ibm bladecenter fo university
TRANSCRIPT
-
8/7/2019 IBM Bladecenter fo University
1/41
Delivering Smarter Systems for a Smarter Planet ArdianshahSystem X & BladeSpecialist
2009 IBM Corporation1
-
8/7/2019 IBM Bladecenter fo University
2/41
Dinner
Visit IBM Demo Room Facility
2009 IBM Corporation
-
8/7/2019 IBM Bladecenter fo University
3/41
What is a Server?
a computer program running as a service, to serve the
context as "clients") which may or may not be running onthe same computer.
services, to serve the needs of programs running on other
computers on the same network.a software/hardware system (i.e. a software service
running on a dedicated computer) such as a databaseserver file server mail server or rint server.
Source: http://en.wikipedia.org
2009 IBM Corporation3
-
8/7/2019 IBM Bladecenter fo University
4/41
Why Server better than PC? Servers often run for long periods without interruption and availability must often be very
high, making hardware reliability and durability extremely important. Although servers cane u rom commo y compu er par s, m ss on-cr ca en erpr se servers are ea y very
fault tolerant and use specialized hardware with low failure rates in order tomaximize uptime, for even a short-term failure can cost more than purchasing and installingthe system
Server Key points:1. RAS (Reliability Availability Serviceability)
High quality component for better MTBF
Hot swap Component
2. Higher Performance
More processor, more memory, more disks
. ca a y Upgradeable to a significant level
Up to 4 or 8 way processor
2009 IBM Corporation
4. Manageability
Advance system Management: IMM, PFA, Light Path Diagnostic4
-
8/7/2019 IBM Bladecenter fo University
5/41
The PC architecture has already been pushed to its limits
Are easy to acquireSupport a broad application base
a e a vantage o rea y ava a e a m n strat on
skills
SERVERSe ove em
In distributed computing environments, 85 percent
of computing capacity sits idle1
than they were 12 years ago2Management costs now represent 70 percent
2009 IBM Corporation5
1 Based on IBM estimates.
2,3 Clabby Analytics, The Data Center Implosion Explosion and the Need to Move to a New Enterprise Data Center Model, February
2008
-
8/7/2019 IBM Bladecenter fo University
6/41
Traditional server paradigms need to change
The x86-based PC architecture is now 28 years old. It has evolved through PCs, towers, racks and blades.
.
Rack Blade Computers optimized
Servers
PC Servers
2009 IBM Corporation6
-
8/7/2019 IBM Bladecenter fo University
7/41
-
8/7/2019 IBM Bladecenter fo University
8/41
Dynamic InfrastructureDynamic InfrastructureFour major
planet vision DynamicInfrastructure
DynamicInfrastructure
IBM themes
New
Intelligence
New
Intelligence
Green &BeyondGreen &Beyond
The world has becomeflatter and smaller. Now it
Smart
Work
Smart
Work
.
How do I create an infrastructurethat drives down cost,
2009 IBM Corporation
,just as dynamic as todays
business climate ?
-
8/7/2019 IBM Bladecenter fo University
9/41
A smarter lanet demands smarter s stems
Clients need systems that:
Scale quickly and efficiently.
Remove memor bottlenecks.
DATAWorkloads
Maximize utilization.
Innovation
Provide rapid access to data.
The next generation x86 architectures must be able tokee u with the roliferation of workloads and ex losion
2009 IBM Corporation9
of data of a smarter, more interconnected planet.
-
8/7/2019 IBM Bladecenter fo University
10/41
IBM S stems.In todays economy, we need dynamic infrastructuresthat drive down costs, and are intelligent and secure.
Not just containing operational cost
Reduce Cost
an comp ex y, u ac ev ngbreakthroughproductivity gains
through virtualization, optimization,
energy stewardship, and flexiblesourcin .
Increasingly customer demand forquality service & continuous
Improve Service
accessibility
Security, resiliency & compliance challengesManage Risks and Threats
2009 IBM Corporation10
are crea e y e acce era ng pace ochange.
