scrf lab and facilities @ ihep
DESCRIPTION
SCRF Lab and Facilities @ IHEP. Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11, 2009, IHEP, Beijing, China. Outline. Brief introduction Upgrade of existing facilities Development of new facilities Summary. - PowerPoint PPT PresentationTRANSCRIPT
SCRF Lab and Facilities @ IHEP
Jianping Dai
On behalf of the SCRF facilities team
First Mini-Workshop on IHEP 1.3GHz Superconducting RF project,
June 10-11, 2009, IHEP, Beijing, China
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 2
Outline
1. Brief introduction
2. Upgrade of existing facilities
3. Development of new facilities
4. Summary
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 3
Brief introduction of SCRF Lab. @IHEP
The SCRF Lab was built in 2004. It was initially equipped with the fundamental facilities
needed by the development of single cell SCRF cavities. Since 2005, several low beta single-cell SRF cavities have
been treated and tested in this lab.
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 4
1st: CP(100m)+HPR(2hr.)+Baking(120 48hr.) @IHEP℃ 2nd: CP(50m)+HPR(2hr.)+Baking(120 48hr.) @IHEP℃ 3rd: CP(20m)+HPR(3hr.)+Baking(120 48hr.) @IHEP℃ 4th: HPR @KEK 5th: warm up and fast cooling down @KEK
Low beta SC-02
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 5
1st: BP(20m)+CP(80m)+Anealing+CP(80m)+HPR(1.5hr.)+Baking(120 ,48hr.) ℃@IHEP2nd: CP(100m)+HPR(2hr.)+Baking(120 48hr.) @IHEP℃3rd: Only evacuation after transfered from IHEP to KEK @KEK4th: EP(80m+3m)+HF+HPR+Baking(120 48hrs.) @KEK℃
Low beta SC-03
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 6
Large grain Nb LL single cell cavity
0 10 20 30 40 501E8
1E9
1E10
1E11
X-ray from 22.09 MV/m
CBP(150)+CP(90)+Anealing+CP(10)+HPR+Baking@IHEPHPR(15 min.)+VT@KEK
IHEP#2 (2nd meas.)
Q0
Eacc [MV/m]
Q0 2008/02/14 Thu.
Eacc=34.72MV/m)[email protected] KLimited by Quench
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 7
To meet the 9-cell cavity requirement for surface preparation and vertical tests, the 1.3 GHz SCRF program will significantly improve the facilities.
Besides the upgrade of the clean room and the ultra-pure water system, several new facilities will be developed.
CBP (tumbling) machine for 9-cell cavities (ZHAI Jiyuan)
HPR facility for 9-cell cavities (LI Zhongquan)
BCP facility for 9-cell cavities (DAI Jianping)
Pretuning machine for 9-cell cavities (HOU Mi)
New dewar and related devices for vertical tests
Helium recycling system for vertical tests based on the BEPCII cryogenic plant, or a brand new vertical test stand near the horizontal test stand
T-mapping and cavity inner surface inspection tools
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 8
Upgrade of the existing facilities (I)
The height of the roof was increased to 3.5m from 2.5m, to host the new HPR machine
All the filters were changed.AAF filter, the efficiency ≥99.9995%@0.12um
The floor was improved
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 9
Upgrade of the existing facilities (II)
1200L
Parameters of the Ultra pure water 180.2M-cm, 8 ~ 20L/min, 1200L
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 10
Upgrade of the existing facilities (III)
Cavity mount stage 3m×4.4m×5.2m, >4m, Three cavities
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 11
Development of the new facilities (I)CBP (tumbling) machine for 9-cell cavities is under fabrication.
Old CBP machine for single cell cavities
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 12
Development of the new facilities (II)
The new HPR machine for 9-cell cavities is under design.
Old HPR machine for single cell cavities
Fermilab HPR ( ANL)
Water Pressure :adjustable150Kg/cm2 (Max),Maximu Flow: 21L/min
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 13
Development of the new facilities (III)Old BCP by hand for single cell cavities
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 14
New BCP for 9-cell cavities
Over flow Tank
Recirculation Pump
WaterChiller
Main Acid Valve
AcidTank
Main Acid Pump
AcidSupply Tank
Acid Dump Tank
Acid Dump Valve
Acid Waste Barrel
Acid Dump Pump
Waste Gas Treatment
Dilute WasteBarrel
UPWTank
UPWPump
Ultra Pure Water (UPW)Barrel
UPWValve
Dilute Waste Valve
Main parameters of the machine It takes a bout 2 hours to cool acid down to 12 OC It takes 5-10 minutes to pump 100 liters of acid into the gravity feed bank. It takes less than 1 minute to fill or discharge the 100 liter process tank. The cooling system can remove up to 2KW of heat generated during the process (the expected normal power generation does not exceed 1kW) The maximum acid flow is ~2 tons/hour
Hydrofluoric (HF), Nitric(HNO3), Orthophosphoric (H3PO4)
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 15
一层
酸排放槽 废酸储槽
清洗排放水槽
铌化铣装置
配酸槽 高位水槽高位酸槽 酸雾塔纯水储槽
冷水机
3#风机液位控制槽
废酸储槽
泵泵
泵泵
排酸 排酸冷却器
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 16
Development of the new facilities (IV)
Pretuning machine for 9-cell cavities
Longitudinal precision: 2um
Maximum force: 10KN ( 1000Kgf)Maximum movement: 6mm
Minimum movement: 2um
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 17
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 18STF 18
About the Kyoto camera system (Mass-production model)
Characteristic of Kyoto camera system
* The high resolution image can be taken.
* The wall gradients of inner surface can be
measured to use the Strip line EL illuminator.
(Judgment of Pit or Bump is possible)
* The heights or depths can be estimated by measured wall gradients for some well-conditioned defects.
Max wall gradient
±20 degree.
Schematic drawing of the wall gradient measurement
1st Mini-Workshop on 1.3GHz cavity, June 10-11, Beijing [email protected] 19
Thanks !