infso-ri-223782 na2 status update etics2 third ahm isabel matranga engineering ingegneria...

18
INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

Upload: dulcie-griffith

Post on 13-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

INFSO-RI-223782

NA2 Status Update

ETICS2 third AHM Isabel MatrangaEngineering Ingegneria Informatica SpA

Budapest, 22-24 June 2009

Page 2: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

2

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Dissemination Events Research Domain - from M13 to M 17

• OGF25/EGEE User Forum• The ETICS System Job Submission Facilities• Validation of standard compliance and interoperability of

grid software using the ETICS Test System

• Presentation to SKA project members• Part of a session on software development• technical person from SKA liked ETICS very much

Forthcoming• EGEE 09 conference (21 – 25 September)

• Standards and Certifications – Improving the quality of eInfrastructure software (in collaboration with OGFEurope)

• Distributed testing and testbed management (in collaboration with EGEE)

Page 3: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

3

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Dissemination Events Commercial Domain - from M13 to M 17

• Demo to CBT (leader in the italian market for Information & Communication Technology (ICT))

• Interested in ETICS (issue with privacy of code)• CBT Manager wanted one person from CBT to follow the

experiment … the request was not fulfilled by the CBT human resources dep.

• Hannover Fair (world's leading showcase for industrial technology)

• ETICS on the stand dedicated to the transfer of Space technologies into other sectors

• Meeting with NETA (company part of Eng group)• Using a commercial tool (SERENA dimensions

http://www.serena.com/), looking for a build tool• Evaluating possible use of ETICS

Page 4: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

4

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Dissemination Events Commercial Domain - from M13 to M 17

• Demo to Head and PM of ENG R&I Dep• Proposed integration of ETICS in ENG API portal among the

tools to support project managers• Interested in offering ETICS as a service through the data

centre of Pont S. Martin

Forthcoming• QA&TEST conference (21-23 October)

• tutorial on ETICS testing and quality verification features

• ICSOC-ServiceWave workshop (proposal 24-27 November)• In collaboration with STV workshop on System Testing and

Validation

• Demo to NICE (Grid&Cloud solutions)• Middle of July dates to be confirmed

Page 5: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

5

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

DisseminationArticles and website from M13 to M 17

ARTICLES• Feature on ETICS in iSGTW published on 26th May• Sent contribution to Primeur magazine

Forthcoming• ICT Results

WEBSITE was kept up to date

Page 6: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

6

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

DisseminationIn the next months …

• Website• Kept up to date • Some new info coming from sustainability and exploitation

activities

• Organisation of demos• Demo to NICE (middle July)• Demo to ENG R&I PMs (July-September)

• Conferences• EGEE 09 (21 – 25 September)• QA&TEST conference (21-23 October) • ICSOC-ServiceWave waiting for confirmation (24-27

November)

• Dissemination Material• New brochure (September)• Video on ETICS (September)

Page 7: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

7

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

DisseminationIn the next months Deliverable and Milestones …

• DNA2.8 - Dissemination and Use of Knowledge Plan Third Update) (November)

• DNA2.10 - Second year analysis of dissemination and training and tuning activities (January)

• DNA2.11 - Dissemination and Use of Knowledge Plan (Final) (February)

• MNA2.6 - Dissemination events organized (according to dissemination plan) (February)

Page 8: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

8

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Training Activities from M13 to M 17On-line training demos

• 01 - ETICS Overview

• 02 - The ETICS Portal and the Web Applications

• 02 - The ETICS Portal and the Web Applications

• 03 - Installing the ETICS Client

• 04 - Building with ETICS (Basic)

• 05 - Building with ETICS (Advanced)

• 06 - The ETICS Packager

• 07 - Testing with ETICS (Basic)

• 08 - Testing with ETICS (Advanced)

• 09 - Requesting a new Project

• 10 - Creating new modules and configurations

• 11 - Managing dependencies

• 12 - Submitting remote builds and tests

• 13 - Analysing Build and Test Reports

• 14 - Locking and Registration

Page 9: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

9

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

TrainingActivities from M13 to M 17

• Training session at OGF25/EGEE User Forum • Using the ETICS Test System to analyse standard

compliance and interoperability of grid software two 90-minute slots

Forthcoming• Full day session on ETICS at the GridKa School

(Beginning September)

Page 10: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

10

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

TrainingIn the next months …

• More training demos on-line (reviwers requested by August)

• Full day session on ETICS at the GridKa School (September)

• DNA2.10 - Second year analysis of dissemination and training and tuning activities (January)

Page 11: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

11

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

A-QCMActivities performed M13 to M 17

• Workshop on software product quality (organized by CTI)

• Questions on availability of the “A-QCM tool”• A-QCM approach was well accepted

• Analysed and identified A-QCM ISO standardisation strategy and plan

• document summarizing conclusions sent to PMB

• Participated to ISO plenary meeting (24-27 May) • Jorgen Boegh will be in charge of preparing the

update of ISO/IEC 25040 standard

Page 12: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

12

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

A-QCMActivities performed M13 to M 17

Forthcoming Conferences

• QA&TEST conference (21-23 October)• tutorial on ETICS testing and quality verification features

• ICSOC-ServiceWave workshop (proposal 24-27 November)

• In collaboration with STV workshop on System Testing and Validation

Page 13: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

13

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

A-QCMIn the next months …

• Trial certification (MNA2.4 two projects are issued with a GridQCM certificate – M12) (August)

• Dissemination• QA&TEST (October)

• ICSOC-ServiceWave (November ?)

• Improvements according to feedback from users and experts

• Participation to ISO intermediate working group meeting (October)

• Possibility to have an informal presentation of ETICS (A-QCM)

Page 14: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

14

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

A-QCMIn the next months Deliverables and Milestones

• DNA2.7 (ETICS Grid Quality Certification Activity Report) (November)

• MNA2.4 Two projects are issued with a A-QCM certificate (August)

• MNA2.5 Four projects are issued with a A-QCM certificate (February)

Page 15: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

15

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Long-term sustainabilityActivities performed M13 to M 17

• Unique value proposition• Analysis of ETICS features• Market analysis of core set of “competitors”• Analysis of potential customers (needs, how ETICS

supports them)• Worked on single partner’s exploitation plans• Analised possible sustainability strategies for ETICS

• Costs• Return of investments

• Prepared the ETICS customer satisfaction survey• Exploring other grant opportunities in areas different

form Research Infrastructure (e.g Qualipso)

Page 16: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

16

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Long-term sustainabilityin the next months …

• Finalize work on identification of:• ETICS unique value proposition• ETICS exploitation and sustainability strategy

• “Market validation” phase … advancing exploitation/sustainability strategies

• overall project results• individual partners

Page 17: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

17

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Long-term sustainabilityin the next months Deliverables

• DNA2.6 - Resubmission (Long-term sustainability strategy and activity report (first release) (August)

• DNA2.9 - Long-term sustainability strategy and activity report (final) (January)

Page 18: INFSO-RI-223782 NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, 22-24 June 2009

18

INFSO-RI-223782

Budapest, 22 - 24 June 2009NA2 Status Update

Q&A

http://www.eticsproject.eu/

Thank you!