I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005 and ends on 31.12.2008 Coordinator and management team : GSI Scientific manager : A. Mueller (IN2P3) Project coordination committee (PCC) comprises one representative from each activity 1 st PCC meeting held at Funchal (Madeira) on 7./8.2.2005 General assembly (GA) comprises one representative from each institution 1 st GA planned for September 2005 Status report of the AGATA joint research activity NS : Integrated Infrastructure Initiative (I3) for Nuclear Structure ontractors and 33 other institutions from 27 countries ctivities: 8 Trans-National Access (TNA) to research infrastruc 9 Joint Research Activities (JRAs), e.g. AGATA, 8 Networking activities

Upload: willis-mcgee

Post on 19-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Contract for the EURONS project has been signed (~14 M€)Project started on 1.1.2005 and ends on 31.12.2008 Coordinator and management team : GSI Scientific manager : A. Mueller (IN2P3) Project coordination committee (PCC)

comprises one representative from each activity 1st PCC meeting held at Funchal (Madeira) on 7./8.2.2005

General assembly (GA) comprises one representative from each institution 1st GA planned for September 2005

Status report of the AGATA joint research activity

EURONS : Integrated Infrastructure Initiative (I3) for Nuclear Structure 45 contractors and 33 other institutions from 27 countries27 activities: 8 Trans-National Access (TNA) to research infrastructures,

9 Joint Research Activities (JRAs), e.g. AGATA, 8 Networking activities

Page 2: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Presentation of all activities Activity information sheet (AIP) reporting every 6 months Monitoring the progress of the project (milestones & deliverables) Preparation of the (annual) reports (management & activity)

Discussion of management organization, payments etc. Executive board of the PCC was elected (3x2 members + manager) Advance payment from GSI in early March :

2/3 of request for the first 18 months’ period Yearly payments after submission of each annual report

Audit certificate needed from each contractor every 2 years check with your local administration

Consortium agreement (CA) distributed to all institutions Comments by the end of February Signatures needed by March 31st, 2005 “Late comers” will accede to the contract

Minutes of the first PCC meeting

Page 3: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Objectives: Development, construction, commissioning and evaluation of the first modules for an advanced gamma ray tracking array (AGATA) including digital front-end electronics and a data acquisition system capable of handling the gamma-ray tracking procedure

Description of work:Task T-J02-1: General Tasks

Subtask T-J02-1.1: Conceptual designSubtask T-J02-1.2: Subsystem commissioningSubtask T-J02-1.3: Prototype commissioning

Task T-J02-2: Detector module and infrastructureSubtask T-J02-2.1: CharacterizationSubtask T-J02-2.2: AssemblySubtask T-J02-2.3: Tests

Task T-J02-3: Local Level Processing systemSubtask T-J02-3.1: ElectronicsSubtask T-J02-3.2: Pulse-shape analysisSubtask T-J02-3.2: PSA evaluation

Task-T_J02-4: Global Level Processing systemSubtask T-J02-4.1: Trigger and system integrationSubtask T-J02-4.2: Gamma-ray trackingSubtask T-J02-4.3: DAQ

Task-T_J02-5: MC simulation and data analysisSubtask T-J02-5.1: Physics emulatorSubtask T-J02-5.2: Data basesSubtask T-J02-5.3: Analysis routines

AGATA JRA : Objectives and Tasks

Page 4: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Task Nr. 1 2 3 4 5

Task name General Tasks Detector module & Infrastructure

Local Level Processing

Global Level Processing

MC Simulations & Data Analysis

1st sub-task Conceptual design of the full AGATA arrayINFN Padua

Characterisation of asymmetrically shaped 36-fold segmentedGe detectorsUniv. Liverpool

Prototype electronics for analogue and digital signal processingCCLRC Daresbury

Global trigger, synchronisation and integration of ancillary detectors INFN Padua

Conceptual array design and Monte-Carlo simulations incl. ancillary detectorsINFN Legnaro

2nd sub-task Commissioning of all sub-systems Task leaders

Cryostat and pre-amplifier developments, detector module assembly and acceptance testUniv. Köln

Pulse-shape analy sis (PSA) algorithmsTU München

Gamma-ray tracking (GRT) algorithmsCSNSM Orsay

Databases for event data storage IPN Lyon

3rd sub-task Commissioning of the full AGATA prototype systemProject leader

Test benches and infra structure for “in-beam” tests, incl. ancillary detectorsIReS Strasbourg

Simulation of detector signals and comparison with experimental dataCEA Saclay

Data acquisition, and storage, run control, graphical users interfaceIPN Orsay

Generic data analysis routines Uppsala Univ.

