18
 Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18 Short Case Study On HKL SCACC Short case study on Hospital Kuala Lumpur Specialist Complex & Ambulatory Care Centre (HKL SCACC)- The first IBS70 government hospital project in Malaysia Table Of Contents 1 IBS construction technology in action 2 Summing up the IBS score 3 IBS in construction procurement & costing 4 IBS in contract management considerations 1. IBS construction technology in action Keywords About IBS Standardization / Penyeragaman

Upload: mrlobbo

Post on 04-Jun-2018

260 views

Category:

Documents


1 download

TRANSCRIPT

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 1/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Short Case Study On HKL SCACCShort case study on Hospital Kuala Lumpur Specialist Complex & Ambulatory Care

Centre (HKL SCACC)- The first IBS70 government hospital project in Malaysia

Table Of Contents

1 IBS construction technology in action

2 Summing up the IBS score

3 IBS in construction procurement & costing

4 IBS in contract management considerations

1. IBS construction technology in action

Keywords About IBS

Standardization / Penyeragaman

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 2/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Component Size

Industry Standard (Specification)

Component Code

Modular

Basic Module

Modular Coordination / Dimension Coordination

Basic Unit

Malaysian Standard MS 1064

Off -Site Assembly

Prefabrication

Precast

IBS Scoring

On-Site Installation

Delivery & Hoisting

Specialized Workers

Higher Cost

Implementation Of IBS System For Government Projects

Surat Pekeliling Perbendaharaan - 31 Oktober 2008

Pengunaan Sistem Terbuka Melalui Modular Kordinasi MS 1064

Keperluan 70% Kandungan Komponen IBS dalam Projek Kerajaan

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 3/18

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 4/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Site Location

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 5/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Site Plan

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 6/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Project Brief

Items Location Descriptions Quantity Remarks

1 All Departments CE Rooms 184

2 OT Operating Theater 9+1

3 2nd to 4th floor Carparks 300 bays

4 The Specialist Clinics and Other Non-clinical Departments 

Level 0 (Ground Floor)

01) Orthopaedics

02) Medical Imaging

03) Clinical Laboratory

04) Outpatient Pharmacy 1

Level 1

05) General Medicine Specialist Clinic

06) General Surgery Specialist Clinic

07) Dental Specialist Clinic

08) Social Services Unit

Level 2

09) Haemodialysis Clinic

10) Nephrology Specialist Clinic

11) Urology Specialist Clininc

Level 3

12) Psychiatric Specialist Clinic

Level 4

13) Neurosurgery Specialist Clinic

14) Neurology Specialist Clinic

Level 5

15) ENT Specialist Clininc

16) Opthalmology Specialist Clinic

17) Oncology Specialist Clinic & Day Care

18) Plastic Surgery Specialist Clinic

19) Dermatology Specialist Clinic

4 Level 6

(cont.) 20) IT Area

21) Medical Records

22) Specialist Office Complex

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 7/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Items Location Descriptions Quantity Remarks

23) Skill Lab

24) Anaesthetic & Pain Specialist Clinic

25) Day Care ( Endoscopy Suite )

Level 7

26) Respiratory & Haemodynamic Equipment Unit

27) Theatre Sterile Supplies Department (TSSD)

28) Day Care

29) Cytotoxic Drug Unit

30) Operation Theatre

5 DIAGNOSTIC IMAGING EQUIPMENT

X-Ray, General, c/w Chest Stand 4

X-ray Fluoro w 90/15 w ERCP Table 1

X-ray Fluoro w 90/15 endo-uro table 38cm II 1

Extracorporeal Shock Wave Litho. (ESWL) 1

Digital Orthopantomography (OPG) 1

CR System complete w Laser Printer 2

CT Scan, 16 slices 1

X-Ray C-Arm, 9" II with 2 Mon. 2

6 OPERATING THEATRE (LIGHTS& TABLES)

Light, Op, Ceiling, Main 110K + Sat. 80K Lux 8

Light, Exam, Ceiling, 30k lux 41

Table, Operating, General, Elec. cw Accs. 3

Table, Operating, Ortho, Elec. cw Accs. 2

Table, Operating, ENT, Elec. cw Accs. 1

Table, Operating, Urology, Elec. cw Accs. 1

Table, Operating, Opth, Elec. c/w Accs. 1

7 CSSD

Autoclave, Pass through, 30ft 2

Cabinet, Drying, Pass through 1

Sterilizing Basket ss 575x280x130mm 70

Sterilizing Basket ss 575x280x260mm 70

Shelf Wire CSSD ss 900(36")X1200(48")X63"(WLH)mm - Group 1 42

Distribution/Collection Trolley, ss 1195x695x975mm 10

Loading/Unloading Trolley, for Washer Disinfector/Dryer 6

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 8/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Items Location Descriptions Quantity Remarks

