Simulation in Production and Logistics 2015 Markus Rabe & Uwe Clausen (eds.) Fraunhofer IRB Verlag, Stuttgart 2015 Influence of Customer Information Uncertainties on Production Order Variance Comparing two Different Kinds of Customer Order Behaviours Einfluss von Kundeninformationsunsicherheit auf die Varianz der Fertigungsaufträge zweier unterschiedlicher Arten von Kundenbestellverhalten Thomas Felberbauer, Andreas Josef Peirleitner, Klaus Altendorfer, University of Applied Sciences Upper Austria, Steyr (Austria), [email protected], [email protected], [email protected] Abstract: In this paper, two different order behaviours, differentiating how custom- ers provide information about their required demand are discussed. On the one hand this is customer-required lead time order behaviour where customers order a stocha- stic order amount with a customer required lead time. On the other hand this is fore- cast evolution order behaviour where the customers provide a forecast quantity for a specific due date for a long horizon in advance and update their forecast quantities periodically. The performance is evaluated by measuring variance of customer demand, gross requirements and production orders and the information quality pro- gress by varying order behaviour parameters as well as forecast error levels. Ana- lysing this performance measures this study investigates how much master pro- duction schedule and material requirement planning mitigate customer information uncertainty. 1 Introduction Two different kinds of how customers provide information about the required demand to their suppliers can be observed and are as well discussed in literature. Firstly, this is customer required lead time (CRL) order behaviour where customers state certain orders with specific CRL and stochastic order amounts. In this case, the manufacturing company generates an aggregated forecast for a long time in advance. The second customer behaviour is forecast evolution (FEV) order behaviour where customers provide a forecast quantity for a specific due date for a long horizon in advance and update their forecast quantities periodically. In both order behaviours, manufacturing companies are facing the problem of information dynamics and uncertainty, i.e. stochastic behaviour of arrivals, due dates and order amounts over time. In this study the stochastic nature of both customer order behaviours FEV and

Upload: others

Post on 20-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

Simulation in Production and Logistics 2015 Markus Rabe & Uwe Clausen (eds.) Fraunhofer IRB Verlag, Stuttgart 2015

Influence of Customer Information Uncertainties on Production Order Variance Comparing two Different Kinds of Customer Order Behaviours

Einfluss von Kundeninformationsunsicherheit auf die Varianz der Fertigungsaufträge zweier unterschiedlicher

Arten von Kundenbestellverhalten

Thomas Felberbauer, Andreas Josef Peirleitner, Klaus Altendorfer, University of Applied Sciences Upper Austria, Steyr (Austria), [email protected],

[email protected], [email protected]

Abstract: In this paper, two different order behaviours, differentiating how custom-ers provide information about their required demand are discussed. On the one hand this is customer-required lead time order behaviour where customers order a stocha-stic order amount with a customer required lead time. On the other hand this is fore-cast evolution order behaviour where the customers provide a forecast quantity for a specific due date for a long horizon in advance and update their forecast quantities periodically. The performance is evaluated by measuring variance of customer demand, gross requirements and production orders and the information quality pro-gress by varying order behaviour parameters as well as forecast error levels. Ana-lysing this performance measures this study investigates how much master pro-duction schedule and material requirement planning mitigate customer information uncertainty.

1 Introduction Two different kinds of how customers provide information about the required demand to their suppliers can be observed and are as well discussed in literature. Firstly, this is customer required lead time (CRL) order behaviour where customers state certain orders with specific CRL and stochastic order amounts. In this case, the manufacturing company generates an aggregated forecast for a long time in advance. The second customer behaviour is forecast evolution (FEV) order behaviour where customers provide a forecast quantity for a specific due date for a long horizon in advance and update their forecast quantities periodically. In both order behaviours, manufacturing companies are facing the problem of information dynamics and uncertainty, i.e. stochastic behaviour of arrivals, due dates and order amounts over time. In this study the stochastic nature of both customer order behaviours FEV and

Page 2: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

378 Felberbauer, Thomas; Peirleitner, Andreas Josef; Altendorfer, Klaus

CRL are compared by analysing the output of the intermediate planning level. Additionally, different levels of forecast errors, which is the deviation of the planned monthly demand to its realisation, are analysed. For the CRL order behaviour we investigate different expected values and variances of customer required lead time. The second source of randomness for CRL is the variance of the order amount. For the FEV order behaviour, the length of frozen zone, meaning the time window where a customer does not change its order anymore is investigated. Another interesting parameter studied for FEV is the change frequency of forecast and the variance of the order amount per change, indicating how volatile the forecast is. To evaluate the negative influence of these different kinds of uncertainty on the production system behaviour, this paper does not measure costs, but the input into the medium term planning, being the mean and standard deviation of gross require-ments and its output, consisting of the mean and standard deviation of production order lot sizes. Another indicator for the negative influence of customer demand uncertainty is the variance of capacity needed. We monitor this indicator, to inves-tigate how much the hierarchical planning structure already mitigates these uncertainty effects. As the interaction of the different planning levels cannot be treated analytically a simulation study is conducted for this investigation.

