ieee pes substations committee annual meeting montreal...

27
2010 Substations Committee Status Report 1 IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010

Upload: nguyenkhanh

Post on 21-Apr-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

2010 Substations Committee Status Report 1

IEEE PESSUBSTATIONS COMMITTEE

ANNUAL MEETINGMONTREAL

May 17 - 20, 2010

2010 Substations Committee Status Report 2

SUBSTATIONS COMMITTEEOFFICERS (2009 – 2010)

Chair Hermann J. KochSiemens

Vice Chair John D. RandolphPacific Gas and Electric

Secretary Mike DoodSchweitzer Engineering Laboratories

These are the only persons who have to respond to IEEEregarding the L50-S annual financial report.

2010 Substations Committee Status Report 3

NEW SUBSTATIONSCOMMITTEE OFFICER in 2010

Secretary for 2011-2012 Mark Etter

ABB Inc.3 Independence WaySuite 206Princeton, NJ 08540tel (732) 932-6250fax (732) [email protected]

2010 Substations Committee Status Report 4

SUBSTATIONS COMMITTEEPAST CHAIRMEN

Past Chair R. S. (Bob) NowellGeorgia Power Company

Past2 Chair Hanna E. AbdallaPower Engineers

Past3 Chair A. P. (Sakis) MeliopoulosGeorgia Tech

Past4 Chair John D. McDonaldGE Energy (IEEE Division VII Director)

2010 Substations Committee Status Report 5

POWER & ENERGY SOCIETYCOMMITTEE REPRESENTATION

John McDonaldPower & Energy Editorial Board

R. S. (Bob) NowellTechnical Council Organization and Procedures Committee

George KaradyTransactions on Power Delivery Editorial Board

John RandolphTechnical Council Technical Sessions Committee

Hubert BilodeauTechnical Council Awards Committee

PES Awards Committee

2010 Substations Committee Status Report 6

Hamid SharifniaTechnical Council Standards Coordinating Committee

Wayne LitzenbergerRepresentation to Emerging Technologies

Jack ChristofersenGary EngmannBruce Dietzman

Ken WhiteC2 National Electrical Safety Code

Subcommittee 3 - Electric Supply Stations

Hanna E. AbdallahUS National Committee of CIGREStudy Committee B3- Substations

POWER & ENERGY SOCIETY COMMITTEEREPRESENTATION .... continued

2010 Substations Committee Status Report 7

2010 IEEE-SA APPOINTMENTS

IEEE-SA Review Committee (Rev Com) IEEE-SA Audit Committee (Aud Com) IEEE Standards Board

Sam SciaccaCEOCG Automation92 Cogwheel LaneSeymour, CT 06483203-888-3002 ext 301203-888-7640 (fax)[email protected]

2010 Substations Committee Status Report 8

WEB SITE http://ewh.ieee.org/cmte/substations/

Webmaster: Chuck [email protected]

2010 Substations Committee Status Report 9

SUBSTATIONS SUBCOMMITTEEBROCHURE

UpdatedStatus 2010-05-06

2010 Substations Committee Status Report 10

SUBSTATIONS COMMITTEEORGANIZATION & PROCEDURE MANUAL

Content

1. INTRODUCTION2. PURPOSE OF THE ORGANIZATION

AND PROCEDURES MANUAL3. SCOPE4. ORGANIZATION5. RESPONSIBILITIES6. OFFICERS7. MEMBERSHIP8. TRANSACTIONS EDITOR9. SUBCOMMITTEES10. WORKING GROUPS11. MEETINGS12. VOTE13. PROCEDURES14. GENERATION OF IEEE STANDARDS15. BALLOTING GROUP FOR A STANDARD16. COMMUNICATIONS17. TASK FORCE, WORKING GROUP, AND

SUBCOMMITTEE PUBLICATIONS18. INTERPRETATIONS19. APPEAL

IEEE POWER AND ENERGY SOCIETY

SUBSTATIONS COMMITTEE

ORGANIZATION AND PROCEDURES MANUAL

Revision: April 2009

Has been revised by Bob Nowell andwill be voted by B0 this meeting!

