installation and operating instructions zip hydroboil

12
Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 1 of 12 Installation and Operating Instructions Zip Hydroboil Instant boiling water HS010 Hydroboil 10 Litre White 10552 HS110 Hydroboil 10 Litre Stainless Steel 10551 HS015 Hydroboil 15 Litre White 11552 HS115 Hydroboil 15 Litre Stainless Steel 11551 HS025 Hydroboil 25 Litre White 12552 HS125 Hydroboil 25 Litre Stainless Steel 12551 HS040 Hydroboil 40 Litre White 04552 HS140 Hydroboil 40 Litre Stainless Steel 04551 ®

Upload: others

Post on 01-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 1 of 12

Installation and Operating Instructions

Zip Hydroboil Instant boiling water

HS010 Hydroboil 10 Litre White 10552 HS110 Hydroboil 10 Litre Stainless Steel 10551HS015 Hydroboil 15 Litre White 11552HS115 Hydroboil 15 Litre Stainless Steel 11551HS025 Hydroboil 25 Litre White 12552HS125 Hydroboil 25 Litre Stainless Steel 12551HS040 Hydroboil 40 Litre White 04552HS140 Hydroboil 40 Litre Stainless Steel 04551

®

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 2 of 12

Installation Checklist

Description

Before Installation:

A. Read the instructions.

B. Note:Allfittingsaresuppliedwiththeappliancekitexceptisolationvalveand pressurereductionvalve,whicharenotsupplied.

C. Checkthewaterqualitytodetermineifextrafiltrationwillberequired.Apotable mainswatersupplymustbeused.

Tocombatthebuildupoflimescale,ahighperformanceinlinefilter(notsuppliedas standardequipment)maybeorderedfromyourZipserviceprovider.(SeeProduct Accessoriespage4)

D. Checktheapplianceratingplateandensurecorrectpowerisavailableforthe appliance.

E. Checkthewallsupportingtheapplianceisadequateforthetotalweightofthe appliance,whenfullofwater.

Before Commissioning:

1. Checktheunithasbeeninstalledcorrectly.

2. Checkallplumbingfittingshavebeentightened.

3. Ensure the vent pipe is positioned to drain correctly.

4. Checkallelectricalconnectionsarecorrectandtherearenoloosewires.

Commission:

7. Flush the supply line before connecting.

8. Turnonthewater,allowtofillandcheckforleaks.

9. Turnonthepower.

WallmountedOver-sinkapplianceforinstantboilingwater.

Features:• Designedtooperatewithin1°Cofboilingpoint.#

• Temperaturecontrolsautomaticallycutoffthepowerintheeventoftemperaturecontrolfailure,boildrycutoutorablockedventpipe.

• Incorporatingapulldowntapforprecisionfillingofcups,italsolocks‘ON’forfillingpots.

• Separatesthecoldwatersupplyfromtheboilingchamberandtheinternalcondensingsystemretainssteamwithintheheater.

• Astainlesssteelcrevicefree,boilingchamberwithserviceaccessportstopandbottom.

• Hightemperaturethermalinsulationwithprovisionforserviceaccesstotheboilingchamber.

• Concealedplumbingandelectricalconnections.

• Choiceofstainlesssteelorwhiteenamelledsteelcase.

Page 3 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

Product Specifications / Accessories ...........................................................................................................................4

Read These Warnings First ..................................................................................................................................... 4 - 5

Installation Requirements .............................................................................................................................................5

Installation Procedures ........................................................................................................................................... 6 - 8

Step 1 – Positioning .................................................................................................................................6

Step 2 – Fastening ...................................................................................................................................6

Step 3 – Connecting ................................................................................................................................7

a)Plumbing ................................................................................................................................7

b)Venting...................................................................................................................................7

c)Electrical ................................................................................................................................7

Step4–Assembling ................................................................................................................................8

Tap Fitting ..................................................................................................................................8

