjusted off transducer data.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-19GT Packer Tests.xls]Test 1

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

1.77 2.46 2.94 2.19 1.29

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.9

2.6

3.0

2.3

1.4

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 2 B2-38 of 56

SHEET 2 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 0 oDEPTH GROUNDWATER: 2.0 m TOP OF TEST INTERVAL: 59.70 18.20

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 5-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 100.20 30.55 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 313.2 316.2 319.0 321.7 324.4 327.1 litres/min

Take litres 3.00 2.80 2.70 2.70 2.70

0.69 Average Take l/m 3.00 2.80 2.70 2.70 2.70 2.78 3.27

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 330.7 334.4 338.1 341.7 345.2 348.9 litres/min

Take litres 3.70 3.70 3.60 3.50 3.70

1.38 Average Take l/m 3.70 3.70 3.60 3.50 3.70 3.64 2.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 351.2 355.3 359.3 363.2 367.2 371.4 litres/min

Take litres 4.10 4.00 3.90 4.00 4.20

2.07 Average Take l/m 4.10 4.00 3.90 4.00 4.20 4.04 1.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 373.2 376.8 380.3 383.9 387.2 391.0 litres/min

Take litres 3.60 3.50 3.60 3.30 3.80

1.38 Average Take l/m 3.60 3.50 3.60 3.30 3.80 3.56 2.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 393.8 396.7 399.5 402.3 405.1 407.9 litres/min

Take litres 2.90 2.80 2.80 2.80 2.80

0.69 Average Take l/m 2.90 2.80 2.80 2.80 2.80 2.82 3.31

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-19GTKITSAULT PROJECT

South Abutment Monitoring Well Installation

Print 11/12/10 11:51

3 0

3.5 STAGE PRESSURE VERSUS LUGEON VALUE

2.2

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 3.312 MAX k= 3.31E-05

DETERMINATION:

MIN Lu= 1.582 MIN k= 1.58E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.582 AVG k= 1.58E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:SOME WATER WAS COMING UP THROUGH THE CASING FOR THE DURATION OF THE TEST (~1 L/min)~0.8 L/min LOSS THROUGH THE RODS (MEASURED WHILE INCREASING PRESSURE TO SHEAR THE PIN).

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-19GT Packer Tests.xls]Test 2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.5

2.2

1.5

0.8

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 2 B2-39 of 56

SHEET 1 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 1.0 m TOP OF TEST INTERVAL: 39.50 12.04

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 13-Aug-10 GAUGE HEIGHT ABOVE GROUND: 0.8 m BOTTOM OF TEST INTERVAL: 75.00 22.87 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 436.0 443.6 450.9 458.6 466.1 473.5 litres/min

Take litres 7.60 7.30 7.70 7.50 7.40

0.69 Average Take l/m 7.60 7.30 7.70 7.50 7.40 7.50 7.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 477.4 487.9 497.8 507.4 517.0 525.9 litres/min

Take litres 10.50 9.90 9.60 9.60 8.90

1.38 Average Take l/m 10.50 9.90 9.60 9.60 8.90 9.70 5.75

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 533.0 544.8 556.3 567.7 579.3 590.5 litres/min

Take litres 11.80 11.50 11.40 11.60 11.20

2.07 Average Take l/m 11.80 11.50 11.40 11.60 11.20 11.50 4.73

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 595.4 603.6 611.8 619.8 627.8 635.8 litres/min

Take litres 8.20 8.20 8.00 8.00 8.00

1.38 Average Take l/m 8.20 8.20 8.00 8.00 8.00 8.08 4.79

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 638.5 643.8 649.3 654.4 659.5 664.8 litres/min

Take litres 5.30 5.50 5.10 5.10 5.30

0.69 Average Take l/m 5.30 5.50 5.10 5.10 5.30 5.26 5.59

Print 11/12/10 11:54

VA101-343/6 K10-20GTKITSAULT PROJECT

Downstream of Northeast Embankment

LUGEON TEST FIELD DATA SHEET

8.0

9.0 STAGE PRESSURE VERSUS LUGEON VALUE

2.2

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 7.970 MAX k= 7.97E-05

DETERMINATION:

MIN Lu= 4.726 MIN k= 4.73E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 4.726 AVG k= 4.73E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-20GT packer tests.xls]Test 1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.9

1.6

2.2

1.6

0.9

0.0

0.5

1.0

1.5

2.0

2.5

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 2 B2-40 of 56

SHEET 2 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.4 m TOP OF TEST INTERVAL: 74.60 22.74

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 13-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.0 m BOTTOM OF TEST INTERVAL: 100.30 30.58 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 718.6 725.0 731.8 738.1 743.9 749.8 litres/min

Take litres 6.40 6.80 6.30 5.80 5.90

0.90 Average Take l/m 6.40 6.80 6.30 5.80 5.90 6.24 7.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 760.4 768.7 776.9 785.0 793.2 801.3 litres/min

Take litres 8.30 8.20 8.10 8.20 8.10

1.72 Average Take l/m 8.30 8.20 8.10 8.20 8.10 8.18 5.60

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 823.5 833.9 844.6 855.2 865.8 876.7 litres/min

Take litres 10.40 10.70 10.60 10.60 10.90

2.65 Average Take l/m 10.40 10.70 10.60 10.60 10.90 10.64 4.86

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 889.8 898.2 906.8 915.3 923.9 932.7 litres/min

