ict library update - ict · pdf file2 white topping an excellent solution for pavement ......

30
[1] Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly March June 2011 Vol. IX : No. 2 & 3 Contents - Articles - 2-5 (Subject wise alphabetically indexed) - Addition of Books - 6-9 - Reports - 10-29 Prepared by : Neeru Saini Librarian

Upload: buidang

Post on 16-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[1]

Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly March – June 2011 Vol. IX : No. 2 & 3

Contents

- Articles - 2-5

(Subject wise alphabetically indexed)

- Addition of Books - 6-9

- Reports - 10-29

Prepared by : Neeru Saini

Librarian

Page 2: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[2]

Articles

Airport

1 The hidden risks to commercial aviation : (International airport review, Vol. 15, issue 1, 2011)

Building

1 Effects of building performance on floor response spectra : (Journal of Structural engineering : Vol. 37,

No. 6, Feb.- March 2011)

2 Green building construction : (NMB&CW : June 2011)

Business Development

1 How customers can rally your troops : (Harvard Business Review : June 2011)

Civil Engineering

1 Business consultants to the engineering, architecture, and construction professions predict that 2011 will

look a lot like 2010, with some markets increasing slightly and others decreasing a bit more before a

genuine turnaround begins in 2012. (Civil Engineering : March 2011)

Energy

1 Aesthetic twist to solar energy : (Energy Next : April 2011).

2 Sun cities : Government of India announced an ambitious plan to power 60 cities with solar energy.

Energy next gives you details : (Energy Next : April 2011).

Page 3: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[3]

Environmental

1 The shrinking of worlds armour the ozone : (Environmental Pollution Centre Journal : Jan. Feb. 2011)

2 A scenario on plastic waste recycling and reuse : (Environmental Pollution Centre Journal : March –

April 2011).

3 Global warming hits food production : (Down to Earth : June 16-30, 2011)

Human Resource

1 Strategies for learning from failure, if organizations are to benefit from failure, employees must feel safe

admitting or reporting on it. (Harvard Business Review : April 2011)

2 Training to support market leladlership : (Human Capital : June 2011)

Infrastructures

1 Concrete structure of nuclear power plants : (The Indian Concrete Journal : April 2011, Vol. 85 : No. 4

2 Why is Brick Coba (BBC) not the correct method for terrace waterproofing ?: (NBM & CW April 2011)

3 Conibase infrastructure waterproofing and protection : (NBM & CW April 2011).

4 Conceptual design of structures in the developing countries of Asia, Africa, the near Pacific and Indian

Oceans for responding to the principal drivers of innovation: (Consulting Ahead : Jan. 2011)

Metro Rail

1 Metro System : Metro rail final destination for MRTS : (Urban Ralways : Vol. 13 , No. 111 Annual).

Pavements

1 Use of polypropylene fiber reinforced concrete as a construction material for rigid pavements : (The

Indian concrete journal: March 2011, vol. 85, No. 3)

2 White topping an excellent solution for pavement rehabilitation : (NBM&CW : March 2011)

Page 4: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[4]

Project Briefs

1 Road & Highway Projects : (NBM&CW : May 2011).

2 Infra developments : (NBM&CW : May 2011)

3 Metro projects : (NBM&CW : May 2011)

4 Airport Project : (NBM&CW : May 2011)

Roads & Bridges

1 Road Recycling : the need for road repairs is fuelling demand for new milling machines :

(World Highways : Jan. Feb. 2011).

2 Steel Construction : Design flexibility in construction with steel : (NBM&CW : March 2011)

Rail

1 High-Speed Challenge : Equipment for new Rail Link in South Korea (Bridge Design & Engineering :

Issue No. 62 First Quarter 2011)

Special Report

1 Delhi 2050 Future Vision: (Architecture + Design, July 2011 Vol. XXVIII, No.7)

Tunnel

1 Each structural component is components to the successful : (Civil Engineering & Construction Review

June 2011)

Page 5: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[5]

Water

1 Alaska takes control of water quality : (Water Today : May 2011)

2 Solid waste management strategies at Amravati city (Environmental Pollution Centre Journal: March -

April 2011)

3 Disaster management of water supply using GIS and Hydraulic model : (Water Today : April 2011)

4 Treating taste and odor compounds in Drinking water : (Water Today : April 2011)

5 Rainwater harvesting : Mumbai scenario : (Water Today : May 2011)

Page 6: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[6]

ADDITIONAL OF BOOKS

1 13680 : Guidelines for expressway part (I) : 2010 2 13681 : Guidelines for expressway Part (II) : 2010 3 13739 : Special Report No. 17 State of the art Non destructive testing techniques of.. 4 13740 : Technical paper International seminar of reducing carbon foot print in the construction: 2011 5 13741 : Souvenir International seminar of reducing carbon food print in the construction : 2011 6 13772 : IS 5613 (P2/Sec.2) : 1985 Design installation for design installation and maintenance of overhead

power 7 13827 : District domestic product of Andhra Pradesh 1999 – 2000 to 2007-2008 8 13828 : District domestic product – Back series 1999-2000 base year 1993-94 to 1998-99) 9 13829 : Annual survey of industries AP-2003-04 10 13830 : annual survey of industries AP-2001-2002 11 13831 : Report on annual survey of industries in Andhra Pradesh :1995 -96 12 13832 : District Statistical Handbook : Burdwan - 2007 13 13833 : District Statistical Handbook : Hawrah 14 13834 : District Statistical Handbook : Nadia 15 13835 : District Statistical Handbook : Murshidabad 16 13836 : District Statistical Handbook : Birbhum 17 13837 : District Statistical Handbook : Purba Medinipur 18 13838 : District Statistical Handbook : Paschim Medinipur 19 13839 : District Statistical Handbook : Kolkata 20 13840 : District Statistical Handbook : North 24 - Parganas 21 13841 : District Statistical Handbook : Bakura 22 13842 : District Statistical Handbook : Purlia