-
8/7/2019 IBM Bladecenter fo University
11/41
Smarter systems from IBMenable you to add memory to x86-based systems independently of the
processor
Add upto
more memoryper processor6x
Reduce
97%
and
by up to
licensingcosts by
2009 IBM Corporation11 2010 IBM Corporation
-
8/7/2019 IBM Bladecenter fo University
12/41
IBM System X & BladeCenter Portfolio
Clusters, HPC,Virtualization,
Web 2.0
Large symmetrical multiprocessing(SMP)
& ou
dx360 M3dx360 M32S | 16 DIMM2S | 16 DIMM
Highdensit/
SMP
ti
ng iDataPlex
BladeCenterS, E, H, T, HTCluster 1350
x3850 X5 + MAX54S | 96 DIMM
8S | 128 DIMM
caleu
comp HS22/HS22V/HX5
PS700/701/702
QS22
x3550 M32S | 18 DIMM
x3650 M32S | 18 DIM
x3630 M3
x3755 M34S | 32 DIMM
+2S | 64 DIMM
SHS22HS22
2S | 12 DIMM2S | 12 DIMMx3100 M31S | 4 DIMM
x3200 M31S | 6 DIMM
x3400 M32S | 16 DIMM
x3500 M32S | 16 DIMM
x3250 M31S | 6 DIMM
x3620 M32S | 12 DIMM
2S | 12 DIMM
HX54S | 32 DIMM
HX5 + MAX52S | 40 DIMM
2009 IBM CorporationScale out / distributedcomputing
-
8/7/2019 IBM Bladecenter fo University
13/41
Why Dont You Move to
IBM BladeCenterThe Smart Choice To Simplify IT Infrastructure
ArdianshahSystem X & BladeSpecialist
2009 IBM Corporation13
-
8/7/2019 IBM Bladecenter fo University
14/41
What is a Blade?
A Blade contains the core components of a server
Each blade has:
Processors
Memory
Internal storage (optional)
Network Interface Cards NIC
Blade-server with cover off
Optional plug-in components
The Blade server plugs into the midplane of achassis that provides common functions as:
Management console Access (KVM)
Power supplies
Cooling Fans
Blade server with its cover on ready forinsertion into the BladeCenter Chassis
Network Connectivity ( LAN, SAN, NAS, HPC) Shared media devices (CD/DVD-ROM and
diskette or USB drives)
2009 IBM Corporation
Optional Modules to support additional
functions Blade servers and Chassis
-
8/7/2019 IBM Bladecenter fo University
15/41
Legacy Environment
PublicInternet/
Layer 4-7
ClientsRouters(Layer 3
Switches)
Firewalls
Layer 2Switches
pp ances
Caching Appliances
pp ances
Caching Appliances
FileWeb Security WebSphereNetwork Application Security Application
StorageFibre
Switches
ServersServers GatewayApplication
ServersServers Servers Servers Servers
StorageFibre
Switches
SAN
2009 IBM Corporation15
-
8/7/2019 IBM Bladecenter fo University
16/41
Step 1
PublicInternet/
Consolidate Servers
Layer 4-7
ClientsRouters(Layer 3
Switches)
Firewalls
Layer 2Switches
pp ances
Caching Appliances
pp ances
Caching Appliances
FileWeb Security WebSphereNetwork Application Security Application
StorageFibre
Switches
ServersServers GatewayApplication
ServersServers Servers Servers Servers
StorageFibre
Switches
SAN
2009 IBM Corporation16
-
8/7/2019 IBM Bladecenter fo University
17/41
Step 2Public
Internet/
Integrate First Layer
of the Network (L2) Layer 4-7
ClientsRouters(Layer 3
Switches)
Firewalls
pp ances
Caching Appliances
pp ances
Caching Appliances
Layer 2Switches
StorageFibre
Switches
StorageFibre
Switches
SAN
2009 IBM Corporation17
-
8/7/2019 IBM Bladecenter fo University
18/41
Step 3Public
Internet/
Integrate
Storage Fabric Layer 4-7
ClientsRouters(Layer 3
Switches)
Firewalls
pp ances
Caching Appliances
pp ances
Caching Appliances
StorageFibre
Switches
StorageFibre
Switches
SAN
2009 IBM Corporation18
-
8/7/2019 IBM Bladecenter fo University
19/41
PublicInternet/Step 4
Layer 4-7
ClientsRouters(Layer 3
Switches)
FirewallsIntegrate Second Layer
of the Network (L4-7) pp ances
