Page 1: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Improving Project Management Practice: an Engineering and Construction Case Study

Sofia V. Carvalho, Anabela P. Tereso, Gabriela FernandesCentre ALGORITMI, University of Minho

Campus de Azurém, 4804-533 Guimarães, Portugal

[email protected], [email protected], [email protected]

Page 2: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Contents

• Introduction

• Literature Review and Main Concepts

• Case Study

• Proposal of PMIIs

• Conclusions

• Future Research

• References

Page 3: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Introduction

Research question

What are the PMIIs that are the most

appropriate for an Engineering & Construction

(E&C) company that wants to increase its

organizational maturity in Project Management?

1

Improving Project Management Practice: an Engineering and Construction Case Study 1

Page 4: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Introduction1

Improving Project Management Practice: an Engineering and Construction Case Study

• Objectives of this research

o Identification of the problems experienced with PM practice in the company.

o Identification and development of PMIIs that mitigate difficulties and fulfill the needs of the company's projects.

o Verification of the adaptability of the PM tools and techniques proposed in a pilot project and validation of the PMIIs using focus groups.

2

Page 5: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Introduction1

Improving Project Management Practice: an Engineering and Construction Case Study

• Approach used based on:

o The Project Management Body of Knowledge (PMBoK®) and Construction Extension to the PMBoK® Guide from PMI [1-2]

Project Management Lifecycle Integration

PM Processes: Inputs / Tools and Techniques / Outputs

o The framework proposed by Fernandes, Ward, and Araújo [3]

Key PMIIs that should be introduced in organizations

How the key PMIIs should be aligned to ensure the fulfillment of PM organizational needs

3

Page 6: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Literature Review and Main Concepts2

Improving Project Management Practice: an Engineering and Construction Case Study

“The specificity of project management in different contexts and industries is recognized, but little empirical research encompasses a sufficiently broad

range of contexts and project types to precisely identify these specificities.”

Besner and Hobbs, 2013 [4]

“The value of any organizational improvement must be judged in the context and situation from which it arises and how well the improvement itself fits

within the context of the organization, industry and geography in which it is embedded”

Thomas and Mullaly, 2008 [5]

4

Page 7: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Literature Review and Main Concepts2

Improving Project Management Practice: an Engineering and Construction Case Study

Fernandes, Ward, and Araújo [3]

5

Page 8: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Literature Review and Main Concepts2

Improving Project Management Practice: an Engineering and Construction Case Study

PMI [2]

6

Page 9: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Literature Review and Main Concepts2

Improving Project Management Practice: an Engineering and Construction Case Study

Oberlender [6]

7

Page 10: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Case Study3

I. Engineering & Construction industry

II. Design, Production and Assembly of Metallic Structures

228

61

Improving Project Management Practice: an Engineering and Construction Case Study 8

Page 11: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Case Study3

Improving Project Management Practice: an Engineering and Construction Case Study 9

Page 12: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Case Study3

Improving Project Management Practice: an Engineering and Construction Case Study 10

Page 13: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Proposal of PMIIs4

Improving Project Management Practice: an Engineering and Construction Case Study

I. Processes, Tools and Techniques

II. General Management System

III. People andOrganizational Learning

• PMII 1: Integrate PM life cycle into the life cycle of BysteelProjects

• PMII 2: Develop PM Tools and Techniques

• PMII 3: Redefine an organizational structure appropriate to projects

• PMII 4: Introduce the figure of Project Manager

• PMII 5: Develop a Project Manager Support Guide

• PMII 6: Promote the involvement of the company in the development of the integration of PM processes

11

Page 14: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 1: Integrate PM life cycle into the life cycle of Bysteel Projects

12

Page 15: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 2: Develop PM Tools and Techniques

The selection of these tools was made taking into account two studies carried out about the identification of PM tools and techniques perceived as most useful [7,8]

13

Page 16: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 3: Redefine an organizational structure appropriate to projects

14

Page 17: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 4: Introduce the figure of Project Manager