Step5–Commissioning .........................................................................................................................8

Operating Procedures ..................................................................................................................................................8

Wall Mounting Template Dimensions ..........................................................................................................................9

Earth Continuity Verification / Wiring Diagram. ........................................................................................................10

Problem Solving...........................................................................................................................................................10

Maintenance ................................................................................................................................................................10

End of life disposal ......................................................................................................................................................10

Spare Parts ..................................................................................................................................................................11

Warranty / Contact Details ..........................................................................................................................................12

Contents

NOTE:

Read all instructions and precautions before proceeding. If in doubt, or need further guidance, please call Zip on 0845 6 005 005.

Pleaseleavetheseinstructionswiththeenduserafterinstallation.

Thisunitmustbeinstalledinaccordancewithwatersupplybyelaws,currentIEEregulationsandrelevantlocalauthoritybyelaws.

TheseproductsareapprovedtotheLVDandEMCdirectivesandCEendorsed.

ZipHydroboilhasbeenexamined,testedandfoundwhencorrectlyfittedtocomplywiththerequirementsoftheUnitedKingdomWaterRegulations/Byelaws(Scotland).TheproductsarelistedundertheWRAS(WaterRegulationsAdvisoryScheme)WaterFittingsandMaterialsDirectory.

ZipHeaters(UK)Ltdcannotbeheldliableforanydamagescausedbyfailuretoobservetheseinstructions.

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 4 of 12

Accessories:Inline FilterFL104 10”(Fortasteandodourremovalwithscalereduction)Drip TrayZD001 StainlessSteel(withdrain)ZD002 StainlessSteel(nodrain)Cup DispenserZE001 Stainless SteelZE002 White PlasticZE010 MugRackTundishZD100 WallMountedChromeTundishZD101 SinkMountedChromeTundishWater BlockHE45004Recommended;fittedintothesupplylinetominimisepotentialdamageintheeventofleakage.Pressure ReducerAQ3 Combinedpressurereducer(setat3.5bar)andlinestrainer.

Read These Warnings First

WARNING: Situations that could cause injury to yourself or others.

CAUTION: Situationsthatcouldcausedamagetoyourapplianceorotherequipment.

NOTE: Notes,usagetipsoradditionalinformation.

IMPORTANT:

PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS. USE THIS PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/OR PERSONAL INJURY, AND WILL INVALIDATE THE WARRANTY. RETAIN THESE INSTRUCTIONS FOR FUTURE USE.

Model Finish CapacityLitres

DeliveryCups @ any onetime

RecoveryCups per

hour

RatingkW@230V

Widthmm

Depthmm

Heightmm

WeightEmpty

Kg

WeightFilled

Kg

HS010 White 10 60 180 3.0 390 244 600 15.0 29.5

HS110 s/steel 10 60 180 3.0 390 244 600 15.0 29.5

HS015 White 15 90 180 3.0 390 299 600 16.0 34.5

HS115 s/steel 15 90 180 3.0 390 299 600 16.0 34.5

HS025 White 25 150 180 3.0 390 299 780 19.0 47.0

HS125 s/steel 25 150 180 3.0 390 299 780 19.0 47.0

HS040 White 40 240 360 2x3.0 515 284 840 25.0 71.0

HS140 s/steel 40 240 360 2x3.0 515 284 840 25.0 71.0Water Inlet Pressure: 0.07MPa(0.7bar)minimum/0.7MPa(7bar)maximum. Protection class IP23

Product Specifications

Page 5 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

SafetyThisapplianceisnotintendedforusebypersons(includingchildren)withreducedphysicalsensoryormentalcapabilities,orlackofexperienceandknowledgeunlesstheyhavebeengivensupervisionor instruction concerning use of the appliance by a person responsible for their safety. Childrenshouldbesupervisedtoensurethattheydonotplaywiththeappliance.

Pleasereadallinstallationrequirements,installationproceduresandprecautionsbeforeinstallinganyZipHydroboilinstantboilingwaterheater.

