Page 1: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

International Co-operative Alliance (ICA)

Cooperative Data Management Methods and Techniques

A Workshop Paper Presented at the Co-operative Registrars/Commissioners/Directors, Co-operative Leaders and

Managers Workshop Held in Harare. 08th – 12th June 2015.

By: Joseph Mutisya

Page 2: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Presentation Objectives:Computerized management information systems overview.

Approaches to management of software projects.

Software development cycle.

Data management and systems acquisition at Society Level.

Cooperative monitoring at country level: CODAS case study.

Discuss strategies of strengthening data management methods and techniques.

Page 3: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction

•“Whatever we do, we are guided

by figures” Yoweri Museveni, President of

the Republic of Uganda.

•“information is at the root of everything we do” Prof. Francis

Omaswa, former Director General, Ministry of Health, Uganda.

Page 4: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction

• “An essential component of any development planning is data. Without data, a country’s efforts to plan for future growth and welfare of its people cannot be grounded in reality and therefore may be severely flawed”.

• Hon. Prof. Peter Anyang’ Nyong’o, former Minister for Planning and National Development, Kenya.

Page 5: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Definitions

Data.

Information.

Database.

Software.

Information systems (components).

Integration.

Source codes

Page 6: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Application Software

Software that solve specific problems or perform

specific tasks. It is divided into;

i. Off – the – shelf application software – programs developed

by software engineers and made available in the market for sale.

Normally sold in bundles called program suites e.g. the

Microsoft Office programs suite.

ii. In – house –developed packages –also referred to as tailor –

made – application software. Designed or tailored to solve

problems specific to an organisation.

Page 7: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Software Development Project

Page 8: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Facts about Software

• Relative cost of software is growing.

• Increase in demand for software.

• Increase in size and complexity of software.

Page 9: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Successful Project Approach

SMART Goals

– Specific

• Clear to anyone with a basic knowledge of the project.

– Measurable• An indicator that the goal is achievable.

– Agreed upon• Agreement between the users and the project team on the

goals.

– Realistic• The goal can be accompanied with the resources, knowledge

and time available.

– Time Framed• Determine the time needed to accomplish the goal.

Page 10: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Software Crisis

• Faulty software.

• Delay in completion time.

• Over budgeting.

• Difficult to maintain software.

• Bad documentation.

Page 11: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Attributes of a successful project

• Senior management should monitor the progress in project.

• Regular progress reporting should be available for senior management and other interested parties on a regular basis.

• Planning and organizing for the project delivery of benefits should start as early as possible in the project life cycle inorder to achieve benefits realization.

Page 12: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Measure of Project Success

• The resulting information System is acceptable to the customer.

• The system was delivered on time.

• The system was delivered within budget.

• The system development process had a minimal impact on ongoing business operations.

Page 13: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Causes of Project Failure

• Failure to establish upper-management commitment to the project.

• Lack of organization’s commitment to the system development methodology.

• Taking shortcuts through or around the system development methodology.

• Poor expectation from the management.

• Premature commitment to a fixed budget and schedule.

• Poor estimating techniques.

• Over-optimism.

• Inadequate management skills.

• Failure to adapt to business change.

• Insufficient resources.

Page 14: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Major processes in developing a Software System

• Feasibility study.

• Full Systems study.

• Requirement determination.

• Evaluation of alternative system.

• Selection of hardware and software.

• Designing of new system.

• Construction new system.

• Implementation new system.

Page 15: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Software cost Estimation Techniques

• No well defined standard of software costing.

• Most techniques assume firm knowledge of requirements which rarely is the case in practice.

1. Expert judgment.

2. Analogy.

3. Work breakdown structure.

Page 16: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Systems Evaluation Criteria

Modular evaluation.System's security.

Unreliable software.Accidents/natural disasters.Hackers/crackers/modifications/copying.Disgruntled, blackmailed, bribed, greedy employees or ex-employees.Consultants/ ex-consultants.Industrial spies.Competitors.Disgruntled customers.Malicious programmed threats.Amateur/career criminals.Terrorists.

Page 17: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Systems Evaluation Criteria Cont.

System's security Continued….Password levels.

Definition of users and respective privileges.The privileges linkages to a particular time window.Transaction authorization by atleast two people.

