installation and operation manual: model 1011 type z purge...

20
MODEL 1011 TYPE Z PURGE/PRESSURIZATION SYSTEM PROCESS AUTOMATION INSTALLATION AND OPERATION MANUAL

Upload: others

Post on 25-Sep-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

MODEL 1011 TYPE Z PURGE/PRESSURIZATION SYSTEM

PROCESS AUTOMATION

INSTALLATION AND OPERATION MANUAL

Page 2: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

2

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Table of Contents

Page 2 System Purpose and Description Purpose,Systemdescription,Importantnotes

Page 3 Identifying Your System Definesspecificfeaturesofthesystem

Page 3 General Information System&materialspecifications,System

accessories,Spareparts,Tools&testequipment

Page 4 Enclosure and Device Design Designrequirements,Adjacentenclosures,Device

ventilation,Temperaturelimitations

Page 5 Installation Overview Installationdiagram

Page 6 Getting Started Establishingconnectionsizes,Determiningenclosure

inlet&outletconnectionlocations

Page 7 System Mounting LH,RH,TM,BM&WMconfigurations,

FM&PMconfigurations

Page 8 Mounting Plate Dimensions Mountingplatedimensiondiagrams

Page 9 Hardware Mounting Optionalenclosureprotectionvent,Warning

nameplates

Page 10 Pneumatic Tubing Requirements Protectivegassupplyrequirements,Pneumatic

connectionrequirements

Page 11 Tubing Installation LH,RH,TM,BM,WM,FM&PMtubing

configurations

Page 12 Tubing Connection Diagrams LH,RH,TM,BM,WM,FM,&PMconfiguration

connectionpoints,Pneumaticdiagram

Page 13 Electrical Supply Requirements Wiringrequirements,Enclosurepower&alarmsignal,

Enclosurewiringmethods&connections

Page 14 Set-Up Procedure ClassI&ClassIIset-up

Page 15 Operating Sequence ClassI&ClassIIoperation

Page 16 Troubleshooting Procedures Troubleshootingchart

Page 17 Warranty and Liability Statement Warrantynotes,Generalterms,Limitations

Page 18 System Maintenance Regularmaintenance,Long-termmaintenance,

Maintenanceschedule

Page 19 Systems Identification & Application Information

Purpose and Description

PurposePepperl+FuchsEnclosureProtectionSystem’spurposeistoallowtheuseofgeneralpurposeornon-ratedelectricalorelectronicdevices,withexceptiontodeviceswhichproduceexcessiveheat,utilizecombustiblegas,orexposearcingcontactstothehazardousatmosphere,inType4or12enclosuresintheplaceofexplosionproofType7enclosures.Otherpurposesincludeheat,moistureanddustcontaminationprevention.

DescriptionModel1011isanenclosurepressurizationorpurgingsystemthatoperatesonasupplyofcompressedinstrumentairorinertgas.Itregulatesandmonitorspressurewithinsealed(protected)enclosures,topreventcombustibledustaccumulationorremoveandpreventflammablegasorvaporaccumulations.InClassIIareas,thesystemmaintainsa“safe”(1.0")pressure.InClassIareas,thesystemaccomplishesfourairexchangesandmaintainsa“safe”(0.25")pressure.Theseprocessesreducethehazardous(classified)arearatingwithintheenclosure(s),inaccordancewiththeNEC-NFPA70,Article500,NFPA496andISA12.4

Important NotesOne(1)permanentfilecopyandone(1)operationscopyofthisManualmustbestudiedandretainedbytheoperatorofthisSystem.User’sAgentsareresponsiblefortransferringthisManualtotheuser,priortostart-up.

Thecontentsofthismanualhavebeenarrangedtoallowtheuseofthisproductasastand-alonedeviceonequipmentandenclosuressuppliedbytheuseroritsagents.Themanual’sparametersencompassacombinationofbothNationalFireProtectionAssociation(NFPA)requirementsandPepperl+Fuchsrequirements.Pepperl+FuchsthereforeacknowledgestheuseofNFPA496asaguideline,thatwehaveenhancedcertainNFPArequirementsandthatadditionalinformationhasbeencompiledtocompletethisdocument.Themanualisintendedasacompleteguideandmustbeconsidered,unlessspecificallystatedotherwise,thatalldirectivescontainedhereinarePepperl+Fuchsrequirementsforsafe,practicalandefficientuseofthisproduct.

Thissystemisnotintendedforusetoprotectenclosuresordeviceswhichcontainignitableconcentrationsofgasesorvapors.Thisexclusiongenerallyappliestoprocessorproductanalyzingsystemsequipment.

All specifications are subject to change without notice.

Page 3: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

3

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Identifying Your System

Thisenclosureprotectionsystemisofferedinvariousstyles.Forproperinstallationandoperation,examinethesystemmodelnumbernameplatetoidentifythesystemstyle,areaclassification,andtype,asnotedbelow.

General Information

System SpecificationsSystemdimensions: SeePage8Shippingweight(lbs.): 7Operatingtemperaturerange: -20°F-120°FSupplypressurerange: *5-120psimax.Supplyrequirements: CleanairorinertgasSafepressure(CI/CII): 0.25"/1.0"Safepressureflowrate: **0.1-3.5SCFHSystemsupplyfitting: 1/4"tubefittingEnclosuresupplyfitting: 1/4"tubefittingEnclosurereferencefitting: 1/4"tubefitting* Withenclosureprotectionvent-120psimaximum Withoutenclosureprotectionven-5psimaximum

InordertocomplywiththeNFPA496standardrequiringprotectionagainstoverpressurizationoftheprotectedenclosure,theinstallermustinstalloneofthefollowingitemsinadditiontotheenclosureprotectionsystem.

a)Installanenclosureprotectionvenontheprotectedenclosure.

b)Installatamperproofregulatorupstreamoftheenclosureprotectionsystem'ssystemsupplyinlettopre-regulateprotectivegassupplyto5psimax.

Inaddition,forsmall,tightlysealedenclosures,ortocompensateforafluctuatingprotectivegassupply,itmaybenecessarytopre-regulatetheprotectivegassupplytoaconstant5psiregardlessofwhetheranenclosureprotectionvenisinstalled.Thiswillreducetheamountof"drifting"thatcannormallyoccurwhenmaintaininga"Safe"pressureinsideaprotectedenclosure.Thepre-regulationcanbeaccomplishedbyinstallingaTR-10Gtamperproofregulatoraccessoriesorequivalent.

**Enclosureintegritydeterminesactualflowrate

Material SpecificationsRegulatorbody: Zincw/enamelfinish,brassRegulatorhandle: PolycarbonateEnclosurepressuregauge: Alum.w/enamelfinishTubefittings: 316SSForgedbodyTubing: 316SS1/4".035weldedSystemnameplates: Silkscreen&Lexan®

Fastenerhardware: Aluminum&stainlesssteelMountingplate&bracket: AnodizedaluminumEnclosurewarningnameplate: SilkscreenedSSLexan®isaregisteredtrademarkoftheGeneralElectricCorporation

Recommended Spare PartsQty Description Part#(supercedes)1 Enclosurepressureindicator-CI 510023(001000)1 Enclosurepressureindicator-CII 513235(001027)1 Enclosurepressurecontrolregulator 513315(002000)1 Installation&operationmanual 129-02051 Enclosurewarningnameplate-CI 513008(EWN-1)1 Enclosurewarningnameplate-CII 513009(EWN-2)

Pleasecallandreferencepartnumberaboveforcurrentsparepartspricing.Immediatepricingisavailabletoallconfirmedcustomers.