NeverattempttoinstallanyZipHydroboilinstantboilingwaterheaterwithoutreadingalloftheapplicableinstructions.

Careshouldbetakentoavoidtouchingthemetalbodyofthetapwhichcanbecomeveryhot.

InsomehardwaterareaswheremineralscaleaccumulationintheboilingchamberoftheZipHydroboilmaybecomeaproblem,considerationshouldbegiventothemaintenancerequired.Asuitableformofwatertreatmentmaybenecessary.

Astheinstaller,itisyourresponsibilitytosupply(ifnecessary)andinstallallvalvesasrequiredbylocalregulationsandrelevant standards.

TheplumbinginstallationmustbedoneinaccordancewithlocalWaterAuthorityregulationsandtheseInstallationInstructions.

Read These Warnings First Cont.

This appliance must be earthed.Ifthepowercableisdamageditmustberepairedonlybyaqualifiedtechnician.Toavoidhazards,allinstallationproceduresmustbecarriedoutbyasuitablyqualifiedtradesperson.Thepowercableandpoweroutletmustbeinasafevisible position for connection.

Thepowercablemustbeadequatelysecured.

Donotremovethecoveroftheheaterunderanycircumstanceswithoutfirstisolatingtheheaterfromthepowersupply.

Theappliance,itswiringandpipingmustnotbemodifiedinanyway.

Theappliancemustbecompletelyfilledwithwaterbeforebeingswitchedon.Incaseofmalfunctionisolatethepowersupplyimmediately.Incaseofleaksalsoisolatethewatersupply.RepairsmustonlybecarriedoutbyZipHeaters(UK)LtdoranauthorisedZipserviceengineer.

LiftingTakecarewhenliftingtheZipHydroboilunit.Someunitsmayexceedsafeliftinglimits.Ifyoufeelthisisbeyondyourpersonalcapabilities,pleaseseekassistancewiththelift.Seespecificationsonpage4forweights.Operating Conditions:Theambienttemperaturesthisunitshouldoperatewithinis5ºC-50ºC.Frostprotection:Ifthisheaterislocatedwhereambientairtemperaturecouldfallbelow5ºC;whentheheaterisnotinuse,donotturnofftheapplianceelectrically.Thissafeguardwillprotecttheunitfromfrostdamagebutdoesnotofferthesameprotectiontotheconnectingpipeworkandfittings.Thisheaterisintendedonlyforindooruseandshouldneverbeinstalledoutdoorsorbeexposedtotheelementsofnature.

Thisunitmustnotbepositionedinanareathatmaybecleanedbyawaterjet.Thisunitmustnotbecleanedbyawaterjet.

Cleaning: Hydroboil should only be wiped clean with a damp cloth. Never use abrasive cleaning agents or solvents on any part of the Hydroboil, particularly the tap.

Installation Requirements

Beforeinstalling,ensurethatthefollowingareavailable:

a. Sufficientspacetopositiontheheatersothereisatleast150mmclearanceabovetheheaterforserviceaccess,65mmtoitsleftand20mmtoitsright–thetapoutletusuallyshouldbepositionedatleast200mmaboveadraining board or drip tray.

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 6 of 12

Before you beginLocatethepapermounting-holetemplatepackedwiththeheater. Readtheinstallationandoperatinginstructionscompletely.

Decidewhethertoinstallwithconcealedorexposedplumbingand/orelectrical connections. Concealed connections are preferred for a superior appearance.

Iftheheaterisusedforfillingcups,theninserttheflowrestrictorintotheoutletpipebeforesecuringtapassembly.

Step 1 - PositioningPositiontheheatersothetapwilldrainontothedrainingboardordriptray.Positionthebaseofthetaptobenotlessthan200mmabovethedrainingboard.(Heightshouldbeincreasedonlyifitisessentialtoaccommodatelargervessels.)