Audit trails.Disaster recovery and systems backup.Failure of hard drive. Power outage.Physical security of the equipment.

Web based.Barcode, ATMs, mobile technology integration, online transactions, biometrics etc.Querying capability.

Page 18: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Systems Evaluation Criteria Cont.

User interface.Reports.User documentation.Technical documentation.System design.Source codes. Support and maintenance.Number of system users.Compliance with standards.Validation checks.Communication infrastructure.Integration.

Page 19: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Systems Testing

– To be carried out for the entire system to find out errors that may result by incorporating other modules

•Unit testing.

•Integration testing.

•system testing.

•User acceptance.

Page 20: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Qualities of a Good System

• User Friendly.

• Reliable.

• Efficient.

• Secure.

• Adaptable.

• Valid.

• Interoperationable.

• Economical.

• Maintainable.

Page 21: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Data Management and Systems Acquisition at Society Level

• Need to have an integrated system.

• Avoid silos approach.

Formation of MIS implementation Steering Committee. The mandate of this committee is to ensure and oversee

successful delivery of MIS to the society.

• Develop a systems user requirements/specifications.

• Formulate a tender document (if need be, system to be implemented in modular form).

Page 22: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Integrated MIS Acquisition Advertise the system development and implementation tender. Tenderers to undertake site visit to clarify any grey areas in the tender document.2 proposals to be presented in 2 different envelopes:

Technical.Financial.

Open financial proposals for only the firms whose technical proposal have been approved.

Visit sampled sites for the first 3 or 2 firms (top scorers). .

Page 23: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Integrated MIS Acquisition After the site visits, the qualified firms may be called in for negotiations.The appointed firm should undertake a detailed information systems requirements analysis and come up with system’s requirements/specifications document.After the production of the above document, a letter of award should then be offered by the cooperative.Thereafter, a detailed contract should be signed between the 2 parties preferably in presence of a lawyer.Need for constant monitoring of the project.

NOTE: the new system must be able to efficiently receive data from the existing systems (via migration).

Page 24: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Co-operative Data Management Methods and Techniques: CODAS Case Study

Page 25: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Monitoring Systems Monitoring is a continuing function that uses

systematic collection of data on specified indicators to inform management and the main stakeholders of an on-going project of the extent of progress and achievement of results in the use of allocated funds.

Evaluation is the systematic and objective assessment of an on-going initiative or completed initiative, program or policy, its design, implementation and results.

Page 26: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Monitoring SystemsAn appropriate monitoring system is a pre-condition for proper evaluation. The evaluation exercise measures the success of a project in relation to its objectives, and the extent to which the intended beneficiaries have really benefited. Evaluation is an integral part of the implementation process; it compares current information and monitoring data relating to

1. the project.

2. the beneficiaries.

3. the conditions existing at the onset of the project, and

4. the conditions expected at various stages of the project.

The evaluation process allows for timely changes to project strategy or implementation, i.e. when it becomes apparent that project objectives are not being met. Without an appropriate monitoring system, the above is not possible.

Page 27: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

The importance of measuring results

•« If you cannot measure results, you cannot differentiate success from failure•If you cannot highlight success, you cannot reward it•If you cannot reward success, you probably reward failure•If you cannot highlight success, you cannot learn from it•If you don't point out failure, you cannot rectify the situation•If you cannot show results, you cannot benefit from the help of the population».

Osborne and Gaebler, 1992

Page 28: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….Information management challenge e.g. the trend of activities, membership tracking, threats etc. Data unavailability.CODAS is a tailor made software managed by ICA in collaboration with the Co-operative Movement, partners and respective Governments to manage the available data within ICA member countries. Developed in Microsoft Access database.If need be, it can easily be upgraded to other databases e.g. Oracle, Navision, SQL server, Mysql etc.Can easily integrate household surveys to capture the impact of cooperatives at that level.Logical Framework Matrix.

Page 29: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….• On agreement, CODAS can be integrated

into the World Wide Web (WWW).

• It can be customized to allow automatic data importation from existing computerized cooperatives.

• If customized to a country’s information needs, the system has full capacity to monitor status and growth of cooperative societies in any country. The system allows easy data analysis and offers instant answers to many queries posed to the database on a day-to-day basis.