Installation Tools & Testing Equipment1/2"chuckdrill

Completesetofdrillbits

1/2"conduitknockoutpunchor0.875"holesaw

Completesetoftubing,conduitbending,instrumentfittingandelectricalcraftsmanhandtools

0-250scfhflowmeter(connectedupstreamoftheprotectionsystemtodetermineairconsumptionandflowduringset-upprocedure)

1011 - CI - Z - UH - ##

Series Model NumberArea Classificatio CI - Class I Area CII - Class II AreaSystem Type Z - Div. 2 to NonhazardousMounting Configuratio UM - universal mount external surface FM - frame mount external frame or rack PM - panel mount enclosure surface cutout## - Additional factory installed accessories FM & PM confi uration mounting plates include four (4) 1/4" mounting holes at each corner, on 5/16" centers.

Confidential according to ISO 16016

sheet

respons.

approved

norm 3 of 5

scale: 1:1

Labels and Mounting Platefor MODEL 1011-CII Type Z

date: 2004-MAR-11Only valid as long as released in EDM or with a valid production documentation!

Twinsburg

125-0916change notice.

Dieses Dokument enthält sicherheitsrelevante Angaben. Es darf nicht ohne Absprache mit dem Normenfachmann geändert werden!

This document contains safety-relevant information. It must not be altered without the authorization of the norm expert!

TECHNICAL INFORMATION:

PLATE MATERIAL:

LABEL MATERIAL:

LABEL COLOR:

NOTE:

0.12” ALUMINUMN/A

WHITE BACKGROUND WITH BLACK COPY AND BORDERFULL INFORMATION PERTAINING TO PRINT FONTS,DIMENSIONS AND COLOR SCHEMES ARE CONTAINED INTHIS COREL DRAW (.CDR) FILENAME UNDER DRAWINGNUMBER 125-0916

US.JMB

US.SSJ

US.WDB

SCALE = 1X

All dimensions are in inches.All outside corners R=0.1

Tolerances: 2-place dec. +/- .01

1.00

2.50

10 CUBIC FEET MAXIMUM ENCLOSURE VOLUME

CLASS II, DIVISION 2, GROUPS F & G TO NONHAZARDOUS

10 CUBIC FEET MAXIMUM ENCLOSURE VOLUME

CLASS II, DIVISION 2, GROUPS F & G TO NONHAZARDOUS

Model 1011 CII Type Z

Model 1011 CII Type Z

PURGE CONTROL FOR USE

IN HAZARDOUS LOCATIONS

PURGE CONTROL FOR USE

IN HAZARDOUS LOCATIONS

CLASSIFIED BY UNDERWRITERS LABORATORIES INC.® IN ACCORDANCEWITH THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD FOR

PURGED AND PRESSURIZED ENCLOSURES FOR ELECTRICAL EQUIPMENTNFPA 496-1996

4S11

CLASSIFIED BY UNDERWRITERS LABORATORIES INC.® IN ACCORDANCEWITH THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD FOR

PURGED AND PRESSURIZED ENCLOSURES FOR ELECTRICAL EQUIPMENTNFPA 496-1996

4S11

C

LASSIFIE

D

®

C

LASSIFIE

D

®

SCALE = 2X

Released EDM checkout 2008-AUG-21

Page 4: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

4

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Model 1011 System AccessoriesOptional Enclosure Protection VentsEPV-1-SA-00 Straightw/sparkarrestorEPV-1-SA-90 Rtanglew/sparkarrestor

Additional ItemsSMK-1,or-4 SystemmountingkitEPSK-1 ClassI,GroupC-DpressureswitchkitEPSK-1A ClassI,GroupA-DpressureswitchkitEPSK-2 ClassII,GroupE-GpressureswitchkitGPSK-1 ClassI,general-purposeswitchkitGPSK-2 ClassII,general-purposeswitchkitRAH Div.1remotealarmhornRAB-1 Div.1remotealarmbeaconRAB-2 Div.2remotealarmbeaconLCK LfittingconduitkitTCK TfittingconduitkitTR-10G Tamperproofregulatorw/gaugeEFC-4 1/4"flushconnectorEBC-4 1/4"bulkheadconnectorEPC-10 1/2"pipeconnectorILF-4 1/4"filterETW Enclosuretemperaturewarning

Enclosure & Device Design

Enclosure Design Requirements1. Allwindowsmustbeshatterproofandsizedassmallas

possible.

2. AllNFPA496requiredmarkingsmustbeplacedonornearallenclosuredoorsandcovers.

3. Theenclosuremustwithstandaninternalpressureoften(10)inchesofwaterwithoutsustainingpermanentdeformationandresistallcorrosiveelementsinthesurroundingatmosphere.

4. Alllightweightobjectsintheenclosure,suchaspaperorinsulation,mustbefirmlysecured.

5. TheenclosureshouldbeconstructedfrommaterialssuchasmetalornonstaticpolycarbonatetomeetorexceedNEMA4or12performancerequirements,butdoesnotrequirethirdpartyapproval.

6. Theinstallationofobstructionsorotherbarriersthatblockorimpedetheflowofprotectivegasmustbeavoided.

7. Thecreationofairpocketsorotherareasthattrapflammablegaseswithintheenclosureordevicesmustbeavoided.

8. Theenclosureshouldbelocatedinanareawhereimpacthazardsareminimal.

9. Iftheenclosureisnonmetallicandcontainsequipmentthatutilizesorswitchespowerloadsgreaterthan2500VA,itmustbeconstructedfromsubstantiallynoncombustiblematerials,suchasmaterialsdesignedtomeetorexceedANSI/UL94ratingsof94V-0or945V.

Adjacent Enclosures1. Adjacentenclosuresmustbeprotectedbyoneofthe

followingmeans:

a) purgedorpressurizedinserieswiththeprotectedenclosure

b) purgedorpressurizedseparatelyor

c) protectedbyothermeans;e.g.,explosionproofenclosures,hermeticallysealeddevicesorintrinsicsafecircuits

2. Adjacentpurgedorpressurizedenclosuresmustbedesignedtomeetallconstructionrequirementsabove.

Total Volume Calculation1. Thetotalvolumeofallpressurizedenclosures,devicesand

wirewaysmustbeconsidered.

2. Allenclosure,device,andwirewayvolumesmustbecalculatedwithoutconsiderationofinternallyconsumedspace.

Device Ventilation1. Encloseddeviceswithintheprotectedenclosurethatdonot

exceed1.22in3offreevolumedonotrequireventilationtotheprotectedenclosure.

2. Ifthefreevolumeofaninternaldeviceexceeds1.22in3itmustbeprotectedbyoneofthefollowingmeans:

a) ventilatedonthetopandbottomsideswith1in2ofopeningforeach400in3ofvolumewithintheinternalprotectedenclosure,ataminimumdiameterof1/4"

b) purgedinserieswiththeprotectedenclosureorbepurgedseparatelyor

c) protectedbyothermeans;e.g.,explosionproofenclosures,hermeticallysealeddevices,orintrinsicsafecircuits.