Page 7: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[7]

23 13843 : Toposheet of H 43 J 15 24 13844 : Toposheet of H 43 I 13 25 13845 : Toposheet of H 43 J 12 26 13846 : Toposheet of H 43 J 1 27 13847 : Toposheet of H 43 J 9 28 13848 : Toposheet of H 43 J 16 29 13849 : Toposheet of H 43 J 14 30 13850 : Toposheet of H 43 P 1 31 13851 : Toposheet of H 43 P 5 32 13852 : Toposheet of H 43 O9 33 13853 : Toposheet of H 43 O1 34 13854 : Toposheet of H 43 J 2 35 13855 : Toposheet of H 43 I 14 36 13856 : Toposheet of H 43 J 10 37 13857 : Toposheet of H 43 I 15 38 13858 : Toposheet of H 43 I 16 39 13859 : Toposheet of H 43 J 6 40 13860 : Toposheet of H 43 J 4 41 13861 : Toposheet of H 43 I 7 42 13862 : Toposheet of H 43 J 13 43 13863 : Toposheet of H 43 O13 44 13864 : Toposheet of H 43 J 11 45 13865 : Toposheet of H 43 I 10 46 13866 : Toposheet of H 43 J 5 47 13867 : Toposheet of H 43 I 4 48 13868 : Toposheet of H 43 J 8 49 13869 : Toposheet of H 43 J12 50 13870 : Traffic engineering and transport planning 51 13871 : Traffic engineering and transport planning 52 13872 : Traffic engineering and transport planning 53 13873 : CPWD Work Manual 2010 54 13874 : Specification for road and bridges works 55 13875 : Specification for road and bridges works 56 13901 : Statistical abstract of Orissa 2008 57 13902 : Economic survey 2010-2011 58 13903 : Piarc international seminar on management of winter service in an extreme continental climate country

management

Page 8: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[8]

59 13904 : Proceedings of 3rd international symposium on new tech. for urban safety of mega city in Asian 60 13905 : Design and manufacture of low cost management vehicles 61 13906 : BS EN- 1426 2007 BS 2000 : bitumen and bituminous binders determination of needle penetration 62 13907 : Telephone directory 63 13908 : Road network map of Mongolia 64 13909 : International seminar national road development strategies and Road safety on improved highway 14-

16 : March 2011 65 13910 : Consultancy services for feasibility study and detailed design of tunnel in Shimla and other parts of

states 66 13911 : National seminar on technological advance in construction industry focus faster speed and better

quality April 2011 67 13912 : Fib days 2010 international conference 14 & 15 Jan. 2011 68 13913 : Airport business directory and year book 2011 69 13914 : Highway Capacity Manual Vol. I 2010 70 13915 : Highway Capacity Manual Vol. II 2010 71 13916 : Highway Capacity Manual Vol. III 2010 72 13947 : IRC SP 93 :2011 : Guidelines on requirements for environmental clearance for road project 73 13948 : IRC SP 94 : 2011 : Material facilities for highway sector in NCR 74 13949 : IRC SP 56 : 2011 : Guidelines for steel pedestrian bridge. 75 13950 : IRC 87 : 2011 : Guidelines for formwork false work and temporary structures 76 13951 : IRC 56: 2011 : Recommended practices for treatment of embankment and road side slopes…. 77 13952 : IRC 34 :2011 : Recommendations for road construction in areas affecting by water logging … 78 13953 : IRC 15 ;2011 : Standard specifications and code of practiced for construction of concrete 79 13954 : Statistical explanation of MP (Hindi) 2008 80 13955 : Estimates of state domestic product MP 1990-00 2009-10 81 13956 : Pramukh statistical number of MP 2010 82 13957 : District wise socio –economic indicators of MP – 2007-2008 83 13958 : District wise socio –economic indicators of MP – 2002-03: 2005-06 84 13959 : District wise socio –economic indicators of MP – 201-2001: 2001-2008 85 14017 : Seminar on technological advance in construction industry focus….. April ,2011 Suraj Kund: Vol. 15

,No. 1 86 14018 : CPWD General specification for electric works Part -1: : Internal 2005 87 14019 : Schedule of rates Maharashtra Nagpur Region : Year 2009-2010 88 14020 : World bank traffic injury prevention country guidelines for the conduct 89 14021 : Toposheet no H43 I12 90 14022 : Toposheet no H43 I13 91 14023 : Toposheet no H43 I14

Page 9: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[9]

92 14024 : Toposheet no H43 I15 93 14025 : Toposheet no H43 I16 94 14026 : Direct taxes ready reckoner 2011-2012 95 14027 : Model EPC agreement for highways 96 14028 : Chenab bridge a canvas in concrete construction of the longest … 97 14029 : Quality control in bridge construction 98 14030 : Quality assurance in bridge construction & acceptance criteria 99 14031 :Parsi Panorma 100 14032 : Manual of fire safety in buildings 101 14033 :seismic conceptual design of buildings basic principals for engineering architectures 102 14034 : Earthquake tips learning earthquake design and construction …. 103 14035 :un citral model low on international commercial arbitration 1985 with amended 2006 104 14067 : Map : a road guide map of Sikkim.

Page 10: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[10]

Reports

Sl. No. Projects Name Acc. No.

Title of the Report (Hard CopRe Soft Copy

Year

1 NH-8 (SD) : Six Laning of Surat-Dahisar Section of NH-8 from Km. 263.000 to Km. 502.000(Length-239Km) in the States of Gujarat & Maharashtra to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-V (Concessionaire: M/S IRB SURAT DAHISAR TOLLWAY PVT LTD)

13758 Monthly Progress Report : Feb. 2011

2 NH-26 : National Highway Development Project (North-South Corridor) NH-25-26 Jhansi to Lalitpur in the State of Uttar Pradesh NS1/BOT/(UP-2) (Gayatri Jhansi)

13742 Monthly Progress Report : Feb 2011

3 MP (2330) : Construction of ADB Assisted thirteen highway corridors under ADB Loan No. 2330 IND

13760 Monthly progress report No. 40 :Feb. 2011

4 NH 43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane with paved shoulders configuration of Raipur- Dhamtari section of …….