2 Literature Review The Manufacturing resource planning concept (MRPII), is a structured approach which is widely used. MRPII consists of three planning levels: Long-term planning, intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production planning (APP). The main functions of mid-term planning are master production scheduling (MPS), which compares the production plan with the actual customer orders, and material requirements planning (MRP), which identifies a list of production orders (see Orlicky 1975). The short-term planning conducts scheduling and dispatching tasks (see Panwalkar and Iskander 1977) for the released production orders and available resources.

Based on the decision hierarchy in manufacturing and the information uncertainties, there is still a research gap concerning the influence of information dynamics and uncertainties on the decisions taken on the upper hierarchical level. Ignoring this information uncertainty influence leads to a lack of coordination and integration also reported in surveys by Fleischmann and Meyr (2003), Kok and Fransoo (2003) and Missbauer and Uzsoy (2011).

Fildes and Kingsman (2010) develop a framework for examining the effect of demand uncertainty and forecast error on unit costs and customer service levels in supply chain planning, including MRP type manufacturing systems.

3 Problem Description The hierarchical production planning approach is modelled in a simulation model. For a detailed description see Huebl et al. (2011) and for a further application see Felberbauer et al. (2012) or Felberbauer and Altendorfer (2014). The simulation model is running a rolling horizon planning on the long and intermediate range plan-ning level. On the long range planning level, the functionality of APP is conducted. In this study we do not calculate an optimal production program but use the forecast

Page 3: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

Influence of Customer Information Uncertainties on Production Order Variance 379

as production program. The intermediate-range planning uses the information of the production program. In the MPS, the production program is disaggregated and actual customer orders are used for the calculation of the gross requirements. The gross requirements are calculated taking the maximum of disaggregated production program and customer demand. MRP runs daily and planned order releases are cal-culated with the main MRP-functions netting, lot sizing, backward scheduling and bill of material (BOM) explosion (see also Hopp and Spearman (2008) for details on the MRP run). Planned orders from the MRP run are released to real production orders if all required sub materials are available. Production orders are produced on the shop floor according to the routing information and the dispatching rule.

3.1 Forecast Error

For both order behaviours the forecast error includes the difference between the monthly constant demand forecast , and the stochastic realized monthly demand

, of sales product in time period . The forecast error , is an identically independent truncated-normal-distributed random variable with an expected value

, 0 and variance , , . The forecast error parameter defines the quality of the forecast and is independent of time period and item . The random monthly demand per sales product and time period is defined as

, , , .

3.2 CRL Order Behaviour

The order amount for item is log-normally distributed and is calculated based on the coefficient of variation . The order arrival rate is

,, , , . Note that in the simulation study, the order rate , is

adjusted to account for forecast error. Each customer order requests a stochastic customer required lead time based on the coefficient of variation .

3.3 FEV Order Behaviour

For the evolution of forecasts in FEV behaviour we are using an extension of the Martingale Model for Forecast Evolution (MMFE), presented in Heath and Jackson (1994). This way of modelling forecasts is originally based on the model of Hausman (1969). In this FEV order behaviour, the customer provides a planned order amount per due date in advance of the real customer order for a certain fore-cast horizon. This amount stays unchanged until the forecast evolution horizon is reached. Between the forecast evolution horizon and the due date, the customer changes the order amount periodically. For each change, the identically independent truncated-normal-distributed evolution error , is added to the actual order amount. To account for the forecast error , , the evolution error is defined by

,,

, / and ,

. Where , is the number of

orders per time period and sales product , the forecast evolution horizon, the frozen zone and the change frequency. / is the number of changes per customer order and therefore , / is the total number of changes of all customer orders per time period and sales product . The parameter defines

Page 4: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

380

the variaproduct AssuminEquationdefines t

3.4

In this stboth cusduction oare inves

Figure 1

Analysesthat indethe inforinteractiorequiremfunction

requiremand A2.calculatideviationrealized

, ,

To discuproductiare intro

Felbe

ance of the evo. is the

ng that the errn for the custthe realized or

Performan

tudy we analystomer order borders. Therefstigated. Figur

1: Performanc

s A1.1 measurex 1 again refermation unceron. Analysis

ments ,

. With A1.3, for material

ments pe3 show the on of the cun between the(i=1) in per (i.e. A2.3) a

,p i pK

uss the smoothon orders, resduced in Equa

erbauer, Thom

olution error constant demror terms are tomer order order amount.