• If need be, some components of SACCOsmay be monitored on quarterly/monthly period.

Page 30: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

System’s Background

CODAS was first designed as a tool for national cooperative data management around the year 2001. In the design phase, it was based on the cooperative sector landscape in Kenya. The study, covered seven provinces comprising of 43 districts. However:

The 2001 study covered only the primary agricultural marketing cooperatives.

Classifications of different parameters were collectively agreed upon by the ministry and stakeholders e.g. an active society is a society that is operational.

After successful implementation of the database, ICA made a decision to expose the database to its member countries.

Page 31: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….• CODAS has todate grown to cover all

sectors of cooperative movement.

• Despite its evolvement with time, CODAS retains a core set of parameters and standards that cut across all cooperatives

operations including the following:– Membership, Age and gender profile of

membership.

– Sector analysis.

– Leadership.

– Management.

– Trainings needs within the movement.

– Affiliation and networks.

– Employment.

– Business performance.

– Products and services etc.

Page 32: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….• CODAS implementation in ICA

member countries:– Enhances government’s efforts to

strengthen cooperatives. – Monitors coop. numbers, types,

locations, status, strengths, weaknesses, threats, assets, liabilities etc. The analysis is undertaken at different levels e.g.:

• Sectors• Regions• Status etc.

– Monitors the trend of cooperatives’activities, performance and legal compliance, and tracks membership in terms of growth or decline, gender composition, participation etc.

– Monitors Coop. Officers’ performance

Page 33: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….– Enhances efficiency in planning, management

and productivity.

– Guarantees prudent allocation/utilization of resources.

– Facilitates policy formulation and implementation

– Provides accurate, timely and relevant data for prudent decision making.

– Offers quick response to needs of the entire cooperative movement, consequently improving the cooperatives’ performances.

– Facilitates establishment of actual contribution of cooperatives in the national economy e.g. employment, financial institutions etc.

– Contributes to poverty alleviation and women empowerment

Page 34: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Cont….– Enables the coops movement to:

• Identify existing capacities within the movement i.e. leadership, membership and staff

• Establish partnership levels within the movement and its benefits

• Identify training needs of the movements i.e. leadership, membership and staff

• Identify challenges faced and competitors

• Contribute possible solutions to the challenges faced

• Establish business areas ventured by coops.

• Establish the extend of governance strengths

• Monitor liquidity status of cooperatives etc.

Page 35: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS Implementation CODAS implementation process commences with

the CODAS awareness seminar (Phase I). During this seminar:

Perusal/discussions on various cooperatives’ documents within a country e.g. strategic plans, policy documents etc. is carried out.

CODAS is exposed to interested co-operatives’ stakeholders to stimulate interest and illustrate its potential to satisfy the country's information needs

CODAS is either accepted or rejected by the hosting country.

Page 36: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS Implementation Phase I cont……

The hosting country’s information needs are established.

The projects scope is ascertained and agreed upon.

Budgetary expectation and CODAS implementation process is preliminary discussed.

Implementation team is constituted.

Draft data capturing tools/instruments may be formulated.

Page 37: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS ImplementationImplementation Stage (Phase II)

Formulation/Fine-Tuning of Survey tools

The questionnaire being the backbone of CODAS entail intense scrutiny from all stakeholders. The challenge is to formulate tools that would:

– Be all-inclusive

– Stand the test of time

– Capture the entire needs of all the cooperatives’stakeholders in the country

– Be user friendly etc.

– Cut across all society types and sectors in the entire country e.g. Agriculture, Insurance, SACCOs, Industry etc.

– Accommodate all categories of societies i.e. primary, secondary and Apex.

Page 38: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS ImplementationImplementation Stage (Phase II)

• The questionnaires among others cover:Cooperative register.

Membership.

Governance.

Capacity building.

Financial reporting.

Employment.

Performance.

Products.

Challenges,Solutions etc.

Pre-testing.

Cooperative verification/census design.

If need be undertake tools translation to make it bilingual.

Questionnaire guide formulation.

Questionnaire Application Training.