13687 Monthly Progress Report : Jan. 2010

13750 Monthly Progress Report : Feb. 2011

5 NH-8 (Gomti) : Independent engineering services for development and operation of Beawar - Gomti section of NH-8 from km. 58.245 to km. 177.050 in Rajasthan through private participation on design, build, finance, operate and transfer (DBFOT) Basis.

13713 O & M Inspection report : No. 5 : Jan. 2010

13764 O & M Inspection Report : 5 Jan. 2011

13774 Quarterly Progress Report : Dec. 2010 to Feb. 2011

6 NH-60(A) (WB) : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane /2 lane with paved shoulders configuration and strengthening of Bankura-Purulia Section (km 0 to 84) of NH-60A in the state of West Bengal (Package No. SP/B/6)

13688 Monthly Progress Report :Jan. 2010

13746 Monthly Progress Report : Feb. 2011

Page 11: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[11]

7 NH-10 (Haryana) : Independent engineering services for 4/6 laning of Delhi/Haryana Border to Rohtak section on NH-10, in the state of Haryana ……

13743 Monthly Progress Report : Feb. 2010

8

NH-2 (UP) : Consultancy Package GTRIP/SC/2 for the Construction Supervision for Balance Works of Four Laning & Strengthening of the Existing Two Lane Stretch from Km 250.500 to Km 307.500 NH-2 Uttar Pradesh on Cons. Pack-1A.

13693 Engineering Report No. 102 : Jan. 2011

13709 Monthly Progress Report No. 108 : Feb. 2011 : construction Package 1A

13773 Engineering Report No. 103 Feb. 2011 : construction Package 1A.

9 NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsaar section from km. 6.082 to km. 108.502 of NH-15 in the state of Punjab on……

13692 Monthly Progress Report No. 5 : Jan. 2011.

13761 Monthly Progress Report No. 6 : Feb. 2011

10 NH-21 (HP) : Consultancy services for the preparation of detailed project report for rehabilitation and up ……..

13697 Operation and maintenance manual : Jan. 2011

13778 Monthly Progress Report No. 41 : Feb. 2011

13710 Monthly Progress Report No. 40 : Jan. 2011

11 NH-59 : (GMP) : Independent engineer services for 4 laning of Godhra to Gujarat/Madhya Pradesh border section of NH-59 ……..

13689 Monthly Progress Report No. 2 : Jan.2011

13762 Monthly Progress Report No. 4 : Feb. 2011

13775 Quarterly Progress Report No. 1 , Nov. 2010 to Dec. 2011

12 NH-13 : Four laning of Bijapur Hungund section of NH-13 from km. 102.00…….

13751 Quality assurance manual and environment management plan

Page 12: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[12]

13 NH-11 (Jaipur Mahua) : Independent consultancy for 4 laning of Jaipur –Mahura Bot project of NH-11

13694 54th M & O & M Report : Jan. 2011

13776 55th MP & O & M Report : Feb. 2011

14 NH-9(PS) : Four laning of Pune-Solapur section of NH-9 from km. 144.400 to km. 249.000 in the state of Maharashtra ………

13766 Monthly Progress Report No. 4 Feb. 2011

15 NH-6 (BS) : consultancy services for preparation of DPR for rehabilitation and upgradataion of Baharagora to Sambalpur section of NH-6……

13749 Progress Report : Feb. 2011

16 NH-83 (Bihar)Consultancy services for preparation of DPR for 4/6 laning of patina- gaya dobhi section……

13714 FDPR : Vol. I : Main Report (Feb. 2011) Package (I)

13715 FDPR : Environmental screening and Environmental assessment report : Feb. 2011

13716 FDPR :Vol. V : social screening report : Feb. 2011

13717 FDPR : Vol. VI : Cost estimate

13718 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 1/8 : Feb. 2011

13719 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 2/8 : Feb. 2011

13720 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 3/8 : Feb. 2011

13721 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 4/8 : Feb. 2011

Page 13: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[13]

13722 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 5/8 : Feb. 2011

13723 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 6/8 : Feb. 2011

12724 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 7/8 : Feb. 2011

12725 FDPR : Vol. VII Design features and detailed design calculations of structures : Part 8/8 : Feb. 2011

12726 FDPR : Vol. VIII : Geotechnical investigations report : Feb. 2011

12727 FDPR : Vol. II : Appendices to main report : Feb. 2011

12728 FDPR : Vol. VI : Cost estimates : Feb. 2011

12729 FDPR : Vol. VII : Design Features and detailed design calculation : (Part 1 of 3) : Feb. 2011

12730 FDPR : Vol. VII : Design Features and detailed design calculation : (Part 2 of 3) : Feb. 2011

12731 FDPR : Vol. VII : Design Features and detailed design calculation : (Part 3 of 3) : Feb. 2011

12732 FDPR : Vol. III : Geotechnical

Page 14: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[14]

investigation report : Feb. 2011

12733 FDPR : Vol. VI :Cost estimate : Feb. 2011

12734 FDPR : Vol. VII : Design features and detailed design calculations of structures (Part 1 of 3): Feb. 2011

13735 FDPR : Vol. VII : Design features and detailed design calculations of structures (Part 2 of 3): Feb. 2011

13736 FDPR : Vol. VII : Design features and detailed design calculations of structures (Part 3 of 3): Feb. 2011

13737 FDPR : Vol. VIII : Geotechnical investigation report : Feb. 2011

13747 Monthly Progress Report : Feb. 2011

17 Manesar : Construction of IT Park at CP – 02, Sector-*, IMT Manesar, Gurgaon, Haryana

13684 Quarterly Progress Report : April to June 2010

13685 Monthly Progress Report : Sept. 2010

13686 Quarterly Progress Report July to Sept. 2010

18 NH-22 (Punjab) : Independent consultancy services for 4/6 laning of zirakpur parwanoo section of NH-22 including Pinjore Kalka-Bypass on BOT basis ……

