For more information please contact www.silenceair.com [email protected] +61 2 9555 7215 Patents and Patents Pending Silenceair is a registered trademark of Silenceair International Pty Limited 240mm Acoustic Wall Ventilator Retrofitting into a Blockwork Cavity wall system INSTALLATION GUIDE - 10-01-01/ 4 240 10 230 110 SILENCEAIR 140 50 270 110 SUGGESTED 200mm BELOW F.C.L TO AVOID CORNICES 240mm ACOUSTIC VENTILATOR NORMINAL 3 BRICK HIGH OPENING IN BRICK WORK WEATHER LOUVRE WITH LOUVRES FACING UP EXTERIOR WEATHER LOUVRE SEAL AROUND SILENCEAIR UNIT ON ALL SIDES INTERIOR EXTERIOR

Upload: others

Post on 12-May-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION GUIDE - 10-01-01/ 4 240mm Acoustic Wall

For more information please contactwww.silenceair.com [email protected] +61 2 9555 7215

Patents and Patents Pending Silenceair is a registered trademark of Silenceair International Pty Limited

240mm Acoustic Wall Ventilator Retrofitting into a Blockwork Cavity wall system

INSTALLATION GUIDE - 10-01-01/ 4

240

10

230

110

SILENCEAIR140

50

270

110

SUG

GES

TED

200

mm

BEL

OW

F.C.L

TO

AVO

ID C

ORN

ICES

240mm ACOUSTIC VENTILATOR

NORMINAL 3 BRICK HIGH OPENINGIN BRICK WORK

WEATHER LOUVRE WITH LOUVRES FACING UP

EXTERIOR WEATHER LOUVRE

SEAL AROUND SILENCEAIR UNITON ALL SIDES

EXTERIORINTERIOREXTERIORINTERIOR

Page 2: INSTALLATION GUIDE - 10-01-01/ 4 240mm Acoustic Wall

For more information please contactwww.silenceair.com [email protected] +61 2 9555 7215

Patents and Patents Pending. Silenceair is a registered trademark of Silenceair International Pty Limited

250

150

3

21

4

• Identify the preferred location of the Silenceair.• Cut a hole 3 bricks high. And 150mm wide in both faces

of brickwork.• Ensure the holes line up.

• On the interior wall, set the weather louvre fixing plate into place. And then snap fit the half chevron louvre plate into place.

• Ensure the louvres are pointing up.

• Insert the Silenceair unit onto place.• Seal around all sides with mortar or filler to ensure

sound does not enter the room.

• This will reduce the visibility of the vent from inside the room.

Page 3: INSTALLATION GUIDE - 10-01-01/ 4 240mm Acoustic Wall

For more information please contactwww.silenceair.com [email protected] +61 2 9555 7215

Patents and Patents Pending. Silenceair is a registered trademark of Silenceair International Pty Limited

65

7

• On the exterior face of the wall, fit the exterior weather louvre fixing plate into place.

• Ensure the integrated fly screen has been put in place.• Snap fit the half chevron weather louvre into place.• Ensure the louvres are facing down.

• All that is visible on the outside is the weather louvre.• The weather louvres can be colour matched to the

brick work.• Please call us to discuss options and lead times.

• Silenceair reserves the right to modify or reissue technical brochures without notice.

• © 2017 Silenceair International Pty Ltd. ABN 44 096 462 949

• Date of Publication: August 2017.

NOTES