Page 39: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS Implementation

Implementation Stage (Phase II) Cont…

CODAS Implementation StrategyPiloting

National

Region wise

CODAS CustomizationRegional Module

Administrator Module

Management Module

CODAS System TrainingData Entry Personnel

CODAS System Administrators

Management/Stakeholders

Page 40: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

CODAS Implementation

Implementation Stage (Phase II) Cont…

System’s DocumentationUser Manuals

Administrator Manuals

Management Manual

CommissioningSystem Administrators may produce a co-operative

status report

Page 41: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Continued…...

• CODAS awareness workshop has been undertaken in:

1. Kingdom of Lesotho

2. South Africa

3. Tanzania

4. Ethiopia

5. Kingdom of Swaziland

6. Uganda

7. Namibia

8. Nigeria

9. Rwanda

10.Botswana

Page 42: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Introduction Continued…...

• The following countries have fully posted their baseline data:

1. Kingdom of Lesotho (2)

2. Kingdom of Swaziland (3)

3. Tanzania (1)

4. Botswana (2)

• The following ICA Member countries are in the process of implementing CODAS:

1. Nigeria

2. Uganda

Page 43: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Common Findings …...• Improver cooperative registration process.

• Resistance due to the findings.

• Shortcuts in the CODAS implementation process.

• Too many dormant societies

• Data collection resource intensive.

• Low cooperative knowledge.

• Illiteracy.

• Low cooperative computerization.

• Low budgets.

• Unclear Government and cooperative movement structure.

• Illegal registrations.

Page 44: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Common Findings….

Society RegistrationsImproper Registration Procedures (e.g. cooperatives registered without bylaws, unknown members).

Outdated cooperative registers e.g. repetition of cooperatives, to many dormant coops etc

Many coops never operate after registration.

Double Registrations with same registration number.

Irregular naming of cooperatives.

Cooperatives with same names.

Page 45: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Common Findings……..

Cooperative Officers’ Performances

Some do not know the total number of societies in their jurisdiction. This leads to:

Lack of proper supervision of societies

Poor deployment of resources

Poor records management

Poor cooperative monitoring

Page 46: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Common Findings……..

Society ControlsMany cooperatives not audited (backlog).

Some cooperatives’ members’ register not up-to-date.

Societies have poor record keeping systems e.g. missing basic information, bylaws, no gender or age segregated data, governance tools etc

Most societies do not comply with the Cooperative Act e.g. AGM, auditing, elections etc.

Mixing of several activities in accounting.

Page 47: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Common Findings………………

CODAS Application

Most countries appreciate the benefits of CODAS:

Assist them in analyzing their data.

Enhance their reporting process.

Enable stakeholders to answer many queries

Feel confident.

Monitor the cooperatives.

Fear (their efficiency and workload now well known)

Page 48: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Recommendation

• To reduce data collection costs, cooperatives should be empowered to fill the questionnaires.

• Automated cooperatives should be encourage to export their data online to CODAS.

• Need to update cooperative registers after surveys by deregistration.

• Data collection should be continuously monitored by the steering committee members.

• CODAS data collection exercise should be calenderlized.

• Registration of cooperatives processes should be streamlined.

Page 49: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Recommendation

• If acceptable, registration numbers of cooperatives must be agreed upon between ICA and respective member countries.

• Countries should partner with development partners on data collection.

Page 50: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

Recommendations: ICT Policies for Cooperatives• The ICT policy guides the development of

ICT infrastructure and facilitates the achievement of the overall organization’s strategic plan. The policy should stipulate and give guidelines on:

– How to communicate

– Who controls the flow of information

– Access to ICT services and agencies and job and educational opportunities.

• It also enhances the ability to be civically engage, to organize and mobilize resources, to provide quality services more efficiently, and to improve overall economic and social conditions within society.

Page 51: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

ICT Policy Content:• The proposed Policy Paper on

ICT should cover major areas such as: Detailed situation analysis of ICT

within the entire organization The challenges of applying ICT to

achieve overall strategic goals and objectives of the Organization

The proposed policy direction guiding ICT diffusion and utilization

Institutional framework Implementation framework of the

ICT Policy.

Page 52: International Co-operative Alliance (ICA)Successful Project Approach SMART Goals –Specific • Clear to anyonewith a basic knowledge of the project. – Measurable • An indicator

ENDThank You!

[email protected]@yahoo.comTel: +254 020 7122627