Take litres 8.40 8.60 8.50 8.60 8.80

1.65 Average Take l/m 8.40 8.60 8.50 8.60 8.80 8.58 6.10

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 940.6 947.5 954.4 961.9 969.4 977.3 litres/min

Take litres 6.90 6.90 7.50 7.50 7.90

0.90 Average Take l/m 6.90 6.90 7.50 7.50 7.90 7.34 9.04

KITSAULT PROJECT

Downstream of Northeast Embankment

Print 11/12/10 11:54

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-20GT

9.0

10.0 STAGE PRESSURE VERSUS LUGEON VALUE

2.8

3.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 9.039 MAX k= 9.04E-05

DETERMINATION:

MIN Lu= 4.859 MIN k= 4.86E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 4.859 AVG k= 4.86E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC DURING P MAX (MORE STEADY FOR P1 AND P2). P3 ADJUSTED OFF TRANSDUCER.NEGLIGIBLE LEAK FROM SWIVEL HEAD. NO OTHER LEAKS DETECTED.~0.8 L/MIN SYSTEM LOSSES AT 37 PSI (MEASURED DURING BLADDER INFLATION). THESE SYSTEM LOSSES HAVE NOT BEEN ACCOUNTED FOR YET.

TEST BY: CG REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-20GT packer tests.xls]Test 2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

0.90 1.72 2.65 1.65 0.90

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.0

1.9

2.8

1.8

1.0

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 2 B2-41 of 56

SHEET 1 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 1.3 m TOP OF TEST INTERVAL: 29.40 8.96

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 14-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 60.30 18.38 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 355.4 363.4 371.7 379.9 387.9 395.9 litres/min

Take litres 8.00 8.30 8.20 8.00 8.00

0.55 Average Take l/m 8.00 8.30 8.20 8.00 8.00 8.10 10.59

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 404.0 417.1 429.8 442.2 455.0 467.7 litres/min

Take litres 13.10 12.70 12.40 12.80 12.70

1.03 Average Take l/m 13.10 12.70 12.40 12.80 12.70 12.74 10.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 569.0 584.7 600.6 616.6 632.4 648.2 litres/min

Take litres 15.70 15.90 16.00 15.80 15.80

1.59 Average Take l/m 15.70 15.90 16.00 15.80 15.80 15.84 9.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 771.3 783.3 795.1 807.2 819.0 830.9 litres/min

Take litres 12.00 11.80 12.10 11.80 11.90

1.03 Average Take l/m 12.00 11.80 12.10 11.80 11.90 11.92 9.78

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 839.7 848.0 856.4 864.9 873.5 881.9 litres/min

Take litres 8.30 8.40 8.50 8.60 8.40

0.55 Average Take l/m 8.30 8.40 8.50 8.60 8.40 8.44 11.04

VA101-343/6 K10-21GTKITSAULT PROJECT

Upstream of Northeast Embankment

Print 11/12/10 12:34

LUGEON TEST FIELD DATA SHEET

12.0 STAGE PRESSURE VERSUS LUGEON VALUE

1.81.8

2.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 11.039 MAX k= 1.10E-04

DETERMINATION:

MIN Lu= 9.109 MIN k= 9.11E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 9.109 AVG k= 9.11E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:2nd attempt. First attempt bit was 5 ft higher, water was coming out through the casing.

TEST BY: started by JS, finished by CG REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-21GT packer tests.xls]Test 1

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.55 1.03 1.59 1.03 0.55

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.3

1.8

1.3

0.8

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 2 B2-42 of 56

SHEET 2 OF 2

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 59.90 18.26

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 15-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 100.40 30.61 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 6958.0 6973.5 6987.0 7000.0 7014.0 7027.0 litres/min

Take litres 15.50 13.50 13.00 14.00 13.00

0.69 Average Take l/m 15.50 13.50 13.00 14.00 13.00 13.80 13.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7034.0 7052.0 7068.0 7085.5 7102.5 7119.0 litres/min

Take litres 18.00 16.00 17.50 17.00 16.50

1.38 Average Take l/m 18.00 16.00 17.50 17.00 16.50 17.00 8.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7128.0 7147.0 7167.0 7186.0 7206.0 7226.0 litres/min

Take litres 19.00 20.00 19.00 20.00 20.00

2.07 Average Take l/m 19.00 20.00 19.00 20.00 20.00 19.60 7.12

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7233.0 7248.0 7264.0 7279.0 7296.0 7311.0 litres/min

Take litres 15.00 16.00 15.00 17.00 15.00

1.38 Average Take l/m 15.00 16.00 15.00 17.00 15.00 15.60 8.21

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 7316.0 7327.0 7339.1 7350.8 7362.2 7374.0 litres/min

Take litres 11.00 12.10 11.70 11.40 11.80

0.69 Average Take l/m 11.00 12.10 11.70 11.40 11.80 11.60 11.06

K10-21GTKITSAULT PROJECT

Upstream of Northeast Embankment

Print 11/12/10 12:34

LUGEON TEST FIELD DATA SHEET

VA101-343/6

12 0

14.0 STAGE PRESSURE VERSUS LUGEON VALUE

2.2

2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 13.157 MAX k= 1.32E-04

DETERMINATION:

MIN Lu= 7.123 MIN k= 7.12E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 7.123 AVG k= 7.12E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-21GT packer tests.xls]Test 2