Minimumclearancesforserviceare150mmtop,65mmleftand20mmright.Markcornerpositiononwallsotopositionmounting-holetemplate.

Step 2 - FasteningPositionmounting-holetemplateonthewallanddrillmountingholeswhereshown.

Drillholesforwaterinlet,ventoutletandwiringifitisintendedtoinstalltheheaterwithconcealedelectricalandplumbingconnections.

Removecoverfasteningscrewsandliftcoverawayfromchassis.

Installplumbingandwiring,andpreparepipeendsforconnectionasshowninstep 3.

Screwheaterchassistothewallusingthesuppliedfixings, ensurethefixingsaresuitableforthesubstrate.Ifnotsupplyyourownsuitablefixings.

Ensurethemountingsurfaceiscapableofsupportingtheweightofthefilledunit,fixingsmustbecapableofsupportingtheheaterweightwhenfilled. See chart on page 7.

Installation Procedures

COLD INLET

VENTOUTLET

INLET POSITION

VENT POSITIONFront View

b. Electrical supply. Astandard13ampdoublepolefusedspuronthewallwithin1500mmoftheheater. Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.The circuit should be protected by a suitably rated RCD. HS140/HS040(40ltr)shouldbeprovidedwiththeirowndedicated30Asupply. TheelectricalinstallationshouldcomplywithcurrentIEEregulationsandanyLocalAuthorityrequirements.

c. Apotablecoldwatersupplywithaminimumworkingpressureof0.07MPa(0.7bar)andamaximumworkingpressureof0.7MPa(7bar)connectedviaanisolation valve.

d. Outletdrainagetoasinkdrainingboardortoadriptray.

e. Accesstodrainagefromaventsituatedatthebaseoftheheater.

f. Inallinstallationinstancesthewallsoftheheatermustbeverticalandthebasehorizontal,therecanbenoexceptionstothisrule.

g. Note: Ifthewaterpressureislikelytoexceed7bar,a3.5barpressurereducingvalvemustbeinstalledinthecoldwatersupplyline.

Size Kw Amps10 Ltr 3.0kW 13 A15 Ltr 3.0kW 13 A25 Ltr 3.0kW 13 A40 Ltr 6.0kW 30 A

Installation Requirements Cont.

Concealed Services

ExposedServices

MinimumClearanceinmm

Page 7 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

Installation Procedures Continued

Approximate Weights When Filled10Litremodels 29.5kg

15Litremodels 34.5kg

25Litremodels 47.0kg

40Litremodels 71.0kg

250mm

Wiring

Concealed VentConcealed

Inlet

45mm

Fig. b

Fig. a

VisibleTundishVentline

Surfacemountcable entry

TerminalBlock

Concealed cable entry

Step 3 – Connecting

a) Plumbing

Forexposedplumbingconnection,connectthecoldwaterinletpipefromthebaseoftheheaterdirectlytothe15mmor1/2inchBSPcompressionfittings.

Forconcealedplumbingconnections,connectthecoldwaterpipethroughtherearofthechassisusinga15mmor1/2inchBSPcapillaryelbow.

Coldwaterpipesmustbeflushedbeforeconnectiontotheinlet.Anycloggingduetosedimentorfineswilladverselyaffecttheoperationoftheheater.

Itisrecommendedthattheheaterbeinstalledwithaisolatingvalvewhichallowsittobeisolatedfromthemainssupplyforservicing.

Water pressure requirements:

Minimum-0.07MPa(0.7bar)Maximum-0.7MPa(7bar).

Caution:Ifpressureislikelytoexceed0.7MPa(7bar),apressurelimitingvalvemustbeinstalledinthecoldwatersupplyline.Ziprecommendsavalveratedat3.5bar(0.35MPa)forthisapplication(ZippartNo.AQ3).

b) Venting

Aventatthebaseoftheheatermustbeplumbedtoasafevisiblelocationas,undercertainconditions,itmaydischargecoldorboilingwaterand/orsteam.