Hatch, Pass Through ~ open: 600X 600 mm 1

Loading/Unloading Trolley for Steam Sterillizer 4

Reverse Osmosis Water System, 1

Barrier Panelling, Sterillization, ss 1

Barrier Panelling, Cleaning & Disinfection, ss 1

Steriliser, Hydrogen Peroxide, ~ 100L 1

Washer / Disinfector, Pass Through 3

Endoscope Washer Disinfector 12

Endoscope Sterilizer -Group 1 1

Washer/Sanitiser, Bedpan 3

Stainless Steel Gauze Cutting Table 2

Stainless Steel Mobile Work Table 4

Stainless Steel Packing Table 6

Stainless Steel Paper Trolley 3

Workstation for Heat Sealer, ss 2

Worktable s/s Mobile, 1080x500x800mm 4

Stainless Steel Linen Inspection Table 2

8 DENTAL

Suction Machine (12 Chairs) 2

Air Compressor w Dryer (12 Chairs) 2

Chair Dental Treatment Unit (Officer) 5

Chair Dental Treatment Unit (Specialist) 4

Dental Technologist Workstation Set 8

9 LAB

Fume cupboard 4 ft 1

Fume cupboard 6 ft 1

Cabinet, Cytotoxic Drug w UV Lamp 1

10 Others

RO System, w Piping, UV Light & Tank 1

IBS Component In Use (Structural & Architectural)

Precast Hollow Core SlabPrefab Steel Roof

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 9/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Precast Wall

Precast Beams

Precast Cornice & MouldingPrecast Staircase

Aluminium System Formwork

Speed Of Progress Of Work

Estimated at 1 month 1 floor for structure framing

Estimated at 1 month 1 floor for precision blockwork

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 10/18

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 11/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Wall system (max 30%) - widely available in the market

Others Simplified Saving Construction Solution (max 20%) - standard

components MS1064; repetition; 3D components; etc

Structural system

Points are awarded based structural system used

Allocation based on % floor area that utilises the structural system

Sub-structure works (elements) are not taken into account in the

calculation e.g. Piling, ground beam, ground slab, underground car parketc)

The construction area includes car porch but excluding driveway, apron

and landscaped areas

For structural system using Load Bearing wall, whether precast or in-situ

the factor can be determined from the table by treating the wall as widecolumn

The factor for tunnel formwork system is 0.6

This is for structural without floor. For other structural systems not

mentioned in the table please refer to CIDB for the factor

IBS Factor For Structural Systems

SYSTEM FLOOR

COLUMN /BEAM

(5) (6)

Precastconcrete

slab(1)

In-situconcrete on

permanent

metalformwork

In-situconcrete

using

reusable(3)system

formwork

In-situconcrete

using

timber(4)formwork

Steelflooring

system

Timberframe

flooring

system

Precast columnand beams

1.0 0.9 0.7 0.6 1.0 1.0CONCRETE

Precast column

and in-situ

beams usingreusable(3)

system

0.9 0.8 0.6 0.5 0.9 0.9

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 12/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

SYSTEM FLOOR

COLUMN

 /BEAM

(5) (6)

Precast

concrete

slab(1)

In-situ

concrete on

permanentmetal

formwork

In-situ

concrete

usingreusable(3)

system

formwork

In-situ

concrete

usingtimber(4)

formwork

Steel

flooring

system

Timber

frame

flooringsystem

formwork

Precast columnand in-situ

beams using

timber(4)

formwork

0.8 0.7 0.5 0.4 0.8 0.8

Precast beams

and in-situ

columns withreusable(3)

system

formwork

0.9 0.8 0.6 0.5 0.9 0.9

Precast beams

and in-situ

columns using

timber(4)formwork

0.8 0.7 0.5 0.4 0.8 0.8

In-situ column

and beams usingreusablesystem(3)

formwork

0.7 0.6 0.5 0.3 0.7 0.7

In-situ columnand beams using

timber(4)

formwork

0.6 0.5 0.3 0.0 0.6 0.6

STEEL Steel columnsand beams

1.0 0.9 0.7 0.6 1.0 1.0

TIMBERTimber frame

system1.0

Prefab timberroof truss

1.0ROOFSYSTEM

Prefab metal1.0

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 13/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

SYSTEM FLOOR

COLUMN

 /BEAM

(5) (6)

Precast

concrete

slab(1)

In-situ

concrete on

permanentmetal

formwork

In-situ

concrete

usingreusable(3)

system

formwork

In-situ

concrete

usingtimber(4)

formwork

Steel

flooring

system

Timber

frame

flooringsystem

roof truss

Timber(4) roof

trusses

0.0

Wall System

Points are awarded based wall system used

Allocation based on % length of the wall system used

External basement wall for earth retaining purposes and toilet cubicle

partition walls are excluded from the calculation

For cavity wall, consider the two separate skins as a wall

Parapet and corridor must be counted in the calculation

IBS Factor For Wall Systems

NO  WALL SYSTEM (7)  IBS FACTOR 

1 Precast Concrete Panel (1) 1.0

2 Metal Cladding 1.0

3 Prefabricated Timber panel 1.0

4 Full height Glass panel (2) 1.0

5 Dry Wall system (3) 1.0

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 14/18

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 15/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