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

0.69 1.38 2.07 1.38 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.5

2.2

1.5

0.8

0.0

0.5

1.0

1.5

2.0

2.5

0.00 5.00 10.00 15.00 20.00 25.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 2 B2-43 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 0.1 m TOP OF TEST INTERVAL: 34.50 10.52

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 15-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.4 m BOTTOM OF TEST INTERVAL: 84.00 25.61 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 403.2 405.6 407.9 410.2 412.4 414.6 litres/min

Take litres 2.40 2.30 2.25 2.25 2.20

0.55 Average Take l/m 2.40 2.30 2.25 2.25 2.20 2.28 2.15

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 415.8 418.7 421.4 424.1 426.8 429.4 litres/min

Take litres 2.90 2.70 2.70 2.65 2.65

1.10 Average Take l/m 2.90 2.70 2.70 2.65 2.65 2.72 1.44

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 430.5 433.9 437.1 440.4 443.6 446.8 litres/min

Take litres 3.35 3.25 3.25 3.25 3.20

1.79 Average Take l/m 3.35 3.25 3.25 3.25 3.20 3.26 1.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 447.9 450.5 453.0 455.5 458.1 460.8 litres/min

Take litres 2.55 2.55 2.50 2.60 2.65

1.24 Average Take l/m 2.55 2.55 2.50 2.60 2.65 2.57 1.22

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 461.4 463.2 465.1 466.9 468.8 470.7 litres/min

Take litres 1.80 1.85 1.85 1.85 1.90

0.69 Average Take l/m 1.80 1.85 1.85 1.85 1.90 1.85 1.46

K10-22GTKITSAULT PROJECT

TMF South Abutment (site D)

Print 11/12/10 12:40

LUGEON TEST FIELD DATA SHEET

VA101-343/6

2.5 STAGE PRESSURE VERSUS LUGEON VALUE2.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 2.153 MAX k= 2.15E-05

DETERMINATION:

MIN Lu= 1.112 MIN k= 1.11E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.112 AVG k= 1.11E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 1

0.0

0.5

1.0

1.5

2.0

2.5

0.55 1.10 1.79 1.24 0.69

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.7

1.3

1.9

1.4

0.8

0.0

0.5

1.0

1.5

2.0

2.5

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 5 B2-44 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.5 m TOP OF TEST INTERVAL: 78.30 23.87

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 16-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 129.00 39.33 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 556.0 564.8 573.7 582.4 590.9 599.3 litres/min

Take litres 8.80 8.90 8.70 8.50 8.40

0.90 Average Take l/m 8.80 8.90 8.70 8.50 8.40 8.66 5.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 619.0 631.5 643.7 656.2 668.3 680.2 litres/min

Take litres 12.50 12.20 12.50 12.10 11.90

1.79 Average Take l/m 12.50 12.20 12.50 12.10 11.90 12.24 3.97

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 700.0 717.8 734.9 751.4 768.5 785.8 litres/min

Take litres 17.80 17.10 16.50 17.10 17.30

2.69 Average Take l/m 17.80 17.10 16.50 17.10 17.30 17.16 3.84

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 801.0 812.2 823.7 835.0 846.1 857.6 litres/min

Take litres 11.20 11.50 11.30 11.10 11.50

1.79 Average Take l/m 11.20 11.50 11.30 11.10 11.50 11.32 3.68

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 869.9 877.5 885.1 892.7 900.2 907.8 litres/min

Take litres 7.60 7.60 7.60 7.50 7.60

0.90 Average Take l/m 7.60 7.60 7.60 7.50 7.60 7.58 4.47

VA101-343/6 K10-22GTKITSAULT PROJECT

TMF South Abutment (Site D)

Print 11/12/10 12:40

LUGEON TEST FIELD DATA SHEET

6.0 STAGE PRESSURE VERSUS LUGEON VALUE

3 0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 5.110 MAX k= 5.11E-05

DETERMINATION:

MIN Lu= 3.675 MIN k= 3.68E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 3.843 AVG k= 3.84E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:SYSTEM LOSSES AT Pmax ~3.6 l/min. THESE LOSSES HAVE NOT BEEN ACCOUNTED FOR YET.PRESSURE GAUGE UNSTEADY AT P2 AND PMAX.TEST DONE IN COMPETENT GREYWACKE.

TEST BY: CG REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.90 1.79 2.69 1.79 0.90

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.1

2.0

2.9

2.0

1.1

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 5 B2-45 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 3.3 m TOP OF TEST INTERVAL: 133.50 40.70

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 16-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 189.00 57.62 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4.0 16.5 28.2 39.8 51.0 62.3 litres/min

Take litres 12.50 11.70 11.60 11.20 11.30

1.72 Average Take l/m 12.50 11.70 11.60 11.20 11.30 11.66 3.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 67.6 83.4 99.4 115.2 130.2 145.6 litres/min

Take litres 15.80 16.00 15.80 15.00 15.40

3.10 Average Take l/m 15.80 16.00 15.80 15.00 15.40 15.60 2.57

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 154.0 176.4 198.5 221.0 244.6 266.8 litres/min

Take litres 22.40 22.10 22.50 23.60 22.20

4.48 Average Take l/m 22.40 22.10 22.50 23.60 22.20 22.56 2.69

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 273.0 289.0 306.0 323.5 342.0 361.5 litres/min

Take litres 16.00 17.00 17.50 18.50 19.50

3.10 Average Take l/m 16.00 17.00 17.50 18.50 19.50 17.70 2.92

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 365.5 376.3 389.4 402.6 417.8 432.3 litres/min