13695 Road safety interim report : Feb. 2011

13698 Monthly Progress Report No. 34 : Jan. 2011

13777 Monthly Progress Report No. 35 , Feb. 2011

13745 Monthly Progress Report No. 21 : Dec.

Page 15: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[15]

2009

19 Bihar (SH) : Consultancy services for preparation of detailed project report for rehabilitation, up gradation and strengthening of roads in Bihar Under ADB Assisted ph. II Project (Package-2), (South Bihar)

13690 Monthly Progress Report :Package (I) Jan. 2010

13691 Quarterly Progress Report :Package (I) Dec.. 2010

13748 Monthly Progress Report : Feb. 2011

20 J & K (2151) : Multi sector project for infrastructure rehabilitation in Jammu & Kashmir ADB Loan – 2151 – INDNH-6

13738 Monthly Progress Report Feb. 2011

21 NH-4 (Harihar to Haveri) : KARNATAKA Western Transport Corridor Tumkur - Haveri Sec. Of NH - 04, Pack. IV & V, ADB Loan.

13711 Monthly Progress Report No. 28 : Package 5 : Feb. 2011

22 NH-9 : (HV) Independent consultancy services for design engineering construction, development finance operation and maintenance of 4/6 laning of Hyderabad-Vijayawada section from km. 40.00 to km. 221.500 of NH-9 in the state of …..

13752 Project quality plan :

13754 Quarterly Report : 3 Dec. 2010 to Feb. 2011

13755 Monthly Report : Feb. 2011

23 NH-47 (KL-1) : 4/6 landing of National highway from Thrissur to Edapally section of NH-47 ……

13767 Monthly Progress Report : Dec. 2010

13769 Monthly Progress Report : Jan. 2011

24 NH-25 (EW-3B) : Ministry of Road Transportation Section km. 58.600 to km 75.500 of Lucknow – Kanpur

13768

Monthly Progress Report : Feb. 2011

Page 16: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[16]

25 NH-54 (AS-1): 4 laning of Silchar to Balachera section of NH-54 from km. 306. 540to km. 275.000 in the state of Assam under East-West Corridor

13770 Monthly Progress Report :Feb. 2011

26 NH-9(PS) : Four laning of Pune-Solapur section of NH-9 from km. 144.400 to km. 249.000 in the state of Maharashtra ………

13753 Quarterly Project Report : Nov. 2010 – Jan. 2011

27 MP (2154) : Consultancy services for construction supervision of package No. 2(Civil work contract package ADB--------

13771 Monthly Progress Report No. 52 : Feb. 2011

28 NH-45 (TN) 4 laning of the existing 2 lane section from km. 121 to km. 192.25 on NH 45 in the state of Tamil Nadu

13759 Monthly O & M Report : Feb. 2011

29 NH-7 (Hyderabad-Bangalore): consultancy services for supervision of works for six laning of km. 556.000 to km. 539.000 and ……

13696 Project completion report : Jan. 2010

13763 Monthly Progress Report 2009 : Feb. 2011

30 NH-2 (Barwa) : feasibility for 6- laning of barwa adda- panagarh section of NH-2…..

13699 Feasibility Report : Vol. I : Main Report : Jan. 2011

13700 Feasibility Report Vol. II : Appendix to main report : Jan. 2011

13701 Feasibility Report Vol. III : Traffic Data Analysis report : Jan. 2011

13702 Feasibility Report Vol. III(A) : Primary Design Report : Jan. 2011

13703 Feasibility Report Vol. IV: Social and Environmental Impact Assessment and materials : Jan. 2011

13704 Feasibility Report Vol. V (A) : Geotechnical investigation report Part

Page 17: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[17]

(1/3) : Jan. 2011

13705 Feasibility Report Vol. V (A) : Geotechnical investigation report Part (2/3) : Jan. 2011

13706 Feasibility Report Vol. V (A) : Geotechnical investigation report Part (3/3) : Jan. 2011

13707 Feasibility Report Vol. VII : Cost Estimate : Jan. 2011

31 Jameshedpur : straight mils road office road junction analysis and design

13765 Final Report : March 2011

32 Bihar (SH) : Consultancy services for preparation of detailed project report for rehabilitation, up gradation and strengthening of roads in Bihar Under ADB Assisted ph. II Project (Package-2), (South Bihar)

13822 QPR : Dec. 2009

13823 MPR : Jan. 2010

13824 MPR Feb. 2010

33 NH-4 (Harihar to Haveri) : KARNATAKA Western Transport Corridor Tumkur - Haveri Sec. Of NH - 04, Pack. IV & V, ADB Loan.

13825 MPR No. 29 : March 2011

34 NH-60(A) (WB) : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane /2 lane with paved shoulders configuration and strengthening of Bankura-Purulia Section (km 0 to 84) of NH-60A in the state of West Bengal (Package No. SP/B/6)

13809 Monthly Progress Report : March 2010

35 NH-7 (AP-7) : Four laning of Islam Nagar to Kadtal of Nagpur-Hyderabad section on ……

13817 MPR No. 10 : March 2011

13818 QPR No. 03 : March 2011

36 NH-54 (AS-1): 4 laning of Silchar to Balachera section of NH-54 from km. 306. 540to km. 275.000 in the state of Assam under East-West Corridor

13819 MPR No. 53 : March 2011

37 NH-83 (Bihar) Consultancy services for preparation of DPR for 4/6 laning of patina- gaya dobhi section……

13811 MPR : March 2011

13812 Progress Report : March 2011

Page 18: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[18]

38 Bihar (SH) : Consultancy services for preparation of detailed project report for rehabilitation, up gradation and strengthening of roads in Bihar Under ADB Assisted ph. II Project (Package-2), (South Bihar)