2010 Substations Committee Status Report 11

SUBSTATIONS ORGANIZATION

Transmission andDistribution

Substations DesignSubcommittee - D0

Transmission andDistributionSubstationsOperations

Subcommittee - E0

Data Acquisition,Processing, andControl Systems

Subcommittee - C0

High Voltage PowerElectronics

StationsSubcommittee - I0

Gas InsulatedSubstations

Subcommittee - K0

Recognition &Awards

Subcommittee - H0

StandardsSubcommittee - S0

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

TransactionEditor

SecretaryVice Chair

+ TCPC Past Chairs

ChairSubstations

Committee - A0

AdministrativeSubcommittee - B0

MeetingsSubcommittee - M0

Transmission andDistribution

Substations DesignSubcommittee - D0

Transmission andDistributionSubstationsOperations

Subcommittee - E0

Data Acquisition,Processing, andControl Systems

Subcommittee - C0

High Voltage PowerElectronics

StationsSubcommittee - I0

Gas InsulatedSubstations

Subcommittee - K0

Recognition &Awards

Subcommittee - H0

StandardsSubcommittee - S0

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

TransactionEditor

SecretaryVice Chair

+ TCPC Past Chairs

ChairSubstations

Committee - A0

AdministrativeSubcommittee - B0

Transmission andDistribution

Substations DesignSubcommittee - D0

Transmission andDistributionSubstationsOperations

Subcommittee - E0

Data Acquisition,Processing, andControl Systems

Subcommittee - C0

High Voltage PowerElectronics

StationsSubcommittee - I0

Gas InsulatedSubstations

Subcommittee - K0

Transmission andDistribution

Substations DesignSubcommittee - D0

Transmission andDistributionSubstationsOperations

Subcommittee - E0

Data Acquisition,Processing, andControl Systems

Subcommittee - C0

High Voltage PowerElectronics

StationsSubcommittee - I0

Gas InsulatedSubstations

Subcommittee - K0

Recognition &Awards

Subcommittee - H0

StandardsSubcommittee - S0

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

WorkingGroups

TransactionEditor

SecretaryVice Chair

+ TCPC Past Chairs

ChairSubstations

Committee - A0

AdministrativeSubcommittee - B0

MeetingsSubcommittee - M0

2010 Substations Committee Status Report 12

SUBSTATIONSADMINISTRATIVE SUBCOMMITTEES

Chair

B0 - ADMINISTRATIVE SUBCOMMITTEE Hermann Koch

H0 - RECOGNITION & AWARDS Hubert BilodeauSUBCOMMITTEE

M0 - MEETINGS SUBCOMMITTEE Diane Watkins

S0 - STANDARDS SUBCOMMITTEE Hamid Sharifnia

2010 Substations Committee Status Report 13

SUBSTATIONSSUBCOMMITTEES

Chair

C0 - DATA ACQUISITION, PROCESSING, AND Craig PreussCONTROL SYSTEMS SUBCOMMITTEE

D0 - TRANSMISSION AND DISTRIBUTION Rich KeilSUBSTATIONS DESIGN SUBCOMMITTEE

E0 - TRANSMISSION AND DISTRIBUTION Randy ClellandSUBSTATIONS OPERATIONSSUBCOMMITTEe

I0 - HIGH VOLTAGE POWER ELECTRONICS Chris HorwillSTATIONS SUBCOMMITTEE

K0 - GAS INSULATED SUBSTATIONS Arun AroraSUBCOMMITTEE

2010 Substations Committee Status Report 14

ADMINISTRATIVE SUBCOMMITTEE - B0

WG B2 – LIAISON Arun AroraReport about

C0 to PSCC I0 to T&D Committee K0 to Switchgear Committee

WG B4 - FELLOW John TengdinPromote and support nominations for SubstationsEngineers for IEEE Fellow Member Status

2010 Substations Committee Status Report 15

DATA ACQUISITION, PROCESSING, ANDCONTROL SYSTEMS SUBCOMMITTEE - C0

WORKING GROUP C1 - SUBSTATION INTELLIGENT ELECTRONIC Sam SciaccaDEVICES (IED) CYBER SECURITY STANDARDS

WORKING GROUP C2 - STANDARD ENVIRON & TESTING John TengdinREQUIREMENTS FOR COMMUNICATIONS NETWORKINGDEVICES IN ELECTRIC POWER SUBSTATIONS

WORKING GROUP C3 - STANDARD FOR SCADA AND AUTOMATION Craig PreussSYSTEMS

WORKING GROUP C4 - TRIAL USE STANDARD FOR CYBER John TengdinSECURITY OF SERIAL SCADA LINKS AND IEC REMOTE ACCESS

WORKING GROUP C5 - STANDARD ELECTRICAL POWER SYSTEM John TengdinDEVICE FUNCTION NUMBERS AND CONTACT DESIGNATIONS

WORKING GROUP C6 - TRIAL USE STANDARD FOR A CRYPTO- Dave WhiteheadGRAPHIC PROTOCOL FOR CYBER SECURITY OF SUBSTATIONSERIAL LINKS

WORKING GROUP C7 - PROFILE FOR PROTECTION AND Tim TibbalsAUTOMATION IEDs

2010 Substations Committee Status Report 16

DATA ACQUISITION, PROCESSING, ANDCONTROL SYSTEMS SUBCOMMITTEE - C0

WORKING GROUP C8 - RECOMMENDED PRACTICES FOR Michael ThesingNETWORK COMMUNICATIONS IN A SUBSTATION

WORKING GROUP C9 - STANDARD COMMUNICATION DELIVERY John TengdinTIME PERFORMANCE REQUIREMENTS FOR ELECTRIC POWERSUBSTATION AUTOMATION