Take litres 10.80 13.10 13.20 15.20 14.50

1.72 Average Take l/m 10.80 13.10 13.20 15.20 14.50 13.36 3.58

K10-22GTKITSAULT PROJECT

TMF South Abutment (Site D)

Print 11/12/10 12:40

LUGEON TEST FIELD DATA SHEET

VA101-343/6

3.5

4.0 STAGE PRESSURE VERSUS LUGEON VALUE6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 3.583 MAX k= 3.58E-05

DETERMINATION:

MIN Lu= 2.573 MIN k= 2.57E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.687 AVG k= 2.69E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 3

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

1.72 3.10 4.48 3.10 1.72

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.2

3.6

5.0

3.6

2.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 5.00 10.00 15.00 20.00 25.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 5 B2-46 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 3.4 m TOP OF TEST INTERVAL: 189.50 57.77

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 17-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 234.00 71.34 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 479.8 483.8 487.6 491.3 495.0 498.6 litres/min

Take litres 4.00 3.80 3.70 3.70 3.60

1.72 Average Take l/m 4.00 3.80 3.70 3.70 3.60 3.76 1.25

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 501.4 505.2 509.0 512.7 516.2 520.2 litres/min

Take litres 3.80 3.80 3.70 3.50 4.00

3.45 Average Take l/m 3.80 3.80 3.70 3.50 4.00 3.76 0.70

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 522.9 527.9 532.8 537.5 542.3 547.0 litres/min

Take litres 5.00 4.90 4.70 4.80 4.70

5.17 Average Take l/m 5.00 4.90 4.70 4.80 4.70 4.82 0.63

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 548.4 552.0 555.5 559.0 562.4 565.9 litres/min

Take litres 3.60 3.50 3.50 3.40 3.50

3.45 Average Take l/m 3.60 3.50 3.50 3.40 3.50 3.50 0.66

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 567.0 569.7 572.4 575.0 577.7 580.3 litres/min

Take litres 2.70 2.70 2.60 2.70 2.60

1.72 Average Take l/m 2.70 2.70 2.60 2.70 2.60 2.66 0.89

VA101-343/6 K10-22GTKITSAULT PROJECT

TMF South Abutment (Site D)

Print 11/12/10 12:40

LUGEON TEST FIELD DATA SHEET

1 2

1.4 STAGE PRESSURE VERSUS LUGEON VALUE

5.76.0

FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 1.252 MAX k= 1.25E-05

DETERMINATION:

MIN Lu= 0.628 MIN k= 6.28E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.628 AVG k= 6.28E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST.

TEST BY: JS REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 4

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.72 3.45 5.17 3.45 1.72

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.2

3.9

5.7

3.9

2.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010' JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 5 B2-47 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 0.6 m TOP OF TEST INTERVAL: 233.50 71.19

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 18-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.5 m BOTTOM OF TEST INTERVAL: 329.00 100.30 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18630.0 18636.0 18641.7 18647.1 18652.8 18658.0 litres/min

Take litres 6.00 5.70 5.40 5.70 5.20

4.07 Average Take l/m 6.00 5.70 5.40 5.70 5.20 5.60 0.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18665.4 18672.8 18680.1 18687.0 18694.0 18700.8 litres/min

Take litres 7.40 7.30 6.90 7.00 6.80

6.62 Average Take l/m 7.40 7.30 6.90 7.00 6.80 7.08 0.36

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18706.0 18716.5 18727.0 18737.3 18747.4 18757.4 litres/min

Take litres 10.50 10.50 10.30 10.10 10.00

10.76 Average Take l/m 10.50 10.50 10.30 10.10 10.00 10.28 0.32

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18761.6 18767.8 18773.5 18779.3 18785.3 18791.0 litres/min

Take litres 6.20 5.70 5.80 6.00 5.70

5.24 Average Take l/m 6.20 5.70 5.80 6.00 5.70 5.88 0.37

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18793.0 18797.6 18802.0 18806.7 18811.3 18815.7 litres/min

Take litres 4.60 4.40 4.70 4.60 4.40

3.72 Average Take l/m 4.60 4.40 4.70 4.60 4.40 4.54 0.40

K10-22GTKITSAULT PROJECT

TMF South Abutment (Site D)

Print 11/12/10 12:40

LUGEON TEST FIELD DATA SHEET

VA101-343/6

0.5

0.5 STAGE PRESSURE VERSUS LUGEON VALUE

11.0

12.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 0.450 MAX k= 4.50E-06

DETERMINATION:

MIN Lu= 0.322 MIN k= 3.22E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.322 AVG k= 3.22E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS HIGHLY ERRATIC I.E JUMPY. NO LEAKS WERE NOTICED DURING THE TEST but 5.6L/min were lost during the packer inflating.Pressures were adjusted from transducer data.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-22GT packer tests.xls]Test 5

0.0

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.4

0.5

0.5

4.07 6.62 10.76 5.24 3.72

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.3

6.8

11.0

5.5

3.9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 5 of 5 B2-48 of 56

SHEET 1 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 1.3 m TOP OF TEST INTERVAL: 24.30 7.41

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: GAUGE HEIGHT ABOVE GROUND: 1.3 m BOTTOM OF TEST INTERVAL: 74.80 22.80 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 18928.0 18956.0 18982.0 19009.0 19035.0 19061.0 litres/min