Caching Appliances
pp ances
Caching Appliances
SAN
2009 IBM Corporation19
-
8/7/2019 IBM Bladecenter fo University
20/41
Step 5
PublicInternet/
IntranetClients
Consolidate Applications
ou ers(Layer 3
Switches)
Firewalls
SSL AppliancesSSL Appliances
SAN
2009 IBM Corporation20
-
8/7/2019 IBM Bladecenter fo University
21/41
Result
PublicInternet/
IntranetClients
BladeCenter
Collapses Complexityou ers
(Layer 3
Switches)
Firewalls
SAN
2009 IBM Corporation21
-
8/7/2019 IBM Bladecenter fo University
22/41
Conventional Servers vs. IBM BladeCenter
1U Servers
14U in a Rack
BladeCenter
7U in a Rack
Chassis
28 Ethernet
Cables + 14 forRemoteManagement
Up to 8 EthernetCables
4 Power Cables
28 Power Cables
Up to 112 Fans
2 Blowers forCooling
Server
14 IndividualPoints to Manage
At least two 8 Port
Integrated 14 portVGA switch Boxfunctionality (1
and 14 KVMCables
Monitor, Keyboard,& Mouse)
2009 IBM CorporationRIGHT
-
8/7/2019 IBM Bladecenter fo University
23/41
Fit-for-purpose choice of chassis
IBM BladeCenter EEnterprise, best
efficiency, best densityIBM BladeCenter TRuggedized, short-
depth
Distributed, small office,easy to configure
IBM BladeCenter HEnterprise high
performance
IBM BladeCenter HTRuggedized, high
performance
A common set of blades A common set of industry-standard switches and I/O fabrics
Common management infrastructure
2009 IBM Corporation23
Over a decade of a stable platform
Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
24/41
BladeCenter S and the NEW O.E.K.
Ideal way to deploy BladeCenter S into office environments
Optional Air Filter on the front
Mobile with rollers
110V Power
Incredibly Quiet
Dust Filter
Up to 12TB
Shippable WW
2009 IBM Corporation24
IBM
Perfect workgroup solution
foundation
BladeCenter S installed in theIBM Office Enablement Kit
-
8/7/2019 IBM Bladecenter fo University
25/41
Fit-for-purpose choice of blades
PS702 Express
HS22VVirtualization
HX5Scalable high end
blade for highdensity compute
and memory
Scalable for
demandingcommercialworkloads and
HS22No Compromise
capac y
PS701 Express
Application & Database
Serving and virtualization
HS12Entry & SMB
JS12 ExpressEntry and SMB PS700 Express
Value for AIX,IBM I and Linux
Best of breed x86 and POWER blade portfolio
Workload O timized Offerin s
2009 IBM Corporation2525
Broad support of chassis with blades and I/O
Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
26/41
HS22 Hardware OverviewOptional RAID 5
w/ battery-backed
Internal USB
No CompromisesDual and redundant power & I/O
connectors
-
L 1.29 in/32.8 mm
2x Intel Xeon 5500 Processors(Nehalem EP)
Additional Features
. .Th 0.18 in/4.5 mm
IMM & UEFILight Path
Diagnostics
Expansion blades, , ,BCHT
2 / xpans on ots(1x CIOv + 1x CFFh)
2009 IBM Corporation
2x hot-swap drive bays(SAS or Solid State)
12x VLP DDR3 Memory(96GB Max / 1333MHz Max)
-
8/7/2019 IBM Bladecenter fo University
27/41
HS22V Max memory DP blade for virtualization and HPC
Internal USB(Embedded Hypervisor)
Dual GbE LOM
(10GbE Option)2x Intel Xeon 5500/5600 Processors
Up to 50%+ more average VMs..(1x CIOv + 1x CFFh)
2x 1.8 SSD
Additional FeaturesIMM & UEFIAdvanced Power Mgmt
TPM 1.2Light Path Diagnostics
2009 IBM Corporation27
(HW RAID 0/1) 18x VLP DDR3 Memory(144GB Max / 1333MHxz Max)
Expansion blades
Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
28/41
O timize memor for 2 socket blade workloads50% more memory than HS22 means 50% more average virtual machines
Ideal for... Ideal for...