13810 Monthly Progress Report :Package (2) March : 2010

13748 Monthly Progress Report : Feb. 2011

39 NH-82 (Bihar Patna) : 13782 FDPR : Link Road : vol. 1 : Main Report : March 2011

13783 FDPR Vol. II : Cost estimate : March 2011

13784 FDPR Vol. IV : Environmental Screening and environmental assessment report : March 2011

13785 FDPR Vol. V : Social impact screening report : March 2011

13786 FDPR Vol. VII : Design features and detailed design calculation of structures (Part I of 2) : March 2011

13787 FDPR Vol. VII : Design features and detailed design calculation of structures (Part 2 of 2) : March 2011

13788 FDPR Vol. VIII : Geotechnical investigation report : March 2011

40 Ethiopia (HAI) : 13789 Consultancy invoice no. 20 for the month for Feb. 2011

13814 Final Inception Report

41 Ethiopia (Won) : 13790 Final engineering drawings vol. V. Cont. Lot (I) : Part one road drawings.

13791 Final engineering drawings vol. V. Cont. Lot (I) : Part two Structures drawings.

13792 Final Eng. Drawings Vol. V: Cont. Lot II : Part one Road Drawings : Nov. 2010

13793 Final Eng. Drawings Vol. V: Cont. Lot II : Part two Structures Drawings : Nov. 2010

13794 Final Eng. Drawings Vol. V: Cont. Lot III : Part one Road Drawings : Nov. 2010

Page 19: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[19]

13795 Final Eng. Drawings Vol. V: Cont. Lot III : Part two Structures Drawings : Nov. 2010

42 Ethiopia (Jijiga) : 13796 MPR : 15 August 2010

13797 QPR : 9 : Sept. 2010

13798 MPR No. 10 : Jan. 2011

13799 MPR No. 19 : Feb. 2011

13816 Status report as on 31st : Jan. 2011

43 Ethiopia (GW) : 13800 MPR No. 48 : August 2010

13801 QPR No. 16 : Sept. 2010

13802 MPR No. 49 : Sept. 2010

13803 QPR No.17 : Dec. 2010

44

Ethiopia (JM) : 13804 QPR : Sept. 2010

13805 Brief Report fro CMD Nov. 2010

13806 QPR : Dec. 2010

13807 MPR : Feb. 2011

45 Ethiopia (JM) : 13808 Engineering site meeting Feb. 2011

46 NH-43 : 13813 MPR : March 2011

47 NH-2 (U.P) : 13821 MPR No. 109 : March 2011

48 NH-8 (SD) : Six Laning of Surat-Dahisar Section of NH-8 from Km. 263.000 to Km. 502.000(Length-239Km) in the States of Gujarat & Maharastra to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-V (Concessionaire: M/S IRB SURAT DAHISAR TOLLWAY PVT LTD)

13922 Monthly Progress Report :April. 2011

49 J & K (2151) : Multi sector project for infrastructure rehabilitation in Jammu & Kashmir ADB Loan – 2151 - IND

13899 Monthly Progress Report March 2010

13944 MPR : April 2011

50 MP (2330) : Construction of ADB Assisted thirteen highway corridors under ADB Loan No. 2330 IND

13878 Monthly progress report No. 41 March 2011

13879 QPR No. 14 Jan. to March 2011

13946 MPR: No. 42 : April 2011

51 NH-8 (Gomti) : Independent engineering services for 13923 O & M Inspection report : No. 7 : March

Page 20: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[20]

development and operation of Beawar - Gomti section of NH-8 from km. 58.245 to km. 177.050 in Rajasthan through private participation on design, build, finance, operate and transfer (DBFOT) Basis.

2010

52 NH-60(A) (WB) : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane /2 lane with paved shoulders configuration and strengthening of Bankura-Purulia Section (km 0 to 84) of NH-60A in the state of West Bengal (Package No. SP/B/6)

13890 Monthly Progress Report : April 2010

53

NH-2 (UP) : Consultancy Package GTRIP/SC/2 for the Construction Supervision for Balance Works of Four Laning & Strengthening of the Existing Two Lane Stretch from Km 250.500 to Km 307.500 NH-2 Uttar Pradesh on Cons. Pack-1A.

13924 Engineering Report No. 104 : March. 2011

13925 QPR Jan. 2011 to March 2011

54 NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsaar section from km. 6.082 to km. 108.502 of NH-15 in the state of Punjab on……

13896 Monthly Progress Report No. 7 : March 2011.

55 NH-25 (EW-3B) : Ministry of Road Transportation Section km. 58.600 to km 75.500 of Lucknow – Kanpur

13894 Monthly Progress Report :March 2011

56 NH-59 : (GMP) : Independent engineer services for 4 laning of Godhra to Gujarat/Madhya Pradesh border section of NH-59 ……..

13934 Monthly Progress Report No. 5 : March .2011

57 NH-13 : Four laning of Bijapur Hungund section of NH-13 from km. 102.00…….

13920 MPR : April 2011

13921 MPR : March 2011

13926 Inspection report No. 3 : Feb. 2011

13927 Inspection report No. 4 : March. 2011

13928 QPR : Jan. to March 2011

58 NH-11 (Jaipur Mahua) : Independent consultancy for 4 laning of Jaipur –Mahura Bot project of NH-11

13936 56th MP & Q& M Report : March 2011

13941 57th Monthly Progress & O & M Report : April 2011

59 NH-9(PS) : Four laning of Pune-Solapur section of NH-9 from km. 144.400 to km. 249.000 in the state of Maharashtra ………

13929 Monthly Progress Report No. 5 March. 2011

60 NH-6 (Orissa) : 13897 Progress Report : 2011

Page 21: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[21]

61 Fiji : Republic of the Fiji islands ministry of works transport and public utilities ……..

13882 Sub-Project selection report : March 2011

13883 Templates fro preparation of loan withdrawal application

13884 Financing management & monitoring manual

62 NH-22 (Punjab) : Independent consultancy services for 4/6 laning of zirakpur parwanoo section of NH-22 including Pinjore Kalka-Bypass on BOT basis ……

13933 QPR No. 12 : Jan. to March 2011

63 Bihar (SH) : Consultancy services for preparation of detailed project report for rehabilitation, up gradation and strengthening of roads in Bihar Under ADB Assisted ph. II Project (Package-2), (South Bihar)

13892 MPR : April 2011

64 NH-4 (Harihar to Haveri) : KARNATAKA Western Transport Corridor Tumkur - Haveri Sec. Of NH - 04, Pack. IV & V, ADB Loan.