, p pO d

nce Indicat

yse the effectsbehaviours onfore, the smoore 1 shows the

ce indicators

res the coefficers to the realirtainty from t

A1.2 measu for sales pr

being the coe, and A1.4

er resource ,evolution of

ustomer demae value knownrcent. Note thare similar to

, p i E K

hing effect of spectively, in ation (3).

mas; Peirleitne

, and is indmand forecast

independent oof item in

1

/

,

h fz

k

cf

p t

ors

s of informatin customer deothing effects e evaluated pe

cient of realizized demand)the customer oures coefficieroduct whicefficient of va4, being the c, the influencthe respectiv

and evolutionn i periods in hat the equat

, , and

2

,1 , p p iK K

the MPS and comparison t

r, Andreas Jo

dependent of tof sales prodof each other subperiod .

,kt

ion uncertaintemand, gross of the MPS a

erformance me

ed customer dfor sales prod

order processent of variatich is already riation of procoefficient ofe of MRP is ve values. Eqn quality mea

advance in cotions for ,

d therefore om

,1 pE K

MRP on the gto , , , t

sef; Altendorf

time period duct and du

leads to the fNote that Eq

ty and forecasrequirements

and the MRP aeasures.

demand duct which s without any ion of realizsmoothed by duction orderf variation ofidentified. A2

quation (2) shasure. It evaluomparison to

, (i.e. Amitted.

gross requiremtwo normalize

fer, Klaus

and sales ue date . following quation 1

(1)

st error of and pro-

algorithm

, (note identifies planning

zed gross the MPS

r amounts f capacity 2.1, A2.2 hows the uates the the value

A2.2) and

(2)

ments and ed values

Page 5: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

Influenc

1P

4

4.1

The mo6 resourcoperatingsystems Figure 2MRP runand not flead timproductswhich re

Figure 2

The appmodelledmately 1the simu20 replic

4.2

The foreThe par

and custscenario

e of Customer

, ,1p i p i pX

Numerica

Productio

delled producces. The prodg in the autowhich clearly

2 represent thn. The materifurther consid

me, and the ms/materials esource the s

2: Bill of mate

lied lot sizingd. Each proce10 minutes anulation study, fcations.

Parameter

ecast error parrameters inve30∀ ∈ 10

tomer requirefor detailed0.5. The par

r Information

, , ,p i p i p iK

al Study D

n System

ction system duction syste

omotive sectory restricts thee BOM strucials in LLC 3

dered. Informamonthly determ

. In figure 2sales product o

erial and routi

g policy for aessing step reqd the internal five years are

r Settings

rameter is vestigated for 0,12 , d lead time: d analysis isrameters inves

Uncertainties

,; 2p i pP

Design

follows a floem is inspiredr. However, i findings in t

cture with LL are purchase

ation about lotministic forec

the routing ior material is m

ing informatio

all materials iquires a determ

capacity per simulated wi

varied betweethe CRL or50∀ ∈∈ 3,6,1

s defined wistigated for th

s on Productio

, , ,i p i p iQ

ow shop strud by differenit is a streamthis study. ThC being the led parts whicht sizing policycast are preseinformation ismanufactured

on

s lot-for-lot aministic proceresource is 48

ith one year is

en 0 and 0.5 wrder behaviou11,13 , and12 and ith he FEV order

on Order Varia

,p iK

ucture and cont production mlined versionhe arcs and nulow level codh are always y, safety stocknted next to s included sh

d.

and no setup essing time of80 hours per ms the warm up

with a step sizur are order

∈ 0,0∈ 0,0.5,10.15,

behaviour are

ance 381

(3)

onsists of facilities

n of such umbers in de for the available

k, planned the sales

howing at

times are f approxi-month. In time and

ze of 0.1. amount:

0.15,0.5 ; . A basic 6 and

e forecast

Page 6: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

382

evolutionand variawith

All resulresourceresourcefactured.

5

5.1

The influhere in scenarioresults:

Applying

Note tha

A first hierarchwhich is of capacrequiremfunctiona

Figure requiremmeasurefunction

Figure 3

Felbe

n horizon ance of evolu2, 1,

lts are shown s show a sims (i.e. M5, M. Due to clarit

Results

MPS Smoo

uence of the Mdetail for the. This order

0.91,

g the MPS fun

0.91,

at without MP

observation fhical planning

given by varcity requirem

ments decreaality. Such beh

3 shows thments orders s , , anality.