Tasks and Responsibilities

Page 5: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Milestones : Short title Date due

Date accomp.

Remarks/ lead participants

M-J02-1.1 Conceptual design of the full array finalised 06/05 INFN-Padua

M-J02-1.2 AGATA demonstrator sub-systems commissioned 12/07 Task leaders

M-J02-1.3 Final report delivered to managing institution 12/08 Project leader

M-J02-2.1 Asymmetric Ge detector prototype characterized 06/06 U-Liverpool

M-J02-2.2 AGATA prototype triple-cluster module assembled 12/06 U-Köln

M-J02-2.3 Infrastructure for in-beam tests commissioned 12/07 IN2P3-IReS

M-J02-3.1 Prototype local level processing electronics delivered 12/05 CCLRC

M-J02-3.2 Pulse-shape analysis algorithms optimised 06/06 TUM/IPNO

M-J02-3.3 Pulse-shape analysis performance evaluated 06/07 CEA-DSM

M-J02-4.1 Prototypes for data acquisition hardware delivered 12/05 INFN-Padua

M-J02-4.2 Gamma-ray tracking algorithms optimised 06/06 IN2P3-CSNSM

M-J02-4.3 Data acquisition system commissioned 06/07 IN2P3-IPNO

M-J02-5.1 Physics emulator integrated in MC simulations 12/05 INFN-Legnaro

M-J02-5.2 Event data base storage commissioned 12/06 IN2P3-IPNL

M-J02-5.3 Analysis routines for event data commissioned 12/07 U-Uppsala

Milestones

Page 6: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Deliverables: Short title Lead contractor

Date due5

Datedeliver

ed

Type[ii]

Dissemination level[iii]

Remarks :

D-J08-1.1 Delivery of the full AGATA prototype system

CCLRC 12/07 R/PU Project leader

D-J08-1.2 Final evaluation report on the full prototype system commissioning

CEA-DSM 12/08 R/PU JRA coordinator

D-J08-2.1 Delivery of prototype triple-cluster module

U-Köln 12/06 P/PU

D-J08-2.2 Report on the characterisation of the detector module

U-Liverpool 12/08 R/PU

D-J08-3.1 Delivery of prototypes of digital signal processing electronics

IN2P3 06/06 P/PU

D-J08-3.2 Report on local level processing system and pulse shape analysis

IN2P3/TUM 12/08 R/PU

D-J08-4.1 Delivery of prototypes of specific data acquisition hardware

INFN 06/06 P/PU

D-J08-4.2 Report on global level processing system and gamma-ray tracking

IN2P3/INFN 12/08 R/PU

D-J08-5.1 Report on MC simulations and data analysis routines

U-Uppsala 12/08 R/PU

Deliverables and lead contractors

Page 7: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

AGATA JRA participant(Nr. & short name)