Temperature Limitations1. Theenclosuremusthavenosurfaceareathatexceeds80

percentoftheflammableorignitablesubstance’sauto-ignitiontemperature.

2. Internaldevicesthatexceedthistemperaturemustbeprotectedbyoneofthefollowingmanners:

a) ThedeviceisenclosedinachamberthatisCULUSlistedasahermeticallysealeddevicethatprohibitstheentranceofaflammableorignitablesubstance,andmaintainsasurfacetemperaturebelowtemperaturelimits.

b) Itcanbeprovenbytestingthatthedeviceswillnotignitethesubstanceinvolved.

c) ThedeviceispurgedinaseparateenclosurethatbearsanETW(enclosuretemperaturewarningnameplate).Devicesmaybeaccessedonlyafterpowerhasbeenremovedandthedevicehasbeenallowedtocooltosafetemperature,ortheareaispositivelyknowntobenonhazardous.

Page 5: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

5

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Model 1002-WPS-LH Shown

Installation Overview

PROTECTIVE GAS SUPPLY

SYSTEM SUPPLY TUBING

ELECTRICAL ALARM WIRING CONDUIT & SEAL

SERVICE VALVE

SYSTEM SUPPLY FITTING

ENCLOSURE PROTECTION

SYSTEM

SYSTEM MOUNTING

BOLT

ENCLOSURE SUPPLY TUBING

ENCLOSURE PROTECTION

VENT

PROTECTED ENCLOSURE

ENCLOSURE CONNECTION

FITTINGS

ENCLOSURE REFERENCE

TUBING

ENCLOSURE WARNING

NAMEPLATE

Page 6: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

6

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Getting Started

Typical Single Protected Enclosure Connections

HELPFUL HINTSIfflammablegasesarelighterthanair,theinletconnectiontoeachenclosuremustenternearabottomcorner.Theoutletconnection,foranoptionalenclosureprotectionventorpipingtoanadjacentprotectedenclosure,mustexitnearanextremeoppositetopcorner.

Ifflammablegasesareheavierthanair,inletandoutletconnectionsmustbereversed.

Inallcases,themostprevalentgasmustdeterminethelocationofinletandoutletconnections.

Determining Enclosure Inlet & Outlet Connection Locations

HELPFUL HINTSToensureadequateprotectivegasflowtotheprotectedenclosure(s),allpipingandtubingmustbefullyreamed.

Precautionsmustbetakentopreventcrimpingandotherdamagetoprotectivegaspipingandtubing.

Whenprotectingmultipleenclosureswithasingleenclosureprotectionsystem,theenclosuresmustbeconnectedinseriesfromthesmallesttothelargesttoensureadequateprotectivegasflow.

PROTECTED ENCLOSURE

C

B

ENCLOSURE PROTECTION VENT(Optional)

E

SUPPLY

REFERENCE

1/2" PROTECTIVE GAS SUPPLY

HEADER

ENCLOSURE PROTECTION

SYSTEM

Maximum tubing / pipe pength and maximum number of bends / elbows

1/4"O.D.tubingfullyreamed

20feet10bends

1/4"O.D.tubingfullyreamed

Description

*Tubing or pipe diameter

Enclosure supply

System supply tubing

Enclosure reference

1/4"O.D.tubingfullyreamed

5feet5bends

20feet10bends

Multi - enclosure connections

1/2"I.D.pipefullyreamed

10feet5elbows

Optional remote venting

1/2"I.D.pipefullyreamed

30feet5elbows

A B EDC

ENCLOSURE PROTECTION

SYSTEM

PROTECTED ENCLOSURE

PROTECTED ENCLOSURE

D

SUPPLY

REFERENCE

B

TYPICAL MULTIPLE PROTECTED ENCLOSURE CONNECTIONS

1/2" PROTECTIVE GAS SUPPLY

HEADER

A

A

D

C

PROTECTED ENCLOSURE

*NOTE: Tube and pipe sizes are not equal in inside diameters. DO NOT substitute tube for pipe with same trade size.

INLET

INLET

Connectionsforheavierthanairgasesandvapors

OUTLET

OUTLET

Connectionsforlighterthanairgasesandvapors

Page 7: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

7

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

System Mounting

IMPORTANT NOTESThe system should be mounted at EYE LEVEL.

Care must be taken to ensure the system and all protruding components are clear of all enclosure accesses (doors and covers) and conduit, pipe, tubing or cable entries.

LH, RH, TM and BM configurations are intended for mounting adjacent to the protected enclosure.

Determine the mounting configuration for your application using the diagrams on page 8.

Remove and save the manila envelope (containing the enclosure warning nameplate) which may be taped to the System mounting bracket.

Although all systems are factory tested and calibrated, we strongly suggest a bench test of basic functions prior to installation.

Mounting LH, RH, TM, & BM Configurations1. Determinethemountingconfigurationforyourapplication

usingthediagramsonpage8.

2. Securethesystemmountingbrackettotheappropriateedgeofthesystemmountingplateusingthehexheadsetscrewsprovidedwiththesystem.

3.Transferholepatternofsystemmountingbrackettointendedsurface.

4. Checkforobstructionshinderingboltfastening,drillandreamthemountingholesbeforemountingthesystem.

5. Securethesystemtotheenclosure,orothermountingsurface,usingthefasteninghardwareprovided.

Mounting FM & PM Configurations1. CarefullyreadtheHELPFULHINTSlocatedbelow.

2. Transferpanelcutoutpatterntotheintendedsurface.

3. Checkforobstructionswhichcouldprohibitboltfasteningorsystempneumaticconnections.

4. Cutpanelcutoutpatternontheintendedsurface.

5. Deburrallcutoutsurfaces.

6. SecuresystemtoenclosureusingSMK-4,orequivalent1/4"x3/4"stainlesssteelnuts,bolts,mountingclipsandlockwashers.

HELPFUL HINTSFMandPMconfigurationsaredesignedtomountthroughapanelcutoutone(1)inchsmallerthantheoverallheightandwidthofthesystemmountingplate,usingclipsandfastenersprovidedwiththeSMK-4mountingkit.Thisdesignfeatureeliminatestheneedtodrillthesystemmountingboltholesintheprotectedenclosure.

FMconfigurationsareintendedformountingadjacenttotheprotectedenclosure.

PMconfigurationsareintendedformountingthroughacutoutintheprotectedenclosuresurface.

Typical Surface Mounted System(Model 1002-LPS-CI-Z-LH shown)

Typical Panel/Frame Mounted System(Model 1002-LPS-CI-Z-LH shown)

Page 8: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

8

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Mounting Plate Dimensions (continued)

8.25"

8"

8"

8.25"

8"

8.25"

8"

8"Panel Cutout7"

Panel Cutout7"

3.25" 1.25"

.6875"

7.3125"

8"

.875"2.4375"

.25" O.D.TYP 2

SystemMounting

Plate

8.25"

8"

1011-LH(Left hand configuration)

1011-RH(Right hand configuration)

1011-TM(Top mount configuration)

1011-BM(Bottom mount configuration)

1011-FM & 1011-PM(Frame & panel mount configuration)

Universal mounting bracket

Page 9: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

9

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Hardware Mounting

Optional Enclosure Protection VentAllconfigurationsmustbemountedinatrueverticalposition.

