intermodal parking facilities and enhancements design...

30
-1- Intermodal Parking Facilities And Enhancements Design-Build Project

Upload: others

Post on 07-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

-1-

Intermodal Parking Facilities

And Enhancements Design-Build Project

Page 2: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Presentation

• Foothill Extension

• Phase 2A – Pasadena to Azusa

– Three Design-Build Projects

– Intermodal Parking Facilities and Enhancements

Design-Build Project: Scope of Work

• Procurement and Evaluation

• Q&A

Page 3: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Completing the Vision

Page 4: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Creation/Powers of the Authority • SB 1847 sponsored by State Senator (now Congressman) Adam Schiff effective January 1, 1999

updated October 2011 – AB706, sponsored by State Assembly

member Norma Torres

• Scope included current Metro Gold Line from Union Station to East Pasadena, and any fixed guide way to Claremont (now Montclair) • SB 1847 also provides the necessary powers to complete the project:

the ability to acquire right-of-way

issue debt

enter into joint development agreements

relocate utilities

accept grants, fees and allocations from all funding sources

enter into design build contracts

Page 5: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Strategic Partnership w/Metro

• We are not LACMTA / Metro • General Relationship

– Construction Authority plans, designs and builds the line (per Metro’s design/safety guidelines and specifications)

– Metro operates and maintains the line following construction

• Both agencies play a role in public safety planning and education

• Master Cooperative Agreement – Formalizes roles and responsibilities – MCA for Pasadena to Azusa and Azusa to Montclair segments

signed March 2010

Page 6: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Building by Phase

Page 7: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Planning/Construction Phases

• Pasadena to Azusa Extension – Fully Funded by Measure R – 11.5 Miles, 5 Cities, 6 Stations/Completion Anticipated 2015

Pasadena-Azusa Azusa-Montclair Airport Ext.

• Azusa to Montclair Extension - Proposed – 12.6 Miles, 6 Stations/Estimated Funding Needed is $550 Million

• Ontario Airport Extension - Proposed – Approximately 8 Miles/Unfunded

Page 8: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

• Pasadena to Azusa comprises three design-build project packages: – Package 1 – Iconic Freeway Structure (I-210 Bridge) – Package 2 - Alignment Contract (11.5 miles) – Package 3 - Intermodal Parking Facilities and Enhancements

Pasadena-Azusa

Status: Pasadena to Azusa

Page 9: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Design-Build Packages

• Package 1: Iconic Freeway Structure over I-210 (approx. 584 linear feet)

• Package 2: Phase 2A Alignment, includes: Rail Track Alignment, Bridges, Crossings, Stations, Utilities, Systems, Signals (and related items), as well as a Maintenance & Operations Facility

• Package 3: – Intermodal Parking Facility at five of the six stations:

four multi-level parking structures and one surface parking lot.

– Intermodal Enhancements, including: bus pads and shelters, bike lockers and racks, sidewalks, ramps, enhanced crosswalks, trees and tree wells, pedestrian street lights, traffic signals and roadway improvements.

Page 10: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Package 1: Iconic Freeway Structure

Page 11: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Package 2: Phase 2A Alignment

Package 2 includes: Rail Track Alignment, Bridges, Crossings, Stations, Utilities, Systems, Signals, and Maintenance & Operations Facility.

Structures

Stations

Track

Crossings

Page 12: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Package 3: Intermodal Parking Facilities and Enhancements

Package 3 includes: parking structures, a surface parking lot, fencing, traffic signals, bus pads and shelters, bike racks and lockers, retaining walls, sidewalks, ramps, enhanced crosswalks, landscaping, trees and tree wells, pedestrian street lights, roadway improvements, other related work.

Page 13: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

-13-

Intermodal Parking Facilities

And Enhancements Design-Build Project:

Scope of Work

Page 14: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Scope of Work: • Design-Build Project Quality Control

o Inspections o Testing

Quality Assurance • Public Agency Project Construction Work Plans

• Coordinate with: Cities Utility Owners Third Parties Alignment (DB2)

Contractor Metro (via Authority)

Page 15: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Intermodal Parking Facilities Five parking facilities:

Four parking structures

One surface parking lot

Utility Relocations

Retaining walls

SUSMP Requirements

Ventilation system, when required

Page 16: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Intermodal Enhancements Bike lockers and racks Bus pads and shelters Sidewalks, ramps and curb ramps Enhanced crosswalks Street trees and tree wells Pedestrian street lights Traffic signal and roadway improvements

Page 17: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Relocation of utilities Vacation of existing street Demolition of existing buildings/facilities

Arcadia Site

Page 18: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

2-level Parking Structure with approx. 300 spaces Intermodal Enhancements on Santa Clara Street & 1st Ave

Arcadia

Page 19: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Multi-level Parking Structure with approx. 350 spaces

Monrovia

Page 20: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Surface Parking Lot with approx. 125 spaces Intermodal Enhancements on Duarte Rd and Highland Ave

Duarte

Page 21: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Retaining walls required Relocation of overhead utilities Relocation of drainage pump station

Irwindale Site

Page 22: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

3-level Parking Structure with approx. 350 spaces Intermodal Enhancements on West Avenida Padilla

Irwindale

Page 23: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Intermodal Enhancements on Santa Fe Ave Joint Venture Parking Structure (not included in scope)*

Azusa-Alameda

Page 24: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

3-level Parking Structure with approx. 200 spaces Intermodal Enhancements at Station Area & on Citrus Ave and Foothill Blvd

Azusa-Citrus

Page 25: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

-25-

Procurement Process

Page 26: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Request for Statements of Qualifications

1. Goal: To create a shortlist of most-qualified teams

2. Evaluation Criteria: Related Project Experience (50 points) Staffing and Organization (35 points) Legal & Financial Qualifications (15 points)

3. Evaluation Criteria: Forms

4. Questions and Answers: Form E

5. Only Addenda are Binding

6. Single Point of Contact; No Ex Parte Communications§3.2

Page 27: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

RFQ Procurement Milestones

RFQ MILESTONES ANTICIPATED DATES

Issue RFQ March 19, 2012

Pre-submittal Conference March 22, 2012

Questions Due April 16, 2012

Authority Response April 25, 2012

Statements of Qualification Due May 15, 2012

Interview Dates (if any) June 4-5, 2012

Announce Shortlist June 8, 2012

Page 28: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Recommend Award

Discussions (if any)

SOQ s received

5/15

Shortlist of Design-Build

Teams

6/8

Industry Review Draft Release

6/8

Industry Review Comments & Technical

One-on-Ones

7/9 – 7/30

8/29

Revised / Final Proposals

(if any)

10/24

RFQ Issued

1/9/13

Proposals Due

RFP Issued

2/27/13

3/19

11/15

Procurement: The Big Picture

Page 29: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

Next Steps

Last Day for Submitting Written Questions April 16, 2012

Proposals Due May 15, 2012

Interview Date (if required) June 4-5, 2012

Shortlist Announced June 8, 2012

Page 30: Intermodal Parking Facilities And Enhancements Design ...foothillgoldline.org/images/uploads/files/2012_03...1. Goal: To create a shortlist of most-qualified teams 2. Evaluation Criteria:

-30-

www.foothillextension.org