Forexposedventplumbing,connectventoutletfromthebaseofheatertoa 15mmorhalfinchODpipewhichhasacontinuousfall,isnomorethan3metreslong,hasnomorethan3rightanglebends,anddischargestoawastewaterdrain.

Forconcealedventplumbing(Fig.a),connectplumbingtotheventoutletfromtheheaterrearusingacapillaryelbowprotruding45mmfromthewall.Theplumbingmustthenbedirectedtoatundishthatmustbeinavisiblelocationbeforebeingplumbedawaytowaste.

Alternativelyattachthetundishtothewall(Fig.b)andplumbawaytowaste.

c) ElectricalForconcealedelectricalconnection,connectapowercablefromtherearoftheheatertotheterminalblockwithintheheaterasshown.

Forsurfacemountinstallationrunthepowercablethroughthecableentryglandatthebottomoftheunittotheterminalblockwithintheheater.Ensurethecableisfirmlysecured.

Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.

Do not turn the power ONuntilwaterflowsfromthetap.

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 8 of 12

Tap OperationZipHydroboilisfittedwithatwo-waytapforinstantboilingwater.

Care should be taken not to touch the metal body of the tap which can become very hot.Forinstantboilingwater,gentlypullthetapleverforward.Boilingwaterwillflowuntilthetaphandleisreleased.

Thisoperationgivesfingertipflowcontrolforsafefillingofcupsandmugs.

To fill larger vessels such as teapots and saucepans, rotate the lever 180 degreesanddepressituntilitlocksintoahorizontalposition.

Boilingwaterwillflowuntiltheleverisreturnedtoitsnormalverticalposition.Thisoperationallowsthevesseltobefilledwithoutholdingyourhandwhereitmaybeaffectedbysteam.

Inlet water temperature

15°C 10°C

10Litremodels 38minutes 40minutes

15Litremodels 40minutes 43minutes

25Litremodels 47minutes 50minutes

40Litremodels 60minutes 64minutes

Operating Procedures

Step 4 - AssemblingPlacetheheatercasebackontothechassisandsecurethetwotopandfourbottomfixingscrews.

Caution! To ensure correct fitment of the tap assembly, follow the instruction a to c below carefully.Removetheblackplasticcapfromthehotoutlettube.PTFEtapehasbeen pre-appliedtothehotoutlettube(checkitisingoodconditionbeforeproceeding). IfnotremovethedamagedPTFEtapeandcarefullyapplytwotothreecompleteturnsofnewPTFEtapeontothethreadsinaclockwisedirectionasshownalongside.

a. Screwthetapassemblyclockwiseontothetapoutlettube.

b. Continueturningclockwiseuntilthetapassemblyjusttouchesthefasciawithoutpressure.

c. Continuetoturnthetapuptoonefullturnmaximumuntilthetapleverisintheuprightposition.(Donotforcethetapupright;ifyoucannotgetthetaptotheuprightpositionwithoutapplyingundueforce,removethetap,startthethreadinanewpositionorapplyafewmoreturns of PTFE and repeat the procedure.

Step 5 - CommissioningCheckprevioussteps.TurnwatersupplyON.Waterisnowflowingintotheheater,checkallconnectionsforleaks.Waitapproximately5minutesandcheckoutlettapforwater.Thisisachievedbypullingthetaphandleforward.

Do Not turnonthepoweratthisstage.Ensurethetaphandleiscorrectlyadjustedtoitsoptimumposition.

• Screwtheredknurledcapclockwiseuntilhandtightwithoutusingexcessiveforceoratoolofanykind.

• Slowlyunscrewtheknurledcapanti-clockwiseuntilthetapstartstodrip.

• Tightentheknurledcapahalfaturnclockwise.Thedrippingwillstopandthetapwillbesetattheoptimumposition.