Theventmustbelocatedtoprovideaccessforroutinetestingofthevent’sflapperassembly.Aminimum8"clearanceisrequiredbelowtheventopening.

1. Determinethevent’smountingconfiguration,i.e.;-00verticalmountor-90sidemount.Seephotosbelow.

2.Determineventlocationandlayoutventmountingholeontheprotectedenclosure.(asdeterminedonpage6,“GettingStarted”)

3. Usinga0.875"holesawor1/2"conduitpunch,drillanddeburrtheenclosureprotectionventmountinghole.

4. Removethehubmountingnutfromtheventhubandplacethehub,withO-ringintact,throughthemountinghole.TheO-ringmustbeontheoutsideoftheprotectedenclosure.

5. Reinstallthehubmountingnuttothemountinghubfrominsidetheprotectedenclosureandtighten.

EPV - 1 - SA - 00Vertical Mount

EPV - 1 - SA - 90Side Mount

Warning Nameplate(s)AnEWN(enclosurewarningnameplate)mustbelocatedinaprominentpositiononornearallenclosureaccesses(doorsandcovers).

One(1)EWNisprovidedwitheachsystem,locatedinthemanilaenvelopetapedtothemountingflangeofthesystem.AdditionalEWNsareavailablefromPepperl+Fuchs.

AllEWNsprovidelabeledspacesallowingthecustomertomarktheprotectedenclosurewith:1)aTCode(temperatureidentificationnumber),2)Class,GroupandDivisionofsurroundingarea,and3)NFPApressurizationTypeX,YorZ,asmayberequiredbyplantandlocalcodesandisrequiredbyNFPA496.

AnETW(enclosuretemperaturewarningnameplate)mustbelocatedinaprominentpositiononornearallenclosureaccesses(doorsandcovers)whenthetemperatureofaninternalcomponentexceeds80percentoftheignitiontemperatureoftheflammablevapor,gasordustinvolved.

TheETWwarnstheoperatortodeenergizeallequipmentforaspecifiedlengthoftime,allowingtheprotectedequipmenttocoolbeforeopeningtheprotectedenclosure.Thelengthoftimerequiredisdeterminedbythecustomerandcanbefactoryorfieldengraved.

AllEWNsandETWsarefurnishedwithanadhesiveback,butshouldalsoberivetedorscrewedtotheprotectedenclosure.

Enclosure temperature warning nameplate

Enclosure warning nameplate - Class II

Enclosure warning nameplate - Class I

Page 10: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

10

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Pneumatic Tubing Requirements

Protective Gas Supply RequirementsTheprotectivegassupplytotheprotectionsystemmustbeaclean,instrumentqualitycompressedairornitrogenandmustcontainnomorethantraceamountsofflammablegas,vaporordust.

Theprotectivegassupplycompressorintakemustoriginateinanonhazardouslocation.Suctionductpassingthroughahazardouslocationandtheprotectionsystemtubingandpipingmustbefabricatedfromnoncombustiblematerialssuitableforprevailinghazardsandenvironmentalconditions.

Theprotectivegassupplymustoriginatefromadedicatedinstrumentqualitycompressedairheader(1/2"pipeorlarger),nofartherthantwenty(20)feetfromtheprotectionsystem.LocalcompressorsandgascylindersshouldnotbeusedbeforeconsultingwithPepperl+Fuchs.

Theprotectivegassupplytotheprotectionsystemmustbeequippedwithatamper-proofregulatorsetat5psimaximum.

Exception:Iftheprotectedenclosure(s)isequippedwithanEnclosureProtectionVent,theprotectivegassupplytotheprotectionsystemmustnotexceed120psimaximum,5psiminimum.(Seepage3,"SystemSpecifications"foradditionalinformationconcerningprotectivegassupplyrequirements.)

SC-4 NC-4

EBC-4EFC-4

EPC-10

SYSTEM SUPPLY FITTINGS

ENCLOSURE SUPPLY & REFERENCE FITTINGS

MULTIPLE ENCLOSURE CONNECTION FITTING

Pneumatic Connection RequirementsALLFITTINGSMAYBECUSTOMERORFACTORYFURNISHED

1. Forsystemsupply,one(1)SC-41/4"malestraightconnectororone(1)NC-41/4"maleelbowconnectororequivalentfittingpersystem.

NOTE: Above fitting is required only if protection system is furnished with an optional in-line filter kit (model ILFK) accessory.

One(1)similarfittingwhichwillconnecttheinertgassupplytubingtotheinertgassupplyheaderconnectionpointandone(1)lotof1/4"O.D.,.035"wallthickness,weldedorseamlessstainlesssteeltubing.

2. Forenclosuresupply,one(1)EFC-41/4"flushconnector,orone(1)EBC-41/4"feed-throughconnectororequivalentfittingpersystem.

3.Forenclosurereference,one(1)EFC-41/4"flushconnector,orone(1)EBC-41/4"feed-throughconnectororequivalentfittingpersystem.

4. One(1)lotof1/4"O.D.,.035"wallthickness,weldedorseamlessstainlesssteeltubing.

5. Formultipleenclosureconnections,two(2)EPC-101/2"pipemountinghubsorequivalentand1/2"150#ratedpipecouplings&unionsperinterconnection.

One(1)lot150#rating1/2"galvanizedoraluminumpipeandfittings,fullyreamedandunrestricted.

PM Pneumatic Connection RequirementsInadditiontoitemnumbers1,4,and5above,thefollowingfittingsarerequiredforallPMconfigurations.

1. ForsystemsupplyonPMconfigurations,one(1)additionalEBC-4orequivalent1/4"throughbulkheadfittingpersystemisrequired.

2. Foratmosphericreference,one(1)PRB-4orequivalent1/4"femalebulkheadfittingandstainlesssteelsinteredelementisrequired.

PRB-4SYSTEM ATMOSPHERIC REFERENCE FITTING

Page 11: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

11

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Tubing Installation

Tubing LH, RH, TM, BM & FM ConfigurationsSystem supply connections

1. Selectorinstallaprotectivegassupplyheadertap,fittedwiththepropertubesizefittingandlocatedwithintwenty(20)feetoftheenclosureprotectionsystem.

2. Ifaservicevalveisplacedbetweentheprotectivegassupplyheaderandtheenclosureprotectionsystem,itmustbeinstalledincloseproximityoftheprotectedenclosureandbelabeledinaccordancewithNFPA496.

3. Selecttheappropriatefittingsrequiredtoconnecttheprotectivegassupplytotheprotectionsystemregulatorasdeterminedonpage10,“PneumaticConnectionRequirements.”

4. Determineappropriatetubingroutefromtheprotectivegassupplyheadertotheprotectionsystemregulator.

5. Bendtubingusingindustrialgradebenders,checktubingfittoensureproperseatingbetweenthetubingandfittings.Fullyreamalltubingends.

6. Installtubingandtightenallfittingstofittingmanufacturer’sspecifications.Securetubingtoappropriatestructuralsupportsasrequired.

Enclosure supply & reference connections

1.Chooselocationfortheenclosuresupplyconnection(s)basedontherequirementsonpage6,“GettingStarted”.