IBS SCORE 

PERCENTAGE OF USAGE 

No  DESCRIPTION 

UNIT 50% ≤≤≤≤ x <75%,  75% ≤≤≤≤ x ≤≤≤≤100% 

vi) Windows(3) Nos 1 2

REPETITION OF STRUCTURAL

LAYOUT 

a) For building more than 2 storeys 

i) Repetition of floor to floor height storey 1 2

ii) Vertical repetition of structural floor

layoutm2 1 3

b) For building 1 or 2 storeys 

Horizontal repetition of structural floor

layoutm2 2 5

OTHER PREFABRICATED

COMPONENTS AND LABOUR

SAVING SOLUTIONS 

i) Prefab Toilet Units Nos 0.5 1

ii) Prefab Staircases Nos 0.5 1

iii) Prefab Lift-Shafts Nos 0.5 1

iv) Spray plaster(4) m2 0.5 1

v) Other Labour Saving Product /Solution(5)

Nos orm2

0.5 1

3. IBS in Construction Procurement & Costing

2 Steps In Estimating IBS Construction Cost

Identify the key cost elements of construction elements with IBS systems

Pre-cast Concrete Framing

Pre-cast Concrete Panel

Pre-cast Concrete Floor

Steel Formwork Systems

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 16/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Structural Steel

Blockwork

Approaches for establishing the IBS project cost

Elemental Measurement

Detail Measurement

Production Cost Estimation

Precast Hollow Core Slab Costing ExamplePRECAST CONCRETEThe design, supply, delivery and

installation of precast component:-

Hollow Core Slabs

Supply and delivery of Precast

Prestressed Hollow Core Slabs.(HCS:

WV6-205mm thick) M2 24,310

Precast prestressed hollow core slab;

265mm thick M2 19,101

Installation & grouting of hollow core

slabs & planks in thicknes:- 300mm &

below (labour only not inclusive

cranage) M2 24,310

Grouting works to precast system whichis HCS/ plank shearkey joint to: (E.mix)

WV6-205 (labour & material) M 20,258

Associated Concrete G30 to topping. M3 2,301

Associated concrete Grade 40 to beam

infill. M3 68

Associated rebar to topping Kg 18,496

Assoicated rebar to shearkey. Kg 5,651

Associated work of RD6 mesh to topping

measure nett, allow lap in rate. M2 27,128

Associated formwork to underside of hcs

at perimeter beam end M 1,786

Associated formwork to edge of topping M 1,880

Precast Beam Costing ExamplePC Beams

machinery LS --

Plant Construction LS --

Steel Work LS --

Steel Mould LS --

Runnin cost LS --

Dismantle LS --

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 17/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur [email protected] Page | 18

Material Cost LS --

Labour Cost LS --

Double Stock & Damanged Panel LS --Transportation LS --

Installation of precast beams and

grouting works:-

Steel Plate LS --

Ditto Transport LS --

Ditto Plumb Prop. No 2

Wire Rope Set 2

Small Tools LS --

Labour Cost Beam Erection/ Joint No 1,022

Labour Cost HCS Erection M2 31,093

Grouting Cost HCS Shear Key Joint M 25,910

Labour cost Erection/Joint No 96

Earthwork for passage LS --C/Run for Crane Passage M3 180

Ditto - Maintenance Mth 9

4. IBS in contract management considerations

Ideas To Increase IBS Score

By increase usage of

Precast Hollow Core Slab

Precast Half SlabPrecast Waffle Slab

Precast Plank

Prefab Steel RoofSteel Structure

Precast Wall

Precast BeamsPrecast Columns

Precast Cornice & Moulding

Precast BalconyPrecast Staircase

Offsite Barbending

3D toilet module (POD)

System Formwork (metal / aluminium / plastic)

Construction Considerations

Heavy lifting crainage / tower crain

8/13/2019 IBS Seminar Notes Yeap 1.0 - QS Perspective on HKL SCACC 10Dec13

http://slidepdf.com/reader/full/ibs-seminar-notes-yeap-10-qs-perspective-on-hkl-scacc-10dec13 18/18

 

Sr Yeap Soon Kiat Dec 2010 Kuala Lumpur yskiat@yahoo com Page | 18

More full time crainage

Different lifting contraption

Walky-talky

Sub-contracting

Limited IBS system / brands

Lack of connection / integration of IBS components

Required a lot of floor to floor & services by services planning & coordination

Allow for starter bars or connectors

Cost Considerations

Savings on formwork

Savings on timber scaffolding

Savings on construction period

Lower labor content

Less wastage

Higher cost of IBS

High initial / setup cost of IBS

Less competitive tender price

Need high tech contractors / sub-contractors

Alteration / Renovation Consideration

Difficult to accommodate, needs to be pre-planned upfront

Requires hacking

Structural elements cannot be hacked