Personnel Networking Overheads TotalEU

First 18 months

28. CEA Saclay1 24.000 9.440 18.560 52.000 21.000

1. GSI Darmstadt 36.000 15.000 10.000 61.000 26.000

3. GANIL Caen 24.000 7.667 6.333 38.000 13.000

4. Univ. Jyväskylä 0 17.500 3.500 21.000 7.000

5. INFN Legnaro 39.000 5.333 8.867 53.200 22.000

5. INFN Milano 47.000 6.583 10.717 64.300 27.000

5. INFN Padova 56.000 6.917 12.583 75.500 32.000

11. Univ. Sofia 0 10.000 2.000 12.000 4.000

17. Univ. zu Köln 46.000 9.000 11.000 66.000 54.000

20. TU München 50.000 5.000 11.000 66.000 30.000

23. NBI Copenhagen 20.000 7.500 5.500 33.000 24.000

29. CNRS/IN2P3 70.000 26.667 19.333 116.000 50.000

33. Istanbul University 0 10.000 2.000 12.000 4.000

35. Univ. Warsaw 12.500 25.000 7.500 45.000 24.000

36. NIPNE Bucharest 0 14.167 2.833 17.000 6.000

38. KTH Stockholm 45.000 5.000 10.000 60.000 16.000

39. Uppsala Univ. 45.000 5.000 10.000 60.000 16.000

40. CCLRC Daresbury1 27.000 13.000 39.000 79.000 27.000

41. Univ. Liverpool 45.000 20.000 13.000 78.000 33.000

44. Univ. York 21.000 9.000 6.000 36.000 19.000

Project Coordination (CEA-Saclay)

0 5.000 0 5.000 2.000

TOTAL 607.500 233.334 209.166 1050.000 457.000

Finances and first payment

Page 8: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Participant No. 28(Coord.)

1 3 4 5 11 17 20 23

Participant short name CE

A/

DSM

Saclay

GSI

GA

NIL

JYU

INF

N

U-Sofia

U-K

öln

TU

M

UK

BH

Personnel/PM EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI

48 months 6 48 12 48 6 36 0 24 72 252 0 36 9 84 24 96 6 12

presently spent 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

next 18 months 3 16 6 16 2 12 0 6 30 96 0 12 9 36 12 36 6 3

Personnel / k€

48 months 24 36 24 0 142 0 46 50 20

presently spent 0 0 0 0 0 0 0 0 0

next 18 months 12 18 8 0 65 0 46 25 20

Other / k€

48 months 33 25 14 21 51 12 20 16 13

presently spent 0 0 0 0 0 0 0 0 0

next 18 months 12 8 5 7 16 4 8 5 4

Sum / k€

48 months 57 61 38 21 193 12 66 66 33

Presently spent 0 0 0 0 0 0 0 0 0

next 18 months 23 26 13 7 81 4 54 30 24

Activity information sheet

Page 9: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Participant No. 29 33 35 36 38 39 40 41 44

Participant short name IN2P

3

U-

Istanbul

U-

Warsaw

NIP

NE

KT

H

U-

Uppsala

CC

LR

C

U-

Liverpoo

l

U-Y

ork

Personnel/PM EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI

48 months 24 192 0 36 12 72 0 36 24 48 24 48 11 96 12 84 6 24

presently spent 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

next 18 months 12 72 0 12 9 24 0 12 6 18 6 18 4 30 6 36 4 6

Personnel / k€

48 months 80 0 12.5 0 45 45 27 45 21

presently spent 0 0 0 0 0 0 0 0 0

next 18 months 35 0 9 0 11 11 10 22 14

Other / k€

48 months 36 12 32.5 17 15 15 52 33 15

presently spent 0 0 0 0 0 0 0 0 0

next 18 months 15 4 14 6 5 5 17 11 5

Sum / k€

48 months 116 12 45 17 60 60 79 78 36

presently spent 0 0 0 0 0 0 0 0 0

next 18 months 50 4 24 6 16 16 27 33 19

Activity information sheet (cont.)

Page 10: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Proposed Lines of Action (major role for RI) Continue and improve the current line of action on RI Reinforce RI action

adding new line for development of new ‘unique’ RI Vision. Roadmap for RI in Europe in the next 10-20 years. The Roadmap can have periodic updates and revisions.

Criteria for priority projects in Roadmap : Pan-European interest; potential impact on ERA; Size (>50M€); maturity of the project and timeliness; Existence of multi-annual and long-term budgetary planning, Quality of management.

AGATA has good chances to become a priority RI project

Research Infrastructures in FP7(as seen by the EC)

Page 11: I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005

I3 EURONS

Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005

Nuclear Physics community should submit one I3, instead of I3HP and I3EURONS; but NuPECC is open for suggestions.

A committee should be formed soon to look into the various issues and ‘new’ criteria connected with I3 applications in FP7.

New design studies and new construction projects should be inventorised. Current priorities for construction: FAIR and SPIRAL-2 Other installations such as a “High-intensity stable beam facility” and other initiatives will be discussed later (according to M. Harakeh)

The AGATA collaboration must start defending its interests

Research Infrastructures in FP7 (as seen by NuPECC)