2. Placetheenclosurereferenceconnectionfittingdirectlybehindtheenclosureprotectionsystemwheneverpossible.Forsystemsprotectingmultipleenclosuresinseries,theenclosurereferenceconnectionfittingmustbeplacedonthelastenclosureintheseries.Seepage6,“GettingStarted.”

3. Drillanddeburrenclosuresupplyandreferencefittingholesontheprotectedenclosure.Mountthefittings.

4. Determineappropriateroutefortheenclosuresupplyandreferencetubing.

5. Bendtubingusingindustrialgradebenders,checktubingfittoensureproperseatingbetweenthetubingandfittings.Fullyreamalltubingends.

6. Installtubingandtightenallfittingstofittingmanufacturer’sspecifications.Securetubingtoappropriatestructuralsupportsasrequired.

Tubing PM ConfigurationsEnclosure bulkhead fittings

1. Selectthefittingsrequiredtoinstallthesystemsupply,systemsupplybulkheadfittingandatmosphericreferencebulkheadfitting.Seepage11,“PneumaticTubingRequirements.”

2.Chooselocationforthesystemsupplybulkheadfitting.Thisfittingallowstheprotectivegassupplytopassthroughthewallofaprotectedenclosuretotheprotectionsystem’sregulatorsupplyinletconnection.

3. Chooselocationfortheatmosphericreferencebulkheadfitting.Thisfittingallowstheenclosurepressuregaugetoreferenceatmosphericpressure.

4. Drillanddeburrsystemsupplyandreferencebulkheadfittingholesintheprotectedenclosure.Mountthefittings.

System supply & reference connections

1. Selectorinstallaprotectivegassupplyheadertap,fittedwiththepropertubesizefittingandlocatedwithintwenty(20)feetoftheenclosureprotectionsystem.

2. Ifaservicevalveisplacedbetweentheprotectivegassupplyheaderandtheprotectionsystem,itmustbeincloseproximityoftheprotectedenclosureandlabeledinaccordancewithNFPA496.

3. Determineappropriatetubingroutefromtheprotectivegassupplyheadertothesystemsupplybulkheadfitting.

4. Determineappropriatetubingroutefromthesystemsupplybulkheadfittingtotheprotectionsystemregulator.

5. Determineappropriatetubingroutefromtheatmosphericreferencebulkheadfittingtotheenclosurepressuregauge’sreferenceinletconnection.

6. Bendtubingusingindustrialgradebenders,checktubingfittoensureproperseatingbetweenthetubingandfittings.Fullyreamalltubingends.

7. Installtubingandtightenallfittingstofittingmanufacturer’sspecifications.Securetubingasrequired.

HELPFUL HINTSAllworkmustbeperformedbytechniciansqualifiedinpneumatictubingandelectricalconduitinstallation.

Pepperl+Fuchsrecommendstheuseof.035"wallthickness,weldedorseamlessstainlesssteeltubing.

Ifflexibletubingisused,itmustbeinstalledinamannerthatprotectsitfromdamageandcorrosion.

Page 12: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

12

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Tubing Connection Diagrams

LH, RH, TM, BM & FM Configuration Connection Points & Pneumatic Diagram

PM Configuration Connection Points & Pneumatic Diagram

HELPFUL HINTPneumaticconnectionsarebolded.

Protectedenclosure

Optionalenclosureprotectionvent

Systemsupply

Venturiorifice

Inlet

Enclosurepressuregauge

Regulator

Sinteredvent Reference

Supply

Enclosurereferencebulkheadfitting

Enclosuresupplybulkheadfitting

Enclosurepressuregauge

Enclosurereference

inlet

Venturiorifice

Mountingbracket

System supply inlet

Enclosurepressurecontrol

regulator

Enclosure supply outlet

Mountingplate

Top Mount Configuration

Enclosurepressuregauge

Atmospheric reference

inlet

Mountingplate

Optionalenclosureprotectionvent

Protectedenclosure

System supply inlet

Enclosurepressurecontrol

regulator

Enclosure supply outlet

Systemsupply

InletSystemsupply

bulkhead

Atmosphericreferencebulkhead

Supply

Reference

Regulator

Enclosurepressuregauge

Sinteredvent

Page 13: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

13

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Electrical Supply Requirements

General Wiring RequirementsWARNING: THIS DEVICE CONTAINS ELECTRICAL PARTS THAT CAN CAUSE SHOCK OR INJURY

Allelectricalconnections,conduitandfittingsontheprotectedenclosuremustbesuitableforthehazardouslocationinwhichtheyareinstalled.Inaddition,allconduitandwiremustbeinstalledinaccordancewithNECasrequiredandallrelevantplantandlocalcodes.

Note:Donotusesealsonconduitusedasaprotected“wireway”tosupplyprotectivegastoadjacentprotectedenclosures.Thesameconduitcanbeutilizedforbothelectricalandpneumaticservicetoanadjacentprotectedenclosure(s),providedtheconduitisoversizedtoallowaminimumfreeclearanceequaltoorlargerthanthepipesizerequiredbetweenmultipleenclosuresasstatedonpage6,“GettingStarted.”

Enclosure Power RequirementsTheprotectedenclosure(s)electricalpowersourcemustoriginatefromacircuitbreakerorfuseddisconnectsuitableforthehazardouslocationinwhichitisinstalled.Theswitchmustbelocatedwithinfifty(50)feetoftheprotectedenclosure(s)andtheprotectionsystemandbeproperlymarked.

Alarm Signal RequirementsForTypeYandZpurgesystems,audiblealarmsorvisualindicatorsmustbeusedtonotifyoperatorsthatpressureinsidetheenclosureisbelowtheNFPAminimum.

Alarmsareconnecteddirectlytotheenclosureandmonitorthedifferentialairpressurebetweentheenclosureandtheenvironmentoutsideit.Thesealarmsareactivatedbythereductioninfloworpressurewithintheprotectiveenclosureandhaveadirectconnectiontotheenclosure,eliminatingtheneedforanalarmontheprotectivegassupply.

• Thealarmmustbelocatedwheretheoperatorcanseeiteasily.

• Thealarmmusttakeitsmeasurementfromtheenclosureonly.

• Alarmslocatedinthehazardousareamustberatedforthearea.

• Valvescannotbeconnectedbetweenthealarmandtheenclosure.

IMPORTANT NOTE: NFPA 496 requires the use of an alarm or an indicator to detect the loss of safe enclosure pressure. In addition, the NFPA 496 requires that if an indicator alone is utilized, a protective gas supply alarm must also be installed between the last valve in the protective gas supply and the protected enclosure. Therefore, the protective gas supply to all Model 1011 systems must be equipped with the above mentioned protective gas supply alarm. Exception: Systems utilizing an EPSK or GPSK enclosure pressure loss alarm switch accessory will satisfy the above mentioned NFPA requirement.

Typical Enclosure Wiring MethodsProtectedenclosuresshouldbewiredsimilartoexplosionproofenclosures,inaccordancewithArticle500oftheNationalElectricCode-NFPA70.

Singleconductorwiringshouldbeplacedinrigidmetalconduit,seal-flexconduitorothermediumsapprovedforuseinthehazardouslocationsurroundingtheprotectedenclosure.Additionally,NFPA496requirestheuseofapprovedsealsonallpressurizedenclosureconduitwiringentries,inaccordancewithNFPA70.Furthermore,theuseofanapprovedsealissimplythemostpracticalwaytopreventexcessiveleakagethroughconduitconnections.