WORKING GROUP C10 - JOINT C10 AND PSRC H13 WG ON Sam SciaccaREQUIREMENT AND APPLICATION OF THE SUBSTATION CYBERSECURITY

WORKING GROUP C11 - RECOMMENDED PRACTICE FOR DATA Lee SmithCOMMUNICATIONS BETWEEN RTUs & IEDs IN A SUBSTATION

WORKING GROUP C12 - DNP 3.0 STANDARD ENVIRONMENTAL Lee SmithAND TESTING REQUIREMENTS FOR COM-MUNI-CATION NET-WORKING DEVICES IN ELECTRIC POWER SUBSTATIONS

WORKING GROUP C13 - STANDARD TEST METHOD OF USE IN THE NNEVALUATION OF MESSAGE COMMUNI-CATIONS BETWEENINTELLIGENT ELECTRONIC DEVICES IN AN INTEGRATED SUBSTA-TION PROTECTION CONTROL, AND DATA ACQUISITION SYSTEM

2010 Substations Committee Status Report 17

TRANSMISSION AND DISTRIBUTION SUB-STATIONS DESIGN SUBCOMMITTEE - D0

WORKING GROUP D1 - GUIDE FOR RECOMMENDED ELECT CLEAR- Hamid SharifniaANCES & INSUL LEVELS IN AIR INSULATED ELECTRIC POWERSUBSTATIONS

WORKING GROUP D2 (F2) – GUIDE FOR DESIGN & INSTALLATION Debra LongtinIN CABLE SYSTEMS IN SUBSTATIONS

WORKING GROUP D3 - GUIDE FOR THE DESIGN OF SUBSTATIONS Hanna AbdallahBUS STRUCTURES

WORKING GROUP D4 (F1) - RECOMMENDED PRACTICES FOR Erik FujisakiSEISMIC DESIGN OF SUBSTATIONS

WORKING GROUP D5 - GUIDE FOR DIRECT LIGHTNING STROKE Bob NowellSHIELDING OF SUBSTATIONS

WORKING GROUP D6 (F0b) – RECOMMENDED PRACTICE FOR THE Jean-B. DastousDESIGN OF FLEXIBLE BUSWORK LOCATED IN SEISMICALLY ACTIVEAREAS

WORKING GROUP D7 - GUIDE FOR SAFETY IN AC SUBSTATION Richard KeilGROUNDING

WORKING GROUP D8 - GUIDE FOR DEVELOPMENT OF Arun AroraSPECIFICATIONS FOR TURNKEY SUBSTATION PROJECTS

WORKING GROUP D9 - AC/DC SYSTEMS Hanna Abdallah

2010 Substations Committee Status Report 18

TRANSMISSION AND DISTRIBUTION SUBSTA-TIONS OPERATIONS SUBCOMMITTEE - E0

WORKING GROUP E1 (G2) - GUIDE FOR THE DESIGN, Diane WatkinsCONSTRUCTION & OPERATION OF ELECTRIC POWERSUBSTATIONS FOR COMMUNITY ACCEPTANCE ANDENVIRONMENTAL COMPATIBILITY

WORKING GROUP E2 (G2) – GUIDE FOR CONTAINMENT James SosinskiAND CONTROL OF OIL SPILLS IN SUBSTATIONS

WORKING GROUP E3 (F3) - GUIDE FOR SUBSTATION FIRE Don DelcourtPROTECTION

WORKING GROUP E4 (D4) - GUIDE FOR TEMPORARY PROTECTIVE Lane GarrettGROUNDING SYSTEMS USED IN SUBSTATIONS

WORKING GROUP E4 - GUIDE FOR THE SAFE INSTALLATION OF Lane GarrettMOBILE SUBSTATION EQUIPMENT

2010 Substations Committee Status Report 19

TRANSMISSION AND DISTRIBUTION SUBSTA-TIONS OPERATIONS SUBCOMMITTEE - E0

WORKING GROUP E5 (G3) - GUIDE FOR ANIMAL DETERRENTS Mike BioFOR ELECTRIC POWE SUPPLY STATIONS

WORKING GROUP E6 (D6) - GUIDE FOR MEASURING EARTH Dennis DeCostaRESISTIVITY, GROUND IMPEDANCE, AND EARTH SURFACEPOTENTIALS OF A GROUNDING SYSTEM

WORKING GROUP E7 (G3) - GUIDE FOR ELECTRIC POWER Hassein BashirianSUBSTATION PHYSICAL AND ELECTRONIC SECURITY

WORKING GROUP E9 (D9) - STD FOR QUALIFYING PERMANENT David KelleyCONNECTIONS USED IN ELECTRICAL POWER SUBSTATIONGROUNDING