BladeCenter HS22
2-socket 12 DIMMs
enera purpose Infrastructure workloads
File/print and email E-commerice applications
BladeCenter HS22V
2-socket 18 DIMMs
mainstream applications,
Memory intense highcompute workloads
Dense power constrainedenvironments
Cost/VM
$/VM - HS22
HS22V Cost Effective for:15 30 VMs per server
HS22 Cost Effective for:15 VMs per server or less
$/VM - HS22V
2009 IBM Corporation2828
5 10 15 20 25 30 35 Virtual Machines
Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
29/41
-
8/7/2019 IBM Bladecenter fo University
30/41
MAX5 for HX5
MAX5
HX5
6x memory buffersFireHawk
6 SMI lanes
2009 IBM Corporation
24x VLP DDR3 memoryHX5+MAX5 Configurations 2S, 40D, 8 I/O ports, 60m 4S, 80D, 16 I/O ports, 120mm
3 scalability ports
-
8/7/2019 IBM Bladecenter fo University
31/41
Solid State - Reliable and Green Local Storage
2009 IBM Corporation31
-
8/7/2019 IBM Bladecenter fo University
32/41
Take advantage of unprecedented flexibilityFlexNode enables you to dynamically transform a single into two distinct systemsand then back again
Optimize workloads: Runinteractive applications by day
wo ys emsne ys em
by night on 4S system
Help reduce software
partitions to optimize softwarelicensing costs when priced persystem core.
Boost security: Isolateworkloads to help improvesecurity and assure quality of
2009 IBM Corporation32
serv ce.
Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
33/41
Flexible and open IO from an ecosystem of partners
Standard Speed Switches High Speed Switches
Standard Speed High Speed
Ethernet Fibre Channel InfiniBand FCoE SAS iSCSI Virtual Fabric
2009 IBM Corporation3333Return toAgenda
-
8/7/2019 IBM Bladecenter fo University
34/41
Read for Critical Business A lication
BladeCenter is desi ned for extreme availabilit a ma or advanta e over com etitors blades that
Two completeN+N redundant
Redundant
may not be designed for extreme uptime
cooling
Redundant I/O
connectors
Redundant
power
IBM BladeCenterCompetitors Lack redundancySingle I/O, single power
2009 IBM CorporationRIGHT
-
8/7/2019 IBM Bladecenter fo University
35/41
Active Energy Manager
2009 IBM Corporation35
-
8/7/2019 IBM Bladecenter fo University
36/41
-
8/7/2019 IBM Bladecenter fo University
37/41
Enterprise Management
omp ete ystem x a e enter anagement
Upward
Resource Management
Platform Management
ToolsCenter
Systems Director 6.1
Hardware/FirmwareUEFI,IMM
Reducing complexity withintegrated platform and
Deploying and managingvirtual servers to control
Managing energy usagehelps meet green
2009 IBM Corporation37
en erpr se serv cemanagement
a a cen er space n a ves an cosobjectives
-
8/7/2019 IBM Bladecenter fo University
38/41
Youre in good company with the IBMBladeCenter community
O en S ecificationAlliance Pro ram
Hardware vendors
Access to BladeCenter specs
Basic technical help
Hardware and software Making product info available More than 300 members
IBM OEMs
IBM Collaborators
Network equipment providers Appliances
Server vendors
Blade.org Accelerating blade platform-based
Working together to bringofferings to market
BNT Brocade
Increasing the numberof blade platform solutions
Increasing end-user confidencein blade platform solutions
Emulex McData
QLogic Voltaire Devon IT
2009 IBM Corporation
-
8/7/2019 IBM Bladecenter fo University
39/41
Future Historym
IBM introduced BladeCenter in November 2002, since then IBM has maintained compatibility, grown theportfolio and opened the specification to the industry. Key to BladeCenter is true reliability, with no single
points of failure and massively improved density, simplification, power & cooling, management and
choice.
HP re-invents, an ave a istory o eserte customers an partners. Every time HP c ange esigns, a
that investment is gone. Customers pay for HPs bad decisions.
2002 2004 2006 1H 2007 2H 2007BladeCenter E BladeCenter T BladeCenter H BladeCenter HT BladeCenter S
2009 IBM Corporation
HP BH7800 HP BLe HP p-Class HP c-Class
-
8/7/2019 IBM Bladecenter fo University
40/41
IBM BladeCenter Virtualization Solution
2009 IBM Corporation40
-
8/7/2019 IBM Bladecenter fo University
41/41
HebrewRussian
GrazieItalian
rac asSpanish
i
oEnglish Merci
French
Danke
PortugueseArabic
Japanese
German
Traditional Chinese
Korean
Simplified Chinese
Thai
2009 IBM Corporation