However,whileexplosionproofenclosuresrequireconduitsealsonallcableentries,inaccordancewithNFPA70.Othermethodsofsealedcableentriesthataresuitableforhazardouslocationscanbeused,suchascompressionglands.

Inconclusion,therearetwoprimarygoals.First,theinstallershouldensurethatallassociatedwiringandcableisprotectedbypressurizationorothermeans,suchasexplosionproofconduitorintrinsicsafetybarriers.Secondly,theinstallershouldensurethatallassociatedconduitandwirewaysaresealedtoconserveprotectivegas,unlesstheyareusedtosupplyprotectivegastootherenclosuresordevices.

Typical Enclosure Wiring Connections

AdjacentPpressurized

device

Explosionproofdevice

Seal

Intrinsicallysafeorfiberopticdevice

Independentlypressurized

device

Intrinsicallysafeorfiberopticdevice

Seal

Conduit

Conduit

Conduit

Glandfitting

Cable

Seal

Pressurizedraceway

Protectedenclosureordevice

Page 14: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

14

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Set-up Procedure

Class I Purging Set-up1.Closetheenclosurepressurecontrolregulatorfullyby

turningcounterclockwise(CCW).

2.Temporarilyconnecttheinertgassupplytoa0to250SCFHflowmeter.Connecttheoutletoftheflowmetertotheenclosurepressurecontrolregulator.

3.Checkoperationofenclosurepressurevent(ifutilized).

4.Sealenclosure(s)andadjustenclosurepressurecontrolregulatorbyopeningslowlyclockwise(CW)toseta“safe”pressureontheenclosurepressureindicator.

NOTE:Ifpressuresettingisdifficulttostabilizeorset,seepage16,“TroubleshootingProcedures.”

5.Whensafeenclosurepressureisstabilized,measureflowofinertgassupplythroughprotectionsystem,tocalculaterequiredexchangetime,basedontheClassIexchangetimechart.

6. Installandtightenallboltsonthepressurelossalarmswitch(ifutilized).Ensuretheconduitissealedwithapprovedcompounds.Energizepowertoswitchandalarmsystem(ifutilized)andtestthefunctionofthealarmsystem.

7.Ceasetestingandremovetestequipment(flowmeter).

8. Connecttheinertgassupplydirectlytotheenclosurepressurecontrolregulator.

IMPORTANT NOTE: Operators must secure wrist or stop watch to manually time exchange cycle for Class I applications.

CLASSIVOLUMEEXCHANGETIMECHART

MEASUREDFLOW REQUIREDEXCHANGETIME

0.10SCFM/6SCFH 40minutespercubicfoot

0.25SCFM/15SCFH 16minutespercubicfoot

0.50SCFM/30SCFH 8minutespercubicfoot

0.75SCFM/45SCFH 5.5minutespercubicfoot

1SCFM/60SCFH 4minutespercubicfoot

2SCFM/120SCFH 2minutespercubicfoot

3SCFM/180SCFH 1.5minutespercubicfoot

4SCFM/240SCFHorgreater 1minutepercubicfoot

NOTE:Thevolumeexchangetimechartisbasedonafour(4)enclosurevolumeexchange.Multiplytherequiredexchangetimeaboveby2.5forapplicationsrequiringaten(10)volumeexchange(motors).

Regardlessofenclosurevolumeorsystemflowrate,itisrequiredthatoperatorswithholdpowertotheenclosurewhileinducingClassIexchange,foratleastfive(5)minutes.Normalexchangetimecalculationsshouldbedoublediflargeobstructionsblockinertgasflow.

Thestart-upinstructionnameplateexchangetimeslotwillbeblank,buttheunitmayfeatureasetofdirectfactornameplateswithself-adhesivebackingsuchas“TENMINUTES,”forapplicationtothestart-upinstructions,dependentonhowthesystemwasspecifiedandpurchased.Fieldmodificationofthisnameplate,toshowadirectfactor,isacceptableasnotedaboveifthemethodusedtomarkthenameplatedoesnotdefacetheinstructionslisted.Materialsusedforthemarkingmustbeindelibleandwithstandprevailingenvironmentalconditions.

Class II Pressurization Set-up1.Closetheenclosurepressurecontrolregulatorfully,by

turningitcounterclockwise(CCW).

2. Removealltracesofcombustibledustfromtheprotectedenclosure.

3.Checkoperationofenclosureprotectionvent(ifutilized).

4.Sealenclosure(s)andadjustenclosurepressurecontrolregulatorbyopeningslowlyclockwise(CW)toseta“safe”pressureontheenclosurepressureindicator.

NOTE:Ifpressuresettingisdifficulttostabilizeorset,seepage16,“TroubleshootingProcedures.”

5. Installandtightenallboltsonthepressurelossalarmswitch(ifutilized).Ensuretheconduitissealedwithapprovedcompounds.Energizepowertoswitchandalarmsystem(ifutilized)andtestthefunctionofthealarmsystem.

HELPFUL HINTSTheterm“Safe”pressureforpurposesofthismanualisdefinedasfollows:

ClassI=aminimum.25inchofwatercolumnpressure

ClassII=aminimum1.0inchofwatercolumnpressure

Regulatormaybeinthelockedpositionuponarrival.Toadjustregulator,pullhandletooutwardposition.

Totestthevent’soperation,gentlyprodtheventflapperopenwithasoft-pointedobject,(example:eraserendofapencil)ensuringthattheventvalveworksfreely.Onverticallyconfiguredvents,thiscanbeaccomplishedfromwithintheprotectedenclosure.Sidemounted-90configuredventscanbetestedbyremovingtheconduitplugatthebottomofthemountingtee.Multipleoperationsrequireonlyonetestperdayifenclosureisnotopenedorleftunattended.

Page 15: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

15

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Operating Sequence

WARNING! Do not exceed a “safe” pressure with the enclosure pressure control regulator. Operators must

follow step-by-step sequence of the start-up instructions nameplate on the protection system.

Class I Purging OperationStart-Up Conditions

Protectionmethod: Type“Z”purge/pressurizationsystemPoweringmethod: LocaldisconnectswitchSystemstatus: Protectedequipmentde-energized alarmsystemandairsupplyonOperating Procedures

1. Checkoperationofenclosurepressurereliefdevice(ifutilized)andsealtheprotectedenclosure.

2. Pressurizetheprotectedenclosuretosetandmaintainaminimumpositivepressureof0.10inches(2.5mm)ofwater.

3. Exchangetherecommendedvolumesofpurginggas.Exception:Powermaybeenergizedimmediatelyiftheprotectedenclosureatmosphereisknowntobenonflammable.

4. Energizetheprotectedequipmentpowermanuallywithadisconnectswitchorbreakerratedforthehazardouslocation.

5. Lossofpressurizationrequiresimmediateattentionorthemanualde-energizingofprotectedequipmentpower.

6. Excessivelyhotequipmentmustbeisolatedinaseparateprotectedenclosure,unlesstheenclosureismarkedwithawarningwhichindicatesarequiredcool-downtimeperiodbeforeaccess.