2010 Substations Committee Status Report 20

HIGH VOLTAGE POWER ELECTRONICSSTATIONS SUBCOMMITTEE - I0

WORKING GROUP I1 - RECOMMENDED PRACTICE TO TEST George KaradyPROCEDURE FOR HVDC THYRISTOR VALVES

WORKING GROUP I2 - RECOMMENDED PRACTICE FOR George KaradySPECIFYING THYRISTOR CONTROLLED SERIES CAPS

WORKING GROUP I4 - GUIDE FOR THE FUNCTIONAL SPECIFICATION Heinz TyllOF TRANSMISSION STATIC VAR COMPEN-SATORS

WORKING GROUP I5 - GUIDE FOR THE EVALUATION OF THE Ben MehrabanRELIABILITY OF HVDC CONVERTER STATIONS

WORKING GROUP I8 - GUIDE FOR CONTROL ARCHITECTURE FOR Nari HingoraniHIGH POWER EECTRONIC USED IN ELEC-TRICAL POWER TRANS. &DISTR. SYSTEMS

2010 Substations Committee Status Report 21

GAS INSULATED SUBSTATIONSSUBCOMMITTEE - K0

WORKING GROUP K1 - STANDARD FOR HIGH VOLTAGE John BrunkeGAS-INSULATED SUBSTATIONS, RATED ABOVE 52 KV

WORKING GROUP K2- TUTORIALS AND PANEL SESSIONS Hermann KochGIS/GIL/SF6

WORKING GROUP K3 – GUIDE FOR APPLICATION OF George BeckerGAS-INSULATED SUBSTATIONS (GIS) 1 KV UP TO 52 KV

WORKING GROUP K4 – GUIDE FOR SULPHUR HEXAFLUORIDE (SF6) Luke van der ZelGAS HANDLING FOR HIGH VOLTAGE EQUIPMENT

WORKING GROUP K5 – GIL APPLICA-TION GUIDE Darin Penner

WORKING GROUP K6 – GIS USER GROUP Venkatesh Minisandram

2010 Substations Committee Status Report 22

GAS INSULATED SUBSTATIONSSUBCOMMITTEE - K0

WORKING GROUP K7 - REVISION OF STANDARD FOR BUSHING Devki SharmaFOR HIGH VOLTAGE (OVER 1000 V AC) CIRCUIT BREAKERS ANDGAS INSULATD SWITCHGEAR

WORKING GROUP K8 - GUIDE FOR MOISTURE MEASUREMENT David GiegelAND CONTROL IN SF6 GAS INSULATED EQUIPMENT

WORKING GROUP K9 – RECOMMENDED PRACTICE FOR THE Arnaud FicheuxINTERFACE OF NEW GIS EQUIPMENT IN EXISTING GIS'S

WORKING GROUP K11 – GUIDE FOR GIS Dave Solhtalab

WORKING GROUP K 12 –GUIDE TO SPECIFICATION FOR GIS George BeckerELECTRIC POWER SUBSTATION EQUIPMENT

2010 Substations Committee Status Report 23

MEMBERSHIP TYPE COMPOSITIONStatus 2010 (2009)

COMMITTEE MEMBER: 80 (76) LIFE COMMITTEE MEMBER: 7 (5) COMMITTEE MEMBER-CORRESPONDING: 8 (8) ACTIVE PARTICIPANT: 334 (358) INTERESTED INDIVIDUAL: 439 (381)

TOTALS: 871 (828)

2010 Substations Committee Status Report 24

WHO WE ARE IN SUBSTATIONS?

0

50

100

150

200

250

300

350

400

450

500

2008 2009 2010

COMMITTEE MEMBER

LIFE COMMITTEEMEMBERCOMMITTEE MEMBER-CORRESP.ACTIVE PARTICIPANT

INTERESTED INDIVIDUAL

2010 Substations Committee Status Report 25

TOTAL MEMBERSHIPDEVELOPMENT

0

100

200

300

400

500

600

700

800

900

1000

2008 2009 2010

TOTAL

2010 Substations Committee Status Report 26

NEXT SUBSTATIONS MEETING2011 CHICAGO

Joint meeting of- IEEE Substations Committee

and- CIGRE B3 Substations Study Committee

15. - 19. May 2011Chicago, IL, USA

Local organization committee:Radoslav BaracGE Infra, [email protected]

2010 Substations Committee Status Report 27

WHAT EACH OF US EXPECTFROM SUBSTATIONS COMMITTEE

To be involved in Substation Engineering!To meet colleagues and exchange knowledge!

To contribute to standards, guides, tutorials,panels and discussions!

To volunteer to leading positions!

Substations Committee Welcomes You!Have a nice week in Montreal!