Take litres 28.00 26.00 27.00 26.00 26.00

0.52 Average Take l/m 28.00 26.00 27.00 26.00 26.00 26.60 22.23

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 19102.0 19135.0 19166.0 19198.0 19230.0 19262.0 litres/min

Take litres 33.00 31.00 32.00 32.00 32.00

0.86 Average Take l/m 33.00 31.00 32.00 32.00 32.00 32.00 18.53

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 19283.0 19317.0 19352.0 19384.0 19417.0 19450.0 litres/min

Take litres 34.00 35.00 32.00 33.00 33.00

1.28 Average Take l/m 34.00 35.00 32.00 33.00 33.00 33.40 14.13

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 19481.0 19506.0 19531.0 19558.0 19584.0 19610.0 litres/min

Take litres 25.00 25.00 27.00 26.00 26.00

0.76 Average Take l/m 25.00 25.00 27.00 26.00 26.00 25.80 16.45

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 19623.0 19642.0 19663.0 19683.0 19705.0 19727.0 litres/min

Take litres 19.00 21.00 20.00 22.00 22.00

0.41 Average Take l/m 19.00 21.00 20.00 22.00 22.00 20.80 20.05

KITSAULT PROJECT

Downstream of South Abutment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-17GT

Print 11/12/10 12:48

25.0 STAGE PRESSURE VERSUS LUGEON VALUE

1 51.6

1.8FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 22.232 MAX k= 2.22E-04

DETERMINATION:

MIN Lu= 14.128 MIN k= 1.41E-04

INTERPRETATION cm/s

REFERENCE: AVG Lu= 18.279 AVG k= 1.83E-04

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS VERY ERRATIC. Very minor leak was noticed out of swivel head, no other leaks. During packer inflate .4L/min were lost at 100psi.LAMINAR was picked because the gauge readings should not be trusted, averaging all of the Lugeon values hopefully gives a more accurate result.

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 1

0.0

5.0

10.0

15.0

20.0

25.0

0.52 0.86 1.28 0.76 0.41

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

0.8

1.1

1.5

1.0

0.7

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 5 B2-49 of 56

SHEET 2 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 74.30 22.65

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 109.80 33.48 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 19820.0 19862.5 19904.0 19946.0 19988.0 20029.0 litres/min

Take litres 42.50 41.50 42.00 42.00 41.00

1.03 Average Take l/m 42.50 41.50 42.00 42.00 41.00 41.80 32.75

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20071.0 20121.0 20171.0 20221.0 20271.0 20321.0 litres/min

Take litres 50.00 50.00 50.00 50.00 50.00

1.79 Average Take l/m 50.00 50.00 50.00 50.00 50.00 50.00 23.84

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20350.0 20406.0 20463.0 20519.0 20575.0 20632.0 litres/min

Take litres 56.00 57.00 56.00 56.00 57.00

2.76 Average Take l/m 56.00 57.00 56.00 56.00 57.00 56.40 17.95

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20673.0 20716.0 20758.0 20802.0 20845.0 20889.0 litres/min

Take litres 43.00 42.00 44.00 43.00 44.00

1.38 Average Take l/m 43.00 42.00 44.00 43.00 44.00 43.20 26.19

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 20912.0 20949.0 20986.0 21024.0 21061.0 21098.0 litres/min

Take litres 37.00 37.00 38.00 37.00 37.00

0.90 Average Take l/m 37.00 37.00 38.00 37.00 37.00 37.20 33.01

K10-23GTKITSAULT PROJECT

Downstream of South Abutment

VA101-343/6

Print 11/12/10 12:48

LUGEON TEST FIELD DATA SHEET

25.0

30.0

35.0 STAGE PRESSURE VERSUS LUGEON VALUE

2.9

2.5

3.0

3.5FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 33.007 MAX k= 3.30E-04DETERMINATION:

MIN Lu= 17.951 MIN k= 1.80E-04INTERPRETATION cm/s

REFERENCE: AVG Lu= 17.951 AVG k= 1.80E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 2

RODS HAD BEEN GREASED DURING DRILLING. HOLE WASHED AT BOTTOM AND 70FT FOR TOTAL OF 25MIN. NO SEAL AT START BETWEEN 'O' RING AND LANDING RING, LOOSNG APPROX 0.5 L/MIN. ATTEMPTS TO SEAL WITH OVERSHOT UNSUCCESSFUL. RODS PULLED LEAVING CORE BARREL IN STICKUP. PACKER CLEANED. LANDING RING IN CORE BARREL VISIBLE IN STICKUP TO DETERMINE ISSUE. SEAL OK. ASSUMED RODS WERE LEAKING. RODS (WITH ADDITIONAL THREAD GREASE) AND PACKER PUT BACK IN HOLE, SEAL SUCCESSFUL. THEREFORE INITIAL LEAKS POSSIBLY DUE TO LEAKS IN RODS? NO LEAKS WERE NOTICED DURING THE TEST. TRANSDUCER WAS NOT AVAILABLE. WATER GAUGE WAS STEADY

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

1.03 1.79 2.76 1.38 0.90

Lu

ge

on

s

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.2

1.9

2.9

1.5

1.0

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

0.00 10.00 20.00 30.00 40.00 50.00 60.00

Pre

ss

ure

(B

ars

)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 5 B2-50 of 56

SHEET 3 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 2.3 m TOP OF TEST INTERVAL: 109.30 33.32

