integrated management systems (ims) oct 2011 r. nahon

28
INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

Upload: angela-wood

Post on 11-Jan-2016

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED MANAGEMENT SYSTEMS

(IMS)

OCT 2011

R. Nahon

Page 2: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

2Integrated Management Systems - IMS

Possible combinations

Possible combinations of integrated and harmonised schemes:

► ISM Code

► ISO 9001 : 2000

► ISO 14001 : 2004

► OHSAS 18001 : 2007

► ISPS (Harmonised Management Systems)

► IPSEM (International Port Safety and Environmental Protection Management Scheme)

► ISO 50001 (Energy Management Systems)??????

Page 3: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

3Integrated Management Systems - IMS

General

► The PNS 4910 “Qualification of auditors performing integrated systems” was revised in accordance with the agreement between BV and BV Certification.

► The operational procedures are described in the PNSs series 4000: 4030, 4071, 4151, 4450, 4513 and 4810.

► BV has developed an intensive training material (see the respective training brochure and training material for a 2 days training session in the Veristar Training Solution database)

Page 4: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED AUDITOR’S QUALIFICATION

Page 5: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

5Integrated Management Systems - IMS

Qualified auditors on AUG11

752011 Marine Training Seminar

IMS auditors ( ISM + ISO)

162152SEP 2011

111853FEB 2010

81254FEB 2009

18001140019001

ISM + ISO

Year

BV certified ISM auditors: around 270

Page 6: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

6Integrated Management Systems - IMS

Qualified auditors on AUG11

762011 Marine Training Seminar

IMS auditors ( ISM + ISO)

► Number/Distribution of IMS Auditors

ISO 9001 : 1

ISO 14001 : 1

ISO 9001 : 4

ISO 14001 : 4

ISO 18001 : 2

ISO 9001 : 30

ISO 14001 : 11

ISO 18001 : 7

ISO 9001 : 16

ISO 14001 : 4

ISO 18001 : 6

ISO 9001 : 1

ISO 14001 : 1

ISO 18001 : 1

Page 7: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

7Integrated Management Systems - IMS

Integrated Auditor Qualification

“Qualification of auditors performing Integrated Systems Audits”

Detailed instructions found on PNS 4910

► BV ISM Auditor (with some audits already performed) has to undertake, at least, 3 further initial or renewal audits (at least, one as a participating auditor and another as a lead auditor) on ISO 9001 and/or ISO 14001 and/or HSAS 18000 standards (BV Cert had simplified the process for ISM auditors)

► Those 3 audits must be carried out under the supervision of a registered BV Cert lead auditor and are not restricted to shipping companies and their ships

► The qualification of BV Cert auditors is registered on the BV Cert website

Page 8: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

8Integrated Management Systems - IMS

Integrated Auditor Qualification

► The CSOM shall attach a Form Plan and Follow-Up Sheet (PNS008) in Qualif to DNS for review.

► BV Cert issue a certificate and send to the CSOM/auditor.

►The experience in “marine transportation”, or similar, shall be evidenced in the “technical code” of the BV Cert website.

►Each CSOM shall contact the BV Cert Local Technical Manager to ensure fully understanding of this process. The BV Cert management does not have the same geographical distribution as Marine (regions/countries/etc).

►In case of any problem in this issue contact:

DNS_CTD

Page 9: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED SYSTEMS’ CONTRACT AND INVOICING

Page 10: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

10Integrated Management Systems - IMS

Contracts

IMS CONTRACTS

PNS 4071

► The Certification Conditions + the Form I* “Application & Quotation” shall be used). The Certification Conditions (with the last version of the Marine General Conditions) must be signed by the client.

► The Form S* “ISO Audit Sampling Plan” shall be agreed and attached to the contract. The company’s fleet shall be considered to define the auditing periodicity of the ISO audits during the ISM audits.

Both forms are found in the PNS 4810

Copy of contract to be provided for BV Certification

Page 11: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

11Integrated Management Systems - IMS

Contracts

PROPOSED TIMING

How many days to provide for integrated systems?

► Minimum time duration for ISO Standards are defined in the BV Cert intranet website in BV Portal/BMS

► The minimum audit duration shall be increased of 25% for integrated audits.

Page 12: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

12Integrated Management Systems - IMS

Contracts

► Sufficient “Stop over time” to be clearly specified to owner when signing a contract.

► There shall be a clause in the contract considering the possibility of ISO standard audits separated from ISM audits in case of lack of auditor during scheduled call or insufficient stop over time. In this case it may be provided 0,5 day more than provided on previous slide.

Page 13: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

13Integrated Management Systems - IMS

Invoicing

GUIDE B (next version will specify)

B14 ISM / ISO Integrated Systems (IMS)

B14.19 ISM / ISO Audits

► When an integrated scheme is contracted a specific criteria of repartition of incomes was agreed between BV and BV Cert., considering:

One ISM certification and one ISO certification (ISO 9001 or 14001)

One ISM certification and two ISO certifications (ISO 9001 & 14001)

► Additional time, travelling time, overtime and additional audits refers to Guide B 14.14 to 14.17.

Page 14: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

14Integrated Management Systems - IMS

Invoicing

► One single invoice shall be issued by BV to the client.

BV Cert will send an internal invoice to the CSOM of the ship’s Connecting District (CD) for its share, which already considers report, contract reviews, ISO certificate issuance and any additional service required for completion of the process.