3: Information

erbauer, Thom

8, frozen zoution error ∈

and 0.3.

for sales prodmilar behaviouM3 and M1 ty the index of

othing Effe

MPS functione CRL order behaviour fo

0.91,

nctionality thi

0.45,

S functionality

from this setg structure miiance in order

ments for the ases in thehaviour is not

he informatioby applying

nd , ,

n progress CR

mas; Peirleitne

one ∈ 0,2∈ 0.1,0.3,0.6

duct 10, neverur. The capacrespectively)f sales produc

ect for CRL

ality to smootbehaviour w

or the pure M

0.69,

is leads to:

0.51,

y is eq

tting is that tigates the ner amount and

scenario wiupstream m

t identified for

on progress g the present(see 3.4) for t

RL order behav

r, Andreas Jo

,4 , change fr. Here the ba

rtheless, all otcity requireme

where sales t 10 is not sho

L Behaviou

th the demandwithout forecaMTO system

0.76 a

0.42a

qual to

the MPS fuegative effect d CRL. The resith the MPS.manufacturingr the pure MT

of customerted informatithe CRL orde

viour with MP

sef; Altendorf

requency ∈asic scenario i

ther sales prodents are showproduct 10

own in the res

r

d uncertainty iast error for

shows the f

and

and

.

nctionality wof demand unsults show a l

The CV of g levels wi

TO system.

r demand anion evolution

er behaviour w

PS functionali

fer, Klaus

∈ 1,2,4 , is defined

ducts and wn for all is manu-ults.

is studied the basic following

0.74.

0.38.

within the ncertainty lower CV

f capacity ith MPS

nd gross n quality with MPS

ity

Page 7: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

Influenc

An obsedemand of the grshowing requirem

5.2

The FEVtwo daysbe obser

With fro

An intuitproductigross req

5.3

Figure 4(productboth orduncertainas produ

α CRL

0

0.5

Figure 4

e of Customer

ervation from continuously

ross requiremthat the M

ments.

Effect of F

V order behavs and without rved:

0.70,

ozen zone the r

0.67,

tive observatioion planning quirements as

Effect of F

4 shows the ption orders, abder behaviournty in compar

uction order un

L order behavi

4: Information

r Information

this setting improves untents is lower

MPS function

Frozen Zon

viour is discusa frozen zone

0.34,

results are:

0.33,

on for the FEa frozen zone

s well as lower

Forecast Er

erformance mbbr. po) for drs. Note thatrison to customncertainty in c

iour

n progress wit

Uncertainties

is that the intil the final dethan the infor

nality has a

e for FEV B

ssed for the be. Without a fr

0.40,

0.38,

EV order behae leads to a lr CV in capac

rror

measures P1 (gdifferent levelt P1 can be mer demand ucomparison to

FEV

th forecast err

0

20

40

60

80

100

120

de

via

tio

n in

pe

rce

nta

ge

s on Productio

nformation quelivery date. Trmation qualit smoothing

Behaviour

basic scenario frozen zone th

0.40 a

0.37 a

aviour is that wlower CV in city requireme

gross requirmls of the forec

interpreted auncertainty and

customer dem

V order behavi

ror for both or

0%

0%

0%

0%

0%

0%

0%

1 2 3peri

pl LLC 0 p

on Order Varia

uality of the The informatioty of customereffect on th

with a frozene following re

and

and

within the hiecustomer dem

ents.

ments, abbr. grcast error valuas gross requd P2 can be inmand uncertai

iour

rder behaviou

4 5 6ods before deliver

pl LLC 2l LLC 1

ance 383

customer on quality r demand he gross

n zone of esults can

0.38.

0.35.

erarchical mand and

r) and P2 ues for uirements nterpreted inty.

urs

7 8 9ry

P1 (gr)

P2 (po)

Page 8: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

384

One uneincreaserequirempercenta

Figure 5

Figure 6

Felbe

expected obsees uncertainty ments variancage only slight

5: Parameter v

6: Parameter v

erbauer, Thom

ervation fromof the custom

ce (see fig. 5tly.

variation CRL

variation FEV

mas; Peirleitne

m this setting mer order amo5 and fig. 6),

L order behav

V order behav

r, Andreas Jo

g is that the founts and also, decreases t

viour

viour

sef; Altendorf

forecast erroo leads to higthe MPS imp

fer, Klaus

or, which gher gross provement

Page 9: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

Influence of Customer Information Uncertainties on Production Order Variance 385

Another counterintuitive effect is that the production order amount has over a long range a higher uncertainty than the gross requirements (only below 4 periods before delivery its uncertainty is lower) and the forecast error significantly decreases this performance.