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 144.80 44.15 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21177.7 21183.2 21188.4 21193.6 21198.6 21203.6 litres/min

Take litres 5.50 5.20 5.20 5.00 5.00

1.17 Average Take l/m 5.50 5.20 5.20 5.00 5.00 5.18 3.14

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21209.7 21216.6 21223.4 21230.1 21236.8 21243.6 litres/min

Take litres 6.90 6.80 6.70 6.70 6.80

2.69 Average Take l/m 6.90 6.80 6.70 6.70 6.80 6.78 2.06

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21261.5 21273.4 21285.3 21296.8 21308.5 21320.0 litres/min

Take litres 11.90 11.90 11.50 11.70 11.50

4.83 Average Take l/m 11.90 11.90 11.50 11.70 11.50 11.70 2.09

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21334.0 21340.6 21347.1 21353.6 21360.0 21366.4 litres/min

Take litres 6.60 6.50 6.50 6.40 6.40

2.48 Average Take l/m 6.60 6.50 6.50 6.40 6.40 6.48 2.11

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 21373.0 21378.6 21384.1 21389.7 21395.2 21400.7 litres/min

Take litres 5.60 5.50 5.60 5.50 5.50

1.24 Average Take l/m 5.60 5.50 5.60 5.50 5.50 5.54 3.22

KITSAULT PROJECT

Downstream of South Abutment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-23GT

Print 11/12/10 12:48

3 0

3.5 STAGE PRESSURE VERSUS LUGEON VALUE

5 2

6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 3.217 MAX k= 3.22E-05

DETERMINATION:

MIN Lu= 2.061 MIN k= 2.06E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 2.088 AVG k= 2.09E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:THE WATER PRESSURE GAUGE WAS ERRATIC.THE TRANSDUCER WAS NOT AVAILABLE

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 3

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

1.17 2.69 4.83 2.48 1.24

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

1.5

3.0

5.2

2.8

1.6

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 5 B2-51 of 56

SHEET 4 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 4

DIP: 90 oDEPTH GROUNDWATER: 0.4 m TOP OF TEST INTERVAL: 174.30 53.14

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 20/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 209.80 63.96 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1087.0 1139.0 1191.0 1242.0 1293.0 1345.0 litres/min

Take litres 52.00 52.00 51.00 51.00 52.00

2.07 Average Take l/m 52.00 52.00 51.00 51.00 52.00 51.60 21.44

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1396.0 1454.0 1512.0 1570.0 1629.0 1687.0 litres/min

Take litres 58.00 58.00 58.00 59.00 58.00

3.86 Average Take l/m 58.00 58.00 58.00 59.00 58.00 58.20 13.39

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 1735.0 1800.0 1866.0 1931.0 1997.0 2063.0 litres/min

Take litres 65.00 66.00 65.00 66.00 66.00

5.86 Average Take l/m 65.00 66.00 65.00 66.00 66.00 65.60 10.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2105.0 2161.0 2217.0 2269.0 2321.0 litres/min

Take litres 56.00 56.00 52.00 52.00

3.86 Average Take l/m 56.00 56.00 52.00 52.00 54.00 12.42

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2367.0 2414.0 2461.0 2508.0 2555.0 2602.0 litres/min

Take litres 47.00 47.00 47.00 47.00 47.00

1.93 Average Take l/m 47.00 47.00 47.00 47.00 47.00 47.00 20.82

K10-15GTKITSAULT PROJECT

Downstream of South Abutment

VA101-343/6

Print 11/12/10 12:48

LUGEON TEST FIELD DATA SHEET

20.0

25.0 STAGE PRESSURE VERSUS LUGEON VALUE

6.0

5.0

6.0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 21.442 MAX k= 2.14E-04DETERMINATION:

MIN Lu= 10.076 MIN k= 1.01E-04INTERPRETATION cm/s

REFERENCE: AVG Lu= 10.076 AVG k= 1.01E-04

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 4

MINOR LOSS IN WATER WHEN SEAL CHECK WAS DONE. ASSUMED WATER WAS ESCAPING THROUGH RODS (SEE PACKER 2). TEST WAS RUN. THE WATER GAUGE WAS VERY ERRATIC. TRANSDUCER WAS IN THE PACKER SETUP SO ASSUMED THAT PRESSURES COULD BE READ FROM TRANSDUCER DATA. DURING THE TEST 0.03L/S WAS NOTICED ESCAPING FROM THE TOP OF THE CASING I.E SEAL NOT TIGHT.WATER SOURCE EMPTIED DURING THE SECOND P2 TEST. WATER SOURCE REFILLED AND THEN SECOND P1 READING WAS COMPLETED.VERY LOW CONFIDENCE WITH DATA ESPECIALLY WATER PRESSURE READINGS I.E ASSUMED. TRANSDUCER PRESSURES ARE ODD?