Class II Pressurization OperationStart-Up Conditions

Protectionmethod: Type“Z”pressurizationsystemPoweringmethod: LocaldisconnectswitchSystemstatus: Protectedequipmentde-energized alarmsystemandairsupplyonOperating Procedures

1. Removehazardoussubstancefromtheprotectedenclosure.Avacuumdeviceisthepreferredtoolfordustremoval.

2. Checkoperationofenclosurepressurereliefdevice(ifutilized)andsealtheprotectedenclosure.

3. Pressurizetheprotectedenclosuretosetandmaintainapositivepressureof0.50inches(12.7mm)ofwater.

4. Energizetheprotectedequipmentpowermanuallywithadisconnectswitchorbreakerratedforthehazardouslocation.

5. Lossofpressurizationrequiresimmediateattentionorthemanualde-energizingofprotectedequipmentpower.

6. Excessivelyhotequipmentmustbeisolatedinaseparateprotectedenclosure,unlesstheenclosureismarkedwithawarningthatindicatesarequiredcool-downtimeperiodbeforeaccess.

Enclosurepressurecontrol

regulator

Model identification

nameplate

Enclosure pressure

gauge

Start-up instruction nameplate

Page 16: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

16

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Troubleshooting Procedures

Problem or Fault Possible Causes Corrective Action

Enclosurepressurecontrolregulatorwillnotholdasafepressure.

Leakagearoundgasketing,covers,seams,pipingandtubingconnections,conduitconnectionsandelectricalconduitsealsoftheenclosure.

Tightenenclosurelatches:Wheretighteningisnotfeasible,andgasketingmaterialsarenotpractical,holesorgapscanbeclosedwithsiliconesealantappliedfrominsidetheprotectedenclosure.

Enclosurepressureindicatorreadingisdifficulttostabilize.

Insufficientenclosureleakageoropeningoftheventuriorificeiscrimpedtoosmall.

Removetheorifice,cutoffthecrimpedendandreamthetube,thenrecrimpandreinstallthetubetonoteeffect.Astubeisshortened,reamed,andrecrimped,sensitivitydecreases,allowingeasieradjustmentofsetpointontheenclosure.

Enclosurepressureindicator"drifts"upordownfromthe"safe"pressuresetting.

Applicationinvolvesasmall,tightlysealedenclosureand/orafluctuatingprotectivegassupply.

Pre-regulatetheprotectivegassupplyupstreamoftheenclosureprotectionsystemto5psimaximum.

Fordramaticfluctuationsintheprotectivegassupply,itmaybeneccessarytoutilizeaself-relievinglowflowprecisionregulatortopre-regulatetheprotectivegassupply.

Enclosurepressurelossalarmswitchdoesnotappeartobeoperating.

Pressureswitchisoutofcalibration. Calibratebyslowlyadjustingcounterclockwisetodecreasethesetpoint,andclockwisetoraisethesetpoint.(Donotattempttocalibratetheswitchuntilalleffortstomaketheswitchrespondproperlyhavefailed)

Problemspersists,orifthesystemdoesnotappeartobeoperatingproperly.

Problemspersist ContactPepperl+FuchsApplications/CustomerServiceDepartmentat(330)486-0002formoreinformation.

Thissectioncoversthemostcommonproblemsdocumentedwiththissystem.Anyproblemsnotcoveredinthissectionshouldbeaddresseddirectlytoourfactory.Pleaseaddressallserviceneedsto:

Pepperl+Fuchs, Inc. Customer Service Department

Page 17: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

17

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

PEPPERL+FUCHS STANDARD 24-MONTH WARRANTY1. LimitedWarranty.Pepperl+Fuchs,Inc.(“P+F")warrantsPurgeUnitsandcomponentsforPurgeUnitsmanufacturedbyP+F

(“Product"or“Products")tobefreefromdefectsinmaterialandworkmanshipunderNormalUseforaperiodoftwenty-four(24)monthsfromthedateofshipmentofsuchProductsfromP+F’swarehouseorplaceofmanufacture(orfromP+F’sauthorizedrepresentativeordistributor).OnlytheoriginalpurchaserofsuchProducts(the“Customer")shallbeentitledtothebenefitoftheforegoingLimitedWarranty.Norepresentative,agentorsalesmanofP+FisauthorizedtogiveorprovideanywarrantyormakeanyrepresentationcontrarytoorinadditiontotheforegoingLimitedWarranty.

2. InspectionandClaims.CustomermustinspectandtestallProductsuponreceipt.AllclaimsundertheLimitedWarrantyprovidedhereinmustbemadewithinthirty(30)daysofthediscoveryofthedefect.CustomermustobtainshippinginstructionsfromP+FpriortoreturninganyProduct,whichProductmustbereturnedatCustomer’sexpenseinaccordancewithP+F’sinstructions.

3. LimitationsandExclusions.“NormalUse"shallmeanuseandoperationwithinratedcapacities,atthecorrectvoltage,andwithanyrequiredmaintenanceasprovidedintheapplicableP+FOperatingManuals.TheLimitedWarrantyprovidedhereindoesnotapplyto(i)anyProductswhichhavebeenalteredormodifiedinanywayordisassembledbytheCustomeroranyoneelse,(ii)anyProductswhichhavebeensubjecttomisuse,negligenceoraccident,orimproperlyinstalled,changed,substitutedorreplaced,(iii)anypartorcomponentnotmanufacturedbyP+F,or(iv)anypartorcomponentthatissubjecttowearorconsumption.ForpartsorcomponentsnotmanufacturedbyP+F,theCustomeroranyotheruserorownershallhaveonlythewarrantyprovidedbythemanufacturerofsuchpartorcomponent.TheLimitedWarrantysetforthhereinisalsosubjecttothefollowing:

(1) TheLimitedWarrantyislimitedtoelectronicandmechanicalperformanceonly,asexpresslydetailedintheproductspecifications,anddoesnotapplytocosmeticappearance;

(2) TheLimitedWarrantyshallnotapplytoanycablesattachedto,orintegratedwith,anyProducts.

(3) TheLimitedWarrantyshallnotapplytoanyProductswhicharestored,orutilized,inharshenvironmentalorelectricalconditionsoutsideP+F’swrittenspecifications.

THELIMITEDWARRANTYSETFORTHHEREINISTHEONLYWARRANTYMADEBYP+FWITHRESPECTTOTHEPRODUCTS.ITISEXPRESSLYAGREEDANDUNDERSTOODTHATP+FMAKESNOWARRANTYOFMERCHANTABILITYORFITNESSFORAPARTICULARPURPOSE.EXCEPTFORTHELIMITEDWARRANTYSETFORTHHEREIN,THEREISNOOTHERWARRANTY,EXPRESS,IMPLIEDORSTATUTORY;ANDTHEREISNOAFFIRMATIONOFFACTORPROMISEBYP+FWITHREFERENCETOTHEPRODUCTS.INNOEVENTSHALLP+FBELIABLEFORACTUALORANTICIPATEDLOSTPROFITSORFORINCIDENTALORCONSEQUENTIALORPUNITIVEDAMAGESORFORDAMAGESRESULTINGFROMBUSINESSINTERRUPTION,ORINJURYORDEATHOFPERSONS,ORINJURYTOPROPERTY.P+F’SLIABILITYONANYCLAIMOFANYKINDARISINGOUTOF,CONNECTEDWITHORRESULTINGFROMTHEDESIGN,MANUFACTURE,SALE,REPAIROROPERATIONOFAPRODUCT,SHALLNOTEXCEEDTHEPRICEALLOCABLETOTHATPRODUCTORTHEPARTTHEREOFWHICHGIVESRISETOTHECLAIM.THEREMEDYSETFORTHINTHISLIMITEDWARRANTYCONSTITUTESTHESOLEANDEXCLUSIVEREMEDYOFTHECUSTOMER.P+FSHALLNOTBELIABLEFORPENALTIESOFANYDESCRIPTION.

