INSTALLATION MANUAL FATL achine Installing: ACTIVITY CHECK POINT 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3. Remove the box. 4. No dent or scratches required during opening the Machine. 1. Remove Accessories from Tub & check it. 2. Remove the packing base by lifting the machine. Two person should lift the machine. BOX OPENING M/C REMOVING FROM BASE 2 3 1 2 1 4

Upload: jadon

Post on 24-Feb-2016

39 views

Category:

Documents


0 download

DESCRIPTION

INSTALLATION MANUAL FATL. Machine Installing:. CHECK POINT. ACTIVITY. BOX OPENING. 1. 2. 1. Minimum two persons required for opening the Machine. 2. Cut the straps & tape. 3. Remove the box. 4. No dent or scratches required during opening the Machine. . 3. 4. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: INSTALLATION  MANUAL FATL

INSTALLATION MANUAL FATL

Machine Installing:

ACTIVITY CHECK POINT

1. Minimum two persons required for opening the Machine.

2. Cut the straps & tape.

3. Remove the box.

4. No dent or scratches required during opening the Machine.

1. Remove Accessories from Tub & check it.

2. Remove the packing base by lifting the machine. Two person should lift the machine.

BOX OPENING

M/C REMOVING FROM BASE

2

3

1 2

1

4

Page 2: INSTALLATION  MANUAL FATL

Rat mesh Installation and Machine Leveling:ACTIVITY CHECK POINT

ANTIRAT COVER FIXING

1. Spread bed sheet ( or cloths) on floor so that no scratch can come on M/C.

2. Lay down the machine by facing left side only on spread bed sheet.

3. Place the rat mesh on base as shown.(Gap should not be there between base and mesh)

4. Finally Put the machine straight.

MACHINE LEVELING1. Place the machine where customer want to use. (Do not place the m/c on inclined floor)

2. Check leveling with respect to floor by up down movement and by filling water in machine up to pulsator level and check uniform distribution of water on pulsator.3. Adjust the leg if up down movement is there or water distribution not uniform on Pulsator.

1

3 4

INSTALLATION MANUAL FATL

2

2

2 3

Page 3: INSTALLATION  MANUAL FATL

Drain hose and Adaptor Installation: fix ACTIVITY CHECK POINT

INLET HOSE MOUNTING WITH TAP

1. Separate the adapter from hose.

2. Do unscrewing of all 4 screws of adapter.

3. Loosen the lower unit of adapter.

4. Fix the adapter with the tap and tight all

4 screws as per the sequence given in fig

5. Tighten the lower unit of adapter.

6. Connect the inlet hose with the adapter.

7. Ensure no leakage from joint.

1. Keep the clamp back side. 2. Connect the Drain hose with M/C.3. Lock drain hose by Clamp.4. Check leakage after fitting. No Leakage required.

DRAIN HOSE FIXING

1 2 3

1

26

INSTALLATION MANUAL FATL

1

23

4

2

2

3

4 5

Page 4: INSTALLATION  MANUAL FATL

Inlet hose mounting with machine and Feed valve filter cleaning:ACTIVITY CHECK POINT

FEED VALVE FILTER CLEANING ( TO EXPLAIN )

1. Remove Filter Mesh from feed valve.

2. Clean Filter Mesh with help of tooth brush and clean water.

3. Pl do this activity fortnightly.

INLET HOSE MOUNTING WITH M/C

1. Check filter present inside valve.

2. Tight other side of Inlet hose with M/C & tight it completely.

3. Open the Tap & check for leakage, No Leakage required.

1 2

1 2

REGULAR MAINTENANCE FATL

Page 5: INSTALLATION  MANUAL FATL

Lint filter and pulsator cleaning:ACTIVITY CHECK POINT

PULSATOR CLEANING 1. Clean the pulsator by pouring clean water after each use of machine.

2. Run the machine in spin to drain the water and switch it off.

LINT FILTER CLEANING1. Take out the lint filter by pulling upward.

2. Reverse the lint filter.

3. Wash out the lint filer separately by clean water.

REGULAR MAINTENANCE FATL

31 2