13942 MPR No. 30 : April 2011 : Package ; 5

13943 MPR No. 30 : April 2011 : Package ; 4

65 NH-10 (Haryana) : Independent engineering services for 4/6 laning of Delhi/Haryana Border to Rohtak section on NH-10, in the state of Haryana ……

13885 MPR : April 2011

13886 MPR : March 2011

13887 QPR : Jan. to March 2011

66 NH-9 : (HV) Independent consultancy services for design engineering construction, development finance operation and maintenance of 4/6 laning of Hyderabad-Vijayawada section from km. 40.00 to km. 221.500 of NH-9 in the state of …..

13930 MPR : March 2011

13931 MPR : April : 2011

67 NH-7 (AP-7) : Four laning of Islam Nagar to Kadtal of Nagpur-Hyderabad section on ……

13895 Monthly Progress Report No. 11 : April 2011

68 NH-54 (AS-1): 4 laning of Silchar to Balachera section of NH-54 from km. 306. 540to km. 275.000 in the state of Assam under East-West Corridor

13898 Quarterly Progress Report : March 2011

13945 MPR : April 2011

Page 22: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[22]

69 NH-83 (Bihar)Consultancy services for preparation of DPR for 4/6 laning of patina- gaya dobhi section……

13893 Monthly Progress : April . 2010

70 MP (2154) : Consultancy services for construction supervision of package No. 2(Civil work contract package ADB--------

13900 QPR : March 2011

71

NH-21 (Punjab) : Independent consultancy services for 4 laning of Kurali- Kiratpur section on NH-21 on BOT Basis under ….

13935 QPR No. 14 : Jan. to March 2011

72 NH-26 : National Highway Development Project (North-South Corridor) NH-25-26 Jhansi to Lalitpur in the State of Uttar Pradesh NS1/BOT/(UP-2) (Gayatri Jhansi)

13876 QPR : 2011

13917 Road Safety Report : Feb. 2011

13918 Road safety Report : April 2011

13919 MPR : April 2011

13877 MPR : 2011

73 MP : (MPSRP-III) : 13880 Agreement Vol. 1 : 2011

74 Mongolia : (KFW) : 13881 Socio economic impact analysis and consultancy completion report : Nov. 2011

75 NH-78 : (Haridwar) : 13888 MPR : March 2011

76 NH-77 : (Hajipur) : MPR No. 5 March 2011 13889 MPR : No. 5 March 2011

77 NH 43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane with paved shoulders configuration of Raipur- Dhamtari section of …….

13891 MPR : April 2011

78 NH-47 (TN-08) 13937 Monthly Other Report : March 2011

13938 Monthly Inspection Report : March 2011

13939 Monthly Progress Report : Feb. 2011

13940 Monthly Progress Report : March 2011

79 NH-8 (SD) : Six Laning of Surat-Dahisar Section of NH-8 from Km. 263.000 to Km. 502.000(Length-239Km) in the States of Gujarat & Maharastra to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-V (Concessionaire: M/S IRB SURAT DAHISAR TOLLWAY PVT LTD)

13993 Monthly Progress Report :May. 2011

13994 Quarterly Inspection / Progress Report

No. 6 : April 2011

13995 O & M Report No. 8 : April 2011

14063 MPR : May 2011

14104 Site inspection report : June 2011

80 NH-22 (Punjab) : Independent consultancy services for 4/6 laning of zirakpur parwanoo section of NH-22

14007 Monthly Progress Report No. 37. April 2011

Page 23: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[23]

including Pinjore Kalka-Bypass on BOT basis …… 14107 MPR No.38 : May 2011

81 Bihar (SH) : Consultancy services for preparation of detailed project report for rehabilitation, up gradation and strengthening of roads in Bihar Under ADB Assisted ph. II Project (Package-2), (South Bihar)

14010 Monthly Progress Report : March 2011

14057 Monthly Progress Report : May 2011 Utilities relocation plan (Electrical ): May 2011 : Pack.

14060 Monthly Progress Report : May 2011

82 J & K (2151) : Multi sector project for infrastructure rehabilitation in Jammu & Kashmir ADB Loan – 2151 - IND

14045 Monthly Progress Report May 2010

13944 MPR : April 2011

83 MP (2330) : Construction of ADB Assisted thirteen highway corridors under ADB Loan No. 2330 IND

14011 Final Feasibility report Vol. 1 : Main report Oct. 2010

14047 MPR No. 43 : May 2011

13946 MPR: No. 42 : April 2011

84 NH-4 (Harihar to Haveri) : KARNATAKA Western Transport Corridor Tumkur - Haveri Sec. Of NH - 04, Pack. IV & V, ADB Loan.