Internal Project

Manager

External Project

ManagerClient

Suppliers

Subcontrators

Site Manager

Assistant Site

Manager

Design Team Modelling Team Production Team

15

Page 18: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

Integration Scope Time Cost Risks Stakeholders Communication Quality Procurement Human Resources

Initiation x

Initial Planning x x x x x x x

Project Monitoring

Execution x x x x x

Monitor and Control x x x x xx

Replanning x x xx

Closure x

PMII 5: Develop a Project Manager Support Guide

16

Page 19: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 5: Develop a Project Manager Support Guide

17

Page 20: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

4

Improving Project Management Practice: an Engineering and Construction Case Study

Proposal of PMIIs

PMII 6: Promote the involvement of the company in the development of the integration of PM processes

Focus groups bring together prequalified stakeholders and

subject matter experts to learn about their expectations and

attitudes about a proposed product, service, or result. A

trained moderator guides the group through an interactive

discussion designed to be more conversational than a one-

on-one interview. [2]

Questionnaires and surveys are written sets of questions

designed to quickly accumulate information from a large number

of respondents. [2]

18

Page 21: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Conclusions5

Improving Project Management Practice: an Engineering and Construction Case Study

• A set of key PMIIs were proposed: the internal processes of theorganization were mapped, and the processes improvement was done,applying the best PM practice contextualized to the organization.

• Practical contribution, based on theoretical foundations, that provides PMpractitioners, especially the ones from the engineering and constructionsector, with guidelines for improving PM practice in organizations thatwant to increase its PM maturity.

• The engagement of the company’s board and its employees in adoptingnew PM processes was done.

19

Page 22: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

Future Research6

Improving Project Management Practice: an Engineering and Construction Case Study

• Long-term goal - achievement of the standardization of PM processes andthe professionalization of project management.

• Roll out of the initiatives proposed to all the projects of the organization,with the appropriate adaptation, in order to optimize the projectmanagement practices in Bysteel, S.A.

• Measure the value of project management at Bysteel - measure the impacton project success of using project management practices.

Acknowledgments. This work has been supported by COMPETE: POCI-01-0145-FEDER-007043 and FCT – Fundação para a Ciência e Tecnologia within the Project Scope: UID/CEC/00319/2013.

20

Page 23: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

References7

Improving Project Management Practice: an Engineering and Construction Case Study

• [1] PMI, “A Guide to the Project Management Body of Knowledge - PMBOK® Guide, 5th ed”. Project Management Institute, Newtown Square, Pennsylvania, 2013.

• [2] PMI, “Construction Extension to the Project Management Body of Knowledge - PMBOK® Guide, 3th ed.” Project Management Institute, Newtown Square, Pennsylvania, 2003.

• [3] G. Fernandes, S. Ward, and M. Araújo, “Developing a framework for embedding useful project management improvement initiatives in organizations,” Proj. Manag. J., vol. 45, no. 4, pp. 81–108, 2014.https://doi.org/10.1002/pmj.21441

• [4] C. Besner and B. Hobbs, “Project Management Practice, Generic or Contextual: A Reality Check,” Proj. Manag. J., vol. 39, no. 1, pp. 16–33, 2008.

• [5] C. Besner and B. Hobbs, “Contextualized project management practice: A cluster analysis of practices and best practices,” Proj. Manag. J., vol. 44, no. 1, pp. 17–34, 2013.

• [6] G. D. Oberlender, “Project Management for Engineering and Construction”. McGraw Hill, 2000.

• [7] G. Fernandes, S. Ward, and M. Araújo, “Identifying useful Project Management Practices: A Mixed MethodologyApproach.” 2013.

• [8] M. Ferreira, A. Tereso, P. Ribeiro, G. Fernandes, and I. Loureiro, “Project Management Practices in Private Portuguese Organizations” Procedia Technol., vol. 9, pp. 608–617, 2013.

21

Page 24: Improving Project Management Practicepessoais.dps.uminho.pt/anabelat/objectos/Apresentação...4 Proposal of PMIIs Improving Project Management Practice: an Engineering and Construction

THANK YOUAnabela Tereso

[email protected]