i. kepco introductions3.amazonaws.com/jujama.usercontent/23ddd075-a0b2... · kepco’s generation...

24
1

Upload: others

Post on 14-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

1

Page 2: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

2

Page 3: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

I. KEPCO Introduction

3

Page 4: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

4

1898

The first electric power company (Hansung) was

established in Korea

1961

Three regional electric companies were merged

to establish a national electric power company (KECO)

1982

KECO was renamed KEPCO when it became a whollyGovernment-owned corporation

1989

2001

KEPCO’s generation unit was spun off to formsix 100%-owned subsidiaries (GENCOs)

2014 KEPCO’s headquarter was transferred to Naju-city

Listed its shares on KRX (Korea Stock Exchange) (21% by IPO)

Page 5: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

5

(Capacity : 72,105MW)

(Capacity : 21,110MW)

2001.4 : 5 Genco separated, 2002.2 : 1 Nuclear company separated

Page 6: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

6

Present

EVs

Smart Home

DistributedEnergy

Resources

Smart Building

Smart ApplianceIn-home Display

Storage Devices

SmartHeating & Cooling

Future

Effective in CO2 Reduction to Prevent Global Warming

• One way flow of Electric Power and Information Real time Two-way flow

Peak Shaving from Technologies

• Supplier-oriented network Operation Customer participation

• Centralized Generation (Massive use of fossil fuel) Distributed Generation (Renewable)

Page 7: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

7

Loss Rate

29.3%

3.69%

‘61 ‘80

5.0%(‘11)8.6%(‘11)

7.3%(‘11) 6.2%(‘11)

‘00 ‘14

6.7%4.7%

Power Outage time Sales per Employee

2,047

24,338

‘80 ‘08

11,131(‘09)5,982(‘09)

7,282(‘09) 13,071(‘09)

‘10 ‘14

18,358 21,938

[MWh]

Power IT Installation

170,000 Customers (2012)

11%, 2.5mil household

190 systems (2014)

DIS, Design, WFM (2014)

53%, 94,500

AMI for MV

AMI for LV

SCADA/DMS

NDIS

DAS*

Completion‘20

19.7

10.9

‘03 ‘05

10(‘08)68(‘11)

73(‘11) 120(‘09)

‘07 ‘14

18.617.2

[Minute/household]

*Distribution Automation System

Page 8: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

II. Utilizing of TETRA

Page 9: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

9

□ Built up Analog TRS* (EDACS) based on 800Mhz frequency for power

facility maintenance with Voice communication (1994)

*Trunked Radio System

□ Used Analog TRS power line switch control and monitor with data

communication (1998)

□ Government allowed KEPCO to use 380Mhz frequency for Digital TRS

migration project (2005)

□ Installed Digital TRS demo system with TETRA, tested Data application

solutions such as controlling and monitoring, etc. (2007~)

□ Implemented nationwide TETRA installation project (2009~ )

Page 10: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

10

TETRA G/W

AMI Server

DAS Server

DistributionRepairing Server

TETRA NMS

AMI Units

Distribution AutomationSystem Units

DistributionRepairing Vehicles

Base Station

Weather ObservationServer

Weather ObservationUnits

Page 11: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

11

□ Automation system : Control and real time monitor of power switches in the field

□ Power facility maintenance : Car navigation and transferring repair information

□ Gathering weather information on the route of Typhoons

□ Collecting Meter data at power poles and transferring to tariff Server

Nationwide Radio Coverage

: 70%

Page 12: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

12

□ European Telecommunication Standard Institute (ETSI)

□ KEPCO has developed application using both of Control and Traffic

Channel [Control CH used Power Automation thanks to fast comm. Speed]

Page 13: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

III. Test Overview

Page 14: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

14

□ Improvement of throughput and success rate using SCCH

□ Comparison the performance of 1 Ch(MCCH) VS. 4 Ch(1 MCCH+3 SCCH)

- Check Power Phase Current Measurement Time and Success Rate

- Check Total Info. Measurement Time and Success Rate

Page 15: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

15

Breaker Breaker4Breaker3Breaker2Breaker1

Page 16: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

16

Page 17: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

IV. Test Results

Page 18: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

18

11

1924 23

0

10

20

30

MCCH SCCH(1) SCCH(2) SCCH(3)

17 19 19 19

0

10

20

30

MCCH SCCH(1) SCCH(2) SCCH(3)

Page 19: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

19

Page 20: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

20

Page 21: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

V. Summary

Page 22: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

22

Before Solution

Phase current

- Over than 99% success rate at 0.5 Sec schedule- Down success rate when reduce schedule

Total Information

- Insufficient success rate (97%) at 5sec schedule

- Down success rate when reduce schedule

After Solution

Phase current

- Very stable success rate when reduce schedule

- Down success rate when reduce schedule

Total Information

- 98% success rate at 3~4sec schedule

Page 23: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

23

Without Further additional hardware Channel card in Base station(TB3), Only with SCCH software upgrade

process, Power facilities automation project can be realized.

BTS are able to contain 4 time numbers of power switch terminal modem by simply adding SCCH software

Even though Shortening periodic schedule from 30sec to 0.3sec, Communication success rate can rise from

94~96% to 99~100%

Gathering and Response time of all modem(224pcs) can be shortened from 5.5~3.5sec to 2.6~2.4sec

.

Communication success rate rise from 86~96% to 97~98%

Able to make sure longer the periodic schedule help communication success rate approach up to 100%

Gathering and Response time of all modem(224pcs) can be shortened from 10~9sec to 9sec

Capacity of 4 time numbers of Modem1

Phase Current Measurement2

Total Information Measurement3

Page 24: I. KEPCO Introductions3.amazonaws.com/JuJaMa.UserContent/23ddd075-a0b2... · KEPCO’s generation unit was spun off to form six 100%-owned subsidiaries (GENCOs) 2014 KEPCO’s headquarter

24

Thank you for your attentions

[email protected]