Whenthetaphasbeenadjustedandtheunitisfullofwaterturnthepoweron.

Afterashortperiod,boilingwaterwillbeavailableandwillbemaintainedclosetoboilingpointthereafter.Initialheatingperiodsareshowninthetableonthe left.

Installation Procedures Continued

o-ring

Note: If the heater is used for filling cups, theninserttheflowrestrictorintotheoutletpipebeforesecuringtapassemblyasabove.

FlowRestrictor

Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

Earthing Continuity Verification & Electrical Diagram

Template Dimensions

If required, an earth continuity testcanbeperformedbytestingbetweenthe earth pin on the products lead and aexposedpieceofmetalonthecaseand the tap body.

39.5mm39.5mm

41mm

41mm

41mm

145mm

42mm

20mm

28mm

54mm

150Ceiling Clearance

65mm Wall Clearance

591mm10L 591mm15L 771mm25L 831mm40L

374mm(10L,15L,25L)499mm(40L)

295mm(15L,25L)420mm(40L)

188mm(10L,15L,25L)313mm(40L)

200mm

CONCEALEDVENTPOSITION

COLD INLET POSITION

Warning:Thisappliancemustbeearthed.Following remedial service the earthing continuity of the heater must be checked by aqualified technician using an appliance tester, or continuity tester of accuracy Class 5 orbetter. Class 5 denotes an accuracy of 5% full scale deflection.1. Isolatepowersupply.2. Setmeterto0ohmwithleadsconnectedtogether.3. Connect one test lead to the earth pin on the three pin plug.4. Connecttheothertestleadtoabarepatchofmetal(preferablyontheedge)ofthetopofthe

cover, then to the front cover of the unit, and then to the tap top under the plastic paddle. Thiscanbeachievedbyinsertingtheprobeupfrombehindthepaddlewithoutlosingwater. Warning:Thewatermaybeboiling-showextracare.

5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 10 of 12

Problem Solving

Symptom Possible Cause Solution

Failstodispensewater.Water isolating valve turned off. Checkwatersupplyvalve.

Blockedfilter,metertube,strainer,jammedballvalveassemblyorairlockintransfertube.

Contact a Zip authorised agent.

Water not boiling.Nopower. Checkpowersupply.

Faultythermostat,element,cutoutorcontactor. Contact a Zip authorised agent.

Runsoutofboilingwaterandfails to refill.

Internaladjustment. Contact a Zip authorised agent.

Outlet tap drips.

Overflowfromvent.

Excessivesteamfromvent.

Power“on”butnoheat.

Overload repeatedly tripping withexcessivesteam.

Overload repeatedly tripping withoutexcessivesteam.

Maintenance / Cleaning

Formaintenanceandsixmonthlysafetychecks,pleaserefertothePreventativeMaintenancesheetNo.85695includedwiththeHydroboil.

MaintenanceshouldbecarriedoutbyaZipauthorisedtechnician.

Cleaning Case: Do not use strong, corrosive, spray or abrasive cleaners. Cleanthecasewithasoftclothorbrushandmildsoapandwater.

