Page 1: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

IHEP SRF Lab Upgrade & Facilities

Jianping Dai

on behalf ofSRF lab upgrade and facilities group

2nd Workshop of the IHEP 1.3GHz SRF R&D Project, December 1-3, 2009, IHEP, Beijing

Page 2: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 2

IHEP SRF Lab (~230m2), constructed at 2004

Page 3: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 3

Facilities layout of IHEP SRF lab

Page 4: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 4

Class 10000: 13m2, equipped with the evacuating and leakage detecting system

Class 10+Class 100: 20m2

The clean room was upgrade in this May: filter change( 0.12µm, 99.999%)and ground modified

Page 5: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 5

Resistivity: >18MOhm-cmTOC: <14ppb (10-9)Water flow: 8-12L/minStore 1200L pure water

Page 6: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 6

HPR for single cell Cavity

High pressure pump, 01.um filter, nozzle, relief valve , HPR stand

•Maximum travel distance of cavity is 1.1m, with a speed of 4-16cm/m•Rotating speed: 2-10cycle/m•Water pressure :0-100kgf/cm2

•Rinsing water flow: 12L/m @80kgf/cm2

Page 7: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 7

A HPR device had been designed, now it’s just under parts fabrication.

Page 8: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 8

Cavity mount stand

3m×4.4m×5.2m:Height:>4m

Page 9: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 9

Control room

Page 10: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 10

Old CP facility

Page 11: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 11

Over flow Tank

Recirculation Pump

WaterChiller

Main Acid Valve

AcidTank

Main Acid Pump

AcidSupply Tank

Acid Dump Tank

Acid Dump Valve

Acid Waste Barrel

Acid Dump Pump

Waste Gas Treatment

Dilute WasteBarrel

UPWTank

UPWPump

Ultra Pure Water (UPW)Barrel

UPWValve

Dilute Waste Valve

Principle of IHEP BCP facility

Design parameters of BCP

• Cool the acid to 12oC• ~1 minute to fill or discharge the cavity• Remove ~2kW of heat during the process• Acid flow: 0-2T/h

Page 12: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 12

配酸槽 高位水槽高位酸槽 酸雾塔纯水储槽

冷水机

3#风机液位控制槽

废酸储槽

泵泵

泵泵

排酸 排酸冷却器

Page 13: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 13

Page 14: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 14

Mechanical pump: 150L/s,Roots pump: 1200L/s

Page 15: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 15

Rotate speed: 0~100Turn/m

Page 16: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 16

Page 17: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 17

Page 18: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 18

97 %

50 %

Page 19: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 19

Experience of SRF Lab

• Vertical test at IHEP SRF Lab.– 1.3GHz/β=0.45 SC:

SC-01 1 time

SC-02 3 times

SC-03 2 times

– 2-cell Tesla cavity 1time

• Surface treatment of the above cavities

Page 20: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 20

1st: CP(100m)+HPR(2hr.)+Baking(120 48hr.) @IHEP℃ 2nd: CP(50m)+HPR(2hr.)+Baking(120 48hr.) @IHEP℃ 3rd: CP(20m)+HPR(3hr.)+Baking(120 48hr.) @IHEP℃ 4th: HPR @KEK 5th: warm up and fast cooling down @KEK

Test of SC-02 cavity

Page 21: IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December

2nd Workshop of 1.3GHz SRF R&D Project, Dec. 1~3, Beijing [email protected] 21

Thanks for your attention!