► The invoice shall be issued considering the product code of ISM (SM2). No particular disposition provided in SM2 to date.

The integrated system shall be mentioned in the invoice.

► An workflow is described in the Guide B with all detail steps to be followed in case of local jobs and international jobs.

Page 15: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED SYSTEMS’ AUDIT

Page 16: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

16Integrated Management Systems - IMS

IMS Audits

“How to perform an ISM/ISO audit in an IMS”

Detailed instructions found on PNS 4151

► Report forms for ISO audits may be downloaded from BV Cert website (BV considered as a subcontractor from BV cert) - PNS 4810 Rev. 1 - and attached to the ASMS report. The information about an IMS audit shall be mentioned in the “report comment”;

► The ISO reports shall include the:

“Surveillance Visit Planning” (SF17)

“Audit Plan” (PNS 4151 item 9)

“ISO Audit Sampling Plan” (see PNS 4071 and 4810)

The report check list found in the BV Cert website

Page 17: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

17Integrated Management Systems - IMS

IMS Audits – Audit Plan

► The audit plan in the ASMS shall be used for both audits and must reflect the considered ISO standard (s).

The audit plan created in the ASMS by default, allows as much new lines to be inserted as required by the auditor.

► The audit plan shall be communicated in advance

Page 18: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

18Integrated Management Systems - IMS

IMS Audits – Company audits

► The “ISO Audit Sampling Plan” (Form S* – PNS 4810) must be updated imperatively during periodical Company audits and annexed to BV Cert. report.

► Company branch offices:

► ISO certification only for the HO - same criteria as for ISM companies’ audits, a sampling program to be established.

► ISO certification for the HO and BOs - a sampling program based on the square root process has to be established

If not annexed, the time for the BV Cert. review will be increased until this plan is received, the issuance of the correspondent ISO certificate will be delayed and client complains may be expected.

Page 19: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

19Integrated Management Systems - IMS

IMS Certificates

“How to issue Integrated System Certificates”

Detailed instructions found on PNS 4450

ISM CERTIFICATES

► BV auditors issues SMC/DOC definitive or limited and CM issues definitive after monitoring (same for simple ISM audits).

Page 20: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

20Integrated Management Systems - IMS

IMS Certificates

ISO CERTIFICATES

► ISO certificates are issued by BV Cert. after satisfactory review of the complete file and report by BV Cert. committee (Company + ship audits) in an average delay of 1 to 2 months if no NC issued and 4 to 5 months when NCs are issued.

► ISO certificates are renewed at each 3 years (after evidence of a minimum of 20 days of audit and 45 hrs of self-study).

► Report shall be submitted to BV Cert. after satisfactory review of corrective action by auditor or the CSOM of the CD (maximum 3 month).

► BV Cert. process requires its specific full report that can be downloaded from the INTERNATIONAL DATA BASE : WebAACS -> http://aacs.ssl-asp.net

Page 21: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

21Integrated Management Systems - IMS

ISO Sampling Process

“How to sample ships for ISO audits on an IMS”

Detailed instructions found on PNS 4513

► To cope with the differences in BV and BV Cert schemes in relation to the quantity of ships to be sampled.

► It is of the CSOM responsibility to prepare a plan to be attached to the contract. This plan shall be documented in the “ISO Audit Sampling Plan” (PNS4810) and may be adjusted according with fleet and auditors’ availabilities.

► New ship to the company shall be ISO audited during next ISM audit.

Page 22: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

22Integrated Management Systems - IMS

IMS Audits

Details in the PNS 4153

IMS

SAMPLING PROCESS

√N

0,6√N

0,8√N

0,6√N 0,6√N 0,6√N

0,8√N

0,6√N

0 21 43 5 6 7

√N 2√N 2√N

8

ISO

0,8√N

9…..

0,6√N

2√N

8

ISM

Renewal

RenewalRenewal Renewal

Page 23: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

23Integrated Management Systems - IMS

IMS Audits

Stage 1: InitialISO 6 months

ISM Interim Audit

ISO max validity = 3 years

DOC max validity = 5 years

SV

DOCP

Renewal Audit - DOCR

Renewal Audit - RA

Initial Audit - DOCI

SV

DOCP

Renewal Audit - RA

Stage 2: Main Audit

SV

DOCP 12 months

IMS

Aud Time

DOCP

ISO t = 1t = 1/3

t = 1/3t = 2/3

t = 1/3

Minimum

t + 25%1/3T + 25%

1/3T + 25%2/3T + 25%

1/3T + 25%2/3T + 25%

t = 2/3

General scheme for the first period of certification of a Company (for reference)

Page 24: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED MANAGEMENT SYSTEMS’ REPORT

Page 25: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

25Integrated Management Systems - IMS

Integrated Management Systems Reports

FINDINGS

The NCs are reported in the Form K found in the ASMS. The NCs related to the ISO standards shall be referred on the right side named “Other ref” (§7

PNS 4151).

NC/MNC only related to ISO – use ref. 1.2.3 of the ISM Code.

For a MNC only related to the ISO Std, besides a warning will appear in the ASMS reminding about an additional audit to be requested, it is not mandatory but recommended by BV Cert.

Page 26: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

INTEGRATED SYSTEMS FROM BV CERTIFICATION

Page 27: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

27Integrated Management Systems - IMS

Bv Cert database

Page 28: INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

28Integrated Management Systems - IMS

Bv Cert database