0.0

5.0

10.0

15.0

20.0

25.0

2.07 3.86 5.86 3.86 1.93

Lu

ge

on

s

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.2

4.0

6.0

4.0

2.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00

Pre

ss

ure

(B

ars

)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 4 of 5 B2-52 of 56

SHEET 5 OF 5

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 5

DIP: 90 oDEPTH GROUNDWATER: 0.3 m TOP OF TEST INTERVAL: 174.30 53.14

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 20/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 244.80 74.63 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 2722.0 2778.0 2834.0 2890.0 2947.0 3003.0 litres/min

Take litres 56.00 56.00 56.00 57.00 56.00

2.07 Average Take l/m 56.00 56.00 56.00 57.00 56.00 56.20 11.79

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3092.0 3157.0 3222.0 3286.0 3351.0 3417.0 litres/min

Take litres 65.00 65.00 64.00 65.00 66.00

3.79 Average Take l/m 65.00 65.00 64.00 65.00 66.00 65.00 7.67

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3473.0 3545.0 3616.0 3687.0 3758.0 3830.0 litres/min

Take litres 72.00 71.00 71.00 71.00 72.00

4.90 Average Take l/m 72.00 71.00 71.00 71.00 72.00 71.40 6.58

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 3887.0 3950.0 4015.0 4080.0 4144.0 4210.0 litres/min

Take litres 63.00 65.00 65.00 64.00 66.00

3.79 Average Take l/m 63.00 65.00 65.00 64.00 66.00 64.60 7.62

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4375.0 4427.0 4478.0 4530.0 4582.0 4634.0 litres/min

Take litres 52.00 51.00 52.00 52.00 52.00

2.07 Average Take l/m 52.00 51.00 52.00 52.00 52.00 51.80 10.86

KITSAULT PROJECT

Downstream of South Abutment

LUGEON TEST FIELD DATA SHEET

VA101-343/6 K10-23GT

Print 11/12/10 12:48

12 0

14.0 STAGE PRESSURE VERSUS LUGEON VALUE

5 0

6.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL TRANSDUCER DATA MAX Lu= 11.786 MAX k= 1.18E-04

DETERMINATION:

MIN Lu= 6.584 MIN k= 6.58E-05

INTERPRETATION cm/s

REFERENCE: AVG Lu= 6.584 AVG k= 6.58E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT YES

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:LARGER TEST ZONE DUE TO LOW CONFIDENCE WITH PACKER 5. MINOR LEAKS FROM CASING

TEST BY: GW REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-23GT packer tests.xls]Test 5

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

2.07 3.79 4.90 3.79 2.07

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.2

3.9

5.0

3.9

2.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 5 of 5 B2-53 of 56

SHEET 1 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 1

DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 19.30 5.88

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19-Aug-10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 59.80 18.23 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4721.3 4722.0 4722.6 4723.2 4723.9 4724.5 litres/min

Take litres 0.70 0.60 0.60 0.70 0.60

0.34 Average Take l/m 0.70 0.60 0.60 0.70 0.60 0.64 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4725.0 4725.8 4726.5 4727.2 4727.9 4728.6 litres/min

Take litres 0.80 0.70 0.70 0.70 0.70

0.72 Average Take l/m 0.80 0.70 0.70 0.70 0.70 0.72 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4729.6 4730.4 4731.2 4732.0 4732.8 4733.6 litres/min

Take litres 0.80 0.80 0.80 0.80 0.80

1.00 Average Take l/m 0.80 0.80 0.80 0.80 0.80 0.80 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4733.9 4734.5 4735.2 4735.8 4736.4 4737.0 litres/min

Take litres 0.60 0.65 0.60 0.60 0.65

0.69 Average Take l/m 0.60 0.65 0.60 0.60 0.65 0.62 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4737.3 4737.8 4738.3 4738.9 4739.4 4739.9 litres/min

Take litres 0.50 0.50 0.60 0.50 0.50

0.34 Average Take l/m 0.50 0.50 0.60 0.50 0.50 0.52 0.15

VA101-343/6 K10-24GTKITSAULT PROJECT

Plant Site

Print 11/12/10 13:02

LUGEON TEST FIELD DATA SHEET

0.2

0.2 STAGE PRESSURE VERSUS LUGEON VALUE

3.53.5

4.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.183 MAX k= 1.83E-06

DETERMINATION:

MIN Lu= 0.145 MIN k= 1.45E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.168 AVG k= 1.68E-06

INTERPRETATION 1 LAMINAR YESTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:1L/min loss during 100psi packer inflate, no leaks noticed.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 1

0.0

0.0

0.0

0.1

0.1

0.1

0.1

0.1

0.2

0.2

0.2

0.34 0.72 1.00 0.69 0.34

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

2.9

3.3

3.5

3.2

2.9

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 1 of 3 B2-54 of 56

SHEET 2 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 2

DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 59.30 18.08

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 89.80 27.38 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4758.5 4759.2 4759.9 4760.6 4761.3 4762.0 litres/min

Take litres 0.70 0.70 0.70 0.70 0.70

1.78 Average Take l/m 0.70 0.70 0.70 0.70 0.70 0.70 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4763.3 4764.1 4764.9 4765.8 4766.6 4767.4 litres/min

Take litres 0.80 0.80 0.90 0.80 0.80

2.47 Average Take l/m 0.80 0.80 0.90 0.80 0.80 0.82 0.18

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4768.0 4768.9 4769.8 4770.7 4771.7 4772.6 litres/min

Take litres 0.90 0.90 0.90 1.00 0.90

3.30 Average Take l/m 0.90 0.90 0.90 1.00 0.90 0.92 0.17

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4773.0 4773.8 4774.5 4775.3 4776.0 4776.7 litres/min

Take litres 0.80 0.70 0.75 0.75 0.70

2.40 Average Take l/m 0.80 0.70 0.75 0.75 0.70 0.74 0.16

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4777.0 4777.7 4778.3 4778.9 4779.5 4780.1 litres/min