SingleElementUpTo3KwwithOnePole T.O.LThermalOverLoad ThermostatControlled

HS140 & HS040 With ContactorT.O.L:ThermalOverLoadThermostatControlled

Page 11 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

Spare Parts

Key Part No Description

1 SP6245 Cisternlidclampkit

2 SP90120 Cisternlidgasketkit

3 SP90490 Gasketkit

4 SP90083 Floatvalvekit,withfloat

5 SP90069 Jumpervalvekit,withseals

6 SP90102 Cistern float

7 SP90494 Transfertubekit-2.4kW

7 SP90531 Transfertubekit–3kW

8 SP90495 Banjoscrew

9 SP90496 O-ringkitcomplete

10 SP90517 Fascia&lenskit

11 SP90110 Fascialightkit

12 SP3947A Thermostatkit1.5-25litres

12 SP3947A Thermostatkit40litre

13 SP1614T Overloadkit

14 SP90501 Taptopkit

Key Part No Description

15 SP90502 Tapassemblycomplete

17 SP90505 Tapnutkit

18 SP90506 Tapextension

19 SP90486 Elementkit3.0kW230V

20 SP90491 Cleaningholecoverkit

21 SP90492 Draincap&sealkit

SP90522 Cisternjetnozzlekit

SP90130 Lid clips

SP81230 Tapflowrestrictor

SP88318 Cisterntank

SP88490 Cisterntankgrommetkit

SP6590 Contactor 40 litres

SP88343 Maintank10L

SP88344 Maintank15L

SP88345 Maintank25L

SP88346 Maintank40L

Page 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03

Head Office

ZipHeaters(UK)Ltd14 Bertie Ward WayDerehamNorfolkNR191TE

Website:www.zipheaters.co.uk [email protected]: 0845 6 005 005Facsimile:01362692448.

Warranty Information

CertainwarrantiesmaybeimpliedbylawintoyourcontractwithZip.Thewarrantyprovidedbelowisadditionaltotheseimpliedwarrantiesandnothingsetoutbelowshalllimityourstatutoryrightsorrightsatlaw.

ZipHeaters(UK)Ltdwarrantsthat,shouldanypartfailwithin24calendarmonthsofinstallation,thatpartwillberepairedorreplacedfreeofchargebyZiporitsDistributororServiceProvider,exceptassetoutbelow,providedtheapplianceisinstalledandusedstrictlyinaccordancewiththeinstructionssupplied,andthatfailureisnotduetoaccident,misuse,abuse,unsuitablewaterconditions,ortoanyalteration,modificationorrepairbyanypartynotexpresslynominatedbyZip.

Nocostsarepayablebythecustomerotherthananymileageortravelling-timechargesincurredbyaZipServiceProviderorthecostofremoval,cartageandre-installationofanycomponentoftheapplianceifitneedstobereturnedforrepair to Zip or its Distributor.

Thiswarrantydoesnotcoverdamageresultingfromnon-operationoftheappliance,theuseofnonauthorisedpartsorconsequentialdamagetoanyother goods, furnishings or property.

Nowarrantyappliestothelifeofanyfiltrationcartridgeinstalledwiththeapplianceascartridgelifemayvaryaccordingtowaterqualityandtherateofwaterconsumption.

Zipdoesnotexclude,restrictormodifyanyliabilitythatcannotbeexcluded,restrictedormodifiedorwhichcannot,excepttoalimitedextent,beexcluded,restrictedormodifiedasbetweentheowneroruserandZipunderthelawsapplicable.

Furthermore,thiswarrantydoesnotdisplaceanystatutorywarranty,but,totheextenttowhichZipisentitledtodoso,theliabilityofZipunderanystatutorywarrantywillbelimitedatZip’soptiontothereplacementoftheapplianceorsupplyofequivalentappliance,thepaymentofthecostofreplacingtheapplianceoracquiringanequivalentappliance,orthepaymentofthecostofhaving the appliance repaired or the repair of the appliance.

Registering Your Purchase

RegisteringyourZipinstallationontheZipwebsitemayhelptoestablishdateofinstallationshoulditbecomenecessarytoservicetheapplianceundertermsoftheZipwarranty.Toregisteryourinstallationgotowww.zipheaters.co.ukandlookundertheheading“Warranty”.

End of life disposal

Theuseofthiscrossedoutwheeledbinlogoindicatesthatthisproductneedstobedisposedofseparatelytoanyotherhouseholdwaste.WithineachoftheEuropeanUnionmembercountries,provisionshavebeenmadeforthecollectionandrecyclingofunwantedelectricalandelectronicequipment.Inordertopreserveourenvironmentweaskthatyoudisposeofthisproductcorrectly.PleasecontactZipCustomerServiceforadviceon08456005005.