INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: R.S.B. INDUSTRIAL LIMITED Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong Chittagong Bangladesh Assessor: EIMS Date: 29 Mar 2014 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/5

Upload: vudung

Post on 08-Sep-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

INITIAL STRUCTURAL INTEGRITY ASSESSMENTREPORT (SIAR)

 

Factory Name: R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong ChittagongChittagong Bangladesh

Assessor: EIMS

Date: 29 Mar 2014

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/5

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong ChittagongBangladesh

Assessor: EIMS

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/5

GENERAL INFORMATION 

General Information

Factory Name: R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong Chittagong Bangladesh

Country: Bangladesh

Province: Chittagong

City: Chittagong

Zip Code: 4223

Audit Duration: 2 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date : 15 April 2014

Final Report Date : 12 May 2014

Are all Action ItemsFrom PreviousAssessmentCompleted?:

N/A

Buildings in Complex : One

Number of BuildingLevels (Stories) :

Four

Approximate BuildingArea (SF) :

17,285 sft per floor, Total building area 69,140 sft

Date of BuildingConstruction :

First phase(two floor): 1997, Second phase(two floor): 2009

Date of Last BuildingRenovation/Addition :

No addition of floor beyond approval

Is the Building mixeduse?:

No

Ancillary Structures inComplex :

No

Number of AncillaryLevels (Stories) :

Not applicable

Approximate Ancillary Not applicable

FactoryName:

R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong ChittagongBangladesh

Assessor: EIMS

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/5

Structures Area (SF) :

Number of Occupants : 1132

Exterior FacadeDescription :

10 inch brick masonry wall both side plastered without reinforcement in facade wall, 6 no. of window

Structural SystemDescription :

RC beam-column structure (From ground to level 2) and level 3 is steel structures

 

 

 

FactoryName:

R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong ChittagongBangladesh

Assessor: EIMS

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/5

ASSESSMENT FINDINGS 

Structural System Design

Question: Have provisions been made in floors or decks for a concentrated load (such asheavy equipment, water tanks, stored materials, etc) applied at a locationwherever this load acting upon an otherwise unloaded floor would producestresses greater than those caused by a uniform load?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: In third floor, four water tank (volume-9500 litre) was found on roof of prayerspace. One water tank weighs around seven kips.

Source of Findings: Visual Assessment: Photograph of water tank at prayer space slab

Suggested Plan ofAction:

Engage a qualified structural engineer to confirm and document that provisionshave been made to accommodate concentrated loads. If provisions have notbeen made, have a qualified structural engineer develop a remediation plan.

Suggested DeadlineDate:

19 Jun 2014

Standard: Alliance Standard Part 8 Section 8.13 and 8.14

 

 

FactoryName:

R.S.B. INDUSTRIAL LIMITED

Address: Plot # 35, Sector # 4, CEPZ, Chittagong Chittagong ChittagongBangladesh

Assessor: EIMS

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/5