4. LimitationofRemedies.IntheeventofP+F’sliability,whetheronthisLimitedWarrantyorbasedoncontract,tort(including,butnotlimitedto,negligenceandstrictliability)orotherwise,Customer’ssoleandexclusiveremedywillbelimitedto,atP+F’soption,therepairorreplacement(f/o/bP+F’splaceofmanufacture)byP+Fofanynon-conformingitemsforwhichclaimismadebyCustomerinaccordancewithparagraph2,ortherepaymentoftheportionofthepurchasepricepaidbyCustomerattributabletothenon-conformingitem.

5. ResponsibilityofCustomer:SafetyandProtectionPrecautions.P+FtakesgreatcaretodesignandbuildreliableanddependableProducts;however,someProductscanfaileventually.Customermusttakeprecautionstodesignitsequipmenttopreventpropertydamageandpersonalinjuryintheunlikelyeventofafailure.ASAMATTEROFPOLICY,P+FDOESNOTRECOMMENDTHEINSTALLATIONOFPRODUCTSASTHESOLEDEVICEFORTHEPROTECTIONOFPERSONNELORPROPERTYAND,THEREFORE,THECUSTOMERSHOULDBUILDINREDUNDANCYORDUALCONTROLUSINGAPPROVEDSAFETYDEVICESFORTHESEAPPLICATIONS.

6. Conflicts.IntheeventthereisanyconflictbetweentheprovisionsofthisLimitedWarrantyandanyprovisionscontainedinanyorders,offers,acceptancesorotherwritingsorstatementsprovidedormadebyCustomertoP+F,theprovisionsofthisLimitedWarrantyshallprevail,andthecontractbetweenP+FandtheCustomershallbedeemedformedonlyupontheprovisionssetforthinthisLimitedWarranty,andanyadditionalorconflictingprovisioninsertedbyCustomershallbeofnoforceoreffect.

Warranty Terms and Conditions

Page 18: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

18

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

System Maintenance

Regular MaintenanceDraintheprotectionsystemregulatorfrequentlyandcleansystemwithnonsolventcleaningagentsonly.

Long-Term MaintenanceCalibratetheenclosurepressureindicatorto0inchesbyventingthepurgepressurereferenceportandtheprotectedenclosuretoatmosphereandadjustingthecalibrationscrewinthelowercenterportionoftheindicator’sface.

Fullyopentheenclosurepressurecontrolregulator,toblowoutanydepositsaroundthetipofthevalveandtoensurethattheenclosureprotectionventisoperatingproperly,thencarefullyreadjustsystemaccordingtotheset-upprocedureandoperatingsequenceonpages14and15.Replaceortightenstempackingnutasrequiredtoprohibitstempackingleakage.

Carefullydisassembletheenclosureprotectionventbylooseningthetwobottomhexnutsthatholdtheunittogether.

(DO NOT REMOVE CAP NUTS ON TOP OF VENT BODY)

Carefullycleantheflappervalveandventbodyseatswithwarmsoapandwater,beingcarefulnottoextendtheventvalvebeyonditsnormalopeningpoint,andbeingcarefulnottoexertanystressonthevalvehinge.

Examinetheentireprotectionsystemandtheprotectedenclosure(s),andreplaceanydefectivepartsduringroutineshutdownoftheprotectedenclosure(s).PartsareavailablefromPepperl+Fuchsonimmediatenoticeasrequired.

MAINTENANCE SCHEDULEDate Work performed Performed by

Page 19: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

Model 1011 Installation and Operation Manual

19

Par

t No.

512

083

Dra

win

g N

o. 1

29-0

205a

03/

09

Subject to modifications without notice

Pepperl+Fuchs Groupwww.pepperl-fuchs.com

USA: +1 330 486 [email protected] [email protected]

Singapore: +65 6779 [email protected]

Copyright Pepperl+Fuchs

Germany: +49 621 776 2222

Systems Identification & Application Information

Date of installation _____________________________________________________

Unit serial #____________________________________________________________

Item ___________________________________________________________________

Customer P.O.# ________________________________________________________

Customer project# _____________________________________________________

Service ________________________________________________________________

Type __________________________________________________________________

Features ______________________________________________________________

Application ____________________________________________________________

Notes: _______________________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Page 20: Installation and Operation Manual: Model 1011 Type Z Purge ...files.pepperl-fuchs.com/selector_files/navi/... · Model 1011 is an enclosure pressurization or purging system that operates

5 1

8

4

2

6

7

3

www.pepperl-fuchs.com

PROCESS AUTOMATION – PROTECTING YOUR PROCESS

Worldwide/German Headquarters Pepperl+Fuchs GmbH Mannheim · GermanyTel. +49 621 776 2222E-Mail: [email protected]

1

Asia Pacific HeadquartersPepperl+Fuchs PTE Ltd. SingaporeCompany Registration No. 199003130ETel. +65 6779 9091E-Mail: [email protected]

2

Central/Western Europe & Africa HeadquartersPepperl+Fuchs N.V. Schoten/Antwerp · BelgiumTel. +32 3 6442500E-Mail: [email protected]

3

Middle East HeadquartersPepperl+Fuchs M.E (FZE) Dubai · UAETel. +971 4 883 8378E-Mail: [email protected]

4

North/Central America Headquarters Pepperl+Fuchs Inc. Twinsburg · Ohio · USATel. +1 330 486 0002E-Mail: [email protected]

5

Northern Europe HeadquartersPepperl+Fuchs GB Ltd. Oldham · EnglandTel. +44 161 6336431E-Mail: [email protected]

6

Southern/Eastern Europe HeadquartersPepperl+Fuchs Elcon srl Sulbiate · ItalyTel. +39 039 62921E-Mail: [email protected]

7

South America HeadquartersPepperl+Fuchs Ltda. São Bernado do Campo · SP · BrazilTel. +55 11 4339 9935E-Mail: [email protected]

8

For over a half century, Pepperl+Fuchs has provided new concepts for the world of process automation. Our company sets standards in quality and innovative technology. We develop, produce, and distribute electronic interface modules, Human-Machine Interfaces and hazardous location protection equipment on a global scale, meeting the most demanding needs of industry. Resulting from our world-wide presence and our high flexibility in production and customer service, we are able to offer complete individual solutions – wherever and whenever you need us. We are the recognized experts in our technologies – Pepperl+Fuchs has earned a strong reputation by supplying the world’s largest process industry companies with the broadest line of proven components for a diverse range of applications.

Subject to modifications • © 2009 PEPPERL+FUCHS, INC. • Printed in USA • Part No. 512083 Drawing No. 129-0205a (TDOCT-1360_ENG) 03/09