14014 MPR No. 31 : May 11 : Package 5

14015 MPR No. 31 : May 11 : Package 4

13774 Quarterly Progress Report : Dec. 2010 to Feb. 2011

85 NH-60(A) (WB) : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane /2 lane with paved shoulders configuration and strengthening of Bankura-Purulia Section (km 0 to 84) of NH-60A in the state of West Bengal (Package No. SP/B/6)

14110 Monthly Progress Report : June 2010

86

NH-233 : (Nepal) : Consultancy services for preparationof DPR for rehabilitation and Upgradation of Indo/Nepal border to Varanasi section of NH-233 in the state of Uttar Pradesh under NHDP IV-B14038

14037 Utilities relocation plan (optical fiber cable ) : May 2011 : Pack. I

14038 Utilities relocation plan (Telephone ) : May 2011: Pack I

14039 Utilities relocation plan (hand pump , water tank, tube well and well municipal tap)..: May 2011: Pack. 1

14040 Utilities relocation plan (Electrical ): May

Page 24: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[24]

2011 : Pack. 1

14041 Utilities relocation plan (optical fiber cable ) : May 2011 : Pack. II

14042 Utilities relocation plan (Telephone ) : May 2011: Pack II

14043 Utilities relocation plan (hand pump , water tank, tube well and well municipal tap)..: May 2011: Pack. II

14044 Utilities relocation plan (Electrical ): May 2011 : Pack. II

87 NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsaar section from km. 6.082 to km. 108.502 of NH-15 in the state of Punjab on……

13998 Monthly Progress Report No. 8 : April 2011.

14016 Quality assurance manual : May 2011

14113 MPR No. 1 : June 2011

88 NH-47 (KL-1) : 4/6 landing of National highway from Thrissur to Edapally section of NH-47 ……

14004 Status report as on 25.04.11

14102 Environmental Report : May 2011

14036 MPR : March 2011

14114 MPR : April 2011

89 NH-25 (EW-3B) : Ministry of Road Transportation Section km. 58.600 to km 75.500 of Lucknow – Kanpur

14001 Monthly Progress Report : April 2011

14055

MPR : May 2011

90 NH-13 : Four laning of Bijapur Hungund section of NH-13 from km. 102.00…….

14008 Inspection report No. 5 : April 2011

14053 MPR : May : 2011

14100 Inspection report No. 6 : May 2011

91 NH-11 (Jaipur Mahua) : Independent consultancy for 4 laning of Jaipur –Mahura Bot project of NH-11

14062 58th MP & O & M Report : May 2011

92 NH-9(PS) : Four laning of Pune-Solapur section of NH-9 from km. 144.400 to km. 249.000 in the state of Maharashtra ………

13983 Consultancy Agreement : Oct. 2010

13984 Concession agreement Vol.1 : Sept.

2009

13985 Concession agreement Vol. 2 : Sept.

2009

13986 Concession agreement Vol. 3 : Sept.

2009

13987 Pavement design manual : 2009

93 NH-6 (Orissa) : 14059 Progress Report : May 2011

Page 25: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[25]

94 NH-10 (Haryana) : Independent engineering services for 4/6 laning of Delhi/Haryana Border to Rohtak section on NH-10, in the state of Haryana ……

14002 MPR : May 2011

95 NH-9 : (HV) Independent consultancy services for design engineering construction, development finance operation and maintenance of 4/6 laning of Hyderabad-Vijayawada section from km. 40.00 to km. 221.500 of NH-9 in the state of …..

14049 QPR No. 4 : May 2011

13982 MPR : April : 2011

14046 MPR : May 2011

96 NH-7 (AP-7) : Four laning of Islam Nagar to Kadtal of Nagpur-Hyderabad section on ……

14009 Monthly Progress Report No. 12 : May 2011

97 NH-54 (AS-1): 4 laning of Silchar to Balachera section of NH-54 from km. 306. 540to km. 275.000 in the state of Assam under East-West Corridor

14050 MPR : May 2011

98 NH-83 (Bihar)Consultancy services for preparation of DPR for 4/6 laning of patina- gaya dobhi section……

14058 Monthly Progress Report : May. 2010

99 MP (2154) : Consultancy services for construction supervision of package No. 2(Civil work contract package ADB--------

14003 MPR No. 54 April 2011

14048 MPR No. 55 : May 2011

100 NH-21 (Punjab) : Independent consultancy services for 4 laning of Kurali- Kiratpur section on NH-21 on BOT Basis under ….

14006 MPR No. 43 : April 2011

101 NH-26 : National Highway Development Project (North-South Corridor) NH-25-26 Jhansi to Lalitpur in the State of Uttar Pradesh NS1/BOT/(UP-2) (Gayatri Jhansi)

13997 Road safety report : April 2011

14013 MPR : May 2011

14099 Change of scope proposals : Feb. 2011

102 NH-77 : (Hajipur) : MPR No. 5 March 2011 14005 Report on safety audit of construction zone May 2011

103 NH 43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane with paved shoulders configuration of Raipur- Dhamtari section of …….

14115 Supplementary traffic analysis Report : June2011

104 NH-47 (Chen.): Independent consultancy services for 6 laning from chengapallia to start of coimbatore …..

13988 Monthly Inspection Report : April 2011

13989 Various other Report : March 2011

13990 Quarterly Progress Report : May. 2011

13991 Monthly Progress Report : April 2011

14054 MPR : May 2011

Page 26: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[26]

14111 Various other report : May 2011

14106 Monthly Inspection Report : May 2011

105 Ethiopia (GW) : Consultancy services for the construction supervision of Woreta Woldiya Road….

13960 MPR No. 50 Oct. 2010

13961 MRP No. 51 Nov. 2010

13962 MPR No. 52 Dec. 2010

13963 MPR No. 53 Jan. 2010

13964 MPR No. 54 Feb. 2010

13965 MPR No. 55 March 2010

13966 MPR No. 56 April 2010

13967 QPR No. 18 March 2010

106 Ethiopia (JT)Consultancy services for construction supervision of Jijiga …..

13968 MPR No. 16 Oct. 2010

13969 MPR No. 17 : Nov. 2010

13970 QPR No. 10 Dec. 2010

13971 MPR No. 18 Jan. 2011

13972 QPR No. 11 March 2011

13973 MPR No. 20 April 2011

107 Ethiopia (JM) : contract for consultancy services for construction supervision of Jimma Mizan Road …..

13974 IPC Np.19 : Sept. 2010

13975 IPC No. 20 : Oct. 2010

13976 IPC No. 21 : Nov. 2010

13977 IPC No. 25 April 2011

13978 MPR : Oct. 2010

13979 MPR : Nov. 2010

13980 QPR : March 2011

13981 MPR : April 2011

108 Ethiopia (45610) : Consultancy services for the maintenance needs assessment and updating of road financing study…..

13992 MPR : Dec. 2010

14061 Guidelines for approving eligibility of maintenance work. : June2011

109 NH-58/72 :Independent engineering services for 4 laning of haridwar Dehradun section from km. ……

13996 MPR : April 2011

110 NH-2 (UP) : Consultancy Package GTRIP/SC/2 for the Construction Supervision for Balance Works of Four Laning & Strengthening of the Existing Two Lane Stretch from Km 250.500 to Km 307.500 NH-2 Uttar Pradesh on Cons. Pack-1A.