Take litres 0.65 0.65 0.60 0.60 0.60

1.99 Average Take l/m 0.65 0.65 0.60 0.60 0.60 0.62 0.15

Print 11/12/10 13:02

LUGEON TEST FIELD DATA SHEET

KITSAULT PROJECT

Plant Site

VA101-343/6 K10-24GT

0.2

0.2

0.2

0.2 STAGE PRESSURE VERSUS LUGEON VALUE

5.0

5.8

4.95.0

6.0

7.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 0.176 MAX k= 1.76E-06DETERMINATION:

MIN Lu= 0.147 MIN k= 1.47E-06INTERPRETATION cm/s

REFERENCE: AVG Lu= 0.147 AVG k= 1.47E-06

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION NO4 WASH-OUT NO5 VOID FILLING YES

DRILLING / TEST RESULTS COMMENTS:

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 2

1.7L/min loss during 100psi packer inflate, no leaks noticed. Gauge was erratic at P2 and P3 pressures. Pressures were adjusted with transducer data.

0.1

0.1

0.1

0.1

0.2

0.2

0.2

0.2

0.2

0.2

0.2

1.78 2.47 3.30 2.40 1.99

Lu

ge

on

s

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.3

5.0

5.8

4.94.5

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

Pre

ss

ure

(B

ars

)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010' JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 2 of 3 B2-55 of 56

SHEET 3 OF 3

PROJECT: PROJECT NO: DRILLHOLE:

AREA: TEST NO: 3

DIP: 90 oDEPTH GROUNDWATER: 24.3 m TOP OF TEST INTERVAL: 94.30 28.75

(FROM HORIZONTAL) ft (DOWN HOLE) m (DOWN HOLE)

DATE: 19/8/10 GAUGE HEIGHT ABOVE GROUND: 1.2 m BOTTOM OF TEST INTERVAL: 119.80 36.52 ft (DOWN HOLE) m (DOWN HOLE)

GAUGE P Time min 0 1 2 3 4 5 6 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4805.2 4809.6 4813.3 4817.2 4821.1 4824.9 litres/min

Take litres 4.40 3.70 3.90 3.90 3.80

2.39 Average Take l/m 4.40 3.70 3.90 3.90 3.80 3.94 1.03

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4827.7 4832.6 4837.5 4842.5 4847.3 4852.0 litres/min

Take litres 4.90 4.90 5.00 4.80 4.70

3.43 Average Take l/m 4.90 4.90 5.00 4.80 4.70 4.86 1.05

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4854.1 4861.0 4867.7 4874.8 4882.0 4889.0 litres/min

Take litres 6.90 6.70 7.10 7.20 7.00

4.60 Average Take l/m 6.90 6.70 7.10 7.20 7.00 6.98 1.26

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4890.2 4894.8 4899.3 4904.0 4909.1 4914.1 litres/min

Take litres 4.60 4.50 4.70 5.10 5.00

3.15 Average Take l/m 4.60 4.50 4.70 5.10 5.00 4.78 1.08

GAUGE P Time min 0 1 2 3 4 5 AVERAGE FLOW LUGEON

(BAR) Flowmeter litres 4916.0 4919.6 4923.5 4927.6 4931.6 4935.6 litres/min

Take litres 3.60 3.90 4.10 4.00 4.00

2.53 Average Take l/m 3.60 3.90 4.10 4.00 4.00 3.92 0.99

VA101-343/6 K10-24GTKITSAULT PROJECT

Plant Site

Print 11/12/10 13:02

LUGEON TEST FIELD DATA SHEET

1 2

1.4 STAGE PRESSURE VERSUS LUGEON VALUE

7.17.0

8.0FLOW VERSUS PRESSURE PLOT

LUGEONS APPROXIMATE PERMEABILITY, cm/s

STATIC WTR LEVEL WATER LEVEL SENSOR MAX Lu= 1.256 MAX k= 1.26E-05

DETERMINATION:

MIN Lu= 0.992 MIN k= 9.92E-06

INTERPRETATION cm/s

REFERENCE: AVG Lu= 1.036 AVG k= 1.04E-05

INTERPRETATION 1 LAMINAR NOTYPE OF FLOW: 2 TURBULENT NO

3 DILATION YES4 WASH-OUT NO5 VOID FILLING NO

DRILLING / TEST RESULTS COMMENTS:The gauge was totally unreliable for this test, use transducer pressures. 2.3L/min were lost during the packer inflate at 100psi, no leaks were noticed during test.Pressures were corrected from the transducer data.

TEST BY: BH REVIEWED BY: BB

M:\1\01\00343\06\A\Data\Task 0200 (Geotechnical Site Investigation Program)\Drillhole data reviewed\Packer Data Reviewed\[K10-24GT packer tests.xls]Test 3

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

2.39 3.43 4.60 3.15 2.53

Lu

geo

ns

Stage Gauge Pressure (BAR)

STAGE PRESSURE VERSUS LUGEON VALUE

4.9

6.0

7.1

5.7

5.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

Pre

ssu

re (

Bar

s)

Q (l/m)

FLOW VERSUS PRESSURE PLOT

Note: Permeability calculation dependent upon flow classification:

0 30NOV'2010 JS BBISSUED FOR REPORT KJBDATE DESCRIPTION PREP'D CHK'D APP'DREV

Page 3 of 3 B2-56 of 56