5.4 CRL and FEV parameter variation

The influence of different parameters on the information evolution quality measure for gross requirements , , (abbr. gr) and production orders , , (abbr. po) is studied for sales product 10, 7 periods (sum of planned lead times) before the delivery date for the CRL, in figure 5, and FEV, in figure 6, order behaviours. Different levels of forecast error parameter are discussed. Each figure consists of three sub tables for the respective parameters of CRL and FEV. The study shows for both order behaviours that with increasing forecast error parameter the information evolution quality measure and increase for all parameter combinations, which means more information progress deviation.

An observation valid for both order behaviours is that the forecast error value α has a negative correlation with the information quality.

An observation from the CRL parameter variation in Figure 4 is that the longer the customer required lead time and the lower its variance the better is the information quality of gross requirements.

The positive effect of a frozen zone on information quality is discussed in 5.2.

An observation from the FEV parameter variation is that a higher number of changes per customer order and big changes are leading to a decrease of information quality.

6 Conclusions In this paper the effect of two different order behaviours, which differ how customers provide information about the demand, namely CRL and FEV is investigated. To identify the influence of information uncertainty within the hierarchical production planning a measure for information quality and information evolution is developed. The results of the simulation study show that for the CRL order behaviour the MPS mitigates the information uncertainty. For the FEV order behaviour the information quality improves with the use of a frozen zone. If the production system is facing forecast errors the system has to deal with higher information uncertainties. In further research we would like to discuss what information quality is needed to justify investments in information sharing between supply chain members.

References Felberbauer, T.; Altendorfer, K.: Comparing the performance of two different

customer order behaviors within the hierarchical production planning. In: Proceedings of the Winter Simulation Conference, Savannah 2014, p. 2227-2238.

Page 10: Influence of Customer Information Uncertainties on ... · intermediate planning and short term control. The long-term planning involves the functions forecasting and aggregate production

386 Felberbauer, Thomas; Peirleitner, Andreas Josef; Altendorfer, Klaus

Felberbauer, T.; Altendorfer, K.; Huebl, A.: Using a scalable simulation model to evaluate the performance of production system segmentation in a combined MRP and Kanban system. In: Proceedings of the Winter Simulation Conference, Berlin (Germany) 2012, pp. 3022-3033.

Fildes, R.; Kingsman, B.: Incorporating demand uncertainty and forecast error in supply chain planning models. Journal of the Operational Research Society 62 (2010) 3, pp. 483–500.

Fleischmann, B.; Meyr, H.: Planning hierarchy, modeling and advanced planning systems. In: Graves, S.C.; de Kok, A.G. (eds.): Supply chain management: design, coordination and operation: Amsterdam: Elsevier 2003, pp. 455–523.

Hausman, W.H.: Sequential decision problems: A model to exploit existing forecasters. Management Science 16 (1969) 2, pp. B-93-111.

Heath, D.C.; Jackson, P.: Modeling the evolution of demand forecasts with application of safety stock analysis in production/distribution systems. IIE Transactions 26 (1994) 3, pp. 17–30.

Hopp, W.J.; Spearman, M.L.: Factory physics: Boston: Mc Graw Hill / Irwin 2008. Huebl, A.; Altendorfer, K.; Jodlbauer, H.; Gansterer, M.; Hartl, R.: Flexible model

for analyzing production systems with discrete event simulation. In: Winter Simulation Conference, Phoenix (AZ) 2011, pp. 1554–1565.

Kok, T.G. de; Fransoo, J.C.: Planning supply chain operations: Definition and comparison of planning concepts. In: Graves, S.C.; de Kok, A.G. (eds.): Supply chain management: Design, coordination and operation: Amsterdam: Elsevier 2003, pp. 597–675.

Missbauer, H.; Uzsoy, R.: Optimization models of production planning problems. In: Kempf, K.G.; Keskinocak, P.; Uzsoy, R. (eds.): Planning production and inventories in the extended enterprise. New York: Springer 2011, pp. 437–507.

Orlicky, J.: Material requirements planning;: The new way of life in production and inventory management. New York: McGraw-Hill 1975.

Panwalkar, S.S.; Iskander, W.: A survey of scheduling rules. Operations Research 25 (1977) 1, pp. 45–61.