13999 Engineering Report : 105 April 2011

14000 MPR : No. 110 : April 2011

14108 MPR : May 2011 No. 111

111 Tanzania (Tango-Horohoro) : 14012 MPR : Feb. 2011

Page 27: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[27]

112 NH-2 (U.P : Consultancy Package …. Construction supervision for four laning and strengthening of the

14052 MPR: Engineering Report : May 2011 No. 106

113 Eth (CSZU) : 14056 Status of hard rock payments

114 NH-31 (D) : Four laning of NH31 C from…. Falakata Dhupguri road West Bengal…….

14064 FDPR Vol. 1 : Main Report : May 2011

14065 FDPR : Cost estimate : May 2011

14066 FDPR : Details (BOT Annuity Basis and schedules ABC & D) : May 2011

115 Uganda 14105 Road design manual Vol. 3 Pavements design Part – I , flexible pavements : July 2005

116 Metro Rail : Delhi Metro rail corporation (Jaipur Metro) : Contractor : DSC Limited contract –JP/EW/C1…….

14068 Design of pile cap at P-23 and P25 Revision : R1: Doc. No. ICT/JP/EW/CI/006 :

14069 Design of pile cap at P-91 and P106 Revision : R1: Doc. No. ICT/JP/EW/CI/006 :

14070 Design of pile cap at P-27 Revision : R1: Doc. No. ICT/JP/EW/CI/006 :

14071 Design of pile foundations PG5 at P142,143,145 : Doc. No ICT/JP/EW/CI/019 : Revision 0

14072 Design of pile foundations P94 to 106 : Doc. No ICT/JP/EW/CI/027 : Revision 0

14073 Design of pile foundations PG1 at P98 to P100,105 and PG9 at P96,P97,P101,P104,P106 : Doc. No ICT/JP/EW/CI/019 : Revision 1

14074 Design of pile foundations PG1at P98 to P98to 103 : Doc. No ICT/JP/EW/CI/019 : Revision 0

14075 Design of pile foundations PG1 to P95/008 : Doc. No ICT/JP/EW/CI/019 : Revision 2

14076 Design of pile foundations PG5 at P91 to 93 : Doc. No ICT/JP/EW/CI/007 : Revision 1

Page 28: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[28]

14077 Design of pile foundations PG5 at P69 to P79/025 : Doc. No ICT/JP/EW/CI/019 : Revision 0

14078 Design of pile foundations PG5 at P80 to P85 : Doc. No ICT/JP/EW/CI/026 : Revision 0

14079 Design of pile foundations PG5 at P64, 65 & P68 : Doc. No ICT/JP/EW/CI/027 : Revision 0

14080 Design of pile foundations PG5 at P59 : Doc. No ICT/JP/EW/CI/023 : Revision 1

14081 Design of pile foundations PG5 at P59 : Doc. No ICT/JP/EW/CI/023 : Revision 0

14082 Design of pile foundations PG5 at P58 : Doc. No ICT/JP/EW/CI/022 : Revision 3

14083 Design of pile foundations PG5 at P58 : Doc. No ICT/JP/EW/CI/022 : Revision 0

14084 Design of pile foundations PG8 at P38 to P39 : P42 : Doc. No ICT/JP/EW/CI/013 : Revision 3

14085 Design of pile foundations P29 to P39: Doc. No ICT/JP/EW/CI/12 : Revision 1

14086 Design of pile foundations P29 to P37: Doc. No ICT/JP/EW/CI/12 : Revision 0

14087 Design of pile foundations PG5 at P58 : Doc. No ICT/JP/EW/CI/010 : Revision 0

14088 Design of pile foundations P26- P28 at Doc. No ICT/JP/EW/CI/011 : Revision 0

14089 Design of pile foundations PG7 at P26 to P28 : Doc. No ICT/JP/EW/CI/009 : Revision 0

14090 Design of pile foundations PG1 at P29 P25 : Doc. No ICT/JP/EW/CI/022 : Revision 0

14091 Design of pile foundations PG6 to P19 at P22 : Doc. No ICT/JP/EW/CI/005 : Revision 1

Page 29: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[29]

14092 Design of pile foundations PG1 at P15 : Doc. No ICT/JP/EW/CI/028 : Revision 0

14093 Design of pile foundations PG5 at P2 to P7 : Doc. No ICT/JP/EW/CI/017 : Revision 2

14094 Design of pile foundations PG5 at P58 : Doc. No ICT/JP/EW/CI/022 : Revision 1

14095 Design of pile foundations PG5 at P58 : Doc. No ICT/JP/EW/CI/017 : Revision 0

14096 Design of pile foundations PG5 at P1 : Doc. No ICT/JP/EW/CI/018 : Revision 2

14097 Design of pile foundations PG5 at P2 : Doc. No ICT/JP/EW/CI/018 : Revision 1

14098 Design of pile foundations PG5 at P1 : Doc. No ICT/JP/EW/CI/018 : Revision 0

Page 30: ICT LIBRARY UPDATE - ICT · PDF file2 White topping an excellent solution for pavement ... Economic survey 2010-2011 58 ... Material facilities for highway sector in NCR 74 13949 :

[30]